B A H A N I N F O R M A S I R A P A T T E R B A T A S

PENANGANAN BENCANA GEMPA BUMI & TSUNAMI DI PROVINSI SULAWESI TENGAH

J a k a r t a , 2 O k t o b e r 2 0 1 8

1

4 FOKUS S TRATEGI TANGGAP DARURAT

EVAKUASI KORBAN BENCANA

1 PEMBERSIHAN KOTA DARI PUING-PUING BANGUNAN RUNTUH

3

PENYEDIAAN PRASARANA & SARANA

AIR BERSIH & SANITASI

2PENYELESAIAN

MASALAH KONEKTIVITAS

4

2

1. Evakuasi Korban Bencana:

• Mobilisasi 10 unit excavator (6 unit di Petobo dan 4 unit di Balaroa termasuk 1 excavator dengan stone breaker),

1 unit loader di Balaroa, 4 unit dump truck (2 unit di Petobo dan 2 unit di Balaroa);

• Tambahan 2 excavator dari Makassar;

• Upaya evakuasi bekerjasama dengan BASARNAS, PMI, TNI/POLRI, Pemerintah setempat dan masyarakat;

• Supply BBM dijamin oleh Depo Pertamina setempat.

2. Penyediaan Prasarana & Sarana Air Bersih dan Sanitasi:

a. Sumber Air Baku: Artesis & Sumur Bor di 8 lokasi (6 lokasi dengan genset dan 2 lokasi dengan solar cell);

b. Sumber Air Permukaan (Intake Jembatan Palu 2 dan Intake Jembatan Kasubi);

c. Sarpras yang dikirimkan dari Makasar (sudah tiba per 30/9) serta dari Surabaya dan Bekasi (dijadwalkan akan

tiba Kamis 4/10:

• 15 unit Mobil Tangki Air (2 unit sudah beroperasi);

• 25 unit HU kap. 2.000 lt (15 unit sudah terpasang);

• 49 unit WC Knock Down (15 unit mulai dipasang per 2/10);

• 34 Tenda Darurat (10 unit mulai didistribusikan per 2/10);

• 5 unit dump truck (3 unit sudah beroperasi);

• 3 unit Mobil IPA, 4 unit Mobil Tinja;

• 3 unit Genset.

d. Akan dilakukan pengecekan jaringan distribusi perpipaan air minum Kota Palu dan Kota Donggala.

Status: 1 Oktober 20184 FOKUS STRATEGI TANGGAP DARURAT

3

3. Pembersihan Kota dari Puing-Puing Bangunan Runtuh:

• Mobilisasi 3 unit excavator, 5 loader, 4 dump truck, 1 grader, termasuk di Loli (Ruas Palu-Donggala);

• Ditargetkan selesai paling lambat pertengahan Oktober 2018 (2 minggu).

4. Pemulihan Konektivitas:

a. Akses ke Kota Palu melalui Lintas Barat, Timur, dan Tengah telah terbuka semua:

• Lintas Barat Ruas Palu – Pel. Pantoloan – Tolitoli – Buol (± 546 km) dan Ruas Palu – Donggala – Pasangkayu

– Mamuju (± 420 km);

• Lintas Tengah Ruas Palu – Napu – Poso (± 427 km) dan Palu – Kebon Kopi – Parigi – Poso (± 220 km);

• Lintas Timur Ruas Palu – Kebon Kopi – Marisa – Gorontalo (± 607 km);

b. Perbaikan 2 jembatan rusak pada ruas jalan nasional di Towalen & Toboyo dan 1 Jembatan Kuning di Kota Palu;

Mengingat fungsi Jembatan Kuning sebagai ikon Kota Palu, jembatan ini akan ditangani Kementerian PUPR

diawali dengan pengecekan struktur jembatan dan desain ulang;

c. Perbaikan jalan-jalan kota yang retak/mencuat dengan pengupasan/scrapping dan patching. Mobilisasi alat

berat 1 unit excavator, 1 loader, dan 2 dump truck.

Status: 1 Oktober 20184 FOKUS STRATEGI TANGGAP DARURAT

4

EVAKUAS I KORBAN BENCANA [ 1 - 2]

• Mobilisasi 10 unit excavator (6 unit di Petobo dan 4 unit di Balaroa termasuk 1excavator dengan stone breaker), 1 unit loader di Balaroa, 4 unit dump truck (2 unitdi Petobo dan 2 unit di Balaroa);

• Tambahan 2 unit excavator dari Makassar.

5

EVAKUAS I KORBAN BENCANA [ 2 - 2]

E X C A V A T O R B E K E R J A U N T U K E V A K U A S I K O R B A N D I B A L A R O A

6

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 1 - 4]

SUDAH BEROPERASI:

• 2 unit Mobil Tangki Air;• 15 unit HU kap. 2.000 lt;• 3 unit dump truck.

MULAI DIPASANG per 2/10:

15 unit WC knock down

MULAI DIDISTRIBUSIKAN per2/10:

10 unit Tenda Darurat

7

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 2 - 4]

D I S T R I B U S I A I R B E R S I H M E L A L U I 2 M O B I L T A N G K I A I R

8

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 3 - 4]

1. Lapangan Watulemo;2. Halaman Balai Kota;3. Bundaran Biromaru; 4. Bundaran STQ;5. Makorem;6. Mesjid Raya;7. Mako Sabara Paboya;8. Lapangan Anoa;

9. Lapangan Perdos;10. Lapangan Dayodara;11. GOR Siranindi;12. Kampung Siswa (Kel. Baiya);13. Kel. Pantoloan Boya;14. BTN Lasonni;15. Mako Sat Brimob Mamboro.

15 HU 2.000 ltSUDAH TERPASANG:

9

P ENY EDIAAN P RAS ARAN A & S ARANA AIR BERS IH & S ANITAS I [ 4 - 4]

H I D R A N U M U M 2 . 0 0 0 L I T E R D I L A P A N G A N W A T U L E M O

10

P EMBERS I H AN KOTA DARI P UING BANGUNAN [ 1 - 2]

Mobilisasi 3 unit excavator, 5 loader, 4 dump truck, 1 grader, termasuk di Loli(Ruas Palu-Donggala)

11

J U M L A H E X C A V A T O R T E R U S D I T A M B A H D A R I M A K A S A R , G O R O N T A L O , & K E B O N K O P I

( P R O Y E K P E N A N G A N A N L E R E N G )

P EMBERS I H AN KOTA DARI P UING BANGUNAN [ 2 - 2]

12

P ETA KONEKTIVIT AS

POSO

KOTA PALU

PARIGIDONGGALA

PASANGKAYU

TOLI TOLIBUOL

MARISA

KEBON KOPI

GORONTALO

MAMUJU

13

P EMUL IH AN KONEKTIVIT AS [ 1 - 3]

K O N E K T I V I T A S D I K E B O N K O P I S U D A H P U L I H K E M B A L IP A S C A L O N G S O R A K I B A T G E M P A ( 2 8 / 9 )

14

P EMUL IH AN KONEKTIVIT AS [ 2 - 3]

J A L U R L O G I S T I K D A R I A R A H G O R O N T A L O & P A R I G I S U D A H T E R B U K A V I A K E B O N K O P I

15

P EMUL IH AN KONEKTIVIT AS [ 3 - 3]

PERBAIKAN JEMBATAN KUNING DI KOTA PALU DIAWALI DENGAN PENGECEKAN STRUKTUR & DESAIN ULANG

16

L AP ORAN KEJ ADIAN GEMP A & TS UNAMI

• Gempa pertama mengguncang Kab. Donggala pukul 14.00 WIB pada 28 September 2018 dengan kekuatanmagnitudo 6 SR pada kedalaman 10 km.

• Gempa kembali terjadi pukul 17:02 WIB dengan kekuatan yang lebih besar, yaitu 7,4 SR dengan kedalamanyang sama.

• Pukul 17:02 BMKG menyatakan status Siaga dan Waspada. Arti status Siaga, tinggi tsunami adalah 0,5-3 meter di pantai barat Donggala.

• Tsunami terjadi di Kota Palu dan Kab. Donggala pada Jumat, 28 September 2018. Sejumlah gempa susulan terusterjadi di kawasan tersebut hinggamalam hari.

• Korban meninggal akibat gempa dan tsunami 844 orang, 632 orang luka-luka, 90 orang dinyatakan hilang, dan sekitar 48.025 jiwa mengungsi di 103 titik

K R O N O L O G I S