GEOSS Implementation Current Status Giovanni Rum GEO Secretariat GEO European Projects Workshop 31 May – 2 June 2016 Berlin

GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Embed Size (px)

Citation preview

Page 1: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GEOSS Implementation Current Status Giovanni Rum

GEO Secretariat

GEO European Projects Workshop

31 May – 2 June 2016

Berlin

Page 2: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Table of Contents

• GEO Strategic Plan 2016-2015 – Background

• Implementing the GEO vision: GEO

“deliverables”

• GEOSS Implementation status

Page 3: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GEOSS,

the Global Earth Observation System of Systems

“A central part of GEO’s Mission is to build the Global Earth Observation

System of Systems (GEOSS). GEOSS is a set of coordinated,

independent Earth observation, information and processing systems ...

GEOSS links these systems …. It facilitates the sharing of

environmental data and information collected from the large array of

observing systems contributed by countries and organizations within

GEO. Further, GEOSS ensures that these data are accessible, of

identified quality and provenance, and interoperable to support the

development of tools and the delivery of information services. Thus,

GEOSS increases our understanding of Earth processes and enhances

predictive capabilities that underpin sound decision-making” (*) in all

societal Benefit Areas.

(*) from the “GEO Strategic Plan 2016-2025: Implementing GEOSS” part A page 6

Page 4: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GEO Strategic Plan 2016-2025: what deliverables?

GEO Vision

Overall

deliverables

Strategic

Objectives

Core

Functions

“The vision for GEO is to realize a future wherein decisions and

actions for the benefit of humankind are informed via coordinated,

comprehensive and sustained Earth Observations and information”.

1. Enabling elements: GEOSS (access to Data, information, Knowledge,

tools), User needs and observational gaps, Capacity Building

2. Demonstrating EO key role: Flagships/Initiatives/Community Activities

3. Creating and keeping awareness: policy relevance, “buy-in” from

decision-makers, user engagement, communication & outreach,

strengthening the GEO Community

Advocate. Engage. Deliver

1. Identifying user needs and addressing gaps in the information

chain

2. Sustaining foundational observations and data

3. Fostering partnerships and mobilize resources

4. Advancing GEOSS and best practice in data management and

sharing

5. Implementing sustained global and regional services

6. Cultivating awareness, building capacity and promoting

innovation

Page 5: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GEO Work Programme logic

SBA’s Process

•User needs

•Observation

requirements

•Knowledge

Development

Providers

Coordination

Data & info

generation

GCI

Operations

Discovery

and Access

Enabling elements (Data

Sharing & Mgmt, RF Protection)

Community Activities GEO Initiatives and Flagships Products &

Services

Capacity Building Coordination

Capacity Building

Policy Mandate

GCI

Development

GEONETCast,

Communication

Networks

GEOSS

Communication and Engagement Outreach

Operations

Foundational

Tasks

3

2 1

Page 6: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

MEMBERS AND PO’S

OBSERVATION AND INFORMATION

SYSTEMS

Foundational Tasks GD-03, GD-04, GD-05, GD-06, GD-

08, GD-09, GD-11

GEOSS Component 1

Page 7: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

From Observations to Decisions (through R&D)

Atmosphere GAW Land Freshwater Coast Ocean GOOS Arctic etc.

Climate GCOS Weather Carbon Energy Ecosystems etc.

Observation Domains

Observation Themes /Global Systems

USERS - Societal Benefit Areas

Satellites In situ Aircraft

Observation Instruments

Decision Making tools

R&D IPCC ? Future Earth? Earth models Etc.

Earth Science

Page 8: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

From Observations instruments to Global Systems

Atmosphere GAW Land Freshwater Coast Ocean GOOS Arctic etc.

Climate GCOS Weather Carbon Energy Ecosystems etc.

Observation Domains

Observation Themes /Global Systems

Satellites In situ Aircraft

Observation Instruments

Requirements

Data and information

Page 9: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Observation systems space and “in situ”

In the System of Systems perspective, what’s the GEO Value added ?

•Rolling inventory of existing satellites/networks and plans for their “densification” and improvement

•Ensuring linkages with the broad User Community and provide, through the user needs process, clear observational requirements

•Facilitating coordination through specific mechanisms (i.e at regional level) and through specific initiatives.

•Advocacy for systems continuity

Page 10: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Observation Systems: GD-05 and GD-06

• GD-05 - GEOSS satellite Earth Observation Resources, coordinated by CEOS, and GD -06 - GEOSS non-space based (“in-situ”) Earth Observation Resources have the same end objective: Ensure availability of coordinated observations that are needed.

• Include the actions to ensure observational gaps closure and continuity of data.

• Complementary to activities focused on formalizing user requirements and providing data in support of specific activities.

Page 11: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GD05 Space-based Observation on going activities

Space Data Coordination

WG on Disaster GEO-DARMA

WG on Climate

WGISS/WGCV/WGCapD GCI, Data Management, CB

Virtual Constellations SBA requirements

Future data architecture GEOSS development Non-Meteorological

Applications for

Geostationary Satellites SBA requirements

Page 12: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GD06 In-Situ Observations Some examples

ARGOS Buoy Networks GTN-H

GAW

Global Coordinations

Regional/National/Thematic Efforts

Emerging Technologies /Activities

Drones Citizen Sensing Marine Observatory

Copernicus In Situ USEPA Airnow CEOP reference sites

Page 13: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

An In Situ interim Report in 2016

Proposed contents:

1. Introduction (Current In Situ definition)

2. Activities in 1-2 continents

3. Activities in 2-3 SBAs

4. Issues identified for the needs of global coordination

• sustainability of existing measurements

• investigating new in situ measurements

• Emerging techniques and new approaches

• Moving from research to sustained long-term operations

• ………………………………………

5. Recommandations and Conclusion including next steps

Page 14: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GD-03 - Global Observing and Information Systems

• These Global Systems are key components of a System of Systems like GEOSS.

• Their definition is definitely user-driven and they constitute, for a number of user communities, the current and potential delivery mechanism

• The “user needs process” (GD-08) is expected to contribute, from a GEO perspective, to a rationalization of the overall picture

BUT

• The landscape is still complex, overlaps and gaps are still there, there are a lot of actors to work with

Page 15: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

• The task provides various coordination opportunities in order to:

–Review and improve the current situation

–Support existing and planned Systems and implement new ones, where necessary

–Encourage integration and linkage among different systems

–Facilitate and foster space and in situ integration

GD-03 - Global Observing and Information Systems

Page 16: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

• The relevant process is under definition (a small Group met beginning of May and a preliminary report is expected by mid-June)

• The process will be kept as simple as feasible and will built on similar process being run at different levels

• It is planned to activate the process for two SBAs in the second half of 2016.

GD-08 - Identifying user needs and addressing gaps in the information chain

Page 17: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GD04 - GEONETCast

Challenges for the future

• Improve GEONETCast Link with the GCI

• Improve GEONETCast data volumes and coverage (Pacific Ocean)

• Ensure data services to GEO Community Activities, Initiatives and

Flagships

2713 users

301 users

3054 users

150 users

Page 18: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GD11- Advancing Communication Networks

Task Objectives

• Improve communication resources available to ensure wider and

sustainable access to and use of EO data and information.

• Assess GEOSS Cloud Service Requirements

• Support AfriGEOSS to improve data dissemination to/from Africa

Initial Findings and way forward

Focus on improvements of existing infrastructure

– Better utilize R&D networks to improve global connectivity.

– Follow WMO Expert Team on Telecommunications Infrastructure

ET-CTS Cloud Pilot Project

– Promote collaborations between AfriGEOSS, African Research and

Education Networks and local EUMETSAT and WMO contacts.

Page 19: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

THE GEOSS COMMON

INFRASTRUCTURE (GCI)

FOUNDATIONAL TASKS GD-02 & GD-07

GEOSS Component 2

Page 20: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

The GCI today

Private sector providers

GEOSS

Portal

GEO

Website

Discovery and

Access Broker

(DAB)

Japan

USA

Canada

South Africa

Australia Brazil

Germa

ny

Russia

Chile Fran

ce

Italy

… more than 100 public providers…

Satellites

Cryosphere

Energy

Disasters

Health

Biodiversity

Inte

rnat

ion

al P

rovi

der

s R

egio

nal

& N

atio

nal

Pro

vid

ers

Environment

Climate/Weat

her

Ocean

Geology/Soil

Spain

New

Zealand

Norway

Water

Switzerland

China

Africa

Page 21: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GCI has doubled its n. of queries over last year

GEOSS Assets and GCI Usage over time

First half of 2016

More than 3 Million queries

The GCI today

Page 22: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

• GEO started in 2016 a systematic process to implement

new GCI capabilities, starting from a major revision of the

relevant GCI “User requirements”, presented at the GEO

Work Programme Symposium (2-4 May 2016)

• Basic requirement: the GCI should allow actual access to

free and open resources

• User needs grouped in

–Structuring user access: from customized search to pre-

defined sets of resources addressing thematic areas (in

principle the GEO SBAs) and geographical areas

–Performance parameters of the Portal, such as Multi-

criteria search, single sign-on, saving prevoius searches

–On-line tools for resources visualization and mash-up

Implementing new GCI capabilities

Page 23: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

The GCI we want

Search Discovery Visualization Online tools

Actual Access

FUNCTIONS

ACCESSIBLE RESOURCES

Data Information Knowledge

Structured access

Starting point for user access

The GCI we have now

Page 24: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GCI User Requirements Functionalities Overview

Functionalities described in the GCI User Requirements Document Reference to the document

How to structure User Access 4.1

Multi-criteria search: Spatial/temporal/thematic.. 4.2.1

Incremental search/filter 4.2.2

Informative and efficient search output 4.2.3

Storing previous searches 4.2.4

RSS Feeds 4.2.5

Data accessibility: format of accessible data 4.3

Single Sign On: 4.4

Data visualization extent bigger 4.5

Data visualization - footprint & summary metadata 4.5

Data visualization tools: zoom, pan, info 4.5

Mash Ups 4.6.1 Advanced web applications 4.6.2

Data quality & accessibility monitoring tools 4.8

User data request interface 4.9.1

GCI user experience 4.9.2

GCI Statistics requirements 4.10.2 Others…your inputs!

Page 25: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

GCI User Requirements Review http://www.earthobservations.org/geoss.php

Page 26: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Principles and guidelines

FOUNDATIONAL TASKS GD-01 & GD-07

GEOSS Component 3

Page 27: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Data Sharing: the backbone of GEO

• Promoting and enabling data sharing is one of GEO’s significant achievements and a prerequisite for building a stronger GEOSS.

• Data sharing is the fundamental enabler for global, regional and national progress towards addressing global societal challenges.

• The Data Sharing Working Group (DSWG) has played a key role to date in building consensus on data sharing guidelines and implementation plans.

• Further advocacy of data sharing implementation and the articulation of evidence are necessary to achieve these objectives.

Page 28: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

First GEO Decade 2005-15: Achievements

• Since 2010 Data CORE. The GEOSS Data Collection of Open Resources for Everyone: a pool of “tagged” datasets with full, open & unrestricted access at no more than the cost of reproduction and distribution.

• 2013 - GEOSS Data Quality Guidelines, endorsed by GEO-X Plenary, Geneva, 2014

• 2012 & 2014 – Two versions of a white paper on legal interoperability, “Legal options for the exchange of data through the GEOSS Data-CORE”

• 2014-2015 GEOSS Data Management Principles and draft Implementation Guidelines . Discoverability, accessibility, usability, preservation, curation

Page 29: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Revised GEOSS Data Sharing Principles (Endorsed by GEO-XII Plenary November 2015)

Data, metadata and products will be shared as Open Data by default, by making them available as part of the GEOSS Data Collection of

Open Resources for Everyone (Data-CORE) without charge or restrictions on reuse, subject to the conditions of registration and

attribution when the data are reused;.

Where international instruments, national policies or legislation preclude the sharing of data as Open Data, data should be made available with minimal restrictions on use and at no more than the

cost of reproduction and distribution

All shared data, products and metadata will be made available with minimum time delay.

Page 30: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

2nd GEO Decade 2016-25

• Data Sharing remains a fundamental GEO activity: promote, monitor (data availability & usability), analyze (impacts, benefits, SDGs), report (on implementation), refine and update (principles and guidelines, including implications from new data sources)

• 2016 Priorities

– Draft revised Implementation Guidelines on the GEOSS Data Sharing Principles.

– Start full implementation of Data Management Guidelines (such as data certification)

Page 31: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic
Page 32: GEOSS Implementation - European Commission · GEOSS Implementation Current Status ... GEO Work Programme logic SBA’s Process •User needs ... Coast Ocean GOOS Arctic

Thank you

Giovanni Rum

[email protected]