Experiment of an inflatable weir with steel gates
Villers – devant – Mouzon
BAW- Symposium Inflatable dams19 June 2008
Timothée CHRETIEN – VNF DIR Nord-EstNicolas PICHON - Cetmef
zurzurüück zum Inhaltsverzeichnis ck zum Inhaltsverzeichnis zur Kurzfassungzur Kurzfassung
19 june 2008 2
Presentation structure
• Experiment’s context ;• Construction spot selection ;• Obermeyer spillway gates ;• Experimental follow-up ;• First results.
19 june 2008 3
Context• An extensive rebuilding program
Aim : improving weirs’ exploitation by:– Providing a high reliability ;– Securing operations ; – reducing the painfulness ;– Guaranteeing a precise water level regulation.
• Explorate innovative technique(s) to:– cut dam building costs;– reduce construction durations.
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 4
The site of Villers devant Mouzon• The dam of Villers devant Mouzon is located on the river
Meuse (North-east of France) ;• The original dam is a needle dam ;
• The site was chosen on an existing dam, where a first experiment of inflatable dam was conducted 20 years ago.
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 5
Obermeyer system
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 6
articulation
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 7
Ductil steel clamp
Anchor bolts
Panel with rib
Rubber hinge flap
Bolts linking gate to hinge
Bladder
19 june 2008 8
Some pictures...
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 9
Advantages• Anchor
– Efforts (water pressure) are linearly applied to the sill ;– No mechanical parts (without pivot) .
• Modular design– It can be very wide without intermediary piers ;– easy assembly and maintenance;– Transportation.
• Steel gates– Precise regulation of upstream water level ;– Protect the bladders of sediments, debris , UV and vandalism ;– An option allows relative movement of adjacent modules ;– An option allows to have several bladders for a single panel
>>> this option provides a high reliability in case of a bladdershould be out of order.
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 10
Limits
• Several concepts are patented ;• Difficulties to communicate with Obermeyer (type of
contract..) ;• Limited experiment feedback;• Vandalism ?
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 11
The IDSG in Villers devant mouzon
• Dam's height is 2,00m , total width of 17,69m ;• 3 modules each 5.87m wide. Steel gates were made from a
plate 16mm thick. An epoxy coating protects the gates from corrosion ;
• 3 bladders (EPDM, chlorubutyle rubber, natural rubber reinforced with 4 layers of polyester fabric, an external layer of EXX-pro improves resistance to UV abrasion and chemical attacks). Each bladder weights 400 kg. Normal pressure is 1,4 bar ;
• 59 steel bolts connect the bladders to the sill.
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 12
The works in few numbers...
• 2 months : works’ duration ;• 2 days : mounting of IDSG ;• A gate weights 2,5 T ( dam’s heaviest part).
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 13
…some pictures.
19 june 2008 14
…civil works...
19 june 2008 15
…assembly
19 june 2008 16
19 june 2008 17
19 june 2008 18
Experimental follow-upGoals
• Understanding the different aspects of designing and building such dams ;
• Experiencing and analysing their mechanic and hydraulic behaviour ;
• Measuring their regulation capacity for navigation purposes ;
• Studying environmental impacts ;
• Estimating the standardization potential ;
• Analysing their operation and maintenance needs ;
• Evaluating their operation and maintenance costs ;
• Assessing their lifetime.
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 19
Tests on the bladders
• Aim : measure mechanical properties of the bladders ;
• Lab tests– Tension test ;– Creep test ;– Colorimetry ;– Hardness ;– Spectrometry...
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 20
System tests
• Aim : test different simulated failures
• Events planned:– Power cuts ;– Leak in the air supply system ;– Gauge faults ;– …
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 21
Puncture tests
Program planned:
• Test the case of different holes (different diameters) in the bladder ;
• Observe the efficiency of dam ;• Observe the evolution of holes ;• Evaluation ;
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 22
First results
• in situ :faulty construction ?
– Problem of watertightness (between dam and abutments) ;
– tightening torque of bolts linking gate to hinge are heterogeneous ;
– One anchor bolt broke.• In functioning :
– A precise regulation of upstream water level ;– Some difficulties with gauges (water level,
inclinometer) ;– Problem of watertightness ( between the 2 different
modules) ;
• Context
• The site
• IDSG
• Experimental follow-up
• First results
19 june 2008 23
First results
Lab Tests:• Context
• The site
• IDSG
• Experimental follow-up
• First results
Vielen Dank fuer IhreAufmerksamkeit!
Voies Navigables de FranceFrench Waterways
www.vnf.fr
Centred'Études TechniquesMaritimes et Fluviales
CETMEF
CETMEFInstitute for Maritime andInland waterways
www.cetmef.equipement.gouv.fr
zurzurüück zum Inhaltsverzeichnis ck zum Inhaltsverzeichnis zur Kurzfassungzur Kurzfassung