7
F - 12 付図 5-8 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES JAPAN INTERNATIONAL COOPERATION AGENCY キナンリマン流域図 Table: Objective River Improvement Length River Length (km) Remarks Kinanliman 1.1 Left bank: 1.1km Right bank: 0.6km Estimated Flood Potential Area of the Kinanliman River Basin

Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 12

付図 5-8 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

キナンリマン流域図

Table: Objective River Improvement Length

River Length (km) Remarks

Kinanliman 1.1 Left bank: 1.1kmRight bank: 0.6km

Estimated Flood Potential Area of the Kinanliman River Basin

Page 2: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 13

付図 5-9 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

キナンリマン流域洪水対策計画概要図

CR1

-2

0

2

4

6

430 450 470 490 510 530 550

Station (m)

Ele

vation

(m)

30.0m

55.6m

EL+0.8m

EL+3.9m

-179m (-385~-150m)

EL+4.7m

CR2

0

2

4

6

8

-60 -40 -20 0 20 40Station (m)

Ele

vation

(m)

30.0m

54.2m

-20m (-150~0m)

EL+1.7m

EL+4.4mEL+5.2m

CR3

2

4

6

8

10

-50 -30 -10 10 30 50 70 90Station (m)

Ele

vat

ion (

m)

30.0m

EL+3.0m

EL+7.7m

EL+8.5m

103m (0~150m)

125.0m

CR4

4

6

8

10

12

360 380 400 420 440 460 480 500

Station (m)

Ele

vation

(m)

30.0m

EL+6.1m

EL+9.2mEL+10.0m

302m (150~350m)

160.0m

CR5

9

11

13

15

17

19

-50 -30 -10 10 30 50 70 90

Station (m)

Ela

vat

ion

(m)

30.0m

582m (350~660m)

EL+15.1mEL+14.3m

EL+10.7m

72.5m

Page 3: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 14

付図 5-10 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

ツガナイ流域図

Table: Objective River Improvement Length

River Length (km)

Tuganay 21.0 Anibongan 10.0 New Ising 9.0 Old Ising 3.0

Page 4: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 15

付図 5-11 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

ツガナイ流域洪水対策計画概要図

CR1_Tuganay

-6

-4

-2

0

2

4

6

8

10

200 250 300 350 400 450 500 550 600

Station (m)

Ele

vation (

m)

20.0m

EL+5.1m

EL-2.8m

6.4km(0~6.5km)

54.8m

CR2_Tuganay

-4

-2

0

2

4

6

8

10

150 200 250 300 350 400 450 500

Station (m)

Ele

vation (

m)

20.0m

8.8km(6.5~9.0km)

EL+5.8m

54.0m

EL-1.9m

EL+6.6m

CR3_Tuganay

0

2

4

6

8

10

150 200 250 300 350Station (m)

Ele

vation

(m

)

20.0m

14.6km(9.0~15.0km)

EL+7.6m

59.0m EL+8.4m

EL+1.9m

CR4_Tuganay

2

4

6

8

10

12

100 150 200 250Station (m)

Ele

vat

ion (

m)

16.2km(15.0~17.0km)

20.0m

EL+3.7m

EL+9.1mEL+9.9m

57.2m

CR5_Tuganay

5

7

9

11

13

15

50 100 150 200Station (m)

Ele

vation

(m

)

20.0m

18.8km(17.0~21.0km)

EL+12.2m

EL+7.0m

EL+13.0m56.0m

CR1_Anibongan

-4

-2

0

2

4

6

8

10

200 250 300 350 400

Station (m)

Ele

vat

ion (

m)

20.0m

4.3km(0~4.5km)

EL+6.4m

66.2mEL+7.0m

EL-0.7m

CR2_Anibongan

-4

-2

0

2

4

6

8

10

300 350 400 450 500

Station (m)

Ele

vation

(m)

20.0m

6.1km(4.5~6.5km)

EL+6.6m

65.0m EL+7.2m

EL-0.3m

CR3_Anibongan

-2

0

2

4

6

8

10

150 200 250 300 350

Station (m)

Ele

vat

ion

(m)

20.0m

9.8km(6.5~10.0km)

EL+7.0m

58.4m EL+7.6m

EL+1.2m

CR1_Ising

-6

-4

-2

0

2

4

-50 0 50 100 150

Station (m)

Ele

vation

(m

)

35.0m

20m

EL+1.4m

99.0mEL+2.0m

EL-4.0m

(0~2.0km)

CR2_Ising

-4

-2

0

2

4

6

0 50 100 150

Station (m)

Ele

vation

(m)

6.0km(2.0~6.0km)

10.0m

35.0m

EL+4.0mEL+3.4m

EL-1.0m

100.0m

CR3_Ising

-4

-2

0

2

4

6

8

3,400 3,450 3,500 3,550

Station (m)

Ele

vation

(m

)

(6.0~9.0km)

30.0m

EL+4.2mEL+3.6m

EL-0.5m

48.8m

CR_Old Ising

-2

0

2

4

6

50 100 150

Station (m)

Ele

vat

ion (

m)

5.0m

3.0km(0~3.0km)

EL+3.5mEL+4.1m

EL-0.3m

22.6m

Optimum Plan

Page 5: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 16

付図 5-12 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

ディナガサン流域図

Table: Objective River Improvement Length

River Length (km)

Dinanggasan 1.6

Estimated Flood Potential Area of the Dinanggasan River Basin

Page 6: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 17

Bridge

Din

angg

asan

Riv

er

Existing Dike

Compol River

CatarmanCompol

River Mouth

BridgeTagib River

296m

3 /s26m 3/s 27

0m3 /s

Dike

Bridge

Din

angg

asan

Riv

er

Existing Dike

Compol River

CatarmanCompol

River Mouth

BridgeTagib River

296m

3 /s26m 3/s 27

0m3 /s

Dike

Bridge

Din

angg

asan

Riv

er

Existing Dike

Compol River

CatarmanCompol

River Mouth

BridgeTagib River

270m

3 /s26m 3/s 27

0m3 /s

DikeChanneling

Bridge

Din

angg

asan

Riv

er

Existing Dike

Compol River

CatarmanCompol

River Mouth

BridgeTagib River

270m

3 /s26m 3/s 27

0m3 /s

DikeChanneling

付図 5-13 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

ディナガサン代替案ケース図

Case-2

Case-1

Tag-Ibo River

Tag-Ibo River

Page 7: Estimated Flood Potential Area of the Kinanliman …F - 12 THE STUDY ON THE NATIONWIDE FLOOD RISK 付図 5-8 ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE

F - 18

付図 5-14 THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION

PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES

JAPAN INTERNATIONAL COOPERATION AGENCY

ディナガサン流域洪水対策概要図

CR1

-2

0

2

4

6

8

10

12

100 200 300 400 500

Station (m)

Ele

vation (

m)

120m (0~120m)

EL+4.3mEL+5.1m

EL+3.1m

190.0m

197.8m

CR2

8

10

12

14

16

18

20

22

200 300 400 500 600Station (m)

Ele

vation(m

)

530m (120~530m)

EL+12.8mEL+11.9m

EL+13.6m

100.0m

107.0m

CR3

22

24

26

28

30

32

34

36

50 150 250 350 450Station (m)

Ele

vation (

m)

880m (530~880m)

EL+26.8mEL+27.6m

EL+25.7m

100.0m

107.6m

CR4

32

34

36

38

40

42

44

46

0 100 200 300 400Station (m)

Ele

vat

ion (

m)

1170m (880~1400m)

EL+38.4mEL+39.2m

EL+37.2m

70.0m

78.0m