43
Progress of Flood Monitoring & Assessment by Remote Sensing in China China Institute of Water Resources &Hydropower Research(IWHR) Li Jiren 2019.6

Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Progress of Flood Monitoring & Assessment by Remote Sensing in China

China Institute of Water Resources &Hydropower Research(IWHR)

Li Jiren

2019.6

Page 2: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

TOPICS

1. Flood monitoring

2. Disaster assessment

3. Monitoring on water project for flood control

4. Flood forecasting and risk map

Page 3: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

China is suffered from flood disaster for a long history. So

Chinese government pays more attention to flood control.

Remote sensing technology has been used for flood

monitoring since1980, then disaster assessment, water

project monitoring, risk map making, and establishment1of

professional system were made step by step.

Page 4: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

1.Flood monitoring

Image Data Sources

1.Space satellite:Landsat 8,SPOT, Radarsat 2, Envisat、

Sentinel-1

GF-1, GF-2, GF-3, GF-4, GF-5, GF-6, ZY3-01, ZY3-02, ZY1-02C

ZY-04, BJ-2, JL-1

2.Air-born SAR 10,000~13,000m(all weather)

helicopter, unmanned plan

Real-time monitoring mainly depends on radar image

Background data from visible image

Page 5: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Appropriatness evaluation for remote sensing data usually used

Data Landsat 8 SPOTNOAA/

AVHRR

GF-3

(domestic)

EOS/

MODISSentinel-1

Air-

born

SAR

Unmanned

plan

Revisit(d) 16 26 0.5 29 0.5 12 anytime anytime

All weather × × √ √√ × √√ × ×

Data obtain × × √ √ √√ √ √√ √√

Inundation

extent√√ √√ √√ √√ √√ √√ √√ √√

Water depth √ √ × √ × √ √ √

Duration × × √ — √ — — √√

Background data √√ √√ × √ × √ × ×

Water works

monitoring× × × × × × √√ √√

Disaster

assessment√ √ √ √ √ √ √ √

NOTE: √√very suitable √general suitable ×not suitable

1.Flood monitoring

Page 6: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

航空卫星通信系统

Real-time transmission system of air-born SAR

Page 7: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Inundated oil-well

at Daqing in 1998

by this system

Page 8: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Factors for monitoring:

Extent of inundation

Duration of inundation(successive monitoring)

Water depth and its spacial distribution with

the aid of DEM

Page 9: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Flood monitoring & assessment system (software)

Page 10: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

系统总界面

雷达影像水体自动提取界面

淹没范围提取界面

Page 11: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Dynamic Monitoring for

Monwa Detention Basin

2003.7.5 17:22

2003.7.7 6:11

2003.7.12 18:18

Water level:28.82m

蒙 洼

王家坝水位:28. 23m

蒙 洼

王家坝水位:28. 69m

蒙 洼

Page 12: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

上六方堤

下六方堤 石姚段

洛河洼

2003年7月12日18时18分

2003年7月7日6时11分上六方堤

下六方堤 石姚段

洛河洼

Dynamic Monitoring for

Jinshanhu Flooding Basin

Page 13: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

2003年7月7日6时11分

2003年7月12日18时18分

城西湖

塘垛湖邱

家湖

城西湖

塘垛湖邱

家湖

Dynamic Monitoring for the

Chendonghu Detention Basin

Page 14: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Heilong River in August,2013

Page 15: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Wuhan City in 2016

Page 16: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Hubei and Anhui in 2016

Page 17: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

14 times monitoring for downstream of Yangtze River in 2016

Page 18: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Shouguang, Shangdong in 2018

Page 19: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Dammed lake of the Jinsha River in 2017 & 2018

Page 20: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

TOPICS

1. Flood monitoring

2. Disaster assessment

3. Security of Water Project for flood control

4. Flood forecasting and risk map

Page 21: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Flood

characteristics unit

Social & economy

unit

Calculation unit

Depending on water depth, duration and inundated objects from

social & economic data base, the most difficult factor is loss rate.

2. Disaster assessment

LOSS

Page 22: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key
Page 23: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key
Page 24: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Disaster loss evaluation model

Economic loss estimation is performed on the basis

of grid which is common for flood routing and

social-economic database.

On the basis of water depth, inundation

duration, inundation object and corresponding

loss rate, the capital loss is calculated.

N

jjn

i j k m n

jkmij eYARcapital )1(

Page 25: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

According to the inundation duration, the

loss due to stoppage of business is

calculated.

365/)1( DayseBLR N

j

i j

ijjbusi

Page 26: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

i j

jijdirectindirect KRR

N

jhistoricalrelief eRR )1(

Page 27: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

i

T bt

ibenifit dtaeUR0

benifitreliefindirectbusicapitaltotal RRRRRW

Page 28: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0 0m~0.5m 0.5m~1.5m 1.5m~2.5m 2.5m~3.5 大于3.5m

水深

损失率

农业部门

工厂企业

建筑业

货运仓储业

商业

Relation curve between loss rate and water

depth for different sector

Page 29: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0 1天 1~2天 3~4天 5~6天 7天以上

淹没时间

损失率

水稻

小麦

玉米

蔬菜

Relation curve between loss rate and

inundation duration for different crops

Page 30: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

TOPICS

1. Flood monitoring

2. Disaster assessment

3. Monitoring on water project for flood control

4. Flood forecasting and risk map

Page 31: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Variation of river regime

Variation of river regime due to scour and filling of sedimentation,

also sand dredging may cause the change of flow direction, and threat

the security of dyke.

Page 32: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

雅江出境处——冲刷为主 布河卡齐兰加国家公园段——冲淤基本平衡 布河流向拐点处——冲刷为主

布河与恒河汇流处——冲淤基本平衡 入海口——淤积为主

Variation of river course

River course

variation of the

Yalouzhanbu

River from 1980

to 2013

Page 33: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Monitoring of river regulation

2008年12月30日

Page 34: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Monitoring of river regulation

2007年5月6日

2013年3月26日

Page 35: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Monitoring on water project for flood control

B

B

R

R R

A

H

'Ar

M

S

Displacement and transformation of

dam by INSAR

Three Gorge Dam

Page 36: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Monitoring on water project for flood control

Stability of dam

Page 37: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Monitoring on water project for flood control

Revise of relation

curve between

Water level and

Storage of reservoir

by means of remote

sensing images

0

20

40

60

80

100

120

140

160

70 80 90 100 110 120 130 140

水库库容

(亿m3)

水位(m)

Shuifeng Reservoir(80m~131m)

Page 38: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

TOPICS

1. Flood monitoring

2. Disaster assessment

3. Monitoring on water project for flood control

4. Flood forecasting and risk map

Page 39: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Flood forecasting and risk map

39

1) Input of flood forecasting system, including precipitation, initial

soil moisture content.

Doppler radar, TRMM, GPM, GPS-RS

Page 40: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Flood forecasting and risk map

2)Parameter determination according to underlying

conditions from remote sensing.

3)Watershed hydrological model on the basis of both

water balance and energy balance, which is significant

for ungagged basin.

Page 41: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Risk maps reveal the flood risk degree and distribution

characteristics under different flood scenarios in key flood control

areas of China.

Risk map which has been made covers 496000 km2, being occupied

48% of the risk region of whole country.

All basic data needed for making risk map are from remote sensing.

48%

Page 42: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

198 rivers with the total length of 2700 km、45 important cities

78 Detention basins with the total area of 29000

km2

26 flood plains with the total area of 8800 km2

227 important area for flood detention with the

total area of 408100 km2

Page 43: Progress of Flood Monitoring & Assessment by …...for ungagged basin. Risk maps reveal the flood risk degree and distribution characteristics under different flood scenarios in key

Thanks for Attention

[email protected]