For the Construction of S10-1 Project
SUMMARY OF COST
Item Description Unit Qty Rate Amount (VND)
I PRELIMINARY COST
1 Mobilization Fee Lot 1
2 Temporary Facilities for Contractor Lot 1
3 Temporary Facilities for Engineer Lot 1
4 Scaffolding and Safety Net Fee Lot 1
5 Lot 1
6 Lot 1
7 Lot 1
8 Lot 1
9 Lot 1
10 Lot 1
11 Testing Fee Lot 1
Sub-total
II BUILDING COST
1 2(A1&A2) (4 Units) Lot 2
2 2(A3&A4) (4 Units) Lot 2
3 2(A5&A6) (4 Units) Lot 2
4 2(A7&A8) (4 Units) Lot 2
5 A9 (2 Units) Lot 6
6 A10 (1 Units) Lot 4
7 A11 (1 Units) Lot 4
Sub-total
III VALUE ADDED TAX (10%)
IV GRAND TOTAL (I+II+III)
Note: A sample of VAT INVOICE is attached in the Form of Tender for all tenderers to consider his electrical fee charged
by Hiep Phuoc Power Co., Ltd.
__________________________For & on behalf of :
_____________________Company Name
_________________Authorized Signature
Temporary Water and Electricity Fee
Site Security and Storage
Site Management Fee
Head Office Management Fee
Insurance Fee
As Built Document Fee
Page2
BILL OF QUANTITIES PROJECT : S10-1 VILLA A -1 & A -2
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 1,004.20 3.2 Return, fill in (and well ram) selected excavated materials c.m. 1,079.00 3.3 Load and cart away surplus excavated materials to a dump c.m. 98.01 3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 191.55
Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 85.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 40.16 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 53.74 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 768.03 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 4,780.07 SPCC- CFE (H17)4.6 Formwork s.m. 348.24
Structure
4.7 c.m. 319.25 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 12,305.17 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 24,912.56 SPCC- CFE (H17)
4.10 Formwork s.m. 2,844.19 Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 487.89 6.2 Waterproof materials to flat roof and gutter s.m. 111.28 6.3 Waterproof materials to sloping roof s.m. 381.02
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 111.28 7.2 Cement mortar screed to sloping roof s.m. 381.02 7.3 Tegola roof material to sloping roof s.m. 381.02 Supplied by the Employer7.4 The concrete or brick for curb of roof m 67.64
Sub total
Unit Price(VND)
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page3
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 1,871.16 Dong Nai or Equivalent8.2 200mm thick hollow brick wall s.m. 685.04 Dong Nai or Equivalent8.3 250mm thick hollow brick wall s.m. 43.92 Dong Nai or Equivalent8.4 300mm thick hollow brick wall s.m. 3.50 Dong Nai or Equivalent8.5 Brick masonry for steps , beam and column cm 49.43 Dong Nai or Equivalent8.6 Steel dowel bar for brick work kg 534.34 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 24.78 8.8 200mm thick solid brick for retaining wall s.m. 96.70 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 4,395.16
9.2 s.m. 1,911.34 9.3 Metal wire mesh to external wall m 1,431.60 9.4 Cement mortar plaster to retaining wall s.m. 193.40
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by the Employer
D4 (2100 x 2750 ) pcs 4.00 D5 (2800 x 2750 ) pcs 6.00 D6 (2800 x 2750 ) pcs 8.00
11.2 Aluminium window (include hardware and silicone.) Supplied by the EmployerW1 (3600 x 2350 ) pcs 4.00 W1a (3600 x 1850 ) pcs 2.00 W2 (1400 x 1850 ) pcs 16.00 W3 (2100 x 1850 ) pcs 2.00 W4 (2800 x 1850 ) pcs 6.00 W5 (1950 x 1850 ) pcs 2.00 W5a (1650 x 1850 ) pcs 2.00 W6 ( 600 x 600 ) pcs 8.00
11.3 Insect screen Supplied by the EmployerW1 (1400x1800 ) sm 5.04 W1a (1400x1300 ) sm 3.64 W2 (1400x1300 ) sm 21.84 W3 (1400x1300 ) sm 3.64
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page4
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)W4 (1400x1300 ) sm 18.20 W5 (1300x1300 ) sm 3.38 W5a (1600x1300 ) sm 4.16 W6 (600x600 ) sm 2.88
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 80.90 12.2 Steel handrail with timber top rail for stairs m 72.00
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 188.74
13.2 s.m. 70.09 13.3 Access panel pcs 20.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 114.96 14.2 Cement mortar to make up level for all area sm 1,206.62 14.3 Glazing tile 600x600mm, for indoor area floor s.m. 804.87 Supplied by the Employer14.4 Glazing skirting tile, for indoor area floor m 553.30 Supplied by the Employer14.5 Glazing tile to stair floor & steps s.m. 88.10 Supplied by the Employer14.6 Glazing tile to skirting of stair m 109.58 Supplied by the Employer14.7 Ceramic floor tile, 200x200mm for kitchen room s.m. 35.10 Supplied by the Employer14.8 Ceramic floor tile, 200x200mm for bath room s.m. 80.58 Supplied by the Employer14.9 Ceramic wall tile, 200x250mm for bath room s.m. 351.37 Supplied by the Employer
14.10 Ceramic runner tile, 100x200mm for bath room m 138.50 Supplied by the Employer14.11 Ceramic skirting tile, 100x200mm for kitchen room m 44.80 Supplied by the Employer14.12 Terra-cotta tile for floor balcony, terrace sm 239.01 Supplied by the Employer14.13 Terra-cotta skirting tile 100mm height for balcony, terrace ... m 278.40 Supplied by the Employer14.14 Cotto tile for floor entrance steps , laundry sm 47.06 Supplied by the Employer14.15 Cotto skirting tile for floor entrance steps , laundry m 51.80 Supplied by the Employer
Sub total
15.0 PAINTING WORKS
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 4,048.11
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener, trowelled smooth for garage
Page5
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by the Employer
16.1 Water closet set 20.00 16.2 Wall hung wash basin set 20.00 16.3 Bath tub 1.8m set 4.00 16.4 Mirror s.m 6.40 16.5 Accessories set 20.00 16.6 Single faucet pcs 16.00 16.7 Mixing faucet pcs 4.00 16.8 Mixing shower pcs 4.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only19.4 lot 1.00 Attendance only
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 610,000,000 VND for M&E WorksAllow the Sum of 157,922,000 VND for Entrance DoorAllow the Sum of 86.898,083 VND for Exterior PaintAllow the Sum of 27,741,200 VND for Art stone tile
Page6
Page7
Page8
Page9
Page10
BILL OF QUANTITIES PROJECT : S10-1 VILLA -3 & A -4
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 1,004.20 3.2 Return, fill in (and well ram) selected excavated materials c.m. 1,079.00 3.3 Load and cart away surplus excavated materials to a dump c.m. 98.01 3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 191.55
Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 85.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 40.16 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 53.74 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 768.03 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 4,780.07 SPCC- CFE (H17)4.6 Formwork s.m. 348.24
Structure
4.7 c.m. 319.25 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 12,305.17 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 24,912.56 SPCC- CFE (H17)
4.10 Formwork s.m. 2,844.19 Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 500.61 6.2 Waterproof materials to flat roof and gutter s.m. 115.62 6.3 Waterproof materials to sloping roof s.m. 389.18
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 115.62 7.2 Cement mortar screed to sloping roof s.m. 389.18 7.3 Tegola roof material to sloping roof s.m. 389.18 Supplied by the Employer7.4 The concrete or brick for curb of roof m 68.94
Sub total
Unit Price(VND)
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page11
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 1,895.84 Dong Nai or Equivalent8.2 200mm thick hollow brick wall s.m. 632.73 Dong Nai or Equivalent8.3 250mm thick hollow brick wall s.m. 56.33 Dong Nai or Equivalent8.4 300mm thick hollow brick wall s.m. 69.87 Dong Nai or Equivalent8.5 Brick masonry for steps , beam and column cm 49.93 Dong Nai or Equivalent8.6 Steel dowel bar for brick work kg 534.34 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 24.78 8.8 200mm thick solid brick for retaining wall s.m. 96.70 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 4,450.28
9.2 s.m. 1,880.93 9.3 Metal wire mesh to external wall m 1,431.60 9.4 Cement mortar plaster to retaining wall s.m. 193.40
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by the Employer
D4 (2100x2750 ) pcs 4.00 D5 (2800x2750 ) pcs 6.00 D6 (2800x2750 ) pcs 8.00
11.2 Aluminium window (include hardware and silicone.) Supplied by the EmployerW1 (3145x2350 ) pcs 2.00 W1a (3145x1850 ) pcs 2.00 W2 (1400x1850 ) pcs 12.00 W3 (2100x1850 ) pcs 2.00 W4 (2800x1850 ) pcs 10.00 W5 (1850x1850 ) pcs 2.00 W5a (1650x1850 ) pcs 2.00 W6 (600x600 ) pcs 8.00
11.3 Insect screen Supplied by the EmployerW1 (1400x1800 ) sm 5.04 W1a (1400x1300 ) sm 3.64 W2 (1400x1300 ) sm 21.84 W3 (1400x1300 ) sm 3.64
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page12
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)W4 (1400x1300 ) sm 18.20 W5 (1300x1300 ) sm 3.38 W5a (1600x1300 ) sm 4.16 W6 (600x600 ) sm 2.88
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 76.90 12.2 Steel handrail with timber top rail for stairs m 72.00
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 188.74
13.2 s.m. 83.95 13.3 Access panel pcs 20.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 114.96 14.2 Cement mortar to make up level for all area sm 1,211.48 14.3 Glazing tile 600x600mm, for indoor area floor s.m. 729.96 Supplied by the Employer14.4 Glazing skirting tile, for indoor area floor m 586.50 Supplied by the Employer14.5 Glazing tile to stair floor & steps s.m. 88.10 Supplied by the Employer14.6 Glazing tile to skirting of stair m 109.58 Supplied by the Employer14.7 Ceramic floor tile, 200x200mm for kitchen room s.m. 35.10 Supplied by the Employer14.8 Ceramic floor tile, 200x200mm for bath room s.m. 72.37 Supplied by the Employer14.9 Ceramic wall tile, 200x250mm for bath room s.m. 351.37 Supplied by the Employer
14.10 Ceramic runner tile, 100x200mm for bath room m 138.50 Supplied by the Employer14.11 Ceramic skirting tile, 100x200mm for kitchen room m 44.80 Supplied by the Employer14.12 Terra-cotta tile for floor balcony, terrace sm 237.94 Supplied by the Employer
14.13 Terra-cotta skirting tile 100mm height for balcony, terrace ... m 271.20 Supplied by the Employer
14.14 Cotto tile for floor entrance steps , laundry sm 48.01 Supplied by the Employer14.15 Cotto skirting tile for floor entrance steps , laundry m 48.21 Supplied by the Employer
Sub total
15.0 PAINTING WORKS
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener, trowelled smooth for garage
Page13
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 4,098.91
Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by the Employer
16.1 Water closet set 20.00 16.2 Wall hung wash basin set 20.00 16.3 Bath tub 1.8m set 4.00 16.4 Mirror s.m 6.40 16.5 Accessories set 20.00 16.6 Single faucet pcs 16.00 16.7 Mixing faucet pcs 4.00 16.8 Mixing shower pcs 4.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only19.4 lot 1.00 Attendance only
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 612,500,000 VND for M&E WorksAllow the Sum of 157,922,000 VND for Entrance DoorAllow the Sum of 783,548,392 VND for Exterior PaintAllow the Sum of 33,594,320 VND for Art stone tile
Page14
Page15
Page16
Page17
Page18
BILL OF QUANTITIES PROJECT : S10-1 VILLA A -5 & A -6
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 1,004.20 3.2 Return, fill in (and well ram) selected excavated materials c.m. 1,079.00 3.3 Load and cart away surplus excavated materials to a dump c.m. 98.01 3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 191.55
Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 85.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 40.33 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 53.74 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 768.03 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 4,780.07 SPCC- CFE (H17)4.6 Formwork s.m. 348.24
Structure
4.7 c.m. 319.78 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 12,227.19 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 24,807.61 SPCC- CFE (H17)
4.10 Formwork s.m. 2,826.59 Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 500.61 6.2 Waterproof materials to flat roof and gutter s.m. 115.62 6.3 Waterproof materials to sloping roof s.m. 397.87
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 115.62 7.2 Cement mortar screed to sloping roof s.m. 397.87 7.3 Tegola roof material to sloping roof s.m. 397.87 Supplied by the Employer7.4 The concrete or brick for curb of roof m 68.94
Sub total
Unit Price(VND)
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page19
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 1,897.98 Dong Nai or Equivalent8.2 200mm thick hollow brick wall s.m. 626.27 Dong Nai or Equivalent8.3 250mm thick hollow brick wall s.m. 133.69 Dong Nai or Equivalent8.4 300mm thick hollow brick wall s.m. 49.79 Dong Nai or Equivalent8.5 Brick masonry for steps , beam and column cm 54.27 Dong Nai or Equivalent8.6 Steel dowel bar for brick work kg 761.00 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 24.78 8.8 200mm thick solid brick for retaining wall s.m. 89.60 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 4,570.11
9.2 s.m. 1,958.75 9.3 Metal wire mesh to external wall m 1,431.60 9.4 Cement mortar plaster to retaining wall s.m. 193.40
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by the Employer
D4 (2100x2750 ) pcs 4.00 D5 (2800x2750 ) pcs 14.00
11.2 Aluminium window (include hardware and silicone.) Supplied by the EmployerW1 (2800x2200 ) pcs 2.00 W1a (500x2200 ) pcs 4.00 W2 (1400x2000 ) pcs 12.00 W3 (1400x1850 ) pcs 4.00 W4 (2800x1850 ) pcs 6.00 W5 (1850x1850 ) pcs 2.00 W5a (1650x1850 ) pcs 2.00 W6 (600x600 ) pcs 6.00 W7 (600x1920 ) pcs 2.00 W8 (2100x1850 ) pcs 2.00 W9 (2100x1850 ) pcs 2.00
11.3 Insect screen Supplied by the EmployerW1 (1400x1650 ) sm 4.62 W2 (1400x1300 ) sm 21.84
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page20
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)W3 (1400x1300 ) sm 7.28 W4 (1400x1300 ) sm 10.92 W5 (1200x1300 ) sm 3.12 W5a (1650x1300 ) sm 4.29 W6 (600x600 ) sm 2.16 W7 (600x600 ) sm 0.72 W8 (1400x1300 ) sm 3.64 W9 (1400x1300 ) sm 3.64
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 76.90 12.2 Steel handrail with timber top rail for stairs m 72.00
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 188.74
13.2 s.m. 88.99 13.3 Access panel pcs 20.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 114.96 14.2 Cement mortar to make up level for all area sm 1,215.39 14.3 Glazing tile 600x600mm, for indoor area floor s.m. 729.96 Supplied by the Employer14.4 Glazing skirting tile, for indoor area floor m 586.50 Supplied by the Employer14.5 Glazing tile to stair floor & steps s.m. 88.10 Supplied by the Employer14.6 Glazing tile to skirting of stair m 109.58 Supplied by the Employer14.7 Ceramic floor tile, 200x200mm for kitchen room s.m. 35.10 Supplied by the Employer14.8 Ceramic floor tile, 200x200mm for bath room s.m. 72.37 Supplied by the Employer14.9 Ceramic wall tile, 200x250mm for bath room s.m. 351.37 Supplied by the Employer
14.10 Ceramic runner tile, 100x200mm for bath room m 138.50 Supplied by the Employer14.11 Ceramic skirting tile, 100x200mm for kitchen room m 44.80 Supplied by the Employer14.12 Terra-cotta tile for floor balcony, terrace sm 237.94 Supplied by the Employer14.13 Terra-cotta skirting tile 100mm height for balcony, terrace ... m 271.20 Supplied by the Employer14.14 Cotto tile for floor entrance steps , laundry sm 51.92 Supplied by the Employer14.15 Cotto skirting tile for floor entrance steps , laundry m 48.21 Supplied by the Employer
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener, trowelled smooth for garage
Page21
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)Sub total
15.0 PAINTING WORKS
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 4,218.74 Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by the Employer
16.1 Water closet set 20.00 16.2 Wall hung wash basin set 20.00 16.3 Bath tub 1.8m set 4.00 16.4 Mirror s.m 6.40 16.5 Accessories set 20.00 16.6 Single faucet pcs 16.00 16.7 Mixing faucet pcs 4.00 16.8 Mixing shower pcs 4.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only19.4 lot 1.00 Attendance only
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 610,320,128 VND for M&E WorksAllow the Sum of 156,466,000 VND for Entrance DoorAllow the Sum of 87,112,175 VND for Exterior PaintAllow the Sum of 34,640.880 VND for Art stone tile
Page22
Page23
Page24
Page25
Page26
BILL OF QUANTITIES PROJECT : S10-1 VILLA A -7 & A -8
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 1,004.20 3.2 Return, fill in (and well ram) selected excavated materials c.m. 1,079.00 3.3 Load and cart away surplus excavated materials to a dump c.m. 98.01 3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 191.55
Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 85.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 40.16 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 53.74 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 768.03 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 4,780.07 SPCC- CFE (H17)4.6 Formwork s.m. 348.24
Structure
4.7 c.m. 319.26 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 12,222.18 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 24,784.65 SPCC- CFE (H17)4.10 Formwork s.m. 2,816.16
Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 527.59 6.2 Waterproof materials to flat roof and gutter s.m. 115.62 6.3 Waterproof materials to sloping roof s.m. 380.06
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 115.62 7.2 Cement mortar screed to sloping roof s.m. 380.06 7.3 Tegola roof material to sloping roof s.m. 380.06 Supplied by the Employer7.4 The concrete or brick for curb of roof m 66.84
Sub total
Unit Price(VND)
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page27
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 1,905.98 Dong Nai or Equivalent8.2 200mm thick hollow brick wall s.m. 624.76 Dong Nai or Equivalent8.3 250mm thick hollow brick wall s.m. 109.21 Dong Nai or Equivalent8.4 300mm thick hollow brick wall s.m. 77.23 Dong Nai or Equivalent8.5 Brick masonry for steps , beam and column cm 53.30 Dong Nai or Equivalent8.6 Steel dowel bar for brick work kg 761.00 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 24.78 8.8 200mm thick solid brick for retaining wall s.m. 89.60 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 4,483.58
9.2 s.m. 1,968.43 9.3 Metal wire mesh to external wall m 1,387.40 9.4 Cement mortar plaster to retaining wall s.m. 179.20
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by the Employer
D4 (2100 x 2750 ) pcs 4.00 D5 (2800 x 2750 ) pcs 14.00 D6 (2800 x 2750 ) pcs 4.00
11.2 Aluminium window (include hardware and silicone.) Supplied by the EmployerW1 (2800 x 1850 ) pcs 2.00 W2 (1400 x 1850 ) pcs 6.00 W3 (2100 x 1850 ) pcs 2.00 W4 (2800 x 1850 ) pcs 6.00 W4a (2800 x 2350 ) pcs 2.00 W5 (1950 x 1850 ) pcs 2.00 W5a (1650 x 1850 ) pcs 2.00 W6 ( 2850 x 1850 ) pcs 2.00 W6a ( 2100 x 1850 ) pcs 4.00 W7 ( 700 x 1850 ) pcs 2.00 W8 ( 600 x 600 ) pcs 6.00
11.3 Insect screen Supplied by the EmployerW1 (1400 x 1300 ) sm 3.64
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page28
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)W2 (1400 x 1300 ) sm 10.92 W3 (1400 x 1300 ) sm 3.64 W4 (1400 x 1300 ) sm 10.92 W4a (1400 x 1800 ) sm 5.04 W5 (1300 x 1300 ) sm 3.38 W5a (1650 x 1300 ) sm 4.29 W6 (1400 x 1300 ) sm 3.64 W6a (1400 x 1300 ) sm 7.28 W8 ( 600 x 600 ) sm 2.16
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 87.40 12.2 Steel handrail with timber top rail for stairs m 72.00
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 188.74
13.2 s.m. 80.41 13.3 Access panel pcs 20.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 114.96 14.2 Cement mortar to make up level for all area sm 1,230.97 14.3 Glazing tile 600x600mm, for indoor area floor s.m. 729.96 Supplied by the Employer14.4 Glazing skirting tile, for indoor area floor m 586.50 Supplied by the Employer14.5 Glazing tile to stair floor & steps s.m. 88.10 Supplied by the Employer14.6 Glazing tile to skirting of stair m 109.58 Supplied by the Employer14.7 Ceramic floor tile, 200x200mm for kitchen room s.m. 35.10 Supplied by the Employer14.8 Ceramic floor tile, 200x200mm for bath room s.m. 72.37 Supplied by the Employer14.9 Ceramic wall tile, 200x250mm for bath room s.m. 351.37 Supplied by the Employer
14.10 Ceramic runner tile, 100x200mm for bath room m 138.50 Supplied by the Employer14.11 Ceramic skirting tile, 100x200mm for kitchen room m 44.80 Supplied by the Employer14.12 Terra-cotta tile for floor balcony, terrace sm 253.52 Supplied by the Employer14.13 Terra-cotta skirting tile 100mm height for balcony, terrace ... m 309.20 Supplied by the Employer14.14 Cotto tile for floor entrance steps , laundry sm 51.92 Supplied by the Employer
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener, trowelled smooth for garage
Page29
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)14.15 Cotto skirting tile for floor entrance steps , laundry m 48.21 Supplied by the Employer
Sub total
15.0 PAINTING WORKS
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 4,132.21 Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by the Employer
16.1 Water closet set 20.00 16.2 Wall hung wash basin set 20.00 16.3 Bath tub 1.8m set 4.00 16.4 Mirror s.m 6.40 16.5 Accessories set 20.00 16.6 Single faucet pcs 16.00 16.7 Mixing faucet pcs 4.00 16.8 Mixing shower pcs 4.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only19.4 lot 1.00 Attendance only
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 618,865,408 VND for M&E WorksAllow the Sum of 157,922,000 VND for Entrance DoorAllow the Sum of 90.268,500 VND for Exterior PaintAllow the Sum of 26,088,800 VND for Art stone tile
Page30
Page31
Page32
Page33
Page34
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 9
Item Descriptions Unit Quantity Break down
Amount (VND)Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 2,716.35 3.2 Return, fill in (and well ram) selected excavated materials c.m. 849.81 3.3 Load and cart away surplus excavated materials to a dump c.m. 745.90 3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 186.48
Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 60.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 26.57
4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 46.62 4.4 Rebar (mild steel bar) kg 963.32
4.5 Rebar (deformed steel bar) kg 7,716.29
4.6 Formwork s.m. 361.13
Structure4.7 Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20 c.m. 208.02 4.8 Rebar (mild steel bar) kg 15,972.36 4.9 Rebar (deformed steel bar) kg 12,625.20 4.10 Formwork s.m. 2,107.89
Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 155.51 6.2 Waterproof materials to flat roof and gutter s.m. 110.66 6.3 Waterproof materials to sloping roof s.m. 390.46
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 110.66 7.2 Cement mortar screed to sloping roof s.m. 390.46 7.3 Tegola roof material to sloping roof s.m. 390.46 7.4 The concrete or brick for curb of roof m 54.96
Sub total
8.0 BRICK WORK & MASONRY WORKS
Unit Price(VND)
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page35
Item Descriptions Unit Quantity Break down
Amount (VND)Material LabourUnit Price
(VND)8.1 100mm thick hollow brick wall s.m. 421.70 8.2 200mm thick hollow brick wall s.m. 523.50 8.3 250mm thick hollow brick wall s.m. 13.05 8.4 300mm thick hollow brick wall s.m. 2.62 8.5 Brick masonry for steps , beam and column cm 31.94 8.6 Steel dowel bar for brick work kg 531.89 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 13.95 8.8 200mm thick solid brick for retaining wall s.m. 93.24
Sub total
9.0 PLASTERING WORKS9.1 Cement mortar plaster to internal column, wall , ceilings and etc s.m. 2,716.35 9.2 Cement mortar plaster to external column, wall , ceilings and etc s.m. 849.81 9.3 Metal wire mesh to external wall m 745.90 9.4 Cement mortar plaster to retaining wall s.m. 186.48
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.)
D2 (1800 X 2700 ) pcs 2.00 D5 (1500 X 2000 ) pcs 2.00 DW1 (900 x 2000 +1500x1200) pcs 2.00 DW2 (900 x 2700 +750x1900) pcs 2.00
11.2 Aluminium window (include hardware and silicone.)W1 (2700 x 1900 ) pcs 4.00 W2 (1000 x 1900 ) pcs 2.00 W3 (2100 x 1900 ) pcs 4.00 W4 (2400 x 1900 ) pcs 4.00 W5 ( 5200 x 600 ) pcs 2.00 W6 ( 2100 x 1850 ) pcs 4.00 W7 ( 1800 x 1900 ) pcs 2.00 W8 ( 1500 x 1900 ) pcs 2.00 W9 ( 3400 x 1200 ) pcs 2.00 W10 ( 1200 x 600 ) pcs 2.00
11.3 Insect screen DW1 (1500 x 1200 ) sm 3.60 W1 (1300 x 1450 ) sm 7.54 W2 (1000 x 1200 ) sm 2.40 W3 (1000 x 1200 ) sm 4.80
Page36
Item Descriptions Unit Quantity Break down
Amount (VND)Material LabourUnit Price
(VND)W4 (1000 x 1200 ) sm 4.80 W5 ( 2000 x 600 ) sm 2.40 W6 ( 2100 x 1200 ) sm 10.08 W7 (1800 x 1200 ) sm 4.32 W8 ( 1500 x 1200 ) sm 3.60 W9 ( 2200 x 1200 ) sm 5.28 W10 ( 1200 x 600 ) sm 1.44
11.4 Aluminium frame (include hardware and silicone.)F1 (2415 x 900 ) pcs 4.00 F2 (1900 x 700 ) pcs 4.00 F3 (1700 x 600 ) pcs 4.00
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 17.60 12.2 Steel handrail with timber top rail for stairs m 15.58
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 258.49 13.2 Suspended gypsum board ceiling, concealed grid (Moistureproof) s.m. 57.89 13.3 Access panel pcs 8.00
Sub total
14.0 FLOOR & WALL FINISHES14.1 Cement mortar to make up level for all area sm 584.48 14.2 Glazing tile 600x600mm, for indoor area floor s.m. 418.16 14.3 Glazing skirting tile, for indoor area floor m 297.12 14.4 Glazing tile to stair floor & steps s.m. 24.62 14.5 Glazing tile to skirting of stair m 28.64 14.6 Ceramic floor tile, 200x200mm for kitchen room s.m. 24.64 14.7 Ceramic floor tile, 200x200mm for bath room s.m. 46.63 14.8 Ceramic wall tile, 200x250mm for bath room s.m. 170.91 14.9 Ceramic runner tile, 60x200mm for bath room m 66.00
14.10 Ceramic skirting tile, 100x200mm for kitchen room m 34.10 14.11 Terra-cotta tile for floor balcony, terrace sm 27.84 14.12 Terra-cotta skirting tile 100mm height for balcony, terrace ... m 56.20 14.13 Cotto tile for floor entrance steps , laundry sm 67.21 14.14 Cotto skirting tile for floor entrance steps , laundry m 43.10
Page37
Item Descriptions Unit Quantity Break down
Amount (VND)Material LabourUnit Price
(VND)14.15 Granite stone for counter top wash basin sm 4.53
Sub total
15.0 PAINTING WORKS
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 2,545.44 Sub total
16.0 PLUMBING & DRAINAGESanitary wares
16.1 Water closet set 8.00 16.2 Wall hung wash basin set 2.00 16.3 Vanity top wash basin set 6.00 16.4 Bath tub 1.8m set 2.00 16.5 Mirror s.m 3.84 16.6 Accessories set 8.00 16.7 Single faucet pcs 2.00 16.8 Mixing faucet pcs 6.00 16.9 Mixing shower pcs 6.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 19.2 lot 1.00 19.3 lot 1.00 19.4 lot 1.00
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 312,147,200 VND for M&E WorksAllow the Sum of 54,698,000 VND for Entrance DoorAllow the Sum of 37,113,061 VND for Exterior PaintAllow the Sum of 17,208.512 VND for Art stone tile
Page38
Remark
SPCC- CFE (H17)SPCC- CFE (H17)SPCC- CFE (H17)SPCC- CFE (H17)
SPCC- CFE (H17)SPCC- CFE (H17)SPCC- CFE (H17)
Supplied by the Employer
Page39
Remark
Dong Nai or EquivalentDong Nai or EquivalentDong Nai or EquivalentDong Nai or EquivalentDong Nai or Equivalent
Dong Nai or Equivalent
Supplied by the Employer
Supplied by the Employer
Supplied by the Employer
Page40
Remark
Supplied by the Employer
Supplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the EmployerSupplied by the Employer
Epoxy zinc rich paint
Epoxy zinc rich paint
Page41
Remark
Supplied by the Employer
Attendance onlyAttendance onlyAttendance onlyAttendance only
Page 42
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 10
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 185.75
3.2 Return, fill in (and well ram) selected excavated materials c.m. 170.61
3.3 c.m. 18.47
3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 73.29 Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 22.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 3.58 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 8.73 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 213.14 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 1,239.61 SPCC- CFE (H17)4.6 Formwork s.m. 91.69
Structure
4.7 c.m. 81.67 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 3,984.60 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 6,766.81 SPCC- CFE (H17)
4.10 Formwork s.m. 713.25 Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 66.36 6.2 Waterproof materials to flat roof and gutter s.m. 28.35 6.3 Waterproof materials to sloping roof s.m. 117.21
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 28.35 7.2 Cement mortar screed to sloping roof s.m. 117.21 7.3 Tegola roof material to sloping roof s.m. 117.21 Supplied by the Employer
Unit Price(VND)
Load and cart away surplus excavated materials to a dump
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page 43
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 10
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)7.4 The concrete or brick for curb of roof m 29.10
Sub total
8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 179.42 Dong Nai or Equivalent8.2 150mm thick hollow brick wall s.m. 11.52 Dong Nai or Equivalent8.3 200mm thick hollow brick wall s.m. 266.47 Dong Nai or Equivalent8.4 250mm thick hollow brick wall s.m. 25.89 Dong Nai or Equivalent8.5 300mm thick hollow brick wall s.m. 3.04 Dong Nai or Equivalent8.6 Brick masonry for steps , beam and column cm 17.36 Dong Nai or Equivalent8.7 Steel dowel bar for brick work kg 135.33
8.8 cm 6.96 8.9 200mm thick solid brick for retaining wall s.m. 28.13 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 942.47
9.2 s.m. 514.04 9.3 Metal wire mesh to external wall m 482.84 9.4 Cement mortar plaster to retaining wall s.m. 56.25
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by the Employer
D2 (1600 X 2100 ) pcs 1.00 D3 (3200 X 2700 ) pcs 1.00 D4 (1600 X 2700 ) pcs 1.00
11.2 Aluminium window (include hardware and silicone.) Supplied by the EmployerW1 (1600 x 1800 ) pcs 17.00 W1a (1600 x 1800 ) pcs 1.00 W2 (800 x 800 ) pcs 4.00 W3 (1600 x 500 ) pcs 1.00
Precast reinforced concrete for beam, lintel beam Gr: 250
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page 44
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 10
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)11.3 Insect screen Supplied by the Employer
W1 (1600 x 1300 ) sm 35.36 W1a (1600 x 1300 ) sm 2.08 W2 (800 x 800 ) sm 2.56 W3 (1600 x 500 ) sm 0.80
11.4 Aluminium louver (include hardware and silicone.) Supplied by the EmployerK1 ( 300 x 300 ) pcs 1.00
Sub total
12.0 METAL WORKS12.1 Steel handrail for balcony and terrace m 9.90 12.2 Steel handrail with timber top rail for stairs m 9.80
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 108.31
13.2 s.m. 18.31 13.3 Access panel pcs 5.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 23.68 14.2 Cement mortar to make up level for all area sm 235.58 14.3 Glazing tile 600 x 600mm for indoor area sm 163.16 Supplied by the Employer14.4 Glazing tile 600 x 600mm for staircase sm 13.65 Supplied by the Employer14.5 Glazing skirting tile 100x600mm for indoor area m 125.61 Supplied by the Employer14.6 Glazing skirting tile 100x600mm for staircase m 15.14 Supplied by the Employer14.7 Floor tile 200x200mm for kitchen, toilet sm 28.20 Supplied by the Employer14.8 Ceramic skirting tile for toilet m 45.05 Supplied by the Employer14.9 Wall ceramic tile 200x250mm for toilet sm 94.41 Supplied by the Employer
14.10 Runner ceramic tile for toilet m 45.05 Supplied by the Employer14.11 Terracotta tile for balcony & terrace sm 7.88 Supplied by the Employer14.12 Terracotta skirting tile for balcony & terrace m 16.90 Supplied by the Employer14.13 Cotto tile for entrance step sm 22.68 Supplied by the Employer
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener , trowelled smooth for garage
Page 45
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 10
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)14.14 Cotto skirting tile for entrance step m 10.64 Supplied by the Employer14.15 Granite stone for counter top wash basin sm 1.38
Sub total
15.0 PAINTING WORKS
15.1 sm 974.70
Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by the Employer
16.1 Water closet set 5.00 16.2 Wall hung wash basin set 3.00 16.3 Vanity top wash basin set 2.00 16.4 Bath tub 1.8m set 1.00 16.5 Tray bath (900 x 900) set 2.00 16.6 Mirror sm 2.40 16.7 Single faucet pcs 2.00 16.8 Mixing faucet pcs 3.00 16.9 Mixing shower pcs 5.00
16.10 pcs 8.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only
Sub total - Total
Emulsion paint to internal columns , walls , ceilings and etc.
Accessories ( shelf , towel bar , soap holder , paper holder )
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 144,628,000 VND for M&E WorksAllow the Sum of 39,309,500 VND for Entrance DoorAllow the Sum of 25,701,950 VND for Exterior Paint
Page 46
Page 47
Page 48
Page 49
Page 50
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 11
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material Labour
3.0 EARTHWORKS3.1 Excavation c.m. 213.69 3.2 Return, fill in (and well ram) selected excavated materials c.m. 194.25
3.3 Load and cart away surplus excavated materials to a dump c.m. 23.72
3.4 Compacted sand for pile cap, tie beam, floor etc. c.m. 75.70 Sub total
4.0 REINFORCED CONCRETEFoundations
4.1 Cut piles heads pcs 21.00 4.2 Lean-mix concrete Gr: 100 , stone 10 x 20 c.m. 3.87 SPCC- CFE (H17)4.3 Concrete for pile cap, tie beam Gr: 250 , stone 10 x 20 c.m. 15.57 SPCC- CFE (H17)4.4 Rebar (mild steel bar) kg 286.77 SPCC- CFE (H17)4.5 Rebar (deformed steel bar) kg 1,370.35 SPCC- CFE (H17)4.6 Formwork s.m. 114.80
Structure
4.7 c.m. 78.04 SPCC- CFE (H17)
4.8 Rebar (mild steel bar) kg 3,837.68 SPCC- CFE (H17)4.9 Rebar (deformed steel bar) kg 6,474.48 SPCC- CFE (H17)
4.10 Formwork s.m. 684.55 Sub total
6.0 WATERPROOFING WORKS
6.1 s.m. 66.52 6.2 Waterproof materials to flat roof and gutter s.m. 24.26 6.3 Waterproof materials to sloping roof s.m. 153.37
Sub total
7.0 ROOF WORKS7.1 Cement mortar screed to gutter s.m. 24.26 7.2 Cement mortar screed to sloping roof s.m. 153.37 7.3 Tegola roof material to sloping roof s.m. 153.37 Supplied by the Employer7.4 The concrete or brick for curb of roof m 37.36
Sub total
Unit Price(VND)
Concrete for columns, beam, slabs, stairs Gr 250, stone 10 x 20
Waterproof materials to balcony, terrace, laundry, kitchen and bath room
Page 51
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 11
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)
8.0 BRICK WORK & MASONRY WORKS8.1 100mm thick hollow brick wall s.m. 162.78 Dong Nai or Equivalent8.2 200mm thick hollow brick wall s.m. 3.15 Dong Nai or Equivalent8.3 250mm thick hollow brick wall s.m. 265.02 Dong Nai or Equivalent8.4 300mm thick hollow brick wall s.m. 33.07 Dong Nai or Equivalent8.5 Brick masonry for steps , beam and column cm 20.80 Dong Nai or Equivalent8.6 Steel dowel bar for brick work kg 359.11 8.7 Precast reinforced concrete for beam, lintel beam Gr: 250 cm 5.77 8.8 200mm thick solid brick for retaining wall s.m. 35.10 Dong Nai or Equivalent
Sub total
9.0 PLASTERING WORKS
9.1 s.m. 889.69
9.2 s.m. 602.79 9.3 Metal wire mesh to external wall m 434.66 9.4 Cement mortar plaster to retaining wall s.m. 70.20
Sub total
11.0 ALUMINIUM WORK11.1 Aluminium door (include hardware and silicone.) Supplied by Employer
D2 (900 X 2200 ) pcs 2.00 D3 (800 X 2200 ) pcs 2.00 D3a (800 X 2200 ) pcs 1.00 D7 (2600 x 2700 ) pcs 1.00
11.2 Aluminium window (include hardware and silicone.) Supplied by EmployerW1 (1600 x 1800 ) pcs 12.00 W2 (800 x 1100 ) pcs 5.00 W2a (800 x 1100 ) pcs 1.00 W3 (800 x 800 ) pcs 3.00
11.3 Insect screen Supplied by EmployerW1 (1600 x 1300 ) sm 24.96 W2 (800 x 400 ) sm 1.60
11.4 Aluminium louver (include hardware and silicone.) Supplied by EmployerK1 ( 300 x 300 ) pcs 2.00
Cement mortar plaster to internal column, wall , ceilings and etc
Cement mortar plaster to external column, wall , ceilings and etc
Page 52
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 11
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)Sub total
12.0 METAL WORKS12.1 Steel hanrail for balcony height 930mm m 4.80 12.2 Steel hanrail for W1 height 470mm m 10.20 12.3 Steel hanrail with timber on top for staicase m 12.73
Sub total
13.0 SUSPENDED CEILINGS13.1 Suspended gypsum board ceiling, concealed grid s.m. 86.15
13.2 s.m. 19.12 13.3 Access panel pcs 5.00
Sub total
14.0 FLOOR & WALL FINISHES
14.1 sm 23.58 14.2 Cement mortar to make up level for all area sm 228.57 14.3 Glazing tile 600 x 600mm for indoor area sm 156.88 Supplied by Employer14.4 Glazing tile 600 x 600mm for staircase sm 13.45 Supplied by Employer14.5 Glazing skirting tile 100x600mm for indoor area m 120.80 Supplied by Employer14.6 Glazing skirting tile 100x600mm for staircase m 9.62 Supplied by Employer14.7 Floor tile 200x200mm for kitchen, toilet sm 29.93 Supplied by Employer14.8 Ceramic skirting tile for toilet m 44.50 Supplied by Employer14.9 Wall ceramic tile 200x250mm for toilet sm 98.70 Supplied by Employer
14.10 Runner ceramic tile for toilet m 35.40 Supplied by Employer14.11 Terracotta tile for balcony & terrace sm 12.92 Supplied by Employer14.12 Terracotta skirting tile for balcony & terrace m 14.20 Supplied by Employer14.13 Cotto tile for entrance step sm 15.39 Supplied by Employer14.14 Cotto skirting tile for entrance step m 8.60 Supplied by Employer14.15 Granite stone for counter top wash basin sm 0.86
Sub total
15.0 PAINTING WORKS
15.1 Emulsion paint to internal columns , walls , ceilings and etc. sm 896.26
Epoxy zinc rich paint
Epoxy zinc rich paint
Epoxy zinc rich paint
Suspended gypsum board ceiling, concealed grid (Moistureproof)
Fine concrete screed with hardener , trowelled smooth for garage
Page 53
BILL OF QUANTITIES PROJECT : S10-1 VILLA A 11
Item Descriptions Unit Quantity Break down
Amount (VND) Remark Material LabourUnit Price
(VND)Sub total
16.0 PLUMBING & DRAINAGESanitary wares Supplied by Employer
16.1 Water closet set 5.00 16.2 Wall hung wash basin set 4.00 16.3 Vanity top wash basin set 1.00 16.4 Bath tub 1.6m set 1.00 16.5 Tray bath (900 x 900) set 1.00 16.6 Mirror set 5.00 16.7 Single faucet pcs 3.00 16.8 Mixing faucet pcs 2.00 16.9 Single shower pcs 3.00
16.10 Mixing shower pcs 2.00
16.11 Accessories ( shelf , towel bar , soap holder , paper holder ) pcs 5.00
Sub total
19.0 PRIME COST SUM
19.1 lot 1.00 Attendance only19.2 lot 1.00 Attendance only19.3 lot 1.00 Attendance only
Sub total - Total
The Contractor is to base the Sum below to consider his cost for attendance which is specified as Prime Cost Sum; this Prime Coat Sum are to include cost of using contractor's facilities such as scaffolding, tower crane, hoist and all the attendance work for the purpose of the Nominated Contractor works.Allow the Sum of 140,000,000 VND for M&E WorksAllow the Sum of 34,040.000 VND for Entrance DoorAllow the Sum of 30,139,726 VND for Exterior Paint