1/23
KB
THIS DRAWING HAS BEEN
PREPARED, REVIEWED, AND APPROVED BY
SARGENT & LUNDY LLC
000 11Nov2011
NRN DIFC RDD/BR BR
001 03May2012 NRN DIFC RDD/BR BR
7/29/2019 Blk-1 Fiber Msd
2/23
Cable Length Summary
Block-1 COMM
Total Est1. = Total calculated lengths of cables in the cable tab.
2. Actual Pulled = Actual cable lengths pulled.
3. Est Unpulled = Estimated length to be pulled.
4. On Order = Cable quantity ordered.
5. Over/Short = Estimate of cables excess (+) or shortage (-) quantity.
6. Field Dev = Overpull (+%) when field pulled lengths are above design estimates;
Underpull (-%) when field pulled lengths are below design estimates.
Total Est
Actual Pulled
Est Unpulled
On Order
Over/Short
Field Dev
X
Y
7/29/2019 Blk-1 Fiber Msd
3/23
Total
# Cables
Total
Pulled
Total EstDescription Actual
Pulled
Over/
Short
Field
Dev
Type Code Est
Unpulled
On
Order
L e n g t h i n M e t e r s
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:07 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
Cable Length Summary
Furnish Spec
FIBER04 QC-1023 4C FIBER OPTIC 62.5/125UM 4265 12246 11546 -12%(12164)618 0
Report Filter = ( CABLE_NUMBER Like 'C1%') AND (CABLE_SEG_CODE = 'CO' OR CABLE_SEG_CODE = 'T') AND CABLE_STATUS = 'Released'
Overall Totals: 65 42 12,246 618 11,546 0
Page 2 of 2
7/29/2019 Blk-1 Fiber Msd
4/23
Unique identifying number assigned the cable(s).
Identifies number of physical cables associated with cable number. (e.g. A cable number for a power feed may include three(3) 1/C cables).
Description of the type of cable (e.g. 7/C #14).
Voltage rating of cables insulation system (e.g. 600V)
Optional - when included is used to indicate that cable has and overall shield
Type of cable insulation material (e.g. XLPE).Type of cable jacket material (e.g. PVC)
Design revision status of the cable.
Plant system to which the cable is assigned (e.g. CD - which would be the Condensate System).
Description of service for which cable is used (e.g. Condensate Booster Pump A).
Optional - when included specifies special grounding requirement (e.g. #2 Bare CU - may be specified when using non-metallic conduit).
Segregation Code assigned to cable (e.g. MV - which would be Medium Voltage Power)
Unique code assigned to each different cable type.
Automatically calculated length which includes the length of the raceway path through which a cable is routed and also includes any end lengths which may be
manually input to account for the cable segment between the last raceway point and the connected equipment (see end length).
Automatically calculated contingency allowance based on the total routed length.
Optional - when included identifies actual installed cable lengths.
Optional - when included identifies budget reference numbers associated with cables.
Optional - when included identifies optional cable information.
Optional - when included identifies Start/Construction code
Contract responsible for providing the cable
Contract responsible for installing the cable
Identifying numbers of equipment between which cable is routed.
Description of equipment between which cable is routed.
Optional - when included identifies equipment compartment to which cable is to be terminated (e.g. switchgear cubicle).
Optional - when included identifies additional lengths which may be input to account for the cable segment between the last raceway point and the connected
equipment (see Rtd Length).
Optional - when included may be used to identify Master Schematic or other wiring drawing on which cable terminations are defined.
Optional - when included may be used to identify document(s) providing unique equipment installation details.
Optional - not required if zone is identified. Identifies the East - North grid location and Elevation of Equipment
Optional - not required when North / East / Elevation coordinates are identified. Identifies name or pre-defined zone in which equipment is located.
Optional - when included identifies optional notes, references, etc.
Optional - Identifies the cables installation route through the raceway system.
Optional - shown only on the last page of cable tabulation and identifies the additional constraints used in the generation of the report.
Cable No.
No. of Cables
Description
Voltage Rating
Shield
InsulationJacket
Rev.
System
Service
Ground
Seg Code
Type Code
Routed Length
Allowance
Pull Length
Budget Ref No
Option 1 / 2 / 3
Startup Code
Furnished SpecInstallation Spec
From/To Equipment Number
From/To Description
Compartment
End Length
Wiring Drawing
Location Drawing
North / East / Elevation
Zone
Remarks
Route Points
Filter Criteria
ITEM DESCRIPTION
Block-1 COMM Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Schematic Dwg:
Description:
Route Points:
Cable No. : Rev:
Type Code:
Service:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment::
Description:
Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
Furnish Spec:
North: North:
Total Length (m):
Remarks:
Schematic Dwg:
End Length(m):
Cable Tabulation
7/29/2019 Blk-1 Fiber Msd
5/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
25
611
BEMCO
C10SW61 10
NETWORK SW61 IN ST1 ELEC ROOM
ED-694369
P00SW171 35
NETWORK SW171 IN CCB
EA-681111
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
636Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6001 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007
C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-44 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-42 C30-EMH-008 C30-D065-61
C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-59 C00-EMH-003
C00-D002-58 C00-EMH-002 C00-D001-111 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B
P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
25
611
BEMCO
C10SW62 10
NETWORK SW62 IN ST1 ELEC ROOM
ED-694369
P00SW172 35
NETWORK SW172 IN CCB
EA-681111
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
636Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6002 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C14-TK-054 C14-TK-053 C14-TK-052 C14-TK-050 C14-TK-049 C14-TK-207 C14-TK-204B CABLE C14-TK-203 C14-TK-205 C10-EMH-007
C10-D066-23 C20-EMH-007 C20-D063-24 C20-EMH-008 C20-D065-44 C20-EMH-009 C20-D066-44 C30-EMH-007 C30-D063-42 C30-EMH-008 C30-D065-61
C30-EMH-009 C30-D066-61 C30-EMH-010 C30-D070-61 C30-EMH-011 C30-D071-63 C00-EMH-171 C00-D351-58 C00-EMH-004 C00-D003-59 C00-EMH-003
C00-D002-58 C00-EMH-002 C00-D001-111 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022 P00-TK-064B P00-TK-063B P00-TK-062B
P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW186 10
NETWORK SW186 IN BLK-1 MVLV BLDG
ED-694369
P00SW171 35
NETWORK SW171 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6003 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-43 C30-EMH-007
C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-60 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-62 C00-EMH-171 C00-D351-57
C00-EMH-004 C00-D003-58 C00-EMH-003 C00-D002-57 C00-EMH-002 C00-D001-110 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
Page 1 of 19
7/29/2019 Blk-1 Fiber Msd
6/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW187 10
NETWORK SW187 IN BLK-1 MVLV BLDG
ED-694369
P00SW172 35
NETWORK SW172 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6004 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-24 C20-EMH-007 C20-D063-23 C20-EMH-008 C20-D065-43 C20-EMH-009 C20-D066-43 C30-EMH-007
C30-D063-41 C30-EMH-008 C30-D065-61 C30-EMH-009 C30-D066-60 C30-EMH-010 C30-D070-65 C30-EMH-011 C30-D071-62 C00-EMH-171 C00-D351-57
C00-EMH-004 C00-D003-58 C00-EMH-003 C00-D002-57 C00-EMH-002 C00-D001-110 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW188 10
NETWORK SW188 IN BLK-1 MVLV BLDG
ED-694369
P00SW171 35
NETWORK SW171 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6005 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007
C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56
C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW189 10
NETWORK SW189 IN BLK-1 MVLV BLDG
ED-694369
P00SW172 35
NETWORK SW172 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6006 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007
C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56
C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
Page 2 of 19
7/29/2019 Blk-1 Fiber Msd
7/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW190 10
NETWORK SW190 IN BLK-1 MVLV BLDG
ED-694369
P00SW171 35
NETWORK SW171 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6007 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007
C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56
C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO
26
638
BEMCO
C10SW191 10
NETWORK SW191 IN BLK-1 MVLV BLDG
ED-694369
P00SW172 35
NETWORK SW172 IN CCB
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
664Total Length (m):
escription:
Remarks:
Schematic: EA-681131
End Length(m):
ED-694369
00C10CPB6008 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-142 C10-TK-141 C10-TK-144 C10-TK-148 C10-TK-151 C10-TK-153 C10-TK-159 C10-TK-215 C10-TK-216B C10-TK-224 C14-TK-201
C14-TK-203 C14-TK-205 C10-EMH-007 C10-D066-23 C20-EMH-007 C20-D063-22 C20-EMH-008 C20-D065-42 C20-EMH-009 C20-D066-42 C30-EMH-007
C30-D063-40 C30-EMH-008 C30-D065-60 C30-EMH-009 C30-D066-59 C30-EMH-010 C30-D070-64 C30-EMH-011 C30-D071-61 C00-EMH-171 C00-D351-56
C00-EMH-004 C00-D003-57 C00-EMH-003 C00-D002-56 C00-EMH-002 C00-D001-109 CABLE C00-TK-037 C00-TK-032 C00-TK-023 C00-TK-022
P00-TK-064B P00-TK-063B P00-TK-062B P00-TK-061B P00-TK-060B P00-TK-059B FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 12
2
11
BEMCO
C11-CPB-66-GH-013 11
B1H1T I/O CABINET-1_TMR
ED-694369
C11-CPB-66-GH-011 0
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6009 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
Page 3 of 19
7/29/2019 Blk-1 Fiber Msd
8/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 12
2
11
BEMCO
C11-CPB-66-GH-013 11
B1H1T I/O CABINET-1_TMR
ED-694369
C11-CPB-66-GH-011 0
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6010 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 12
2
11
BEMCO
C11-CPB-66-GH-013 11
B1H1T I/O CABINET-1_TMR
ED-694369
C11-CPB-66-GH-011 0
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6011 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 14
2
12
BEMCO
C11-CPB-66-GH-012 6
B1H1T I/O CABINET-2_TMR
ED-694369
C11-CPB-66-GH-011 6
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6012 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-151 CABLE
FIBER04
CPB 1
N
PVC
CO 14
2
12
BEMCO
C11-CPB-66-GH-012 6
B1H1T I/O CABINET-2_TMR
ED-694369
C11-CPB-66-GH-011 6
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6013 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-151 CABLE
Page 4 of 19
7/29/2019 Blk-1 Fiber Msd
9/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 14
2
12
BEMCO
C11-CPB-66-GH-012 6
B1H1T I/O CABINET-2_TMR
ED-694369
C11-CPB-66-GH-011 6
B1H1T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6014 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-151 CABLE
FIBER04
CPB 1
N
PVC
CO 18
3
14
BEMCO
C11-CPB-66-GH-003 5
B1H1 I/O CABINET-2_SIMP
ED-694369
C11-CPB-66-GH-001 9
B1H1 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6015 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO 18
3
14
BEMCO
C11-CPB-66-GH-003 5
B1H1 I/O CABINET-2_SIMP
ED-694369
C11-CPB-66-GH-001 9
B1H1 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6016 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO 21
3
15
BEMCO
C11-CPB-66-GH-004 6
B1H1 I/O CABINET-3_SIMP
ED-694369
C11-CPB-66-GH-001 9
B1H1 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6017 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-148 CABLE
Page 5 of 19
7/29/2019 Blk-1 Fiber Msd
10/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 21
3
15
BEMCO
C11-CPB-66-GH-004 6
B1H1 I/O CABINET-3_SIMP
ED-694369
C11-CPB-66-GH-001 9
B1H1 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6018 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-148 CABLE
FIBER04
CPB 1
N
PVC
CO 10
2
11
BEMCO
C12-CPB-66-GH-013 11
B1H2T I/O CABINET-1_TMR
ED-694369
C12-CPB-66-GH-011 0
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6019 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 10
2
11
BEMCO
C12-CPB-66-GH-013 11
B1H2T I/O CABINET-1_TMR
ED-694369
C12-CPB-66-GH-011 0
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6020 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 10
2
11
BEMCO
C12-CPB-66-GH-013 11
B1H2T I/O CABINET-1_TMR
ED-694369
C12-CPB-66-GH-011 0
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6021 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
Page 6 of 19
7/29/2019 Blk-1 Fiber Msd
11/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 15
3
14
BEMCO
C12-CPB-66-GH-012 5
B1H2T I/O CABINET-2_TMR
ED-694369
C12-CPB-66-GH-011 9
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6022 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-141 CABLE
FIBER04
CPB 1
N
PVC
CO 15
3
14
BEMCO
C12-CPB-66-GH-012 5
B1H2T I/O CABINET-2_TMR
ED-694369
C12-CPB-66-GH-011 9
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6023 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-141 CABLE
FIBER04
CPB 1
N
PVC
CO 15
3
14
BEMCO
C12-CPB-66-GH-012 5
B1H2T I/O CABINET-2_TMR
ED-694369
C12-CPB-66-GH-011 9
B1H2T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
17Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6024 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-141 CABLE
FIBER04
CPB 1
N
PVC
CO 15
3
15
BEMCO
C12-CPB-66-GH-003 6
B1H2 I/O CABINET-2_SIMP
ED-694369
C12-CPB-66-GH-001 5
B1H2 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6025 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-139 C10-TK-137 CABLE
Page 7 of 19
7/29/2019 Blk-1 Fiber Msd
12/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 15
3
15
BEMCO
C12-CPB-66-GH-003 6
B1H2 I/O CABINET-2_SIMP
ED-694369
C12-CPB-66-GH-001 5
B1H2 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6026 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-139 C10-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO 16
3
16
BEMCO
C12-CPB-66-GH-004 7
B1H2 I/O CABINET-3_SIMP
ED-694369
C12-CPB-66-GH-001 5
B1H2 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6027 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-139 C10-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO 16
3
16
BEMCO
C12-CPB-66-GH-004 7
B1H2 I/O CABINET-3_SIMP
ED-694369
C12-CPB-66-GH-001 5
B1H2 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6028 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-139 C10-TK-137 CABLE
FIBER04
CPB 1
N
PVC
CO 11
2
12
BEMCO
C13-CPB-66-GH-013 7
B1H3T I/O CABINET-1_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6029 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-143 CABLE
Page 8 of 19
7/29/2019 Blk-1 Fiber Msd
13/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 11
2
12
BEMCO
C13-CPB-66-GH-013 7
B1H3T I/O CABINET-1_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6030 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO 11
2
12
BEMCO
C13-CPB-66-GH-013 7
B1H3T I/O CABINET-1_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
14Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6031 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO 17
3
13
BEMCO
C13-CPB-66-GH-012 5
B1H3T I/O CABINET-2_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6032 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-140 C10-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO 17
3
13
BEMCO
C13-CPB-66-GH-012 5
B1H3T I/O CABINET-2_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6033 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-140 C10-TK-143 CABLE
Page 9 of 19
7/29/2019 Blk-1 Fiber Msd
14/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 17
3
13
BEMCO
C13-CPB-66-GH-012 5
B1H3T I/O CABINET-2_TMR
ED-694369
C13-CPB-66-GH-011 5
B1H3T CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6034 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-140 C10-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO 20
3
13
BEMCO
C13-CPB-66-GH-003 8
B1H3 I/O CABINET-2_SIMP
ED-694369
C13-CPB-66-GH-001 5
B1H3 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6035 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO 20
3
13
BEMCO
C13-CPB-66-GH-003 8
B1H3 I/O CABINET-2_SIMP
ED-694369
C13-CPB-66-GH-001 5
B1H3 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6036 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO 24
3
15
BEMCO
C13-CPB-66-GH-004 10
B1H3 I/O CABINET-3_SIMP
ED-694369
C13-CPB-66-GH-001 5
B1H3 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6037 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-165 CABLE
Page 10 of 19
7/29/2019 Blk-1 Fiber Msd
15/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
3
15
BEMCO
C13-CPB-66-GH-004 10
B1H3 I/O CABINET-3_SIMP
ED-694369
C13-CPB-66-GH-001 5
B1H3 CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
18Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6038 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-165 CABLE
FIBER04
CPB 1
N
PVC
CO 13
3
18
BEMCO
C10-CPB-66-GH-023 18
B1BT I/O CABINET-2_TMR
ED-694369
C10-CPB-66-GH-021 0
B1BT CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6039 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 13
3
18
BEMCO
C10-CPB-66-GH-023 18
B1BT I/O CABINET-2_TMR
ED-694369
C10-CPB-66-GH-021 0
B1BT CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6040 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
FIBER04
CPB 1
N
PVC
CO 13
3
18
BEMCO
C10-CPB-66-GH-023 18
B1BT I/O CABINET-2_TMR
ED-694369
C10-CPB-66-GH-021 0
B1BT CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6041 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED
Page 11 of 19
7/29/2019 Blk-1 Fiber Msd
16/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 16
3
19
BEMCO
C10-CPB-66-GH-024 7
B1BT I/O CABINET-3_SIMP
ED-694369
C10-CPB-66-GH-021 12
B1BT CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
22Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6042 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-133 CABLE
FIBER04
CPB 1
N
PVC
CO 16
3
19
BEMCO
C10-CPB-66-GH-024 7
B1BT I/O CABINET-3_SIMP
ED-694369
C10-CPB-66-GH-021 12
B1BT CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
22Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6043 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-133 CABLE
FIBER04
CPB 1
N
PVC
CO 14
3
16
BEMCO
C10-CPB-66-GH-004 5
B1C I/O CABINET-3_SIMP
ED-694369
C10-CPB-66-GH-001 7
B1C CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6044 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-149 C10-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO 14
3
16
BEMCO
C10-CPB-66-GH-004 5
B1C I/O CABINET-3_SIMP
ED-694369
C10-CPB-66-GH-001 7
B1C CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
19Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6045 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-149 C10-TK-150 CABLE
Page 12 of 19
7/29/2019 Blk-1 Fiber Msd
17/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 16
3
18
BEMCO
C10-CPB-66-GH-005 7
B1C I/O CABINET-4_SIMP
ED-694369
C10-CPB-66-GH-001 7
B1C CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6046 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-149 C10-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO 16
3
18
BEMCO
C10-CPB-66-GH-005 7
B1C I/O CABINET-4_SIMP
ED-694369
C10-CPB-66-GH-001 7
B1C CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
21Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6047 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-149 C10-TK-150 CABLE
FIBER04
CPB 1
N
PVC
CO 10
2
11
BEMCO
C10-CPB-66-GH-012 5
B1E I/O CABINET-1_SIMP
ED-694369
C10-CPB-66-GH-011 6
B1E CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6048 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-145 CABLE
FIBER04
CPB 1
N
PVC
CO 10
2
11
BEMCO
C10-CPB-66-GH-012 5
B1E I/O CABINET-1_SIMP
ED-694369
C10-CPB-66-GH-011 6
B1E CONTROLLER CABINET
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
13Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6049 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-145 CABLE
Page 13 of 19
7/29/2019 Blk-1 Fiber Msd
18/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO 13
3
13
BEMCO
C10-CPB-66-GH-011 6
B1E CONTROLLER CABINET
ED-694369
C10-CPB-66-GH-013 7
B1E I/O CABINET-2_SIMP
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6050 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-145 CABLE
FIBER04
CPB 1
N
PVC
CO 13
3
13
BEMCO
C10-CPB-66-GH-011 6
B1E CONTROLLER CABINET
ED-694369
C10-CPB-66-GH-013 7
B1E I/O CABINET-2_SIMP
EA-681121
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:North: North:
16Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694369
00C10CPB6051 BLOCK-1 FIBER OPTIC CABLE (DCS)4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C10-TK-145 CABLE
FIBER04
CPB 1
N
PVC
CO
13
280
BEMCO
C11-MBR-10-GH-001 20
DIVERTER DAMPER LCP
ED-694380
C10-CPB-66-GN-001 10
B1C NETWORK CABINET
EA-681101
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
293Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694380
01C10CPB6084 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C11-TK-041 C11-TK-042 C11-TK-044 C11-TK-045 C11-TK-046 C11-TK-051 CABLE C11-TK-323 C11-TK-322 C11-TK-311 C11-TK-302
C11-TK-301 C11-TK-203 C11-TK-102 C11-TK-201 C11-TK-516 C11-TK-517A C11-TK-518A C11-TK-519A C11-TK-522A C11-TK-523A C11-TK-524A
C10-TK-213A C10-TK-212A C10-TK-158 C10-TK-151 C10-TK-148 C10-TK-144 C10-TK-142 CABLE
Page 14 of 19
7/29/2019 Blk-1 Fiber Msd
19/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
13
280
BEMCO
C11-MBR-10-GH-001 20
DIVERTER DAMPER LCP
ED-694380
C10-CPB-66-GN-001 10
B1C NETWORK CABINET
EA-681101
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
293Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694380
01C10CPB6085 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C11-TK-041 C11-TK-042 C11-TK-044 C11-TK-045 C11-TK-046 C11-TK-051 CABLE C11-TK-323 C11-TK-322 C11-TK-311 C11-TK-302
C11-TK-301 C11-TK-203 C11-TK-102 C11-TK-201 C11-TK-516 C11-TK-517A C11-TK-518A C11-TK-519A C11-TK-522A C11-TK-523A C11-TK-524A
C10-TK-213A C10-TK-212A C10-TK-158 C10-TK-151 C10-TK-148 C10-TK-144 C10-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
9
186
BEMCO
C12-MBR-10-GH-001 20
DIVERTER DAMPER LCP
ED-694380
C10-CPB-66-GN-001 10
B1C NETWORK CABINET
EA-681101
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
195Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694380
01C10CPB6088 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C12-TK-041 C12-TK-042 C12-TK-044 C12-TK-045 C12-TK-046 C12-TK-051 CABLE C12-TK-323 C12-TK-322 C12-TK-311 C12-TK-302
C12-TK-301 C12-TK-203 C12-TK-102 C12-TK-201 C12-TK-517 C12-TK-518A C12-TK-523A C12-TK-524A C10-TK-203A C10-TK-162A C10-TK-161A
C10-TK-143 CABLE
FIBER04
CPB 1
N
PVC
CO
9
186
BEMCO
C12-MBR-10-GH-001 20
DIVERTER DAMPER LCP
ED-694380
C10-CPB-66-GN-001 10
B1C NETWORK CABINET
EA-681101
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
195Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694380
01C10CPB6089 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: FIELD ROUTED C12-TK-041 C12-TK-042 C12-TK-044 C12-TK-045 C12-TK-046 C12-TK-051 CABLE C12-TK-323 C12-TK-322 C12-TK-311 C12-TK-302
C12-TK-301 C12-TK-203 C12-TK-102 C12-TK-201 C12-TK-517 C12-TK-518A C12-TK-523A C12-TK-524A C10-TK-203A C10-TK-162A C10-TK-161A
C10-TK-143 CABLE
Page 15 of 19
7/29/2019 Blk-1 Fiber Msd
20/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
24
576
BEMCO
C10BPA01 7
VFD PANEL FOR CW PUMP#1A BLOCK-1
ED-694381
C10-CPB-66-GN-001 9
B1C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
600Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694381
01C10CPB6103 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C00-TK-143 C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-18 C00-EMH-176 C00-D359-26
C00-EMH-174 C00-D353-29 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-59 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-59 C30-EMH-008
C30-D063-40 C30-EMH-007 C20-D066-40 C20-EMH-009 C20-D065-41 C20-EMH-008 C20-D063-22 C20-EMH-007 C10-D066-23 C10-EMH-007 C14-TK-205
C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145
C10-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
24
576
BEMCO
C10BPA01 7
VFD PANEL FOR CW PUMP#1A BLOCK-1
ED-694381
C10-CPB-66-GN-001 9
B1C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
600Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694381
01C10CPB6104 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C00-TK-143 C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-19 C00-EMH-176 C00-D359-27
C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-60 C30-EMH-010 C30-D066-60 C30-EMH-009 C30-D065-60 C30-EMH-008
C30-D063-41 C30-EMH-007 C20-D066-41 C20-EMH-009 C20-D065-42 C20-EMH-008 C20-D063-23 C20-EMH-007 C10-D066-24 C10-EMH-007 C14-TK-205
C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145
C10-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
24
570
BEMCO
C10BPA02 7
VFD PANEL FOR CW PUMP#1B BLOCK-1
ED-694381
C10-CPB-66-GN-001 9
B1C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
594Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694381
01C10CPB6105 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-18 C00-EMH-176 C00-D359-26
C00-EMH-174 C00-D353-29 C00-EMH-171 C30-D071-61 C30-EMH-011 C30-D070-59 C30-EMH-010 C30-D066-59 C30-EMH-009 C30-D065-59 C30-EMH-008
C30-D063-40 C30-EMH-007 C20-D066-40 C20-EMH-009 C20-D065-41 C20-EMH-008 C20-D063-22 C20-EMH-007 C10-D066-23 C10-EMH-007 C14-TK-205
C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145
C10-TK-142 CABLE
Page 16 of 19
7/29/2019 Blk-1 Fiber Msd
21/23
Saudi Electricity Company
12620-001
Qurayyah Combined Cycle
4:10 pm
PLADES Plant Design System
INTELAGEN - CMS (03.7.860 - 3.2)
Run Date: 5/3/2012
Sargent & Lundy LLC, Chicago, IL
Block-1 COMM
txtReportTitle
FIBER04
CPB 1
N
PVC
CO
24
570
BEMCO
C10BPA02 7
VFD PANEL FOR CW PUMP#1B BLOCK-1
ED-694381
C10-CPB-66-GN-001 9
B1C NETWORK CABINET
EA-681133
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic:
North: North:
594Total Length (m):
escription:
Remarks:
Schematic: EA-681121
End Length(m):
ED-694381
01C10CPB6106 BLOCK-1 MODBUS CABLE4C FIBER OPTIC 62.5/125UM Service:
Route: CABLE C00-TK-142 C00-TK-141 C00-TK-140 C00-TK-145 C00-TK-150 C00-TK-172 C00-EMH-179 C00-D361-19 C00-EMH-176 C00-D359-27
C00-EMH-174 C00-D353-31 C00-EMH-171 C30-D071-62 C30-EMH-011 C30-D070-60 C30-EMH-010 C30-D066-60 C30-EMH-009 C30-D065-60 C30-EMH-008
C30-D063-41 C30-EMH-007 C20-D066-41 C20-EMH-009 C20-D065-42 C20-EMH-008 C20-D063-23 C20-EMH-007 C10-D066-24 C10-EMH-007 C14-TK-205
C14-TK-203 C14-TK-201 C10-TK-224 C10-TK-216B C10-TK-215 C10-TK-159 C10-TK-153 C10-TK-154 C10-TK-150 C10-TK-149 C10-TK-145
C10-TK-142 CABLE
FIBER04
CPB 1
N
PVC
CO
9
177
BEMCO
C13-MBR-10-GH-001 20
DIVERTER DAMPER LCP
ED-694380
C10-CPB-66-GN-001 5
B1C NETWORK CABINET
EA-681101
Cable: Rev:
Type Code:
System: No. of Cables:
Shield:
Ground:
Jacket:
Seg Code: Pull Length(m):
Allowance (m):
Routed Length (m): Option 1:
Option 2:
Option 3:Startup Code: Budget Ref No:
Installation Spec:
Equipment No: Compartment:
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Equipment No: Compartment: End Length(m):
Description:
Equip Location: East: Elevation:Zone:
Location Dwg: Wiring Dwg:
Cable From End: Cable To End:
Routing Information:
QC-1023Furnish Spec:
Schematic