Upload
kelly-tarter
View
226
Download
2
Embed Size (px)
DESCRIPTION
Â
Citation preview
:: Current Thesis work
This thesis focuses on RECONNECTION through Activity, Assembly and Assimilation, where the park once held assembly. The
resultant intervention emulates from the abandoned bridge at Richmond Street in Balboa Park that once connected the park to the freeway.
By seeing the bridge as a repurposed point of connection, the new architecture will utilize the abandoned space to give the bridge a
neoteric expanded identity. By investigating new program, it introduces a space that allows both visitors and everyday users to
utilize the space informed by their own intentions and ideas. Through dif-ferent transparencies and overlays of structure and materials, the
density will determine the platform of the project. The final design will extend and enhance interactions between people and their park.
Activity. Assembly. Assimilation. … RECONNECTION
:: Field Work
Project was based out of Temecula California at a residential home. The project was to design a added two car garage with a
Attached RV garage within close proximity to a pool house.
Individual Contracting with Heid Construction TO MATCH ADJACENT SURFACES.
*(OPTIONAL- SKIP TROWEL TEXTURE)
LIGHTING SELECTION & TYPES BY OWNER.
DRYWALL FINISH TO BE ORANGE PEEL FINISH.
ALL GYPSUM BD. CORNERS TO BE BULLNOSED.ALL BASEBOARDS TO BE 6" HIGH OR BY OWNERS SPECS.
INTERIOR FINISH NOTES:
CEILING TREATMENT TO BE ORANGE PEEL FINISH,
INTERIOR ELEVATIONS - BY OTHERS.
ENAMEL PAINT BATHS & KITCHENS.
WH
WH
FAU
PR.3068 HC
3068 HC
8050 SLDR. (X
OX
)
PR.2068 HC
3068 HC
6060 SLDR.
3068 SC
3068 HC
6060 SLDR.
PR. 3080 FRENCH
2050 SH
3068 SC
3068 HC
5040 SLDR.
ARCH
TOP
2440 FIX.
5050 SLDR.
4020 SLDR.
PR. 3068 FRENCH
(TEMP.)2650 SHOBSCURE
3050 SH
8050 SLDR. (XOX)
5020 FIX. A
RCHED
6050 SLDR.
5040 SLDR.
3068 HC
3068 HC
TOP O
/ 6050 SLDR.
W/ CLOSER
4060 SLDR.
3040 FIXED
5040 SLDR.
3050 SH
5050 SLDR.
5040 SLDR.
O/ 6050 SLD
R.6013 FIX
. EYEBROW
5040 SLDR.
PR. 3080 SC
6050 SLDR.
OPTIO
NA
L ARCH
ED GLA
ZED W
IND
OW
(TEMP.) O
/ DO
OR
OBSCURE2040 SH
2868 HC
2668 HC
2868 HC
9840 FIX. A
RCH TO
P(TEMP.) O
/ DO
OR
ARCH
TOP
2440 FIX.
2668 HC
2868 HC
2668 HC
2468 SC
CON
C.
rv. garage
27
26 GA. G.I. MATERIAL, SEALEDAT EDGES. (SEC. 302.4)
DUCTS PIERCING WALLS SHALL BE
+18" HIGH WOODPLATFORM
AT WALLS AND CEILING.5/8" TYPE "X" GYP. BD.
(OPTIONAL:)RUN UP TO ROOF HERE.
FITTING - 20 MIN. RATED.AUTO-CLOSER - TO BE TIGHTDOOR SHALL BE EQUIPPED W/
garage
bedroom - 2
bath - 2bath - 3bedroom - 3
niche
dining
linen
hall
kitchen
family
nook
living
entry
porch
patio
study
powder
m./bath
hers
master suite
sitting
33
2719
39
27
27
laundry17 21 18
STOO
P
d 5
24
25
22
9
26
8
22
25
12
3236
S & P
S & P
S & PS & PS & P
S & P
S & P
S & P
S & PS & P
2221
frzr.
hall
pantry
storage27
frig6
d.o.3122
t.c.
421
3
1
2
dw
35
15
23
34TYP. OF 2
TYP. OF 211
patio
38
37
24
# MBU36
20
12
13
w
32
25
22
25 22
24
22
2516
10
26
9
his
7
83'-7"
31.30.
33. BUILT-IN WORK BENCH WITH CABINETS ABOVE.
BUILT-IN BOOKSHELVES...BY OWNER. BUILT-IN DOUBLE OVEN OR SINGLE OVEN W/ MICROWAVE ABOVE, VERIFY DIMENSIONS WITH MANUFACTURER. 24"Ø SKYLIGHT WITH MIRRORED LIGHTWELL. INSTALL PER MANUF. RECCOMS. - I.C.B.O.#2469.
32.
BUILT-IN LINEN SHELVES - 5 HIGH.
PH(909) 757-1551 - ON 18" SQUARE BASE. 16"Ø PRE-CAST COLUMNS BY- "EMPIRE CONC.", WILDOMAR,CA.
UPPER AND LOWER CABINET WITH WOOD TOP.
PIPING ARE TO BE SELF-DRAINING. ABOVE CROWN WEIR OF TRAP. PUMP AND CIRCULATION ACCESS. THE CIRCULATION PUMP IS TO BE LOCATED WITH 110v OUTLET (GFI) WITH REMOVABLE PANEL FOR SPA/TUB WITH PLATFORM (FINISH BY OWNERS SPECS.)
HOT & COLD WATER HOOK - UPS. SINGLE UTILITY SINK, PROVIDE REQ'D DRAIN AND
MIRROR FIXED TO WALL ABOVE SPLASH. TOP @ +72"
75 GALLON WATER HEATER. USE ON NON-RIGID CONN.
WIDTHS AND SPECIAL CASING DETAILS, (IF REQUIRED).
PROVIDE ALUMINUM THRESHOLDS AT ALL EXTERIOR DOORS,
VERIFY ALL STAINED/VARNISHED HARDWOOD MATERIAL
PROVIDE WEATHER STRIPPING AT ALL EXTERIOR DOORS.DOOR SIZES INDICATED ON THIS SCHEDULE ARE EITHERNOMINAL OR ROUGH OPENING. VERIFY ALL SIZES ON THESITE WITH OWNER PRIOR TO FABRICATION.ALL DOORS OF SIMILAR DESIGN SHALL BE FABRICATED BY
ALL FRENCH DOORS SHALL BE FABRICATED BY THE WINDOW
ASSEMBLIES SHALL BE FABRICATED AS ONE UNIT.ADJUST FRAME WIDTHS TO COMPENSATE FOR STUD WALL
FRENCH DOOR/SIDELIGHT AND ENTRY DOOR/SIDELIGHT
(VERIFY WITH OWNER).
DOOR NOTES:
AND COLORS WITH OWNER.
THE SAME FABRICATOR.
ELECTRICAL AND DRAIN. "KOLHER" OR EQ.
FLOOR PLAN NOTES
WITH GLASS BLOCK WALL OPENINGS - PER PLAN.
PANTRY WITH ADJUSTABLE SHELVES, 5 HIGH. VERIFY DIMENSIONS WITH MFG.
DIMENSIONS AND INSTALL PER MFG. SPECS.
GLASS ENCLOSURE BY "KOHLER" OR EQ. MOD.# K-715. CERAMIC TILE SHOWER WITH WALLS TO (+84") AND
PRE-CAST FIBERGLASS TUB/SHOWER WITH TEMPERED
WATER STUB-OUT, RECESSED IN WALL FOR ICE-MAKER. 39" CLEAR REFRIGERATOR SPACE, PROVIDE WITH COLD BUILT-IN UPPER AND LOWER CABINETS W/CLOTHES ROD. BUILT-IN TRASH COMPACTOR. VERIFY DIM. WITH MANUF.
BEND AND SELF-CLOSING BACK DRAFT DAMPER. VERIFY VENT TO OUTSIDE AIR, VENT PIPE SHALL HAVE 90 DEGREE BUILT-IN COOK-TOP WITH METAL HOOD, FAN AND LIGHT,
APPROVED AIRGAP FITTING, VERIFY DIMENSIONS WITH BUILT-IN DISHWASHER ON SEPARATE CIRCUIT, WITH
DOUBLE SINK W/GARBAGE DISPOSAL. PROVIDE REQUIRED
INDICATES NOTES APPLICABLE TO THIS PLAN ONLY!
DECORATIVE NICHE BY OWNER... +32" ABV. FLOOR. LAUNDRY TUB, VERIFY SIZE WITH OWNER.
REFER. TO MFG. SPECS. FOR LENGTH & SIZE OF DUCTING. DRYER SPACE PROVIDE DRYER VENT TO OUTSIDE AIR.
AIR TO OUTSIDE, PROVIDE WATER RECIRCULATING PUMP. AND STRAP FOR LATERAL SUPPORT. PROVIDE COMBUSTION
BUILT-IN DESK (+29" A.F.F.) W/DRAWER UNDER TOP AND
BUILT-IN SHELVES - 5 HIGH.
METAL FIREPLACE BY "MAJESTIC" (OR EQUAL)
SHOWER SEAT +18" HIGH.
COUNTER TOP & SPLASH BY OWNERS SPECS. BUILT-IN ENTERTAINMENT CENTER BY GEN. CONTRACTOR.
INSTALL APPROVED SPARK ARRESTOR. (SEE PLANS FOR PROVIDE GLASS DOORS, VENTS TO OUTSIDE AIR. NON-COMBUSTIBLE MATERIAL AROUND OPENING. WITH MANUF. MINIMUM HEARTH DEPTH, 12" MINIMUM
WASHER SPACE, PROVIDE HOT AND COLD WATER/WASTE.
LINEN WITH 5 SHELVES.
BUILT-UP TILED SHELF AROUND TUB - TOP AT 20" A.F.F.(VER. HT.)
MANUFACTURER.
8.
23.
29.28.
26.
MODEL # CALLOUT).
25.
27.
21.22.
ABOVE FLOOR.
CABINETS ABOVE.
14.
19.
20.
16.17.18.
15. CABINETS ABOVE.
12.13.
11.
10.
9.
1.
6.
7.
4.5.
3.
2.
MANUFACTURER.
24.
14"Ø PRE-CAST (1/2 COLUMNS) BY- "EMPIRE CONC.", WILDOMAR,CA. PH(909) 757-1551 - ON (1/2) 18" SQUARE BASE.
34.
+42" HIGH BARTOP WITH BRACKETS FOR SUPPORT UNDERNEATH.35. UPPER AND LOWER LINEN CABINET WITH WOOD TOP.36. BUILT-IN DRYWALL NICHE W/ CURVED INTERIOR WALLS.37.
AIR TO OUTSIDE, PROVIDE WATER RECIRCULATING PUMP. AND STRAP FOR LATERAL SUPPORT. PROVIDE COMBUSTION 30 GALLON WATER HEATER. USE NON-RIGID CONN.38.
PROVIDE SET BACK THERM. AND SUMMER FAN SWITCH. CONDENSATE LINE TO OUTSIDE OR APPROVED DRAIN. UP FLOW F.A.U. - PROVIDE COMBUSTION AIR AND39.
TEMERATURE OF 70 DEGREES F. AT 3 FEET ABOVE THE
WALL COVERING AT TUBS AND SHOWERS TO BE CEMENT
MOISTURE RESISTANT. UBC 807.1.3 AND 2512MATERIALS OTHER THAN STRUCTURAL ELEMENTS TO BEPLASTER, TILE, OR APPROVED EQUAL TO 96" ABOVE DRAIN.
KITCHEN LIGHTING 40 LUMENS/WATT OR FLLUORESCENT
BATHROOMS SHALL HAVE AN EFFICIENCY OF AT LEASTGENERAL PURPOSE LIGHTING IN KITCHENS ANDFIXED APPLIANCES TO BE ON A SEPARATE CIRCUIT.
ALL WINDOWS TO BE VINYL FRAMED (U.N.O.)
FLOOR IN ALL HABITABLE ROOMS. PER UBC #310.11.
FIXTURES. TABLE 2-2 SEC. 150 (K) 1.3.
40 LUMENS PER WATT.
COLOR BY OTHERS.
ALL WINDOWS TO BE DUAL PANE.
FACILITIES CAPABLE OF MAINTAINING A ROOMDWELLING UNIT SHALL BE PROVIDED WITH HEATING
NOTE:ALL NEW GLAZING SHALL COMPLY WITH STANDARDS OFTHE U.S. CONSUMER PRODUCT SAFETY COMMISSION.MANUFACTURERS SHALL SUPPLY CERTIFICATE OF
WINDOW NOTES:
ALL WINDOWS SHALL BE VINYL FINISH (U.N.O.)
ENTRY DOOR/SIDELIGHTS ASSEMBLY SHALL BE
ADJUST FRAME WIDTHS TO COMPENSATE FORSTUD WALL WIDTHS AND SPECIAL CASING (IF REQ.)ALL EXTERIOR WINDOWS SHALL BE FULLY WEATHER-
CONTRACTORS SHALL DETERMINE/VERIFY ALL FINISH
ALL WINDOWS SHALL BE FABRICATED BY THE SAMEFABRICATOR. (BUILDERS FINISH OR EQUAL).
FABRICATED AS ONE UNIT.
VERIFY WINDOW FINISHES WITH OWNER.
COMPLIANCE TO THE OWNER.
DIMENSIONS.
STRIPPED.
SECTION # 807.1.3 U.B.C. AND U.P.C. #412.8.ALL SHOWERS SHALL COMPLY WITH
WINDOW SIZES ARE INDICATED AS ROUGH OPENINGS.
REVISED
01.05.2015
SHEET NO.
A.1
DATE:
SCALE:
DRAWN BY:
FLO
OR
PLA
N
JOB:
UPDATED:
01/11/2015
01/11/2015
KELLY TARTER
1/8” = 1’-0”
SUD
DO
N R
ESID
ENCE
328
57 V
ISTA
DE
ORO
TEM
ECLA
CA
. 925
91
01.06.2015
01.11.2015
** NOTE
WINDOWS TO BE DULE GLAZED LOW-E VINAL,WITH A U FACTOR OF O.350
5040
SLD
R.
3068
HC
5040
SLD
R.
3068 HC
5040
SLD
R.
4060
SLD
R.
6050 SLDR.
3040
FIX
ED
3068
HC
5040
SLD
R.
17'-1
"
4'-3
"2'
-8 1
/2"
5'-8
1/8
"5'
-3 3
/4"
4'-0" 12'-0" 4'-0"
20'-0"
5'-6" 4'-6" 9'-8"
4'-4" 3'-0" 5'-0" 3'-0" 4'-0"
4"5'
-0" 2'-1
0"3'
-6"
4'-8
"
2'-6
"4"
21'-0"
2'-6 1/2"
10'-0"
8'-5 1/2"
6'-1
1"10
'-0"
10'-0
"17
'-6"
6'-6
"
4'-0"3'-0"
15'-4 1/8"
22'-4 1/8"
44'-8 3/8"
6'-0
7/8"
10'-8 3/4"10'-8 3/4"
21'-5 1/2"
7'-0
"7'
-0"
3'-0
"4'
-0"
21'-0
"
2'-6
"16
'-0"
2'-0
7/8
"
8 1/
8"
3'-1 3/8"
14'-0"
3'-6"
27'-7 3/4"
22'-4 1/4"
50'-0"
REVISED
01.05.2015
SHEET NO.
A.1.1
DATE:
SCALE:
DRAWN BY:
DIM
ENSI
ON
PL
AN
JOB:
UPDATED:
01/30/2015
01/30/2015
KELLY TARTER
1/4” = 1’-0”
SUD
DO
N R
ESID
ENC
E 3
2857
VIS
TA D
E O
ROTE
MEC
LA C
A. 9
2591
01.06.2015
01.11.2015
01.30.2015
** NOTE
WINDOWS TO BE DULE GLAZED LOW-E VINAL,WITH A U FACTOR OF O.350
FLOOR TO CEILING BUILTIN CABITNETS
SINK / CABINETS
2" KICK SPACE
2X4 EXT STUDS @ 16" OC.
1/2" PLYWD.BACKING
BUILT-UP FOAM RADIUSED FASCIA (BY OTHERS) W/ COLOR COAT OVER
STUCCO FINISH O/ (2) LYR. 15# PAPER
PROVIDE CONT. G.I. DRIPW/ HEMMED EDGES
EAVE BLOCKING SEE STRUCT. DOC.
CONC. ROOF TILES O/ (1) LYR. 30# FELT
"O 'HAGIN" VENTING SYSTEM@ LOWER 1/3" OF ROOF EAVE BLOCK/ CEILING INSTALATION LINE-UBC 1505.3
4 1/2" RISE2" KICK SPACE
612
PLACEMENTOF TOILET
INT. FINISH
GLASS DOOR TO SHOWER EXTERIOR SHOWER WALL
001
002
1
003
A-2
A-31
REAR ELEVATION
POOL HOUSE BATH 'ES' WALLPOOL HOUSE BATH 'SW' WALL
FRONT ELEVATION
A-21
POOL HOUSE FRONT VIEW
POOL HOUSE BATH 'NE' WALL
RIGHT SIDE EXTERIOR ELEVATION
POOL HOUSE BATH 'NW' WALL
REVISED
01.05.2015
SHEET NO.
A.2
DATE:
SCALE:
DRAWN BY:
ELEV
ATIO
NS
/ D
ETA
ILS
JOB:
UPDATED:
01/11/2015
01/11/2015
KELLY TARTER
1/8” = 1’-0”
SUD
DO
N R
ESID
ENCE
328
57 V
ISTA
DE
ORO
TEM
ECLA
CA
. 925
91
01.06.2015
01.11.2015
REQ'D FREE AIR MOVEMENT. THEN MULTIPLY BY 144TO CONVERT THE CALCULATION INTO SQUARE INCHES
THE TOTAL NUMBER OF SQUARE INCHES OF FREE FLOWAIR MOVEMENT TO BE PROVIDED BY GABLE END VENTS.
THE TOTAL NUMBER OF SQUARE INCHES OF FREE FLOWAIR MOVEMENT TO BE PROVIDED BY O'HAGIN VENTS.
THE TOTAL NUMBER OF SQUARE INCHES OF FREE FLOW
REQUIRED ROOF VENTILATION
OF REQ'D FREE AIR MOVEMENT.
THE SQUARE FOOTAGE OF ATTIC AREA.
DIVIDE (A) BY 300 TO YIELD THE SQUARE FEET OF
E
THE ATTIC VENTILATION CALCULATIONS OCCUR PER U.B.C.
DS.I.
SLOPE
S.I.
6:12
C
(B)
BS.I.
APLANS.F S.I.
(A)
SECTION 1505.3 AS FOLLOWS:
AIR MOVEMENT TO BE PROVIDED BY EAVE VENT BLOCKS.
(C)
(E)
12"PLAN.
12"PLAN.
SHEATHING WITH 1/2" SOLID SHEATHING AT
TYPICAL ROOFING TO BE "S" CONC. ROOF TILES
TYPICAL ROOF OVERHANG AT RAKE CONDITIONTO BE UNLESS NOTED OTHERWISE ON
TYPICAL ROOF OVERHANG AT EAVE CONDITIONTO BE UNLESS NOTED OTHERWISE ON
ALL OVERHANGS.
UNLESS NOTED OTHERWISE
ROOF SHEATHING TO BE 1/2" PLYWOOD
ROOF NOTES:INDICATES
ON PLAN.
(D)
NOTES:
BY "EAGLE" OR EQ. I.C.B.O. # 4660.
ALL VENT OPENINGS SHALL BE COVERED W/ 1/4"
FRAMER SHALL BE RESPONSIBLE FOR COORDINATING W/TRUSS MFR. TO ACCOMMODATE ALL ATTIC VENTS
ALL VENTS SHALL BE INSTALLED SO AS TO MAKETHEM WATER-PROOF AND WALL MOUNTED LOUVERSSHALL BE SEALED AND FLASHED WITH "MOISTOP" INTHE SAME MANNER PRESCRIBED FOR WINDOWINSTALLATIONS.
AREA WITH THE BALANCE OF VENTS 3 FEET ABOVE.PLACED IMMEDIATELY ABOVE THE ATTIC INSULATIONO'HAGIN VENTS LOCATED ON THE ROOF SHOULD BE
CORROSION RESISTANT METAL MESH.
1/2 UPPER THIRD & 1/2 LOWER THIRD95 SQ. IN. PER O'HAGIN
5016 2408 432 1976 N/A
21 TOTAL X 95 =1995 SQ.IN. NFVA
REVISED
01.05.2015
SHEET NO.
A.3
DATE:
SCALE:
DRAWN BY:
ROO
F PL
AN
JOB:
UPDATED:
01/11/2015
01/11/2015
KELLY TARTER
1/4” = 1’-0”
SUD
DO
N R
ESID
ENCE
328
57 V
ISTA
DE
ORO
TEM
ECLA
CA
. 925
91
01.11.2015
HIP
HIP
HIP
RID
GE
RID
GE
HIP
HIP
HIP HIP
HIP
HIPHIP
HIP
HIP
REVISED
01.05.2015
SHEET NO.
S1.1
DATE:
SCALE:
DRAWN BY:
FOU
ND
ATIO
NPL
AN
JOB:
UPDATED:
01/17/2015
01/17/2015
KELLY TARTER
1/4” = 1’-0”
SUD
DO
N R
ESID
ENCE
328
57 V
ISTA
DE
ORO
TEM
ECLA
CA
. 925
91
01.06.2015
01.11.2015
01.17.2015
F1 2'-3" X 2'-3" X 12" 2# 5TWPAD FOOTING SCHEDULE
12" INTO SOIL
4
S2
F1
2# 5T & B
MST48
HDU2SDS2.5
18" INTO SOIL
HDU2SDS2.5
18" WIDE
24" INTO SOIL
HDU2
SDS2
.5
24" WIDE
4# 5 T & B
30" INTO SOIL24" WIDE
4
PAST
4# 5T & B
2# 5T & B
HDU2
S42
S4
12" WIDE
HDU2
S4
TYP.3
S4
HDU2SDS2.5
HDU2SDS2.5
HDU2SDS2.5
HDU2SDS2.5
HDU2SDS2.5HDU2SDS2.5
HDU2SDS2.5
HDU2SDS2.5
HDU2
5
HDU2
HDU2
HDU2
HDU2
HDU2SDS2.5 S24
2S2
S22
S21
6S2
2S2
POST6x6
3S2
3S2
B
2S2
POST4x6
S21
S48
A
S27
1
4x6POST
S22
2
2S2
6x6
SSW
AB
2-1" AB
SSWAB
SSWAB2-1" AB
2-1" AB
SSWABSSW
AB
1
1
1
1
2
3X
11
1
2
11
1
1
SSW
AB
SSWAB
2-1" AB
SSWAB
2'-0"
1
1
5
4'-0"
3'-0
"
3'-0"
4'-0
"
5'-0"
5'-0"
3'-6"
3'-6"
REVISED
01.05.2015
SHEET NO.
S1.2
DATE:
SCALE:
DRAWN BY:
FRA
MIN
G
PLA
N
JOB:
UPDATED:
01/17/2015
01/17/2015
KELLY TARTER
1/4” = 1’-0”
SUD
DO
N R
ESID
ENC
E 3
2857
VIS
TA D
E O
ROTE
MEC
LA C
A. 9
2591
01.06.2015
01.11.2015
01.17.2015
3068
HC
3068 HC
3068
HC
5040
SLD
R.
5040
SLD
R.
5040
SLD
R.
6050 SLDR.
4060
SLD
R.
5040
SLD
R.
3040
FIX
ED
253
4X4
HDR 1 4X10
6X8HDR 6
4X6
HD
R 10
C.1
D.1
5365353
6
3
3.1
2.1
4X6
HD
R 10
6X6 POST
4X10
HD
R 11
HD
R 2
4X6
3
HDR 12
4X6HD
R 13
MST48
MST48 4X6BM3
6X6
6X6
6X12
MST48
1.1
S3S321
3'/
2 x
14 P
RLLM
4X6 POST
4X6 POST
535
21S3 S3
HDR 7
1
3
A.1 S3S321
A
HDR 7
1 2S3 S3
B
4X8'
HD
R 4
5S3
53
S3S321
5
1
S35
2S3 S3
HD
R 9
TRUSS @ 24" OC
GIRDER TRUSS
MST48 MST48
DRAG TRUSS F=3000#
CONT.6X12' BM1
CONT.
HDR 8
GIRDER TRUSS
HDR 3
535
GIRDER TRUSS
6X12
'BM
2
53
1 2S3
5
BM 2
6X12
'
MST48 MST48
S3
S3
2
DRAG TRUSS F=3000#
5
S
TYP.7
8S3
S3
5S3
SSW 24X13
TRUSS @ 24" OC
SSW 24X13
S34
HEADER ON TOP OF 6X6 POST SSW6X6 POST
1 2S3 S3
GIRDER TRUSS
B.1
TRUSSES @ 24" OC.
GIRDER TRUSS
1 2
5S3
5S3
S3 S3
4X6
L=19'-8 1/8"
2L= 4.5'
2
L=4'
L= 13.5'
L= 4' L= 4'
2
2L= 7'-8 3/4" L= 7'-8 3/4"
2
L=4'-4"
L=4'-4"
2
3
3
3
3
L=24'-11 3/4"
L=19'-8 1/4"
L= 12'-8 1/8"
L= 4'
2
L= 15X9'
3
2
2
13x3
2
2
L=14'-5"
2L=4'-3"
L= 15.5'
L=8'
13x3L=8'
SSW 18X9
:: Health Care
Portraying the importance of healthcare by understanding what matters to the user. The design was influenced through site analysis
and countless health care visits . The final design addresses sustainable issues pertaining to interiors while penetrating the health issues of the air
and enviormental qualities.
Team :Chanel Myers
Kelly Tarter Inteiror design school project Florinda Bogner
Independant Contracting with Heid Construction
:: Landslides
This project focused strongly on the topic of landslides. Through the beginning of the design phase, the site was not only analyzed
by the surroundings that was offered, but also the steep hill side that stands directly behind the project. The design implied aspects that
worked with the idea that a landslide could happen at any given time. The proposed architecture that was exposed would create a “safety shield” for the rest of the building, creating a safe escape rough for
those trapped in.
Second year Studio
Rock
Act
ivity
Cen
ter
Rio
de Ja
neiro
, Bra
zil
A 2.0
PROGRESS PRINT
PLAN CHECK
BID SET
CONSTRUCTION
SHEET NUMBER
PROJECT NO.
DATE05/06/2015CHECKED BY
DRAWN BY KELLY TARTER
DESIGN BY KELLY TARTER
SHEET TITLE
ROOF PLAN & DIMENTION PLAN
01
ROOF PLAN DIMENTION PLAN
SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0”
24'-1 1/2"
37'-10"
"0-'5
14'-1
0 1/
2"
37'-11 1/2"
21'-9"
13'-9"
48'-7 1/2"
46'-7"
75'-0
1/2
"
Plans
Rock
Act
ivity
Cen
ter
Rio
de Ja
neiro
, Bra
zil
A 3.1
PROGRESS PRINT
PLAN CHECK
BID SET
CONSTRUCTION
SHEET NUMBER
PROJECT NO.
DATE05/06/2015CHECKED BY
DRAWN BY KELLY TARTER
DESIGN BY KELLY TARTER
SHEET TITLE
MODEL 1
01
Rock
Act
ivity
Cen
ter
Rio
de Ja
neiro
, Bra
zil
A 1.1
WINTER SUN
SUMMER SUN
WIND DIRECTION
PASSIVE VENTILATION DAYLIGHT ANALYSIS
10
20
30
40
50
60
N
EW
1020
30
40
50
60
70
80
100
120
110
130
140
150
160170190
200
210
220
230
240
250
260
280
290
300
310
320
330
340350
SUN PATH
S
PROGRESS PRINT
PLAN CHECK
BID SET
CONSTRUCTION
SHEET NUMBER
PROJECT NO.
DATE05/06/2015CHECKED BY
DRAWN BY KELLY TARTER
DESIGN BY KELLY TARTER
SHEET TITLE
SITE ANALYSIS
01
:: GIS dataSecond year