27
AFTER JULY 2012 Atsuto Suzuki

After July 2012

Embed Size (px)

DESCRIPTION

After July 2012. Atsuto Suzuki. July 4 2012. Why ILC in Japan ? : 2. July 12, 2012. Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan. - PowerPoint PPT Presentation

Citation preview

Page 1: After July 2012

AFTER JULY 2012

Atsuto Suzuki

Page 2: After July 2012

July 4 2012

2

Page 3: After July 2012

Japan Policy CouncilSecond Recommendations:

Regional Development through Creation of Global Country

inside Japan

Realizing a global city that can attract human and financial resources from around the world: Regional development triggered by the International Linear Collider (ILC)

Realizing an international organization for the International Linear Collider (ILC), to push towards reforming regional cities as a role model for the creation of a global country.

July 12, 2012Why ILC in Japan ? : 2

Page 4: After July 2012
Page 5: After July 2012
Page 6: After July 2012
Page 7: After July 2012
Page 8: After July 2012
Page 9: After July 2012

ILC Proposal from Japan1. Why ILC in Japan ? : 1

In 2008

Page 10: After July 2012

A bid-to host activity in Japan

~90 industries & ~30 universities

Page 11: After July 2012

Prime Minister Noda

positive reference to the ILC

15/Dec./2011

Page 12: After July 2012
Page 13: After July 2012

Next Prime Minister ??

Page 14: After July 2012

Budget support from the government

In principal (researcher’s proposal)

50% of the total host country the other non-host countries

Extra support

Given the special aims in Japan (Creation of Global Country inside Japan), the extra support from the government is feasible.

Multi-body promotion : MEXT (Ministry of Education, Culture, Sports, Science & Technology ) + METI (Ministry of Economy, Trade and Industry) + MLIT (Ministry of Land, Infrastructure, Transport and Tourism) + ………..

Page 15: After July 2012

November 12 FALC at Fermi Lab.

Page 16: After July 2012

16

CY

Technical Design Report completeBaseline established

2011 2012 2013 2014 20162010

ILC

2015

Technical design & R&D program

2017 2018

SRF system tests

TDR reviews

Site EOI’s

Cost Estimating

Decision to proceed

Site/host established

Project Implementation Plan complete XFEL operation

LHC

Physics Run 1 Physics Run 2Interconnect repair

Existence of low-lying SUSY known

Higgs energy scale known

Transition Period Facility Period

2. ILC Possible Timeline

Designing Structure of ILC Lab.

Page 17: After July 2012

Transition Period & Facility Period ILC : Global Project

3. Preferable Organization Model for the ILC

Multi-National Lab. : Essential foster regional activities both for current and future programs. foster younger generation in regional activities

Page 18: After July 2012

Organization Framework from Legal and Procurement Perspectives

Legal Basis of Organization Treaty-based organization (like CERN) Limited liability company (like XFEL) Institution-level agreements

Procurement of Material Resources In-kind contributions Common-fund

Procurement of Human Resources Seconded personnel from participating institutes Direct employment

18

Page 19: After July 2012

19

Report on Japanese Situation

Atsuto Suzuki(KEK)

Page 20: After July 2012

4. Summary

Page 21: After July 2012

ILC Physics

21

• LHC discovery of Higgs-like particle :– Beginning of new era of particle physics

• Is it the Standard Model Higgs?• Where is the dark matter?• Is there really new physics at Terascale?

• ILC Higgs– Generate ~10K Higgs (can be tagged!)

• 5 s sensitivity in ~ 1 day (LHC : ~1 year)

– Higgs Brs to a few % (LHC : a few 10s %)• e.g. H cc ⇾ (LHC : cannot)

– Gtot to 5% (challenging at LHC)

– CP to 3~4% (mix coeff)

• ILC top– mt(msbar) to 100 MeV (LHC: ~ 1 GeV)

– Anomalous ttZ, tbW, ttg coupl (LHC: hint of ttg only)

• ILC new physics– Composite Higgs scale to 45 TeV (LHC: ~7 TeV)– Anomalous WWV coupl (x10 better than LHC)

LHCILC

ILC: Simple and clean initial&final states

Specify Initial-state 4-momentum

& beam polarization : control intermediate state

(e.g. eR turns of W±&A0)

Higgs couplings (ILC)

Staging Scenario

Page 22: After July 2012

GDERD

Linear Collider Directorate (LCD) Accelerator/Detector R&D Cite Recommendation Detailed Design for Construction Project Proposal

ILCSC

Linear Collider Board( LCB) Detailed Design for ILC Lab. Chart-out of Approval Process for instance, ICFAIUPAP OECD Governmental Board

ICFA Project Proposal to

  ICFA IUPAP OECD Governmental Board

2012 2013 2014 2015~6

Cite/HostEstablish

Toward ILC Construction : International Activities

Page 23: After July 2012

Toward ILC Construction : Japan Activities

HEPResearchers

Set-up JLCB and JLCD

2012 2013 2014 2015~6

Cite Decision Design ILC Lab.

Japan Policy Council

Positive Referencefrom New Prime

Minister

Detailed Design of International Country

Project Proposal to Science Council

of Japan

Fomal Messageon Hosting ILC in Japan

Establish ILC Pre-

J-Lab.

ILC Host Recommendation to Government

Cite/HostEstablish

Establish ILC -Lab.

Page 24: After July 2012
Page 25: After July 2012
Page 26: After July 2012
Page 27: After July 2012

Toward ILC Construction : Japan Activities

HEPResearchers

Set-up JLCB and JLCD

2012 2013 2014 2015~6

Cite Decision Design ILC Lab.

Japan Policy Council

Positive Referencefrom New Prime

Minister

Detailed Design of International Country

Project Proposal to Science Council

of Japan

Fomal Messageon Hosting ILC in Japan

Establish ILC Pre-

J-Lab.

ILC Host Recommendation to Government

Cite/HostEstablish

Establish ILC -Lab.