264/7 ISSUE 1PAGE 1 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
CONTENTS PAGE
1.0 SCOPE 2
2.0 TECHNICAL REQUIREMENTS TO BE SPECIFIED BY THE PURCHASER 2
3.0 DEFINITIONS 2
4.0 REQUIREMENTS 3
4.1 Design 34.2 LHD size 3
4.3 Bucket mass capacity 34.4 Bucket volume capacity rating 34.5 Cutting edge 34.6 Welding 34.7 Material 3
5.0 QUALITY ASSURANCE PROVISIONS 3
5.1 Quality management 35.2 Deviations 4
APPENDIX A : RELATED DOCUMENTS 5
APPENDIX B : RECORD OF AMENDMENTS 6
7/29/2019 aga_spec_264007
http://slidepdf.com/reader/full/agaspec264007 2/6
264/7 ISSUE 1PAGE 2 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
1.0 SCOPE
This specification details the requirements for load-haul-dump vehicle buckets.
2.0 TECHNICAL REQUIREMENTS TO BE SPECIFIED BY THE PURCHASER
The following requirements shall be specified on every invitation to tender, contract or order:
2.1 Title, date, number and issue of this specification.2.2 LHD size (see Clause 4.2).
3.0 DEFINITIONS
For the purpose of this specification the definitions in SAE J73ID, SAE J742 and the followingdefinitions apply:
ANGLOGOLD ASHANTI : AngloGold Ashanti Limited
APPROVED : Approved by the Engineer in writing
AWS : American welding society
CONTRACTOR : The Company, partnership or person contractually obliged tosupply products or services to the Purchaser
ENGINEER : The Consulting Engineer, Consulting Mechanical and
Electrical Engineer of AngloGold Ashanti or their appointedrepresentative
LHD : Load-haul-dump
PURCHASER : The company or store designated as the recipient of finishedproducts or services
QUALITY ASSURANCE : An independent inspection agencyREPRESENTATIVE appointed by the Engineer
PURCHASER'S : A company, partnership or person authorisedREPRESENTATIVE authorised by the Engineer to act on the Purchaser's behalf
RATED STRUCK CAPACITY : The volume m3 enclosed by the interior (Volume) surfaces and a strike plane across the bucket width
RATED CAPACITY : The rated struck capacity m3 and an(Volume) additional volume m3 above the strike plane bounded by 2 : 1
slopes to all four bucket edges
SABS : South African Bureau of Standards
SAE : Society of Automotive Engineers (USA)
7/29/2019 aga_spec_264007
http://slidepdf.com/reader/full/agaspec264007 3/6
264/7 ISSUE 1PAGE 3 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
4.0 REQUIREMENTS
4.1 Design
Buckets shall be designed to handle broken quartzite ore and permit loading on 32% grade(18°13') down attack angle.
4.2 LHD size
Shall be specified by the Engineer from Table I.
TABLE 1 - BUCKET SIZE
1 2 3 4
LHDSize(t)
Bucket massCapacity(t)
BulkFactor
Bucket Width+ 0,5 mm- 0(m)
3579
3579
1,751,62,02,32,5
4.3 Bucket mass capacity
Capacity specified in Table 1 column 2 shall be determined with a broken ore volume ratio of 1,75 : 1.
4.4 Bucket volume capacity rating
Shall be determined in accordance with the requirements of SAE 742 and shall be the struckvolume and a heaped load with a 2 : 1 angle of repose.
4.5 Cutting edge
The bucket shall be provided with a weld-on, replaceable cutting edge of 'Apex 6' or equal andapproved material.
4.6 Welding
Welding shall comply with the requirements of AWS Specification D14.3.
4.7 Material
Buckets shall be manufactured from steel to SABS 1431 Grade 300WA.
5.0 QUALITY ASSURANCE PROVISIONS
5.1 Quality management
The requirement of AngloGold Ashanti Quality System Procedure QSP 100 shall apply.
7/29/2019 aga_spec_264007
http://slidepdf.com/reader/full/agaspec264007 4/6
264/7 ISSUE 1PAGE 4 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
5.2 Deviations
The Contractor shall submit a Concession Request in accordance with AngloGold AshantiQuality System Procedure QSP 163 for each unavoidable deviation from this and relatedspecifications detailed in Appendix A, failing which the Contractor shall rectify the deviation. Thecost of such deviation shall be borne by the Contractor.
7/29/2019 aga_spec_264007
http://slidepdf.com/reader/full/agaspec264007 5/6
264/7 ISSUE 1PAGE 5 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
APPENDIX A : RELATED DOCUMENTS
The latest issue of the following documents shall be deemed to form part of this specification:
ANGLOGOLD ASHANTI QSP 100 : Quality management system requirements for criticaland major equipments
ANGLOGOLD ASHANTI QSP 163 : Concession requests requiring customer approval
AWS D14.3 : Welding - earthmoving and construction equipment.
SAE J731D : Component nomenclature for loaders
SAE J742 : Capacity rating for loader buckets
SABS 1431 : Structural steel
7/29/2019 aga_spec_264007
http://slidepdf.com/reader/full/agaspec264007 6/6
264/7 ISSUE 1PAGE 6 OF 6
ANGLOGOLD ASHANTI SPECIFICATION
LOAD-HAUL-DUMP VEHICLE BUCKETS
UNDER LICENCE FROM AAC APPROVED 1998-08-28
APPENDIX B : RECORD OF AMENDMENTS