Confindustria Emilia- Romagna “Low cost sorbent for reducing mercury emissions” SOREME Project 12 month meeting Pisa, 27 January 2014 Life+ 11 ENV/IT/109-SOREME

Confindustria Emilia-Romagna

  • Upload
    efrat

  • View
    55

  • Download
    0

Embed Size (px)

DESCRIPTION

Confindustria Emilia-Romagna. “Low cost sorbent for reducing mercury emissions” SOREME Project 12 month meeting Pisa, 27 January 2014. Life+ 11 ENV/IT/109-SOREME . Role of Confindustria ER in SOREME. - PowerPoint PPT Presentation

Citation preview

Page 1: Confindustria Emilia-Romagna

Confindustria Emilia-Romagna

“Low cost sorbent for reducing mercury emissions”

SOREME Project12 month meeting

Pisa, 27 January 2014

Life+ 11 ENV/IT/109-SOREME

Page 2: Confindustria Emilia-Romagna

CONER represents companies to test the SOREME sorbent at semi-industrial and industrial level over different industrial cycles

CONER is responsible for implementation of the following actions:

Implementation actions (B) B.4 - Demonstration of the innovative project mercury sorbent at semi-industrial

level B.5 - Demonstration of the innovative project mercury sorbent at industrial level

Monitoring of the impact of the project actions (C) C.4 – Feedback on SOREME mercury sorbent use C.5 - Demonstration of environmental-technical-socio-economic viability

CONER is also involved : Communication and dissemination actions (D) Project management and monitoring of the project progress (E)

Role of Confindustria ER in SOREME

Page 3: Confindustria Emilia-Romagna

started

In running

Role of Confindustria ER in SOREME: timetable

Page 4: Confindustria Emilia-Romagna

Description of the workFocus on demonstration of the SOREME sorbent at semi-industrial/indusrial level (action B.4-B.5)

Main activities and results:

Survey and selection of Industries available to host the demonstration of SOREME sorbent ( with the involvement of local industrial associations ) side effect: dissemination and promotional events!

Identification of scenarios for demonstration and assessment of technological and regulatory issues.

Identification of Industrial plans where to carry out the demonstration activities at semi industrial and industrial level (gas emission) – tradeoff between complexity of industrial plans, regulatory issues, industry internal policy & authorizations, available budget and timing.

Identification of a specific external assistance (Klyma srl) to design customized demonstration facility (SOREME DEMONSTRATION FACILITY) to be integrated within the specific industrial plan;

Identification of sub-components providers (consumables) required to assembly the Soreme Demonstration Facility on the base of “best value for money” and timing.

Times required to complete B.4 – aprox. 5/6 wks … despite the delay the industrial demonstration is estimated to be faster (A draft video has been prepared and will be integrated as activities move further on)

Start regulatory assessment on technical-economic-enviromental viability (C.5 action) Preliminary feedback on mercury sorbent use (C.4 action)

Page 5: Confindustria Emilia-Romagna

Description of the work

Survey and selection of enterprises in Emilia Romagna Region available to collaborate in the semi-industrial testing of SOREME sorbent.

Different types of enterprises operating in the field of waste management have been identified:

Large size enterprises with large waste management plants

SMEs specialized in waste and energy management

SME specialized in water treatments

SMEs specialized in services in the field of eco-innovation

Laboratories and small companies in charge of certification and environmental assessment

Page 6: Confindustria Emilia-Romagna

Description of the work

Scenarios for SOREME Demonstration and assessment of related problems

Main scenarios Gas treatment from combustion plants : Crematory, Urban Waste, Medical Waste Water treatment from waste water plants

Some constraints and limiting factors

Heterogeneous scenario with highly customized industrial plans (not possible to define a general purpose strategy which works equally good for all the scenario)

Timing, available budget, regulation and internal authorization paths.

Strategy: The demonstration activities has required clearly-identified specific plan (with its own

specific technological and regulatory constrains).

Focus the demonstration activities on the more significant scenarios (gas emissions) the one with greater economic and environmental impacts but the one with more complexity in terms of plan engineering and regulations from here the other scenario will be much more easy and chip!

Page 7: Confindustria Emilia-Romagna

SOREME Demonstration on GAS EMISSIONS FROM COMBUSTION PLANTS

SMEs plants have been selected to carry out the semi-industrial tests.

- Economic reasons. Large plants have to stop the daily activities with significant important financial loss (order of magnitude of hundred-thousand €/h)

- Time reasons. Large enterprises require longer internal procedure to release authorizations to build up a pilot plant

- Huge flows = Huge amount of sorbent- Uncertainty related to a clear qualification of SOREME sorbent. - Potential Technological incompatibility with existing plants/machineries. - Regulatory framework. Control of national and regional authorities (ARPA) on the activities

which may lie out of the officially authorized ones (HERA: public-private partnership)- Security constraints.

- This inconvenience may be solved one the SOREME sorbent will be qualified ( potentially included in future activities, if some budget will be left)

Description of the work

Page 8: Confindustria Emilia-Romagna

SOREME Ecosystems (sites and suppliers)

Bergamo(out of ER region)

Dissemination activities Dissemination activities

BresciaFoggiaModenaParmaPiacenzaRiminiSpinea

Dissemination activities

Cervignano del Friuli

sites

Page 10: Confindustria Emilia-Romagna

Technical information and Design Constraints

Fisical sizing of soreme sorbent: Two different SOREME Sorbents available (in Granular vs Pellets) with different adsorption capability

Industrial constraints – the semi-industrial and industrial demonstrations require a well designed process to avoid to perturb the industrial plan during current operations.

Process constraints Identify suitable places to interact with the industrial plan to manage the gas

emissions and respect the current regulations (enviromental and security regulations)

Gas emission temperture relativenly high Dusts with different sizing are present that may interfere with the demonstration

activities The emission flows after being taken from the plan for the demonstration activity

must be reintroduced in the plants to be subjected to well-regulated filtration procedures

Page 11: Confindustria Emilia-Romagna

Technical information – Design ConstraintsPhysical Characteristics of the SOREME sorbent and design of filters

Granular SOREME Sorbent

non homogeneous, with variable dimensions (from fine 1 mm up to 10 mm in size)

The evaluation of the sorbent has allowed to carry out a

demonstration activities using

a fixed bed filters controlled emission flow speed (low regime) precaution to avoid dragging fine dusts in the

sorbent itself and in the industrial plants.

Firsts Feedback on usage It will be recommendable to carry out an analysis of the

particle size distribution as it influences the final necessary amount of SOREME Sorbent and the related evaluation of its efficiency

Page 12: Confindustria Emilia-Romagna

Technical information – Design ConstraintsPhysical Characteristics of the SOREME sorbent and design of filters

Granular SOREME Pellets

produced using a blend of Sorbent (70%) and bentonite (30%) and with a variable diameter of 4-6 mm and length of 5-25 mm.

The specific weight is about 0,5 Kg/L.

Firsts Feedback on usage As the sorbent efficiency depends on the available

surfaces bentonite may prevent gas emission to properly interact with the SOREME activated sorbent reducing its efficiency.

For the preliminary evaluation SOREME sorbent both Pellets and Granular can be treated under micronized process conditions to improve its efficiency

Some preliminary contcact has been establised with LB-Technology (MO) which can eventually improve the actual

General suggestions to improve SOREME sorbent

Page 13: Confindustria Emilia-Romagna

The Soreme Demonstration FacilityIndustrial gas flow pipeline (containing hot exhausts + powders) Industrial

Treatment Stages to satisfy

environmental regulations on

emissions

(A draft video has been prepared and will be integrated as activities move further on)

Page 14: Confindustria Emilia-Romagna

The Soreme Demonstration Facility

hot exhausts + powders

The SOREME demonstration facility comprises 4 main treatment stages

Stage 1 – pre-condition the hot emission

Stage 2 – Filtration

Fresh air

Stage 3 – pressurizing

Stage 4 – Adsorption

Page 15: Confindustria Emilia-Romagna

The Soreme Demonstration FacilityFirst stage – precondition the hot emission1. Capture and control a suitable amount of hot exhausts from the main gas pipeline2. Pre-treat the heat gas to lower the temperature by an active heat exchanger

The stage is made by 3. Control valves 4. Temperature and pression sensors5. Flexible (special) pipelines to handle with hot exhaust 6. Flexible pipelines to handle air 7. Specially-designed Heat exchanger 8. Air Pump

High temperature exhausts\powders

Fresh air

Hot a

ir

Low temperature exhaustspowders to the second stage

Page 16: Confindustria Emilia-Romagna

The Soreme Demonstration Facility

Second stage – Purification1. Capture and control the particles dusts and powders in the exhausts2. A second lowering stage for temperature controls

The stage is made by 2. Control valves 3. Temperature and pression sensors4. Flexible pipelines to handle pre treated emission5. Specially-designed multiple – filtration systems

Exhausts from the 1st stage containingpowders

Page 17: Confindustria Emilia-Romagna

The Soreme Demonstration FacilityThird and fourth stage – Presurizing/Adsorption

1. Control the interaction of Soreme Sorbent with pre-treated gas emission2. Control the gas pressure after the Sorbent-Gas interaction 3. Re-insert the “soreme”-purified gas in the industrial pipelines2. To protect the industrial plan from unexpected accidents

The stage is made by

1. Control valves 2. Temperature and pression sensors3. Flexible pipelines to handle pre treated emission4. Specially-designed – pressurizing systems5. SOREME specially-designed filter. 6. Protective stage

The flow rate of gas to be tested has been fixed around 20÷70 Nm3/hour, with aspiration system for exhausted gases able to be tuned within the range also my means on a by-pass discharge directed to the mainstream.

Exposure conditions – sizing the process

Page 18: Confindustria Emilia-Romagna

Technical information – Design Constraints

Adsorption Stage

On the basis of the SOREME physical characteristics, a filter based on a fixed bed system has been specially designed, using ascending fluxes on the gas to be detected.

Physically, the system is composed by a cylindrical matallic bulk body and an internal cavity able to host interchangeable drums, varying in diameter and length, used to host SOREME sorbent (in all its shapes) and arranged on the same support within the filter. The system has been designed in this way in order to be a compromise between the operating conditions during the industrial demonstrations

Reconfigurable Soreme Filter

Granular SoremePellets Soreme

Page 19: Confindustria Emilia-Romagna

Definition of the dimensions of the filter

Dosage of sorbent has been determined on the basis of the results and outcome of tests carried out in the CNR Laboratories in Pisa.

The reference data is of 0.25g/Nm3, which is then correlated with the average value available in literature (estimated as 0.324g/Nm3).

Geometric dimensions and other parameters have been fixed according to the availability of materials and devices in the market to be used in the construction of the device, taking into account also: cost/benefits ratio, rapid availability and rapid realization of the device.

Flow surface has been fixed to 0.056m2, corresponding to a ring with the diameter of 0.266m

The height of the filtering bed has been fixed to 1 m, in relation to the amount of sorbent to be tested in the industrial phase (i.e. 0.056m3).

Page 20: Confindustria Emilia-Romagna

Timing & Conclusions

Times required to complete B.4 – aprox. 5/6 wks … despite the delay the industrial demonstration is estimated to be faster

What is missing:

The formal authorization of the industrial plan Most of the components are special parts, specially designed and customized according

to soreme sorbent specifications and usage sites Specialized suppliers ( most SMEs) and relatively expensive components and Specialized

system integrators. Once each parts will be available, a “calibration” phase is forseen before moving the

SOREME demonstrator facility to the Industrial Plan Trials will be done at semi-industrial and industrial levels accordingly with the results,

the timing and the budget availability

After exposure the Soreme Demostrtors filters will be sent to CNR for analysis. For that it is necessary to define and share a PROTOCOL.

The tecnico-economic viability requires of soreme sorbent as viable product requires also to face with some regulatory issues related to waste management and to by-product valorization

Page 21: Confindustria Emilia-Romagna

Thank you for your attention

Page 22: Confindustria Emilia-Romagna

… contact

Danilo Mascolo Chief Innovation & Technology Transfer Officer

Via Barberia 13Bologna

Page 23: Confindustria Emilia-Romagna

Confindustria Emilia-Romagna

“Low cost sorbent for reducing mercury emissions “

SOREME Project12 month meeting

Pisa, 27 January 2014

Life+ 11 ENV/IT/109-SOREME

Page 24: Confindustria Emilia-Romagna

Oggetto di revisione nell’ambito del DLGS di recepimento della Direttiva 2010/75/UE relativa alle emissioni industriali

Emissioni in area, acqua, suoloValori limiti

Metodi campionamento, analisi e valutazione inquinanti derivanti dagli impianti

Criteri e norme tecniche sulle caratteristiche costruttive e funzionali degli impianti Definizione di impianti di incenerimento:

• qualsiasi unità e attrezzatura tecnica, fissa o mobile, destinata al trattamento termico di rifiuti con o senza recupero del calore prodotto dalla combustione, attraverso l’incenerimento mediante ossidazione dei rifiuti, nonché altri processi di trattamento termico, quali ad esempio la pirolisi, la gassificazione ed il processo al plasma, a condizione che le sostanze risultanti dal trattamento siano successivamente incenerite. Nella nozione di impianto di incenerimento si intendono compresi: il sito e tutte le linee di incenerimento, nonché i luoghi di ricezione dei rifiuti in ingresso allo stabilimento, i luoghi di stoccaggio, le installazioni di pretrattamento in loco, i sistemi di alimentazione in rifiuti, in combustibile ausiliario e in aria di combustione, le caldaie, le installazioni di trattamento o stoccaggio in loco dei residui e delle acque reflue, i camini, i dispositivi ed i sistemi di controllo delle operazioni di incenerimento, di registrazione e monitoraggio delle condizioni di incenerimento. Se per il trattamento termico dei rifiuti sono utilizzati processi diversi dall’ossidazione, quali ad esempio la pirolisi, la gassificazione o il processo al plasma, l’impianto di incenerimento dei rifiuti include sia il processo di trattamento termico che il successivo processo di incenerimento.

• Processo termico ossidazione• Processo di incremento paralisi, gassificazione, processo al plasma

La normativa sull’incremento e coincenerimento di rifiuti

Page 25: Confindustria Emilia-Romagna

Definizione di impianto di coincenerimentoProduzione di energia o materiali attraverso la combustione di rifiuti

• qualsiasi unità tecnica, fissa o mobile, la cui funzione principale consiste nella produzione di energia o di materiali e che utilizza rifiuti come combustibile normale o accessorio o in cui i rifiuti sono sottoposti a trattamento termico ai fini dello smaltimento, mediante ossidazione dei rifiuti, nonché altri processi di trattamento termico, quali ad esempio la pirolisi, la gassificazione ed il processo al plasma, a condizione che le sostanze risultanti dal trattamento siano successivamente incenerite. Nella nozione di impianto di coincenerimento si intendono compresi: il sito e l'intero impianto, compresi le linee di coincenerimento, la ricezione dei rifiuti in ingresso allo stabilimento e lo stoccaggio, le installazioni di pretrattamento in loco, i sistemi di alimentazione dei rifiuti, del combustibile ausiliario e dell'aria di combustione, i generatori di calore, le apparecchiature di trattamento, movimentazione e stoccaggio in loco delle acque reflue e dei rifiuti risultanti dal processo di coincenerimento, le apparecchiature di trattamento degli effluenti gassosi, i camini, i dispositivi ed i sistemi di controllo delle varie operazioni e di registrazione e monitoraggio delle condizioni di coincenerimento. Se per il trattamento termico dei rifiuti sono utilizzati processi diversi dall’ossidazione, quali ad esempio la pirolisi, la gassificazione o il processo al plasma, l’impianto di coincenerimento dei rifiuti include sia il processo di trattamento termico che il successivo processo di coincenerimento. Se il coincenerimento dei rifiuti avviene in modo che la funzione principale dell'impianto non consista nella produzione di energia o di materiali, bensì nel trattamento termico ai fini dello smaltimento dei rifiuti, l'impianto è considerato un impianto di incenerimento.

Page 26: Confindustria Emilia-Romagna

Definizione di camino struttura con una o più canne di scarico che fungono da condotto per la fuoriuscita del gas prodotto

Residui di lavorazione degli impianti• Scorie, ceneri pesanti, solidi di reazione derivanti dal trattamento del gas• Fanghi di risulta delle acque reflue• Catalizzatori esauriti; carbone attivo esaurito

SONO TUTTI RIFIUTI, ALCUNI ANCHE PERICOLOSI

Impianti soggetti ad autorizzazione• Alcuni sono in IPPC (Integrated Pollution Prevention Control)-All. VIII parte

II p. 1.1, 5.2 D.Lgs 152/06 VERIFICARE• Altri sono sottoposti ad autorizzazione unica in materia di rifiuti 8Art. 208

D.Lgs 152/06)

Page 27: Confindustria Emilia-Romagna

CONTENUTI DELLA DOMANDA La domanda per autorizzazione deve contenere:

• Garanzie che l’impianto è costruito e gestito secondo le BAT ( Best Availables Tecniques)

• Che il calore generato e recuperato per produzione di vapore o energiaCONTENUTI DELL’AUTORIZZAZIONE Elenco di tutti i rifiuti che si possono trattare nell’impianto e relative quantità Potenza termica dell’impianto Procedure e frequenze di comparamento per controllo delle emissioni nonché

punti di comparamento e localizzazione Modalità e termini dei controlli programmati effettuati dall’Autorità competente Se si tratta di incenerimento/coincenerimento di rifiuti pericolosi: flussi di massa

dei rifiuti pericolosi, loro valori calorifici, nonché info sulle loro caratteristiche inquinanti (presenza di floro, cloro, metalli pesanti)

MODALITA’ GESTIONALI DEGLI IMPIANTI Utilizzo delle BAT per attrezzature di stoccaggio, pretrattamento,

movimentazione; occorre ottenere il più alto livello di incenerimento

Page 28: Confindustria Emilia-Romagna

L’Autorità Competenete può sempre imporre prescrizioni particolari sito-specifiche

E’ vietato il coincenerimento di oli contenuti PCB (policlorodifenili)/PCT

Scarico o acque reflue

Se in IPPC l’ente allo scarico deve contenere le caratteristiche quantitative e qualitative dello scarico. Inoltre deve indicare i valori limite di scarico. Infine deve contenre prescrizioni tecniche circa autocontrolli e punti di campionamento.

TUTTO IL REGIME AMMINISTRATIVO E AUTORIZZATORIO E’ SOGGETTO AL DLGS 195/2005 SULLA TRASPARENZA E PUBBLICITA’ DEGLI ATTI

TUTTI GLI IMPIANTI ESISTENTI SI DEVONO ADEGUARE ENTRO IL 10 NOVEMBRE 2016

SANZIONI ARRESTO FINO A 2 ANNI PER ESERCIZIO SENZA AUTORIZZAZIONE

Page 29: Confindustria Emilia-Romagna

Thank you for your attention

Page 30: Confindustria Emilia-Romagna

… contact

Gianluca Rusconi

Legal and Lobby Officer

Via Barberia 13Bologna

Page 31: Confindustria Emilia-Romagna

Technical information

Exposure conditionsLiterature data reports a superficial velocity ranging between 0.1-0.5 m/sec for the abatement of Hg in combustion fumes and contact times ranging between the wide interval of 0.1-60 sec.

The set up of superficial velocity interval will be subject to further investigation, nevertheless it can be expected to be higher in case of test using powder sorbent and lower in case of test using pellets, having the latter minor exposed surface. In case of powder carbon, the limit in the velocity is given by the constraints represented by the bed fluidification due to the presence of small particles, with the risk of obstruction of detecting devices. The same criteria have been driving the definition of hydraulic retention times, which resulted to be relatively short for the powder sorbent and longer for the pellets. The flow rate of gas to be tested has been fixed around 20÷70 Nm3/hour, with aspiration system for exhausted gases able to be tuned within the range also my means on a by-pass discharge directed to the mainstream.