CINDA Significant Track Records
CTCI PowerPoint Master Deck
1
1
Panipat
2
Kochi
3
Dahej
5
Manesar
Sricity
Client Project Location
CSCI Steel ACL Phase-1 Project Dahej, Gujarat
Sentec Production Factory Manesar, Haryana
Foxconn Production Factory Sricity, A.P.
OPPO / Foxlink / Waffer JV
Ecotech VI EMC Greater Noida, A.P.
CCIL Carbon Black Project (FS) Gujarat
Hydrocarbon
Industrial Plant
Ramagundam
4
4
5
6 6
7
Mumbai
Client Project Location
ISRL SBR Project Panipat, Haryana
Petronet LNG Kochi 5 MMTA LNG Terminal Project
Kochi, Kerala
Adani Dhamra LNG Receiving Terminal Project (Regas Package)
Dhamra. Odhisha
RFCL Fertilizer Plant Civil Package Ramagundam, Telangana
Petronet LNG Dahej LNG Terminal III-B1 Expansion Regas Package
Dahej, Gujarat
Heurtey Petrochem RFCL Reformer Package Civil Work
Ramagundam, Telangana
1
2
9
3
4
Greater Noida
7
8
8 9 Dhamra
3
Copyright © 2016 CTCI All Rights Reserved.
• The Adani Group is a multinational conglomerate company based in India, and one of
India’s Top 5 leading business entities. Awarded this project, CTCI becomes the
contractor with the highest market share in India’s LNG receiving terminal construction
market.
• The scope of Dhamra LNG Receiving Terminal includes engineering, procurement,
construction and commissioning of 5.0MMTPA re-gasification facility.
• Project: Dhamra LNG Receiving Terminal Project (Regas Package)
• Client: Dhamra LNG Terminal Pvt. Ltd. (Adani Group)
• Contractor: CTCI and CINDA Consortium
• Scale: 5 MMTPA Regasification Facility
• Scope: EPCC
• Location: Dhamra, Odisha, India
CINDA On-going Project
Copyright © 2016 CTCI All Rights Reserved.
• Project: Dahej LNG Terminal III-B1 Regas Project
• Client: Petronet LNG Ltd.
• Contractor: CTCI/CINDA Consortium (CTCI is the leader)
• Location: Dahej, Gujarat, India
• Capacity: 2.5 Million Ton
• Schedule: 32 months (July 2016 – April 2019)
• Scope: EPCC Lump Sum Turn Key
• Contract Value: USD 55 Million
CINDA On-going Project
Copyright © 2016 CTCI All Rights Reserved.
• Project: TEGNA Ecotech VI EMC
• Client: OPPO / Foxlink / Waffer JV
• Contractor: CTCI/CINDA Consortium (CTCI is the leader)
• Location: Greater Noida, U.P., India
• Area: 100 Acres
• Schedule: 11 months (May 2017 – Mar 2018)
• Scope: Planning & Consultant Service
• Contract Value: INR 20 Million
CINDA On-going Project
Copyright © 2016 CTCI All Rights Reserved.
• Project: Civil Work for U&O Package
• Client: RFCL (Ramagundam Fertilizers and Chemicals Ltd.)
• Contractor: CINDA
• Location: Ramagundam, Telangana
• Schedule: 14 months (Jul. 2016 – Sep. 2017)
+ 10 months for additional work
• Scope: PC
• Contract Value: INR 1360 Millions
CINDA On-going Project
Copyright © 2016 CTCI All Rights Reserved.
• Project: Civil Work for Reformer Package
• Client: Heurtey Petrochem India Private Ltd
• Contractor: CINDA
• Location: Ramagundam, Telangana
• Schedule: 13 months (Mar. 2017 – Mar. 2018)
• Scope: PC
• Contract Value: INR 50 Millions
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: Foxconn AP-B3 Factory Project
• Client: Rising Star Mobile (Subsidiary of Foxconn)
• Contractor: CINDA
• Location: Sricity, A.P., India
• Schedule: 4 months (May 2016 – Sep. 2016)
• Scope: PC
• Contract Value: INR 100 Millions
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: SENTEC Factory Project (Phase-1)
• Client: SENTEC India Co. Pvt. Ltd.
• Contractor: CINDA
• Location: Manesar, Haryana, India
• Schedule: 12 months (Oct. 2013 – Sep. 2014)
• Scope: EPC
• Contract Value: INR 50 Millions
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: ACL Project (Phase-1)
• Client: CSCI (an Indian subsidiary of China Steel Corporation)
• Contractor: CEC/CSMC/CTCI/CINDA
• Location: Dahej, India
• Capacity: 200 KTA
• Schedule: 29 months (June 2012 – December 2014)
• Scope: EPC (exclude long lead equipment)
• Contract Value: 100 Million USD
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: Regas Facilities for LNG Receiving Terminal
• Client: Petronet LNG Ltd.
• Contractor: COC/CINDA Consortium (COC is the leader)
• Location: Kochi, India
• Capacity: 5 Million Ton
• Schedule: 38 months (August 2009 – October 2012)
• Scope: EPCC Lump Sum Turn Key
• Contract Value: 390 Million USD
• Unit Description:
• Terminal: 5 Million Ton
Tank: 2 x 155,000 metric ton by IHI, Japan
※ The scope of work executed by CINDA is on shore portion including detailed design, local
procurement and construction work.
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: Regas Facilities for LNG Receiving Terminal
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: Reloading facility for LNG Receiving Terminal
• Client: Petronet LNG Ltd.
• Contractor: CINDA E&C
• Location: Kochi, India
• Schedule: 3 months (July 2014 – September 2014)
• Scope: Engineering Consultancy Service
• Contract Value: 3.5 Million INR
CINDA Significant Track Records
Copyright © 2016 CTCI All Rights Reserved.
• Project: SBR Project
• Client: ISRL (JV of IOCL, TSRC, and Marubeni)
• Contractor: CTCI/CINDA Consortium
• Location: Panipat, India
• Capacity: 120 KTA
• Schedule: 6 months (January 2009 – July 2009)
• Scope: Basic Design and Cost Estimation
• Contract Value: USD 1.4 Million
CINDA Significant Track Records