METRADO ESTRUCTURA ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL 03.00.00 MOVIMIENTO DE TIERRAS 03.02.00 ESCAVACIÓN CIMIENTOS CORRIDOS 03.02.01 CORTE DE TERRENO HASTA 0.40 M TERRENO NORMAL EN ZONA 1, ADMINISTRACION 1 10.6 6.26 0.10 6.64 EN RAMPAS 1 7.82 5.30 0.25 10.36 RAMPA ENTRE ZONA 1, LABORATORIOS Y ZONA 3, SSHH 1 2.80 1.80 0.23 1.16 03.02.02 EXCAV. ZANJA P/CIMIENTO MAT. SUEL. H=1.00 a 1.50 M ZONA 1 ADMINISTRACION EJE 1 1 5.70 0.8 1.00 4.56 EJE 2 1 3.25 0.8 1.00 2.60 EJE 3 1 5.70 0.8 1.00 4.56 EJE A Y C 2 1.27 0.8 1.00 2.03 2 1.43 0.7 1.00 2.00 2 1.98 0.7 1.00 2.77 EJE B 1 2.96 0.8 1.00 2.37 1 2.22 0.8 1.00 1.78 ZONA 2 LABORATORIOS EJE 4, 7, 10 Y 11 4 5.85 0.8 1.00 18.72 EJE D Y F 2 13.252 0.65 1.00 17.23 EJE E 1 1.075 0.65 1.00 0.70 ZONA 3 SS HH. EJE 13, 14 Y 15 3 7.925 0.8 1.00 19.02 EJE G Y J 2 4.83 0.8 1.00 7.73 EJE H 1 4.83 0.55 1.00 2.66 ENTRE EJE 13 Y 14 1 1.325 0.55 1.00 0.73 1 3.125 0.5 1.00 1.56 ENTRE EJE 14 Y 15 1 2.075 0.5 1.00 1.04 ENTRE EJE H e I 5 0.9 0.5 1.00 2.25 ENTRE EJE I Y J 1 0.625 0.5 1.00 0.31 ACCESO PRINCIPAL EN GRADAS 1 3.625 0.4 0.5 0.73 1 0.48 0.4 0.5 0.10 EN RAMPA 1 9.4 0.4 0.5 1.88 1 0.48 0.4 0.5 0.10 EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 1.00 2.40 EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 1.00 7.39 EN SARDINELES EN VEREDAS DE ZONA 1 2 10 0.15 0.4 1.20 2 8.725 0.15 0.4 1.05 EN VEREDAS DE ZONA 2 2 9.65 0.15 0.4 1.16 2 25.2 0.15 0.4 3.02 EN VEREDAS EN ZONA 3 2 10.25 0.15 0.4 1.23 2 9.1 0.15 0.4 1.09 EN VEREDA DE ZONA 4 2 5.5 0.15 0.4 0.66 2 5.2 0.15 0.4 0.62 EN VEREDA DE ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18 2 6.7 0.15 0.4 0.80 2 3.23 0.15 0.4 0.39 EN VEREDAS ENTRE ZONA 4 Y 6 1 2.55 0.15 0.4 0.15 1 2.23 0.15 0.4 0.13 1 1.64 0.15 0.4 0.10 1 1.98 0.15 0.4 0.12 2 12.2 0.15 0.4 1.46 EN CANALES PLUVIALES EN ZONA 1 2 10.6 0.3 0.15 0.95 2 9.625 0.3 0.15 0.87 EN ZONA 2 2 10.6 0.3 0.15 0.95 2 26.1 0.3 0.15 2.35 ZONA 3 SS HH. 2 10.975 0.3 0.15 0.99 2 9.25 0.3 0.15 0.83 PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMB UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO:

Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

Embed Size (px)

DESCRIPTION

Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

Citation preview

Page 1: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

03.00.00 MOVIMIENTO DE TIERRAS

03.02.00 ESCAVACIÓN CIMIENTOS CORRIDOS

03.02.01 CORTE DE TERRENO HASTA 0.40 M TERRENO NORMAL 18.16 M3

EN ZONA 1, ADMINISTRACION 1 10.6 6.26 0.10 6.64

EN RAMPAS 1 7.82 5.30 0.25 10.36

RAMPA ENTRE ZONA 1, LABORATORIOS Y ZONA 3, SSHH 1 2.80 1.80 0.23 1.16

03.02.02 EXCAV. ZANJA P/CIMIENTO MAT. SUEL. H=1.00 a 1.50 M 134.23 M3

ZONA 1 ADMINISTRACION

EJE 1 1 5.70 0.8 1.00 4.56

EJE 2 1 3.25 0.8 1.00 2.60

EJE 3 1 5.70 0.8 1.00 4.56

EJE A Y C 2 1.27 0.8 1.00 2.03

2 1.43 0.7 1.00 2.00

2 1.98 0.7 1.00 2.77

EJE B 1 2.96 0.8 1.00 2.37

1 2.22 0.8 1.00 1.78

ZONA 2 LABORATORIOS

EJE 4, 7, 10 Y 11 4 5.85 0.8 1.00 18.72

EJE D Y F 2 13.252 0.65 1.00 17.23

EJE E 1 1.075 0.65 1.00 0.70

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 7.925 0.8 1.00 19.02

EJE G Y J 2 4.83 0.8 1.00 7.73

EJE H 1 4.83 0.55 1.00 2.66

ENTRE EJE 13 Y 14 1 1.325 0.55 1.00 0.73

1 3.125 0.5 1.00 1.56

ENTRE EJE 14 Y 15 1 2.075 0.5 1.00 1.04

ENTRE EJE H e I 5 0.9 0.5 1.00 2.25

ENTRE EJE I Y J 1 0.625 0.5 1.00 0.31

ACCESO PRINCIPAL

EN GRADAS 1 3.625 0.4 0.5 0.73

1 0.48 0.4 0.5 0.10

EN RAMPA 1 9.4 0.4 0.5 1.88

1 0.48 0.4 0.5 0.10

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 1.00 2.40

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 1.00 7.39

EN SARDINELES

EN VEREDAS DE ZONA 1 2 10 0.15 0.4 1.20

2 8.725 0.15 0.4 1.05

EN VEREDAS DE ZONA 2 2 9.65 0.15 0.4 1.16

2 25.2 0.15 0.4 3.02

EN VEREDAS EN ZONA 3 2 10.25 0.15 0.4 1.23

2 9.1 0.15 0.4 1.09

EN VEREDA DE ZONA 4 2 5.5 0.15 0.4 0.66

2 5.2 0.15 0.4 0.62

EN VEREDA DE ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18

2 6.7 0.15 0.4 0.80

2 3.23 0.15 0.4 0.39

EN VEREDAS ENTRE ZONA 4 Y 6 1 2.55 0.15 0.4 0.15

1 2.23 0.15 0.4 0.13

1 1.64 0.15 0.4 0.10

1 1.98 0.15 0.4 0.12

2 12.2 0.15 0.4 1.46

EN CANALES PLUVIALES

EN ZONA 1 2 10.6 0.3 0.15 0.95

2 9.625 0.3 0.15 0.87

EN ZONA 2 2 10.6 0.3 0.15 0.95

2 26.1 0.3 0.15 2.35

ZONA 3 SS HH. 2 10.975 0.3 0.15 0.99

2 9.25 0.3 0.15 0.83

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

Page 2: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

EN BUZONES PLUVIALES 3 0.8 0.8 1 1.92

EN DADOS DE CONCRETO EN MESAS DE CONCRETO 15 0.4 0.4 2 4.80

03.03.00 EXCAVACION PARA ZAPATAS Y SIMILARES

03.03.02 EXCAVACIÓN PARA ZAPATA MAT. SUELTO H=1.40 m 71.14 M3

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 4 1.05 1.05 1.6 7.06

2 1.05 1.05 1.6 3.53

EN ZONA 2 LABORATORIOS

ZAPATA 2 8 1.4 0.9 1.6 16.13

8 1.4 0.9 1.6 16.13

ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 1.37 16.97

1 2.3 1.4 1.37 4.41

ZAPATA 7 3 1.2 1.2 1.6 6.91

03.12.00 EXCAVACION MASIVA

03.12.01 EXCAVACION MASIVA H=1 M C/TRACTOR 487.92 M3

ZONA 3, SSHH 1 12.40 10.00 0.55 68.20

EN ZONA 2, LABORATORIOS 1 21.16 10.60 0.36 80.75

RAMPA ZONA 3, SSHH Y ZONA4 CISTERNA 1 5.65 4.22 0.74 17.64

RAMPA ENTRE ZONA 4,CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 9.85 1.70 1.78 29.81

1 9.85 1.70 1.17 19.59

LOSA DEPORTIVA 1 31.30 18.10 0.48 271.93

03.21.00 RELLENO CON MATERIAL PROPIO

03.21.01 RELLENO CON MATERIAL PROPIO MANUAL 49.67 M3

ZONA1 AREA

ZAPATA 1 5 0.881 0.9 3.96

1 0.92 0.9 0.83

EN EJE 1 Y 3 2 1.6 0.4 1.28

2 1.386 0.4 1.11

EJE 2 2 2.3 0.275 0.4 0.51

EJE A Y C 4 3.62 0.275 0.4 1.59

EJE B 2 5.98 0.275 0.4 1.32

ZONA 2 AREA

ZAPATA 2 4 0.969 0.9 3.49

4 0.95 0.9 3.42

8 1.038 0.9 7.47

EJE 4, 7, 10 Y 11 8 5.85 0.275 0.4 5.15

EJE D Y F 4 13.252 0.25 0.4 5.30

ZONA 3

EJE 13, 14 Y 15 6 7.925 0.275 0.4 5.23

EJE G,H Y J 6 6.75 0.275 0.4 4.46

ENTRE EJE 13 Y 14 2 1.325 0.2 0.4 0.21

2 3.125 0.175 0.4 0.44

ENTRE EJE 14 Y 15 2 2.075 0.175 0.4 0.29

ZAPATA 7 3 1.34 0.9 3.62

03.31.00 REFINE NIVELACIÓN Y COMPACTACIÓN DEL TERRENO

03.31.01 NIVELACIÓN APISONADO MANUAL 1213.76 M2

ZONA 1 ADMINISTRACIÓN 1 10.60 9.63 102.08

ZONA 2 LABORATOIOS 1 23.63 10.61 250.66

ZONA 3 SSHH 1 10.98 9.95 109.25

VEREDAS ACCESO PRINCIPAL 1 15.28 1.20 18.34

1 6.68 3.30 22.04

1 17.58 5.30 93.17

RAMPA ENTRE ZONA 4, CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 11.70 3.60 42.12

GRADAS EN ZONA 4 1 2.70 2.60 7.02

VEREDA ENTRE ZONA 4 CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 4.75 4.35 20.66

LOSA DEPORTIVA 1 18.10 30.10 544.81

2 3.00 0.60 3.60

03.35.00 BASE

Page 3: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

03.35.01 BASE GRANULAR E= 0.2m COMPACTADO CON PLANCHA 548.41 M2

1 18.1 30.1 544.81

2 3 0.6 3.60

03.85.00 ELIMINACION DE MATERIAL EXCEDENTE

03.85.02 ELIMINACION MATERIAL EXCEDENTE 25% DE ESPONJAMIENTO 811.82 M3

DE EXCAVACIÓN MASIVA 1.25 487.92 609.90

DE EXCAVACION PARA ZAPATAS 1.25 71.14 88.92

DE EXCAVACIÓN PARA CIMIENTOS 1.25 134.23 167.79

DE CORTE DE TERRENO 1.25 18.16 22.70

DE RRELLENO CON MATERIAL PROPIO -1.56 49.67 -77.49

04.00.00 OBRAS DE CONCRETO SIMPLE

04.01.25 CONCRETO PARA CIMIENTO CORRIDO 1:10 (C:H) + 30% PG 72.67 M3

ZONA 1 ADMINISTRACION

EJE 1 1 6.25 0.8 0.6 3.00

EJE 2 1 2.875 0.8 0.6 1.38

EJE 3 1 6.25 0.8 0.6 3.00

EJE A Y C 2 1.15 0.8 0.6 1.10

2 2.1 0.7 0.6 1.76

2 2.775 0.7 0.6 2.33

EJE B 1 6.025 0.8 0.6 2.89

ZONA 2 LABORATORIOS

EJE 4, 7, 10 Y 11 4 6.25 0.8 0.6 12.00

EJE D Y F 2 18.25 0.65 0.6 14.24

EJE E 1 1.625 0.65 0.6 0.63

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 7.925 0.8 0.6 11.41

EJE G Y J 2 5.95 0.8 0.6 5.71

EJE H 1 5.95 0.55 0.6 1.96

ENTRE EJE 13 Y 14 1 1.8 0.55 0.6 0.59

1 3.125 0.5 0.6 0.94

ENTRE EJE 14 Y 15 1 2.075 0.5 0.6 0.62

ENTRE EJE H e I 5 0.9 0.5 0.6 1.35

ENTRE EJE I Y J 1 0.625 0.5 0.6 0.19

ACCESO PRINCIAPAL

EN GRADAS 1 3.625 0.4 0.3 0.44

1 0.48 0.4 0.3 0.06

EN RAMPA 1 9.4 0.4 0.3 1.13

1 0.48 0.4 0.3 0.06

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 0.6 1.44

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 0.6 4.43

04.03.07 SOLADO PARA ZAPATAS C:H 1:12 E=4” 46.71 M2

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 6 1.05 1.05 6.62

EN ZONA 2 LABORATORIOS

ZAPATA 2 16 1.4 0.9 20.16

ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 12.39

1 2.3 1.4 3.22

ZAPAT 7 3 1.2 1.2 4.32

04.07.13 CONCRETO DE SOBRE CIMIENTO 1:8 (C:H) + 25% PM 15.66 M3

ZONA 1 ADMINISTRACION

EJE 1 1 6.25 0.25 0.6 0.94

EJE 2 1 1.875 0.25 0.6 0.28

EJE 3 1 6.25 0.25 0.6 0.94

EJE A Y C 2 1.15 0.25 0.6 0.35

2 2.1 0.15 0.6 0.38

1 1.6 0.15 0.6 0.14

1 2.775 0.15 0.6 0.25

EJE B 1 5.025 0.25 0.6 0.75

ZONA 2 LABORATORIOS

Page 4: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

EJE 4, 7, Y 11 3 6.25 0.25 0.6 2.81

EJE 10 1 4.15 0.25 0.6 0.62

EJE D 1 14.335 0.15 0.6 1.29

EJE F 1 15.225 0.15 0.6 1.37

EJE E 1 1.625 0.15 0.6 0.15

ZONA 3 SS HH.

EJE 13, 14 Y 15 3 6.375 0.25 0.6 2.87

EJE G 1 3.055 0.25 0.6 0.46

EJE J 1 3.45 0.25 0.6 0.52

EJE H 1 6.25 0.15 0.6 0.56

ENTRE EJE 13 Y 14 1 1.8 0.15 0.6 0.16

3 0.35 0.15 0.6 0.09

ENTRE EJE 14 Y 15 2 0.35 0.15 0.6 0.06

ENTRE EJE H e I 5 1.35 0.15 0.6 0.61

ENTRE EJE I Y J 1 0.625 0.15 0.6 0.06

04.07.91 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTO 148.45 M2

ZONA 1 ADMINISTRACION

EJE 1 2 5.95 0.6 7.14

EJE 2 2 1.725 0.6 2.07

EJE 3 2 5.95 0.6 7.14

EJE A Y C 4 0.8 0.6 1.92

4 1.925 0.6 4.62

2 0.925 0.6 1.11

2 1.75 0.6 2.10

EJE B 2 5.025 0.6 6.03

ZONA 2 LABORATORIOS

EJE 4, 7, Y 11 6 6.25 0.6 22.50

EJE 10 2 4.15 0.6 4.98

EJE D 2 14.375 0.6 17.25

EJE F 2 15.225 0.6 18.27

EJE E 2 1.625 0.6 1.95

ZONA 3 SS HH.

EJE 13, 14 Y 15 6 6.375 0.6 22.95

EJE G 2 3.055 0.6 3.67

EJE J 2 3.45 0.6 4.14

EJE H 2 6.25 0.6 7.50

ENTRE EJE 13 Y 14 2 1.8 0.6 2.16

6 0.35 0.6 1.26

ENTRE EJE 14 Y 15 4 0.35 0.6 0.84

ENTRE EJE H e I 10 1.35 0.6 8.10

ENTRE EJE I Y J 2 0.625 0.6 0.75

04.08.56 CONCRETO 175 kg/cm2 GRADAS Y RAMPAS 5.51 M3

ZONA 1 ADMINISTRACIÓN Y ACCESO

GRADAS 3 1.00 1.00 0.1 0.30

3 2.50 0.25 0.25 0.47

RAMPA 1 7.00 1.05 0.1 0.74

GRADAS ENTRE ZONA 4 Y ZONA 6 9 2.4 0.25 0.25 1.35

RAMPA ENTRE ZONA 4 Y ZONA 6 2 7.25 1.4 0.1 2.03

1 0.75 3.2 0.1 0.24

1 0.2 1.5 0.1 0.03

2 1.767 0.1 0.35

04.08.58 ENCOFRADO Y DESENCOFRADO NORMAL GRADAS 5.53 M2

ZONA 1 ADMINISTRACION Y ACCESO

EN GRADAS DE ACCESO 3 1.05 0.127 0.40

3 2.5 0.127 0.95

GRADAS ENTRE ZONA 4 Y ZONA 6 10 2.4 0.174 4.18

04.08.91 CONCRETO 175 kg/cm2 LOSA DEPORTIVA 85.07 M3

1 18.1 30.1 0.15 81.72

Page 5: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

2 18.1 0.175 0.2 1.27

2 29.75 0.175 0.2 2.08

04.08.92 ENCOFRADO Y DESENCOFRADO NORMAL LOSA DEPORTIVA 80.75 M2

2 18.1 0.5 18.10

2 30.1 0.5 30.10

3 30.1 0.15 13.55

7 18.1 0.15 19.01

04.09.05 FALSO PISO DE 4” CON MEZCLA 1:8 C:H 218.15 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ALMACEN 1 3.125 1.65 5.16

1 0.8 0.25 0.20

ARCHIVO 1 3.225 1.625 5.24

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 11 5.5 60.50

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

04.09.58 CONCRETO 175 kg/cm2 EN SARDINEL 16.45 M3

ZONA 1 ADMINISTRACIÓN Y ACCESO

SARDINELES EN ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18

2 6.7 0.15 0.4 0.80

2 3.23 0.15 0.4 0.39

1 13.078 0.15 0.4 0.78

1 8.65 0.15 0.4 0.52

1 6.31 0.15 0.4 0.38

1 11.56 0.15 0.4 0.69

1 2.82 0.15 0.4 0.17

2 8.2 0.15 0.4 0.98

EN ADMINISTRACIÓN 2 10 0.15 0.4 1.20

Page 6: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

2 9.25 0.15 0.4 1.11

ZONA 2 LABORATORIOS 2 10 0.15 0.4 1.20

2 25.2 0.15 0.4 3.02

2 3.1 0.15 0.4 0.37

ZONA 3 SS.HH. 2 10.37 0.15 0.4 1.24

2 9.1 0.15 0.4 1.09

1 1.43 0.15 0.4 0.09

1 1.75 0.15 0.4 0.11

ENTRE ZONA 4 Y ZONA 6 1 1.45 0.15 0.4 0.09

1 1.38 0.15 0.4 0.08

1 2.55 0.15 0.4 0.15

1 2.23 0.15 0.4 0.13

1 1.64 0.15 0.4 0.10

1 1.98 0.15 0.4 0.12

2 12 0.15 0.4 1.44

04.09.91 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINEL 236.39 M2

ZONA 1 ADMINISTRACIÓN Y ACCESO

SARDINELES EN ACCESO PRINCIPAL 4 1.48 0.4 2.37

4 6.7 0.4 10.72

4 3.23 0.4 5.17

2 13.078 0.4 10.46

2 8.65 0.4 6.92

2 6.31 0.4 5.05

2 11.56 0.4 9.25

2 2.82 0.4 2.26

4 8.2 0.4 13.12

EN ADMINISTRACIÓN 4 10 0.4 16.00

4 9.25 0.4 14.80

ZONA 2 LABORATORIOS 4 10 0.4 16.00

4 25.2 0.4 40.32

4 3.1 0.4 4.96

ZONA 3 SS.HH. 4 10.37 0.4 16.59

4 9.1 0.4 14.56

2 1.43 0.4 1.14

2 1.75 0.4 1.40

ZONA 4 CISTERNA Y TANQUE ELEVADO 4 5.5 0.4 8.80

4 5.2 0.4 8.32

ENTRE ZONA 4 Y ZONA 6 2 1.45 0.4 1.16

2 1.38 0.4 1.10

2 2.55 0.4 2.04

2 2.23 0.4 1.78

2 1.64 0.4 1.31

2 1.98 0.4 1.58

4 12 0.4 19.20

04.10.58 CONCRETO 175 kg/cm2 EN CANAL PLUVIAL 8.36 M3

ZONA 1 ADMINISTRACION 2 10.6 0.1 0.55 1.17

2 9.625 0.1 0.55 1.06

EN ZONA 2 LABORATORIOS 2 26.1 0.1 0.55 2.87

2 10.6 0.1 0.55 1.17

ZONA 3 SS.HH. 1 19.87 0.1 0.55 1.09

1 18.35 0.1 0.55 1.01

04.10.91 ENCOFRADO Y DESENCOFRADO NORMAL EN CANAL PLUVIAL 60.83 M2

ZONA 1 ADMINISTRACION 2 10.6 0.4 8.48

2 9.625 0.4 7.70

EN ZONA 2 LABORATORIOS 2 26.1 0.4 20.88

2 10.6 0.4 8.48

ZONA 3 SS.HH. 1 19.87 0.4 7.95

1 18.35 0.4 7.34

05.00.00 OBRAS DE CONCRETO ARMADO

05.01.00 CIMIENTO CORRIDO REFORZADO

Page 7: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

05.01.59 CONCRETO F’C 175 KG/CM2 SOBRECIMIENTO REFORZADO 5.26 M3

EN ACCESO PRINCIPAL

EN GRADAS 1 3.5 0.15 0.3 0.16

1 2.5 0.15 0.127 0.05

1 1.35 0.15 0.127 0.03

1 0.6 0.15 0.58 0.05

EN RAMPA 1 9.276 0.15 0.39 0.54

EN GRADAS ENTRE ZONA 4 Y 6 1 4.523 0.2 0.5 0.45

EN RAMPA ENTRE ZONA 4 Y 6 1 14.77 0.2 0.885 2.61

1 7.25 0.2 0.94 1.36

05.01.92 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO REFORZADO 55.31 M2

EN ACCESO PRINCIPAL

EN GRADAS 2 3.5 0.3 2.10

2 2.5 0.127 0.64

2 1.35 0.127 0.34

2 0.6 0.58 0.70

EN RAMPA 2 9.276 0.39 7.24

EN GRADAS ENTRE ZONA 4 Y 6 2 4.523 0.5 4.52

EN RAMPA ENTRE ZONA 4 Y 6 2 14.77 0.885 26.14

2 7.25 0.94 13.63

05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO 577.59 KG

1 577.59 577.59

05.02.00 ZAPATAS

05.02.59 CONCRETO F’C 210 KG/CM2 PARA ZAPATAS 28.02 M3

EN ZONA 1 ADMINISTRACIÓN

ZAPATA 1 6 1.05 1.05 0.6 3.97

EN ZONA 2 LABORATORIOS

ZAPATA 2 16 1.4 0.9 0.6 12.10

ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 0.6 7.43

1 2.3 1.4 0.6 1.93

ZAPATA 7 3 1.2 1.2 0.6 2.59

05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS 1 791.04 791.04 791.04 KG

05.06.00 TABIQUE Y PLACA

05.06.59 CONCRETO F’C 210 KG/CM2 PARA PLACA 3.91 M3

EN MURO DE CONTENCIÓN 1 9.25 0.2 1.56 2.89

1 2.5 0.2 2.04 1.02

05.06.92 ENCOFRADO Y DESENCOFRADO EN PLACAS 39.06 M2

EN MURO DE CONTENCIÓN 2 9.25 1.56 28.86

2 2.5 2.04 10.20

05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS 420.94 KG

1 420.94 420.94

05.08.00 COLUMNAS

05.08.59 CONCRETO F’C 210 KG/CM2 PARA COLUMNAS 23.47 M3

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C-1 4 0.25 0.25 4.64 1.16

4 0.25 0.25 4.05 1.01

COLUMNA C-2 EN EJE 2 2 0.25 0.25 4.05 0.51

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 0.25 5.66 0.71

COLUMNA C-3 EN RESTO 5 0.25 0.25 4.05 1.27

COLUMNEA CA-1 9 0.15 0.15 1.55 0.31

COLUMNA C-10 3 0.1257 4.5 1.70

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 11 4 0.6 0.25 4.64 2.78

COLUMNA C-4 EN RESTO 4 0.6 0.25 4.05 2.43

COLUMNA C-5 8 0.5 0.25 4.05 4.05

COLUMNA C-3 EN EJE 4 Y 12 2 0.25 0.25 5.66 0.71

COLUMNA C-3 EN RESTO 4 0.25 0.25 4.05 1.01

Page 8: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

COLUMNETA CA-2 15 0.15 0.15 2.65 0.89

COLUMNETA CA-3 17 0.15 0.15 1.85 0.71

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 4 0.25 0.25 5.17 1.29

COLUMNA C-6 EN RESTO 7 0.25 0.25 4.05 1.77

COLUMNA C-7 4 0.25 0.25 4.64 1.16

05.08.92 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 320.26 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 0.75 4.64 13.92

4 0.5 4.64 9.28

COLUMNA C-2 2 0.75 4.05 6.07

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS 1 4,666.97 4666.97 4666.97 KG

05.08.96 JUNTAS DE TECNOPORTE E=1" 9.49 M2

ZONA 1 ADMINISTRACIÓN 7 0.15 1.55 1.63

ZONA 2 LABORATORIOS 10 0.15 2.65 3.97

14 0.15 1.85 3.89

05.09.00 VIGAS Y DINTELES

05.09.59 CONCRETO F’C 210 KG/CM2 PARA VIGAS 13.72 M3

ZONA 1 ADMINISTRACION

EJE 1 Y 3 4 3.128 0.25 0.3 0.94

4 3.254 0.25 0.3 0.98

EN EJE 2 1 2.875 0.25 0.3 0.22

EN EJE A 1 6.025 0.25 0.3 0.45

EN EJE B 1 6.02 0.25 0.3 0.45

EN EJE C 1 6.025 0.25 0.3 0.45

EN ACCESO PRINCIPAL - VIGA "S" 1 5.41 0.12 0.6 0.39

VIGUETAS SOLERAS

EN EJE A 1 2.5 0.15 0.15 0.06

EN EJE C 1 3.325 0.15 0.15 0.07

ZONA 2 LABORATORIOS

EN EJE 4 Y 11 4 3.13 0.25 0.3 0.94

4 3.254 0.25 0.3 0.98

EN EJE 7 2 3.13 0.25 0.3 0.47

EN EJE 10 1 5.76 0.25 0.3 0.43

Page 9: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

EN EJE D Y F 2 18.225 0.25 0.3 2.73

EN EJE E 1 1.625 0.25 0.3 0.12

VIGUETAS SOLERAS

EJE D 1 11.8 0.15 0.15 0.27

EJE F 1 13.7 0.15 0.15 0.31

ZONA 3 SS.HH

EJE 13 Y 15 2 6.375 0.25 0.3 0.96

2 6.91 0.25 0.3 1.04

EJE 14 1 6.375 0.25 0.3 0.48

EJE G 1 6 0.25 0.3 0.45

EJE H 1 6.25 0.25 0.3 0.47

VP 110 1 1.7 0.15 0.3 0.08

05.09.92 ENCOFRADO Y DESENCOFRADO EN VIGAS 125.77 M2

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 3.128 0.3 7.51

4 6.508 0.3 7.81

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

05.09.95 ACERO FY=4200 KG/CM2 EN VIGAS 1 1,982.42 1982.42 1982.42 KG

05.15.00 SUMIDERO PLUVIAL

05.15.58 CONCRETO 175 kg/cm2 EN SUMIDERO PLUVIAL 1.05 M3

ZONA 1 ADMINISTRACION 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

ZONA 2 LABORATORIOS 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

ZONA 3 SS.HH. 4 0.65 0.85 0.1 0.22

2 0.8 0.8 0.1 0.13

05.15.92 ENCOFRADO Y DESENCOFRADO NORMAL EN SUMIDERO PLUVIAL 7.20 M2

ZONA 1 ADMINISTRACION 4 0.6 0.85 2.04

1 0.6 0.6 0.36

Page 10: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRUCTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 2 LABORATORIOS 4 0.6 0.85 2.04

1 0.6 0.6 0.36

ZONA 3 SS.HH. 4 0.6 0.85 2.04

1 0.6 0.6 0.36

05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL 1 103.46 103.46 103.46 KG

07.00.00 ESTRUCTURA DE MADERA DE TECHO

07.01.01 TIJERALES TIPO 1 32.00 UND

32 32.00

07.01.02 COLOCACION Y ANCLAJE DE TEJERALES 32.00 UND

32 32.00

07.01.03 CORREAJE DE MADERA 2" x 3" 472.20 M

EN ZONA 1 12 7.875 94.50

EN ZONA 2 12 23.625 283.50

EN ZONA 3 12 7.85 94.20

07.01.05 FRISO DE MADERA DE 1" x 12" 78.70 M

EN ZONA 1 2 7.875 15.75

EN ZONA 2 2 23.625 47.25

EN ZONA 3 2 7.85 15.70

07.01.06 FRISO DE MAREDA DE 1" x 4" 78.10 M

EN ZONA 1 2 13.017 26.03

EN ZONA 2 2 13.017 26.03

EN ZONA 3 2 13.017 26.03

08.00.00 COBERTURAS

08.01.01 COBERTURA CON PLANCHA DE TEJA ANDINA 501.97 M2

EN ZONA 1 1 8.025 6.63 53.21

1 8.025 6.03 48.39

EN ZONA 2 1 23.625 6.63 156.63

1 23.625 6.03 142.46

EN ZONA 3 1 8.00 6.63 53.04

1 8.00 6.03 48.24

08.01.02 CUMBRERA ARTICULADA DE TEJA ANDINA 39.65 M

EN ZONA 1 1 8.025 8.03

EN ZONA 2 1 23.625 23.63

EN ZONA 3 1 8.00 8.00

08.02.00 PRUEBAS Y ENSAYOS

08.02.01 PRUEBA DE CALIDAD DE CONCRETO 40.00 UND

40 40.00

08.02.02 DISEÑO DE MEZCLAS 6.00 UND

6 6.00

Page 11: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO

EN ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 3.385 2 1 6.77

Ø 3/8" 1.40 1 1 1.40

Ø 3/8" 0.64 3 1 1.92

VERTICALES Ø 3/8" 0.58 5 1 2.90

Ø 3/8" 0.71 5 1 3.55

Ø 3/8" 0.84 12 1 10.08

EN RAMPA DE ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 9.88 2 1 19.76

VERTICALES Ø 3/8" 0.74 50 1 37.00

ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 4.52 6 2 54.24

VERTICALES Ø 3/8" 1.21 23 2 55.66

EN RAMPA ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 21.54 16 1 344.64

VERTICALES Ø 3/8" 2.12 108 2 457.92

TOTAL (ML) 0.00 0.00 0.00 0.00 995.84 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 577.59 0.00

577.59

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 12: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS

ZAPATA 1 LONGITUDINAL Ø 5/8" 0.90 5 6 27.00

TRANSVERSAL Ø 5/8" 0.90 5 6 27.00

ZAPATA 7 LONGITUDINAL Ø 5/8" 1.025 6 3 18.45

TRANSVERSAL Ø 5/8" 1.025 6 3 18.45

ZAPATA 2 LONGITUDINAL Ø 5/8" 1.25 16 4 80.00

TRANSVERSAL Ø 5/8" 0.75 16 6 72.00

ZAPATA 8 MURO DE CONTENCION LONGITUDINAL Ø 5/8" 10.1 14 1 141.40

TRANSVERSAL Ø 5/8" 1.25 52 1 65.00

LONGITUDINAL Ø 5/8" 2.15 14 1 30.10

TRANSVERSAL Ø 5/8" 1.25 12 1 15.00

TOTAL (ML) 0.00 0.00 494.40 0.00 0.00 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 791.04 0.00 0.00 0.00

791.04

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 13: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS

EN MURO DE CONTENCIÓN LONGITUDINAL Ø 3/8" 11.95 24 1 286.80

VERTICALES Ø 1/2" 2.60 48 2 249.60

TOTAL (ML) 0.00 0.00 0.00 249.60 286.80 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 254.59 166.34 0.00

420.94

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 14: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C-1 LONGITUDINAL Ø 5/8" 5.425 4 6 130.20

ESTRIBOS Ø 3/8" 1.13 30 4 135.60

COLUMNA C-2 LONGITUDINAL Ø 5/8" 5.075 4 2 40.60

ESTRIBOS Ø 3/8" 1.13 27 2 61.02

COLUMNA C-3 EJE 1 Y 3 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72

ESTRIBOS Ø 3/8" 1.13 38 2 85.88

COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 5 101.50

ESTRIBOS Ø 3/8" 1.13 27 5 152.55

COLUMNA C-10 LONGITUDINAL Ø 5/8" 5.525 8 3 132.60

ESTRIBOS Ø 3/8" 1.13 33 3 111.87

COLUMNETAS CA-1 LONGITUDINAL Ø 3/8" 2.125 4 9 76.50

ESTRIBOS Ø 1/4" 0.54 9 9 43.74

ZONA 2 LABORATORIOS

COLUMNA C-3 EN EJE 4 Y 11 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72

ESTRIBOS Ø 3/8" 1.13 38 2 85.88

COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 4 81.20

ESTRIBOS Ø 3/8" 1.13 27 4 122.04

COLUMNA C-4 EN EJE 4 Y 11 LONGITUDINAL Ø 5/8" 5.43 8 4 173.60

ESTRIBOS Ø 3/8" 1.6 30 4 192.00

COLUMNA C-4 RESTO LONGITUDINAL Ø 5/8" 5.08 8 4 162.40

ESTRIBOS Ø 3/8" 1.6 27 4 172.80

COLUMNA C-5 LONGITUDINAL Ø 5/8" 5.08 4 8 162.40

LONGITUDINAL Ø 1/2" 5.08 4 8 162.40

ESTRIBOS Ø 3/8" 1.49 27 8 321.84

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

CANT DE ELEMENTOS

Nº DE VECES

Page 15: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

COLUMNETAS CA -2 LONGITUDINAL Ø 3/8" 2.20 4 15 132.00

ESTRIBOS Ø 1/4" 0.54 13 15 105.30

COLUMNETA CA-3 LONGITUDINAL Ø 3/8" 3.13 4 18 225.00

ESTRIBOS Ø 1/4" 0.54 17 18 165.24

ZONA 3 SS HH.

COLUMNA C-6 EJE 13 Y 15 LONGITUDINAL Ø 5/8" 5.68 4 4 90.80

ESTRIBOS Ø 3/8" 1.13 34 4 153.68

COLUMNA C-6 RESTO LONGITUDINAL Ø 5/8" 5.08 4 7 142.10

ESTRIBOS Ø 3/8" 1.13 27 7 213.57

COLUMNA C-7 LONGITUDINAL Ø 5/8" 5.43 4 4 86.80

ESTRIBOS Ø 3/8" 1.13 30 8 271.20

COLUMNA C-8 LONGITUDINAL Ø 5/8" 8.93 4 2 71.40

ESTRIBOS Ø 3/8" 1.13 55 2 124.30

COLUMNA C-9 LONGITUDINAL Ø 5/8" 8.93 4 4 142.80

ESTRIBOS Ø 3/8" 1.13 55 8 497.20

COLUMNETA CA-4 LONGITUDINAL Ø 3/8" 2.05 4 2 16.40

ESTRIBOS Ø 1/4" 0.54 12 2 12.96

TOTAL (ML) 0.00 0.00 1,619.84 162.40 3,151.33 327.24

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 2,591.74 165.65 1,827.77 81.81

4,666.97

Page 16: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.09.95 EJE D

ACERO FY=4200 KG/CM2 EN VIGAS

ZONA 1 ADMINISTRACION

VP - 101- 103 LONGITUDINAL Ø 1/2" 7.24 2 2 28.96

LONGITUDINAL Ø 1/2" 7.14 2 2 28.56

ESTRIBOS Ø 3/8" 0.95 52 2 98.80

LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48

LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04

LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

VP - 102 LONGITUDINAL Ø 1/2" 3.87 2 1 7.74

LONGITUDINAL Ø 1/2" 3.77 2 1 7.54

ESTRIBOS Ø 3/8" 0.95 28 2 53.20

VS - 101 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 50 1 47.50

VS -102 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 56 1 53.20

VS - 103 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08

ESTRIBOS Ø 3/8" 0.95 48 1 45.60

V"S" PUERTA PRINCIPAL LONGITUDINAL Ø 1/2" 6.82 4 1 27.28

LONGITUDINAL Ø 3/8" 6.71 4 1 26.84

ESTRIBOS Ø 3/8" 1.40 48 1 67.20

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.18 4 1 8.72

ESTRIBOS Ø 1/4" 0.55 20 1 11.00

LONGITUDINAL Ø 3/8" 1.52 4 1 6.08

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 17: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRIBOS Ø 1/4" 0.55 14 1 7.70

LONGITUDINAL Ø 3/8" 2.18 4 1 8.72

ESTRIBOS Ø 1/4" 0.55 17 1 9.35

LONGITUDINAL Ø 3/8" 2.50 4 1 10.00

ESTRIBOS Ø 1/4" 0.55 20 1 11.00

ZONA 2 LABORATORIOS

VP - 104 - 107 LONGITUDINAL Ø 1/2" 7.24 4 2 57.92

LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48

LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

ESTRIBOS Ø 3/8" 0.95 53 2 100.70

VP - 105 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VP - 106 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 60 1 57.00

VS-104 Y 105 LONGITUDINAL Ø 1/2" 23.74 4 2 189.92

ESTRIBOS Ø 3/8" 0.95 168 2 319.20

VS -106 LONGITUDINAL Ø 1/2" 2.37 4 1 9.48

ESTRIBOS Ø 3/8" 0.95 17 1 16.15

VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.13 4 2 17.04

ESTRIBOS Ø 1/4" 0.55 17 2 18.70

LONGITUDINAL Ø 3/8" 2.20 4 2 17.60

ESTRIBOS Ø 1/4" 0.55 17 2 18.70

LONGITUDINAL Ø 3/8" 1.13 4 1 4.52

ESTRIBOS Ø 1/4" 0.55 8 1 4.40

LONGITUDINAL Ø 3/8" 2.30 4 1 9.20

ESTRIBOS Ø 1/4" 0.55 18 1 9.90

LONGITUDINAL Ø 3/8" 2.13 4 1 8.52

ESTRIBOS Ø 1/4" 0.55 17 1 9.35

LONGITUDINAL Ø 3/8" 3.30 4 1 13.20

ESTRIBOS Ø 1/4" 0.55 28 1 15.40

LONGITUDINAL Ø 3/8" 3.20 4 4 51.20

ESTRIBOS Ø 1/4" 0.55 27 4 59.40

LONGITUDINAL Ø 3/8" 1.10 4 1 4.40

ESTRIBOS Ø 1/4" 0.55 8 1 4.40

LONGITUDINAL Ø 3/8" 1.33 4 1 5.32

ESTRIBOS Ø 1/4" 0.55 10 1 5.50

LONGITUDINAL Ø 3/8" 1.53 4 1 6.12

CANT DE ELEMENTOS

Nº DE VECES

Page 18: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ESTRIBOS Ø 1/4" 0.55 12 1 6.60

ZONA 3 SS.HH.

VP-108 Y 110 LONGITUDINAL Ø 1/2" 7.62 4 2 60.96

LONGITUDINAL INC Ø 1/2" 8.04 2 2 32.16

LONGITUDINAL INC Ø 1/2" 4.76 2 2 19.04

LONGITUDINAL INC Ø 1/2" 4.32 2 2 17.28

ESTRIBOS Ø 3/8" 0.95 59 2 112.10

ESTRIBOS Ø 3/8" 0.95 66 2 125.40

VP -109 LONGITUDINAL Ø 1/2" 7.62 4 1 30.48

ESTRIBOS Ø 3/8" 0.95 62 1 58.90

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

VS - 107 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VS - 108 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 56 1 53.20

VS -109 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96

ESTRIBOS Ø 3/8" 0.95 54 1 51.30

VS - 110 LONGITUDINAL Ø 1/2" 2.44 4 1 9.76

ESTRIBOS Ø 3/8" 0.70 17 1 11.90

TOTAL (ML) 0.00 0.00 0.00 888.56 1,772.83 191.40

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 906.33 1,028.24 47.85

1,982.42

CANT DE ELEMENTOS

Nº DE VECES

Page 19: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL

MUROS HORIZONTAL Ø 3/8" 1.5 5 12 90.00

VERTICAL Ø 3/8" 0.85 16 3 40.80

ACERO DE LOSA DE FONDO HORIZONTAL Ø 3/8" 1.05 5 3 15.75

TRANSVERSAL Ø 3/8" 1.05 5 3 15.75

EN TAPA HORIZONTAL Ø 3/8" 0.67 4 3 8.04

TRANSVERSAL Ø 3/8" 0.67 4 3 8.04

Ø 3/8"

TOTAL (ML) 0.00 0.00 0.00 0.00 178.38 0.00

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 103.46 0.00

103.46

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 20: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOS (ACERO F'Y=4200 Kg/cm2 )

ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"

#NAME? #NAME?

LOSA SUPERIOR LONGITUDINAL Ø 3/8" 3.54 6 4 84.96

TRANSVERSAL Ø 3/8" 0.94 16 4 60.16

TRANSVERSAL Ø 3/8" 0.25 4 4 4.00

EN MUROS VERTICAL Ø 3/8" 1.55 5 32 248.00

HORIZONTAL Ø 3/8" 0.84 6 32 161.28

VERTICAL Ø 3/8" 1.55 3 8 37.20

HORIZONTAL Ø 3/8" 0.7 5 8 28.00

EN CUBA LONGITUDINAL Ø 3/8" 0.89 5 4 17.80

TRANSVERSAL Ø 3/8" 1 4 4 16.00

MESA DE CONCRETO LONGITUDINAL Ø 3/8" 3.44 4 5 68.80

TRANSVERSAL Ø 3/8" 0.54 18 5 48.60

COLUMNETA VERTICAL Ø 3/8" 1.35 4 15 81.00

ESTRIBOS Ø 1/4" 0.55 9 15 74.25

TOTAL (ML) 0.00 0.00 0.00 0.00 855.80 74.25

TOTAL (KG)

4.04 2.26 1.60 1.02 0.58 0.25

0.00 0.00 0.00 0.00 496.36 18.56

514.93

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

CANT DE ELEMENTOS

Nº DE VECES

Page 21: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

09.00.00 ALBAÑILERIA

09.01.00 MUROS DEL LADRILLO DE ARCILLA K.K.

09.01.01 MURO DE LADRILLO K.K. DE SOGA MEXCLA C:A 1.5 79.81 M2

ZONA 1 ADMINISTRACION

EJE A 1 2.5 0.8 2.00

EJE C 1 3.475 0.8 2.78

ZONA 2 LABORATORIOS

EJE D 1 10.8 1.9 20.52

EJE F 1 13.7 1.1 15.07

EJE E 1 0.625 2.65 1.66

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 1 1.8 2.65 4.77

EJE H 1 6.25 2.65 16.56

DIVISORES DE BAÑOS 5 1.5 1.75 13.13

5 0.2 1.75 1.75

1 0.9 1.75 1.58

09.01.02 MURO DE LADRILLO K.K. DE CABEZA MEXCLA C:A 1.5 207.92 M2

ZONA 1 ADMINISTRACION

EJE 1 Y 3 4 2.975 2.65 31.54

4 2.98 0.83 9.89

EJE 2 1 1.725 2.65 4.57

EJE A Y C 2 0.8 2.65 4.24

EJE B 1 5.025 2.65 13.32

ZONA 2 LABORATORIOS

EJE 4 Y 12 4 3.125 2.65 33.13

4 3.125 0.806 10.08

EJE 7 2 3.125 2.65 16.56

EJE 11 2 2.075 2.65 11.00

ZONA 3 SS.HH.

EJE 13 Y 15 2 0.9 2.65 4.77

4 0.25 2.65 2.65

2 0.637 2.65 3.38

2 0.662 2.65 3.51

2 0.225 2.65 1.19

2 1.55 2.65 8.22

8 0.4 2.25 7.20

4 1.55 0.512 3.17

2 2.98 1.052 6.27

EJE 14 1 6.375 2.65 16.89

EJE G 1 2.501 2.65 6.63

1 0.4 2.25 0.90

EJE J 1 2.652 2.65 7.03

2 0.4 2.25 1.80

10.00.00 REVOQUES ENLUCIDOS Y MOLDEDURAS

10.03.00 TARRAJEO DE MUROS

10.03.02 TARRAJEO MUROS EXTERIORES E INTERIORES FROTACHODO MEXCL. C:A 1.5 E=2cm 590.74 M2

DE CABEZA

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.975 2.7 64.26

8 2.98 0.83 19.79

EJE 2 2 1.725 2.7 9.32

EJE A Y C 4 0.8 2.7 8.64

EJE B 2 5.025 2.7 27.14

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.125 2.7 67.50

8 3.125 0.806 20.15

EJE 7 4 3.125 2.7 33.75

EJE 11 4 2.075 2.7 22.41

ZONA 3 SS.HH.

EJE 13 Y 15 4 0.9 2.7 9.72

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

Page 22: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

8 0.25 2.7 5.40

4 0.637 2.7 6.88

4 0.662 2.7 7.15

4 0.225 2.7 2.43

4 1.55 2.7 16.74

16 0.4 2.3 14.72

8 1.55 0.512 6.35

4 2.98 1.052 12.54

EJE 14 2 6.375 2.7 34.43

EJE G 2 2.501 2.7 13.51

2 0.4 2.3 1.84

EJE J 2 2.652 2.7 14.32

4 0.4 2.3 3.68

DE SOGA

ZONA 1 ADMINISTRACION

EJE A 2 2.5 0.85 4.25

EJE C 2 3.475 0.85 5.91

ZONA 2 LABORATORIOS

EJE D 2 10.8 1.95 42.12

EJE F 2 13.7 1.1 30.14

EJE E 2 0.625 2.7 3.38

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 2 1.8 2.7 9.72

EJE H 2 6.25 2.7 33.75

DIVISORES DE BAÑOS 10 1.5 1.8 27.00

10 0.2 1.8 3.60

2 0.9 1.8 3.24

EN SOBRECIENTO REFORZADO

EN GRADAS DE ACCESO 1 3.5 0.127 0.44

1 2.5 0.127 0.32

1 1.5 0.127 0.19

1 0.75 0.38 0.29

EN RAMPA 1 9.276 0.38 3.52

1 0.6 0.38 0.23

10.03.07 PIZARRA ACRILICA 5.00 UND

5 5.00

10.05.00 TARRAJEO DE COLUMNAS

10.05.02 TARRAJEO EN COLUMNA MEZCL. C:A 1.5 E= 2cm 339.67 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 1 4.64 18.56

4 0.75 4.64 13.92

COLUMNA C-2 2 2 4.05 16.20

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

Page 23: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

10.06.00 TARRAJEO EN VIGAS

10.06.02 TARRAJEO DE VIGAS C:A 1:5 E=2cm 124.73 M2

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 2.85 0.3 6.84

4 6.2 0.3 7.44

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

10.11.00 VESTIDURA DE DERRAMES

10.11.02 VESTIDURA DERRAMES ANCHO 0.10 MEZCL. C:A 1:5 E=2cm 8.97 M2

ZONA 1 ADMINISTRACION Y ACCESO

EJEA 1 3.175 0.15 0.48

EJE C 1 4.175 0.15 0.63

ZONA 2 LABORATORIOS

EJE D 1 13.5 0.15 2.03

EJE F 1 16.95 0.15 2.54

ZONA 3 SS. HH.

EJE G 3 0.4 0.25 0.30

EJE J 6 0.4 0.25 0.60

EJE 13 Y 15 24 0.4 0.25 2.40

10.18.00 BRUÑAS

10.18.01 BRUÑAS DE 1"cm 358.43 M

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.4 19.20

4 2.975 11.90

4 2.4 9.60

Page 24: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

4 2.975 11.90

EJE 2 2 2.6 5.20

2 1.725 3.45

EJE A 2 2.4 4.80

8 0.45 3.60

2 1.575 3.15

2 0.925 1.85

EJE C 2 2.4 4.80

2 0.8 1.60

4 0.45 1.80

2 1.575 3.15

2 1.9 3.80

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 2.4 19.20

2 2.6 5.20

8 3.125 25.00

EJE 7 4 2.6 10.40

4 3.125 12.50

EJE 11 8 2.6 20.80

4 2.075 8.30

EJE D 16 1.65 26.40

1 10.8 10.80

EJE F 22 0.85 18.70

1 13.845 13.84

ZONA 3 SS.HH.

EJE 13 Y 15 16 2.4 38.40

2 4.474 8.95

2 6.075 12.15

4 0.28 1.12

8 0.737 5.90

2 5.71 11.42

EJE G 2 2.4 4.80

1 2.501 2.50

EJE J 4 2.4 9.60

1 2.652 2.65

11.00.00 CIELORASOS

11.03.01 CIELORASO DE MEZCLA C:A 1:5 DE CEMENTO 9.00 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00

11.04.00 CIELOSRASOS DE GYPLAC

11.04.01 CIELORASO DE GYPLAC ST 224.47 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

DIRECCION 1 3.5 3.125 10.94

SALA DE PROFESORES 1 6.525 3.125 20.39

ALEROS 1 1.5 7.875 11.81

1 1 7.875 7.88

2 7 0.5 7.00

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.625 5.08

CONTROL DE ARCHIVOS 1 3.125 1.625 5.08

LABORATORIO DE COMPUTO 1 6.5 8 52.00

ALEROS 1 1.5 24.5 36.75

1 1 24.5 24.50

2 7 0.5 7.00

ZONA 3 SS.HH.

ALEROS 1 1.5 8 12.00

1 1 8 8.00

2 7.375 0.5 7.38

11.04.02 CIELORASO DE GYPLAC RH 41.15 M2

ZONA 3 SS.HH. 1 3.125 1.7 5.31

2 1.487 1.7 5.06

Page 25: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

2 4.925 3.125 30.78

11.04.03 CIELORASO DE GYPLAC RF 18.69 M2

LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69

11.04.04 ENTRAMADO DE CIELORASO MADERA 2" x 2" x 10 1286.00 M

ZONA 1 ADMINISTRACIÓN 15 8 120.00

13 9.5 123.50

ZONA 2 LABORATORIO 41 9.5 389.50

16 24.5 392.00

ZONA 3 SS.HH. 14 9.5 133.00

16 8 128.00

12.00.00 PISOS Y PAVIMENTOS

12.01.01 CONTRAPISO E=40 MM BASE 3 CM MEZC. 1:5 ACAB. 1 CM PASTA 1:2 218.15 M2

ZONA 1 ADMINISTRACIÓN

SECRETARIA 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ALMACEN 1 3.125 1.65 5.16

1 0.8 0.25 0.20

ARCHIVO 1 3.225 1.625 5.24

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 11.00 5.5 60.50

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

12.05.04 PISO DE CERAMICA DE 30 x 30 CM ANTIDESLIZANTE 180.60 M2

ZONA 1 ADMINISTRACION

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

1 1 0.15 0.15

1 2.25 0.1 0.23

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.65 5.16

Page 26: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

1 0.8 0.25 0.20

LABORATORIO DE FISICA Y QUIMICA 1 11 5.5 60.50

2 1.625 0.5 1.63

6 3.5 0.5 10.50

2 1.2 0.15 0.36

1 3.025 0.1 0.30

LABORATORIO DE COMPUTO 1 8 5.5 44.00

6 2.5 0.5 7.50

1 2.05 0.1 0.21

1 1.2 0.15 0.18

ZONA 3 SS.HH.

SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66

1 0.9 0.25 0.23

SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63

1 1 0.25 0.25

SS.HH ALUMNOS 1 4.925 1.625 8.00

5 1.35 0.9 6.08

5 0.7 0.15 0.53

1 1.663 1.5 2.49

1 0.6 0.15 0.09

1 1.5 1.012 1.52

1 4.925 1.625 8.00

1 1.775 1.5 2.66

12.12.02 PISO DE PARQUET 37.55 M2

ZONA 1 ADMINISTRACIÓN

DIRECCION 1 3.5 3.125 10.94

1 1.925 0.1 0.19

1 1 0.25 0.25

SALA DE PROFESORES 1 6.51 2.975 19.37

1 2.775 0.15 0.42

1 2.25 0.1 0.23

1 3.5 0.15 0.53

1 1.925 0.1 0.19

ZONA 2 LABORATORIOS

ARCHIVO 1 3.225 1.625 5.24

1 0.8 0.25 0.20

12.51.01 CONCRETO F’C 175 KG/CM2 EN VEREDAS 33.15 M3

ZONA 1 ADMINISTRACIÓN 1 9.7 8.725 0.1 8.46

-1 7.025 7 0.1 -4.92

ZONA 2 LABORATORIOS 1 25.2 9.35 0.1 23.56

-1 23.5 7 0.1 -16.45

ZONA 3 SS.HH. 1 10.075 9.1 0.1 9.17

-1 7.375 7 0.1 -5.16

VEREDA DE ACCESO PRINCIPAL 1 13.98 0.1 1.40

1 5 1.41 0.1 0.71

1 17.425 5 0.1 8.71

1 6.695 2.1 0.1 1.41

1 3.7 3.23 0.1 1.20

1 2.25 6.31 0.1 1.42

1 2.1 6.96 0.1 1.46

ENTRE ZONA 4 Y ZONA 6 1 1.8 1.7 0.1 0.31

1 1.8 0.9 0.1 0.16

1 4.4 3.9 0.1 1.72

12.51.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS 12.89 M2

ZONA 1 ADMINISTRACION

EN ACCCESO PRINCIPAL 1 2.5 0.127 0.32

2 1.05 0.1 0.21

1 5 0.1 0.50

2 2.1 0.1 0.42

Page 27: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

2 3.7 0.1 0.74

1 13.64 0.1 1.36

8 2.5 0.1 2.00

2 2.1 0.1 0.42

2 2.4 0.1 0.48

EN VEREDAS DE ADMINISTRACION 10 0.85 0.1 0.85

2 1.85 0.1 0.37

ZONA 2 LABORATORIOS 16 0.85 0.1 1.36

8 1.85 0.1 1.48

ZONA 3 SS.HH. 4 1.05 0.1 0.42

8 1.35 0.1 1.08

ENTRE ZONA 4 Y ZONA 6 1 4.33 0.1 0.43

5 0.9 0.1 0.45

12.51.03 JUNTA ASFALTICA RC 250 128.27 M

ZONA 1 ADMINISTRACION

EN ACCCESO PRINCIPAL 1 2.5 2.50

2 1.05 2.10

1 5 5.00

2 2.1 4.20

2 3.7 7.40

1 13.64 13.64

8 2.5 20.00

2 2.1 4.20

2 2.4 4.80

EN VEREDAS DE ADMINISTRACION 10 0.85 8.50

2 1.85 3.70

ZONA 2 LABORATORIOS 16 0.85 13.60

8 1.85 14.80

ZONA 3 SS.HH. 4 1.05 4.20

8 1.35 10.80

ENTRE ZONA 4 Y ZONA 6 1 4.33 4.33

5 0.9 4.50

13.00.00 CONTRAZOCALO

13.03.00 CONTRAZOCALO DE CEMENTO

13.03.13 CONTRAZOCALO DE CEMENTO H=30cm 104.52 M

ZONA 1 ADMINISTRACION ACCESO PRINCIPAL

EJE 1 Y 3 2 7.00 14.00

EJE A 1 6.025 6.03

EJE C 1 7.025 7.03

ZONA 2 LABORATORIOS

EJE 4 Y 12 2 7.00 14.00

EJE D 1 17.89 17.89

EJE F 1 21.625 21.63

ZONA 3 SS.HH.

EJE 13 Y 15 2 7.375 14.75

EJE G 1 4.2 4.20

EJE J 1 5.00 5.00

13.04.01 CONTRAZOCALO DE CERAMICO DE 10 x 30cm 78.75 M

ZONA ADMINISTRACION

SECRETARIA Y RECEPCION 1 9.426 9.43

ZONA 2 LABORATORIOS

LABORATORIO FISICA Y QUIMICA 1 36.325 36.33

LABORATORIO DE COMPUTO 2 6.5 13.00

2 8 16.00

2 2 4.00

14.00.00 ZOCALO

14.01.04 ZOCALO DE MAYOLICA DE 20 x 32 89.34 M2

ZONA 3 SS.HH

EN DOCENTES DAMAS 1 5.93 1.3 7.71

EN DOCENTES VARONES 1 5.93 1.3 7.71

Page 28: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

DISCAPACITADOS 1 9.1 1.3 11.83

EN ALUMNOS DAMAS 3 3.55 1.3 13.84

1 14.72 1.3 19.14

EN ALUMNOS VARONES 2 3.55 1.3 9.23

1 1.95 1.3 2.54

1 1.65 0.9 1.48

1 10.997 1.3 14.30

1 3.9 0.4 1.56

18.00.00 CARPINTERIA DE MADERA

18.01.00 PUERTAS DE MADERA

18.01.07 PUERTA DE MADERA TIPO P1-1 1 1.00 1.00 UND

18.01.08 PUERTA DE MADERA TIPO P1-2 2 2.00 2.00 UND

18.01.09 PUERTA DE MADERA TIPO P2-1 3 3.00 3.00 UND

18.01.10 PUERTA DE MADERA TIPO P2-2 3 3.00 3.00 UND

18.01.11 PUERTA DE MADERA TIPO P3-1 2 2.00 2.00 UND

18.01.12 PUERTA DE MADERA TIPO P3-2 2 2.00 2.00 UND

19.00.00 CARPINTERIA METALICA Y HERRERIA

19,01.00 PUERTA METALICA

19.01.01 PUERTA METALICA TIPO P3-3 5 5.00 5.00 UND

19.01.02 PUERTA METALICA TIPO P4-1 1 1.00 1.00 UND

19.01.03 PUERTA METALICA TIPO PM-1 1 1.00 1.00 UND

19.01.04 PUERTA METALICA TIPO PM-2 1 1.00 1.00 UND

19.01.07 ARCOS Y TABLERO DE BLASQUET 2 2.00 2.00 UND

19.01.08 PARANTES Y NET DE VOLEY 1 1.00 1.00 GLB

19.02.00 VENTANAS METALICAS

19.02.01 VENTANAS DE METAL TIPO V-1 1 1.00 1.00 UND

19.02.02 VENTANAS DE METAL TIPO V-2 1 1.00 1.00 UND

19.02.03 VENTANAS DE METAL TIPO V-3 1 1.00 1.00 UND

19.02.04 VENTANAS DE METAL TIPO V-4 1 1.00 1.00 UND

19.02.05 VENTANAS DE METAL TIPO V-5 1 1.00 1.00 UND

19.02.06 VENTANAS DE METAL TIPO V-6 2 2.00 2.00 UND

19.02.07 VENTANAS DE METAL TIPO V-7 1 1.00 1.00 UND

19.02.08 VENTANAS DE METAL TIPO V-8 1 1.00 1.00 UND

19.02.09 VENTANAS DE METAL TIPO V-9 1 1.00 1.00 UND

19.02.10 VENTANAS DE METAL TIPO V-10 1 1.00 1.00 UND

19.02.11 VENTANAS DE METAL TIPO V-11 1 1.00 1.00 UND

19.02.13 VENTANAS DE METAL TIPO V-13 2 2.00 2.00 UND

19.02.14 VENTANAS DE METAL TIPO V-14 1 1.00 1.00 UND

Page 29: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

19.02.15 VENTANAS DE METAL TIPO V-15 1 1.00 1.00 UND

19.02.16 VENTANAS DE METAL TIPO V-16 1 1.00 1.00 UND

19.02.17 VENTANAS DE METAL TIPO V-17 1 1.00 1.00 UND

19.02.18 VENTANAS DE METAL TIPO V-18 11 11.00 11.00 UND

19.15.03 PASAMANOS AISLADOS DE TUB. 2" 74.58 M

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90

3 0.9 2.70

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48

21 0.9 18.90

1 15.1 15.10

15 0.9 13.50

19.15.04 REJAS PARA CANAL PLUVIAL 6.47 M2

ZONA 1 ADMINISTRACION 2 2.125 0.3 1.28

ZONA 2 LABORATORIOS 1 2.44 0.3 0.73

2 1.8 0.3 1.08

ENTRE ZONA 3 Y ZONA 5 1 9.55 0.3 2.87

1 1.72 0.3 0.52

21.01.00 VIDRIOS, CRISTALES Y SIMILARES

21.01.03 VIDRIO INCOLORO TRANSPARENTE TRIPLE 450.07 P2

ZONA 1 ADMINISTRACION FACTOR

V - 1 1 1.72 1.7 10.76 31.46

V - 2 1 2.25 1.7 10.76 41.16

V-3 1 1.92 1.7 10.76 35.12

V-4 1 1.25 1.7 10.76 22.87

ZONA 2 LABORATORIOS

V-5 1 1.08 0.6 10.76 6.97

V-6 2 2.95 0.6 10.76 38.09

V-7 1 1.85 0.6 10.76 11.94

V-8 1 0.85 0.6 10.76 5.49

V-9 1 1.95 0.6 10.76 12.59

V-10 1 1.88 0.6 10.76 12.14

V-11 1 1.28 1.4 10.76 19.28

V-13 2 2.95 1.4 10.76 88.88

V-14 1 3.05 1.4 10.76 45.95

V-15 1 2.05 1.4 10.76 30.88

V-17 1 1.88 1.4 10.76 28.32

ZONA 3 SS-HH

V-18 11 0.4 0.4 10.76 18.94

22.00.00 PINTURA

22.01.04 PINTURA LATEX EN CIELORASO 293.31 M2

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00

CIELORASO GYPLAC ST

ZONA 1 ADMINISTRACIÓN

SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67

DIRECCION 1 3.5 3.125 10.94

SALA DE PROFESORES 1 6.525 3.125 20.39

ALEROS 1 1.5 7.875 11.81

1 1 7.875 7.88

2 7 0.5 7.00

ZONA 2 LABORATORIO

ALMACEN 1 3.125 1.625 5.08

CONTROL DE ARCHIVOS 1 3.125 1.625 5.08

LABORATORIO DE COMPUTO 1 6.5 8 52.00

ALEROS 1 1.5 24.5 36.75

1 1 24.5 24.50

2 7 0.5 7.00

ZONA 3 SS.HH.

Page 30: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

ALEROS 1 1.5 8 12.00

1 1 8 8.00

2 7.375 0.5 7.38

CIELORASO GYPLAC RH

ZONA 3 SS.HH. 1 3.125 1.7 5.31

2 1.487 1.7 5.06

2 4.925 3.125 30.78

CIELORASO GYPLAC RF

LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69

22.01.06 PINTURA EN MUROS EXTERIORES E INTERIORES 594.72 M2

DE CABEZA

ZONA 1 ADMINISTRACION

EJE 1 Y 3 8 2.975 2.7 64.26

8 2.98 0.83 19.79

EJE 2 2 1.725 2.7 9.32

EJE A Y C 4 0.8 2.7 8.64

EJE B 2 5.025 2.7 27.14

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.125 2.7 67.50

8 3.125 0.806 20.15

EJE 7 4 3.125 2.7 33.75

EJE 11 4 2.075 2.7 22.41

ZONA 3 SS.HH.

EJE 13 Y 15 4 0.9 2.7 9.72

8 0.25 2.7 5.40

4 0.637 2.7 6.88

4 0.662 2.7 7.15

4 0.225 2.7 2.43

4 1.55 2.7 16.74

16 0.4 2.3 14.72

8 1.55 0.512 6.35

4 2.98 1.052 12.54

EJE 14 2 6.375 2.7 34.43

EJE G 2 2.501 2.7 13.51

2 0.4 2.3 1.84

EJE J 2 2.652 2.7 14.32

4 0.4 2.3 3.68

DE SOGA

ZONA 1 ADMINISTRACION

EJE A 2 2.5 0.85 4.25

EJE C 2 3.475 0.85 5.91

ZONA 2 LABORATORIOS

EJE D 2 10.8 1.95 42.12

EJE F 2 13.7 1.1 30.14

EJE E 2 0.625 2.7 3.38

ZONA 3 SS.HH.

ENTRE EJE 13 Y 14 2 1.8 2.7 9.72

EJE H 2 6.25 2.7 33.75

DIVISORES DE BAÑOS 10 1.5 1.8 27.00

10 0.2 1.8 3.60

2 0.9 1.8 3.24

DERRAMES

ZONA 1 ADMINISTRACION Y ACCESO

EJEA 1 3.175 0.15 0.48

EJE C 1 4.175 0.15 0.63

ZONA 2 LABORATORIOS

EJE D 1 13.5 0.15 2.03

EJE F 1 16.95 0.15 2.54

ZONA 3 SS. HH.

EJE G 3 0.4 0.25 0.30

EJE J 6 0.4 0.25 0.60

EJE 13 Y 15 24 0.4 0.25 2.40

Page 31: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

22.01.07 PINTURA EN VIGAS Y COLUMNAS 523.35 M2

ZONA 1 ADMINISTRACION Y ACCESO

COLUMNA C.1 4 1 4.64 18.56

4 0.75 4.64 13.92

COLUMNA C-2 2 2 4.05 16.20

COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83

COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19

COLUMNA C-10 3 1.257 4.5 16.96

COLUMNETA CA-1 9 0.3 1.55 4.19

ZONA 2 LABORATORIOS

COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91

COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77

2 1.45 4.05 11.75

COLUMNA C-5 10 2.55 4.05 103.27

COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83

1 0.35 5.66 1.98

COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07

1 0.35 4.05 1.42

1 0.5 4.05 2.03

COLUMNETA CA-2 16 0.45 2.65 19.08

COLUMNETA CA-3 19 0.45 1.85 15.82

ZONA 3 SS.HH.

COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62

1 0.5 5.17 2.59

1 0.35 5.17 1.81

COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11

1 0.25 4.05 1.01

2 0.5 4.05 4.05

1 0.2 4.05 0.81

COLUMNA C-7 3 1.35 4.64 18.79

1 1.1 4.64 5.10

EN ZONA 4 CISTERNA Y TANQUE ELEVADO

COLUMNA C-8 2 0.8 7.9 12.64

COLUMNA C-9 2 1.3 7.9 20.54

2 1.45 7.9 22.91

COLUMNETA CA-4 1 0.45 1.55 0.70

COLUMNETAS EN PARAPETO

LOSA 2 16 0.15 0.9 2.16

VIGAS

ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL

EJE 1 Y 3 8 2.85 0.3 6.84

4 6.2 0.3 7.44

EJE 2 2 1.73 0.3 1.04

1 1 0.85 0.85

EJE A Y C 4 0.8 0.3 0.96

2 1.92 0.85 3.26

2 2.25 0.85 3.82

EJE B 2 3.5 0.3 2.10

2 1.52 0.3 0.91

1 1 0.85 0.85

VIGUETAS SOLERAS

EN EJE A 2 2.5 0.15 0.75

EN EJE C 2 3.325 0.15 1.00

ZONA 2 LABORATORIOS

EJE 4 Y 12 8 3.13 0.3 7.51

4 6.5 0.3 7.80

EJE 7 4 3.125 0.3 3.75

EJE 11 4 2.08 0.3 2.50

2 0.8 0.85 1.36

EJE D 2 17.98 0.85 30.57

EJE E 2 1.625 0.3 0.98

VIGUETAS SOLERAS

EJE D 2 11.8 0.15 3.54

EJE F 2 13.7 0.15 4.11

Page 32: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

ZONA 3 SS.HH.

EJE 13 Y 15 4 6.08 0.3 7.30

4 6.71 0.3 8.05

EJE 14 2 6.375 0.3 3.82

EJE G 2 3.51 0.3 2.11

1 3.2 0.85 2.72

EJE H 2 6.25 0.3 3.75

EJE J 2 2.64 0.3 1.58

1 2.8 0.85 2.38

ENTRE EJE 13 Y 14 2 1.8 0.3 1.08

22.01.08 PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS 74.58 M

EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90

3 0.9 2.70

EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48

21 0.9 18.90

1 15.1 15.10

15 0.9 13.50

22.01.09 PINTURA DOS MANOS EN CONTRAZOCALO CON ESMALTE 32.52 M2

ZONA 1 ADMINISTRACION ACCESO PRINCIPAL

EJE 1 Y 3 2 7.00 0.3 4.20

EJE A 1 6.025 0.3 1.81

EJE C 1 7.025 0.3 2.11

ZONA 2 LABORATORIOS

EJE 4 Y 12 2 7.00 0.3 4.20

EJE D 1 19.9 0.3 5.97

EJE F 1 23.5 0.3 7.05

ZONA 3 SS.HH.

EJE 13 Y 15 2 7.375 0.3 4.43

EJE G 1 4.2 0.3 1.26

EJE J 1 5.00 0.3 1.50

22.01.12 PINTURA EN TRAFICO DE CAMPO DE FUTBITO 1 101.8 101.80 101.80 M

22.01.13 PINTURA EN TRAFICO DE CAMPO DE BASQUET 1 42.11 42.11 42.11 M

22.01.14 PINTURA EN TRAFICO DE CAMPO DE VOLEY 1 72 72.00 72.00 M

22.01.15 PINTURA EN TABLERO DE BASQUET Y ARCOS 2 2.00 2.00 GLB

24.00.00 APARATOS SANITARIOS Y ACCESORIOS

24.01.01 INODORO TANQUE BAJO 8 8.00 8.00 PZA

24.01.04 LAVATORIO DE 20" x 16" 3 3.00 3.00 PZA

24.02.08 LAVATORIO TIPO OVALIN 6 6.00 6.00 PZA

24.02.11 URINARIO PICO BLANCO 1 1.00 1.00 PZA

24.02.12 URINARIOS CORRIDOS ENCHAPADOS 1 1.00 1.00 UND

24.04.06 PAPELERA DE LOSA COLOR 8 8.00 8.00 PZA

24.09.01 COLOCACION DE APARATOS SANITARIOS 18 18.00 18.00 PZA

24.09.02 COLOCACION DE ACCCESORIOS SANITARIOS 18 18.00 18.00 PZA

24.10.00 PLACA RECORDATORIA

24.10.01 PLACA RECORDATORIA 1 1.00 1.00 UND

24.11.00 LIMPIEZA FINAL DE LA OBRA

24.11.01 LIMPIEZA FINAL DE LA OBRA 1 1.00 1.00 GLB

Page 33: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

ARQUITECTURA

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA

Page 34: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOINSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

25.00.00 SISTEMA DE DESAGUE

25.02.00 SALIDA DE DESAGUE

25.02.01 SALIDA DE DESAGUE PVC SAL 2" 27 27 27.00 PTO

25.02.02 SALIDA DE DESAGUE PVC SAL 4" 8 8 8.00 PTO

25.02.04 SALIDA DE VENTILACION DE PVC 2" 9 9 9.00 PTO

25.03.00 REDES DE DISTRIBUCION

25.03.04 TUBERIA PVC 2" 84.36 M

ZONA 2 LABORATORIOS 1 22.71 22.71

ZONA 3 SS.HH. 1 45.00 45

ZONA 6 PABELLON 1 1 16.65 16.65

25.03.06 TUBERIA PVC 4" 24.46 M

ZONA 3 SS.HH. 1 24.46 24.46

25.04.00 REDES COLECTORAS

25.04.01 EXCAVACION MANUAL EN MATERIAL SUELTO H=1.00 M 17.15 M3

ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98

ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30

ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87

25.04.02 RELLENO CON MATERIAL PROPIO MANUAL 17.15 M3

ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98

ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30

ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87

25.04.03 TUBERIAS DE PVC S-25 D=110 mm UF NTP ISO 4435 x 6m 58.23 M

ZONA 1 ADMINISTRACION 1 5.00 5.00

ZONA 2 LABORATORIOS 1 17.32 17.32

ZONA 3 SS.HH. 1 8.48 8.48

ZONA 6 PABELLON 1 1 27.43 27.43

25.05.00 ACCESORIOS DE REDES

25.05.01 CODO PVC SAL 2" x 45° 13.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 9 9.00

25.05.02 CODO PVC SAL 2" x 90° 45.00 PZA

ZONA 2 LABORATORIOS 10 10.00

ZONA 3 SS.HH. 27 27.00

ZONA 6 PABELLON 1 8 8.00

25.05.03 CODO PVC SAL 4" x 45° 7.00 PZA

ZONA 3 SS.HH. 7 7.00

25.05.04 CODO PVC SAL 4" x 90° 8.00 PZA

ZONA 3 SS.HH. 8 8.00

25.05.17 YEE PVC SAL DE 2" 6.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 2 2.00

25.05.18 YEE PVC SAL DE 4" 8.00 PZA

ZONA 3 SS.HH. 8 8.00

25.05.19 YEE PVC SAL DE 4" a 2" 11.00 PZA

ZONA 3 SS.HH. 11 11.00

25.06.00 ADITIVOS VARIOS

25.06.01 SUMIDERO DE BRONCE DE 2" 16.00 PZA

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 12 12.00

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

Page 35: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

INSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

25.06.09 REGISTRO DE BRONCE ROSCADO DE PISO DE 2" 6.00 PZA

ZONA 2 LABORATORIOS 3 3.00

ZONA 3 SS.HH. 3 3.00

25.06.11 REGISTRO DE BRONCE ROSCADO DE PISO DE 4" 10.00 PZA

ZONA 3 SS.HH. 10 10.00

25.06.15 SOMBRERO DE VENTILACIÓN DE 2" PVC 2.00 PZA

ZONA 3 SS.HH. 2 2.00

25.06.16 CACHIMBA PVC D=110 A 200 mm 3.00 JGO

3 3.00

25.06.17 TRAMPA "P" PVC D= 2" 9.00 UND

ZONA 2 LABORATORIOS 4 4.00

ZONA 3 SS.HH. 5 5.00

25.07.00 CAJA DE INSPECCION

25.07.05 CAJA DE REG. ALB. 12" x 24" TAPA F°F° 7.00 UND

ZONA 2 LABORATORIOS 1 1.00

ZONA 3 SS.HH. 2 2.00

ZONA 6 PABELLON 1 4 4.00

26.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIOS

26.01.00 SALIDA DE AGUA FRIA

26.01.01 SALIDA DE AGUA FRIA EN PVC INC.TUBERIAS Y ACCESORIOS 29.00 PTO

ZONA 2 LABORATORIOS 6 6.00

ZONA 3 SS.HH. 19 19.00

ZONA 6 PABELLON 1 4 4.00

26.02.00 REDE DE DISTRIBUCION

26.02.11 TUBERIA PVC CLASE 10 P/AGUA FRIA 1/2" 104.64 M

ZONA 2 LABORATORIOS 1 37.57 37.57

ZONA 3 SS.HH. 1 53.62 53.62

ZONA 6 PABELLON 1 1 13.45 13.45

26.02.12 TUBERIA PVC CLASE 10 P/AGUA FRIA 3/4" 79.31 M

RED DE DISTRIBUCION GENERAL 1 79.31 79.31

26.02.13 TUBERIA PVC CLASE 10 P/AGUA FRIA 1 1/2" 22.60 M

EN RED DE ADUCCION 1 22.6 22.60

26.04.00 ACCESORIOS DE REDES

26.04.57 CODO 1/2" PVC C-10 PARA AGUA 100.00 UND

ZONA 2 LABORATORIOS 24 24.00

ZONA 3 SS.HH. 65 65.00

ZONA 6 PABELLON 1 11 11.00

26.04.58 CODO 3/4" PVC C-10 PARA AGUA 8.00 UND

EN LINEA DE DISTRIBUCIÓN GENERAL 8 8.00

26.04.60 CODO 1 1/2" PVC C-10 PARA AGUA 2.00 UND

RED DE ADUCCIÓN 2 2.00

26.04.91 TEE 1/2" PVC C-10 PARA AGUA 24.00 UND

ZONA 2 LABORATORIOS 5 5.00

ZONA 3 SS.HH. 17 17.00

ZONA 6 PABELLON 1 2 2.00

26.04.92 TEE 3/4" PVC C-10 PARA AGUA 4.00 UND

EN LINEA DE DISTRIBUCIÓN GENERAL 4 4.00

26.05.00 VALVULAS

Page 36: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

INSTALACIONES SANITARIAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

26.05.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" 16.00 PZA

ZONA 2 LABORATORIOS 7 7.00

ZONA 3 SS.HH. 7 7.00

ZONA 6 PABELLON 1 2 2.00

26.05.02 VALVULA DE PASE DE BRONCE DE 3/4" 4.00 PZA

EN RED GENERAL 4 4.00

26.06.02 CAJA DE REGISTRO ALB. 10" x 12" 2 2.00 2.00 UND

28.00.00 SISTEMA DE DESAGUE PLUVIAL

28.02.00 REDES DE DISTRIBUCION

28.02.08 TUBERIA PVC SAL PESADO 3" 77.00 M

ZONA 1 ADMISTRACION 2 5.00 10.00

2 6.00 12.00

ZONA 2 LABORATORIOS 3 5.00 15.00

3 6.00 18.00

ZONA 3 SS.HH. 2 11.00 22.00

28.04.00 ACCESORIOS DE REDES

28.04.62 CODO PVC SAL PESADO 2" x 45° 1 1.00 1.00 PZA

28.04.63 CODO PVC SAL PESADO 2" x 90° 4 4.00 4.00 PZA

28.04.64 CODO PVC SAL PESADO 3" x 90° 42.00 PZA

ZONA 1 ADMISTRACION 12 12.00

ZONA 2 LABORATORIOS 18 18.00

ZONA 3 SS.HH. 12 12.00

28.04.65 CANALETA METALICA GALVANIZA 81.05 M

ZONA 1 ADMISTRACION 1 16.05 16.05

ZONA 2 LABORATORIOS 1 49 49.00

ZONA 3 SS.HH. 1 16 16.00

Page 37: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

METRADOINSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

29.02.00 SALIDA DE TECHO

29.02.01 SALIDA PARA TECHO CENTRO DE LUZ 87.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 6 6

ZONA 2 LABORATORIOS 33 33

ZONA 3 SS.HH. 12 12

ZONA 6 TALLERES 24 24

ZONA 7 AUDITORIO 12 12

29.03.04 SALIDA PARA INTERRUPTOR SIMPLE 9.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 2 2

ZONA 3 SS.HH. 4 4

29.03.05 SALIDA PAR INTERRUPTOR DOBLE 16.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 3 3

ZONA 3 SS.HH. 3 3

ZONA 6 TALLERES 5 5

ZONA 7 AUDITORIO 3 3

29.04.01 SALIDA PARA SPOT LIGHT 24.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 7 7

ZONA 3 SS.HH. 4 4

ZONA 6 TALLERES 7 7

ZONA 7 AUDITORIO 4 4

29.04.02 SALIDA PARA BRAQUET PTO

ZONA 1 ADMINISTRACION Y ACCESO 3 3

29.07.00 SALIDA PARA TOMACORRIENTE

29.07.14 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. SAP CABLE TW 14 CAJA PESADA 66.00 PTO

ZONA 1 ADMINISTRACION Y ACCESO 7 7

ZONA 2 LABORATORIOS 32 32

ZONA 3 SS.HH. 3 3

ZONA 6 TALLERES 17 17

ZONA 7 AUDITORIO 7 7

31.00.00 TUBERIAS CONDUCTORES Y CABLES

31.01.02 TUBERIA PVC SAP (ELECTRICA) D= 20mm 639.20 M

ZONA 1 ADMINISTRACION Y ACCESO 1 72.70 72.70

ZONA 2 LABORATORIOS 1 168.38 168.38

ZONA 3 SS.HH. 1 56.40 56.40

ZONA 6 TALLERES 1 251.76 251.76

ZONA 7 AUDITORIO 1 89.96 89.96

31.01.03 TUBERIA PVC SAP (ELECTRICA) D= 25mm 31.70 M

ZONA 1 ADMINISTRACION Y ACCESO 1 6.30 6.30

ZONA 2 LABORATORIOS 1 6.30 6.30

ZONA 3 SS.HH. 1 12.80 12.80

ZONA 7 AUDITORIO 1 6.30 6.30

31.01.04 TUBERIA PVC SAP (ELECTRICA) D= 40 mm 3.36 M

ZONA 6 TALLERES 1 3.36 3.36

31.01.05 TUBERIA PVC SAP (ELECTRICA) D= 50mm 85.07 M

EN RED GENERAL 1 85.07 85.07

32.00.00 CABLES

32.01.01 CONDUCTOR ELECTRICO CU TW 2.5 mm2 934.62 M

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

Page 38: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

INSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

ZONA 1 ADMINISTRACION Y ACCESO 1 118.28 118.28

ZONA 2 LABORATORIOS 1 246.31 246.31

ZONA 3 SS.HH. 1 104.1 104.1

ZONA 6 TALLERES 1 328.03 328.03

ZONA 7 AUDITORIO 1 137.9 137.9

32.01.02 CONDUCTOR ELECTRICO CU TW 4 mm2 361.36 M

ZONA 1 ADMINISTRACION Y ACCESO 1 42.5 42.5

ZONA 2 LABORATORIOS 1 114.74 114.74

ZONA 3 SS.HH. 1 16.36 16.36

ZONA 6 TALLERES 1 133.76 133.76

ZONA 7 AUDITORIO 1 54 54

32.01.03 CONDUCTOR ELECTRICO CU TW 10 mm2 67.02 M

ZONA 6 TALLERES 1 67.02 67.02

32.01.04 CONDUCTOR ELECTRICO CU TW 35 mm2 64.60 M

ZONA 6 TALLERES 1 64.6 64.6

32.01.05 CONDUCTOR ELECTRICO DE 10 mm2 NYY 75.36 M

ZONA 1 ADMINISTRACION Y ACCESO 1 12.6 12.6

ZONA 3 SS.HH. 1 25.6 25.6

ZONA 4 CISTERNA Y TANQUE ELEVADO 1 24.56 24.56

ZONA 7 AUDITORIO 1 12.6 12.6

32.01.06 CONDUCTOR ELECTRICO DE 16 mm2 NYY 12.60 M

ZONA 2 LABORATORIOS 1 12.6 12.6

32.01.08 CONDUCTOR ELECTRICO DE 150 mm2 NYY 171.44 M

RED GENERAL 1 171.44 171.44

32.01.09 CONDUCTOR ELECTRICO DE 10 mm2 Cu DESNUDO 210.49 M

ZONA 1 ADMINISTRACION Y ACCESO 1 26.93 26.93

ZONA 2 LABORATORIOS 1 59.72 59.72

ZONA 3 SS.HH. 1 23.45 23.45

ZONA 6 TALLERES 1 100.39 100.39

32.01.10 CONDUCTOR ELECTRICO DE 35 mm2 Cu DESNUDO 123.37 M

ZONA 6 TALLERES 1 35.65 35.65

EN RED GENERAL 1 87.72 87.72

32.01.11 CABLEDO Y ESTRUCTURADO CENTRO DE COMPUTO 1 1 1.00 GLB

33.02.00 TABLERO PARA DISTRIBUCION PARA CORRIENTE ALT.

33.02.11 TABLERO GENERAL GABINETE METALICO CON 8 POLOS 1 1 1.00 PZA

33.02.12 TABLERO DISTRIBUCIÓN CAJA METALICO CON 8 POLOS 2 2 2.00 PZA

33.02.13 TABLERO DISTRIBUCIÓN CAJA METALICO CON 12 POLOS 3 3 3.00 PZA

33.02.14 TABLERO DISTRIBUCIÓN CAJA METALICO CON 24 POLOS 1 1 1.00 PZA

36.00.00 ARTEFACTOS ELECTRICO

36.01.01 FLUORESCENTE RECTO ISPE 2 x 40 W INCLUYE EQUIPO Y PANTALLA 69.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 30 30

ZONA 6 TALLERES 24 24

ZONA 7 AUDITORIO 12 12

36.01.02 FLUORESCENTE CIRCULAR ISPE 1 x 32 W INCLUYE EQUIPO Y PANTALLA 18.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

ZONA 2 LABORATORIOS 3 3

ZONA 3 SS.HH. 12 12

Page 39: Estructuras, Arquitectura, Sanitarias, Electricas_modificacion_01

INSTALACIONES ELECTRICAS

ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA

UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA

36.01.03 SPOT LIGHT DE 20 W AHORRADOR CON PANTALLA CIRCULAR 24.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 2 2

ZONA 2 LABORATORIOS 7 7

ZONA 3 SS.HH. 4 4

ZONA 6 TALLERES 7 7

ZONA 7 AUDITORIO 4 4

36.01.04 BRAQUET TIPO BOLA D=40 cm 40 W-COMPLETO 3.00 UND

ZONA 1 ADMINISTRACION Y ACCESO 3 3

38.00.00 POZO A TIERRA

38.01.01 POZO A TIERRA 8 8 8.00 GLB

38.02.02 TABLERO AUTOMATICO DE 30°, 20° Y 15 A 1 1 1.00 UND

38.02.04 PARARRAYO IONIZANTE S6-60 1 1 1.00 GLB