Upload
hitendra-panchal
View
222
Download
0
Embed Size (px)
Citation preview
7/25/2019 ETPII STP
1/1
ANNEXURE-1
CENTRIFUGAL PUMP DATA SHEET(ETP-II KALOL) JOB NO.:________ITEM NO_____
(SINGLE STAGE HORIZONTAL CENTRIFUGAL PUMP) RESUISATION NO _________________ PAGE__________OF_________BY______
APPLICABLE TO PROPOSAL PURCHASE AS BUILTFOR SLUDGE TRANSFER PUMP-1no.SITE_______________UNIT _____________SLUDGE TRANSFER PUMP
SERICE____________CONT. TRANSFER OF UNTREATEDEFFLUENT!"ATERREMAR#S_____________SALINITY 1$-1% GM!LIT
NO OF PUMPS RE&UIRED_________1(ONE)DRIER TYPE_FLP S&.CAGE.IND.MOTOR
DRIER FURNISHED BY_________________
MANUFACTURER_____''____REMAR#S__________SIZE AND TYPE________________________PUMP SERIAL NO_______________________
OPERATING CONDITIONS(TO BE COMPLETED BY PURCHASER)LI&UID HANDLED_____________ CONT. TRANSFER OF UNTREATEDEFFLUENT!"ATER PUMPING TEMPERATURE(C)NORMAL________$C____MINIMUM 1$C _____MAXIMUM $CSPECIFIC GRAITY * PT_______1.$$__________APOR PRESSURE AT PT( +,!% ,)_____________ISCOSITY * PT (CST)__________1.$ TO %.$______CP____ACCELERATION HEAD ()_________________NPSH AAILABLE ()___FLOODED SUCTION"ITHOUT ACCELERATION HEAD ()______ACTUAL____ELECTRICAL AREA CLASSIFICATIONCLASS__II__GROUP___A!B________HAZARDOUS______
SITE TEMPERATURE(C)NORMAL____/$C____MAXIMUM $C_____ MINIMUM 1$CCORROSION!ERROSION CAUSED BY _________________0H : . TO 2.
CAPACITY * PT (M/!H3)MAXIMUM _____ MINIMUM ____RATED $ M/!H3DISCHARGE PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED .$ #G!CM%
SUCTION PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED SUCTION FLOODIFFERENTIAL PRESSURE ( +,!% ,)MAXIMUM _____ MINIMUM ____RATED _______LOCATION INDOOR HEAT
OUTDOOR UNHEATEDDIFFERENTIAL HEAD ()_________________
REMAR#S : TO BOOST THE "ATER PRESSUREPUMP SHALL BE LOCATED IN HAZARDOUS AREA
___________________________________
PUMP CHARACTERISTIC (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)DESIGN PRESSURE____________________NO OF STAGES___SINGLE________SPEED IN RPM _______________________EFFICIENCY__________________RATED PO"ER(#") : PRIME MOERIMPELLER DIAMETER ()______________CASING MA"P ( +,!% ,) ______________HYDROTEST PRESSURE ( +,!% ,) ________COUPLING MFR.!TYPE _________!___________MA#E!MODEL NO : ____________________
SUCTION SIDE FLANGE :SIZE______ RATING_______ FACING______ POSITION______
DISCHARGE SIDE FLANGE :SIZE______ RATING_______ FACING______ POSITION______
LUBRICATION TYPE_____________PAC#ING MFR.!TYPE _________!___________GLAND TYPE!MATERIAL _________!___________PROPOSAL CURE NO_________________
CASING TYPE!MOUNTING!SPLIT (HOR.!ERT.)_HORIZONTAL___________________!________________REMAR#S :
MATERIAL OF CONSTRUCTION ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER)CASE SS/1_________ IMPELLER SS/1_________ SHAFT SS/1_________ REMAR#S _________________________________
BASE PLATE M.S____________ SHAFT SLEEE_________ SS/1__________"EAR RING _________ SS/1__________
MOUNTING PLATE ( TO BE COMPLETED BY PURCHASER AND MANUFACTURER) BASEPLATE S#IDPLATE SOLEPLATE BY PUMP MANUFACTURER ____________ DEC#ING __________________________REMAR#S ___________________________
OPEN BEAM SUPPORT ___________________________ FULLY GROUTED UNGROUTED4 OERALL SIZE _____________________________
DATE_________ REISION__
OWNER
ONSHORE DESIGNGROUP,ONGC,BARODA
LSTK CONTRACTOR
ONGC LIMITED SAAIR ENERG! LIMITED
RE. NO. " TITLE" CENTRIFUGAL PUMP DATASHEET
(ETP-II KALOL)
PRO#ECT" SOUTH KADIGGS$CTF$WIP