34
DAFTAR HARGA BAHAN KABUPATEN SERUYAN TRIWULAN II TAHUN 2015 NO JENIS BAHAN DAN MATERIAL SATUAN SERUYAN HILIR DANAU SEMBULUH 1 2 3 4 5 I BAHAN KAYU 1 Balok Kayu Kls I 6,500,000.00 5,500,000.00 2 Balok Kayu Kls II 2,000,000.00 1,800,000.00 3 Balok Kayu Kls III 1,600,000.00 1,500,000.00 4 Kayu Bulat ( Biasa / Hutan ) Btg 5,000.00 4,500.00 5 Kayu Dolken / Galam Dia. 8 - 10 cm Btg 10,000.00 9,000.00 6 List Profil Moulding biasa M' 6,250.00 5,000.00 7 Papan Kayu Kls I 9,300,000.00 7,500,000.00 8 Papan Kayu Kls II 2,500,000.00 2,250,000.00 9 Papan Kayu Kls III 1,800,000.00 1,700,000.00 10 Papan Kayu Kls IV 1,600,000.00 1,500,000.00 11 Papan Moulding Kls.II 2,170,000.00 2,100,000.00 12 Matting Btg 150,000.00 150,000.00 II PENUTUP ATAP 1 Aluminium Plat lbr 60 cm M' 37,000.00 40,000.00 2 Bubungan Metal 1/2 Bundar M' - - 3 Bubungan Segi Empat M' 40,000.00 25,000.00 4 Genteng Beton Bh 8,000.00 15,000.00 5 Genteng Kodok Bh 3,800.00 10,000.00 6 Genteng Metal Tbl. 0,25 mm 2 x 4 Lbr 49,500.00 47,500.00 7 Genteng Metal Tbl. 0,30 mm 2 x 4 Lbr 53,000.00 51,000.00 8 Kuda2 Metal Zincalume ( Baja Ringan) Pelana 225,000.00 235,000.00 9 Nok Genteng Metal Bh 40,000.00 35,000.00 10 Plastik Gelombang Kecil Lbr 30,000.00 35,000.00 11 Rangka Plafond (Baja Ringan) Zincalume - - 12 Seng Gelombang Kecil Lbr 45,000.00 47,000.00 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 3 M 2 M 2

Hsbj Triwulan III Th. 2015

Embed Size (px)

DESCRIPTION

rab jalan

Citation preview

Page 1: Hsbj Triwulan III Th. 2015

DAFTAR HARGA BAHAN KABUPATEN SERUYANTRIWULAN II TAHUN 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

I BAHAN KAYU

1 Balok Kayu Kls I 6,500,000.00 5,500,000.00

2 Balok Kayu Kls II 2,000,000.00 1,800,000.00

3 Balok Kayu Kls III 1,600,000.00 1,500,000.00

4 Kayu Bulat ( Biasa / Hutan ) Btg 5,000.00 4,500.00

5 Kayu Dolken / Galam Dia. 8 - 10 cm Btg 10,000.00 9,000.00

6 List Profil Moulding biasa M' 6,250.00 5,000.00

7 Papan Kayu Kls I 9,300,000.00 7,500,000.00

8 Papan Kayu Kls II 2,500,000.00 2,250,000.00

9 Papan Kayu Kls III 1,800,000.00 1,700,000.00

10 Papan Kayu Kls IV 1,600,000.00 1,500,000.00

11 Papan Moulding Kls.II 2,170,000.00 2,100,000.00

12 Matting Btg 150,000.00 150,000.00

II PENUTUP ATAP1 Aluminium Plat lbr 60 cm M' 37,000.00 40,000.00

2 Bubungan Metal 1/2 Bundar M' - -

3 Bubungan Segi Empat M' 40,000.00 25,000.00

4 Genteng Beton Bh 8,000.00 15,000.00

5 Genteng Kodok Bh 3,800.00 10,000.00

6 Genteng Metal Tbl. 0,25 mm 2 x 4 Lbr 49,500.00 47,500.00

7 Genteng Metal Tbl. 0,30 mm 2 x 4 Lbr 53,000.00 51,000.00

8 Kuda2 Metal Zincalume ( Baja Ringan) Pelana 225,000.00 235,000.00

9 Nok Genteng Metal Bh 40,000.00 35,000.00

10 Plastik Gelombang Kecil Lbr 30,000.00 35,000.00

11 Rangka Plafond (Baja Ringan) Zincalume - -

12 Seng Gelombang Kecil Lbr 45,000.00 47,000.00

M3

M3

M3

M3

M3

M3

M3

M3

M2

M2

Page 2: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

13 Seng Gelombang Besar Lbr 45,000.00 47,000.00

14 Seng Plat Lebar 30 Cm M' 15,000.00 15,000.00

15 Seng Plat Lebar 40 Cm M' 17,500.00 17,500.00

16 Seng Plat Lebar 60 cm M' 25,000.00 25,000.00

17 Talang PVC 1/2 Lingkaran Btg 65,000.00 65,000.00

18 Talang PVC Siku-siku Btg 75,000.00 75,000.00

Page 3: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

III PENUTUP PLAFOND / DINDING

1 Calsiboard 4 mm Lbr 85,000.00 95,000.00

2 Formica / Melamien Lbr 37,000.00 37,000.00

3 Gypsum baord Lbr 140,500.00 235,000.00

4 Hardboard 12 mm Lbr - -

5 List Profil Gypsum Btg 160,000.00 165,000.00

6 Nusa Board 3,5 mm Lbr 64,350.00 64,350.00

7 Plat Asbes Lbr 30,000.00 35,000.00

8 Plywood 3 mm Lbr 57,000.00 60,000.00

9 Plywood 4 mm Lbr 70,000.00 75,000.00

10 Plywood 9 mm Lbr 115,000.00 120,000.00

11 Plywood 12mm Lbr 170,000.00 165,000.00

12 Teakwood 4 mm Lbr 155,000.00 150,000.00

IV P A K U

1 Paku Asbes Kg 35,000.00 32,500.00

2 Paku Beton Bh 25,000.00 20,000.00

3 Paku Genteng Metal Kg 30,000.00 25,000.00

4 Paku Kait Bh 25,000.00 25,000.00

5 Paku Kayu Kg 15,000.00 15,000.00

6 Paku Plywood/Teakwood Kg 20,000.00 20,000.00

7 Paku Seng Kg 30,000.00 30,000.00

8 Paku Sirap Kg 23,000.00 23,000.00

9 Paku Skrup Bj 20,000.00 20,000.00

10 Paku Ulin Kg 18,000.00 18,000.00

V SEMEN

2 Semen PC Kg 1,525.00 1,650.00

3 Semen Putih Kg 4,000.00 4,125.00

4 Semen Warna Kg 20,000.00 22,000.00

VI BESI, KAWAT

Page 4: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

1 Angker Untuk Kosen Bh

2 Besi beton polos Kg 13,000.00 18,000.00

3 Besi beton ulir Kg 16,000.00 22,000.00

4 Besi Beugel / Strip ( Kuda - kuda ) Bh 7,000.00 5,000.00

5 Baja Ringan

6 Kawat Beronjong Ø 2,7 mm (2m x 1 m x 0,5 m) Unit 231,000.00 231,000.00

7 Kawat Beronjong Ø 2,7 mm (3m x 1 m x 0,5 m) Unit - -

8 Kawat Beronjong Ø 2,7 mm (3m x 1,5 m x 0,5 m) Unit - -

9 Kawat Beronjong Ø 3 mm (2m x 1 m x 0,5 m) Unit 278,250.00 278,250.00

10 Kawat Beronjong Ø 3 mm (3m x 1 m x 0,5 m) Unit - -

11 Kawat Beronjong Ø 3 mm (3m x 1,5 m x 0,5 m) Unit - -

12 Kawat Beton/Bendrat Kg 17,000.00 17,500.00

13 Kawat Duri ( 1 Rol = 35 m' ) Rol 90,000.00 90,000.00

14 Kawat Harmonika ( lbr. 1 m ) M' 35,000.00 35,000.00

15 Kawat Kasa Besi 35,000.00 35,000.00

16 Kawat Kasa Plastik 30,000.00 30,000.00

17 Kawat Wiremesh Polos Rol 2,165,000.00 2,165,000.00

18 Kawat Wiremesh Ulir Rol 4,025,000.00 4,025,000.00

19 Pagar Besi Pipa 500,000.00 500,000.00

20 Pagar Besi Ulir/Tempa 550,000.00 550,000.00

21 Plat Besi Tebal 2 mm polos Lbr 50,000.00 50,000.00

22 Plat Besi Tebal 3 mm polos Lbr 65,000.00 65,000.00

23 Teralis Besi Bermotif 750,000.00 650,000.00

24 Teralis Besi Biasa 525,000.00 500,000.00

VII BATU, PASIR DAN TANAH

1 Bataco Bh 3,000.00 3,000.00

2 Batu Alam tempel 200,000.00 200,000.00

3 Batu Bata Bh 700.00 850.00

4 Batu Belah/Batu Kali 609,000.00 577,500.00

5 Batu Kerawang Bh 15,000.00 15,000.00

6 Batu Pecah 0,5 - 1 Cm 708,750.00 787,500.00

M2

M2

M2

M2

M2

M2

M2

M3

M3

Page 5: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

7 Batu Pecah 1 - 2 Cm 708,750.00 787,500.00

8 Batu Pecah 2 - 3 Cm 708,750.00 787,500.00

9 Batu Pecah 3 - 5 Cm 682,500.00 766,500.00

10 Batu Pecah 5 - 7 Cm 656,250.00 735,000.00

11 Batu Pecah 10 - 15 Cm 624,750.00 614,250.00

12 Batu Tempel Hitam 130,000.00 130,000.00

13 Kapur Padam 20,000.00 35,000.00

14 Kerikil Sungai / Koral 708,750.00 577,500.00

16 Pasir Beton 136,500.00 131,250.00

17 Pasir Kwarsa 378,000.00 378,000.00

18 Pasir Pasang/Pantai 136,500.00 131,250.00

19 Pasir Trans Unit I 136,500.00 127,050.00

20 Pasir Urug 95,025.00 105,500.00

21 Paving Segi Enam Bh 4,000.00 3,500.00

22 Paving Persegi Panjang Bh 3,500.00 4,000.00

23 Tanah Pilihan - 88,095.00

24 Tanah Urug 73,500.00 78,750.00

M3

M3

M3

M3

M3

M2

M3

M3

M3

M3

M3

M3

M3

M3

M3

Page 6: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

VIII KERAMIK

1 Keramik 20 x 20 cm (merk Asia) 60,000.00 65,000.00

2 Keramik 20 x 25 cm (merk Asia) 65,000.00 65,000.00

3 Keramik 30 x 30 cm (merk Asia) 55,000.00 60,000.00

4 Keramik 40 x 40 cm (merk Asia) 70,000.00 70,000.00

5 Keramik 30 x 30 cm (merk Mulia) 65,000.00 67,500.00

6 Keramik 40 x 40 cm (merk Mulia) 65,000.00 65,000.00

7 Keramik 30 x 30 cm (merk Impresso) 71,000.00 74,550.00

8 Keramik 40 x 40 cm (merk Impresso) 75,000.00 78,750.00

9 Keramik 20 x 20 cm (merk Diamond) 71,000.00 74,550.00

10 Keramik 20 x 25 cm (merk Diamond) 72,000.00 75,600.00

11 Keramik 30 x 30 cm (merk Diamond) 76,000.00 79,800.00

12 Keramik 40 x 40 cm (merk Diamond) 83,000.00 87,150.00

13 Keramik 20 x 20 cm (merk Masterina) 69,000.00 72,450.00

14 Keramik 20 x 25 cm (merk Masterina) 72,000.00 75,600.00

15 Keramik 30 x 30 cm (merk Masterina) 73,500.00 77,175.00

16 Keramik 40 x 40 cm (merk Masterina) 75,000.00 78,750.00

17 Keramik 20 x 20 cm (merk Roman) 107,250.00 112,612.50

18 Keramik 20 x 25 cm (merk Roman) 115,000.00 120,750.00

19 Keramik 30 x 30 cm (merk Roman) 109,000.00 114,450.00

20 Keramik 40 x 40 cm (merk Roman) 120,000.00 126,000.00

21 Keramik 60 x 60 cm (merk Roman) 189,000.00 198,450.00

22 Keramik 60 x 60 cm (merk Granito) 316,500.00 332,325.00

23 Plint keramik 10 x 20 cm 7,000.00 7,350.00

24 Plint keramik 10 x 30 cm 13,750.00 14,437.50

25 Plint keramik 10 x 40 cm 16,500.00 17,325.00

26 Plint keramik 10 x 60 cm

27 Porselin 11 x 11 cm 10,000.00 10,500.00

28 Mozaik 30 x 30 cm 50,000.00 50,000.00

29 Marmer 40 x 40 cm 355,000.00 355,000.00

IX AKSESORIS

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 7: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

1 Bak Cuci Piring Logam Double lengkap Bh 380,000.00 370,000.00

2 Bak Cuci Piring Logam Tunggal lengkap Bh 360,000.00 350,000.00

3 Bak Cuci Tangan ( Westapel Keramik ) Bh 350,000.00 275,000.00

4 Bak Mandi Fiber dia. 60 x 60 x 60 Bh 350,000.00 287,500.00

5 Bak Mandi suduk kecil Bh 250,000.00 150,000.00

6 Bak Mandi sudut besar Bh 350,000.00 287,500.00

7 Engsel Kuningan 3" Bh 22,500.00 20,000.00

8 Engsel Kuningan 4" Bh 25,000.00 22,500.00

9 Engsel Stainlees 3" Bh 25,000.00 22,500.00

Page 8: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

10 Engsel Stainlees 4" Bh 30,000.00 27,500.00

11 Espagnolat Psg 150,000.00 150,000.00

12 Floor Drain Bh 15,000.00 15,000.00

13 Grendel Kuningan 3 " Bh 12,500.00 13,500.00

14 Grendel Kuningan 4 " Bh 15,000.00 15,750.00

15 Grendel Standar 3 " Bh 50,000.00 52,500.00

16 Grendel Standar 4 " Bh 75,000.00 78,750.00

17 Kait Angin Bh 15,000.00 17,500.00

18 Klosed Duduk Keramik Kls. I Bh 1,550,000.00 1,500,000.00

19 Klosed Jongkok Keramik Standart Bh 165,000.00 175,000.00

20 Kran Leding Bh 20,000.00 15,000.00

21 Kunci Tanam Cilinder 2 Slaag Klas I Bh 125,000.00 125,000.00

22 Kunci Tanam Cilinder 2 Slaag Standar Bh 75,000.00 75,000.00

23 Kusen Aluminium 62,000.00 60,000.00

24 Pintu Lipat besi 2,200,000.00 2,310,000.00

25 Rel Pintu Geser M' - -

26 Rolling Door Aluminium 300,000.00 350,000.00

27 Rolling Door Besi - -

28 Urinoir Keramik + Asesorisnya Bh 470,000.00 465,000.00

29 Wastafel Berwarna KIA Bh 350,000.00 345,000.00

X K A C A

1 Kaca Buram 12 mm 350,000.00 350,000.00

2 Kaca patri 5 mm - -

3 Kaca Ray-Band ukuran 3 mm 130,000.00 140,000.00

4 Kaca Ray-Band ukuran 5 mm 150,000.00 160,000.00

5 Kaca Bening tebal 5 mm 140,000.00 145,000.00

6 Kaca wireglassed 5 mm 175,000.00 175,000.00

XI BAHAN BAKAR MINYAK, PELUMAS DAN ASPAL

1 Aspal AC Pen 60/70 Kg 13,000.00 13,500.00

2 Air Bersih Ltr 250.00 250.00

M1

M2

M2

M2

M2

M2

M2

M2

M2

M2

Page 9: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

3 Aspal Emulsi Kg 13,000.00 13,500.00

4 Bensin/Premium (Industri) Ltr 12,000.00 12,000.00

5 Gemuk Kg 12,000.00 12,000.00

6 Minyak Tanah Ltr 9,500.00 9,500.00

7 Minyak Bakisting Ltr 6,500.00 6,500.00

8 Oli Ltr 20,000.00 20,000.00

9 Residu Ltr 12,500.00 21,000.00

10 Solar (Industri) Ltr 12,000.00 12,000.00

Page 10: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

XII CAT DINDING, TEMBOK

1 Ampelas Kain Lbr 4,000.00 4,000.00

2 Ampelas Kertas Lbr 5,000.00 5,000.00

3 Cat Kayu Dasar Kg 40,000.00 45,000.00

4 Cat Kayu Mengkilap Standar Kg 50,000.00 50,000.00

5 Cat Menie besi Kg 20,000.00 35,000.00

6 Cat Tembok ( Aries / Setara ) Kg 7,000.00 7,350.00

7 Cat Tembok ( Dulux / Setara ) Eksterior Kg 45,000.00 47,250.00

8 Cat Tembok ( Dulux / Setara ) Interior Kg 49,000.00 51,450.00

9 Cat Tembok ( fresh / Setara ) Kg 20,250.00 21,650.00

10 Cat Tembok ( Jarum / Setara ) Kg 27,500.00 28,875.00

11 Cat Tembok ( Jotun / Setara ) Eksterior Kg 82,500.00 86,625.00

12 Cat Tembok ( Jotun / Setara ) Interior Kg 77,500.00 81,375.00

13 Cat Tembok ( Matex / Setara ) Kg 9,200.00 9,500.00

14 Dempul Kayu Kg 20,000.00 15,000.00

15 Lem Kayu Ltr 30,000.00 20,000.00

16 Minyak Cat Ltr 22,500.00 11,000.00

17 Pernis Ltr 57,000.00 57,000.00

18 Plamur Tembok / dempul Kg 8,000.00 7,000.00

19 Plitur Ltr 57,000.00 57,000.00

20 Ter (Blacken) Ltr 12,500.00 21,000.00

21 Tinner Ltr 66,500.00 19,000.00

XIII GORONG - GORONG

1 Gorong - gorong dia. 100 Cm x 0,5 M M' 550,000.00 577,500.00

2 Gorong - Gorong dia. 80 Cm x 1 M M' 354,000.00 371,700.00

3 Gorong - Gorong dia. 60 Cm x 1 M M' 264,000.00 252,000.00

4 Gorong - gorong dia. 30 Cm x 1,2 M M' 115,000.00 120,750.00

XIV P I P A

1 Bh 5,000.00 5,000.00

2 Knee, Tee, Sock Pipa PVC Dia. 1/2 " Bh 2,500.00 2,500.00

Isolatif / Sealtape

Page 11: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

3 Knee, Tee, Sock Pipa PVC Dia. 3/4 " Bh 3,500.00 3,500.00

4 Lem PVC Bh 9,000.00 9,450.00

5 Pipa galvanis Medium A ½” (tbl. 2,2 mm) Btg 128,700.00 135,150.00

6 Pipa galvanis Medium A 1” (tbl. 2,2 mm) Btg 278,950.00 292,900.00

7 Pipa galvanis Medium A 1 ½” (tbl. 2,2 mm) Btg 418,385.00 439,325.00

8 Pipa galvanis Medium A 3/4” (tbl. 2,2 mm) Btg 168,025.00 176,450.00

9 Pipa galvanis Medium A 2” (tbl. 2,2 mm) Btg 556,325.00 584,150.00

10 Pipa galvanis Medium 3” (tbl. 2,3 mm) Btg 815,200.00 855,975.00

11 Pipa galvanis Medium 4” (tbl. 2,3 mm) Btg 939,225.00 986,200.00

Page 12: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

12 Pipa galvanis Medium 6” (tbl. 3 mm) Btg 2,139,500.00 2,246,475.00

13 Pipa galvanis Medium 8” (tbl. 3,5 mm) Btg 3,987,500.00 4,186,875.00

14 Pipa galvanis Medium 10” (tbl. 6 mm) Btg 6,380,000.00 6,699,000.00

15 Pipa galvanis Medium 12” (tbl. 6,35 mm) Btg 8,250,000.00 8,662,500.00

16 Pipa galvanis Medium 16” (tbl. 6,35 mm) Btg 14,850,000.80 15,592,500.84

17 Pipa PVC Pj. 4m Ukuran 1/2" (Maspion) Btg 26,000.00 30,000.00

18 Pipa PVC Pj. 4m Ukuran 3/4" (Maspion) Btg 32,000.00 35,000.00

19 Pipa PVC Pj. 4m Ukuran 1" (Maspion) Btg 40,000.00 42,000.00

20 Pipa PVC Pj. 4m Ukuran 1 ½" (Maspion) Btg 45,000.00 47,000.00

21 Pipa PVC Pj. 4m Ukuran 2" (Maspion) D Btg 40,000.00 50,000.00

22 Pipa PVC Pj. 4m Ukuran 3" (Maspion) D Btg 65,000.00 68,000.00

23 Pipa PVC Pj. 4m Ukuran 4" (Maspion) D Btg 68,000.00 70,000.00

XV UTILITAS

1 Profil Tank 1100 Ltr Bh 1,200,000.00 1,500,000.00

2 Profil Tank 2200 Ltr Bh 2,992,500.00 2,992,500.00

3 Pompa Air Listrik kecil Bh 375,000.00 375,000.00

XVI ELEKTRICAL

1 Kabel Listrik NYM / Tanam 2 x 2,5 mm Rol 500,000.00 500,000.00

2 Kabel Listrik NYA 2,5 mm Standar PLN Rol 290,000.00 290,000.00

3 Kabel Listrik NYA 4 mm Standar PLN Rol 445,500.00 445,500.00

4 Lampu Mercuri Bh 275,000.00 275,000.00

5 Lampu Pijar standar Bh 10,000.00 10,000.00

6 Lampu TL Bulat ( 20 Watt ) Bh 100,000.00 100,000.00

7 Lampu TL Bulat ( 40 Watt ) Bh 125,000.00 125,000.00

8 Lampu TL Panjang ( 20 Watt ) Bh 100,000.00 100,000.00

9 Lampu TL Panjang ( 40 Watt ) Bh 125,000.00 125,000.00

10 Schkelar Bh 35,000.00 35,000.00

Page 13: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

11 Stop Kontak + Instalasi ( Bangunan Beton ) Bh 75,000.00 75,000.00

12 Stop Kontak + Instalasi ( Bangunan Kayu ) Bh 60,000.00 60,000.00

13 Titik Lampu + Instalasi ( Bangunan Beton ) Bh 110,000.00 110,000.00

14 Titik Lampu + Instalasi ( Bangunan Kayu ) Bh 75,000.00 75,000.00

15 Zekering Kast Lokal 1 Group Bh 50,000.00 50,000.00

16 Zekering Kast Lokal 2 Group Bh 95,000.00 95,000.00

Dirangkum

Kasi Pembangunan dan Kasi Pemeliharaan Pemanfaatan Air Jalan Dan Jembatan

Dinas PU Kab. Seruyan Dinas PU Kab. Seruyan

IWAN ZULIANTO, ST APRIZAL MAULANA,STNIP. 19790702 200604 1 007 NIP. 19740405 200604 1 013

DisetujuiKabid Sumber Daya Air Kabid Bina MargaDinas PU Kab. Seruyan Dinas PU Kab. Seruyan

ABDUL RAJAK, SPi KASTAM, SE, MMNIP. 19720513 200604 1 020 NIP. 19680710 199703 1 006

Mengetahui :Plt. Kepala Dinas PUKabupaten Seruyan

Page 14: Hsbj Triwulan III Th. 2015

NO JENIS BAHAN DAN MATERIAL SATUAN K E C A M A T A N

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5

AKHMAD HIDAYAT, MT, M.ScNIP. 19730214 199803 1 013

Catatan : Untuk Harga Bahan Material Pasir, Batu dan Tanah

Sudah Termasuk Galian C

Page 15: Hsbj Triwulan III Th. 2015

DAFTAR HARGA BAHAN KABUPATEN SERUYANTRIWULAN II TAHUN 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

5,000,000.00 4,500,000.00 4,000,000.00

1,800,000.00 1,700,000.00 1,600,000.00

1,500,000.00 1,400,000.00 1,300,000.00

4,000.00 3,500.00 3,000.00

8,000.00 7,000.00 6,000.00

4,500.00 3,750.00 3,500.00

7,500,000.00 6,000,000.00 5,000,000.00

2,250,000.00 2,000,000.00 1,800,000.00

1,700,000.00 1,600,000.00 1,500,000.00

1,500,000.00 1,400,000.00 1,300,000.00

2,000,000.00 1,900,000.00 1,850,000.00

150,000.00 150,000.00 150,000.00

30,000.00 45,000.00 50,000.00

- -

25,000.00 50,000.00 65,000.00

15,000.00 20,000.00 25,000.00

10,000.00 15,000.00 20,000.00

47,500.00 50,000.00 53,000.00

51,000.00 53,500.00 56,500.00

235,000.00 250,000.00 300,000.00

35,000.00 45,000.00 55,000.00

35,000.00 37,500.00 40,000.00

- - -

47,000.00 54,000.00 56,000.00

Page 16: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

47,000.00 54,000.00 56,000.00

15,000.00 17,500.00 20,000.00

17,500.00 20,000.00 22,500.00

25,000.00 27,500.00 30,000.00

65,000.00 90,000.00 120,000.00

75,000.00 120,000.00 125,000.00

Page 17: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

95,000.00 115,000.00 120,000.00

37,000.00 85,000.00 90,000.00

235,000.00 235,000.00 240,000.00

- - -

165,000.00 175,000.00 180,000.00

64,350.00 75,000.00 105,000.00

35,000.00 35,000.00 40,000.00

60,000.00 70,000.00 80,000.00

75,000.00 85,000.00 95,000.00

120,000.00 130,000.00 140,000.00

165,000.00 170,000.00 182,000.00

150,000.00 160,000.00 165,000.00

32,500.00 37,500.00 45,000.00

20,000.00 25,000.00 30,000.00

25,000.00 30,000.00 32,500.00

25,000.00 35,000.00 42,500.00

15,000.00 17,500.00 20,000.00

20,000.00 25,000.00 30,000.00

30,000.00 35,000.00 37,500.00

23,000.00 25,000.00 27,500.00

20,000.00 25,000.00 27,500.00

18,000.00 20,000.00 25,000.00

1,650.00 2,550.00 3,125.00

4,250.00 4,375.00 4,500.00

22,000.00 23,000.00 25,000.00

Page 18: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

18,000.00 18,000.00 20,000.00

22,000.00 22,000.00 25,000.00

5,000.00 10,000.00 15,000.00

236,500.00 242,000.00 253,000.00

- - -

- - -

284,875.00 209,150.00 304,750.00

- - -

- - -

17,000.00 20,000.00 25,000.00

90,000.00 120,000.00 120,000.00

35,000.00 45,000.00 45,000.00

35,000.00 40,000.00 40,000.00

30,000.00 35,000.00 35,000.00

2,165,000.00 2,265,000.00 2,615,000.00

4,025,000.00 4,125,000.00 4,475,000.00

500,000.00 1,250,000.00 1,300,000.00

550,000.00 1,750,000.00 1,850,000.00

50,000.00 1,100,000.00 1,250,000.00

65,000.00 1,100,000.00 1,250,000.00

650,000.00 750,000.00 850,000.00

500,000.00 525,000.00 650,000.00

3,000.00 3,500.00 4,000.00

200,000.00 250,000.00 275,000.00

900.00 1,000.00 1,100.00

577,500.00 588,000.00 598,500.00

15,000.00 17,500.00 18,000.00

787,500.00 813,750.00 840,000.00

Page 19: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

787,500.00 813,750.00 840,000.00

787,500.00 813,750.00 840,000.00

766,500.00 787,500.00 813,750.00

735,000.00 761,250.00 787,500.00

614,250.00 677,250.00 725,000.00

130,000.00 225,000.00 250,000.00

95,000.00 27,500.00 30,000.00

577,500.00 420,000.00 420,000.00

131,250.00 207,900.00 231,000.00

378,000.00 420,000.00 446,250.00

131,250.00 207,900.00 231,000.00

122,400.00 207,900.00 231,000.00

105,500.00 98,175.00 103,950.00

3,500.00 4,750.00 5,500.00

4,000.00 4,200.00 5,200.00

91,087.50 92,137.50 93,187.50

78,750.00 84,000.00 85,050.00

Page 20: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

65,000.00 67,500.00 75,000.00

65,000.00 70,000.00 82,000.00

60,000.00 70,000.00 75,000.00

70,000.00 80,000.00 87,000.00

67,500.00 72,000.00 80,000.00

65,000.00 72,000.00 82,000.00

74,550.00 76,325.00 78,100.00

78,750.00 80,625.00 82,500.00

50,000.00 76,325.00 78,100.00

75,600.00 77,400.00 79,200.00

79,800.00 81,700.00 83,600.00

40,000.00 89,225.00 91,300.00

80,000.00 74,175.00 75,900.00

80,000.00 77,400.00 79,200.00

77,175.00 79,012.50 80,850.00

78,750.00 80,625.00 82,500.00

112,612.50 115,293.75 117,975.00

120,750.00 123,625.00 126,500.00

114,450.00 117,175.00 119,900.00

126,000.00 75,000.00 85,000.00

198,450.00 203,175.00 207,900.00

332,325.00 340,237.50 348,150.00

7,350.00 7,525.00 7,700.00

14,437.50 14,781.25 15,125.00

17,325.00 17,737.50 18,150.00

10,500.00 10,750.00 11,000.00

52,500.00 65,000.00 75,000.00

365,000.00 375,000.00 385,000.00

Page 21: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

370,000.00 420,000.00 470,000.00

350,000.00 400,000.00 450,000.00

275,000.00 315,000.00 400,000.00

287,500.00 450,000.00 550,000.00

150,000.00 300,000.00 500,000.00

287,500.00 450,000.00 550,000.00

20,000.00 23,000.00 25,000.00

22,500.00 25,000.00 27,500.00

25,500.00 25,000.00 27,500.00

Page 22: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

27,500.00 30,000.00 32,500.00

150,000.00 175,000.00 180,000.00

15,000.00 17,500.00 20,000.00

13,500.00 14,750.00 15,500.00

15,750.00 16,500.00 17,250.00

55,000.00 57,500.00 60,000.00

82,500.00 86,250.00 90,000.00

17,500.00 20,000.00 25,000.00

1,500,000.00 1,600,000.00 1,700,000.00

175,000.00 200,000.00 250,000.00

15,000.00 22,500.00 25,000.00

130,000.00 145,000.00 150,000.00

75,000.00 95,000.00 120,000.00

60,000.00 115,000.00 135,000.00

2,420,000.00 2,530,000.00 2,640,000.00

- - -

350,000.00 500,000.00 750,000.00

- - -

465,000.00 475,000.00 500,000.00

345,000.00 365,000.00 375,000.00

350,000.00 400,000.00 450,000.00

- - -

140,000.00 145,000.00 150,000.00

160,000.00 175,000.00 180,000.00

145,000.00 150,000.00 160,000.00

175,000.00 185,000.00 200,000.00

13,500.00 14,000.00 15,000.00

250.00 300.00 300.00

Page 23: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

13,500.00 14,000.00 15,000.00

12,000.00 14,000.00 16,500.00

12,000.00 25,000.00 40,000.00

9,500.00 10,000.00 12,000.00

6,500.00 7,500.00 7,500.00

25,000.00 30,000.00 35,000.00

21,000.00 25,000.00 30,000.00

12,000.00 14,000.00 16,000.00

Page 24: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

4,000.00 5,000.00 7,500.00

5,000.00 6,000.00 8,500.00

45,000.00 30,000.00 35,000.00

50,000.00 55,000.00 60,000.00

35,000.00 25,000.00 30,000.00

7,700.00 8,225.00 9,250.00

49,500.00 52,875.00 57,375.00

53,900.00 57,575.00 62,475.00

22,650.00 24,150.00 26,175.00

30,250.00 32,300.00 35,050.00

90,750.00 96,925.00 105,175.00

85,250.00 91,050.00 98,800.00

9,500.00 12,000.00 15,000.00

15,000.00 65,000.00 75,000.00

30,000.00 35,000.00 37,500.00

11,000.00 50,000.00 65,000.00

57,000.00 57,000.00 57,000.00

8,500.00 8,000.00 9,000.00

57,000.00 57,000.00 57,000.00

21,000.00 13,000.00 15,000.00

30,000.00 70,000.00 55,000.00

605,000.00 646,250.00 701,250.00

389,400.00 415,950.00 451,350.00

252,000.00 270,900.00 284,450.00

126,500.00 135,125.00 146,625.00

5,000.00 6,000.00 7,000.00

2,500.00 2,750.00 3,000.00

Page 25: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

3,500.00 3,750.00 4,000.00

9,450.00 9,675.00 9,900.00

135,150.00 138,375.00 141,575.00

292,900.00 299,875.00 306,850.00

439,325.00 449,775.00 460,225.00

176,450.00 180,650.00 184,850.00

584,150.00 598,050.00 611,750.00

855,975.00 876,350.00 896,725.00

986,200.00 1,009,675.00 1,033,150.00

Page 26: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

2,246,475.00 2,299,975.00 2,353,450.00

4,186,875.00 4,286,562.50 4,386,250.00

6,699,000.00 6,858,500.00 7,018,000.00

8,662,500.00 8,868,750.00 9,075,000.00

15,592,500.84 15,963,750.86 16,335,000.88

30,000.00 35,000.00 40,000.00

35,000.00 40,000.00 45,000.00

42,000.00 45,000.00 50,000.00

47,000.00 50,000.00 55,000.00

50,000.00 55,000.00 60,000.00

68,000.00 70,000.00 75,000.00

70,000.00 75,000.00 80,000.00

1,250,000.00 1,614,375.00 1,750,000.00

2,992,500.00 3,067,325.00 3,200,000.00

375,000.00 425,000.00 450,000.00

500,000.00 525,000.00 551,250.00

290,000.00 304,500.00 351,700.00

445,500.00 467,775.00 491,175.00

275,000.00 285,000.00 300,000.00

10,000.00 12,000.00 15,000.00

100,000.00 115,000.00 120,000.00

125,000.00 130,000.00 135,000.00

100,000.00 115,000.00 120,000.00

125,000.00 130,000.00 135,000.00

35,000.00 40,000.00 40,000.00

Page 27: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

75,000.00 80,000.00 80,000.00

60,000.00 70,000.00 70,000.00

110,000.00 120,000.00 120,000.00

75,000.00 80,000.00 80,000.00

50,000.00 55,000.00 60,000.00

95,000.00 100,000.00 105,000.00

Kuala Pembuang, 01 April 2014

Dirangkum

Kasi Penyehatan LingkunganPermukiman

Dinas PU Kab. Seruyan

BAHRUDIN, STNIP. 19750601 200903 1 001

DisetujuiKabid Cipta Karya

Dinas PU Kab. Seruyan

YUSDI HARIANI, STNIP. 19770204 200604 1 009

Page 28: Hsbj Triwulan III Th. 2015

K E C A M A T A N

HANAU SERUYAN TENGAH SERUYAN HULU

6 7 8

Page 29: Hsbj Triwulan III Th. 2015

DAFTAR HARGA UPAH KABUPATEN SERUYANTRIWULAN II TAHUN 2015

NO. TENAGA KERJA KODE SATUAN KECAMATAN

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5 6

1 Pekerja L.01 Orang/Hari 70,000.00 75,000.00

2 Tukang

L.02

Tukang Gali Orang/Hari 75,000.00 80,000.00

Tukang Batu/Tembok Orang/Hari 90,000.00 95,000.00

Tukang Kayu Orang/Hari 100,000.00 105,000.00

Tukang Besi/Besi Beton Orang/Hari 100,000.00 105,000.00

Tukang Cat/Pelitur Orang/Hari 90,000.00 95,000.00

Tukang Pipa/Operator Pompa Orang/Hari 75,500.00 80,000.00

Tukang Penganyam Bronjong Orang/Hari 70,000.00 75,000.00

Tukang Tebas Orang/Hari 78,000.00 83,000.00

Tukang Las Orang/Hari 85,000.00 90,000.00

Tukang Listrik Orang/Hari 85,000.00 90,000.00

3 Kepala Tukang L.03 Orang/Hari 110,000.00 115,000.00

4 Mandor L.04 Orang/Hari 120,000.00 ###

5 Juru Ukur L.05 Orang/Hari - -

6 Pembantu Juru Ukur L.06 Orang/Hari - -

7 Ahli Alat Berat (Mekanik) L.07 Orang/Hari 87,500.00 90,000.00

8 Operator Alat Berat L.08 Orang/Hari 87,500.00 90,000.00

Page 30: Hsbj Triwulan III Th. 2015

NO. TENAGA KERJA KODE SATUAN KECAMATAN

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5 6

9 Pembantu Operator L.09 Orang/Hari 66,000.00 71,000.00

10 Supir Truk L.10 Orang/Hari 80,500.00 ###

11 Kenek Truk L.11 Orang/Hari 67,000.00 ###

12 Penjaga Malam L.12 Orang/Hari 87,500.00 80,500.00

Dirangkum

Kasi Pembangunan dan Kasi Pemeliharaan

Pemanfaatan Air Jalan Dan Jembatan

Dinas PU Kab. Seruyan Dinas PU Kab. Seruyan

IWAN ZULIANTO, ST APRIZAL MAULANA,ST

NIP. 19790702 200604 1 007 NIP. 19740405 200604 1 013

Disetujui

Kabid Sumber Daya Air Kabid Bina Marga

Dinas PU Kab. Seruyan Dinas PU Kab. Seruyan

ABDUL RAJAK, SPi KASTAM, SE, MM

NIP. 19720513 200604 1 020 NIP. 19751014 200604 1 010

Mengetahui :

Page 31: Hsbj Triwulan III Th. 2015

NO. TENAGA KERJA KODE SATUAN KECAMATAN

SERUYAN HILIR DANAU SEMBULUH

1 2 3 4 5 6

Kepala Dinas PU

Kabupaten Seruyan

AKHMAD HIDAYAT, MT, M.Sc

NIP. 19670830 199503 1 003

Page 32: Hsbj Triwulan III Th. 2015

DAFTAR HARGA UPAH KABUPATEN SERUYANTRIWULAN II TAHUN 2015

KECAMATAN

HANAU SERUYAN TENGAH SERUYAN HULU

7 8 9

75,000.00 80,000.00 85,000.00

80,000.00 85,000.00 90,000.00

95,000.00 100,000.00 105,000.00

### 110,000.00 115,000.00

105,000.00 110,000.00 115,000.00

95,000.00 100,000.00 105,000.00

80,000.00 85,000.00 90,000.00

75,000.00 80,000.00 85,000.00

83,000.00 88,000.00 93,000.00

90,000.00 95,000.00 100,000.00

90,000.00 95,000.00 100,000.00

115,000.00 120,000.00 125,000.00

120,000.00 125,000.00 130,000.00

- - -

- - -

90,000.00 95,000.00 100,000.00

90,000.00 95,000.00 100,000.00

Page 33: Hsbj Triwulan III Th. 2015

KECAMATAN

HANAU SERUYAN TENGAH SERUYAN HULU

7 8 9

71,000.00 75,000.00 80,000.00

80,500.00 85,500.00 90,000.00

67,000.00 70,000.00 75,000.00

80,500.00 85,500.00 90,000.00

Kuala Pembuang, 01 April 2015

Dirangkum

Kasi Penyehatan Lingkungan

Permukiman

Dinas PU Kab. Seruyan

BAHRUDIN, ST

NIP. 19750601 200903 1 001

Disetujui

Kabid Cipta Karya

Dinas PU Kab. Seruyan

YUSDI HARIANI, ST

NIP. 19770204 200604 1 009

Page 34: Hsbj Triwulan III Th. 2015

KECAMATAN

HANAU SERUYAN TENGAH SERUYAN HULU

7 8 9