ETPII STP

Embed Size (px)

Citation preview

  • 7/25/2019 ETPII STP

    1/1

    ANNEXURE-1

    CENTRIFUGAL PUMP DATA SHEET(ETP-II KALOL) JOB NO.:________ITEM NO_____

    (SINGLE STAGE HORIZONTAL CENTRIFUGAL PUMP) RESUISATION NO _________________ PAGE__________OF_________BY______

    APPLICABLE TO PROPOSAL PURCHASE AS BUILTFOR SLUDGE TRANSFER PUMP-1no.SITE_______________UNIT _____________SLUDGE TRANSFER PUMP

    SERICE____________CONT. TRANSFER OF UNTREATEDEFFLUENT!"ATERREMAR#S_____________SALINITY 1$-1% GM!LIT

    NO OF PUMPS RE&UIRED_________1(ONE)DRIER TYPE_FLP S&.CAGE.IND.MOTOR

    DRIER FURNISHED BY_________________

    MANUFACTURER_____''____REMAR#S__________SIZE AND TYPE________________________PUMP SERIAL NO_______________________

    OPERATING CONDITIONS(TO BE COMPLETED BY PURCHASER)LI&UID HANDLED_____________ CONT. TRANSFER OF UNTREATEDEFFLUENT!"ATER PUMPING TEMPERATURE(C)NORMAL________$C____MINIMUM 1$C _____MAXIMUM $CSPECIFIC GRAITY * PT_______1.$$__________APOR PRESSURE AT PT( +,!% ,)_____________ISCOSITY * PT (CST)__________1.$ TO %.$______CP____ACCELERATION HEAD ()_________________NPSH AAILABLE ()___FLOODED SUCTION"ITHOUT ACCELERATION HEAD ()______ACTUAL____ELECTRICAL AREA CLASSIFICATIONCLASS__II__GROUP___A!B________HAZARDOUS______

    SITE TEMPERATURE(C)NORMAL____/$C____MAXIMUM $C_____ MINIMUM 1$CCORROSION!ERROSION CAUSED BY _________________0H : . TO 2.

    CAPACITY * PT (M/!H3)MAXIMUM _____ MINIMUM ____RATED $ M/!H3DISCHARGE PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED .$ #G!CM%

    SUCTION PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED SUCTION FLOODIFFERENTIAL PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED _______LOCATION INDOOR HEAT

    OUTDOOR UNHEATEDDIFFERENTIAL HEAD ()_________________

    REMAR#S : TO BOOST THE "ATER PRESSUREPUMP SHALL BE LOCATED IN HAZARDOUS AREA

    ___________________________________

    PUMP CHARACTERISTIC (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)DESIGN PRESSURE____________________NO OF STAGES___SINGLE________SPEED IN RPM _______________________EFFICIENCY__________________RATED PO"ER(#") : PRIME MOERIMPELLER DIAMETER ()______________CASING MA"P ( +,!% ,) ______________HYDROTEST PRESSURE ( +,!% ,) ________COUPLING MFR.!TYPE _________!___________MA#E!MODEL NO : ____________________

    SUCTION SIDE FLANGE :SIZE______ RATING_______ FACING______ POSITION______

    DISCHARGE SIDE FLANGE :SIZE______ RATING_______ FACING______ POSITION______

    LUBRICATION TYPE_____________PAC#ING MFR.!TYPE _________!___________GLAND TYPE!MATERIAL _________!___________PROPOSAL CURE NO_________________

    CASING TYPE!MOUNTING!SPLIT (HOR.!ERT.)_HORIZONTAL___________________!________________REMAR#S :

    MATERIAL OF CONSTRUCTION ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER)CASE SS/1_________ IMPELLER SS/1_________ SHAFT SS/1_________ REMAR#S _________________________________

    BASE PLATE M.S____________ SHAFT SLEEE_________ SS/1__________"EAR RING _________ SS/1__________

    MOUNTING PLATE ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER) BASEPLATE S#IDPLATE SOLEPLATE BY PUMP MANUFACTURER ____________ DEC#ING __________________________REMAR#S ___________________________

    OPEN BEAM SUPPORT ___________________________ FULLY GROUTED UNGROUTED4 OERALL SIZE _____________________________

    DATE_________ REISION__

    OWNER

    ONSHORE DESIGNGROUP,ONGC,BARODA

    LSTK CONTRACTOR

    ONGC LIMITED SAAIR ENERG! LIMITED

    RE. NO. " TITLE" CENTRIFUGAL PUMP DATASHEET

    (ETP-II KALOL)

    PRO#ECT" SOUTH KADIGGS$CTF$WIP