P AUL ORELL ANA CS0301 RUTAS CRÍTICAS EL PROGRAMA TERMINA A LAS 22 SEMANAS RUTA CRITICA : B-C-F-H-J ACTIVIDAD ES ACTIVIDADES PRECEDENTES TIEMPO A 5 B 4 C B 3 D A,C 2 E D 6 F C 5 G F 3 H F 4 I B 4  J H,E,G 6

Administracion Padmiaul

Embed Size (px)

DESCRIPTION

admi

Citation preview

Page 1: Administracion Padmiaul

7/17/2019 Administracion Padmiaul

http://slidepdf.com/reader/full/administracion-padmiaul 1/2

PAUL ORELLANACS0301

RUTAS CRÍTICAS

EL PROGRAMA TERMINA A LAS 22 SEMANAS

RUTA CRITICA :

B-C-F-H-J

ACTIVIDAD

ES

ACTIVIDADES

PRECEDENTES

TIEMPO

A 5B 4C B 3

D A,C 2E D 6F C 5G F 3H F 4I B 4 J H,E,G 6

Page 2: Administracion Padmiaul

7/17/2019 Administracion Padmiaul

http://slidepdf.com/reader/full/administracion-padmiaul 2/2

PAUL ORELLANACS0301

2. GRAFICAR EL PUNTO DE EQUILIBRIO

PUNTO DE EUILIBRIO

C!"0#04 C$U

P!"0#10 C$U

CF"2%000