135 Control No. AR-1600M-1/MB-03 ALL TERRAIN CRANE AR-1600M JAPANESE SPECIFICATIONS The "fully automatic luffing jib" and the "luffing jib" are optional equipment. Refer to the specifications in the following pages regarding the details of these optional jibs. CARRIER MODEL SPEC. NO. FAUN RTF160-5 AR-1600M-1-90101 AR

ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 135--

Control No. AR-1600M-1/MB-03

ALL TERRAIN CRANE

AR-1600M

JAPANESE SPECIFICATIONS

The "fully automatic luffing jib" and the "luffing jib"are optional equipment.Refer to the specifications in the following pagesregarding the details of these optional jibs.

CARRIER MODEL SPEC. NO.

FAUN RTF160-5 AR-1600M-1-90101

AR

ハイマン翻訳
Return to index
Page 2: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 136--

AR-1600M-1 / MB-03

CRANE CAPACITY13.5m Boom 160,000kg at 3.2m (20part-line)18.1m Boom 110,000kg at 5.0m (13part-line)22.6m Boom 100,000kg at 5.0m (12part-line)31.8m Boom 65,000kg at 7.0m ( 7part-line)40.9m Boom 50,000kg at 8.0m ( 6part-line)45.4m Boom 42,000kg at 9.0m ( 5part-line)50.0m Boom 30,000kg at 12.0m ( 4part-line)Single top 9,400kg ( 1part-line)<Reference>Fully automatic luffing jib10.2m Jib 18,600kg at 10.0m ( 2part-line)17.9m Jib 9,300kg at 14.0m ( 1part-line)25.7m Jib 5,600kg at 16.0m ( 1part-line)Luffing jib

11m Jib 75,000kg at 7.0m ( 8part-line)20m Jib 47,000kg at 10.0m ( 6part-line)29m Jib 27,000kg at 14.0m ( 4part-line)37m Jib 8,500kg at 40.0m ( 1part-line)45m Jib 5,800kg at 24.0m ( 1part-line)

MAX.LIFTING HEIGHTBoom 50.0m<Reference> Fully automatic luffing jib 78.0m<Reference> Luffing jib 95.0mMAX.WORKING RADIUSBoom 47.0m<Reference> Fully automatic luffing jib 55.0m<Reference> Luffing jib 70.0mBOOM LENGTH13.5m - 50.0mBOOM EXTENSION SPEED36.5m/210sMAIN WINCH SINGLE LINE WINDING SPEED130m/min (5th layer)AUXILIARY WINCH SINGLE LINE WINDINGSPEED130m/min (5th layer)BOOM ELEVATION ANGLE-1.5°- 83°BOOM ELEVATION SPEED-1.5°- 83°/80sSWING ANGLE360°continueSWING SPEED1.4/1.0rpmWIRE ROPEMain Winch

24mm x 340m (Diameter x Length)Anti-rotate wire rope

Auxiliary Winch24mm x 310m (Diameter x Length)Anti-rotate wire rope

HOOK160t hook (20part-line)

(Using additional sling and single top)110t hook (13part-line)(Using single top)

65t hook ( 7part-line)25t hook ( 3part-line)

9.4t hook ( 1part-line)BOOM5-section hydraulically telescoping boom of boxconstruction(stage 2: sequential; stages 3,4,5: synchronized)2-stage lock or no lock (spring type and air cylinder type)BOOM EXTENSION4 double-acting hydraulic cylindersSINGLE TOPSingle sheave. Mounted to main boom head by pin.HOISTDriven by hydraulic variable motor and via planetary gearreducer.Automatic brake2-speed (high/low) selection type2 single winches

BOOM ELEVATION2 double-acting hydraulic cylindersSWINGHydraulic motor driven planetary gear reducerSwing bearingDisk type negative brake2-speed (high/low) selection typePneumatically operated swing lockOUTRIGGERSFully hydraulic H-type 3 stepsSlides and jacks each provided with independentoperation device.Fully extended width 8.8mMiddle extended width 8.0m, 6.8m, 5.6mExtended width detector provided.Slide lock power pin provided.REAR JACKHydraulic type (with grounding detector)Individual operation typeCOUNTERWEIGHT50t, 44t, 34t, 25tENGINE FOR CRANEEngine exclusive to upper component operationModel MITSUBISHI 6D24-TType 4-cycle, 6 in-line cylinder, direct-injection,

water-cooled diesel enginePiston displacement 11,945cc with turbo chargerMax. output 188kW (225PS) at 1,800min-1(rpm)Max. torque 1,030N.m (105kg.m) at 1,400min-1(rpm)FUEL TANK CAPACITY280 litersHYDRAULIC PUMPS2 variable piston pumps and 2 gear pumpsHYDRAULIC OIL TANK CAPACITYUpper 1,585 litersLower 210 litersSAFETY DEVICESAutomatic moment limiter (AML)

Multiple displayWith working range limiting function

Outrigger extension automatic detector (individual detection)Weight combination automatic detectorSwing range controllerSwing automatic stop deviceBoom elevation slow down and stop deviceOver-winding cutout deviceDead winding holding deviceCable followerHook safety latchWinch drum lockHydraulic safety valveHydraulic lock (elevation, telescoping, hoist, jack, jib tilt,dismount)Swing lockBoom angle indicatorLevel gaugeEQUIPMENTOil coolerBoom dismount deviceSwing frame dismount deviceCounterweight dismount deviceBoom elevation creeping mode setting deviceAML external warning lampHook movement amount indicatorWind velocity meterIron plateHot and cool boxesLunch tableAir conditionerDrum monitorFM radioBack monitorOPTIONAL EQUIPMENTSwing alarm

AR-1600MCRANE SPECIFICATIONS

Page 3: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 137--

AR-1600M-1 / MB-03

MANUFACTURERFAUN GmbH

CARRIER MODELRTF 160-5

ENGINEModel OM442LA (Benz)Type 4-cycle, V8-cylinder, direct-injection,

turbo diesel engine with inter coolerPiston displacement 14,618ccMax. output 503PS at 2,100rpmMax. torque 206kg.m at 1,100 to 1,600rpm

TRANSMISSIONFully automatic5-forward and 1-reverse speedsSub-transmission provided.

CLUTCHTorque converter provided.Automatic lock-up mechanism provided.

DRIVING METHOD10 x 610 x 8 --- Off load (with def-lock mechanism)

AXLE (all axles)Full-floating type

SUSPENSION (all axles)Hydraulic pneumatic suspensionStroke: +149mm/-113mm

STEERINGType: Left-side handle

Fully hydraulic power steering2 circuitsEmergency power steering

Mode: Normal (6 front wheels, 2 rear wheels)Clamp (10 wheels)Crab (10 wheels)Rear steering (4 rear wheels)

BRAKE SYSTEMService Brake

Air brake on all wheels2 circuits

Parking Brake4th and 5th axles (4-wheel) spring brake for publicthoroughfare traveling(3rd, 4th and 5th axles (6-wheel) spring brake for on-site traveling)

Emergency BrakeWorks by applying the parking brake

Auxiliary BrakeFlow type retarder (transmission built-in)Exhaust brake

ELECTRIC SYSTEM24 V DC. 2 batteries of 12V-170Ah

FUEL TANK CAPACITY700 liters

CABTwo-man type

TIRES16.00R25 (all wheels)

WHEEL11.25-25 (all wheels)

STANDARD EQUIPMENTAir conditionerFM radioMud guardCentralized lubrication unitBed for napping

DIMENSIONS (CARRIER ONLY)Overall length 13,640mmOverall width 3,000mmOverall height 2,775mmWheel base 2,850mm + 1,700mm + 2,550mm +

1,700mmTread 2,557mm

WEIGHTS (CARRIER ONLY)Gross vehicle weightTotal 40,900kg (Two-man type)

Front: 1st + 2nd axle 19,500kgRear: 3rd axle 1,400kg

4th + 5th axle 20,000kg

PERFORMANCE (CARRIER ONLY)Max. traveling speed 60km/hGradeability (tan θ) 0.73Min. turning radius

8-wheel steering 11.8m10-wheel steering 9.7m

Note:1 The swing jib of this crane must be removed and

transported separately from the carrier when runningon public roads.

2 This crane is covered by Class C Conditions underthe Basic Running Conditions of the Road Traffic Act.

CARRIER SPECIFICATIONS GENERAL DATA

Page 4: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 138--

AR-1600M-1 / MB-03

BOOM TOTAL RATED LOADS

1. The total rated loads shown are for the case where the outriggers are set horizontally on firm level ground. Thevalues above the bold lines are based on the crane strength while those below are based on the crane stability.

2. The weights of the slings and hooks (160t hook with attachment: 2,700kg, 110t hook: 2,100kg, 65t hook: 940kg, 25thook: 730kg, 9.4t hook: 430kg) are included in the total rated loads shown.

3. The total rated load is based on the actual working radius including the deflection of the boom.4. The table below shows the classification of Performances A to I of the total rated load.

- If the rear jack is not used, the performanceclassification in parentheses shall apply.At this time, the maximum total rated load is 50t.

- Performance I shall apply only to the 13.5mboom, and the working area is as shown in theillustration.

5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed92.1kN (9.4t) for both the main winch and the auxiliary winch.

For 20 part lines in parentheses, the attachment and single top should be used, and for 13 part lines, the single topshould be used.

6. The total rated loads shown are for the case where the 2nd boom section fixing pin is used.When the 2nd boom section fixing pin is not used, the maximum total rated loads relative to the boom length arerestricted as shown in the table below.

7. The total rated load for the single top shall be the value obtained by subtracting the weight of the hook mounted tothe boom from the total rated load of the boom and must not exceed 9.4t.

8. When the maximum instantaneous velocity is 10m/s or more, stop crane operation.9. Markθin the total rated load chart shows the boom angle range (under no load).

Counterweight

Outrigger extension width

8.8m

8.0m

6.8m

5.6m

2.7m

50t

A (C)

A (C)

C (C)

-

-

44t

A (D)

B (D)

D (D)

-

-

34t

C (E)

D (E)

E (E)

F (F)

-

25t

D (F)

E (F)

F (F)

G (G)

-

0t

G (H)

G (H)

H (H)

H (H)

I (I)

A

H

13.5m

(20)12

18.1m

(13)12

22.6m

12

31.8m

7

40.9m

6

45.4m

5

50.0m

4

Single top

1

A= Boom length H= No. of part-lines

Over 18.1m

up to 50.0m

26

Boom length

Max. total rated load (t)

Over 13.5m

up to 18.1m

58

Page 5: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 139--

AR-1600M-1 / MB-03

Performance A

160.0

151.7

139.6

129.3

118.8

100.6

86.9

76.2

67.6

62.0

51.4

110.0

110.0

110.0

110.0

110.0

97.0

86.1

76.5

67.4

60.2

54.2

49.4

40.7

23.9

100.0

100.0

100.0

100.0

100.0

90.0

81.4

71.8

65.9

58.8

52.8

47.3

38.7

32.3

27.8

20.2

65.0

65.0

59.6

54.5

50.4

46.9

43.3

37.2

31.6

27.6

24.1

20.2

17.1

14.6

12.6

50.0

50.0

47.3

44.5

41.8

38.5

32.6

28.5

25.0

21.8

19.1

17.0

15.1

13.2

11.4

9.9

8.8

7.7

6.5

42.0

42.0

38.8

36.6

34.5

30.2

26.5

23.1

20.7

18.2

16.4

14.7

13.1

11.6

10.2

8.9

7.8

6.7

5.9

5.1

30.0

30.0

30.0

30.0

26.4

23.3

20.7

18.4

16.6

14.8

13.3

12.0

10.8

9.6

8.6

7.6

6.7

6.0

5.2

4.5

3.9

3.6

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

34.0m

36.0m

38.0m

40.0m

42.0m

44.0m

46.0m

47.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 10~83 11~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

12~83 12~83

Page 6: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 140--

AR-1600M-1 / MB-03

Performance B

160.0

151.7

139.6

129.3

118.8

100.6

86.9

76.2

67.6

62.0

51.4

110.0

110.0

110.0

110.0

110.0

97.0

86.1

76.5

67.4

60.2

54.2

49.4

40.7

23.9

100.0

100.0

100.0

100.0

100.0

90.0

81.4

71.8

65.9

58.8

52.8

47.3

38.7

32.3

26.1

20.2

65.0

65.0

59.6

54.5

50.4

46.9

43.3

37.2

31.6

27.6

23.3

19.5

16.5

14.1

12.0

50.0

50.0

47.3

44.5

41.8

38.5

32.6

28.5

25.0

21.8

19.1

17.0

14.9

12.8

11.1

9.4

8.0

6.8

5.7

42.0

42.0

38.8

36.6

34.5

30.2

26.5

23.1

20.7

18.2

16.4

14.7

13.1

11.4

9.8

8.3

7.1

6.0

5.0

4.2

30.0

30.0

30.0

30.0

26.4

23.3

20.7

18.4

16.6

14.8

13.3

12.0

10.8

9.6

8.6

7.4

6.2

5.2

4.4

3.6

2.9

2.6

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

34.0m

36.0m

38.0m

40.0m

42.0m

44.0m

46.0m

47.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 10~83 11~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

13~83 13~83

Page 7: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 141--

AR-1600M-1 / MB-03

Performance C

160.0

151.7

139.6

129.3

118.8

100.6

86.9

74.6

65.1

57.6

51.4

110.0

110.0

110.0

110.0

110.0

97.0

85.8

73.5

64.0

56.4

50.2

45.0

36.8

23.9

100.0

100.0

100.0

100.0

100.0

90.0

81.4

71.8

63.2

55.6

49.3

44.1

36.0

27.8

22.0

17.8

65.0

65.0

59.6

54.5

50.4

46.9

43.3

37.2

30.1

24.1

19.7

16.3

13.5

11.3

9.5

50.0

50.0

47.3

44.5

41.8

38.5

32.6

28.5

25.0

20.6

17.2

14.4

12.2

10.3

8.7

7.4

6.3

5.3

4.5

42.0

42.0

38.8

36.6

34.5

30.2

26.5

23.1

20.7

17.5

14.8

12.5

10.6

9.1

7.7

6.5

5.5

4.7

3.9

3.3

30.0

30.0

30.0

30.0

26.4

23.3

20.7

18.4

16.6

14.8

12.8

10.9

9.3

8.0

6.8

5.8

4.9

4.1

3.4

2.8

2.1

1.8

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

34.0m

36.0m

38.0m

40.0m

42.0m

44.0m

46.0m

47.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 10~83 11~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

13~83 13~83

Page 8: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 142--

AR-1600M-1 / MB-03

Performance D

160.0

150.0

134.3

121.4

110.6

93.6

80.7

70.7

61.8

54.5

47.7

110.0

110.0

110.0

110.0

109.7

92.7

79.8

69.7

60.6

53.4

46.1

39.8

30.6

23.9

100.0

100.0

100.0

100.0

100.0

90.0

79.1

68.9

59.8

52.5

45.0

38.7

29.6

22.7

17.6

13.9

65.0

65.0

59.6

54.5

50.4

46.9

41.0

31.7

24.9

19.7

15.9

12.9

10.5

8.6

7.0

50.0

50.0

47.3

44.5

41.8

38.5

32.6

26.0

20.7

16.8

13.8

11.4

9.4

7.8

6.4

5.2

4.2

3.4

2.7

42.0

42.0

38.8

36.6

34.5

30.2

26.4

21.1

17.2

14.1

11.7

9.7

8.1

6.7

5.5

4.5

3.6

2.9

2.2

30.0

30.0

30.0

30.0

26.4

23.3

20.7

17.5

14.5

12.0

10.0

8.4

7.0

5.8

4.8

3.9

3.1

2.4

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

34.0m

36.0m

38.0m

40.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 10~83 12~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

19~83 34~83

Page 9: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 143--

AR-1600M-1 / MB-03

Performance E

160.0

150.0

134.3

121.4

110.6

93.6

80.7

70.7

60.4

50.5

43.1

110.0

110.0

110.0

110.0

109.7

92.7

79.8

69.7

58.7

48.9

41.5

35.7

27.3

21.5

100.0

100.0

100.0

100.0

100.0

90.0

79.1

68.9

57.6

47.8

40.4

34.7

26.2

20.4

16.1

12.8

65.0

65.0

59.6

54.5

50.2

42.8

36.9

28.3

22.4

18.0

14.6

12.0

9.6

7.7

6.0

50.0

50.0

47.3

44.5

41.8

37.9

29.3

23.3

18.9

15.5

12.8

10.7

8.7

7.0

5.5

4.3

3.3

2.4

42.0

42.0

38.8

36.6

34.5

29.7

23.7

19.2

15.8

13.2

11.0

9.1

7.4

5.9

4.7

3.6

2.7

1.8

30.0

30.0

30.0

30.0

26.4

23.3

19.6

16.2

13.5

11.3

9.4

7.7

6.2

5.0

3.9

3.0

2.1

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

34.0m

36.0m

38.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 10~83 18~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

25~83 34~83

Page 10: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 144--

AR-1600M-1 / MB-03

Performance F

160.0

150.0

134.3

121.4

110.6

93.6

80.3

62.8

50.9

42.4

36.0

110.0

110.0

110.0

110.0

109.7

92.7

78.5

61.1

49.3

40.8

34.4

29.4

22.0

17.0

100.0

100.0

100.0

100.0

100.0

90.0

77.1

59.8

48.1

39.7

33.3

28.3

21.0

16.0

12.1

9.0

65.0

65.0

59.6

50.7

42.1

35.6

30.5

23.1

18.0

14.2

11.2

8.7

6.6

4.8

3.4

50.0

50.0

47.3

43.2

36.6

31.5

24.1

18.9

15.0

12.1

9.7

7.6

5.8

4.4

3.1

2.1

42.0

42.0

38.8

36.6

32.0

24.5

19.2

15.4

12.5

10.1

8.0

6.2

4.8

3.5

2.4

30.0

30.0

30.0

30.0

24.8

19.6

15.7

12.8

10.4

8.4

6.6

5.1

3.8

2.8

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

24.0m

26.0m

28.0m

30.0m

32.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

0~83 9~83 30~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

38~83 44~83

Page 11: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 145--

AR-1600M-1 / MB-03

Performance G

148.0

137.8

123.3

111.4

101.4

85.2

68.4

53.1

42.8

34.6

28.2

110.0

110.0

110.0

110.0

100.5

84.1

66.6

51.5

41.2

32.7

26.3

21.6

14.9

10.6

100.0

100.0

100.0

100.0

99.9

83.2

65.2

50.2

40.1

31.4

25.1

20.4

13.8

9.2

5.6

3.1

65.0

65.0

53.0

42.6

34.3

27.9

23.0

16.2

11.7

8.3

5.5

3.4

50.0

50.0

43.7

35.7

29.1

24.2

17.3

12.7

9.4

6.7

4.5

42.0

41.1

36.2

29.6

24.7

17.7

13.1

9.8

7.2

5.0

30.0

30.0

30.0

25.1

18.1

13.5

10.2

7.6

5.4

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

16.0m

18.0m

20.0m

22.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

4~83 36~83 52~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

58~83 61~83

Page 12: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 146--

AR-1600M-1 / MB-03

Performance H

148.0

137.8

123.3

110.0

82.4

53.2

37.9

28.5

22.2

17.6

14.2

110.0

110.0

110.0

107.2

80.0

51.2

36.1

26.8

20.6

16.1

12.6

10.0

5.6

100.0

100.0

100.0

100.0

78.1

49.7

34.8

25.6

19.4

15.0

11.6

8.7

53.2

37.8

28.4

22.0

17.4

14.0

11.2

7.0

39.2

29.7

23.2

18.5

15.0

12.3

8.2

30.2

23.7

19.0

15.5

12.7

8.6

24.1

19.4

15.8

13.1

9.0

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

12.0m

14.0m

Unit:ton

B

A13.5m 18.1m 22.6m 31.8m 40.9m 45.4m 50.0m

47~83 58~83 67~830~83 0~83θ (°)

A= Boom length B= Working radius

θ= Boom angle range (for the unladen condition)

70~83 72~83

Performance I

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

3.2m

3.5m

4.0m

4.5m

5.0m

6.0m

7.0m

8.0m

9.0m

10.0m

11.0m

Unit:ton

B

A13.5m

6~83θ (°)

Page 13: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 147--

AR-1600M-1 / MB-03

NOTES:1. The deflection of the boom is not incorporated in the figure above. The above figure is for Performance A.2. The boom extension for each boom are as follows:

50.0m BOOM

45.4m BOOM

40.9m BOOM

31.8m BOOM

22.6m BOOM

18.1m BOOM

13.5m BOOM

WORKING RADIUS - LIFTING HEIGHT

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)

BOOM

BOOM

BOOM

BOOM

BOOM

BOOM

BOOM

[BOOM]

Page 14: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 148--

AR-1600M-1 / MB-03

DIM

EN

SIO

NS

( 1/1

00

)

[On

pu

blic

th

oro

ug

hfa

re t

rave

ling

co

nd

itio

n]

Page 15: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 149--

AR-1600M-1 / MB-03

DIM

EN

SIO

NS

( 1/1

00

)

[On

-site

tra

velin

g c

on

diti

on

]

Page 16: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 150--

◆ MEMO ◆

Page 17: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 151--

AR-1600M-1 / FLJ-02

Control No. AR-1600M-1/FLJ-02

ALL TERRAIN CRANE

AR-1600M

JAPANESE SPECIFICATIONS

These specifications are for the optional fullyautomatic luffing jib for the AR-1600M type crane.Refer to these specifications along withspecification control no. AR-1600M-1/MB.

(Fully Automatic Luffiing Jib)

AR

ハイマン翻訳
Return to index
Page 18: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 152--

AR-1600M-1 / FLJ -02

CRANE CAPACITY10.2m Jib 18,600kg at 10.0m (2part-line)17.9m Jib 9,300kg at 14.0m (1part-line)25.7m Jib 5,600kg at 16.0m (1part-line)JIB3-section synchronously telescoping boom of boxconstructionHydraulic non-stage offset (5°- 60°) type1.7m (fixing part) + 10.2m - 25.7m (elevating/telescopingpart)JIB1 double-acting hydraulic cylinder1 wire rope type telescoping device

JIB LENGTH10.2m17.9m25.7m

MAX.LIFTING HEIGHT78.0m

MAX.WORKING RADIUS55.0m

AR-1600MCRANE SPECIFICATIONS

Page 19: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 153--

AR-1600M-1 / FLJ-02

BOOM TOTAL RATED LOADS

1. The total rated loads shown are for the case where the outriggers are set horizontally on firm level ground. Thevalues above the bold lines are based on the crane strength while those below are based on the crane stability.

2. The weights of the slings and hooks (25t hook: 730kg, 9.4t hook: 430kg) are included in the total rated loads shown.3. The total rated load is based on the actual working radius including the deflection of the boom.4. The table below shows the classification of Performances FA to FF of the total rated load.

- If the rear jack is not used, the performance classification in parentheses shall apply.5. The standard hook and number of part lines are shown in the total rated loads chart. The load per line should not

exceed 9.4t.6. When the maximum instantaneous velocity is 10m/s or more, stop crane operation.7. Markθin the total rated load chart shows the boom angle range (under no load).8. The total rated loads shown are for the case where the 2nd boom section fixing pin is used.

Ensure that the 2nd boom section fixing pin is used with the fully automatic luffing jib.

Counterweight

Outrigger extension width

8.8m

8.0m

6.8m

5.6m

2.7m

50t

FA (FC)

FA (FC)

FC (FC)

-

-

44t

FA (FD)

FB (FD)

FD (FD)

-

-

34t

FC (FE)

FD (FE)

FE (FE)

FF (FF)

-

25t

FD (FF)

FE (FF)

FF (FF)

FF (FF)

-

0t

FF (-)

-

-

-

-

Page 20: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 154--

AR-1600M-1 / FLJ -02

Performance FA 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

69.0

66.1

63.2

60.2

57.0

53.8

50.3

46.6

42.6

38.2

33.1

27.2

19.1

18.6

18.6

18.6

17.6

16.8

16.0

14.7

13.6

12.6

11.8

11.0

10.4

9.8

9.3

8.8

7.9

6.7

5.5

4.4

2.7

80.8

79.5

78.2

76.8

74.1

71.4

68.6

65.7

62.6

59.5

56.3

52.8

49.2

45.2

40.7

35.6

29.4

13.9

13.4

12.9

12.4

11.6

10.9

10.3

9.8

9.3

8.9

8.6

8.2

8.0

7.7

6.7

5.7

4.5

81.5

80.1

78.8

76.1

73.3

70.4

67.5

64.5

61.3

58.0

54.5

50.8

46.7

42.2

36.9

10.8

10.5

10.2

9.7

9.2

8.8

8.5

8.2

7.9

7.7

7.5

7.1

6.8

6.4

5.8

81.3

78.4

75.6

72.6

69.6

66.5

63.2

59.8

56.1

52.2

8.2

7.9

7.7

7.4

7.3

7.1

7.0

7.0

6.9

6.9

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 66 ~ 8335 ~ 8318 ~ 83 28 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.7

62.2

59.6

56.9

54.1

51.2

48.2

44.9

41.3

37.5

33.0

27.7

20.3

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.7

6.2

5.8

5.4

5.1

4.8

4.5

4.3

4.1

3.9

3.7

3.5

3.1

1.8

79.5

77.3

75.0

72.7

70.3

67.9

65.4

62.8

60.1

57.4

54.5

51.4

48.1

44.6

40.7

36.3

30.9

7.2

6.6

6.2

5.7

5.5

5.2

4.9

4.6

4.4

4.2

4.0

3.9

3.8

3.8

3.7

3.6

3.3

80.3

78.0

75.6

73.3

70.8

68.3

65.7

63.0

60.2

57.2

54.1

50.8

47.3

43.3

38.7

5.4

5.0

4.8

4.6

4.4

4.2

4.0

3.9

3.8

3.6

3.5

3.5

3.5

3.5

3.5

79.2

76.7

74.1

71.5

68.7

65.9

62.9

59.8

56.4

52.8

3.8

3.8

3.6

3.5

3.3

3.3

3.3

3.2

3.2

3.2

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8337 ~ 8319 ~ 83 29 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 21: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 155--

AR-1600M-1 / FLJ-02

Performance FA 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

63.1

60.9

58.7

56.4

53.9

51.4

48.8

46.0

43.0

39.7

36.1

24.3

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

3.2

3.0

2.9

2.8

2.6

2.5

2.4

2.3

2.2

2.1

1.9

1.7

79.4

77.5

75.6

73.6

71.6

69.6

67.5

65.4

63.2

60.9

58.5

56.1

53.5

50.8

47.9

44.7

41.2

29.6

3.9

3.6

3.5

3.2

3.0

2.8

2.6

2.6

2.5

2.4

2.4

2.4

2.3

2.2

2.2

2.1

2.0

1.8

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

64.8

62.5

60.1

57.5

54.8

51.9

48.7

45.1

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

2.1

2.1

2.1

2.1

2.0

2.0

1.9

1.8

79.5

77.4

75.2

72.8

70.5

68.0

65.5

62.8

59.9

56.9

53.6

2.0

2.0

2.0

1.9

1.9

1.9

1.9

1.8

1.8

1.8

1.8

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

55.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

52 ~ 83 71 ~ 8344 ~ 8323 ~ 83 28 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 22: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 156--

AR-1600M-1 / FLJ -02

Performance FA 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

74.1

71.9

69.7

67.4

65.0

62.5

59.9

57.3

54.5

51.6

48.5

45.2

41.6

37.7

18.6

18.6

17.9

17.2

16.0

14.8

13.9

13.0

12.3

11.2

10.0

9.0

8.1

7.1

6.2

5.2

4.3

3.1

2.1

81.2

80.2

78.1

76.0

73.8

71.6

69.4

67.1

64.7

62.2

59.5

56.8

53.9

50.8

47.4

43.8

39.9

35.4

13.4

13.0

12.3

11.6

11.0

10.5

10.1

9.7

9.1

8.3

7.6

6.9

6.1

5.2

4.3

3.4

2.4

1.4

79.4

77.3

75.1

72.9

70.6

68.3

65.9

63.4

60.8

58.0

55.1

52.1

48.7

45.0

40.8

36.2

10.0

9.6

9.2

8.9

8.6

8.4

8.1

7.7

7.1

6.5

6.0

5.6

4.8

3.7

2.5

1.5

81.5

79.3

77.1

74.8

72.5

70.2

67.8

65.3

62.6

59.8

56.8

8.0

7.8

7.6

7.4

7.3

7.2

7.1

7.0

6.7

6.2

5.8

80.1

77.7

75.2

72.7

70.0

67.3

6.5

6.5

6.5

6.5

6.5

6.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 66 ~ 8336 ~ 8337 ~ 83 35 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

72.1

70.2

68.2

66.2

64.2

62.1

60.0

57.8

55.5

53.0

50.4

47.6

44.6

41.2

9.3

9.3

8.9

8.4

7.8

7.2

6.8

6.4

6.0

5.7

5.4

5.2

5.0

4.7

4.3

3.8

3.2

2.7

1.9

80.1

78.3

76.5

74.6

72.7

70.8

68.8

66.8

64.7

62.6

60.4

58.2

55.8

53.2

50.5

47.5

44.2

7.0

6.4

6.1

5.6

5.5

5.1

4.9

4.8

4.5

4.4

4.3

4.2

4.0

3.6�

3.3

2.9

2.3

80.8

79.0

77.1

75.2

73.3

71.3

69.4

67.3

65.2

63.0

60.7

58.4

55.9

53.1

50.1

46.9

43.2

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.6

3.5

3.1

2.8

2.4

1.8

80.2

78.2

76.2

74.2

72.2

70.0

67.9

65.7

63.3

60.9

58.3

55.6

52.5

3.7

3.6

3.5

3.4

3.4

3.3

3.3

3.3

3.2

3.2

3.1

3.1

2.9

79.9

77.7

75.3

72.9

70.5

67.9

3.0

3.0

3.0

3.0

3.0

3.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8342 ~ 8341 ~ 83 43 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 23: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 157--

AR-1600M-1 / FLJ-02

Performance FA 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

72.1

70.5

68.8

67.1

65.4

63.6

61.8

59.9

57.9

55.9

53.9

51.7

49.4

5.6

5.3

4.9

4.6

4.3

4.0

3.8

3.6

3.3

3.2

3.0

2.9

2.8

2.6

2.5

2.4

2.3

2.2

80.2

78.5

77.0

75.3

73.7

72.1

70.4

68.7

66.9

65.1

63.2

61.3

59.4

57.4

55.3

53.0

4.0

3.5

3.3

3.1

3.0

2.9

2.7

2.6

2.5

2.4

2.3

2.2

2.2

2.2

2.1

2.0

80.0

78.4

76.8

75.1

73.5

71.7

70.0

68.2

66.3

64.5

62.6

60.6

58.4

56.3

50.1

2.7

2.6

2.5

2.4

2.3

2.2

2.1

2.1

2.0

2.0

2.0

2.0

1.9

1.9

1.7

80.3

78.6

76.8

75.1

73.2

71.3

69.4

67.5

65.4

63.2

61.0

58.7

1.9

1.9

1.8

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

55.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

58 ~ 83 70 ~ 8349 ~ 8348 ~ 83 52 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 24: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 158--

AR-1600M-1 / FLJ -02

Performance FA 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

76.1

74.1

72.1

69.9

67.8

65.6

63.3

61.0

58.6

56.1

53.5

50.7

47.7

44.5

17.6

17.0

15.8

14.8

13.8

12.4

11.0

9.8

8.8

8.0

7.3

6.6

5.9

5.2

4.2

3.1

2.1

81.4

79.5

77.7

75.7

73.8

71.8

69.7

67.5

65.3

63.1

60.7

58.2

55.5

52.7

49.8

46.6

12.8

12.0

11.5

10.8

10.2

9.6

8.9

8.3

7.7

7.1

6.4

5.7

4.9

4.2

3.4

2.4

80.8

79.0

77.1

75.1

73.1

71.1

68.9

66.8

64.5

62.1

59.7

57.0

54.1

51.1

47.9

44.3

9.7

9.4

9.0

8.6

8.3

7.9

7.5

7.2

6.7

6.2

5.7

5.0

4.2

3.4

2.6

1.6

80.7

78.7

76.6

74.6

72.5

70.4

68.2

65.9

63.6

61.2

58.5

55.7

52.6

7.5

7.1

6.7

6.3

6.2

6.1

5.9

5.8

5.7

5.5

5.0

4.5

3.9

80.2

78.0

75.8

73.7

71.5

69.2

6.3

6.0

5.7

5.7

5.7

5.7

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8344 ~ 8344 ~ 83 46 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

74.0

72.3

70.5

68.8

67.0

65.1

63.2

61.3

59.3

57.0

54.7

52.3

49.7

46.9

8.5

8.5

8.0

7.5

7.0

6.6

6.3

6.0

5.6

5.4

5.2

4.9

4.3

3.7

3.1

2.5

1.7

79.9

78.2

76.5

74.8

73.1

71.4

69.6

67.8

65.9

64.0

62.1

60.1

57.8

55.4

52.9

50.2

7.1

6.3

5.8

5.5

5.3

5.1

4.9

4.7

4.5

4.3

4.2

4.1

3.6

3.2

2.7

2.2

80.5

78.9

77.2

75.5

73.8

72.1

70.3

68.5

66.6

64.7

62.7

60.6

58.3

55.7

53.0

50.1

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.6

3.3

2.8

2.3

1.8

79.9

78.2

76.4

74.6

72.8

70.9

69.0

67.0

65.0

62.8

60.7

58.3

55.7

3.7

3.6

3.5

3.4

3.3

3.2

3.2

3.1

3.1

3.0

3.0

2.9

2.7

78.0

76.1

74.0

71.9

69.7

3.0

3.0

2.9

2.9

2.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

54 ~ 83 68 ~ 8349 ~ 8346 ~ 83 49 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 25: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 159--

AR-1600M-1 / FLJ-02

Performance FA 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

73.6

72.1

70.6

69.0

67.4

65.8

64.2

62.4

60.7

59.0

57.1

55.3

53.3

5.3

5.3

5.0

4.7

4.4

4.1

3.9

3.7

3.5

3.3

3.1

3.0

2.8

2.7

2.6

2.5

2.4

2.3

81.2

79.6

78.2

76.6

75.1

73.6

72.1

70.5

69.0

67.4

65.7

64.1

62.3

60.5

58.7

56.8

4.6

3.8

3.5

3.2

3.0

2.8

2.7

2.6

2.5

2.5

2.4

2.4

2.3

2.2

2.2

2.1

81.1

79.5

78.1

76.6

75.1

73.6

72.0

70.4

68.8

67.1

65.4

63.7

61.8

60.0

54.9

2.9

2.5

2.4

2.3

2.3

2.2

2.1

2.1

2.0

2.0

1.9

1.9

1.8

1.8

1.7

79.6

78.0

76.4

74.8

73.1

71.4

69.6

67.8

66.0

64.1

62.0

56.6

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

1.6

1.5

1.5

79.8

78.0

76.1

74.3

72.4

1.4

1.3

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

55.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 72 ~ 8354 ~ 8352 ~ 83 56 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 26: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 160--

AR-1600M-1 / FLJ -02

Performance FA 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.8

76.1

74.2

72.3

70.3

68.4

66.3

64.1

62.0

59.8

57.5

55.1

52.6

13.2

13.2

13.2

12.0

10.7

9.4

8.4

7.3

6.4

5.6

4.9

4.2

3.6

3.0

81.1

79.4

77.6

75.7

73.9

72.1

70.2

68.2

66.1

64.0

61.8

59.5

57.1

54.6

51.9

12.6

11.7

10.7

9.5

8.9

8.3

7.9

7.1

6.4

5.7

5.1

4.5

3.8

3.2

2.3

80.6

78.8

77.0

75.1

73.3

71.5

69.6

67.6

65.5

63.3

61.0

58.6

56.1

53.4

9.6

8.8

8.0

7.5

7.0

6.9

6.7

6.1

5.6

5.1

4.5

4.0

3.4

2.6

80.4

78.6

76.7

74.9

73.1

71.2

69.3

67.3

65.0

62.7

60.2

57.6

54.8

51.8

7.1

6.5

6.2

6.0

5.9

5.8

5.7

5.4

4.9

4.3

3.7

3.2

2.6

1.8

79.5

77.6

75.7

73.8

71.8

69.8

5.6

5.5

5.5

5.4

5.3

5.3

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 68 ~ 8352 ~ 8352 ~ 83 51 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.7

78.3

76.8

75.4

73.9

72.3

70.7

69.0

67.2

65.4

63.5

61.6

59.6

57.6

55.4

53.3

8.0

8.0

8.0

8.0

7.9

7.4

7.0

6.4

5.8

5.2

4.7

4.2

3.6

3.1

2.6

2.3

81.4

80.0

78.5

77.0

75.5

74.0

72.3

70.6

68.9

67.2

65.4

63.5

61.5

59.5

57.4

55.2

7.1

6.8

6.5

6.2

5.9

5.6

5.1

4.7

4.4

4.1

3.9

3.4

3.1

2.8

2.4

2.1

80.2

78.7

77.2

75.6

74.0

72.3

70.6

68.9

67.2

65.3

63.4

61.5

59.6

57.4

5.2

5.0

4.8

4.5

4.2

4.0

3.8

3.6

3.4

3.2

3.0

2.9

2.8

2.5

81.5

79.9

78.4

76.7

75.0

73.4

71.6

69.9

68.1

66.2

64.3

62.3

60.2

57.8

4.0

3.9

3.8

3.5

3.3

3.2

3.0

2.9

2.8

2.7

2.6

2.5

2.4

2.1

80.2

78.4

76.7

74.8

73.0

3.2

3.0

2.9

2.8

2.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

56 ~ 83 71 ~ 8356 ~ 8353 ~ 83 54 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 27: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 161--

AR-1600M-1 / FLJ-02

Performance FA 50.0m boom + 1.7m + Fully automatic luffing jib

79.9

78.7

77.4

76.1

74.8

73.4

72.0

70.6

69.1

67.6

66.0

64.4

62.8

61.1

59.3

57.6

55.7

5.0

5.0

5.0

5.0

5.0

4.7

4.5

4.3

4.0

3.8

3.5

3.2

3.0

2.7

2.4

2.2

1.9

81.2

79.8

78.5

77.1

75.8

74.4

72.9

71.5

70.0

68.5

66.9

65.3

63.7

62.1

60.2

4.7

4.4

4.1

3.8

3.6

3.4

3.2

3.0

2.8

2.6

2.4

2.2

2.1

2.0

1.7

81.0

79.6

78.2

76.9

75.4

74.0

72.6

71.1

69.6

67.9

66.3

64.6

62.9

3.4

3.0

2.9

2.8

2.6

2.5

2.4

2.3

2.2

1.9

1.8

1.7

1.6

80.2

78.7

77.4

75.9

74.4

72.8

71.2

69.7

68.0

66.3

61.9

2.1

2.0

2.0

1.9

1.8

1.7

1.6

1.6

1.5

1.4

1.3

79.8

78.1

76.5

74.9

73.1

1.6

1.5

1.5

1.5

1.4

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

55.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

61 ~ 83 72 ~ 8362 ~ 8355 ~ 83 59 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 28: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 162--

AR-1600M-1 / FLJ -02

Performance FB 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

69.0

66.1

63.2

60.2

57.0

53.8

50.3

46.6

42.5

38.0

32.9

26.9

19.0

18.6

18.6

18.6

17.6

16.8

16.0

14.7

13.6

12.6

11.8

11.0

10.4

9.8

9.3

8.8

7.1

5.5

4.2

3.0

1.9

80.8

79.5

78.2

76.8

74.1

71.4

68.6

65.7

62.6

59.5

56.3

52.8

49.2

45.2

40.5

35.3

29.0

13.9

13.4

12.9

12.4

11.6

10.9

10.3

9.8

9.3

8.9

8.6

8.2

8.0

7.5

5.9

4.4

3.1

81.5

80.1

78.8

76.1

73.3

70.4

67.5

64.5

61.3

58.0

54.5

50.8

46.7

42.1

36.6

10.8

10.5

10.2

9.7

9.2

8.8

8.5

8.2

7.9

7.7

7.5

7.1

6.8

6.1

4.5

81.3

78.4

75.6

72.6

69.6

66.5

63.2

59.8

56.1

52.2

8.2

7.9

7.7

7.4

7.3

7.1

7.0

7.0

6.9

6.9

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 66 ~ 8335 ~ 8318 ~ 83 28 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.7

62.2

59.6

56.9

54.1

51.2

48.2

44.9

41.3

37.4

32.8

27.3

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.7

6.2

5.8

5.4

5.1

4.8

4.5

4.3

4.1

3.9

3.6

2.7

1.9

79.5

77.3

75.0

72.7

70.3

67.9

65.4

62.8

60.1

57.4

54.5

51.4

48.1

44.6

40.7

36.1

30.4

7.2

6.6

6.2

5.7

5.5

5.2

4.9

4.6

4.4

4.2

4.0

3.9

3.8

3.8

3.7

3.1

2.1

80.3

78.0

75.6

73.3

70.8

68.3

65.7

63.0

60.2

57.2

54.1

50.8

47.3

43.3

38.6

5.4

5.0

4.8

4.6

4.4

4.2

4.0

3.9

3.8

3.6

3.5

3.5

3.5

3.5

3.3

79.2

76.7

74.1

71.5

68.7

65.9

62.9

59.8

56.4

52.8

3.8

3.8

3.6

3.5

3.3

3.3

3.3

3.2

3.2

3.2

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8337 ~ 8326 ~ 83 29 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 29: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 163--

AR-1600M-1 / FLJ-02

Performance FB 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

63.1

60.9

58.7

56.4

53.9

51.4

48.8

46.0

43.0

39.7

36.1

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

3.2

3.0

2.9

2.8

2.6

2.5

2.4

2.3

2.2

2.1

1.9

79.4

77.5

75.6

73.6

71.6

69.6

67.5

65.4

63.2

60.9

58.5

56.1

53.5

50.8

47.9

44.7

41.2

3.9

3.6

3.5

3.2

3.0

2.8

2.6

2.6

2.5

2.4

2.4

2.4

2.3

2.2

2.2

2.1

2.0

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

64.8

62.5

60.1

57.5

54.8

51.9

48.7

45.1

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

2.1

2.1

2.1

2.1

2.0

2.0

1.9

1.8

79.5

77.4

75.2

72.8

70.5

68.0

65.5

62.8

59.9

56.9

53.6

2.0

2.0

2.0

1.9

1.9

1.9

1.9

1.8

1.8

1.8

1.8

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

52 ~ 83 71 ~ 8344 ~ 8335 ~ 83 40 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 30: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 164--

AR-1600M-1 / FLJ -02

Performance FB 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

74.1

71.9

69.7

67.4

65.0

62.5

59.9

57.3

54.5

51.4

48.2

44.8

41.2

18.6

18.6

17.9

17.2

16.0

14.8

13.9

13.0

12.3

11.2

10.0

9.0

8.1

7.0

5.4

4.1

2.9

1.8

81.2

80.2

78.1

76.0

73.8

71.6

69.4

67.1

64.7

62.2

59.5

56.8

53.8

50.5

47.1

43.4

13.4

13.0

12.3

11.6

11.0

10.5

10.1

9.7

9.1

8.3

7.6

6.9

5.9

4.5

3.2

2.1

79.4

77.3

75.1

72.9

70.6

68.3

65.9

63.4

60.8

58.0

55.1

51.8

48.3

44.5

40.3

10.0

9.6

9.2

8.9

8.6

8.4

8.1

7.7

7.1

6.5

6.0

4.8

3.5

2.3

1.3

81.5

79.3

77.1

74.8

72.5

70.2

67.8

65.3

62.6

59.8

56.8

8.0

7.8

7.6

7.4

7.3

7.2

7.1

7.0

6.7

6.2

5.8

80.1

77.7

75.2

72.7

70.0

67.3

6.5

6.5

6.5

6.5

6.5

6.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 66 ~ 8340 ~ 8341 ~ 83 43 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

72.1

70.2

68.2

66.2

64.2

62.1

60.0

57.8

55.5

53.0

50.1

47.2

44.0

9.3

9.3

8.9

8.4

7.8

7.2

6.8

6.4

6.0

5.7

5.4

5.2

5.0

4.7

4.2

3.2

2.3

1.5

80.1

78.3

76.5

74.6

72.7

70.8

68.8

66.8

64.7

62.6

60.4

58.2

55.8

53.2

50.3

47.0

7.0

6.4

6.1

5.6

5.5

5.1

4.9

4.8

4.5

4.4

4.3

4.2

4.0

3.6

2.9

2.0

80.8

79.0

77.1

75.2

73.3

71.3

69.4

67.3

65.2

63.0

60.7

58.4

55.9

53.1

49.9

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.6

3.5

3.1

2.4

80.2

78.2

76.2

74.2

72.2

70.0

67.9

65.7

63.3

60.9

58.3

55.6

52.4

3.7

3.6

3.5

3.4

3.4

3.3

3.3

3.3

3.2

3.2

3.1

3.1

2.7

79.9

77.7

75.3

72.9

70.5

67.9

3.0

3.0

3.0

3.0

3.0

3.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8349 ~ 8344 ~ 83 46 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 31: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 165--

AR-1600M-1 / FLJ-02

Performance FB 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

72.1

70.5

68.8

67.1

65.4

63.6

61.8

59.9

57.9

55.9

53.9

51.7

49.2

5.6

5.3

4.9

4.6

4.3

4.0

3.8

3.6

3.3

3.2

3.0

2.9

2.8

2.6

2.5

2.4

2.3

1.8

80.2

78.5

77.0

75.3

73.7

72.1

70.4

68.7

66.9

65.1

63.2

61.3

59.4

57.4

55.3

53.0

4.0

3.5

3.3

3.1

3.0

2.9

2.7

2.6

2.5

2.4

2.3

2.2

2.2

2.2

2.1

2.0

80.0

78.4

76.8

75.1

73.5

71.7

70.0

68.2

66.3

64.5

62.6

60.6

58.4

56.3

2.7

2.6

2.5

2.4

2.3

2.2

2.1

2.1

2.0

2.0

2.0

2.0

1.9

1.9

80.3

78.6

76.8

75.1

73.2

71.3

69.4

67.5

65.4

63.2

61.0

58.7

1.9

1.9

1.8

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

58 ~ 83 70 ~ 8355 ~ 8348 ~ 83 52 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 32: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 166--

AR-1600M-1 / FLJ -02

Performance FB 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

76.1

74.1

72.1

69.9

67.8

65.6

63.3

61.0

58.6

56.0

53.2

50.3

17.6

17.0

15.8

14.8

13.8

12.4

11.0

9.8

8.8

8.0

7.3

6.6

5.3

4.0

2.8

81.4

79.5

77.7

75.7

73.8

71.8

69.7

67.5

65.3

63.1

60.7

58.2

55.4

52.4

49.3

12.8

12.0

11.5

10.8

10.2

9.6

8.9

8.3

7.7

7.1

6.4

5.7

4.5

3.2

2.1

80.8

79.0

77.1

75.1

73.1

71.1

68.9

66.8

64.5

62.1

59.7

56.9

53.9

50.7

9.7

9.4

9.0

8.6

8.3

7.9

7.5

7.2

6.7

6.2

5.7

4.8

3.5

2.4

80.7

78.7

76.6

74.6

72.5

70.4

68.2

65.9

63.6

61.2

58.5

55.4

52.0

7.5

7.1

6.7

6.3

6.2

6.1

5.9

5.8

5.7

5.5

5.0

3.8

2.6

80.2

78.0

75.8

73.7

71.5

69.2

6.3

6.0

5.7

5.7

5.7

5.7

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8350 ~ 8350 ~ 83 49 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

74.0

72.3

70.5

68.8

67.0

65.1

63.2

61.3

59.3

56.9

54.4

51.8

8.5

8.5

8.0

7.5

7.0

6.6

6.3

6.0

5.6

5.4

5.2

4.9

4.0

3.0

2.2

79.9

78.2

76.5

74.8

73.1

71.4

69.6

67.8

65.9

64.0

62.1

60.1

57.8

55.1

52.4

7.1

6.3

5.8

5.5

5.3

5.1

4.9

4.7

4.5

4.3

4.2

4.1

3.6

2.7

1.9

80.5

78.9

77.2

75.5

73.8

72.1

70.3

68.5

66.6

64.7

62.7

60.6

58.2

55.3

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.6

3.2

2.3

79.9

78.2

76.4

74.6

72.8

70.9

69.0

67.0

65.0

62.8

60.7

58.1

54.8

3.7

3.6

3.5

3.4

3.3

3.2

3.2

3.1

3.1

3.0

3.0

2.7

1.8

78.0

76.1

74.0

71.9

69.7

3.0

3.0

2.9

2.9

2.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

54 ~ 83 68 ~ 8354 ~ 8351 ~ 83 52 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 33: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 167--

AR-1600M-1 / FLJ-02

Performance FB 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

73.6

72.1

70.6

69.0

67.4

65.8

64.2

62.4

60.7

59.0

57.1

55.1

5.3

5.3

5.0

4.7

4.4

4.1

3.9

3.7

3.5

3.3

3.1

3.0

2.8

2.7

2.6

2.5

2.2

81.2

79.6

78.2

76.6

75.1

73.6

72.1

70.5

69.0

67.4

65.7

64.1

62.3

60.5

58.7

56.8

4.6

3.8

3.5

3.2

3.0

2.8

2.7

2.6

2.5

2.5

2.4

2.4

2.3

2.2

2.2

2.1

81.1

79.5

78.1

76.6

75.1

73.6

72.0

70.4

68.8

67.1

65.4

63.7

61.8

60.0

2.9

2.5

2.4

2.3

2.3

2.2

2.1

2.1

2.0

2.0

1.9

1.9

1.8

1.8

79.6

78.0

76.4

74.8

73.1

71.4

69.6

67.8

66.0

64.1

62.0

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

1.6

1.5

79.8

78.0

76.1

74.3

72.4

1.4

1.3

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

61 ~ 83 72 ~ 8359 ~ 8354 ~ 83 56 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 34: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 168--

AR-1600M-1 / FLJ -02

Performance FB 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.8

76.1

74.2

72.3

70.3

68.4

66.3

64.1

62.0

59.8

57.4

13.2�

13.2�

13.2�

12.0�

10.7�

9.4�

8.4�

7.3�

6.4�

5.6�

4.9�

3.9

81.1�

79.4�

77.6�

75.7�

73.9�

72.1�

70.2�

68.2�

66.1�

64.0�

61.8�

59.5�

56.9

12.6�

11.7�

10.7�

9.5�

8.9�

8.3�

7.9�

7.1�

6.4�

5.7�

5.1�

4.4�

3.2

80.6�

78.8�

77.0�

75.1�

73.3�

71.5�

69.6�

67.6�

65.5�

63.3�

61.0�

58.4

9.6�

8.8�

8.0�

7.5�

7.0�

6.9�

6.7�

6.1�

5.6�

5.1�

4.5�

3.5

80.4�

78.6�

76.7�

74.9�

73.1�

71.2�

69.3�

67.3�

65.0�

62.7�

60.2�

57.3�

54.2

7.1�

6.5�

6.2�

6.0�

5.9�

5.8�

5.7�

5.4�

4.9�

4.3�

3.7�

2.7�

1.6

79.5�

77.6�

75.7�

73.8�

71.8�

69.8

5.6�

5.5�

5.5�

5.4�

5.3�

5.3

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

54 ~ 83 68 ~ 8357 ~ 8356 ~ 83 56 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.7�

78.3�

76.8�

75.4�

73.9�

72.3�

70.7�

69.0�

67.2�

65.4�

63.5�

61.6�

59.6�

57.5

8.0�

8.0�

8.0�

8.0�

7.9�

7.4�

7.0�

6.4�

5.8�

5.2�

4.7�

4.2�

3.6�

2.9

81.4�

80.0�

78.5�

77.0�

75.5�

74.0�

72.3�

70.6�

68.9�

67.2�

65.4�

63.5�

61.5�

59.4

7.1�

6.8�

6.5�

6.2�

5.9�

5.6�

5.1�

4.7�

4.4�

4.1�

3.9�

3.4�

3.1�

2.6

80.2�

78.7�

77.2�

75.6�

74.0�

72.3�

70.6�

68.9�

67.2�

65.3�

63.4�

61.5

5.2�

5.0�

4.8�

4.5�

4.2�

4.0�

3.8�

3.6�

3.4�

3.2�

3.0�

2.9

81.5�

79.9�

78.4�

76.7�

75.0�

73.4�

71.6�

69.9�

68.1�

66.2�

64.3�

62.3�

59.7

4.0�

3.9�

3.8�

3.5�

3.3�

3.2�

3.0�

2.9�

2.8�

2.7�

2.6�

2.5�

1.9

80.2�

78.4�

76.7�

74.8�

73.0

3.2�

3.0�

2.9�

2.8�

2.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

58 ~ 83 71 ~ 8360 ~ 8357 ~ 83 58 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 35: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 169--

AR-1600M-1 / FLJ-02

Performance FB 50.0m boom + 1.7m + Fully automatic luffing jib

79.9�

78.7�

77.4�

76.1�

74.8�

73.4�

72.0�

70.6�

69.1�

67.6�

66.0�

64.4�

62.8�

61.1�

59.3

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

4.5�

4.3�

4.0�

3.8�

3.5�

3.2�

3.0�

2.7�

2.4

81.2�

79.8�

78.5�

77.1�

75.8�

74.4�

72.9�

71.5�

70.0�

68.5�

66.9�

65.3�

63.7�

62.1

4.7�

4.4�

4.1�

3.8�

3.6�

3.4�

3.2�

3.0�

2.8�

2.6�

2.4�

2.2�

2.1�

2.0

81.0�

79.6�

78.2�

76.9�

75.4�

74.0�

72.6�

71.1�

69.6

67.9�

66.3�

64.6�

62.9

3.4

3.0�

2.9�

2.8�

2.6�

2.5�

2.4�

2.3�

2.2�

1.9�

1.8�

1.7�

1.6

80.2�

78.7�

77.4�

75.9�

74.4�

72.8�

71.2�

69.7�

68.0�

66.3

2.1�

2.0�

2.0�

1.9�

1.8�

1.7�

1.6�

1.6�

1.5�

1.4

79.8�

78.1�

76.5�

74.9�

73.1�

1.6�

1.5�

1.5�

1.5�

1.4

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

65 ~ 83 72 ~ 8362 ~ 8358 ~ 83 61 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 36: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 170--

AR-1600M-1 / FLJ -02

Performance FC 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

69.0

66.1

63.2

60.2

57.0

53.8

50.2

46.4�

42.3�

37.9�

32.8�

26.8

18.6

18.6

18.6

17.6

16.8

16.0

14.7

13.6

12.6

11.8

11.0

10.4

9.8

8.7�

7.1�

5.6�

4.4�

3.2�

2.1

80.8

79.5

78.2

76.8

74.1

71.4

68.6

65.7

62.6

59.5

56.3

52.8

49.1�

44.9�

40.3�

35.1�

28.8

13.9

13.4

12.9

12.4

11.6

10.9

10.3

9.8

9.3

8.9

8.6

8.2

7.5�

6.0�

4.6�

3.5�

2.3

81.5

80.1

78.8

76.1

73.3

70.4

67.5

64.5

61.3

58.0

54.5

50.8

46.6�

41.8�

36.3

10.8

10.5

10.2

9.7

9.2

8.8

8.5

8.2

7.9

7.7

7.5

7.1

6.2�

4.8�

3.6

81.3

78.4

75.6

72.6

69.6

66.5

63.2

59.8

56.1

52.2

8.2

7.9

7.7

7.4

7.3

7.1

7.0

7.0

6.9

6.9

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 66 ~ 8335 ~ 8326 ~ 83 28 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.7

62.2

59.6

56.9

54.1

51.2

48.2

44.9

41.3�

37.2�

32.5

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.7

6.2

5.8

5.4

5.1

4.8

4.5

4.3

4.1

3.7

2.8�

2.0

79.5

77.3

75.0

72.7

70.3

67.9

65.4

62.8

60.1

57.4

54.5

51.4

48.1

44.6

40.6�

35.8

7.2

6.6

6.2

5.7

5.5

5.2

4.9

4.6

4.4

4.2

4.0

3.9

3.8

3.8

3.2�

2.3

80.3

78.0

75.6

73.3

70.8

68.3

65.7

63.0

60.2

57.2

54.1

50.8

47.3

43.2�

38.2

5.4

5.0

4.8

4.6

4.4

4.2

4.0

3.9

3.8

3.6

3.5

3.5

3.5

3.4�

2.5

79.2

76.7

74.1

71.5

68.7

65.9

62.9

59.8

56.4

52.8

3.8

3.8

3.6

3.5

3.3

3.3

3.3

3.2

3.2

3.2

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8337 ~ 8332 ~ 83 35 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 37: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 171--

AR-1600M-1 / FLJ-02

Performance FC 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

63.1

60.9

58.7

56.4

53.9

51.4

48.8

46.0

43.0

39.7

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

3.2

3.0

2.9

2.8

2.6

2.5

2.4

2.3

2.2

2.1

79.4

77.5

75.6

73.6

71.6

69.6

67.5

65.4

63.2

60.9

58.5

56.1

53.5

50.8

47.9

44.7

41.2

3.9

3.6

3.5

3.2

3.0

2.8

2.6

2.6

2.5

2.4

2.4

2.4

2.3

2.2

2.2

2.1

2.0

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

64.8

62.5

60.1

57.5

54.8

51.9

48.7

45.1

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

2.1

2.1

2.1

2.1

2.0

2.0

1.9

1.8

79.5

77.4

75.2

72.8

70.5

68.0

65.5

62.8

59.9

56.9

53.6

2.0

2.0

2.0

1.9

1.9

1.9

1.9

1.8

1.8

1.8

1.8

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

52 ~ 83 71 ~ 8344 ~ 8339 ~ 83 40 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 38: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 172--

AR-1600M-1 / FLJ -02

Performance FC 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

74.1

71.9

69.7

67.4

65.0

62.5

59.9�

57.1�

54.2�

51.2�

48.0�

44.6

18.6

18.6

17.9

17.2

16.0

14.8

13.9

13.0

12.3

11.2

10.0

8.6�

7.0�

5.5�

4.3�

3.1�

2.0

81.2

80.2

78.1

76.0

73.8

71.6

69.4

67.1

64.7

62.2

59.5�

56.5�

53.5�

50.2�

46.8

13.4

13.0

12.3

11.6

11.0

10.5

10.1

9.7

9.1

8.3

7.5�

6.0�

4.7�

3.5�

2.4

79.4

77.3

75.1

72.9

70.6

68.3

65.9

63.4

60.8

57.9�

54.8�

51.5�

48.0

10.0

9.6

9.2

8.9

8.6

8.4

8.1

7.7

7.1

6.3�

5.0�

3.8�

2.6

81.5

79.3

77.1

74.8

72.5

70.2

67.8

65.3

62.6

59.8

56.6

8.0

7.8

7.6

7.4

7.3

7.2

7.1

7.0

6.7

6.2

5.3

80.1

77.7

75.2

72.7

70.0

67.3

6.5

6.5

6.5

6.5

6.5

6.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 66 ~ 8347 ~ 8344 ~ 83 46 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

72.1

70.2

68.2

66.2

64.2

62.1

60.0

57.8

55.3�

52.6�

49.8�

46.9

9.3

9.3

8.9

8.4

7.8

7.2

6.8

6.4

6.0

5.7

5.4

5.2

5.0

4.2�

3.3�

2.4�

1.6

80.1

78.3

76.5

74.6

72.7

70.8

68.8

66.8

64.7

62.6

60.4

58.2

55.7�

52.9�

49.8

7.0

6.4

6.1

5.6

5.5

5.1

4.9

4.8

4.5

4.4

4.3

4.2

3.9�

3.0�

2.1

80.8

79.0

77.1

75.2

73.3

71.3

69.4

67.3

65.2

63.0

60.7

58.4

55.8�

52.8�

49.4

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.6

3.4�

2.6�

1.7

80.2

78.2

76.2

74.2

72.2

70.0

67.9

65.7

63.3

60.9

58.3

55.4�

51.8

3.7

3.6

3.5

3.4

3.4

3.3

3.3

3.3

3.2

3.2

3.1

2.9�

2.0

79.9

77.7

75.3

72.9

70.5

67.9

3.0

3.0

3.0

3.0

3.0

3.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8349 ~ 8346 ~ 83 49 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 39: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 173--

AR-1600M-1 / FLJ-02

Performance FC 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

72.1

70.5

68.8

67.1

65.4

63.6

61.8

59.9

57.9

55.9

53.9

51.4

5.6

5.3

4.9

4.6

4.3

4.0

3.8

3.6

3.3

3.2

3.0

2.9

2.8

2.6

2.5

2.4

1.8

80.2

78.5

77.0

75.3

73.7

72.1

70.4

68.7

66.9

65.1

63.2

61.3

59.4

57.4

55.3

4.0

3.5

3.3

3.1

3.0

2.9

2.7

2.6

2.5

2.4

2.3

2.2

2.2

2.2

2.1

80.0

78.4

76.8

75.1

73.5

71.7

70.0

68.2

66.3

64.5

62.6

60.6

58.4

56.3

2.7

2.6

2.5

2.4

2.3

2.2

2.1

2.1

2.0

2.0

2.0

2.0

1.9

1.9

80.3

78.6

76.8

75.1

73.2

71.3

69.4

67.5

65.4

63.2

61.0

58.7

1.9

1.9

1.8

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

58 ~ 83 70 ~ 8355 ~ 8351 ~ 83 54 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 40: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 174--

AR-1600M-1 / FLJ -02

Performance FC 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

76.1

74.1

72.1

69.9

67.8

65.6

63.3

60.9�

58.4�

55.7�

53.0

17.6

17.0

15.8

14.8

13.8

12.4

11.0

9.8

8.8

8.0

6.9�

5.5�

4.2�

3.1

81.4

79.5

77.7

75.7

73.8

71.8

69.7

67.5

65.3

63.1

60.5

57.8�

55.0

12.8

12.0

11.5

10.8

10.2

9.6

8.9

8.3

7.7

7.1

5.9�

4.7�

3.5

80.8

79.0

77.1

75.1

73.1

71.1

68.9

66.8

64.5

62.1

59.4�

56.5�

53.5

9.7

9.4

9.0

8.6

8.3

7.9

7.5

7.2

6.7

6.2

5.0�

3.8�

2.7

80.7

78.7

76.6

74.6

72.5

70.4

68.2

65.9

63.6

61.1�

58.1�

54.9�

51.6

7.5

7.1

6.7

6.3

6.2

6.1

5.9

5.8

5.7

5.3�

4.1�

2.9�

1.8

80.2

78.0

75.8

73.7

71.5

69.2

6.3

6.0

5.7

5.7

5.7

5.7

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8353 ~ 8352 ~ 83 54 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

74.0

72.3

70.5

68.8

67.0

65.1

63.2

61.3�

59.0�

56.6�

54.1

8.5

8.5

8.0

7.5

7.0

6.6

6.3

6.0

5.6

5.4

5.1�

4.1�

3.2�

2.3

79.9

78.2

76.5

74.8

73.1

71.4

69.6

67.8

65.9

64.0

62.1

59.9�

57.4

7.1

6.3

5.8

5.5

5.3

5.1

4.9

4.7

4.5

4.3

4.2

3.8�

2.9

80.5

78.9

77.2

75.5

73.8

72.1

70.3

68.5

66.6

64.7

62.7

60.5�

57.7

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.7

3.4�

2.5

79.9

78.2

76.4

74.6

72.8

70.9

69.0

67.0

65.0

62.8

60.6�

57.5

3.7

3.6

3.5

3.4

3.3

3.2

3.2

3.1

3.1

3.0

2.9�

2.0

77.0�

74.9�

72.7�

70.5�

68.2

3.0

3.0

2.9

2.9

2.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

56 ~ 83 67 ~ 8356 ~ 8353 ~ 83 56 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 41: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 175--

AR-1600M-1 / FLJ-02

Performance FC 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

73.6

72.1

70.6

69.0

67.4

65.8

64.2

62.4

60.7

59.0

57.0

5.3

5.3

5.0

4.7

4.4

4.1

3.9

3.7

3.5

3.3

3.1

3.0

2.8

2.7

2.6

2.2

81.2

79.6

78.2

76.6

75.1

73.6

72.1

70.5

69.0

67.4

65.7

64.1

62.3

60.5

58.7

4.6

3.8

3.5

3.2

3.0

2.8

2.7

2.6

2.5

2.5

2.4

2.4

2.3

2.2

2.2

81.1

79.5

78.1

76.6

75.1

73.6

72.0

70.4

68.8

67.1

65.4

63.7

61.8

60.0

2.9

2.5

2.4

2.3

2.3

2.2

2.1

2.1

2.0

2.0

1.9

1.9

1.8

1.8

79.6

78.0

76.4

74.8

73.1

71.4

69.6

67.8

66.0

64.1

62.0

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

1.6

1.5

79.8

78.0

76.1

74.3

72.4

1.4

1.3

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

61 ~ 83 72 ~ 8359 ~ 8356 ~ 83 58 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 42: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 176--

AR-1600M-1 / FLJ -02

Performance FC 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.8

76.1

74.2

72.3

70.3

68.4

66.3

64.1

61.9�

59.5

13.2�

13.2�

13.2�

12.0�

10.7�

9.4�

8.4�

7.3�

6.4�

5.4�

4.2

81.1�

79.4�

77.6�

75.7�

73.9�

72.1�

70.2�

68.2�

66.1�

64.0�

61.6

59.1

12.6�

11.7�

10.7�

9.5�

8.9�

8.3�

7.9�

7.1�

6.4�

5.7�

4.6�

3.5

80.6�

78.8�

77.0�

75.1�

73.3�

71.5�

69.6�

67.6�

65.5�

63.3�

60.7

9.6�

8.8�

8.0�

7.5�

7.0�

6.9�

6.7�

6.1�

5.6�

5.0�

3.8

80.4�

78.6�

76.7�

74.9�

73.1�

71.2�

69.3�

67.3�

65.0�

62.6�

59.8�

56.8

7.1�

6.5�

6.2�

6.0�

5.9�

5.8�

5.7�

5.4�

4.9�

4.1�

3.0�

1.9

79.5�

77.6�

75.7�

73.8�

71.8�

69.8

5.6�

5.5�

5.5�

5.4�

5.3�

5.3

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

56 ~ 83 68 ~ 8359 ~ 8359 ~ 83 58 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.7�

78.3�

76.8�

75.4�

73.9�

72.3�

70.7�

69.0�

67.2�

65.4�

63.5�

61.5�

59.4

8.0�

8.0�

8.0�

8.0�

7.9�

7.4�

7.0�

6.4�

5.8�

5.2�

4.7�

3.9�

3.0

81.4�

80.0�

78.5�

77.0�

75.5�

74.0�

72.3�

70.6�

68.9�

67.2�

65.4�

63.5�

61.3

7.1�

6.8�

6.5�

6.2�

5.9�

5.6�

5.1�

4.7�

4.4�

4.1�

3.9�

3.4�

2.8

80.2�

78.7�

77.2�

75.6�

74.0�

72.3�

70.6�

68.9�

67.2�

65.3�

63.4�

5.2�

5.0�

4.8�

4.5�

4.2�

4.0�

3.8�

3.6�

3.4�

3.2�

3.0�

81.5�

79.9�

78.4�

76.7�

75.0�

73.4�

71.6�

69.9�

68.1�

66.2�

64.3�

4.0�

3.9�

3.8�

3.5�

3.3�

3.2�

3.0�

2.9�

2.8�

2.7�

2.6�

80.2�

78.4�

76.7�

74.8�

73.0

3.2�

3.0�

2.9�

2.8�

2.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

62 ~ 83 71 ~ 8362 ~ 8358 ~ 83 60 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 43: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 177--

AR-1600M-1 / FLJ-02

Performance FC 50.0m boom + 1.7m + Fully automatic luffing jib

79.9�

78.7�

77.4�

76.1�

74.8�

73.4�

72.0�

70.6�

69.1�

67.6�

66.0�

64.4�

62.8�

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

4.5�

4.3�

4.0�

3.8�

3.5�

3.2�

3.0

81.2�

79.8�

78.5�

77.1�

75.8�

74.4�

72.9�

71.5�

70.0�

68.5�

66.9�

65.3�

63.7�

4.7�

4.4�

4.1�

3.8�

3.6�

3.4�

3.2�

3.0�

2.8�

2.6�

2.4�

2.2�

2.1�

81.0�

79.6�

78.2�

76.9�

75.4�

74.0�

72.6�

71.1�

69.6

67.9�

66.3�

64.6

3.4

3.0�

2.9�

2.8�

2.6�

2.5�

2.4�

2.3�

2.2�

1.9�

1.8�

1.7

80.2�

78.7�

77.4�

75.9�

74.4�

72.8�

71.2�

69.7�

68.0�

66.3

2.1�

2.0�

2.0�

1.9�

1.8�

1.7�

1.6�

1.6�

1.5�

1.4

79.8�

78.1�

76.5�

74.9�

73.1�

1.6�

1.5�

1.5�

1.5�

1.4

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

50.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

65 ~ 83 72 ~ 8364 ~ 8362 ~ 83 63 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 44: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 178--

AR-1600M-1 / FLJ -02

Performance FD 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

69.0

66.1

63.2

60.2

57.0�

53.6�

50.0�

46.2�

42.1�

37.6

18.6

18.6

18.6

17.6

16.8

16.0

14.7

13.6

12.6

11.8

11.0

10.0�

7.9�

6.2�

4.6�

3.2�

1.9

80.8

79.5

78.2

76.8

74.1

71.4

68.6

65.7

62.6

59.5

56.3�

52.6�

48.7�

44.5�

39.8

13.9

13.4

12.9

12.4

11.6

10.9

10.3

9.8

9.3

8.9

8.5�

6.7�

5.1�

3.6�

2.3

81.5

80.1

78.8

76.1

73.3

70.4

67.5

64.5

61.3

58.0

54.5�

50.4�

46.1�

41.2

10.8

10.5

10.2

9.7

9.2

8.8

8.5

8.2

7.9

7.7

7.1�

5.4�

3.9�

2.5

81.3

78.4

75.6

72.6

69.6

66.5

63.2

59.8

56.1

51.9

8.2

7.9

7.7

7.4

7.3

7.1

7.0

7.0

6.9

5.7

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 66 ~ 8341 ~ 8337 ~ 83 39 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.7

62.2

59.6

56.9

54.1

51.2

48.0�

44.5�

40.7

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.7

6.2

5.8

5.4

5.1

4.8

4.5

3.6�

2.6�

1.7

79.5

77.3

75.0

72.7

70.3

67.9

65.4

62.8

60.1

57.4

54.5

51.4

47.9�

44.0

7.2

6.6

6.2

5.7

5.5

5.2

4.9

4.6

4.4

4.2

4.0

3.9

3.1�

2.1

80.3

78.0

75.6

73.3

70.8

68.3

65.7

63.0

60.2

57.2

54.1

50.8

46.8

5.4

5.0

4.8

4.6

4.4

4.2

4.0

3.9

3.8

3.6

3.5

3.5

2.5

79.2

76.7

74.1

71.5

68.7

65.9

62.9

59.8

56.4

52.8

3.8

3.8

3.6

3.5

3.3

3.3

3.3

3.2

3.2

3.2

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8346 ~ 8340 ~ 83 43 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 45: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 179--

AR-1600M-1 / FLJ-02

Performance FD 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

63.1

60.9

58.7

56.4

53.9

51.4

48.8

45.8

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

3.2

3.0

2.9

2.8

2.6

2.5

2.4

1.9

79.4

77.5

75.6

73.6

71.6

69.6

67.5

65.4

63.2

60.9

58.5

56.1

53.5

50.8

47.6

3.9

3.6

3.5

3.2

3.0

2.8

2.6

2.6

2.5

2.4

2.4

2.4

2.3

2.2

1.8

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

64.8

62.5

60.1

57.5

54.8

51.9

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

2.1

2.1

2.1

2.1

2.0

2.0

79.5

77.4

75.2

72.8

70.5

68.0

65.5

62.8

59.9

56.9

53.6

2.0

2.0

2.0

1.9

1.9

1.9

1.9

1.8

1.8

1.8

1.8

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

52 ~ 83 71 ~ 8351 ~ 8345 ~ 83 47 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 46: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 180--

AR-1600M-1 / FLJ -02

Performance FD 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

74.1

71.9

69.7

67.4

64.8�

62.1�

59.4�

56.6�

53.7

18.6

18.6

17.9

17.2

16.0

14.8

13.9

13.0

12.3

9.9�

7.8�

6.1�

4.5�

3.1

81.2

80.2

78.1

76.0

73.8

71.6

69.4

67.1

64.6�

61.8�

58.9�

55.9

13.4

13.0

12.3

11.6

11.0

10.5

10.1

9.7

8.5�

6.7�

5.1�

3.6

79.4

77.3

75.1

72.9

70.6

68.3

65.9

63.3�

60.4�

57.3�

54.1

10.0

9.6

9.2

8.9

8.6

8.4

8.1

7.1�

5.5�

4.1�

2.7

81.5

79.3

77.1

74.8

72.5

70.2

67.8

65.3

62.4�

59.2�

55.8

8.0

7.8

7.6

7.4

7.3

7.2

7.1

7.0

6.0�

4.5�

3.0

80.1

77.7

75.2

72.7

70.0

67.3

6.5

6.5

6.5

6.5

6.5

6.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 66 ~ 8354 ~ 8353 ~ 83 55 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

72.1

70.2

68.2

66.2

64.2

62.1

59.7�

57.2

9.3

9.3

8.9

8.4

7.8

7.2

6.8

6.4

6.0

5.7

5.4

4.3�

3.2

80.1

78.3

76.5

74.6

72.7

70.8

68.8

66.8

64.7

62.6

60.3�

57.6

7.0

6.4

6.1

5.6

5.5

5.1

4.9

4.8

4.5

4.4

4.0�

2.9

80.8

79.0

77.1

75.2

73.3

71.3

69.4

67.3

65.2

63.0

60.6�

57.8

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.8

3.5�

2.5

80.2

78.2

76.2

74.2

72.2

70.0

67.9

65.7

63.3

60.8�

57.5

3.7

3.6

3.5

3.4

3.4

3.3

3.3

3.3

3.2

3.1�

2.0

79.9

77.7

75.3

72.9

70.5

67.9

3.0

3.0

3.0

3.0

3.0

3.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

56 ~ 83 67 ~ 8357 ~ 8356 ~ 83 57 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 47: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 181--

AR-1600M-1 / FLJ-02

Performance FD 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

72.1

70.5

68.8

67.1

65.4

63.6

61.8

59.9

5.6

5.3

4.9

4.6

4.3

4.0

3.8

3.6

3.3

3.2

3.0

2.9

2.8

80.2

78.5

77.0

75.3

73.7

72.1

70.4

68.7

66.9

65.1

63.2

61.3

4.0

3.5

3.3

3.1

3.0

2.9

2.7

2.6

2.5

2.4

2.3

2.2

80.0

78.4

76.8

75.1

73.5

71.7

70.0

68.2

66.3

64.5

62.6

2.7

2.6

2.5

2.4

2.3

2.2

2.1

2.1

2.0

2.0

2.0

80.3

78.6

76.8

75.1

73.2

71.3

69.4

67.5

65.4

63.2

61.0

1.9

1.9

1.8

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

48.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

60 ~ 83 70 ~ 8362 ~ 8359 ~ 83 60 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 48: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 182--

AR-1600M-1 / FLJ -02

Performance FD 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

76.1

74.1

72.1

69.9

67.8

65.4�

62.9�

60.4

17.6

17.0

15.8

14.8

13.8

12.4

11.0

9.8

7.8�

6.0�

4.4

81.4

79.5

77.7

75.7

73.8

71.8

69.7

67.5

65.1�

62.5�

59.8

12.8

12.0

11.5

10.8

10.2

9.6

8.9

8.3

6.6�

5.1�

3.6

80.8

79.0

77.1

75.1

73.1

71.1

68.9

66.7�

64.1�

61.4

9.7

9.4

9.0

8.6

8.3

7.9

7.5

7.1�

5.5�

4.1

80.7

78.7

76.6

74.6

72.5

70.4

68.2

65.9

63.2

7.5

7.1

6.7

6.3

6.2

6.1

5.9

5.8

4.6

80.2

78.0

75.8

73.7

71.5

69.2

6.3

6.0

5.7

5.7

5.7

5.7

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

62 ~ 83 67 ~ 8360 ~ 8360 ~ 83 59 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

74.0

72.3

70.5

68.8

67.0

65.0�

62.8�

60.5

8.5

8.5

8.0

7.5

7.0

6.6

6.3

6.0

5.3�

4.1�

3.0

79.9

78.2

76.5

74.8

73.1

71.4

69.6

67.8

65.9

63.8

7.1

6.3

5.8

5.5

5.3

5.1

4.9

4.7

4.5

3.8

80.5

78.9

77.2

75.5

73.8

72.1

70.3

68.5

66.6

64.4

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.4

79.9

78.2

76.4

74.6

72.8

70.9

69.0

67.0

65.0

3.7

3.6

3.5

3.4

3.3

3.2

3.2

3.1

3.1

78.0�

76.1�

74.0�

71.9�

69.7

3.0

3.0

2.9

2.9

2.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

63 ~ 83 68 ~ 8363 ~ 8360 ~ 83 62 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 49: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 183--

AR-1600M-1 / FLJ-02

Performance FD 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

73.6

72.1

70.6

69.0

67.4

65.8

64.2

5.3

5.3

5.0

4.7

4.4

4.1

3.9

3.7

3.5

3.3

3.1

3.0

81.2

79.6

78.2

76.6

75.1

73.6

72.1

70.5

69.0

67.4

65.7

4.6

3.8

3.5

3.2

3.0

2.8

2.7

2.6

2.5

2.5

2.4

81.1

79.5

78.1

76.6

75.1

73.6

72.0

70.4

68.8

67.1

65.4

2.9

2.5

2.4

2.3

2.3

2.2

2.1

2.1

2.0

2.0

1.9

79.6

78.0

76.4

74.8

73.1

71.4

69.6

67.8

66.0

1.8

1.8

1.7

1.7

1.7

1.7

1.6

1.6

1.6

79.6�

77.7�

75.9�

74.0�

72.1

1.4

1.3

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

65 ~ 83 72 ~ 8364 ~ 8363 ~ 83 65 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 50: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 184--

AR-1600M-1 / FLJ -02

Performance FD 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.8

76.1

74.2

72.3

70.3

68.2�

65.9�

63.6

13.2�

13.2�

13.2�

12.0�

10.7�

9.4�

7.7�

6.0�

4.4

81.1�

79.4�

77.6�

75.7�

73.9�

72.1�

70.2�

68.0�

65.7

12.6�

11.7�

10.7�

9.5�

8.9�

8.3�

7.9�

6.6�

5.0

80.6�

78.8�

77.0�

75.1�

73.3�

71.5�

69.6�

67.3

9.6�

8.8�

8.0�

7.5�

7.0�

6.9�

6.7�

5.5

80.4�

78.6�

76.7�

74.9�

73.1�

71.2�

69.3�

66.9

7.1�

6.5�

6.2�

6.0�

5.9�

5.8�

5.7�

4.6

79.5�

77.6�

75.7�

73.8�

71.8�

69.8

5.6�

5.5�

5.5�

5.4�

5.3�

5.3

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

65 ~ 83 68 ~ 8366 ~ 8363 ~ 83 64 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.7�

78.3�

76.8�

75.4�

73.9�

72.3�

70.7�

69.0�

67.0�

64.9

8.0�

8.0�

8.0�

8.0�

7.9�

7.4�

7.0�

6.4�

5.1�

3.9

81.4�

80.0�

78.5�

77.0�

75.5�

74.0�

72.3�

70.6�

68.9�

67.0

7.1�

6.8�

6.5�

6.2�

5.9�

5.6�

5.1�

4.7�

4.4�

3.7

80.2�

78.7�

77.2�

75.6�

74.0�

72.3�

70.6�

68.9�

5.2�

5.0�

4.8�

4.5�

4.2�

4.0�

3.8�

3.6�

81.5�

79.9�

78.4�

76.7�

75.0�

73.4�

71.6�

69.9�

4.0�

3.9�

3.8�

3.5�

3.3�

3.2�

3.0�

2.9�

80.2�

78.4�

76.7�

74.8�

73.0

3.2�

3.0�

2.9�

2.8�

2.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

68 ~ 83 71 ~ 8367 ~ 8364 ~ 83 65 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 51: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 185--

AR-1600M-1 / FLJ-02

Performance FD 50.0m boom + 1.7m + Fully automatic luffing jib

79.7�

78.5�

77.2�

75.9�

74.6�

73.2�

71.8�

70.4�

68.9�

67.4

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

4.5�

4.3�

4.0�

3.8

81.0�

79.6�

78.3�

76.9�

75.5�

74.1�

72.7�

71.3�

69.8�

68.2

4.7�

4.4�

4.1�

3.8�

3.6�

3.4�

3.2�

3.0�

2.8�

2.6

80.8�

79.4�

78.0�

76.7�

75.2�

73.8�

72.3�

70.9�

69.3

3.4�

3.0�

2.9�

2.8�

2.6�

2.5�

2.4�

2.3�

2.2

80.0�

78.5�

77.2�

75.7�

74.1�

72.6�

71.0

2.1�

2.0�

2.0�

1.9�

1.8�

1.7�

1.6

79.6�

77.9�

76.3�

74.6�

72.8

1.6�

1.5�

1.5�

1.5�

1.4

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

70 ~ 83 72 ~ 8368 ~ 8366 ~ 83 67 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 52: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 186--

AR-1600M-1 / FLJ -02

Performance FE 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

69.0

66.1

63.2

60.2

56.9�

53.4�

49.8�

46.0�

41.9

18.6

18.6

18.6

17.6

16.8

16.0

14.7

13.6

12.6

11.8

11.0

8.6�

6.4�

4.6�

3.1�

1.8

80.8

79.5

78.2

76.8

74.1

71.4

68.6

65.7

62.6

59.5

56.1�

52.3�

48.4�

44.2

13.9

13.4

12.9

12.4

11.6

10.9

10.3

9.8

9.3

8.9

7.1�

5.2�

3.6�

2.2

81.5

80.1

78.8

76.1

73.3

70.4

67.5

64.5

61.3

58.0

54.2�

50.1�

45.8

10.8

10.5

10.2

9.7

9.2

8.8

8.5

8.2

7.9

7.7

5.7�

4.0�

2.5

81.3

78.4

75.6

72.6

69.6

66.5

63.2

59.8

55.9�

51.6

8.2

7.9

7.7

7.4

7.3

7.1

7.0

7.0

6.1�

4.3

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 66 ~ 8345 ~ 8341 ~ 83 44 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.7

62.2

59.6

56.9

54.1�

51.0�

47.6

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.7

6.2

5.8

5.4

5.1

4.6�

3.4�

2.3

79.5

77.3

75.0

72.7

70.3

67.9

65.4

62.8

60.1

57.4

54.5

51.1�

47.5

7.2

6.6

6.2

5.7

5.5

5.2

4.9

4.6

4.4

4.2

4.0

3.0�

1.9

80.3

78.0

75.6

73.3

70.8

68.3

65.7

63.0

60.2

57.2

54.1

50.4

5.4

5.0

4.8

4.6

4.4

4.2

4.0

3.9

3.8

3.6

3.5

2.4

79.2

76.7

74.1

71.5

68.7

65.9

62.9

59.8

56.4

52.7

3.8

3.8

3.6

3.5

3.3

3.3

3.3

3.2

3.2

2.9

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

51 ~ 83 67 ~ 8350 ~ 8347 ~ 83 47 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 53: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 187--

AR-1600M-1 / FLJ-02

Performance FE 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

63.1

60.9

58.7

56.4

53.9

51.4

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

3.2

3.0

2.9

2.8

2.6

2.4

79.4

77.5

75.6

73.6

71.6

69.6

67.5

65.4

63.2

60.9

58.5

56.1

53.5

3.9

3.6

3.5

3.2

3.0

2.8

2.6

2.6

2.5

2.4

2.4

2.4

2.3

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

64.8

62.5

60.1

57.5

54.8

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

2.1

2.1

2.1

2.1

2.0

79.5

77.4

75.2

72.8

70.5

68.0

65.5

62.8

59.9

56.9

2.0

2.0

2.0

1.9

1.9

1.9

1.9

1.8

1.8

1.8

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

56 ~ 83 71 ~ 8354 ~ 8351 ~ 83 53 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 54: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 188--

AR-1600M-1 / FLJ -02

Performance FE 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

74.1

71.9

69.7

67.2�

64.6�

61.9�

59.1

18.6

18.6

17.9

17.2

16.0

14.8

13.9

13.0

11.0�

8.4�

6.3�

4.5

81.2

80.2

78.1

76.0

73.8

71.6

69.4

67.0�

64.3�

61.4�

58.5

13.4

13.0

12.3

11.6

11.0

10.5

10.1

9.3�

7.1�

5.2�

3.6

79.4

77.3

75.1

72.9

70.6

68.3

65.9�

63.0�

60.0

10.0

9.6

9.2

8.9

8.6

8.4

7.8�

5.8�

4.1

81.5

79.3

77.1

74.8

72.5

70.2

67.8

65.1�

62.0�

58.7�

55.3

8.0

7.8

7.6

7.4

7.3

7.2

7.1

6.4�

4.6�

3.1�

1.7

80.1

77.7

75.2

72.7

70.0

67.3

6.5

6.5

6.5

6.5

6.5

6.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

55 ~ 83 66 ~ 8359 ~ 8359 ~ 83 58 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

72.1

70.2

68.2

66.2

64.2�

61.8�

59.3

9.3

9.3

8.9

8.4

7.8

7.2

6.8

6.4

6.0

5.5�

4.2�

3.0

80.1

78.3

76.5

74.6

72.7

70.8

68.8

66.8

64.7

62.4�

59.8

7.0

6.4

6.1

5.6

5.5

5.1

4.9

4.8

4.5

3.8�

2.7

80.8

79.0

77.1

75.2

73.3

71.3

69.4

67.3

65.2

62.8

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.9

3.4

80.2

78.2

76.2

74.2

72.2

70.0

67.9

65.7

63.2

3.7

3.6

3.5

3.4

3.4

3.3

3.3

3.3

3.0

79.9

77.7

75.3

72.9

70.5

67.9

3.0

3.0

3.0

3.0

3.0

3.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

62 ~ 83 67 ~ 8361 ~ 8359 ~ 83 59 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 55: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 189--

AR-1600M-1 / FLJ-02

Performance FE 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

72.1

70.5

68.8

67.1

65.4

63.6

5.6

5.3

4.9

4.6

4.3

4.0

3.8

3.6

3.3

3.2

3.0

80.2

78.5

77.0

75.3

73.7

72.1

70.4

68.7

66.9

65.1

63.2

4.0

3.5

3.3

3.1

3.0

2.9

2.7

2.6

2.5

2.4

2.3

80.0

78.4

76.8

75.1

73.5

71.7

70.0

68.2

66.3

64.5

2.7

2.6

2.5

2.4

2.3

2.2

2.1

2.1

2.0

2.0

80.3

78.6

76.8

75.1

73.2

71.3

69.4

67.5

65.4

1.9

1.9

1.8

1.8

1.8

1.7

1.7

1.7

1.7

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

64 ~ 83 70 ~ 8364 ~ 8363 ~ 83 62 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 56: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 190--

AR-1600M-1 / FLJ -02

Performance FE 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

76.1

74.1

72.1

69.9�

67.5�

65.1�

62.6�

17.6

17.0

15.8

14.8

13.8

12.4

10.9�

8.4�

6.2�

4.4

81.4

79.5

77.7

75.7

73.8

71.8

69.7

67.2�

64.7

12.8

12.0

11.5

10.8

10.2

9.6

8.9

7.0�

5.2

80.8

79.0

77.1

75.1

73.1

71.1

68.9

66.4�

63.7

9.7

9.4

9.0

8.6

8.3

7.9

7.5

5.8�

4.1

80.7

78.7

76.6

74.6

72.5

70.4

68.2

65.6

7.5

7.1

6.7

6.3

6.2

6.1

5.9

4.7

80.2

78.0

75.8

73.7

71.5

69.2

6.3

6.0

5.7

5.7

5.7

5.7

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

64 ~ 83 67 ~ 8363 ~ 8362 ~ 83 64 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

74.0

72.3

70.5

68.8

66.8�

64.6

8.5

8.5

8.0

7.5

7.0

6.6

6.3

5.3�

4.0

79.9

78.2

76.5

74.8

73.1

71.4

69.6

67.8

65.6

7.1

6.3

5.8

5.5

5.3

5.1

4.9

4.7

3.7

80.5

78.9

77.2

75.5

73.8

72.1

70.3

68.5

66.2

5.1

4.8

4.6

4.4

4.3

4.2

4.1

4.0

3.3

79.9

78.2

76.4

74.6

72.8

70.9

69.0

3.7

3.6

3.5

3.4

3.3

3.2

3.2

78.0�

76.1�

74.0�

71.9�

69.7

3.0

3.0

2.9

2.9

2.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

67 ~ 83 68 ~ 8365 ~ 8364 ~ 83 64 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 57: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 191--

AR-1600M-1 / FLJ-02

Performance FE 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

73.6

72.1

70.6

69.0

67.4

5.3

5.3

5.0

4.7

4.4

4.1

3.9

3.7

3.5

3.3

81.2

79.6

78.2

76.6

75.1

73.6

72.1

70.5

69.0

67.4

4.6

3.8

3.5

3.2

3.0

2.8

2.7

2.6

2.5

2.5

81.1

79.5

78.1

76.6

75.1

73.6

72.0

70.4

68.8

2.9

2.5

2.4

2.3

2.3

2.2

2.1

2.1

2.0

79.6

78.0

76.4

74.8

73.1

71.4

69.6

1.8

1.8

1.7

1.7

1.7

1.7

1.6

79.8�

78.0�

76.1�

74.3�

72.4

1.4

1.3

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

69 ~ 83 72 ~ 8368 ~ 8366 ~ 83 66 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 58: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 192--

AR-1600M-1 / FLJ -02

Performance FE 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.8

76.1

74.2

72.3

70.1�

67.8

13.2�

13.2�

13.2�

12.0�

10.7�

8.3�

6.2

81.1�

79.4�

77.6�

75.7�

73.9�

72.1�

70.0�

67.6

12.6�

11.7�

10.7�

9.5�

8.9�

8.3�

7.0�

5.1

80.6�

78.8�

77.0�

75.1�

73.3�

71.5�

69.3

9.6�

8.8�

8.0�

7.5�

7.0�

6.9�

5.8

80.4�

78.6�

76.7�

74.9�

73.1�

71.2�

7.1�

6.5�

6.2�

6.0�

5.9�

5.8�

79.5�

77.6�

75.7�

73.8�

71.8�

69.7

5.6�

5.5�

5.5�

5.4�

5.3�

5.1

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

69 ~ 83 68 ~ 8368 ~ 8367 ~ 83 66 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.7�

78.3�

76.8�

75.4�

73.9�

72.3�

70.7�

68.6

8.0�

8.0�

8.0�

8.0�

7.9�

7.4�

6.8�

5.2

81.4�

80.0�

78.5�

77.0�

75.5�

74.0�

72.3�

70.6�

7.1�

6.8�

6.5�

6.2�

5.9�

5.6�

5.1�

4.7�

80.2�

78.7�

77.2�

75.6�

74.0�

72.3�

70.6

5.2�

5.0�

4.8�

4.5�

4.2�

4.0�

3.8�

81.5�

79.9�

78.4�

76.7�

75.0�

73.4�

71.6

4.0�

3.9�

3.8�

3.5�

3.3�

3.2�

3.0

80.2�

78.4�

76.7�

74.8�

73.0

3.2�

3.0�

2.9�

2.8�

2.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

70 ~ 83 71 ~ 8369 ~ 8367 ~ 83 69 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 59: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 193--

AR-1600M-1 / FLJ-02

Performance FE 50.0m boom + 1.7m + Fully automatic luffing jib

79.9�

78.7�

77.4�

76.1�

74.8�

73.4�

72.0�

70.6

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

4.5�

4.3�

81.2�

79.8�

78.5�

77.1�

75.8�

74.4�

72.9�

71.5

4.7�

4.4�

4.1�

3.8�

3.6�

3.4�

3.2�

3.0�

81.0�

79.6�

78.2�

76.9�

75.4�

74.0�

72.6

3.4�

3.0�

2.9�

2.8�

2.6�

2.5�

2.4�

80.2�

78.7�

77.4�

75.9�

74.4

2.1�

2.0�

2.0�

1.9�

1.8�

79.8�

78.1�

76.5�

74.9�

73.1

1.6�

1.5�

1.5�

1.5�

1.4

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

73 ~ 83 72 ~ 8371 ~ 8369 ~ 83 70 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 60: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 194--

AR-1600M-1 / FLJ -02

Performance FF 31.8m boom + 1.7m + Fully automatic luffing jib

81.0

79.7

78.4

77.1

75.8

74.5

71.8

68.9�

65.9�

62.8

18.6

18.6

18.6

17.6

16.8

16.0

14.7

12.5�

8.8�

6.1

80.8

79.5

78.2

76.8

74.1

71.4

68.5�

65.3�

62.1

13.9

13.4

12.9

12.4

11.6

10.9

9.9�

7.0�

4.7

81.5

80.1

78.8

76.1

73.3

70.4

67.4�

64.1

10.8

10.5

10.2

9.7

9.2

8.8

7.8�

5.4

81.3

78.4

75.6

72.6

69.6

66.3�

62.7

8.2

7.9

7.7

7.4

7.3

6.2�

4.1

80.6

77.5

74.4

71.1

67.7

6.7

6.6

6.6

6.6

6.6

7.0

8.0

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

62 ~ 83 66 ~ 8363 ~ 8362 ~ 83 62 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

80.5

79.5

78.4

76.3

74.1

71.8

69.5

67.1

64.4�

61.7

9.3

9.3

9.3

8.9

8.5

7.8

7.2

6.6�

4.8�

3.4

79.5

77.3

75.0

72.7

70.3

67.9

65.3

7.2

6.6

6.2

5.7

5.5

5.2

4.4

80.3

78.0

75.6

73.3

70.8

68.3

65.7

5.4

5.0

4.8

4.6

4.4

4.2

3.9

79.2

76.7

74.1

71.5

68.7

65.9

3.8

3.8

3.6

3.5

3.3

3.3

80.2

77.4

74.5

71.4

68.2

3.1

3.1

3.0

3.0

3.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

65 ~ 83 67 ~ 8365 ~ 8361 ~ 83 65 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 61: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 195--

AR-1600M-1 / FLJ-02

Performance FF 31.8m boom + 1.7m + Fully automatic luffing jib

80.8

79.0

77.2

75.3

73.3

71.4

69.4

67.3

65.2

5.6

5.6

5.6

5.1

4.7

4.4

4.0

3.7

3.5

79.4

77.5

75.6

73.6

71.6

69.6

67.5

3.9

3.6

3.5

3.2

3.0

2.8

2.6

81.4

79.5

77.5

75.4

73.5

71.4

69.2

67.1

2.9

2.8

2.6

2.4

2.4

2.3

2.2

2.2

79.5

77.4

75.2

72.8

70.5

68.0

2.0

2.0

2.0

1.9

1.9

1.9

79.5

76.9

74.2

71.3

1.5

1.5

1.5

1.4

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

67 ~ 83 71 ~ 8366 ~ 8365 ~ 83 67 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 62: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 196--

AR-1600M-1 / FLJ -02

Performance FF 40.9m boom + 1.7m + Fully automatic luffing jib

81.3

80.4

79.3

78.3

76.2

73.8�

71.3

18.6

18.6

17.9

17.2

16.0

12.4�

8.7

81.2

80.2

78.1

76.0

73.7�

71.0

13.4

13.0

12.3

11.6

9.9�

6.9

79.4

77.3

75.1

72.7

10.0

9.6

9.2

7.8

81.5

79.3

77.1

74.8

72.3

8.0

7.8

7.6

7.4

6.3

80.4�

78.0�

75.5�

73.0�

70.1�

67.0

6.5

6.5

6.5

6.5

4.8�

2.9

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

71 ~ 83 67 ~ 8372 ~ 8371 ~ 83 70 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

81.0

79.3

77.6

75.8

74.0

71.9

9.3

9.3

8.9

8.4

7.8

6.3

80.1

78.3

76.5

74.6

72.7

7.0

6.4

6.1

5.6

5.5

80.8

79.0

77.1

75.2

73.3

5.1

4.8

4.6

4.4

4.3

80.2

78.2

76.2

74.2

3.7

3.6

3.5

3.4

80.2

78.0

75.7

73.4

70.9

67.8

3.0

3.0

3.0

3.0

2.9�

1.7

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

73 ~ 83 67 ~ 8372 ~ 8371 ~ 83 72 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 63: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 197--

AR-1600M-1 / FLJ-02

Performance FF 40.9m boom + 1.7m + Fully automatic luffing jib

80.0

78.5

76.9

75.3

73.7

5.6

5.3

4.9

4.6

4.3

80.2

78.5

77.0

75.3

73.7

4.0

3.5

3.3

3.1

3.0

80.0

78.4

76.8

75.1

2.7

2.6

2.5

2.4

80.3

78.6

76.8

75.1

1.9

1.9

1.8

1.8

79.6

77.5

75.3

73.1

70.8

1.4

1.4

1.4

1.4

1.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

74 ~ 83 70 ~ 8374 ~ 8373 ~ 83 73 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 64: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 198--

AR-1600M-1 / FLJ -02

Performance FF 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.8

78.0

75.8�

73.4

17.6

17.0

15.8

12.3�

8.6

81.4

79.5

77.7

75.6

12.8

12.0

11.5

9.8

80.8

79.0

77.1

74.9

9.7

9.4

9.0

7.8

80.7

78.7

76.6

74.6

7.5

7.1

6.7

6.3

80.2

78.0

75.8

73.4�

70.5�

67.6

6.3

6.0

5.7

4.8�

3.0�

1.5

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

73 ~ 83 67 ~ 8374 ~ 8372 ~ 83 74 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

78.9

77.3

75.7

8.5

8.5

8.0

79.9

78.2

76.5

7.1

6.3

5.8

80.5

78.9

77.2

5.1

4.8

4.6 79.9

78.2

76.4

3.7

3.6

3.5 78.0�

76.1�

74.0�

71.2

3.0

3.0

2.9

1.8

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

75 ~ 83 71 ~ 8376 ~ 8374 ~ 83 75 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 65: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 199--

AR-1600M-1 / FLJ-02

Performance FF 45.4m boom + 1.7m + Fully automatic luffing jib

80.7

79.4

78.0

76.5

75.1

5.3

5.3

5.0

4.7

4.4

81.2

79.6

78.2

76.6

4.6

3.8

3.5

3.2

81.1

79.5

78.1

2.9

2.5

2.4

79.6

78.0

1.8

1.8

79.8�

78.0�

76.1�

74.3

1.4

1.3

1.3

1.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

D

B (m) E M E M E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°� 40°� 60°�

77 ~ 83 74 ~ 8377 ~ 8374 ~ 83 76 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Page 66: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 200--

AR-1600M-1 / FLJ -02

Performance FF 50.0m boom + 1.7m + Fully automatic luffing jib

79.4

77.5

13.2�

12.2

81.1�

79.4�

77.4

12.6�

11.7�

9.7

80.6�

78.8�

9.6�

8.8� 80.4�

78.6�

7.1�

6.5� 79.5�

77.6�

75.5�

72.9�

70.2

5.6�

5.5�

4.9�

3.1�

1.6

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

D

B (m) E M E M E M E M E M

C 1.7m + 10.2m

5°� 15°� 25°� 40°� 60°�

77 ~ 83 70 ~ 8377 ~ 8376 ~ 83 76 ~ 83

C= Jib length D= Jib offset B= Working radius (m)E= Boom angle M= Total rated load F= Standard hook H= No. of part-line

Unit:ton

θ (°)

F

H

25t hook (730kg)�2part-line

79.9�

78.5�

77.2

8.0�

8.0�

8.0

81.4�

80.0�

78.5

7.1�

6.8�

6.5� 80.2�

78.7�

5.2�

5.0� 81.5�

79.9�

4.0�

3.9

80.2�

78.4�

76.7�

74.1

3.2�

3.0�

2.9�

1.8

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

D

B (m) E M E M E M E M E M

C 1.7m + 17.9m

5°� 15°� 25°� 40°� 60°�

78 ~ 83 73 ~ 8377 ~ 8376 ~ 83 77 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

80.4

79.2�

77.9

5.0�

5.0�

5.0 81.2�

79.8

4.7�

4.4

81.0�

79.6

3.4�

3.0

18.0

20.0

22.0

24.0

26.0

28.0

D

B (m) E M E M E M

C 1.7m + 25.7m

5°� 15°� 25°�

78 ~ 8377 ~ 83 78 ~ 83

Unit:ton

θ (°)

F

H

9.4t hook (430kg)�1part-line

Page 67: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 201--

AR-1600M-1 / FLJ-02

NOTES:The deflection of the boom and jib are not incorporated in the figure above.The above figure is for Performance FA.

WORKING RADIUS(m)

LIFTINGHEIGHT(m

)

WORKING RADIUS - LIFTING HEIGHT

31.8m boom + 1.7m + Fully automatic luffing jib

Page 68: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 202--

AR-1600M-1 / FLJ -02

NOTES:The deflection of the boom and jib are not incorporated in the figure above.The above figure is for Performance FA.

WORKING RADIUS(m)

LIFTINGHEIGHT(m

)

40.9m boom + 1.7m + Fully automatic luffing jib

Page 69: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 203--

AR-1600M-1 / FLJ-02

NOTES:The deflection of the boom and jib are not incorporated in the figure above.The above figure is for Performance FA.

WORKING RADIUS(m)

LIFTINGHEIGHT(m

)

45.4m boom + 1.7m + Fully automatic luffing jib

Page 70: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 204--

AR-1600M-1 / FLJ -02

NOTES:The deflection of the boom and jib are not incorporated in the figure above.The above figure is for Performance FA.

WORKING RADIUS(m)

LIFTINGHEIGHT(m

)

50.0m boom + 1.7m + Fully automatic luffing jib

Page 71: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 205--

AR-1600M-1 / LJ-02

Control No. AR-1600M-1/LJ-02

ALL TERRAIN CRANE

AR-1600M

JAPANESE SPECIFICATIONS

These specifications are for the optional luffing jibfor the AR-1600M type crane.Refer to these specifications along withspecification control no. AR-1600M-1/MB.

(Luffiing Jib)

AR

ハイマン翻訳
Return to index
Page 72: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 206--

AR-1600M-1 / LJ -02

CRANE CAPACITY11m Jib 75,000kg at 7.0m (8part-line)20m Jib 47,000kg at 10.0m (6part-line)29m Jib 27,000kg at 14.0m (4part-line)37m Jib 8,500kg at 40.0m (1part-line)45m Jib 5,800kg at 24.0m (1part-line)JIBLattice typeJIB LENGTH1.8m (fixing part) + 11.0m, 20.0m, 29.0m 37.0m, 45,0m

MAX.LIFTING HEIGHT95.0m

MAX.WORKING RADIUS70.0m

AR-1600MCRANE SPECIFICATIONS

Page 73: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 207--

AR-1600M-1 / LJ-02

BOOM TOTAL RATED LOADS

1. The total rated loads shown are for the case where the outriggers are set horizontally on firm level ground. Thevalues above the bold lines are based on the crane strength while those below are based on the crane stability.

2. The weights of the slings and hooks (110t hook: 2,100kg, 65t hook: 940kg, 25t hook: 730kg, 9.4t hook: 430kg) areincluded in the total rated loads shown.

3. The total rated load is based on the actual working radius including the deflection of the boom.4. The table below shows the classification of Performances LS, LA to LD of the total rated load.

- If the rear jack is not used, the performance classification in parentheses shall apply.5. The standard hook and number of part lines are shown in the total rated loads chart. The load per line should not

exceed 9.4t.6. The elevation wire rope is a 6-part line.7. When the maximum instantaneous velocity is 10m/s or more, stop crane operation.8. Markθin the total rated load chart shows the boom angle range (under no load).9. The total rated loads shown are for the case where the 2nd boom section fixing pin is used.

Ensure that the 2nd boom section fixing pin is used with theluffing jib.

Counterweight

Outrigger extension width

8.8m

8.0m

6.8m

5.6m

2.7m

50t

LS (LC)

LA (LC)

LC (LC)

-

-

44t

LA (LD)

LB (LD)

LD (LD)

-

-

34t

LC (-)

LD (-)

-

-

-

25t

LD (-)

-

-

-

-

0t

-

-

-

-

-

Page 74: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 208--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

75.0�

75.0�

71.6�

66.3�

62.9�

57.9�

53.0�

45.9�

39.1�

32.2�

27.6�

24.0�

20.8�

17.8

66.0�

63.0�

59.8�

56.8�

53.6�

46.2�

40.3�

33.0�

28.0�

24.3�

21.1�

18.0

52.6�

51.0�

49.5�

47.5�

44.6�

39.7�

33.7�

28.4�

24.7�

21.2

41.6�

40.4�

38.1�

36.3�

33.7�

28.9�

25.2

29.0�

28.2

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

B(m)

F 110t hook (2,100kg)

8part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 33~83 43~83 66~83θ (°)

Performance LS 1.8m + 11m luffing jib

Unit: ton

61.0�

61.0�

61.0�

57.8�

52.6�

48.3�

41.1�

35.6�

30.5�

26.2�

22.9�

19.5�

16.3�

14.0�

12.0

61.0�

58.6�

54.0�

50.0�

42.5�

36.8�

31.3�

27.0�

23.5�

19.9�

16.8�

14.2�

12.3

51.2�

49.4�

43.7�

37.7�

32.1�

27.5�

23.8�

20.2�

17.1�

14.4

40.0�

38.3�

33.0�

28.3�

24.3�

20.7

31.1�

30.3�

29.7

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

B(m)

F 65t hook (940kg)

7part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 32~83 48~83 65~83θ (°)

Unit: ton

38.9�

38.9�

38.9�

37.3�

33.8�

29.4�

25.7�

22.6�

20.0�

17.9�

16.0�

14.3�

12.7�

11.0�

9.6�

8.4�

7.1�

6.0

35.0�

34.6�

32.5�

30.5�

26.6�

23.5�

20.7�

18.5�

16.5�

14.9�

13.2�

11.6�

10.0�

8.6�

7.3

29.5�

29.5�

27.6�

24.2�

21.4�

19.4�

17.1�

15.3�

13.6�

11.8�

10.1�

8.7

27.4�

27.0�

24.7�

22.3�

19.8�

18.0�

16.3�

14.1

23.2�

23.0�

22.9�

22.1

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

19~83 23~83 31~83 48~83 65~83θ (°)

Unit: ton

Page 75: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 209--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

47.0�

47.0�

46.6�

45.0�

42.2�

39.0�

34.2�

30.0�

26.4�

22.9�

20.8�

18.7�

16.6�

14.8�

13.0�

11.2

40.0�

37.4�

34.2�

31.3�

29.0�

27.0�

24.0�

21.5�

19.2

17.1�

15.2�

13.4

30.0�

27.9�

26.2�

24.6�

23.4�

22.1�

19.8�

17.6�

15.5�

13.6

21.8�

20.8�

19.9�

19.1�

18.5�

17.8

16.2�

15.8�

15.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

B(m)

F 65t hook (940kg)

6part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

18~83 25~83 25~83 47~83 62~83θ (°)

Performance LS 1.8m + 20m luffing jib

Unit: ton

43.0�

43.0�

43.0�

40.8�

37.7�

33.0�

28.7�

25.2�

21.8�

19.0�

16.5�

14.5�

13.0�

11.8�

10.4�

9.2�

7.9

39.1�

35.9�

33.1�

29.7�

26.3�

22.7�

19.8�

17.4�

15.6�

14.0�

12.3�

10.8�

9.5

29.7�

28.5�

27.3�

25.8�

22.7�

20.6�

18.1�

16.2�

14.0�

12.3�

11.1

22.6�

21.9�

21.1�

20.3�

19.1�

17.5�

15.2

17.2�

16.7�

16.2�

16.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

20~83 26~83 36~83 51~83 63~83θ (°)

Unit: ton

26.5�

26.5�

26.5�

25.8�

23.4�

21.1�

18.9�

16.9�

15.2�

13.7�

12.4�

11.2�

10.0�

8.8�

7.7�

6.7�

5.8�

5.0�

4.3

25.7�

25.0�

24.3�

22.1�

19.8�

17.8�

16.0�

14.4�

13.1�

11.8�

10.5�

9.3�

8.1�

7.1�

6.1�

5.3�

4.5

23.1�

22.4�

21.8�

20.8�

18.6�

16.8�

15.2�

13.7�

12.3�

11.0�

9.7�

8.5�

7.4�

6.3

18.6�

18.2�

17.9�

17.6�

16.1�

14.5�

13.1�

11.5�

10.1

15.2�

15.0�

14.9�

14.9

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

23~83 25~83 35~83 51~83 63~83θ (°)

Unit: ton

18.0�

18.0�

18.0�

18.0�

18.0�

16.8�

15.6�

14.1�

12.7�

11.6�

10.6�

9.0�

7.9�

6.9�

6.0�

5.2�

4.5�

3.8�

3.2

18.0�

17.3�

16.6�

15.9�

15.2�

14.5�

13.2�

11.9�

10.8�

9.6�

8.4�

7.3�

6.3�

5.5�

4.7�

4.0�

3.4

18.0�

17.2�

16.5�

15.7�

15.0�

13.5�

12.7�

11.2�

10.0�

8.9�

7.6�

6.7�

5.8�

5.0�

4.2

14.7�

14.4�

14.3�

14.0�

12.7�

11.6�

10.6�

9.3�

8.1�

7.0

12.2�

12.1�

12.0�

11.9�

11.8

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

29~83 31~83 35~83 49~83 64~83θ (°)

Unit: ton

Page 76: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 210--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

14.5�

14.5�

14.5�

14.5�

14.5�

13.5�

12.2�

11.2�

10.2�

9.3�

8.5�

7.6�

6.9�

6.2�

5.5�

4.8�

4.1�

3.2�

1.6

14.1�

14.1�

14.1�

13.9�

13.7�

13.0�

11.8�

10.8�

9.8�

8.9�

8.1�

7.3�

6.6�

5.9�

5.2�

4.4�

3.6�

1.8

14.1�

13.8�

13.6�

13.4�

12.3�

11.2�

10.2�

9.3�

8.5�

7.7�

6.9�

6.1�

5.4�

4.6�

3.9

13.1�

13.1�

13.1�

13.1�

11.9�

10.8�

9.8�

9.0�

8.1�

7.4�

6.6

12.0�

12.0�

12.0�

11.3�

10.2

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

27~83 29~83 34~83 51~83 64~83θ (°)

Performance LS 1.8m + 20m luffing jib

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.3�

7.4�

6.7�

6.0�

5.3�

4.5�

3.9�

3.3�

2.7

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.6�

7.8�

7.0�

6.3�

5.6�

5.0�

4.3�

3.6�

3.0�

1.5

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.0�

8.1�

7.3�

6.6�

5.9�

5.3�

4.6�

3.9�

3.3�

1.7

11.0�

10.5�

10.0�

9.5�

9.0�

8.5�

7.7�

6.9�

6.2�

5.6�

4.9�

4.1

9.3�

9.3�

9.3�

8.8�

7.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

39~83 37~83 38~83 49~83 64~83θ (°)

Unit: ton

9.1�

9.1�

9.1�

9.1�

9.1�

9.1�

8.2�

7.4�

6.7�

5.9�

5.4�

4.9�

4.3�

3.7�

3.2�

2.7�

2.2

9.1�

9.1�

9.1�

9.0�

8.8�

8.0�

7.3�

6.5�

5.8�

5.2�

4.7�

4.2�

3.6�

3.1�

2.6�

1.5

8.6�

8.6�

8.6�

8.6�

8.1�

7.7�

7.0�

6.3�

5.6�

5.0�

4.4�

4.0�

3.4�

2.8�

1.6

7.8�

7.8�

7.8�

7.8�

7.4�

7.0�

6.3�

5.6�

5.0�

4.3�

3.8�

3.3

6.8�

6.8�

6.8�

6.8�

6.8�

6.6

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

44~83 42~83 44~83 48~83 64~83θ (°)

Unit: ton

Page 77: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 211--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

27.0�

27.0�

25.9�

25.2�

23.9�

22.7�

21.8�

20.8�

19.2�

17.1�

15.4�

13.8�

12.6�

11.4�

10.3�

9.5�

8.7

23.0�

23.0�

22.2�

21.3�

20.4�

19.2�

18.2�

17.0�

16.0�

14.1�

13.1�

11.8�

10.7�

9.8�

8.8

19.5�

18.5�

17.5�

16.5�

16.0�

15.0�

14.5�

13.6�

12.4�

11.5�

10.1

14.0�

14.0�

13.3�

12.8�

12.3�

11.9�

11.7

10.7�

10.3�

10.1

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

23~83 27~83 33~83 51~83 66~83θ (°)

Performance LS 1.8m + 29m luffing jib

Unit: ton

25.0�

25.0�

24.8�

24.0�

23.1�

22.0�

20.4�

18.0�

16.0�

14.2�

12.8�

11.4�

10.2�

9.2�

8.2�

7.4�

6.6�

5.9

22.8�

22.0�

21.2�

20.4�

19.7�

19.1�

17.0�

15.2�

13.5�

12.1�

10.9�

9.9�

8.8�

7.9�

6.9�

6.1

20.0�

19.1�

18.2�

17.4�

16.5�

15.8�

14.3�

12.9�

11.5�

10.3�

9.3�

8.2�

7.2

15.0�

14.4�

13.8�

13.3�

12.9�

12.2�

11.0�

9.8

10.9�

10.7�

10.5

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

24~83 28~83 32~83 48~83 66~83θ (°)

Unit: ton

16.8�

16.8�

16.8�

16.8�

16.8�

16.5�

16.0�

14.8�

13.4�

12.2�

11.2�

10.0�

8.9�

7.9�

7.0�

6.1�

5.4�

4.7�

3.2

16.8�

16.8�

16.8�

16.8�

16.5�

15.6�

14.3�

13.1�

11.9�

10.8�

9.6�

8.6�

7.6�

6.7�

5.9�

5.1�

3.5

16.8�

16.5�

16.0�

15.6�

15.2�

13.8�

12.7�

11.5�

10.2�

9.2�

8.1�

7.2�

6.3�

5.5

13.3�

13.1�

12.8�

12.6�

12.3�

11.1�

10.0�

8.8�

7.7�

6.7

10.7�

10.6�

10.5�

10.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

28~83 31~83 36~83 48~83 65~83θ (°)

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

8.7�

7.7�

6.8�

6.0�

5.3�

4.5�

3.9�

2.6

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.1�

8.3�

7.4�

6.6�

5.8�

5.1�

4.4�

2.9

11.0�

11.0�

11.0�

10.6�

10.3�

9.9�

9.6�

8.8�

8.0�

7.2�

6.3�

5.5�

4.8�

3.2

11.0�

10.5�

10.1�

9.7�

9.3�

8.5�

7.8�

6.9�

6.0�

5.2

8.5�

8.4�

8.3�

8.2�

8.2

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

36~83 39~83 42~83 46~83 65~83θ (°)

Unit: ton

Page 78: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 212--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

9.0�

9.0�

9.0�

9.0�

9.0�

9.0�

8.8�

8.5�

8.1�

7.8�

7.5�

6.9�

6.3�

5.8�

5.3�

4.8�

4.2�

2.5

8.4�

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.3�

6.7�

6.1�

5.6�

5.1�

4.7�

3.1

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.2�

6.7�

6.3�

5.8�

5.0�

3.5�

1.5

7.8�

7.8�

7.8�

7.8�

7.8�

7.5�

7.2�

6.7�

6.2�

5.8�

3.9

7.0�

7.0�

7.0�

7.0�

7.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

37~83 40~83 39~83 42~83 65~83θ (°)

Performance LS 1.8m + 29m luffing jib

Unit: ton

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.7�

6.0�

5.4�

4.8�

4.3�

3.9�

3.3�

1.9

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.4�

6.9�

6.4�

5.8�

5.2�

4.7�

4.2�

3.7�

2.4

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.6�

6.2�

5.6�

5.1�

4.5�

4.0�

2.8

7.0�

7.0�

7.0�

7.0�

6.5�

6.1�

5.8�

4.9�

4.4�

3.2

6.0�

6.0�

6.0�

6.0�

5.8

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

46~83 49~83 51~83 54~83 65~83θ (°)

Unit: ton

6.6�

6.6�

6.6�

6.6�

6.5�

6.3�

6.0�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.1�

2.8�

2.4�

1.8

6.4�

6.3�

6.1�

6.0�

5.9�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.2�

2.8�

2.0

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.1�

4.6�

4.2�

3.7�

3.2�

2.4

5.4�

5.4�

5.4�

5.3�

5.2�

5.1�

4.9�

4.5�

4.0�

2.8�

2.0

4.2�

4.2�

4.2�

4.2�

4.2�

4.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

47~83 50~83 52~83 51~83 65~83θ (°)

Unit: ton

Page 79: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 213--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.2�

7.8�

7.4�

6.6�

6.1�

4.6�

3.3

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.3�

8.1�

8.0�

7.8�

7.6�

7.5�

7.3�

6.6�

5.1�

3.7�

2.1

8.4�

8.2�

8.0�

7.8�

7.6�

7.4�

7.2�

7.0�

6.9�

6.8�

6.6�

5.5�

4.0

7.2�

7.0�

6.8�

6.7�

6.5�

6.3�

6.2�

6.1�

5.8

5.9�

5.8�

5.6�

5.5

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

26~83 25~83 30~83 45~83 66~83θ (°)

Performance LS 1.8m + 37m luffing jib

Unit: ton

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.0�

6.4�

5.9�

5.3�

4.7�

3.4�

2.3

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

6.3�

5.8�

5.3�

3.9�

2.8�

1.6

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.2�

6.8�

6.3�

5.6�

4.4�

3.1�

1.8

6.7�

6.4�

6.2�

6.0�

5.8�

5.6�

5.5�

4.9

5.5�

5.3�

5.3�

5.3�

5.3

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

34~83 35~83 38~83 51~83 61~83θ (°)

Unit: ton

6.3�

6.3�

6.3�

6.3�

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.5�

5.2�

4.8�

3.8�

2.8

6.3�

6.3�

6.3�

6.2�

6.1�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.3�

5.1�

4.3�

3.2

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.5�

4.7�

3.6�

2.4

6.1�

6.1�

6.0�

6.0�

5.9�

5.8�

5.7�

5.2�

4.0

5.2�

5.2�

5.2�

5.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

40~83 43~83 44~83 48~83 64~83θ (°)

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.6�

4.2�

3.8�

3.0�

1.7

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.6�

4.2�

3.2�

2.3

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.5�

3.5�

2.6�

1.7

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

3.9�

3.0�

2.1

5.0�

5.0�

5.0�

4.3

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

44~83 48~83 49~83 51~83 61~83θ (°)

Unit: ton

Page 80: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 214--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.8�

2.1�

1.5

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.4�

1.6

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.5�

2.8�

2.0

3.8�

3.8�

3.8�

3.7�

3.6�

3.3�

2.5�

1.6

3.3�

3.3�

3.3�

3.3

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

48~83 51~83 54~83 55~83 64~83θ (°)

Performance LS 1.8m + 37m luffing jib

Unit: ton

Page 81: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 215--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

5.8�

5.8�

5.8�

5.7�

5.6�

5.5�

5.3�

5.2�

5.0�

4.9�

4.7�

4.6�

4.4�

4.2�

4.1�

4.0�

3.8�

3.6�

2.7

5.2�

5.2�

5.0�

4.8�

4.6�

4.5�

4.3�

4.1�

4.0�

3.9�

3.7�

3.6�

3.4�

3.3�

3.1

4.3�

4.2�

4.1�

3.9�

3.8�

3.7�

3.6�

3.5�

3.4�

3.2�

3.2�

3.1�

2.1

3.5�

3.3�

3.3�

3.3�

3.2�

3.2�

3.1

3.1�

3.1�

3.1

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0�

70.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

32~83 36~83 36~83 52~83 63~83θ (°)

Performance LS 1.8m + 45m luffing jib

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.9�

2.8�

1.7

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.8�

3.3�

2.2

4.1�

4.1�

4.1�

4.1�

4.1�

4.1�

4.0�

3.9�

3.4�

3.0�

2.7

3.3�

3.3�

3.3�

3.2�

2.9�

2.7�

2.4

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

42~83 47~83 51~83 55~83 67~83θ (°)

Unit: ton

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.8�

3.5�

3.0

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.9�

3.8�

3.7�

3.5�

3.3�

2.6

4.0�

4.0�

3.9�

3.8�

3.7�

3.7�

3.6�

3.5�

3.4�

3.2�

3.0

3.3�

3.2�

3.2�

3.1�

3.1�

3.0

2.5

3.0�

3.0�

3.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

65.0

70.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

47~83 46~83 50~83 51~83 62~83θ (°)

Unit: ton

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.2�

2.8�

2.1

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.3�

2.4�

1.7

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.1�

2.8�

2.1

3.0�

3.0�

3.0�

3.0�

2.8�

2.5�

1.7

2.7�

2.5

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0�

65.0

70.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

50~83 50~83 53~83 55~83 65~83θ (°)

Unit: ton

Page 82: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 216--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.7�

2.6�

2.5�

2.2�

1.9

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.4�

2.1�

1.7

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.6�

2.3�

1.9

2.8�

2.8�

2.8�

2.5�

2.2�

1.4

2.3�

2.3�

2.3

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

70.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

53~83 53~83 56~83 58~83 62~83θ (°)

Performance LS 1.8m + 45m luffing jib

Unit: ton

Page 83: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 217--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

75.0�

75.0�

71.6�

66.3�

62.9�

56.8�

51.6�

42.9�

36.1�

30.9�

26.7�

23.2�

19.7�

17.0

66.0�

63.0�

59.8�

56.8�

52.7�

43.8�

36.9�

31.5�

27.2�

23.6�

20.1�

17.1

52.6�

51.0�

49.5�

47.5�

44.6�

37.6�

32.1�

27.7�

24.0�

20.3

41.6�

40.4�

38.1�

36.3�

32.8�

28.1�

24.3

29.0�

28.2

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

B(m)

F 110t hook (2,100kg)

8part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 33~83 43~83 66~83θ (°)

Performance LA 1.8m + 11m luffing jib

Unit: ton

61.0�

61.0�

61.0�

61.0�

57.8�

52.6�

48.3�

41.1�

34.9�

29.7�

25.5�

21.7�

18.3�

15.5�

13.2�

11.3

61.0�

58.6�

54.0�

50.0�

42.5�

35.9�

30.5�

26.2�

22.3�

18.8�

15.9�

13.5�

11.5

51.2�

49.4�

43.7�

36.7�

31.2�

26.8�

22.9�

19.3�

16.3�

13.7

40.0�

37.8�

32.1�

27.4�

23.5�

19.7

31.1�

30.3�

29.7

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

B(m)

F 65t hook (940kg)

7part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 32~83 48~83 65~83θ (°)

Unit: ton

38.9�

38.9�

38.9�

37.3�

33.8�

29.4�

25.7�

22.6�

20.0�

17.9�

15.6�

13.3�

11.3�

9.7�

8.2�

7.0�

5.9�

4.9

35.0�

34.6�

32.5�

30.5�

26.6�

23.5�

20.7�

18.5�

16.1�

13.7�

11.7�

10.0�

8.5�

7.2�

6.0

29.5�

29.5�

27.6�

24.2�

21.4�

19.4�

16.6�

14.1�

12.0�

10.2�

8.7�

7.3

27.4�

27.0�

24.7�

22.3�

19.8�

17.1�

14.5�

12.3

23.2�

23.0�

22.9�

22.1

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

19~83 24~83 31~83 48~83 65~83θ (°)

Unit: ton

Page 84: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 218--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

47.0�

47.0�

46.6�

45.0�

42.2�

38.3�

33.0�

28.7�

25.3�

22.2�

19.3�

16.9�

14.9�

13.2�

11.6�

10.3

40.0�

37.4�

34.2�

31.3�

29.0�

26.1�

23.1�

20.1�

17.5�

15.4�

13.6�

11.9

30.0�

27.9�

26.2�

24.6�

23.4�

20.8�

18.1�

15.9�

13.9�

12.1

21.8�

20.8�

19.9�

19.1�

18.5�

16.4

16.2�

15.8�

15.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

B(m)

F 65t hook (940kg)

6part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

18~83 25~83 25~83 47~83 62~83θ (°)

Performance LA 1.8m + 20m luffing jib

Unit: ton

43.0�

43.0�

43.0�

40.8�

37.2�

31.9�

27.6�

24.1�

20.9�

18.0�

15.6�

13.6�

11.8�

10.3�

9.0�

7.9�

6.8

39.1�

35.9�

33.1�

28.8�

25.2�

22.0�

18.9�

16.4�

14.3�

12.4�

10.8�

9.4�

8.2

29.7�

28.5�

27.3�

25.8�

22.7�

19.9�

17.2�

14.9�

13.0�

11.3�

9.7

22.6�

21.9�

21.1�

20.3�

18.2�

15.7�

13.6

17.2�

16.7�

16.2�

16.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

20~83 26~83 36~83 51~83 63~83θ (°)

Unit: ton

26.5�

26.5�

26.5�

25.8�

23.4�

21.1�

18.9�

16.9�

15.1�

13.1�

11.4�

9.9�

8.6�

7.5�

6.4�

5.5�

4.7�

4.0�

3.3

25.7�

25.0�

24.3�

22.1�

19.8�

17.8�

16.0�

14.0�

12.2�

10.6�

9.2�

8.0�

6.9�

5.9�

5.0�

4.2�

3.4

23.1�

22.4�

21.8�

20.8�

18.6�

16.8�

14.8�

12.9�

11.2�

9.7�

8.4�

7.2�

6.2�

5.2

18.6�

18.2�

17.9�

17.6�

15.8�

13.7�

11.9�

10.3�

8.9

15.2�

15.0�

14.9�

14.2

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

23~83 25~83 35~83 51~83 63~83θ (°)

Unit: ton

18.0�

18.0�

18.0�

18.0�

18.0�

16.8�

15.6�

14.1�

12.7�

11.4�

9.9�

8.6�

7.5�

6.4�

5.5�

4.7�

3.9�

3.2�

2.4

18.0�

17.3�

16.6�

15.9�

15.2�

14.5�

13.2�

11.9�

10.7�

9.3�

8.0�

6.9�

6.0�

5.1�

4.2�

3.5�

2.7

18.0�

17.2�

16.5�

15.7�

15.0�

13.5�

12.7�

11.2�

9.8�

8.5�

7.4�

6.3�

5.4�

4.5�

3.7

14.7�

14.4�

14.3�

14.0�

12.7�

11.6�

10.5�

9.1�

7.8�

6.7

12.2�

12.1�

12.0�

11.9�

11.8

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

29~83 31~83 35~83 49~83 64~83θ (°)

Unit: ton

Page 85: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 219--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

14.5�

14.5�

14.5�

14.5�

14.5�

13.5�

12.2�

11.2�

10.2�

9.3�

8.4�

7.3�

6.2�

5.3�

4.5�

3.8�

3.0�

2.3

14.1�

14.1�

14.1�

13.9�

13.7�

13.0�

11.8�

10.8�

9.8�

8.9�

7.9�

6.8�

5.8�

5.0�

4.1�

3.4�

2.6

14.1�

13.8�

13.6�

13.4�

12.3�

11.2�

10.2�

9.3�

8.5�

7.3�

6.3�

5.3�

4.5�

3.7�

2.9

13.1�

13.1�

13.1�

13.1�

11.9�

10.8�

9.8�

9.0�

7.8�

6.7�

5.7

12.0�

12.0�

12.0�

11.3�

10.2

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 65t hook (940kg)

3part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

37~83 39~83 41~83 51~83 64~83θ (°)

Performance LA 1.8m + 20m luffing jib

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.3�

7.4�

6.7�

6.0�

5.1�

4.3�

3.6�

2.8�

2.0

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.6�

7.8�

7.0�

6.3�

5.6�

4.8�

4.0�

3.3�

2.5

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.0�

8.1�

7.3�

6.6�

5.9�

5.2�

4.4�

3.6�

2.8

11.0�

10.5�

10.0�

9.5�

9.0�

8.5�

7.7�

6.9�

6.2�

5.6�

4.8�

3.9

9.3�

9.3�

9.3�

8.8�

7.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

42~83 45~83 46~83 49~83 64~83θ (°)

Unit: ton

9.1�

9.1�

9.1�

9.1�

9.1�

9.1�

8.2�

7.4�

6.7�

5.9�

5.4�

4.9�

4.3�

3.7�

3.2�

2.6�

1.8

9.1�

9.1�

9.1�

9.0�

8.8�

8.0�

7.3�

6.5�

5.8�

5.2�

4.7�

4.2�

3.6�

3.1�

2.4

8.6�

8.6�

8.6�

8.6�

8.1�

7.7�

7.0�

6.3�

5.6�

5.0�

4.4�

4.0�

3.4�

2.8�

7.8�

7.8�

7.8�

7.8�

7.4�

7.0�

6.3�

5.6�

5.0�

4.3�

3.8�

3.2

6.8�

6.8�

6.8�

6.8�

6.8�

6.6

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

47~83 49~83 51~83 52~83 64~83θ (°)

Unit: ton

Page 86: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 220--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

27.0�

27.0�

25.9�

25.2�

23.9�

22.7�

21.8�

20.8�

18.3�

16.3�

14.5�

12.9�

11.6�

10.4�

9.3�

8.4�

7.5

23.0�

23.0�

22.2�

21.3�

20.4�

19.2�

18.2�

17.0�

15.3�

13.6�

12.2�

10.9�

9.7�

8.7�

7.7

19.5�

18.5�

17.5�

16.5�

16.0�

15.0�

14.3�

12.7�

11.4�

10.1�

9.0

14.0�

14.0�

13.3�

12.8�

12.3�

11.9�

11.7

10.7�

10.3�

10.1

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

23~83 27~83 33~83 51~83 66~83θ (°)

Performance LA 1.8m + 29m luffing jib

Unit: ton

25.0�

25.0�

24.8�

24.0�

23.1�

22.0�

19.5�

17.1�

15.0�

13.2�

11.7�

10.3�

9.1�

8.1�

7.2�

6.3�

5.5�

4.8

22.8�

22.0�

21.2�

20.4�

19.7�

18.3�

16.1�

14.2�

12.5�

11.1�

9.8�

8.7�

7.7�

6.7�

5.9�

5.1

20.0�

19.1�

18.2�

17.4�

16.5�

15.1�

13.4�

11.8�

10.5�

9.2�

8.1�

7.1�

6.1

15.0�

14.4�

13.8�

13.3�

12.8�

11.3�

9.9�

8.7

10.9�

10.7�

10.5

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

24~83 28~83 33~83 48~83 66~83θ (°)

Unit: ton

16.8�

16.8�

16.8�

16.8�

16.8�

16.5�

16.0�

14.5�

12.8�

11.2�

9.9�

8.7�

7.6�

6.7�

5.8�

5.1�

4.4�

3.7�

2.2

16.8�

16.8�

16.8�

16.8�

16.5�

15.6�

13.9�

12.3�

10.8�

9.5�

8.4�

7.4�

6.5�

5.6�

4.8�

4.1�

2.5

16.8�

16.5�

16.0�

15.6�

15.0�

13.2�

11.7�

10.3�

9.1�

8.0�

7.0�

6.1�

5.3�

4.5

13.3�

13.1�

12.8�

12.6�

11.4�

10.0�

8.8�

7.7�

6.7�

5.7

10.7�

10.6�

10.5�

10.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

28~83 31~83 36~83 49~83 65~83θ (°)

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

8.4�

7.3�

6.4�

5.6�

4.8�

4.1�

3.5�

1.9

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.1�

8.2�

7.1�

6.2�

5.4�

4.6�

3.9�

2.3

11.0�

11.0�

11.0�

10.6�

10.3�

9.9�

9.6�

8.8�

7.8�

6.9�

6.0�

5.1�

4.4�

2.7

11.0�

10.5�

10.1�

9.7�

9.3�

8.5�

7.6�

6.6�

5.7�

4.8

8.5�

8.4�

8.3�

8.2�

8.2

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

36~83 39~83 42~83 46~83 65~83θ (°)

Unit: ton

Page 87: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 221--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

9.0�

9.0�

9.0�

9.0�

9.0�

9.0�

8.8�

8.5�

8.1�

7.8�

7.5�

6.9�

6.1�

5.3�

4.5�

3.8�

3.2

8.4�

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.3�

6.7�

6.0�

5.2�

4.5�

3.8�

2.1

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.2�

6.7�

5.8�

5.0�

4.3�

2.6

7.8�

7.8�

7.8�

7.8�

7.8�

7.5�

7.2�

6.6�

5.7�

4.8

7.0�

7.0�

7.0�

7.0�

7.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

44~83 45~83 47~83 51~83 65~83θ (°)

Performance LA 1.8m + 29m luffing jib

Unit: ton

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.7�

6.0�

5.4�

4.8�

4.3�

3.6�

2.9

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.4�

6.9�

6.4�

5.8�

5.2�

4.7�

4.2�

3.6�

1.9

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.6�

6.2�

5.6�

5.1�

4.5�

4.0�

2.4

7.0�

7.0�

7.0�

7.0�

6.5�

6.1�

5.8�

4.9�

4.4�

2.9

6.0�

6.0�

6.0�

6.0�

5.8

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

48~83 49~83 51~83 54~83 65~83θ (°)

Unit: ton

6.6�

6.6�

6.6�

6.6�

6.5�

6.3�

6.0�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.1�

2.8�

2.4�

6.4�

6.3�

6.1�

6.0�

5.9�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.2�

2.8�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.1�

4.6�

4.2�

3.7�

3.2�

2.3

5.4�

5.4�

5.4�

5.3�

5.2�

5.1�

4.9�

4.5�

4.0�

2.8

4.2�

4.2�

4.2�

4.2�

4.2�

4.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

51~83 54~83 55~83 57~83 65~83θ (°)

Unit: ton

Page 88: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 222--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

7.9�

7.1�

6.3�

5.6�

4.9�

3.5�

2.2

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.3�

8.1�

8.0�

7.8�

7.6�

7.1�

6.3�

5.6�

4.0�

2.7

8.4�

8.2�

8.0�

7.8�

7.6�

7.4�

7.2�

7.0�

6.9�

6.8�

6.2�

4.4�

3.0

7.2�

7.0�

6.8�

6.7�

6.5�

6.3�

6.2�

6.1�

5.0

5.9�

5.8�

5.6�

5.5

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

34~83 38~83 41~83 45~83 66~83θ (°)

Performance LA 1.8m + 37m luffing jib

Unit: ton

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.0�

6.4�

5.9�

5.3�

4.6�

3.2

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

6.3�

5.8�

5.3�

3.8�

2.4

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.2�

6.8�

6.3�

5.6�

4.3�

2.9

6.7�

6.4�

6.2�

6.0�

5.8�

5.6�

5.5�

4.9

5.5�

5.3�

5.3�

5.3�

5.3

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

41~83 44~83 47~83 51~83 61~83θ (°)

Unit: ton

6.3�

6.3�

6.3�

6.3�

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.5�

5.0�

4.3�

2.9

6.3�

6.3�

6.3�

6.2�

6.1�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.3�

5.1�

3.6�

2.2

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.5�

4.1�

2.7

6.1�

6.1�

6.0�

6.0�

5.9�

5.8�

5.7�

4.9�

3.2

5.2�

5.2�

5.2�

5.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

46~83 48~83 51~83 54~83 64~83θ (°)

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.6�

4.2�

3.8�

2.6

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.6�

4.2�

3.2�

1.9

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.5�

3.5�

2.6�

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

3.9�

3.0�

5.0�

5.0�

5.0�

4.3

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

49~83 51~83 54~83 58~83 61~83θ (°)

Unit: ton

Page 89: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 223--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.8�

2.1�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.4�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.5�

2.8�

2.0

3.8�

3.8�

3.8�

3.7�

3.6�

3.3�

2.5�

3.3�

3.3�

3.3�

3.3

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

52~83 56~83 57~83 61~83 64~83θ (°)

Performance LA 1.8m + 37m luffing jib

Unit: ton

Page 90: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 224--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

5.8�

5.8�

5.8�

5.7�

5.6�

5.5�

5.3�

5.2�

5.0�

4.9�

4.7�

4.6�

4.4�

4.2�

4.1�

4.0�

3.8�

2.8

5.2�

5.2�

5.0�

4.8�

4.6�

4.5�

4.3�

4.1�

4.0�

3.9�

3.7�

3.6�

3.4�

3.3�

2.2

4.3�

4.2�

4.1�

3.9�

3.8�

3.7�

3.6�

3.5�

3.4�

3.2�

3.2�

2.6

3.5�

3.3�

3.3�

3.3�

3.2�

3.2�

3.1

3.1�

3.1�

3.1

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

40~83 42~83 46~83 52~83 63~83θ (°)

Performance LA 1.8m + 45m luffing jib

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.7�

2.5

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.8�

3.1

4.1�

4.1�

4.1�

4.1�

4.1�

4.1�

4.0�

3.9�

3.4�

3.0�

2.5

3.3�

3.3�

3.3�

3.2�

2.9�

2.7�

2.4

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

44~83 48~83 51~83 55~83 67~83θ (°)

Unit: ton

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.8�

3.4�

2.1

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.9�

3.8�

3.7�

3.5�

2.9�

1.6

4.0�

4.0�

3.9�

3.8�

3.7�

3.7�

3.6�

3.5�

3.4�

3.2�

2.3

3.3�

3.2�

3.2�

3.1�

3.1�

2.9�

1.5

3.0�

3.0�

3.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

65.0

70.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

48~83 47~83 50~83 51~83 62~83θ (°)

Unit: ton

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.2�

2.8

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.3�

2.4

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.1�

2.8�

2.0

3.0�

3.0�

3.0�

3.0�

2.8�

2.5

2.7�

2.5

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

54~83 55~83 57~83 61~83 65~83θ (°)

Unit: ton

Page 91: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 225--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.7�

2.6�

2.5�

2.2

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.4�

2.1

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.6�

2.3

2.8�

2.8�

2.8�

2.5�

2.2

2.3�

2.3�

2.3

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

57~83 57~83 61~83 63~83 66~83θ (°)

Performance LA 1.8m + 45m luffing jib

Unit: ton

Page 92: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 226--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

75.0�

75.0�

71.6�

66.3�

62.9�

56.8�

51.6�

42.9�

36.1�

30.9�

26.5�

22.4�

19.1�

16.4

66.0�

63.0�

59.8�

56.8�

52.7�

43.8�

36.9�

31.5�

27.1�

22.9�

19.4�

16.6

52.6�

51.0�

49.5�

47.5�

44.6�

37.6�

32.1�

27.7�

23.2�

19.6

41.6�

40.4�

38.1�

36.3�

32.8�

28.1�

23.5

29.0�

28.2

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

B(m)

F 110t hook (2,100kg)

8part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 33~83 43~83 66~83θ (°)

Performance LB 1.8m + 11m luffing jib

Unit: ton

61.0�

61.0�

61.0�

61.0�

57.8�

52.6�

48.3�

41.1�

34.9�

29.7�

25.0�

20.9�

17.7�

15.0�

12.8�

10.8

61.0�

58.6�

54.0�

50.0�

42.5�

35.9�

30.5�

25.8�

21.6�

18.2�

15.4�

13.0�

11.0

51.2�

49.4�

43.7�

36.7�

31.2�

26.6�

22.2�

18.6�

15.7�

13.2

40.0�

37.8�

32.1�

27.4�

22.8�

19.0

31.1�

30.3�

29.7

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

B(m)

F 65t hook (940kg)

7part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 32~83 48~83 65~83θ (°)

Unit: ton

38.9�

38.9�

38.9�

37.3�

33.8�

29.4�

25.7�

22.6�

20.0�

17.7�

15.0�

12.8�

10.9�

9.1�

7.5�

6.1�

4.8�

3.7

35.0�

34.6�

32.5�

30.5�

26.6�

23.5�

20.7�

18.4�

15.6�

13.3�

11.3�

9.5�

7.8�

6.3�

5.0

29.5�

29.5�

27.6�

24.2�

21.4�

18.9�

16.1�

13.7�

11.6�

9.8�

8.0�

6.5

27.4�

27.0�

24.7�

22.3�

19.6�

16.6�

14.0�

11.9

23.2�

23.0�

22.9�

22.1

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

19~83 24~83 32~83 48~83 65~83θ (°)

Unit: ton

Page 93: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 227--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

47.0�

47.0�

46.6�

45.0�

42.2�

38.3�

33.0�

28.7�

24.9�

21.5�

18.7�

16.4�

14.4�

12.7�

11.3�

10.0

40.0�

37.4�

34.2�

31.3�

29.0�

26.0�

22.4�

19.5�

17.0�

14.9�

13.1�

11.6

30.0�

27.9�

26.2�

24.6�

23.2�

20.2�

17.6�

15.4�

13.5�

11.8

21.8�

20.8�

19.9�

19.1�

18.3�

15.9

16.2�

15.8�

15.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

B(m)

F 65t hook (940kg)

6part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

18~83 25~83 25~83 47~83 62~83θ (°)

Performance LB 1.8m + 20m luffing jib

Unit: ton

43.0�

43.0�

43.0�

40.8�

37.2�

31.9�

27.6�

23.6�

20.2�

17.4�

15.1�

13.1�

11.4�

10.0�

8.7�

7.4�

6.2

39.1�

35.9�

33.1�

28.8�

24.9�

21.3�

18.3�

15.9�

13.8�

12.0�

10.5�

9.1�

7.7

29.7�

28.5�

27.3�

25.8�

22.3�

19.2�

16.7�

14.5�

12.6�

10.9�

9.4

22.6�

21.9�

21.1�

20.3�

17.6�

15.2�

13.2

17.2�

16.7�

16.2�

16.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

20~83 26~83 36~83 51~83 63~83θ (°)

Unit: ton

26.5�

26.5�

26.5�

25.8�

23.4�

21.1�

18.9�

16.9�

14.6�

12.7�

11.0�

9.6�

8.1�

6.8�

5.7�

4.7�

3.8�

2.9�

2.2

25.7�

25.0�

24.3�

22.1�

19.8�

17.8�

15.6�

13.5�

11.8�

10.2�

8.9�

7.5�

6.3�

5.2�

4.1�

3.2�

2.4

23.1�

22.4�

21.8�

20.8�

18.6�

16.5�

14.3�

12.4�

10.8�

9.4�

8.0�

6.7�

5.5�

4.4

18.6�

18.2�

17.9�

17.6�

15.3�

13.3�

11.5�

10.0�

8.6

15.2�

15.0�

14.9�

13.8

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

23~83 25~83 35~83 51~83 63~83θ (°)

Unit: ton

18.0�

18.0�

18.0�

18.0�

18.0�

16.8�

15.6�

14.1�

12.7�

11.0�

9.6�

8.1�

6.8�

5.7�

4.6�

3.7�

2.9�

2.1

18.0�

17.3�

16.6�

15.9�

15.2�

14.5�

13.2�

11.8�

10.3�

8.9�

7.5�

6.3�

5.2�

4.2�

3.3�

2.4

18.0�

17.2�

16.5�

15.7�

15.0�

13.5�

12.6�

10.9�

9.5�

8.2�

6.9�

5.7�

4.6�

3.6�

2.7

14.7�

14.4�

14.3�

14.0�

12.7�

11.6�

10.2�

8.8�

7.4�

6.1

12.2�

12.1�

12.0�

11.9�

11.8

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

34~83 36~83 37~83 49~83 64~83θ (°)

Unit: ton

Page 94: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 228--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

14.5�

14.5�

14.5�

14.5�

14.5�

13.5�

12.2�

11.2�

10.2�

9.3�

7.9�

6.6�

5.4�

4.4�

3.5�

2.7�

1.9

14.1�

14.1�

14.1�

13.9�

13.7�

13.0�

11.8�

10.8�

9.8�

8.7�

7.4�

6.2�

5.1�

4.1�

3.2�

2.3

14.1�

13.8�

13.6�

13.4�

12.3�

11.2�

10.2�

9.3�

8.1�

6.8�

5.6�

4.5�

3.6�

2.7�

1.8

13.1�

13.1�

13.1�

13.1�

11.9�

10.8�

9.8�

8.8�

7.4�

6.2�

5.0

12.0�

12.0�

12.0�

11.3�

10.2

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 65t hook (940kg)

3part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

39~83 42~83 41~83 51~83 64~83θ (°)

Performance LB 1.8m + 20m luffing jib

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.3�

7.4�

6.3�

5.2�

4.2�

3.3�

2.4�

1.7

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.6�

7.8�

7.0�

6.0�

4.9�

3.9�

3.0�

2.2

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.0�

8.1�

7.3�

6.6�

5.5�

4.4�

3.5�

2.6�

1.8

11.0�

10.5�

10.0�

9.5�

9.0�

8.5�

7.7�

6.9�

6.1�

5.0�

3.9�

3.0

9.3�

9.3�

9.3�

8.8�

7.9

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

45~83 47~83 46~83 49~83 64~83θ (°)

Unit: ton

9.1�

9.1�

9.1�

9.1�

9.1�

9.1�

8.2�

7.4�

6.7�

5.9�

5.4�

4.9�

4.0�

3.1�

2.2

9.1�

9.1�

9.1�

9.0�

8.8�

8.0�

7.3�

6.5�

5.8�

5.2�

4.7�

3.7�

2.9�

2.0

8.6�

8.6�

8.6�

8.6�

8.1�

7.7�

7.0�

6.3�

5.6�

5.0�

4.3�

3.4�

2.5�

1.7

7.8�

7.8�

7.8�

7.8�

7.4�

7.0�

6.3�

5.6�

5.0�

3.9�

3.0�

2.1

6.8�

6.8�

6.8�

6.8�

6.8�

6.6

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

51~83 51~83 51~83 52~83 64~83θ (°)

Unit: ton

Page 95: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 229--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

27.0�

27.0�

25.9�

25.2�

23.9�

22.7�

21.8�

20.2�

17.8�

15.8�

14.0�

12.5�

11.2�

10.1�

9.0�

8.1�

7.3

23.0�

23.0�

22.2�

21.3�

20.4�

19.2�

18.2�

16.6�

14.8�

13.2�

11.8�

10.6�

9.4�

8.4�

7.5

19.5�

18.5�

17.5�

16.5�

16.0�

15.0�

13.9�

12.4�

11.0�

9.8�

8.7

14.0�

14.0�

13.3�

12.8�

12.3�

11.9�

11.6

10.7�

10.3�

10.1

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

23~83 27~83 33~83 51~83 66~83θ (°)

Performance LB 1.8m + 29m luffing jib

Unit: ton

25.0�

25.0�

24.8�

24.0�

23.1�

21.7�

18.9�

16.5�

14.5�

12.8�

11.3�

10.0�

8.8�

7.8�

6.7�

5.8�

4.9�

4.1

22.8�

22.0�

21.2�

20.4�

19.7�

17.7�

15.6�

13.7�

12.1�

10.7�

9.5�

8.4�

7.4�

6.3�

5.3�

4.4

20.0�

19.1�

18.2�

17.4�

16.5�

14.7�

13.0�

11.5�

10.1�

8.9�

7.9�

6.8�

5.7

15.0�

14.4�

13.8�

13.3�

12.5�

11.0�

9.6�

8.4

10.9�

10.7�

10.5

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

24~83 28~83 33~83 48~83 66~83θ (°)

Unit: ton

16.8�

16.8�

16.8�

16.8�

16.8�

16.5�

16.0�

14.1�

12.4�

10.9�

9.5�

8.4�

7.2�

6.1�

5.2�

4.3�

3.5�

2.8

16.8�

16.8�

16.8�

16.8�

16.5�

15.3�

13.5�

11.9�

10.5�

9.2�

8.1�

7.0�

5.9�

5.0�

4.1�

3.3

16.8�

16.5�

16.0�

15.6�

14.5�

12.8�

11.3�

10.0�

8.8�

7.7�

6.6�

5.6�

4.6�

3.8

13.3�

13.1�

12.8�

12.5�

11.0�

9.7�

8.5�

7.4�

6.3�

5.2

10.7�

10.6�

10.5�

10.3

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

38~83 42~83 45~83 49~83 65~83θ (°)

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.2�

8.0�

6.8�

5.8�

4.8�

4.0�

3.2�

2.5

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

9.0�

7.8�

6.7�

5.7�

4.7�

3.9�

3.1

11.0�

11.0�

11.0�

10.6�

10.3�

9.9�

9.6�

8.6�

7.6�

6.4�

5.4�

4.5�

3.6�

1.7

11.0�

10.5�

10.1�

9.7�

9.3�

8.4�

7.4�

6.3�

5.2�

4.2

8.5�

8.4�

8.3�

8.2�

8.2

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

39~83 42~83 42~83 46~83 65~83θ (°)

Unit: ton

Page 96: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 230--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

9.0�

9.0�

9.0�

9.0�

9.0�

9.0�

8.8�

8.5�

8.1�

7.8�

7.5�

6.5�

5.4�

4.5�

3.6�

2.9�

2.2

8.4�

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.3�

6.5�

5.4�

4.5�

3.6�

2.9

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.7�

7.2�

6.3�

5.3�

4.3�

3.5

7.8�

7.8�

7.8�

7.8�

7.8�

7.5�

7.2�

6.2�

5.1�

4.2

7.0�

7.0�

7.0�

7.0�

7.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

48~83 51~83 54~83 57~83 65~83θ (°)

Performance LB 1.8m + 29m luffing jib

Unit: ton

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.7�

6.0�

5.1�

4.2�

3.3�

2.5�

1.8

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.4�

6.9�

6.4�

5.8�

5.2�

4.2�

3.4�

2.6

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.6�

6.2�

5.6�

5.1�

4.1�

3.3

7.0�

7.0�

7.0�

7.0�

6.5�

6.1�

5.8�

4.9�

4.1�

2.0

6.0�

6.0�

6.0�

6.0�

5.8

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

49~83 51~83 53~83 54~83 65~83θ (°)

Unit: ton

6.6�

6.6�

6.6�

6.6�

6.5�

6.3�

6.0�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.0

6.4�

6.3�

6.1�

6.0�

5.9�

5.8�

5.6�

5.1�

4.6�

4.1�

3.6�

3.2�

2.4

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.1�

4.6�

4.2�

3.7�

3.1

5.4�

5.4�

5.4�

5.3�

5.2�

5.1�

4.9�

4.5�

4.0�

2.0

4.2�

4.2�

4.2�

4.2�

4.2�

4.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

57~83 54~83 57~83 57~83 65~83θ (°)

Unit: ton

Page 97: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 231--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

7.7�

6.7�

5.8�

5.0�

4.3�

2.7

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.3�

8.1�

8.0�

7.8�

7.6�

6.8�

5.9�

5.1�

3.3

8.4�

8.2�

8.0�

7.8�

7.6�

7.4�

7.2�

7.0�

6.9�

6.7�

5.8�

3.9�

2.2

7.2�

7.0�

6.8�

6.7�

6.5�

6.3�

6.2�

6.1�

4.5

5.9�

5.8�

5.6�

5.5

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

36~83 40~83 41~83 45~83 66~83θ (°)

Performance LB 1.8m + 37m luffing jib

Unit: ton

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.0�

6.3�

5.4�

4.6�

3.9�

2.3

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

6.3�

5.6�

4.8�

3.0

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.2�

6.8�

6.3�

5.6�

3.7�

2.0

6.7�

6.4�

6.2�

6.0�

5.8�

5.6�

5.5�

4.5

5.5�

5.3�

5.3�

5.3�

5.3

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

42~83 45~83 47~83 52~83 61~83θ (°)

Unit: ton

6.3�

6.3�

6.3�

6.3�

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.1�

4.3�

3.6�

2.0

6.3�

6.3�

6.3�

6.2�

6.1�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.3�

4.5�

2.8

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.4�

3.5

6.1�

6.1�

6.0�

6.0�

5.9�

5.8�

5.7�

4.4�

2.5

5.2�

5.2�

5.2�

5.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

46~83 50~83 53~83 54~83 64~83θ (°)

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.6�

3.9�

3.2

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.6�

4.2�

2.5

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.5�

3.3

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

3.9�

2.4

5.0�

5.0�

5.0�

4.3

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

54~83 53~83 56~83 58~83 61~83θ (°)

Unit: ton

Page 98: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 232--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.8

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

2.3

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.5�

2.8

3.8�

3.8�

3.8�

3.7�

3.6�

3.3�

2.5�

3.3�

3.3�

3.3�

3.3

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

56~83 56~83 58~83 61~83 64~83θ (°)

Performance LB 1.8m + 37m luffing jib

Unit: ton

Page 99: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 233--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

5.8�

5.8�

5.8�

5.7�

5.6�

5.5�

5.3�

5.2�

5.0�

4.9�

4.7�

4.6�

4.4�

4.2�

4.1�

4.0�

3.3

5.2�

5.2�

5.0�

4.8�

4.6�

4.5�

4.3�

4.1�

4.0�

3.9�

3.7�

3.6�

3.4�

2.7

4.3�

4.2�

4.1�

3.9�

3.8�

3.7�

3.6�

3.5�

3.4�

3.2�

3.2

3.5�

3.3�

3.3�

3.3�

3.2�

3.2�

3.1

3.1�

3.1�

3.1

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

46~83 49~83 54~83 59~83 63~83θ (°)

Performance LB 1.8m + 45m luffing jib

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

2.9

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.8�

2.4

4.1�

4.1�

4.1�

4.1�

4.1�

4.1�

4.0�

3.9�

3.4�

3.0

3.3�

3.3�

3.3�

3.2�

2.9�

2.7�

2.4

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

49~83 49~83 52~83 55~83 67~83θ (°)

Unit: ton

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.8�

2.5

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.9�

3.8�

3.7�

3.5�

2.1

4.0�

4.0�

3.9�

3.8�

3.7�

3.7�

3.6�

3.5�

3.4�

2.9

3.3�

3.2�

3.2�

3.1�

3.1�

2.3

3.0�

3.0�

3.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

52~83 52~83 56~83 58~83 62~83θ (°)

Unit: ton

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.2�

2.2

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.2

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.1�

2.6

3.0�

3.0�

3.0�

3.0�

2.8�

2.2

2.7�

2.5

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

55~83 59~83 58~83 61~83 65~83θ (°)

Unit: ton

Page 100: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 234--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.7�

2.6�

2.5

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.4

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.6�

2.3

2.8�

2.8�

2.8�

2.5

2.3�

2.3�

2.3

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

60~83 61~83 61~83 65~83 66~83θ (°)

Performance LB 1.8m + 45m luffing jib

Unit: ton

Page 101: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 235--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

75.0�

75.0�

71.6�

66.3�

60.3�

54.1�

48.7�

40.2�

33.8�

27.9�

23.0�

19.2�

16.2�

13.8

66.0�

63.0�

59.8�

55.4�

49.9�

41.1�

34.6�

28.7�

23.7�

19.7�

16.6�

13.9

52.6�

51.0�

49.5�

47.5�

42.0�

35.3�

29.5�

24.2�

20.1�

16.8

41.6�

40.4�

38.1�

36.2�

30.3�

24.8�

20.4

29.0�

28.2

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

B(m)

F 110t hook (2,100kg)

8part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 33~83 43~83 66~83θ (°)

Performance LC 1.8m + 11m luffing jib

Unit: ton

61.0�

61.0�

61.0�

57.8�

52.6�

47.5�

39.0�

32.6�

26.4�

21.5�

17.8�

14.8�

12.3�

10.3�

8.6

61.0�

58.6�

54.0�

48.9�

40.1�

33.5�

27.4�

22.4�

18.4�

15.3�

12.7�

10.6�

8.8

51.2�

49.4�

41.2�

34.4�

28.3�

23.1�

19.0�

15.7�

13.1�

10.8

40.0�

35.5�

29.4�

23.9�

19.6�

16.2

31.1�

30.3�

29.7

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

B(m)

F 65t hook (940kg)

7part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 32~83 48~83 65~83θ (°)

Unit: ton

38.9�

38.9�

38.9�

37.3�

33.8�

29.4�

25.7�

21.6�

17.8�

14.8�

12.4�

10.3�

8.6�

7.2�

5.9�

4.8�

3.8�

2.9

35.0�

34.6�

32.5�

30.5�

26.6�

22.5�

18.6�

15.5�

12.9�

10.8�

9.0�

7.5�

6.2�

5.0�

3.9

29.5�

29.5�

27.6�

23.3�

19.3�

16.1�

13.4�

11.2�

9.3�

7.7�

6.3�

5.1

27.4�

27.0�

24.4�

20.1�

16.7�

13.9�

11.6�

9.6

23.2�

23.0�

22.9

20.6�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

19~83 24~83 32~83 48~83 65~83θ (°)

Unit: ton

Page 102: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 236--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

47.0�

47.0�

46.6�

45.0�

42.2�

35.9�

30.8�

25.8�

21.8�

18.7�

16.1�

14.0�

12.2�

10.6

9.3�

8.1

40.0�

37.4�

34.2�

31.3�

27.0�

22.9�

19.6�

16.9�

14.6�

12.7�

11.0�

9.6

30.0�

27.9�

26.2�

23.9�

20.5�

17.6�

15.2�

13.2�

11.4�

9.8

21.8�

20.8�

19.9�

18.5�

15.9�

13.7

16.2�

15.8�

15.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

B(m)

F 65t hook (940kg)

6part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

18~83 25~83 25~83 47~83 62~83θ (°)

Performance LC 1.8m + 20m luffing jib

Unit: ton

43.0�

43.0�

43.0�

40.8�

34.8�

29.4�

24.4�

20.5�

17.3�

14.8�

12.7�

10.9�

9.3�

8.0�

6.8�

5.8�

4.9

39.1�

35.9�

31.2�

25.9�

21.8�

18.5�

15.8�

13.5�

11.6�

9.9�

8.5�

7.2�

6.1

29.7�

28.5�

27.3�

23.0�

19.5�

16.7�

14.3�

12.2�

10.5�

8.9�

7.5

22.6�

21.9�

21.0�

17.9�

15.3�

13.0�

11.1

17.2�

16.7�

16.2�

15.9

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

20~83 27~83 36~83 51~83 63~83θ (°)

Unit: ton

26.5�

26.5�

26.5�

25.8�

23.4�

20.0�

16.9�

14.3�

12.2�

10.4�

8.9�

7.6�

6.4�

5.4�

4.5�

3.7�

3.0�

2.2

25.7�

25.0�

24.3�

21.4�

18.1�

15.4�

13.2�

11.3�

9.7�

8.2�

7.0�

5.9�

4.9�

4.1�

3.3�

2.5

23.1�

22.4�

21.8�

19.3�

16.5�

14.1�

12.1�

10.4�

8.9�

7.5�

6.4�

5.3�

4.3�

3.5

18.6�

18.2�

17.8�

15.3�

13.1�

11.2�

9.6�

8.1�

6.8

15.2�

15.0�

13.7�

11.7

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

29~83 31~83 36~83 51~83 63~83θ (°)

Unit: ton

18.0�

18.0�

18.0�

18.0�

18.0�

16.8�

14.4�

12.3�

10.5�

8.9�

7.6�

6.4�

5.4�

4.5�

3.7�

2.9�

2.2

18.0�

17.3�

16.6�

15.9�

15.2�

13.3�

11.4�

9.7�

8.3�

7.1�

6.0�

5.0�

4.1�

3.3�

2.6�

1.8

18.0�

17.2�

16.5�

15.7�

14.2�

12.2�

10.5�

9.0�

7.7�

6.5�

5.4�

4.5�

3.6�

2.8�

2.0

14.7�

14.4�

14.3�

13.3�

11.4�

9.8�

8.3�

7.0�

5.9�

4.8

12.2�

12.1�

12.0�

11.9�

10.2

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

36~83 36~83 37~83 49~83 64~83θ (°)

Unit: ton

Page 103: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 237--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

14.5�

14.5�

14.5�

14.5�

14.5�

13.5�

12.0�

10.3�

8.7�

7.4�

6.2�

5.2�

4.3�

3.5�

2.8�

2.0

14.1�

14.1�

14.1�

13.9�

13.7�

13.0�

11.2�

9.6�

8.2�

6.9�

5.8�

4.9�

4.0�

3.2�

2.5

14.1�

13.8�

13.6�

13.4�

12.1�

10.4�

8.9�

7.6�

6.4�

5.4�

4.4�

3.6�

2.8�

2.0

13.1�

13.1�

13.1�

13.1�

11.4�

9.7�

8.3�

7.0�

5.9�

4.9�

3.9

12.0�

12.0�

12.0�

10.3�

8.7

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

42~83 45~83 44~83 51~83 64~83θ (°)

Performance LC 1.8m + 20m luffing jib

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

8.5�

7.2�

6.0�

5.0�

4.1�

3.3�

2.5�

1.7

11.0�

11.0�

11.0�

11.0�

10.4�

9.8�

9.2�

8.0�

6.8�

5.7�

4.7�

3.8�

3.1�

2.3

11.0�

11.0�

11.0�

10.5�

10.0�

9.5�

8.8�

7.4�

6.3�

5.3�

4.3�

3.5�

2.7�

1.9

11.0�

10.5�

10.0�

9.5�

9.0�

8.3�

7.0�

5.9�

4.9�

3.9�

3.1�

2.3

9.3�

9.3�

9.3�

8.7�

7.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

47~83 49~83 49~83 51~83 64~83θ (°)

Unit: ton

9.1�

9.1�

9.1�

9.1�

9.1�

9.1�

8.2�

7.4�

6.7�

5.9�

4.8�

3.9�

3.1�

2.3

9.1�

9.1�

9.1�

9.0�

8.8�

8.0�

7.3�

6.5�

5.6�

4.6�

3.7�

2.9�

2.2

8.6�

8.6�

8.6�

8.6�

8.1�

7.7�

7.0�

6.2�

5.2�

4.2�

3.4�

2.7

7.8�

7.8�

7.8�

7.8�

7.4�

7.0�

5.8�

4.8�

3.9�

3.1�

2.3

6.8�

6.8�

6.8�

6.8�

6.8�

6.2

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

53~83 53~83 54~83 55~83 64~83θ (°)

Unit: ton

Page 104: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 238--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

27.0�

27.0�

25.9�

25.2�

23.9�

22.7�

20.2�

17.6�

15.4�

13.6�

12.0�

10.6�

9.4�

8.3�

7.4�

6.5�

5.8

23.0�

23.0�

22.2�

21.3�

20.4�

18.7�

16.4�

14.4�

12.7�

11.3�

10.0�

8.8�

7.8�

6.9�

6.0

19.5�

18.5�

17.5�

16.5�

15.3�

13.5�

11.9�

10.5�

9.3�

8.2�

7.1

14.0�

14.0�

13.3�

12.8�

12.3�

11.3�

9.9

10.7�

10.3�

10.1

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

23~83 27~83 33~83 51~83 66~83θ (°)

Performance LC 1.8m + 29m luffing jib

Unit: ton

25.0�

25.0�

24.8�

24.0�

22.1�

18.9�

16.3�

14.1�

12.3�

10.7�

9.3�

8.1�

7.1�

6.1�

5.3�

4.6�

3.9�

3.3

22.8�

22.0�

21.2�

20.4�

17.7�

15.4�

13.4�

11.7�

10,2�

8.9�

7.8�

6.7�

5.8�

5.0�

4.2�

3.5

20.0�

19.1�

18.2�

16.6�

14.4�

12.6�

11.0�

9.7�

8.4�

7.3�

6.3�

5.4�

4.5

15.0�

14.4�

13.8�

12.2�

10.6�

9.3�

8.0�

6.8

10.9�

10.7�

10.5

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

24~83 28~83 33~83 48~83 66~83θ (°)

Unit: ton

16.8�

16.8�

16.8�

16.8�

16.8�

15.9�

13.7�

11.8�

10.3�

8.9�

7.7�

6.6�

5.7�

4.8�

4.1�

3.4�

2.8�

2.2

16.8�

16.8�

16.8�

16.8�

15.1�

13.1�

11.4�

9.9�

8.6�

7.5�

6.4�

5.5�

4.7�

3.9�

3.3�

2.6

16.8�

16.5�

16.0�

14.3�

12.5�

10.9�

9.5�

8.3�

7.2�

6.2�

5.3�

4.4�

3.7�

3.0

13.3�

13.1�

12.2�

10.7�

9.3�

8.1�

6.9�

5.9�

5.0�

4.1

10.7�

10.6�

10.0�

8.7

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

38~83 42~83 45~83 49~83 65~83θ (°)

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.0�

8.6�

7.4�

6.3�

5.4�

4.6�

3.8�

3.1�

2.5�

1.8

11.0�

11.0�

11.0�

11.0�

11.0�

10.5�

9.7�

8.4�

7.2�

6.2�

5.3�

4.5�

3.7�

3.1�

2.4

11.0�

11.0�

11.0�

10.6�

10.3�

9.3�

8.1�

7.0�

6.0�

5.1�

4.3�

3.5�

2.9

11.0�

10.5�

10.1�

9.2�

8.0�

6.9�

5.9�

5.0�

4.1�

3.3

8.5�

8.4�

8.3�

8.2�

7.4

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

44~83 47~83 50~83 53~83 65~83θ (°)

Unit: ton

Page 105: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 239--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

9.0�

9.0�

9.0�

9.0�

9.0�

9.0�

8.8�

8.5�

8.1�

7.1�

6.1�

5.1�

4.3�

3.6�

2.9�

2.2

8.4�

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

7.0�

6.0�

5.1�

4.3�

3.5�

2.9�

2.2

8.4�

8.4�

8.4�

8.4�

8.4�

8.1�

7.9�

6.8�

5.9�

5.0�

4.2�

3.4�

2.7

7.8�

7.8�

7.8�

7.8�

7.8�

6.8�

5.8�

4.9�

4.1�

3.3

7.0�

7.0�

7.0�

7.0�

6.3

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

49~83 51~83 54~83 57~83 65~83θ (°)

Performance LC 1.8m + 29m luffing jib

Unit: ton

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.5�

6.8�

5.8�

4.9�

4.0�

3.3�

2.6

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.4�

6.8�

5.8�

4.9�

4.1�

3.3�

2.7

8.0�

8.0�

8.0�

8.0�

7.5�

7.1�

6.6�

5.7�

4.8�

4.0�

3.3�

2.6

7.0�

7.0�

7.0�

7.0�

6.5�

5.7�

4.8�

4.0�

3.2

6.0�

6.0�

6.0�

6.0�

5.3

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

54~83 56~83 57~83 60~83 65~83θ (°)

Unit: ton

6.6�

6.6�

6.6�

6.6�

6.5�

6.3�

6.0�

5.8�

5.6�

5.1�

4.6�

3.8�

3.1

6.4�

6.3�

6.1�

6.0�

5.9�

5.8�

5.6�

5.1�

4.6�

3.9�

3.2

6.1�

6.0�

5.9�

5.8�

5.7�

5.6�

5.1�

4.6�

3.9�

3.1

5.4�

5.4�

5.4�

5.3�

5.2�

5.1�

4.7�

3.9�

3.2

4.2�

4.2�

4.2�

4.2�

4.2�

4.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

59~83 60~83 61~83 63~83 65~83θ (°)

Unit: ton

Page 106: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 240--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

7.9�

7.0�

6.1�

5.3�

4.6�

4.0�

3.4�

2.1

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.3�

8.1�

8.0�

7.0�

6.2�

5.4�

4.7�

4.0�

2.6

8.4�

8.2�

8.0�

7.8�

7.6�

7.4�

7.2�

7.0�

6.1�

5.4�

4.6�

3.1

7.2�

7.0�

6.8�

6.7�

6.5�

6.3�

6.2�

5.4�

3.6

5.9�

5.8�

5.6�

5.5

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

42~83 46~83 50~83 54~83 66~83θ (°)

Performance LC 1.8m + 37m luffing jib

Unit: ton

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.6�

5.8�

5.0�

4.3�

3.7�

3.1

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

5.9�

5.1�

4.4�

3.8�

2.4

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

5.9�

5.2�

4.5�

2.9

6.7�

6.4�

6.2�

6.0�

5.8�

5.6�

5.3�

3.5

5.5�

5.3�

5.3�

5.3�

5.3

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

48~83 50~83 54~83 58~83 61~83θ (°)

Unit: ton

6.3�

6.3�

6.3�

6.3�

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.5�

4.7�

4.0�

3.4�

2.8

6.3�

6.3�

6.3�

6.2�

6.1�

6.1�

6.0�

5.9�

5.8�

5.7�

4.9�

4.2�

3.6�

2.2

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.8�

5.7�

5.0�

4.3�

2.8

6.1�

6.1�

6.0�

6.0�

5.9�

5.8�

5.2�

3.5

5.2�

5.2�

5.2�

5.2

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

51~83 54~83 57~83 61~83 64~83θ (°)

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.4�

3.7�

3.1�

2.5

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

4.0�

3.4

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.8�

4.1�

2.6

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

3.4

5.0�

5.0�

5.0�

3.9

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

54~83 57~83 60~83 64~83 66~83θ (°)

Unit: ton

Page 107: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 241--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.5�

2.9�

2.3

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.2�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.6�

3.5�

2.5

3.8�

3.8�

3.8�

3.7�

3.6�

3.3

3.3�

3.3�

3.3�

3.3

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

56~83 60~83 62~83 66~83 68~83θ (°)

Performance LC 1.8m + 37m luffing jib

Unit: ton

Page 108: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 242--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

5.8�

5.8�

5.8�

5.7�

5.6�

5.5�

5.3�

5.2�

5.0�

4.9�

4.7�

4.6�

4.4�

4.2�

4.1�

3.9�

2.6

5.2�

5.2�

5.0�

4.8�

4.6�

4.5�

4.3�

4.1�

4.0�

3.9�

3.7�

3.6�

3.3�

2.1

4.3�

4.2�

4.1�

3.9�

3.8�

3.7�

3.6�

3.5�

3.4�

3.2�

2.6

3.5�

3.3�

3.3�

3.3�

3.2�

3.2�

3.1

3.1�

3.1�

3.1

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

46~83 49~83 54~83 59~83 63~83θ (°)

Performance LC 1.8m + 45m luffing jib

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.2�

3.6�

2.3

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

4.3�

4.2�

3.0

4.1�

4.1�

4.1�

4.1�

4.1�

4.1�

4.0�

3.9�

3.4�

2.4

3.3�

3.3�

3.3�

3.2�

2.9�

2.7

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

49~83 54~83 57~83 62~83 67~83θ (°)

Unit: ton

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

3.9�

3.3�

2.0

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.9�

3.8�

3.7�

2.8

4.0�

4.0�

3.9�

3.8�

3.7�

3.7�

3.6�

3.5�

3.4�

2.3

3.3�

3.2�

3.2�

3.1�

3.1

3.0�

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

52~83 57~83 59~83 64~83 67~83θ (°)

Unit: ton

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.0

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

2.6

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

3.1�

2.1

3.0�

3.0�

3.0�

3.0�

2.8

2.7�

2.5

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

58~83 59~83 62~83 66~83 69~83θ (°)

Unit: ton

Page 109: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 243--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.7�

2.6�

2.5

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.6

2.8�

2.8�

2.8�

2.5

2.3�

2.3�

2.1

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

65.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

60~83 65~83 65~83 65~83 66~83θ (°)

Performance LC 1.8m + 45m luffing jib

Unit: ton

Page 110: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 244--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

75.0�

75.0�

71.6�

65.2�

57.6�

51.4�

45.8�

35.7�

28.7�

23.5�

19.2�

15.8�

13.2�

11.0

66.0�

63.0�

59.1�

52.7�

47.3�

36.9�

29.6�

24.3�

19.8�

16.3�

13.5�

11.2

52.6�

51.0�

49.5�

47.5�

38.0�

30.5�

24.9�

20.4�

16.7�

13.7

41.6�

40.4�

38.1�

31.5�

25.7�

20.9�

17.0

29.0�

28.2

6.0�

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

B(m)

F 110t hook (2,100kg)

8part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 33~83 43~83 66~83θ (°)

Performance LD 1.8m + 11m luffing jib

Unit: ton

61.0�

61.0�

61.0�

56.4�

50.1�

44.3�

34.3�

27.3�

22.0�

17.7�

14.4�

11.7�

9.6�

7.8�

6.2

61.0�

58.1�

51.7�

46.1�

35.6�

28.4�

23.0�

18.5�

15.0�

12.2�

10.0�

8.0�

6.4

51.2�

47.7�

36.9�

29.4�

23.9�

19.2�

15.6�

12.7�

10.3�

8.2

38.6�

30.7�

24.9�

20.1�

16.2�

13.1

31.1�

30.3�

25.5

7.0�

8.0�

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

B(m)

F 65t hook (940kg)

7part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

26~83 28~83 32~83 48~83 65~83θ (°)

Unit: ton

38.9�

38.9�

38.9�

37.3�

33.8�

27.3�

22.0�

17.7�

14.4�

11.8�

9.6�

7.8�

6.3

35.0�

34.6�

32.5�

28.5�

23.2�

18.7�

15.2�

12.4�

10.2�

8.3�

6.7�

5.3

29.5�

29.5�

24.1�

19.5�

15.9�

13.0�

10.7�

8.7�

7.0�

5.6�

4.3�

3.1

27.4�

25.2�

20.5�

16.7�

13.7�

11.2�

9.1�

7.3

23.2�

23.0�

21.1�

17.2

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

44~83 42~83 35~83 49~83 65~83θ (°)

Unit: ton

Page 111: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 245--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

47.0�

47.0�

46.6�

45.0�

38.7�

31.4�

26.1�

21.9�

18.4�

15.6�

13.3�

11.4�

9.8�

8.5�

7.3�

6.2

40.0�

37.4�

33.0�

27.4�

23.1�

19.5�

16.5�

14.1�

12.1�

10.4�

8.9�

7.6

30.0�

27.9�

24.2�

20.5�

17.4�

14.8�

12.7�

10.8�

9.2�

7.8

21.8�

20.8�

18.6�

15.8�

13.4�

11.3

16.2�

15.8�

15.5

9.0

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

B(m)

F 65t hook (940kg)

6part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

18~83 26~83 26~83 47~83 62~83θ (°)

Performance LD 1.8m + 20m luffing jib

Unit: ton

43.0�

43.0�

43.0�

37.4�

30.1�

24.8�

20.5�

17.1�

14.3�

12.0�

10.1�

8.5�

7.2�

6.0�

4.9�

4.0�

3.2

39.1�

32.0�

26.4�

22.1�

18.4�

15.4�

13.0�

10.9�

9.2�

7.8�

6.5�

5.3�

4.3

29.7�

28.0�

23.4�

19.6�

16.5�

13.9�

11.7�

9.9�

8.3�

6.9�

5.6

22.6�

21.3�

17.9�

15.1�

12.7�

10.7�

8.9

17.2�

16.7�

16.2�

13.3

10.0

11.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0

B(m)

F 65t hook (940kg)

5part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

20~83 27~83 37~83 51~83 63~83θ (°)

Unit: ton

26.5�

26.5�

26.5�

24.3�

20.1�

16.6�

13.8�

11.6�

9.7�

8.1�

6.7�

5.5�

4.5�

3.6�

2.7�

1.9

25.7�

25.0�

21.7�

18.0�

15.1�

12.7�

10.6�

8.9�

7.5�

6.2�

5.1�

4.1�

3.2�

2.3

23.1�

22.4�

19.4�

16.3�

13.7�

11.6�

9.7�

8.2�

6.8�

5.6�

4.6�

3.6�

2.7�

1.8

18.6�

17.8�

15.1�

12.7�

10.7�

9.0�

7.5�

6.2�

5.0

15.2�

13.5�

11.4�

9.5

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

37~83 40~83 38~83 51~83 63~83θ (°)

Unit: ton

18.0�

18.0�

18.0�

18.0�

16.6�

13.9�

11.6�

9.7�

8.1�

6.7�

5.6�

4.5�

3.6�

2.7�

1.8

18.0�

17.3�

16.6�

15.2�

12.8�

10.7�

9.0�

7.6�

6.3�

5.2�

4.2�

3.3�

2.4

18.0�

17.2�

16.4�

13.8�

11.7�

9.9�

8.3�

6.9�

5.7�

4.7�

3.7�

2.8�

1.9

14.7�

14.4�

12.9�

10.9�

9.2�

7.7�

6.4�

5.2�

4.2�

3.2

12.2�

12.1�

11.6�

9.8�

8.2

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

44~83 46~83 46~83 49~83 64~83θ (°)

Unit: ton

Page 112: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 246--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

14.5�

14.5�

14.5�

14.5�

13.7�

11.4�

9.5�

7.9�

6.5�

5.4�

4.3�

3.4�

2.5�

1.6

14.1�

14.1�

14.1�

13.9�

12.6�

10.6�

8.9�

7.4�

6.1�

5.0�

4.1�

3.2�

2.3

14.1�

13.8�

13.6�

11.6�

9.8�

8.2�

6.8�

5.7�

4.6�

3.7�

2.8�

1.9

13.1�

13.1�

12.9�

10.9�

9.2�

7.7�

6.4�

5.2�

4.2�

3.3�

2.3

12.0�

11.7�

9.8�

8.2�

6.8

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

49~83 51~83 51~83 53~83 64~83θ (°)

Performance LD 1.8m + 20m luffing jib

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

9.3�

7.7�

6.3�

5.2�

4.1�

3.2�

2.2

11.0�

11.0�

11.0�

11.0�

10.4�

8.7�

7.2�

6.0�

4.9�

3.9�

3.0

11.0�

11.0�

11.0�

10.5�

9.6�

8.1�

6.7�

5.5�

4.5�

3.6�

2.7

11.0�

10.5�

10.0�

9.1�

7.6�

6.4�

5.2�

4.2�

3.3�

2.3

9.3�

9.3�

8.2�

6.8�

5.6

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

54~83 56~83 56~83 57~83 64~83θ (°)

Unit: ton

9.1�

9.1�

9.1�

9.1�

9.1�

9.1�

7.5�

6.2�

5.0�

4.0�

3.0

9.1�

9.1�

9.1�

9.0�

8.6�

7.1�

5.8�

4.7�

3.8�

2.8

8.6�

8.6�

8.6�

8.6�

8.0�

6.6�

5.4�

4.4�

3.5

7.8�

7.8�

7.8�

7.6�

6.3�

5.2�

4.2�

3.2

6.8�

6.8�

6.8�

6.8�

5.6�

4.5

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

B(m)

F 65t hook (940kg)

3part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

59~83 59~83 61~83 62~83 64~83θ (°)

Unit: ton

Page 113: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 247--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

27.0�

27.0�

25.9�

25.2�

23.5�

20.1�

17.2�

14.8�

12.9�

11.2�

9.8�

8.6�

7.5�

6.5�

5.7�

4.9�

4.3

23.0�

23.0�

22.2�

21.3�

18.5�

16.0�

13.9�

12.1�

10.6�

9.2�

8.1�

7.0�

6.1�

5.3�

4.5

19.5�

18.5�

17.1�

14.9�

13.0�

11.3�

9.9�

8.6�

7.5�

6.5�

5.5

14.0�

14.0�

13.3�

12.4�

10.8�

9.4�

8.1

10.7�

10.3�

10.1

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

18.1m boom

10°� 20°� 30°� 45°� 60°�

23~83 27~83 33~83 51~83 66~83θ (°)

Performance LD 1.8m + 29m luffing jib

Unit: ton

25.0�

25.0�

24.8�

22.3�

18.7�

15.9�

13.5�

11.6�

9.9�

8.5�

7.3�

6.2�

5.3�

4.5�

3.7�

3.0�

2.3

22.8�

22.0�

20.5�

17.4�

14.9�

12.8�

11.0�

9.5�

8.2�

7.0�

6.0�

5.0�

4.2�

3.5�

2.7�

2.0

20.0�

19.0�

16.3�

14.0�

12.1�

10.4�

9.0�

7.7�

6.6�

5.6�

4.7�

3.8�

3.0

15.0�

13.6�

11.8�

10.2�

8.7�

7.5�

6.3�

5.2

10.9�

10.7�

9.5

14.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 65t hook (940kg)

4part-lineH

Offset

22.6m boom

10°� 20°� 30°� 45°� 60°�

28~83 28~83 34~83 48~83 66~83θ (°)

Unit: ton

16.8�

16.8�

16.8�

16.8�

15.4�

13.1�

11.2�

9.5�

8.1�

6.9�

5.8�

4.8�

4.0�

3.2�

2.5

16.8�

16.8�

16.8�

14.7�

12.5�

10.7�

9.2�

7.9�

6.7�

5.7�

4.8�

3.9�

3.2�

2.4

16.8�

16.2�

13.9�

12.0�

10.3�

8.9�

7.6�

6.5�

5.5�

4.6�

3.7�

3.0�

2.2

13.3�

11.8�

10.2�

8.8�

7.5�

6.4�

5.3�

4.4�

3.5�

2.7

10.7�

9.6�

8.2�

7.0

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

B(m)

F 25t hook (730kg)

2part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

46~83 47~83 48~83 51~83 65~83θ (°)

Unit: ton

11.0�

11.0�

11.0�

11.0�

11.0�

11.0�

10.8�

9.2�

7.8�

6.6�

5.5�

4.5�

3.7�

2.9�

2.1

11.0�

11.0�

11.0�

11.0�

10.5�

9.0�

7.6�

6.5�

5.4�

4.5�

3.7�

3.0�

2.2

11.0�

11.0�

11.0�

10.1�

8.7�

7.4�

6.3�

5.3�

4.4�

3.6�

2.8�

2.0

11.0�

10.1�

8.7�

7.4�

6.3�

5.3�

4.4�

3.5�

2.7

8.5�

8.4�

8.2�

7.0�

5.8

16.0

18.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

50~83 52~83 53~83 56~83 65~83θ (°)

Unit: ton

Page 114: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 248--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

9.0�

9.0�

9.0�

9.0�

9.0�

9.0�

8.8�

7.5�

6.3�

5.2�

4.3�

3.4�

2.6

8.4�

8.4�

8.4�

8.4�

8.4�

8.4�

7.4�

6.3�

5.2�

4.3�

3.5�

2.7

8.4�

8.4�

8.4�

8.4�

8.4�

7.2�

6.1�

5.1�

4.2�

3.4�

2.7

7.8�

7.8�

7.8�

7.3�

6.2�

5.2�

4.3�

3.5�

2.7

7.0�

7.0�

7.0�

5.8�

4.8

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

56~83 57~83 58~83 60~83 65~83θ (°)

Performance LD 1.8m + 29m luffing jib

Unit: ton

8.0�

8.0�

8.0�

8.0�

8.0�

8.0�

7.2�

6.0�

4.9�

4.0�

3.1

8.0�

8.0�

8.0�

8.0�

8.0�

7.2�

6.0�

5.0�

4.1�

3.3

8.0�

8.0�

8.0�

8.0�

7.1�

6.0�

5.0�

4.1�

3.3

7.0�

7.0�

7.0�

6.1�

5.1�

4.2�

3.4�

2.6

6.0�

6.0�

5.8�

4.8�

3.9

20.0

22.0

24.0

26.0

28.0

30.0�

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

60~83 61~83 62~83 63~83 65~83θ (°)

Unit: ton

6.6�

6.6�

6.6�

6.6�

6.5�

6.3�

6.0�

5.8�

4.7�

3.8

6.4�

6.3�

6.1�

6.0�

5.9�

5.8�

4.8�

3.9

6.1�

6.0�

5.9�

5.8�

5.7�

4.8�

3.9�

3.1

5.4�

5.4�

5.4�

5.3�

5.0�

4.1�

3.3

4.2�

4.2�

4.2�

4.2�

3.9�

3.0

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0

B(m)

F 25t hook (730kg)

2part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

64~83 65~83 65~83 66~83 67~83θ (°)

Unit: ton

Page 115: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 249--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.2�

7.1�

6.1�

5.3�

4.5�

3.8�

3.2�

2.6�

1.9

8.5�

8.5�

8.5�

8.5�

8.5�

8.5�

8.3�

7.2�

6.3�

5.4�

4.6�

3.9�

3.3�

2.7

8.4�

8.2�

8.0�

7.8�

7.6�

7.2�

6.3�

5.4�

4.7�

4.0�

3.3

7.2�

7.0�

6.8�

6.7�

6.5�

5.7�

4.8�

4.1�

2.4

5.9�

5.8�

5.6�

5.5

18.0

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

44~83 48~83 52~83 54~83 66~83θ (°)

Performance LD 1.8m + 37m luffing jib

Unit: ton

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

6.8�

5.8�

5.0�

4.2�

3.5�

2.9�

2.2

7.4�

7.4�

7.4�

7.4�

7.4�

7.4�

7.0�

6.0�

5.2�

4.4�

3.7�

3.1�

2.4

7.4�

7.4�

7.4�

7.4�

7.4�

7.0�

6.1�

5.3�

4.5�

3.8�

3.1

6.7�

6.4�

6.2�

6.0�

5.6�

4.8�

4.0�

2.4

5.5�

5.3�

5.3�

5.3�

4.6

20.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

53~83 52~83 56~83 58~83 61~83θ (°)

Unit: ton

6.3�

6.3�

6.3�

6.3�

6.3�

6.3�

6.2�

6.1�

6.0�

5.5

4.7

3.9

3.2�

2.5

6.3�

6.3�

6.3�

6.2�

6.1�

6.1�

6.0�

5.8�

4.9�

4.2�

3.5�

2.8�

2.2

6.3�

6.3�

6.2�

6.1�

6.0�

5.9�

5.1�

4.3�

3.6�

3.0

6.1�

6.1�

6.0�

6.0�

5.5�

4.7�

3.9�

2.3

5.2�

5.2�

5.2�

4.6

20.0

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

57~83 55~83 59~83 61~83 65~83θ (°)

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.4�

3.6�

2.9

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.7�

3.9�

3.2�

2.6

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.1�

3.4�

2.8

5.0�

5.0�

5.0�

5.0�

4.5�

3.8�

2.2

5.0�

5.0�

4.6�

2.7

22.0

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

61~83 62~83 61~83 64~83 66~83θ (°)

Unit: ton

Page 116: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 250--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.4

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7

3.1

3.8�

3.8�

3.8�

3.8�

3.8�

3.8�

3.7�

3.3

2.7

3.8�

3.8�

3.8�

3.7�

3.6

3.3�

3.3�

3.3

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

64~83 65~83 66~83 70~83 73~83θ (°)

Performance LD 1.8m + 37m luffing jib

Unit: ton

Page 117: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 251--

AR-1600M-1 / LJ-02

B= Working radius F= Standard hook H= No. of part-line

5.8�

5.8�

5.8�

5.7�

5.6�

5.5�

5.3�

5.2�

5.0�

4.9�

4.7�

4.6�

4.3�

3.7�

3.1�

2.6

5.2�

5.2�

5.0�

4.8�

4.6�

4.5�

4.3�

4.1�

4.0�

3.9�

3.7�

3.4

4.3�

4.2�

4.1�

3.9�

3.8�

3.7�

3.6�

3.5�

3.4�

2.8

3.5�

3.3�

3.3�

3.3�

3.2�

3.2�

2.2

3.1�

3.1�

3.1

20.0

22.0

24.0

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0�

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

31.8m boom

10°� 20°� 30°� 45°� 60°�

51~83 56~83 55~83 59~83 63~83θ (°)

Performance LD 1.8m + 45m luffing jib

Unit: ton

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.0�

3.4�

2.8�

2.2

5.0�

5.0�

5.0�

4.9�

4.8�

4.7�

4.6�

4.5�

4.4�

3.7�

3.1

4.1�

4.1�

4.1�

4.1�

4.1�

4.1�

4.0�

3.9�

2.6

3.3�

3.3�

3.3�

3.2�

2.9

3.0�

3.0

22.0

24.0

26.0

28.0

30.0

32.0�

34.0�

36.0�

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

36.3m boom

10°� 20°� 30°� 45°� 60°�

54~83 59~83 62~83 68~83 72~83θ (°)

Unit: ton

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

3.7�

3.1�

2.4

4.2�

4.2�

4.2�

4.2�

4.2�

4.2�

4.1�

4.0�

3.9�

3.5�

2.9

4.0�

4.0�

3.9�

3.8�

3.7�

3.7�

3.6�

3.5�

2.4

3.3�

3.2�

3.2�

3.1

3.0�

3.0�

2.6

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0�

44.0�

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

40.9m boom

10°� 20°� 30°� 45°� 60°�

60~83 61~83 61~83 66~83 67~83θ (°)

Unit: ton

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4�

2.7

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.2�

2.6

3.5�

3.5�

3.5�

3.5�

3.5�

3.5�

3.4

3.0�

3.0�

3.0�

3.0

2.7�

2.5

24.0

26.0

28.0

30.0

32.0

34.0

36.0

38.0

40.0

42.0

44.0

46.0�

48.0�

50.0�

55.0

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

45.4m boom

10°� 20°� 30°� 45°� 60°�

63~83 63~83 67~83 68~83 69~83θ (°)

Unit: ton

Page 118: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 252--

AR-1600M-1 / LJ -02

B= Working radius F= Standard hook H= No. of part-line

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.8�

2.3�

2.3�

26.0�

28.0�

30.0�

32.0�

34.0�

36.0

38.0�

40.0�

42.0�

44.0�

46.0�

48.0�

50.0�

55.0�

60.0

B(m)

F 9.4t hook (430kg)

1part-lineH

Offset

50.0m boom

10°� 20°� 30°� 45°� 60°�

68~83 68~83 68~83 69~83 71~83θ (°)

Performance LD 1.8m + 45m luffing jib

Unit: ton

Page 119: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 253--

AR-1600M-1 / LJ-02

NOTES:The deflection of the boom and the jib are not incorporated in the figure above.The above figure is for Performance LS.

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)

BOOM

BOOM

BOOM

WORKING RADIUS - LIFTING HEIGHT

1.8m + 11m luffing jib

Page 120: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 254--

AR-1600M-1 / LJ -02

NOTES:The deflection of the boom and the jib are not incorporated in the figure above.The above figure is for Performance LS.

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)

BOOM

BOOM

BOOM

BOOM

BOOM

1.8m + 20m luffing jib

Page 121: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 255--

AR-1600M-1 / LJ-02

NOTES:The deflection of the boom and the jib are not incorporated in the figure above.The above figure is for Performance LS.

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)

BOOM

BOOM

BOOM

BOOM

BOOM

1.8m + 29m luffing jib

Page 122: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 256--

AR-1600M-1 / LJ -02

NOTES:The deflection of the boom and the jib are not incorporated in the figure above.The above figure is for Performance LS.

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)BOOM

BOOM

BOOM

1.8m + 37m luffing jib

Page 123: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 257--

AR-1600M-1 / LJ-02

NOTES:The deflection of the boom and the jib are not incorporated in the figure above.The above figure is for Performance LS.

WORKING RADIUS (m)

LIFTINGHEIGHT(m

)BOOM

BOOM

BOOM

1.8m + 45m luffing jib

Page 124: ALL TERRAIN CRANE AR-1600M · 5. The chart below shows the standard number of part lines for each boom length. The load per line should not exceed 92.1kN (9.4t) for both the main

-- 258--

AR-1600M-1 / LJ -02

◆ MEMO ◆