    Measurment Book Abstract (AMB) 3Rd R/A Bill M/s SEPL

    Sl.No. Qty. Unit Rate

    1 2 3 4 5 6 7 8 9 = 6 * 8 10 = 77.5% * 9 11

    1 2.1.2 Nil

    Design and Engg.Nil 13,000,000 650,000

    Supply of Plant and Equip.Nil 332,330,000 16,616,500

    Supply of Commissoining SparesNil 699,352 34,967

    Nil 10,000,000 500,000

    Ocean Freight,Coustom Clerence etc.Nil 6,000,000 300,000

    Nil 4,000,000 200,000

    Sub Total 1 (a)366,029,352 18,301,467

    2 2.1.2 Nil

    Design and Engg.Nil 13,000,000 650,000

    Supply of Plant and Equip.Nil 332,330,000 16,616,500

    Supply of Commissoining SparesNil 699,352 34,967

    Nil 10,000,000 500,000

    Ocean Freight,Coustom Clerence etc.Nil 6,000,000 300,000

    Nil 4,000,000 200,000

    Sub Total 1 (b)366,029,352 18,301,467

    3 2.1.1 Table-4(Part A) Nil 550,000 27,500

    4 2.1.2 Table-4(Part A) Nil 550,000 27,500

    Sun Total (c) 1,100,000 55,000

    Grand Total-I 733,158,704 36,657,934

    ContractClause

    PartyInvoice

    No.

    BillingSchedule Item

    No.

    Description of Items withcontract Item No.

    Total BasicAmount

    77.5% of TotalBasic Amount

    TaxInvoice

    No.

    Five per cent (5%) of the Total ContractPrice of (Rs 378,239,386) specified inthe Appendix - 1 excluding Taxes,Duties & Training

    Table-2 ofAppendix-1

    Table-4 ofAppendix-I

    Table-8 ofAppendix-1

    Table-11 ofAppendix-1

    Erection,commissoning & PG Test ofplant and Equipment

    Sl.No.10 ofAppendix-1

    Sl.No.11 ofAppendix-1

    Comprehensive marine cum erectioninsurance

    Five per cent (5%) of the Total ContractPrice of (Rs 378,239,386) specified inthe Appendix - 1 excluding Taxes,

    Table-2 ofAppendix-1

    Table-4 ofAppendix-I

    Table-8 ofAppendix-1

    Table-11 ofAppendix-1

    Erection,commissoning & PG Test ofplant and Equipment

    Sl.No.10 ofAppendix-1

    Sl.No.11 ofAppendix-1

    Comprehensive marine cum erectioninsurance

    SEPL/SUPPLEMENTARY/09-

    10/001dt.05/10/09

    1st 5% of the total Freight charges ofRs.550000

    2nd 5% of the total Freight charges ofRs.550000

  • 8/14/2019 AMB 3RD RA SPM

    2/2

    Measurment Book Abstract (AMB) 3Rd R/A Bill M/s SEPL

    Sl.No. Qty. Unit Rate

    1 2 3 4 5 6 7 8 9 = 6 * 8 10 = 77.5% * 9 11

    ContractClause

    PartyInvoice

    No.

    BillingSchedule Item

    No.

    Description of Items withcontract Item No.

    Total BasicAmount

    77.5% of TotalBasic Amount

    TaxInvoi

    No

    2.1.3

    1.01 Inner Cover (Set-1) 4 Nos. 3,742,550 14,970,200 11,601,905 39,40,41

    do 1.02 Inner Cover (Set-2) 4 Nos. 3,742,550 14,970,200 11,601,905 43,44,45

    1.03 Inner Cover (Set-3) 4 Nos. 3,742,550 14,970,200 11,601,905 50,51,52

    do 1.04 Inner Cover (Set-4) 4 Nos. 3,742,550 14,970,200 11,601,905 54,55,5

    6.6 (6b) 4 no. 4,128,250 16,513,000 12,797,575

    do 6.6 (6c) 3000 KVA Convertor Transformer 1 no. 6,192,400 6,192,400 4,799,110 635

    6.6 (6d) LT Sub Station 2 (PCC) 2 no. 5,160,300 10,320,600 7,998,465

    do 6.6 (6f) PDB for VFD (1 ) 2 no. 4,816,300 9,632,600 7,465,265

    Sub Total-II 102,539,400 79,468,035

    2.3.4

    2.3.4 Page 2 of 17 7 Shipment 1,731,100 1,341,602

    do 6 shipment 1,836,494 1,423,283

    Sub Total-III 3,567,594 2,764,885

    2.3.1.1 Page 4 of 17 Basic Engineering drawing 1 dwgs 7,200,000 313,043 242,608

    do do Detail Design & Engineering 4 dwgs 4,800,000 679,245 526,415

    Sub Total-IV 992,288 769,023

    Grand total = I + II + III +IV 840,257,986 119,659,877

    77.5% of the contract price specified inthe Appendix-1 excluding taxes, dutiesand training charges shall be releasedtowards progress payment and 100%taxes and duties on submission ofdocumentary evidence.

    SEPL/BAF/09-10/35

    dt.05/10/09

    SEPL/BAF/09-10/46 dt03/11/09

    SEPL/BAF/09-10/52 dt20/11/09

    2000 KVA Power DistrubutionTransformer

    636,637639

    SEPL/BAF/09-10/45 dt03/11/09

    5026001502600

    502600502600

    77.5% of the contract price on accont ofOcean Freight, Custom Clearence(excluding Impoty duty), Port Clearenceand Inland Transportation

    SEPL/BAF/09-10/002 dt

    30.05.2009

    For 7 shipments of RAD CON arraived at SAIL,Bokaro Steel Plant) vide Ref. no. P.Eng/CRM-III/Pkg.028/09-395 dated 18.05.2009

    SEPL/BAF/09-10/012 dt

    12.10.2009

    For 6 shipments of RAD CON arraived at SAIL,Bokaro Steel Plant) vide Ref. no. P.Eng/CRM-III/Pkg.028/09-706 dated 18.09.2009

    SEPL/BAF/09-10/015 dt

    15.07.2009