KEMAJUAN PELAKSANAAN KEGIATAN
PEMBANGUNAN DI LINGKUNGAN
DITJEN CIPTA KARYA
STATUS : 29 JULI 2010
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL CIPTA KARYA
RPM PHLN TOTAL
1 Direktorat PAM 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 195 600 795 3 2 2 - 2 2 1 3 47 733 1,116,865,527
2 Direktorat PPLP 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 211 188 399 28 12 3 1 5 1 - 1 - 348 1,038,091,517
3 Direktorat Bangkim 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 163 532 695 21 2 - - 21 - 11 1 6 633 452,261,725
4 Direktorat PBL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 328 200 528 12 2 5 3 13 1 1 3 8 480 456,543,516
5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 110 2 112 2 - 13 - - 2 - - - 95 141,264,367
6 Setditjen Cipta Karya 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 - 4 - - - - - 2 - 14 16,244,090
7 Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - - - - - - -
-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - - - - - - -
-PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - - - - - - -
-PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - - - - - - -
-RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - - - - - - -
TOTAL 5,300,429,700 2,402,300,300 7,702,730,000 1,551,568,170 70,606,734 3,035,511,296 965,752,800 4,001,264,096 2,079,291,000 7,702,730,000 1,013 1,536 2,549 66 22 23 4 41 6 13 10 61 2,303 3,221,270,742
Keterangan :
1 Penyiapan Dokumen Lelang
2 Pengumuman Lelang/Prakualifikasi
3 Penyusunan shortlist
4 Undangan Pelelangan
5 Penjelasan Pekerjaan Aanwyzing
6 Pemasukan Penawaran
7 Usulan Pemenang
8 Penetapan Pemenang
9 Penerbitan Surat Perintah Mulai Kerja
10 Penandatangan Kontrak
NILAI KONTRAK
(Rp. x 1.000) 8TOTAL 2
PAGU (Rp)
REKAPITULASI LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB
NO NAMA SATUAN KERJA
PAGU PAKET KONTRAK
SWAKELOLA +
APBLMRUPIAH MURNI PLN
JUMLAH PAKET DALAM PROSES PRA KONTRAK
TOTAL 1
PAKET > RP 100 JUTA
KONTRAKTUAL
≤ 100 JT9 10
KONTRAKTUAL > 100 JT3 4 5 6 7
NON
FISIK FISIK TOTAL
NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN
1 Persiapan Lelang 57 Percepatan Proses Lelang
2 Proses Lelang 179 Percepatan Proses Evaluasi Penawaran
3 Sanggah Banding 0 Dilakukan evaluasi ulang
4 Tender Ulang 0 Percepatan Proses Pelelangan
5 Review DED 0 Percepatan Review DED
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran 10 Mengajukan pembukaan blokir
a. Loan belum efektif 4
b. Menunggu Penandatanganan Loan Agreement 1
c. Tanggap Darurat 0
d. Revisi Kegiatan 4
e. Belum tersedia dokumen RPIJM 0
f. Menunggu persyaratan pembuktian BMN 1
7 Pemindahan Lokasi 0 Mempercepat proses revisi lokasi
246TOTAL
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS: 29 JULI 2010, 08.00 WIB
NO. DIREKTORATJUMLAH
PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG
1 Dit. PAM 3 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum 16 Agustus 2010
Perbaikan Rumah Dinas (PKPAM Kalteng) Minggu II Agustus 2010
Consultant For Bali Southtern Water Supply Project Lelang Tidak Dilaksanakan
2 Dit. PPLP 28 Pembangunan PS Sampah Terpadu 3R Kota Medan Minggu II Agustus 2010
Pembangunan PS Sampah Terpadu 3R Kab. Asahan Minggu II Agustus 2010
Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan Awal September 2010
Pembangunan PS Sampah Terpadu 3R Kota Padang Minggu II Agustus 2010
Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh Minggu II Agustus 2010
Pembangunan PS Sampah terpadu 3R (PPLP Sumsel) Minggu II Agustus 2010
Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang Selatan Minggu II Agustus 2010
Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang Minggu II Agustus 2010
Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang Minggu II Agustus 2010
Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang Minggu II Agustus 2010
Jakarta Urban Flood Management Project (JUFMP) Loan belum efektif
Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut Minggu II Agustus 2010
Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten Sukabumi 30 Juli 2010
Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang Minggu II Agustus 2010
Penyediaan PS Pengolah Sampah Kota Magelang Minggu II Agustus 2010
Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten Minggu II Agustus 2010
DAFTAR PAKET BELUM LELANG TA.2010DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS: 29 JULI 2010
NO. DIREKTORATJUMLAH
PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG
Penyediaan PS Pengolah Sampah Kab. Klaten Minggu II Agustus 2010
Semarang Urban Drainage (Package C2: Semarang Pumping Station and Retarding Pond,
Mechanical and Electrical Works)
Menunggu Persetujuan NOL
JICA
Pembangunan PS Air Limbah Terpusat Paket AL - 1 Awal September 2010
Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong Kab. Sanggau Minggu II Agustus 2010
Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau Kab. Sanggau Minggu II Agustus 2010
Pengembangan TPA Regional MamminasataMenunggu Proses Review
Desain
Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan Minggu II Agustus 2010
Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih, Karangasem. Minggu II Agustus 2010
Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad Mungga,
Singaraja.Minggu II Agustus 2010
Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP Revisi DIPA ditolak DJA
Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak Minggu III Agustus 2010
Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke Minggu III Agustus 2010
3 Dit. Bangkim 21 Pembangunan Rususnawa Lokasi Padang Akhir Juli 2010
Pembangunan Rusunawa Lokasi Rempoa Akhir Juli 2010
NO. DIREKTORATJUMLAH
PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG
Pembangunan Rusunawa Lokasi Surabaya Akhir Juli 2010
Perbaikan Rusunawa di Bandar Lampung Awal Agustus 2010
Perbaikan Rusunawa di Bogor Awal Agustus 2010
Perbaikan Rusunawa di Medan Awal Agustus 2010
Perbaikan Rusunawa di Bandung Awal Agustus 2010
Perbaikan Rusunawa di Sleman Awal Agustus 2010
Perbaikan Rusunawa di Yogyakarta Awal Agustus 2010
Perbaikan rusunawa di Cilacap Awal Agustus 2010
Perbaikan Rusunawa di Sumsel Awal Agustus 2010
Perbaikan Rusunawa di Bengkulu Awal Agustus 2010
Perbaikan Rusunawa di Solo Awal Agustus 2010
Perbaikan Rusunawa di Padang Awal Agustus 2010
Pembangunan PSDdan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari
SultraAkhir Juli 2010
Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur Akhir Juli 2010
Pembangunan PSD di Kws Rusunawa Bau-Bau Sultra Akhir Juli 2010
Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara Akhir Juli 2010
Pembangunan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta Akhir Juli 2010
Pembangunan PSD di Kws Rusunawa Sidoarjo Ngelom Jawa Timur Akhir Juli 2010
Pembangunan Jalan Poros Lokasi Kws.Membalong Kab.Belitung Awal Agustus 2010
NO. DIREKTORATJUMLAH
PAKETNAMA PAKET BELUM LELANG PERKIRAAN MULAI LELANG
4 Dit. PBL 12 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan Menunggu Arahan Menteri PU
Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan Menunggu Arahan Menteri PU
Evaluation Consultant - Baseline ND Minggu I Oktober 2010
Evaluation Consultant - Impact PAKET Minggu I Oktober 2010
Evaluation Consultant - Kelembagaan BKM Indikator Pengukuran Kinerja Minggu I Oktober 2010
Konsultan Evaluasi IDB PNPM 2 Minggu I Oktober 2010
Good and Service Advance21 Juli 2010 (belum update
eMon)
Lanjutan Revitalisasi Kompleks Perkantoran Cipta Karya Werdha Pura Sanur Bali Menunggu Revisi DIPA
Rehabilitasi Gedung Kantor Cipta Karya (Ruang Kerja Subdit PGRN) dan Rumah Dinas 03 Agustus 2010
DUKUNGAN PSD KWS. TRADISIONAL KEL. KUTO PANJI KEC. BELINYU
PENDAMPINGAN FISIK TRADISIONAL
DUKUNGAN PRASARANA DAN SARANA RUANG TERBUKA HIJAU KEL. SRI MENANTI KEC.
SUNGAILIAT
5 Dit. Bina Program 2 Presentation Room Direktorat Bina Program 02 Agustus 2010
LED and Business Plan 01 September 2010
TOTAL 66
Penetapan Lokasi Diputuskan
Bupati Bangka pada 4 Agustus
2010
NO. DIREKTORATJUMLAH
PAKETNAMA PAKET PROSES LELANG PERKIRAAN TERKONTRAK
1 Dit. PAM 1 SPAM IKK Tanjungsiang (AM-Sbg-01) di Kec. Tanjungsiang Kab. Subang 05 Agustus 2010
2 Dit. Bina Program 10 TA. Program Development Advisory Minggu II Agustus 2010
TA. Procurement/Safe Guard Specialist Minggu II Agustus 2010
TA-MPA/PHAST and Sustainabality Specialist Minggu II Agustus 2010
TA-CLTS Specialist Minggu II Agustus 2010
TA-Advocacy Minggu II Agustus 2010
Konsulltan NMC RIS-PNPM 2 Minggu II Agustus 2010
Konsultan RMC (Lampung) RIS-PNPM 2 Minggu II Agustus 2010
Konsulltan RMC (Sumatera Selatan) RIS-PNPM 2 Minggu II Agustus 2010
Konsultan RMC (Jambi dan Riau) RIS-PNPM 2 Minggu II Agustus 2010
Konsultan untuk Training Coach Team RIS-PNPM 2010 Minggu II Agustus 2010
TOTAL 11
DAFTAR PAKET PROSES LELANG TA.2010
DI LINGKUNGAN DITJEN CIPTA KARYASTATUS: 29 JULI 2010
RPM PHLN TOTAL
1 Direktorat PAM 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 1,137,484,986 72,073,500 1,209,558,486 1,044,792,027 72,073,500 1,116,865,527 92,692,959 - 92,692,959
2 Direktorat PLP 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 502,139,403 598,259,000 1,100,398,403 439,833,097 598,258,420 1,038,091,517 62,306,306 580 62,306,886
3 Direktorat Bangkim 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 490,862,370 24,000,000 514,862,370 428,261,725 24,000,000 452,261,725 62,600,645 - 62,600,645
4 Direktorat PBL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 357,011,397 128,544,905 485,556,302 327,998,611 128,544,905 456,543,516 29,012,786 - 29,012,786
5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 64,186,940 83,622,963 147,809,903 57,666,099 83,622,963 141,264,367 6,520,841 - 6,520,841
6 Setditjen 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 - 19,352,947 16,244,090 - 16,244,090 3,108,857 - 3,108,857
7 Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 - - - - - 2,079,291,000 2,079,291,000 - - - - - - - - -
-P2KP 817,891,000 61,800,000 879,691,000 - - - - - 879,691,000 879,691,000 - - - - - - - - -
-PPIP 375,000,000 150,000,000 525,000,000 - - - - - 525,000,000 525,000,000 - - - - - - - - -
-PAMSIMAS - 255,100,000 255,100,000 - - - - - 255,100,000 255,100,000 - - - - - - - - -
-RISE - 419,500,000 419,500,000 - - - - - 419,500,000 419,500,000 - - - - - - - - -
TOTAL 5,300,429,700 2,402,300,300 7,702,730,000 1,551,568,170 70,606,734 3,035,511,296 965,752,800 4,001,264,096 2,079,291,000 7,702,730,000 2,571,038,043 906,500,368 3,477,538,411 2,314,795,649 906,499,788 3,221,270,742 256,242,394 580 256,242,974
PHLNTOTAL RPM PHLN TOTAL RPM
REKAPITULASI LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
NO NAMA SATUAN KERJA
PAGU
SWAKELOLA
+ AP
KONTRAKTUAL > 100 JTBLM TOTAL
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM PHLNTOTAL
PAGU (Rp)
RUPIAH MURNI PLN TOTAL KONTRAKTUAL
≤ 100 JT
KEU. FISIK
(RP) % % % (RP) %
1 Direktorat Pengembangan Air Minum 1,387,145,845 97,195,500 1,484,341,345 812,885,997 54.76 59.48 520,079,887 10,232,976 530,312,863 35.73 44.41 (282,573,134) (19.04)
2 Direktorat Pengembangan PLP 633,610,238 607,359,000 1,240,969,238 590,341,362 47.57 51.55 191,110,692 236,329,906 427,440,598 34.44 35.11 (162,900,764) (13.13)
3 Direktorat Pengembangan Permukiman 899,323,660 24,000,000 923,323,660 279,128,748 30.23 32.01 240,325,913 13,273,079 253,598,992 27.47 37.25 (25,529,756) (2.76)
4 Direktorat Penataan Bangunan dan Lingkungan 532,249,922 637,874,300 1,170,124,222 464,526,030 39.70 60.00 150,898,753 227,378,362 378,277,115 32.33 36.33 (86,248,915) (7.37)
5 Direktorat Bina Program 540,942,532 148,471,500 689,414,032 169,866,134 24.64 24.64 88,791,971 40,340,008 129,131,979 18.73 22.70 (40,734,155) (5.91)
6 Sekretariat Jenderal Cipta Karya 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)
7 Program Pemberdayaan Masyarakat 1,192,891,000 886,400,000 2,079,291,000 754,592,000 36.29 34.90 121,867,450 234,897,859 356,765,309 17.16 13.22 (325,346,691) (15.65)
-P2KP 817,891,000 61,800,000 879,691,000 284,380,000 32.33 32.33 121,867,450 14,780,000 136,647,450 15.53 6.10 (147,732,550) (16.79)
-PPIP 375,000,000 150,000,000 525,000,000 219,600,000 41.83 36.31 - - - - - (147,120,000) (28.02)
-PAMSIMAS - 255,100,000 255,100,000 25,487,000 9.99 9.99 - 7,390,823 7,390,823 2.90 3.14 (18,096,177) (7.09)
-RISE - 419,500,000 419,500,000 225,125,000 53.67 53.67 - 212,727,036 212,727,036 50.71 50.85 (12,397,964) (2.96)
5,300,429,700 2,402,300,300 7,702,730,000 3,133,533,388 40.68 45.18 1,358,914,799 762,452,190 2,121,366,989 27.54 30.41 (939,686,399) (12.20)
DEVIASIREALISASI
PHLN TOTALTOTAL RUPIAH
MURNI
FISIK
(%)
DIREKTORAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
REKAPITULASI LAPORAN PELAKSANAAN BULANAN TA 2010
Total
NO NAMA SATUAN KERJA
PAGU
KEUANGAN KEUANGAN
RENCANA PENYERAPAN
AKHIR BULAN JULI
RUPIAH MURNI PLN
7,702,730
- 28,907 132,054 308,139
702,454
1,244,885
2,121,673
3,133,533
4,303,291
5,571,570
6,538,451
7,184,918
7,702,720
-3,947 7,894 27,141
46,845 98,330
211,344 271,230
452,196
660,025
837,038
1,127,995
1,458,874
1,690,926
2,121,367
-
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPAN DITJEN CIPTA KARYA
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
Satker Pusat 159,190,845 - 159,190,845 38,081,350 - 121,109,495 - 121,109,495 - 159,190,845 24 16 40 1 1 - - - - - - - 38 114,489,181
1 466178 Dit. PAM 57,090,845 57,090,845 33,194,936 - 23,895,909 - 23,895,909 - 57,090,845 20 3 23 1 1 21 19,066,650
2 448311 PSPAM IKK 102,100,000 102,100,000 4,886,414 - 97,213,586 - 97,213,586 - 102,100,000 4 13 17 - 17 95,422,531
Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 158,652,432 9,377,517 1,076,598,051 80,522,500 1,157,120,551 - 1,325,150,500 171 584 755 2 1 2 - 2 2 1 3 47 695 1,002,376,346
Wilayah 1 631,063,200 52,518,500 683,581,700 87,573,061 7,463,462 552,123,677 36,421,500 588,545,177 - 683,581,700 80 366 446 - 1 2 - 2 2 1 3 40 395 496,494,331
1 501380 PKPAM NAD 33,830,500 33,830,500 1,134,550 653,050 32,042,900 - 32,042,900 - 33,830,500 5 10 15 - 15 29,262,418
2 494931 PKPAM Sumut 53,452,000 53,452,000 2,365,300 - 51,086,700 - 51,086,700 - 53,452,000 6 30 36 - 36 49,785,083
3 494993 PKPAM Sumbar 48,475,100 11,850,000 60,325,100 14,036,538 260,000 35,258,562 10,770,000 46,028,562 - 60,325,100 9 16 25 - 1 1 1 1 21 38,877,739
4 495044 PKPAM Riau 34,464,000 4,628,000 39,092,000 7,067,585 480,000 26,916,415 4,628,000 31,544,415 - 39,092,000 1 10 11 - 1 1 9 29,102,905
5 495364 PKPAM Kepri 22,954,700 22,954,700 1,524,500 189,400 21,240,800 - 21,240,800 - 22,954,700 5 12 17 - 17 20,052,016
6 495081 PKPAM Jambi 29,731,700 29,731,700 1,116,050 610,050 28,005,600 - 28,005,600 - 29,731,700 3 11 14 - 14 26,276,327
7 495260 PKPAM Bengkulu 28,912,100 28,912,100 1,579,460 215,920 27,116,720 - 27,116,720 - 28,912,100 5 17 22 - 22 26,465,298
8 495163 PKPAM Sumsel 54,136,100 6,444,000 60,580,100 14,815,779 40,422 45,723,899 - 45,723,899 - 60,580,100 4 10 14 - 1 13 43,823,832
9 495302 PKPAM Babel 27,183,300 27,183,300 1,629,435 723,218 24,830,647 - 24,830,647 - 27,183,300 5 11 16 - 2 14 20,985,685
10 495220 PKPAM Lampung 26,497,700 26,497,700 1,614,090 400,000 24,483,610 - 24,483,610 - 26,497,700 2 8 10 - 10 23,883,442
11 496055 PKPAM Banten 25,723,800 25,723,800 3,392,600 679,202 21,651,998 - 21,651,998 - 25,723,800 4 19 23 - 23 20,782,555
12 495596 PKPAM Jawa Barat 57,705,300 6,319,000 64,024,300 12,205,122 - 51,819,178 - 51,819,178 - 64,024,300 5 14 19 - 1 2 16 38,316,109
13 495684 PKPAM Jawa Tengah 89,198,300 22,901,500 112,099,800 20,835,977 2,970,256 67,552,067 20,741,500 88,293,567 - 112,099,800 9 89 98 - 3 26 69 60,064,996
14 495741 PKPAM D.I.Y 32,433,000 32,433,000 2,153,475 - 30,279,525 - 30,279,525 - 32,433,000 5 30 35 - 35 20,856,546
15 495817 PKPAM Jawa Timur 66,365,600 376,000 66,741,600 2,102,600 241,944 64,115,056 282,000 64,397,056 - 66,741,600 12 79 91 - 1 1 8 81 47,959,380
Wilayah 2 596,891,800 44,677,000 641,568,800 71,079,371 1,914,055 524,474,374 44,101,000 568,575,374 - 641,568,800 91 218 309 2 - - - - - - - 7 300 505,882,015
16 495879 PKPAM Kalbar 49,879,400 49,879,400 1,875,400 - 48,004,000 - 48,004,000 - 49,879,400 5 27 32 - 32 46,583,863
17 495920 PKPAM Kalteng 28,216,200 28,216,200 1,153,770 63,780 26,998,650 - 26,998,650 - 28,216,200 4 15 19 1 1 17 24,762,250
18 495967 PKPAM Kalsel 39,308,200 6,302,000 45,610,200 8,874,300 - 31,009,900 5,726,000 36,735,900 - 45,610,200 4 9 13 - 4 9 22,918,990
19 496002 PKPAM Kaltim 32,549,300 32,549,300 2,062,330 - 30,486,970 - 30,486,970 - 32,549,300 10 7 17 - 17 29,990,971
20 496112 PKPAM Sulut 28,497,584 28,497,584 1,885,473 - 26,612,111 - 26,612,111 - 28,497,584 2 12 14 - 14 22,439,099
21 496752 PKPAM Gorontalo 25,771,600 6,989,000 32,760,600 4,893,290 20,000 20,858,310 6,989,000 27,847,310 - 32,760,600 3 5 8 - 2 6 23,972,790
22 496174 PKPAM Sulteng 32,054,100 5,763,000 37,817,100 8,400,700 - 23,653,400 5,763,000 29,416,400 - 37,817,100 12 8 20 - 20 26,731,170
23 496240 PKPAM Sulsel 53,378,200 8,593,000 61,971,200 9,194,045 900,000 43,284,155 8,593,000 51,877,155 - 61,971,200 3 19 22 - 22 45,165,353
24 466235 PKPAM Sulbar 20,995,500 20,995,500 4,543,188 - 16,452,312 - 16,452,312 - 20,995,500 6 6 12 - 12 15,721,141
25 496313 PKPAM Sultra 27,854,400 27,854,400 1,995,975 349,425 25,509,000 - 25,509,000 - 27,854,400 3 14 17 - 17 25,443,363
26 496441 PKPAM Bali 26,892,200 8,449,000 35,341,200 1,960,557 50,000 24,881,643 8,449,000 33,330,643 - 35,341,200 11 10 21 1 20 19,740,764
27 496539 PKPAM NTB 38,927,500 38,927,500 1,617,500 181,000 37,129,000 - 37,129,000 - 38,927,500 4 5 9 - 9 31,513,615
28 496582 PKPAM NTT 46,741,300 8,581,000 55,322,300 9,774,300 310,000 36,657,000 8,581,000 45,238,000 - 55,322,300 11 14 25 - 25 42,564,773
29 496369 PKPAM Maluku 34,558,500 34,558,500 3,370,234 - 31,188,266 - 31,188,266 - 34,558,500 2 24 26 - 26 29,121,915
30 496709 PKPAM Maluku Utara 45,377,916 45,377,916 4,876,109 - 40,501,807 - 40,501,807 - 45,377,916 5 17 22 22 39,364,620
31 496642 PKPAM Papua 36,098,000 36,098,000 1,505,600 39,850 34,552,550 - 34,552,550 - 36,098,000 4 14 18 - 18 33,722,658
32 496828 PKPAM Papua Barat 29,791,900 29,791,900 3,096,600 - 26,695,300 - 26,695,300 - 29,791,900 2 12 14 - 14 26,124,680
TOTAL 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 195 600 795 3 2 2 - 2 2 1 3 47 733 1,116,865,527
Keterangan : 6. Pemasukan Penawaran
1 Penyiapan Dokumen Lelang 7. Usulan Pemenang
2 Pengumuman Lelang/Prakualifikasi 8. Penetapan Pemenang
3 Penyusunan shortlist 9. Penerbitan Surat Perintah Mulai Kerja
4 Undangan Pelelangan 10. Penandatangan Kontrak
5 Penjelasan Pekerjaan Aanwyzing
NILAI KONTRAK
(Rp. x 1.000) 8 9TOTAL FISIK 2 3 4 5 6 NON
FISIK
SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM 7TOTAL
KONTRAKTUAL
≤ 100 JT
PAGU (Rp)
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 29 JULI 2010, JAM 08.00 WIB
NOKODE
SATKERNAMA SATUAN KERJA
PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK
TOTAL PLNRUPIAH
MURNI101
PAKET > RP 100 JUTA
NO. URAIAN PERMASALAHAN PAKET TINDAK LANJUT KETERANGAN
1 Persiapan Lelang 1 Penetapan lokasi final CSR
2 Proses Lelang 59
3 Sanggah Banding 0
4 Tender Ulang 0
5 Review DED 0
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif 1 Diusulkan untuk direvisi DIPA untuk pengurangan pagu DIPA ke DJA
melalui surat Dirjen CK.
Consultant For Bali
Southtern Water Supply
Project
b. Menunggu Penandatanganan Loan Agreement
c. Tanggap Darurat
d. Revisi Kegiatan 1 Mempercepat proses pelepasan tanda bintang ke DJA. Perbaikan Rumah Dinas
e. Belum tersedia dokumen RPIJM
f. Menunggu persyaratan pembuktian BMN
7 Pemindahan Lokasi 0
62
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS: 29 JULI 2010
TOTAL
1 DIREKTORAT
PENGEMBANGAN AIR
MINUM
1 1 Pelaksanaan Pilot Project Corporate Social Responsibility (CSR) Bidang Air Minum 2,552,166 Persiapan lelang. Rencana pengumuman : 16
Agustus 2010. Rencana tanda
tangan kontrak : 3 Nopember
2010.
2 1 1 Perbaikan Rumah Dinas 350,000
3 1 1 Consultant For Bali Southtern Water Supply Project 8,449,000 Loan belum efektif.
TOTAL 3 11,351,166
PENJELASAN BELUM LELANG TINDAK LANJUT
PENGEMBANGAN
KINERJA PENGELOLAAN
AIR MINUM KALIMANTAN
TENGAH
Belum dapat ditender karena
masih terdapat tanda bintang
dikarenakan salah peruntukan dan
sedang dalam proses revisi
pelepasan tanda bintang ke DJA.
Mempercepat proses
pelepasan tanda bintang
ke DJA.
PENGEMBANGAN
KINERJA PENGELOLAAN
AIR MINUM BALI
Diusulkan untuk direvisi DIPA
untuk pengurangan pagu
DIPA ke DJA melalui surat
Dirjen CK.
NO SATKER/PROVINSI
JML
PAKET
BELUM
LELANG
PAKET KONTRAK/RINCIAN KEGIATANPAGU
(X Rp.1000)
PERMASALAHAN PAKET BELUM LELANGDIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 29 JULI 2010
RPM PHLN TOTAL
Satker Pusat 159,190,845 - 159,190,845 38,081,350 - 121,109,495 - 121,109,495 - 159,190,845 117,729,254 - 117,729,254 114,489,181 - 114,489,181 3,240,073 - 3,240,073
466178 Dit. PAM 57,090,845 - 57,090,845 33,194,936 - 23,895,909 23,895,909 57,090,845 20,515,668 - 20,515,668 19,066,650 19,066,650 1,449,018 - 1,449,018
448311 PSPAM IKK 102,100,000 - 102,100,000 4,886,414 - 97,213,586 97,213,586 102,100,000 97,213,586 97,213,586 95,422,531 95,422,531 1,791,055 - 1,791,055
Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 158,652,432 9,377,517 1,076,598,051 80,522,500 1,157,120,551 - 1,325,150,500 1,019,755,732 72,073,500 1,091,829,232 930,302,846 72,073,500 1,002,376,346 89,452,886 - 89,452,886
Wilayah 1 631,063,200 52,518,500 683,581,700 87,573,061 7,463,462 552,123,677 36,421,500 588,545,177 - 683,581,700 508,284,738 36,421,500 544,706,238 460,072,831 36,421,500 496,494,331 48,211,907 - 48,211,907
501380 PKPAM NAD 33,830,500 - 33,830,500 1,134,550 653,050 32,042,900 - 32,042,900 - 33,830,500 32,042,900 32,042,900 29,262,418 29,262,418 2,780,482 - 2,780,482
494931 PKPAM Sumut 53,452,000 - 53,452,000 2,365,300 - 51,086,700 - 51,086,700 - 53,452,000 51,086,700 51,086,700 49,785,083 49,785,083 1,301,617 - 1,301,617
494993 PKPAM Sumbar 48,475,100 11,850,000 60,325,100 14,036,538 260,000 35,258,562 10,770,000 46,028,562 - 60,325,100 33,898,562 10,770,000 44,668,562 28,107,739 10,770,000 38,877,739 5,790,823 - 5,790,823
495044 PKPAM Riau 34,464,000 4,628,000 39,092,000 7,067,585 480,000 26,916,415 4,628,000 31,544,415 39,092,000 24,742,415 4,628,000 29,370,415 24,474,905 4,628,000 29,102,905 267,510 - 267,510
495364 PKPAM Kepri 22,954,700 - 22,954,700 1,524,500 189,400 21,240,800 - 21,240,800 - 22,954,700 21,240,800 21,240,800 20,052,016 20,052,016 1,188,784 - 1,188,784
495081 PKPAM Jambi 29,731,700 - 29,731,700 1,116,050 610,050 28,005,600 - 28,005,600 - 29,731,700 28,005,600 28,005,600 26,276,327 26,276,327 1,729,273 - 1,729,273
495260 PKPAM Bengkulu 28,912,100 - 28,912,100 1,579,460 215,920 27,116,720 - 27,116,720 - 28,912,100 27,116,720 27,116,720 26,465,298 26,465,298 651,422 - 651,422
495163 PKPAM Sumsel 54,136,100 6,444,000 60,580,100 14,815,779 40,422 45,723,899 - 45,723,899 - 60,580,100 44,323,899 44,323,899 43,823,832 43,823,832 500,067 - 500,067
495302 PKPAM Babel 27,183,300 - 27,183,300 1,629,435 723,218 24,830,647 - 24,830,647 - 27,183,300 22,155,814 22,155,814 20,985,685 20,985,685 1,170,129 - 1,170,129
495220 PKPAM Lampung 26,497,700 - 26,497,700 1,614,090 400,000 24,483,610 - 24,483,610 - 26,497,700 24,483,610 24,483,610 23,883,442 23,883,442 600,168 - 600,168
496055 PKPAM Banten 25,723,800 - 25,723,800 3,392,600 679,202 21,651,998 - 21,651,998 - 25,723,800 21,651,998 21,651,998 20,782,555 20,782,555 869,443 - 869,443
495596 PKPAM Jawa Barat 57,705,300 6,319,000 64,024,300 12,205,122 - 51,819,178 - 51,819,178 - 64,024,300 41,160,256 41,160,256 38,316,109 38,316,109 2,844,147 - 2,844,147
495684 PKPAM Jawa Tengah 89,198,300 22,901,500 112,099,800 20,835,977 2,970,256 67,552,067 20,741,500 88,293,567 - 112,099,800 54,967,327 20,741,500 75,708,827 39,323,496 20,741,500 60,064,996 15,643,831 - 15,643,831
495741 PKPAM D.I.Y 32,433,000 - 32,433,000 2,153,475 - 30,279,525 - 30,279,525 - 32,433,000 30,279,525 30,279,525 20,856,546 20,856,546 9,422,979 - 9,422,979
495817 PKPAM Jawa Timur 66,365,600 376,000 66,741,600 2,102,600 241,944 64,115,056 282,000 64,397,056 - 66,741,600 51,128,612 282,000 51,410,612 47,677,380 282,000 47,959,380 3,451,232 - 3,451,232
Wilayah 2 596,891,800 44,677,000 641,568,800 71,079,371 1,914,055 524,474,374 44,101,000 568,575,374 - 641,568,800 511,470,994 35,652,000 547,122,994 470,230,015 35,652,000 505,882,015 41,240,979 - 41,240,979
495879 PKPAM Kalbar 49,879,400 - 49,879,400 1,875,400 - 48,004,000 - 48,004,000 - 49,879,400 48,004,000 48,004,000 46,583,863 46,583,863 1,420,137 - 1,420,137
495920 PKPAM Kalteng 28,216,200 - 28,216,200 1,153,770 63,780 26,998,650 - 26,998,650 - 28,216,200 25,348,650 25,348,650 24,762,250 24,762,250 586,400 - 586,400
495967 PKPAM Kalsel 39,308,200 6,302,000 45,610,200 8,874,300 - 31,009,900 5,726,000 36,735,900 - 45,610,200 23,372,900 5,726,000 29,098,900 17,192,990 5,726,000 22,918,990 6,179,910 - 6,179,910
496002 PKPAM Kaltim 32,549,300 - 32,549,300 2,062,330 - 30,486,970 - 30,486,970 - 32,549,300 30,486,970 30,486,970 29,990,971 29,990,971 495,999 - 495,999
496112 PKPAM Sulut 28,497,584 - 28,497,584 1,885,473 - 26,612,111 - 26,612,111 - 28,497,584 26,612,111 26,612,111 22,439,099 22,439,099 4,173,012 - 4,173,012
496752 PKPAM Gorontalo 25,771,600 6,989,000 32,760,600 4,893,290 20,000 20,858,310 6,989,000 27,847,310 - 32,760,600 17,141,930 6,989,000 24,130,930 16,983,790 6,989,000 23,972,790 158,140 - 158,140
496174 PKPAM Sulteng 32,054,100 5,763,000 37,817,100 8,400,700 - 23,653,400 5,763,000 29,416,400 - 37,817,100 23,653,400 5,763,000 29,416,400 20,968,170 5,763,000 26,731,170 2,685,230 - 2,685,230
496240 PKPAM Sulsel 53,378,200 8,593,000 61,971,200 9,194,045 900,000 43,284,155 8,593,000 51,877,155 - 61,971,200 43,284,155 8,593,000 51,877,155 36,572,353 8,593,000 45,165,353 6,711,802 - 6,711,802
466235 PKPAM Sulbar 20,995,500 - 20,995,500 4,543,188 - 16,452,312 - 16,452,312 - 20,995,500 16,452,312 16,452,312 15,721,141 15,721,141 731,171 - 731,171
496313 PKPAM Sultra 27,854,400 - 27,854,400 1,995,975 349,425 25,509,000 - 25,509,000 - 27,854,400 25,509,000 25,509,000 25,443,363 25,443,363 65,637 - 65,637
496441 PKPAM Bali 26,892,200 8,449,000 35,341,200 1,960,557 50,000 24,881,643 8,449,000 33,330,643 - 35,341,200 24,881,643 24,881,643 19,740,764 19,740,764 5,140,879 - 5,140,879
496539 PKPAM NTB 38,927,500 - 38,927,500 1,617,500 181,000 37,129,000 - 37,129,000 - 38,927,500 37,129,000 37,129,000 31,513,615 31,513,615 5,615,385 - 5,615,385
496582 PKPAM NTT 46,741,300 8,581,000 55,322,300 9,774,300 310,000 36,657,000 8,581,000 45,238,000 - 55,322,300 36,657,000 8,581,000 45,238,000 33,983,773 8,581,000 42,564,773 2,673,227 - 2,673,227
496369 PKPAM Maluku 34,558,500 - 34,558,500 3,370,234 - 31,188,266 - 31,188,266 - 34,558,500 31,188,266 31,188,266 29,121,915 29,121,915 2,066,351 - 2,066,351
496709 PKPAM Maluku Utara 45,377,916 - 45,377,916 4,876,109 - 40,501,807 - 40,501,807 - 45,377,916 40,501,807 40,501,807 39,364,620 39,364,620 1,137,187 - 1,137,187
496642 PKPAM Papua 36,098,000 - 36,098,000 1,505,600 39,850 34,552,550 - 34,552,550 - 36,098,000 34,552,550 34,552,550 33,722,658 33,722,658 829,892 - 829,892
496828 PKPAM Papua Barat 29,791,900 - 29,791,900 3,096,600 - 26,695,300 - 26,695,300 - 29,791,900 26,695,300 26,695,300 26,124,680 26,124,680 570,620 - 570,620
TOTAL 1,387,145,845 97,195,500 1,484,341,345 196,733,782 9,377,517 1,197,707,546 80,522,500 1,278,230,046 - 1,484,341,345 1,137,484,986 72,073,500 1,209,558,486 1,044,792,027 72,073,500 1,116,865,527 92,692,959 - 92,692,959
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
KODE
SATKERNAMA SATUAN KERJA
PAGU
RUPIAH MURNI PLN TOTAL SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM
PAGU TERKONTRAK
RPM PHLN TOTALTOTAL
PAGU (Rp) NILAI KONTRAK
RPMKONTRAKTUAL
≤ 100 JT TOTAL
SISA PAGU KONTRAK
PHLN TOTAL RPM PHLN
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 159,190,845 - 159,190,845 49,954,323 31.38 31.38 66,623,099 - 66,623,099 41.85 46.27 16,668,776 10.47
1 466178 Direktorat Pengembangan Air Minum 57,090,845 57,090,845 25,674,943 44.97 44.97 18,453,544 - 18,453,544 32.32 34.16 (7,221,399) (12.65)
2 448311 Pengembangan Sistem Penyediaan AM IKK 102,100,000 102,100,000 24,279,380 23.78 23.78 48,169,555 - 48,169,555 47.18 53.04 23,890,175 23.40
Satker Propinsi 1,227,955,000 97,195,500 1,325,150,500 762,931,674 57.57 62.86 453,456,788 10,232,976 463,689,764 34.99 44.19 (299,241,910) (22.58)
Wilayah 1 631,063,200 52,518,500 683,581,700 381,432,035 55.80 63.88 203,381,787 6,845,252 210,227,039 30.75 36.75 (171,204,996) (25.05)
1 501380 Pengembangan Kinerja Pengelolaan AM NAD 33,830,500 33,830,500 18,473,401 54.61 27.97 10,385,200 - 10,385,200 30.70 46.57 (8,088,201) (23.91)
2 494931 Pengembangan Kinerja Pengelolaan AM Sumut 53,452,000 53,452,000 24,621,497 46.06 45.31 11,082,164 - 11,082,164 20.73 17.91 (13,539,333) (25.33)
3 494993 Pengembangan Kinerja Pengelolaan AM Sumbar 48,475,100 11,850,000 60,325,100 34,734,106 57.58 53.40 12,027,193 1,046,581 13,073,774 21.67 22.65 (21,660,332) (35.91)
4 495044 Pengembangan Kinerja Pengelolaan AM Riau 34,464,000 4,628,000 39,092,000 21,142,310 54.08 88.64 6,256,647 1,005,676 7,262,323 18.58 9.67 (13,879,987) (35.51)
5 495364 Pengembangan Kinerja Pengelolaan AM Kepri 22,954,700 22,954,700 7,987,276 34.80 23.19 7,221,396 - 7,221,396 31.46 36.21 (765,880) (3.34)
6 495081 Pengembangan Kinerja Pengelolaan AM Jambi 29,731,700 29,731,700 9,701,858 32.63 69.19 7,378,880 - 7,378,880 24.82 35.46 (2,322,978) (7.81)
7 495260 Pengembangan Kinerja Pengelolaan AM Bengkulu 28,912,100 28,912,100 17,124,017 59.23 71.98 15,283,604 - 15,283,604 52.86 50.29 (1,840,413) (6.37)
8 495163 Pengembangan Kinerja Pengelolaan AM Sumsel 54,136,100 6,444,000 60,580,100 19,857,851 32.78 59.05 16,480,551 2,037,745 18,518,296 30.57 38.18 (1,339,555) (2.21)
9 495302 Pengembangan Kinerja Pengelolaan AM Babel 27,183,300 27,183,300 11,248,807 41.38 68.52 6,535,251 - 6,535,251 24.04 16.89 (4,713,556) (17.34)
10 495220 Pengembangan Kinerja Pengelolaan AM Lampung 26,497,700 26,497,700 16,067,117 60.64 60.64 15,924,976 - 15,924,976 60.10 67.05 (142,141) (0.54)
11 496055 Pengembangan Kinerja Pengelolaan AM Banten 25,723,800 25,723,800 15,757,875 61.26 67.46 8,617,076 - 8,617,076 33.50 41.05 (7,140,799) (27.76)
12 495596 Pengembangan Kinerja Pengelolaan AM Jawa Barat 57,705,300 6,319,000 64,024,300 32,027,264 50.02 73.62 11,543,258 42,000 11,585,258 18.10 16.24 (20,442,006) (31.93)
13 495684 Pengembangan Kinerja Pengelolaan AM Jawa Tengah 89,198,300 22,901,500 112,099,800 72,702,686 64.86 66.66 35,791,104 2,713,250 38,504,354 34.35 58.11 (34,198,332) (30.51)
14 495741 Pengembangan Kinerja Pengelolaan AM D.I.Y 32,433,000 32,433,000 26,074,722 80.40 80.40 11,038,628 - 11,038,628 34.04 54.95 (15,036,094) (46.36)
15 495817 Pengembangan Kinerja Pengelolaan AM Jawa Timur 66,365,600 376,000 66,741,600 53,911,248 80.78 80.45 27,815,859 - 27,815,859 41.68 38.40 (26,095,389) (39.10)
Wilayah 2 596,891,800 44,677,000 641,568,800 381,499,639 59.46 61.77 250,075,001 3,387,724 253,462,725 39.51 52.12 (128,036,914) (19.96)
16 495879 Pengembangan Kinerja Pengelolaan AM Kalbar 49,879,400 49,879,400 31,658,455 63.47 40.72 23,315,333 - 23,315,333 46.74 42.92 (8,343,122) (16.73)
17 495920 Pengembangan Kinerja Pengelolaan AM Kalteng 28,216,200 28,216,200 19,438,140 68.89 89.62 12,582,652 - 12,582,652 44.59 55.12 (6,855,488) (24.30)
18 495967 Pengembangan Kinerja Pengelolaan AM Kalsel 39,308,200 6,302,000 45,610,200 29,299,992 64.24 64.24 6,037,001 1,952,796 7,989,797 17.52 25.32 (21,310,195) (46.72)
19 496002 Pengembangan Kinerja Pengelolaan AM Kaltim 32,549,300 32,549,300 28,080,281 86.27 83.23 12,056,073 - 12,056,073 37.04 51.76 (16,024,208) (49.23)
20 496112 Pengembangan Kinerja Pengelolaan AM Sulut 28,497,584 28,497,584 15,363,048 53.91 69.28 6,545,953 - 6,545,953 22.97 40.84 (8,817,095) (30.94)
21 496752 Pengembangan Kinerja Pengelolaan AM Gorontalo 25,771,600 6,989,000 32,760,600 18,889,762 57.66 57.66 5,196,121 - 5,196,121 15.86 26.81 (13,693,641) (41.80)
22 496174 Pengembangan Kinerja Pengelolaan AM Sulteng 32,054,100 5,763,000 37,817,100 22,017,116 58.22 67.16 8,550,409 144,000 8,694,409 22.99 25.20 (13,322,707) (35.23)
23 496240 Pengembangan Kinerja Pengelolaan AM Sulsel 53,378,200 8,593,000 61,971,200 35,565,272 57.39 62.91 26,777,007 - 26,777,007 43.21 57.02 (8,788,265) (14.18)
24 466235 Pengembangan Kinerja Pengelolaan AM Sulbar 20,995,500 20,995,500 5,759,066 27.43 25.59 11,982,196 - 11,982,196 57.07 76.42 6,223,130 29.64
25 496313 Pengembangan Kinerja Pengelolaan AM Sultra 27,854,400 27,854,400 6,150,252 22.08 20.16 19,185,276 - 19,185,276 68.88 75.77 13,035,024 46.80
26 496441 Pengembangan Kinerja Pengelolaan AM Bali 26,892,200 8,449,000 35,341,200 25,254,822 71.46 72.46 7,626,317 - 7,626,317 21.58 48.05 (17,628,505) (49.88)
27 496539 Pengembangan Kinerja Pengelolaan AM NTB 38,927,500 38,927,500 20,635,468 53.01 53.09 12,213,834 - 12,213,834 31.38 55.84 (8,421,634) (21.63)
28 496582 Pengembangan Kinerja Pengelolaan AM NTT 46,741,300 8,581,000 55,322,300 37,608,100 67.98 80.44 22,753,293 1,290,928 24,044,221 43.46 63.26 (13,563,879) (24.52)
29 496369 Pengembangan Kinerja Pengelolaan AM Maluku 34,558,500 34,558,500 32,585,210 94.29 94.29 20,290,150 - 20,290,150 58.71 82.14 (12,295,060) (35.58)
30 496709 Pengembangan Kinerja Pengelolaan AM Maluku Utara 45,377,916 45,377,916 24,467,772 53.92 56.92 11,098,593 - 11,098,593 24.46 25.44 (13,369,179) (29.46)
31 496642 Pengembangan Kinerja Pengelolaan AM Papua 36,098,000 36,098,000 16,056,390 44.48 49.49 24,733,188 - 24,733,188 68.52 78.24 8,676,798 24.04
32 496828 Pengembangan Kinerja Pengelolaan AM Papua Barat 29,791,900 29,791,900 12,670,495 42.53 44.37 19,131,605 - 19,131,605 64.22 82.81 6,461,110 21.69
TOTAL 1,387,145,845 97,195,500 1,484,341,345 812,885,997 54.76 59.48 520,079,887 10,232,976 530,312,863 35.73 44.41 (282,573,134) (19.04)
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
PAGU REALISASI RENCANA PENYERAPAN
AKHIR BULAN JULINO
RUPIAH
MURNIPHLN
KODE
SATKERNAMA SATUAN KERJA
DEVIASI
KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL
FISIK
(%)
Keu (%) Fisik (%)
1. Provinsi Sumatera Utara 20.73 17.91 Percepatan pelaksanaan melalui :
- Penarikan uang muka paling lambat
sampai dengan akhir bulan Juli 2010
diperkirakan senilai Rp 7.812.736.572,-
(15.90 %)
- Pengadaan pipa diupayakan akan
selesai seluruhnya pada akhir bulan
Agustus 2010 sehingga progres fisik
mencapai 61 % dan progres
keuangan sebesar Rp
22.026.010.000,- (56.92 %).
2. Provinsi Sumatera Barat 21.67 22.65 Terdapat 2 paket kontrak (Bantek : FasilitasiPerencanaan Teknis
Pengembangan SPAM dan Pembuatan Profil PDAM masih dalam tahap
proses lelang
Percepatan proses lelang dan
diperkirakan sebelum tanggal 10
Agustus 2010 sudah tanda tangan
kontrak
3. Provinsi Riau 18.58 9.67 - Provinsi Riau termasuk yang harus melaksanakan pelelangan semi e-
proc plus berdasarkan Surat Edaran Menteri Pekerjaan Umum nomor :
12/SE/2009 tanggal 28 Desember 2009, sehingga proses pelelangan
yang semula direncanakan akan dimulai pada bulan Januari 2010
terpaksa ditunda sampai dengan awal bulan Maret 2010 dikarenakan
harus menunggu pelatihan semi e-proc yang dilaksanakan tanggal 23 -
25 Februari 2010 di Kota Batam
Percepatan pengiriman material oleh
Penyedia Jasa IPA sehingga pada
akhir Agustus 2010 diharapkan
progres fisik mencapai 71 % dan
realisasi keuangan mencapai Rp
16.492.914.000 (66.11 %). Hal ini juga
memperhatikan kemungkinan adanya
larangan penyebrangan Truk
mengingat waktu Hari Raya Idul Fitri
tanggal 11 September 2010
- Pembebasan tanah untuk lokasi IPA IKK Tampan terkendala karena
pembebasan lahan dilakukan seluas 5 Ha (termasuk lokasi untuk IPA
Pekanbaru Selatan), saat ini belum ada kesepakatan harga antara Tim
Pengadaan Tanah Kab. Kampar, Tim Appraisal (Independen), dan
pemilik lahan dimana Tim Appraisal memperkirakan Rp 40.000/M2
sementara pemilik lahan mengajukan penawaran Rp 70.000/M2
Kepala Dinas PU Provinsi Riau
menjanjikan akan segera
menyelesaikan masalah ini sehingga
pada akhir bulan Juli 2010 lahan
tersebut sudah dapat digunakan.
Terlambat dimulainya proses tender (baru bisa dimulai bulan April 2010)
dikarenakan proses review DED & RAB yang disebabkan oleh : DED
yang disusun oleh Pemerintah Kabupaten/Kota perlu penyesuaian
dengan kondisi lapangan, masalah tanah yang mengakibatkan adanya
pergeseran penempatan sarana dan prtasarana yang akan dibangun.
Sehingga kontrak baru ditandatangani akhir bulan Juni 2010 dan awal
bulan Juli 2010.
PERMASALAHAN DAN RENCANA TINDAK LANJUT PERCEPATAN PROGRES
DIREKTORAT PENGEMBANGAN AIR MINUM
STATUS 29 JULI 2010
No Satker PKPAMProgres
Permasalahan Tindak Lanjut Ket
Keu (%) Fisik (%)
4. Provinsi Jawa Barat 18.1 16.24 1. Terlambat proses pelelangan sehingga kontrak baru ditandatangani
bulan akhir Juni dan awal Juli 2010. Keterlambatan pada umumnya
terjadi karena perlu dilakukan review desain khususnya review desain
IPA Beton
Asisten perencanaan agar melakukan
review untuk persiapan TA 2011.
Konsultan supervisi sekaligus
mengerjakan review DED.
2. Masih terdapat 2 paket kegiatan (dengan total nilai pagu sebesar
Rp.6.973.922.000) yang belum tanda tangan kontrak yaitu:
a) IKK Tanjung Siang Kab. Subang
Pengumuman lelang terlambat karena ada perubahan lokasi dari IKK
Sindang Barang Kab. Cianjur yang tidak jadi dilaksanakan karena DDUB
dan kelembagaan pengelola tidak siap sampai batas waktu yang
ditetapkan.
Memonitor proses lelang sesuai
alokasi waktu. Status lelang: masa
sanggah (akhir masa sanggah:
30/7/2010). Rencana tanda tangan
kontrak: Kamis, 5-Agustus-2010
b) Konsultan Supervisi UWSSP (Kota Bogor)
Pengumuman lelang terlambat karena menyesuaikan dengan jadwal
proses lelang paket kegiatan fisik yang dilaksanakan APBD Kota Bogor
Memonitor proses lelang sesuai
alokasi waktu. Status lelang:
pembukaan dokumen biaya. Rencana
tanda tangan kontrak: Minggu II
Agustus 2010.
3. Revisi POK untuk perubahan lokasi Percepatan proses revisi POK. Status:
sudah masuk ke Dit. Bina Program.
4. Revisi DIPA untuk pelatihan fasilitator PAMSIMAS Percepatan proses revisi DIPA.
Status: sudah masuk ke Dit. Bina
Program
5. Provinsi Kalimantan Selatan 17.52 25.32 Paket Fisik:
- Paket fisik (Pengadaan IPA Paket 20 l/dtk di lokasi Tanah Bumbu),
tanda tangan kontrak pada tanggal 29 Juli 2010 dan penarikan uang
muka senilai Rp 626 juta baru diproses.
Penarikan uang muka sebesar Rp 626
juta akan selesai pada tanggal 1
Agustus 2010
- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat
senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak
tanggal 26 Juli 2010. Jaminan pelaksanaan telah selesai namun uang
muka sedang proses.
Proses jaminan pelaksanaan selesai
tanggal 31 Juli 2010 sebesar 800 juta
- Pake fisik (pekerjaan rehabilitasi sumur dalam senilai Rp 975 juta dari
pagu Rp 1 M belum menarik uang muka.
Penarikan uang muka sebesar Rp 195
juta pada tanggal 5 Agustus 2010
- Paket fisik (pekerjaan pembuatan SPAM air gambut senilai Rp 2,480 M
dari pagu Rp 3,19 M belum menarik uang muka
Penarikan uang muka sebesar Rp 496
juta pada tanggal 5 Agustus 2010
No Satker PKPAMProgres
Permasalahan Tindak Lanjut Ket
Keu (%) Fisik (%)
- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Banjar Baru,
RSH senilai Rp 1,050 M dari pagu Rp 1,5 M) baru tanda tangan kontrak
tanggal 26 Juni 2010. Kontraktor belum mengambil uang muka
Penarikan uang muka sebesar Rp 210
juta pada tanggal 5 Agustus 2010
- Pake fisik (Pengadaan dan pemasangan pipa di lokasi Martapura Barat
senilai Rp .... M dari pagu Rp 5,197 M) baru tanda tangan kontrak
tanggal 26 Juli 2010. Kontraktor belum mengambil uang muka.
Penarikan uang muka sebesar Rp 210
juta pada tanggal 5 Agustus 2010
Paket Konsultan:
- 2 paket Konsultan (Rencana Induk dan Air Baku) masih pada tahap
masa sanggah.
Masa sanggah selesai tanggal 30 Juli
2010 dan tanda tangan kontrak
tanggal 4 Agustus 2010. Uang muka
akan ditarik pada tanggal 9 Agustus
sebesar Rp. 140 juta.
Kegiatan PAMSIMAS :
Kotabaru :
- DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap III untuk
3 desa sebesar Rp. 77 juta x 3 desa = Rp. 220 juta, sehingga dana
sebesar Rp 220 juta tersebut akan dibayarkan pada TA 2010, dengan
syarat harus dibuat kontrak baru dan cara pembayarannya harus
dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini adalah
target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.
Pencairan tahap III untuk 3 desa
pada TA 2009 tsb akan diselesaikan
pada akhir bulan 9 Agustus 2010
(kesepakatan dengan KPPN).
Satker PPIP harus memproses
tambahan pagu dana TA 2010 untuk 3
desa sebesar 220 juta
Kab. Tanah Bumbu
- DIPA Satker PPIP TA 2009 tidak cukup untuk membiayai tahap II dan III
untuk 3 desa sebesar Rp.154 juta x 3 desa = Rp. 462 juta, sehingga
dana sebesar Rp 462 juta tersebut akan dibayarkan pada TA 2010,
dengan syarat harus dibuat kontrak baru dan cara pembayarannya
harus dilakukan dalam 3 tahap. Akibat dari luncuran tahun 2009 ini
adalah target kegiatan Pamsimas TA 2010 akan berkurang 3 desa.
Pencairan tahap II dan III untuk 3
desa pada TA 2009 tsb akan
diselesaikan pada akhir bulan 9
Agustus 2010 (kesepakatan dengan
KPPN).
Satker PPIP harus memproses
tambahan pagu dana TA 2010 untuk 3
desa sebesar 462 juta
6. Provinsi Gorontalo 15.86 26.81 Paket Fisik:
Paket fisik (Pengadaan dan pemasangan IPA Paket dan pipa 5 l/dtk di
lokasi desa Manano) senilai Rp 3,184 M dari pagu Rp 3,31 M baru tanda
tangan kontrak pada tanggal 21 Juli 2010 akibat adanya tender ulang.
- Penambahan tenaga kerja dan jam
kerja sampai jam 8. Sehingga pada
akhir Agustus progres akan mencapai
fisik 7.14 % , keuangan 20 %
No Satker PKPAMProgres
Permasalahan Tindak Lanjut Ket
Keu (%) Fisik (%)
Paket Konsultan:
Paket Konsultan (Pendampingan Rencana Induk SPAM senilai Rp 361
juta dari pagu Rp 400 juta) baru tanda tangan kontrak pada tanggal 21
Juli 2010 karena adanya tender ulang.
Laporan pendahuluan akan
diselesaikan tanggal 28 Agustus 2010
sehingga pada tanggal 30 Agustus
bisa mengadakan penarikan termin
pertama sebesar 20% (Rp 72,2 juta)
Kegiatan PAMSIMAS :
Progres fisik Paket PMAC baru mencapai 35% dan belum ada progres
keuangan karena terdapat kesalahan pada nomer register loan dan saat
ini sedang proses revisi di ditjen anggaran Kementerian Keuangan.
- Revisi PAMSIMAS diperkirakan
selesai tanggal 18 Agustus 2010
sehingga pada tanggal 30 Agustus
bisa mencairkan dana sebesar Rp 4
M.
7. Provinsi Bali 21.58 48.05 - Kegiatan konsultan penyusunan DED Southterm Bali Water Suply
project dengan pagu sebesar Rp 8,449 M belum bisa ditenderkan
karena "Loan JICA' untuk Southterm Bali Water Suply project belum
ditandatangi (rencana penandatanganan tanggal 31 Maret 2011). Bobot
kegiatan ini adalah sebesar 23,9 % dari pagu anggaran.
- Kegiatan tersebut diusulkan direvisi
dihilangkan dari DIPA .Surat usulan
revisi DIPA dari Satker PK PAM Bali
telah diserahkan pada tgl 5 juli 2010.
Rekomendasi revisi dari Ditpam
tanggal 30 Juli 2010, diharapkan revisi
DIPA bisa disetujui oleh kementerian
Keuangan pada tanggal 30 Agustus
2010
- Terdapat sisa lelang dari paket kontraktual sebesar Rp.5,03 M dengan
bobot 14,20%.
- Sisa dana itu diusulkan untuk
dimanfaatkan dengan revisi POK.
Usulan revisi dari Satker Bali
direncanakan tanggal 2 Agustus 2010
dan diharapkan disetujui tanggal 15
Agustus 2010. Persiapan proses
prakontrak sudah dilaksanakan.
Paket fisik (Banpro Penyehatan PDAM Kab. Bangli senilai Rp 0,698 M
dari pagu Rp 1,071 M) yang tanda tangan kontrak tanggal 1 Juni 2010.
Progres saat ini fisik 73% dan keuangan 20%.
- Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp 0,803 M.
Sehingga tanggal 31 Agustus progres
fisik 100 % dan keuangan 95 %
Paket fisik (Banpro Penyehatan PDAM Kab.Jembrana senilai Rp 1,198
M dari pagu Rp 1,508 M) yang tanda tangan kontrak tanggal 1 Juni
2010. Progres saat ini fisik 65% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp 0,803 M.
Sehingga diperkirakan tanggal 31
Agustus progres fisik 100 % dan
keuangan 95 %
No Satker PKPAMProgres
Permasalahan Tindak Lanjut Ket
Keu (%) Fisik (%)
Paket fisik (Pembangunan SPAM desa rawan air Desa Sibetan
Kab.Karang Asem senilai Rp 3,211 M dari pagu Rp 4,953 M) yang
tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 55%
dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp 1.79 M.
Sehingga diperkirakan tanggal 31
Agustus progres fisik 80% dan
keuangan 76 %
Paket fisik (Pembangunan SPAM kumuh nelayan Candi Dasan
Kab.Karang Asem senilai Rp 1,658 M dari pagu Rp 2,448 M) yang
tanda tangan kontrak tanggal 1 Juni 2010. Progres saat ini fisik 50%
dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp 1.01 M.
Sehingga diperkirakan tanggal 31
Agustus progres fisik 90% dan
keuangan 81 %
Paket fisik (Pembangunan SPAM Desa Kurikub Kab.Gianyar senilai Rp
1,15 M dari pagu Rp 1,49 M) yang tanda tangan kontrak tanggal 20 Mei
2010. Progres saat ini fisik 50 % dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp 0,4025 M.
Sehingga diperkirakan tanggal 31
Agustus progres fisik 65% dan
keuangan 55 %
Paket fisik (Pembangunan SPAM desa Brangblang Kab.Jembrana
senilai Rp 2,27 M dari pagu Rp 3,028 M) yang tanda tangan kontrak
tanggal 20 Mei 2010. Progres saat ini fisik 50% dan keuangan 20%.
Tanggal 13 Agustus diperkirakan akan
menyerap dana sebesar Rp0,7945 M.
Sehingga diperkirakan tanggal 31
Agustus progres fisik 65% dan
keuangan 55 %
No Satker PKPAMProgres
Permasalahan Tindak Lanjut Ket
1,484,341
- 15,311 45,064
102,244
242,805
414,142
589,536
812,886
998,101
1,193,059
1,344,747
1,420,536
1,484,331
- -
27.90 12,541
22,693 46,640 52,260
85,623
178,722
240,874
295,147
371,781
428,836
530,313
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENGEMBANGAN AIR MINUM
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
a. Satker Pusat 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 27 2 29 - 1 - - 1 1 - - - 26 57,197,615
1 466190 Direktorat PPLP 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 27 2 29 1 1 1 26 57,197,615
b. Satker Propinsi 564,363,115 585,359,000 1,149,722,115 63,553,518 15,069,511 485,840,086 585,259,000 1,071,099,086 - 1,149,722,115 184 186 370 28 11 3 1 4 - - 1 - 322 980,893,902
1 494880 PPLP NAD 13,180,232 385,388,200 398,568,432 3,410,220 292,900 9,577,112 385,288,200 394,865,312 - 398,568,432 14 11 25 1 24 394,237,486
2 494956 PPLP Sumatera Utara 17,315,451 2,000,000 19,315,451 1,817,851 400,000 15,097,600 2,000,000 17,097,600 - 19,315,451 4 8 12 3 1 8 14,401,787
3 495007 PPLP Sumatera Barat 26,759,831 - 26,759,831 4,164,711 814,000 21,781,120 - 21,781,120 - 26,759,831 4 10 14 2 12 19,586,504
4 495050 PPLP Riau 11,016,721 - 11,016,721 1,127,588 739,155 9,149,978 - 9,149,978 - 11,016,721 1 5 6 1 5 4,713,617
5 495370 PPLP Kepulauan Riau 9,373,631 - 9,373,631 1,141,704 300,000 7,931,927 - 7,931,927 - 9,373,631 7 2 9 9 7,069,111
6 495090 PPLP Jambi 9,605,750 - 9,605,750 1,183,895 1,125,930 7,295,925 - 7,295,925 - 9,605,750 4 2 6 6 6,674,557
7 495276 PPLP Bengkulu 9,920,452 - 9,920,452 1,296,007 280,000 8,344,445 - 8,344,445 - 9,920,452 4 4 8 1 7 7,735,400
8 495188 PPLP Sumatera Selatan 16,391,415 - 16,391,415 3,782,515 385,000 12,223,900 - 12,223,900 - 16,391,415 4 4 8 1 7 11,564,476
9 495311 PPLP Bangka Belitung 12,242,231 - 12,242,231 1,478,756 500,000 10,263,475 - 10,263,475 - 12,242,231 9 4 13 13 9,812,973
10 495239 PPLP Lampung 8,115,231 - 8,115,231 1,158,246 740,000 6,216,985 - 6,216,985 - 8,115,231 5 5 10 10 6,127,263
11 496061 PPLP Banten 11,881,531 - 11,881,531 1,608,836 357,850 9,914,845 - 9,914,845 - 11,881,531 9 6 15 4 11 8,120,891
12 448333 PPLP DKI 12,206,900 1,000,000 13,206,900 704,900 274,500 11,227,500 1,000,000 12,227,500 - 13,206,900 11 3 14 1 13 9,114,788
13 495616 PPLP Jawa Barat 43,445,475 - 43,445,475 1,486,475 500,000 41,459,000 - 41,459,000 - 43,445,475 4 6 10 2 8 30,532,901
14 495704 PPLP Jawa Tengah 30,229,431 40,000,000 70,229,431 5,103,531 1,426,900 23,699,000 40,000,000 63,699,000 - 70,229,431 7 14 21 5 16 54,572,105
15 495750 PPLP DIY 7,768,731 2,000,000 9,768,731 1,124,931 - 6,643,800 2,000,000 8,643,800 - 9,768,731 3 5 8 1 7 5,910,141
16 495832 PPLP Jawa Timur 92,339,350 - 92,339,350 2,690,825 1,100,000 88,548,525 - 88,548,525 - 92,339,350 9 15 24 6 18 66,941,881
17 495885 PPLP Kalimantan Barat 8,803,031 - 8,803,031 1,277,449 299,250 7,226,332 - 7,226,332 - 8,803,031 4 4 8 2 6 6,621,542
18 495936 PPLP Kalimantan Tengah 9,941,831 - 9,941,831 1,329,516 200,000 8,412,315 - 8,412,315 - 9,941,831 5 4 9 9 8,235,957
19 495973 PPLP Kalimantan Selatan 29,526,031 - 29,526,031 3,432,626 787,310 25,306,095 - 25,306,095 - 29,526,031 8 8 16 1 15 22,800,839
20 496018 PPLP KalimantanTimur 17,229,931 - 17,229,931 1,492,906 400,000 15,337,025 - 15,337,025 - 17,229,931 7 3 10 10 13,593,929
21 496137 PPLP Sulawesi Utara 12,762,231 - 12,762,231 1,027,791 300,000 11,434,440 - 11,434,440 - 12,762,231 2 3 5 5 10,920,770
22 496761 PPLP Gorontalo 7,281,975 - 7,281,975 1,181,975 - 6,100,000 - 6,100,000 - 7,281,975 8 3 11 1 2 2 6 3,912,950
23 496180 PPLP Sulawesi Tengah 6,851,231 - 6,851,231 1,304,185 100,000 5,447,046 - 5,447,046 - 6,851,231 1 3 4 4 4,235,006
24 496262 PPLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 3,269,611 1,654,201 15,155,787 1,000,000 16,155,787 - 21,079,599 7 12 19 1 2 16 13,956,473
25 466229 PPLP Sulawesi Barat 7,103,059 - 7,103,059 1,068,519 539,800 5,494,740 - 5,494,740 - 7,103,059 1 3 4 4 5,337,147
26 496322 PPLP Sulawesi Tenggara 7,912,331 - 7,912,331 1,207,406 747,560 5,957,365 - 5,957,365 - 7,912,331 3 6 9 9 5,900,253
27 496472 PPLP Bali 42,213,562 153,970,800 196,184,362 3,980,728 100,000 38,132,834 153,970,800 192,103,634 - 196,184,362 16 9 25 3 2 20 182,011,724
28 496545 PPLP NTB 20,465,131 - 20,465,131 4,028,681 177,000 16,259,450 - 16,259,450 - 20,465,131 6 5 11 11 12,457,422
29 496591 PPLP NTT 10,762,531 - 10,762,531 1,232,096 233,000 9,297,435 - 9,297,435 - 10,762,531 3 4 7 7 8,374,334
30 496375 PPLP Maluku 9,942,631 - 9,942,631 1,215,856 - 8,726,775 - 8,726,775 - 9,942,631 6 6 12 12 8,558,031
31 496715 PPLP Maluku Utara 7,147,231 - 7,147,231 977,231 200,000 5,970,000 - 5,970,000 - 7,147,231 2 3 5 1 4 5,703,240
32 496658 PPLP Papua 7,180,031 - 7,180,031 918,456 - 6,261,575 - 6,261,575 - 7,180,031 3 3 6 2 4 5,243,757
33 496834 PPLP Papua Barat 7,368,385 - 7,368,385 1,327,495 95,155 5,945,735 - 5,945,735 - 7,368,385 3 3 6 6 5,914,647
TOTAL 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 211 188 399 28 12 3 1 5 1 - 1 - 348 1,038,091,517
Keterangan :
1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran
2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang
3 Penyusunan shortlist 8 Penetapan Pemenang
4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja
5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak
FISIK
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
NOKODE
SATKERNAMA SATUAN KERJA
PAGU PAKET KONTRAK
STATUS : 29 JULI 2010, JAM 08.00 WIB
SWAKELOLA +
AP
KONTRAKTUAL > 100 JTTOTAL PLN TOTAL
PAKET > RP 100 JUTA
JUMLAH PAKET DALAM PROSES PRA KONTRAK
BLMRUPIAH
MURNI
NON
FISIK
KONTRAKTUAL
≤ 100 JT
PAGU (Rp) NILAI KONTRAK
(Rp. x 1.000) 109871TOTAL 65432
NO. URAIAN PERMASALAHAN JUMLAH PAKET KETERANGAN
1 Persiapan Lelang 23 21 paket 3R (pemberdayaan),
sedang penyusunan RAB; 1
paket IPAL RSH
(pemberdayaan)
2 Proses Lelang 23
3 Sanggah Banding -
4 Tender Ulang -
5 Review DED -
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif 3 1. Sumatera Utara: Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan
2. DKI Jakarta: Jakarta Urban Flood Management Project (JUFMP)
3. Sulawesi Selatan: Pengembangan TPA Regional Mamminasata
b. Menunggu Penandatanganan Loan Agreement 1 1. DI Yogyakarta: Pembangunan PS Air Limbah Terpusat (MSMHP)
c. Tanggap Darurat -
d. Revisi Kegiatan -
e. Belum tersedia dokumen RPIJM -
f. Menunggu persyaratan pembuktian BMN 1 1. Maluku Utara: Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang
PLP
7 Pemindahan Lokasi -
51TOTAL
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
STATUS: 29 JULI 2010
TINDAK LANJUT
1 PPLP SUMATERA UTARA 3 1. Pembangunan PS Sampah Terpadu 3R Kota Medan 204,300 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan PS Sampah Terpadu 3R Kab. Asahan 204,300 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
3. Supervisi Pembangunan PS Air Limbah Terpusat Kota Medan 109,600 Loan belum efektif
2 PPLP SUMATERA BARAT 2 1. Pembangunan PS Sampah Terpadu 3R Kota Padang 200,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan PS Sampah Terpadu 3R Kota Payakumbuh 200,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
3 PPLP SUMATERA SELATAN 1 1. Pembangunan PS Sampah terpadu 3R 500,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
4 PPLP BANTEN 4 1. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Kota tangerang
Selatan
400,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Prasarana Pengelolaan sampah terpadu 3R Kab. Tangerang 400,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Prasarana Pengelolaan sampah Terpadu 3R Citra Gading Serang 400,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
4. Pembangunan Prasarana Pengelolaan Sampah Terpadu 3R Sepang Serang 400,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
PERMASALAHAN DAN TINDAK LANJUT PAKET BELUM LELANG TA. 2010
DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
STATUS: 29 JULI 2010
NO SATKER/PROVINSIJML PAKET
BELUM LELANG
PAGU
(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN
5 PPLP DKI JAKARTA 1 1. Jakarta Urban Flood Management Project (JUFMP) 1,000,000 Loan belum efektif: Kelengkapan
perencanaan (termasuk dokumen
AMDAL) belum selesai
6 PPLP JAWA BARAT 2 1. Pembangunan Air Limbah Terpusat Skala Kawasan (RSH Tenjoresmi) Kabupaten
Sukabumi
1,029,000 Pemberdayaan
2. Pembangunan Prasarana dan Sarana Sampah Terpadu 3R Kabupaten Garut 450,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
7 PPLP JAWA TENGAH 5 1. Pembangunan Tempat Pengolahan Sampah Terpadu Kota Magelang 130,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Penyediaan PS Pengolah Sampah Kota Magelang 120,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Tempat Pengolahan Sampah Terpadu Kab Klaten 130,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
4. Penyediaan PS Pengolah Sampah Kab. Klaten 120,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
5. Semarang Urban Drainage (Package C2: Semarang Pumping Station and
Retarding Pond, Mechanical and Electrical Works)
1,000,000 Menunggu persetujuan JICA
8 PPLP D.I. YOGYAKARTA 1 1. Pembangunan PS Air Limbah Terpusat Paket AL - 1 2,000,000 Loan Agreement belum efektif Persiapan pemaketan pelelangan
9 PPLP KALIMANTAN BARAT 2 1. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Entikong
Kab. Sanggau
248,380 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Penyediaan Prasarana dan Sarana Pengolah Sampah Sistem 3R Kota Sanggau
Kab. Sanggau
248,380 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
10 PPLP SULAWESI SELATAN 1 1. Pengembangan TPA Regional Mamminasata 1,000,000 Tanda tangan Loan Agreement pada
akhir Maret 2010. Rencana
Pengumuman Lelang/Prakualifikasi pada
tanggal 5 Juli 2010
Mempercepat proses lelang
NO SATKER/PROVINSIJML PAKET
BELUM LELANG
PAGU
(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN
11 PPLP BALI 3 1. Pembangunan PS Persampahan 3R Pupuan, kec. Pupuan Kab.Tabanan 200,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan 3R di Besakih,
Karangasem.
500,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
3. Pembangunan Pengelolaan Sampah Terpadu Skala Kawasan (3R) di Tukad
Mungga, Singaraja.
200,000 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
12 PPLP MALUKU UTARA 1 1. Pengadaan Mobil Penyuluhan Kampanye dan Edukasi 3R Bidang PLP 250,000 Bintang pada DIPA Revisi DIPA Revisi DIPA ditolak DJA
13 PPLP PAPUA 2 1. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Biak 416,800 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
2. Pembangunan Pengelolaan Sampah Terpadu 3R Kab. Merauke 476,800 Proses pemberdayaan masih
berlangsung dan menunggu hasil
rencana dari konsultan perencanaan
Pemberdayaan
28 12,537,560
NO SATKER/PROVINSIJML PAKET
BELUM LELANG
PAGU
(X Rp.1000)PENJELASAN BELUM LELANGPAKET KONTRAK TINDAK LANJUT KETERANGAN
TOTAL
RPM PHLN TOTAL
Satker Pusat 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 - 91,247,123 47,280,655 20,000,000 67,280,655 37,197,615 20,000,000 57,197,615 10,083,040 - 10,083,040
1 466190 Direktorat PPLP 69,247,123 22,000,000 91,247,123 19,766,468 100,000 49,380,655 22,000,000 71,380,655 91,247,123 47,280,655 20,000,000 67,280,655 37,197,615 20,000,000 57,197,615 10,083,040 - 10,083,040
Satker Propinsi 564,363,115 585,359,000 1,149,722,115 63,553,518 15,069,511 485,840,086 585,259,000 1,071,099,086 - 1,149,722,115 454,858,748 578,259,000 1,033,117,748 402,635,482 578,258,420 980,893,902 52,223,266 580 52,223,846
1 494880 PPLP NAD 13,180,232 385,388,200 398,568,432 3,410,220 292,900 9,577,112 385,288,200 394,865,312 398,568,432 9,342,112 385,288,200 394,630,312 8,949,866 385,287,620 394,237,486 392,246 580 392,826
2 494956 PPLP Sumatera Utara 17,315,451 2,000,000 19,315,451 1,817,851 400,000 15,097,600 2,000,000 17,097,600 19,315,451 14,689,000 - 14,689,000 14,401,787 - 14,401,787 287,213 - 287,213
3 495007 PPLP Sumatera Barat 26,759,831 - 26,759,831 4,164,711 814,000 21,781,120 - 21,781,120 26,759,831 21,381,120 - 21,381,120 19,586,504 - 19,586,504 1,794,616 - 1,794,616
4 495050 PPLP Riau 11,016,721 - 11,016,721 1,127,588 739,155 9,149,978 - 9,149,978 11,016,721 5,247,000 - 5,247,000 4,713,617 - 4,713,617 533,383 - 533,383
5 495370 PPLP Kepulauan Riau 9,373,631 - 9,373,631 1,141,704 300,000 7,931,927 - 7,931,927 9,373,631 7,931,927 - 7,931,927 7,069,111 - 7,069,111 862,816 - 862,816
6 495090 PPLP Jambi 9,605,750 - 9,605,750 1,183,895 1,125,930 7,295,925 - 7,295,925 9,605,750 7,295,925 - 7,295,925 6,674,557 - 6,674,557 621,368 - 621,368
7 495276 PPLP Bengkulu 9,920,452 - 9,920,452 1,296,007 280,000 8,344,445 - 8,344,445 9,920,452 7,944,445 - 7,944,445 7,735,400 - 7,735,400 209,045 - 209,045
8 495188 PPLP Sumatera Selatan 16,391,415 - 16,391,415 3,782,515 385,000 12,223,900 - 12,223,900 16,391,415 11,723,900 - 11,723,900 11,564,476 - 11,564,476 159,424 - 159,424
9 495311 PPLP Bangka Belitung 12,242,231 - 12,242,231 1,478,756 500,000 10,263,475 - 10,263,475 12,242,231 10,263,475 - 10,263,475 9,812,973 - 9,812,973 450,502 - 450,502
10 495239 PPLP Lampung 8,115,231 - 8,115,231 1,158,246 740,000 6,216,985 - 6,216,985 8,115,231 6,216,985 - 6,216,985 6,127,263 - 6,127,263 89,722 - 89,722
11 496061 PPLP Banten 11,881,531 - 11,881,531 1,608,836 357,850 9,914,845 - 9,914,845 11,881,531 8,314,845 - 8,314,845 8,120,891 - 8,120,891 193,954 - 193,954
12 448333 PPLP DKI 12,206,900 1,000,000 13,206,900 704,900 274,500 11,227,500 1,000,000 12,227,500 13,206,900 11,227,500 - 11,227,500 9,114,788 - 9,114,788 2,112,712 - 2,112,712
13 495616 PPLP Jawa Barat 43,445,475 - 43,445,475 1,486,475 500,000 41,459,000 - 41,459,000 43,445,475 39,980,000 - 39,980,000 30,532,901 - 30,532,901 9,447,099 - 9,447,099
14 495704 PPLP Jawa Tengah 30,229,431 40,000,000 70,229,431 5,103,531 1,426,900 23,699,000 40,000,000 63,699,000 70,229,431 23,199,000 39,000,000 62,199,000 15,572,105 39,000,000 54,572,105 7,626,895 - 7,626,895
15 495750 PPLP DIY 7,768,731 2,000,000 9,768,731 1,124,931 - 6,643,800 2,000,000 8,643,800 9,768,731 6,643,800 - 6,643,800 5,910,141 - 5,910,141 733,659 - 733,659
16 495832 PPLP Jawa Timur 92,339,350 - 92,339,350 2,690,825 1,100,000 88,548,525 - 88,548,525 92,339,350 79,548,525 - 79,548,525 66,941,881 - 66,941,881 12,606,644 - 12,606,644
17 495885 PPLP Kalimantan Barat 8,803,031 - 8,803,031 1,277,449 299,250 7,226,332 - 7,226,332 8,803,031 6,729,572 - 6,729,572 6,621,542 - 6,621,542 108,030 - 108,030
18 495936 PPLP Kalimantan Tengah 9,941,831 - 9,941,831 1,329,516 200,000 8,412,315 - 8,412,315 9,941,831 8,412,315 - 8,412,315 8,235,957 - 8,235,957 176,358 - 176,358
19 495973 PPLP Kalimantan Selatan 29,526,031 - 29,526,031 3,432,626 787,310 25,306,095 - 25,306,095 29,526,031 25,010,695 - 25,010,695 22,800,839 - 22,800,839 2,209,856 - 2,209,856
20 496018 PPLP KalimantanTimur 17,229,931 - 17,229,931 1,492,906 400,000 15,337,025 - 15,337,025 17,229,931 15,337,025 - 15,337,025 13,593,929 - 13,593,929 1,743,096 - 1,743,096
21 496137 PPLP Sulawesi Utara 12,762,231 - 12,762,231 1,027,791 300,000 11,434,440 - 11,434,440 12,762,231 11,434,440 - 11,434,440 10,920,770 - 10,920,770 513,670 - 513,670
22 496761 PPLP Gorontalo 7,281,975 - 7,281,975 1,181,975 - 6,100,000 - 6,100,000 7,281,975 4,580,000 - 4,580,000 3,912,950 - 3,912,950 667,050 - 667,050
23 496180 PPLP Sulawesi Tengah 6,851,231 - 6,851,231 1,304,185 100,000 5,447,046 - 5,447,046 6,851,231 5,447,046 - 5,447,046 4,235,006 - 4,235,006 1,212,040 - 1,212,040
24 496262 PPLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 3,269,611 1,654,201 15,155,787 1,000,000 16,155,787 21,079,599 14,755,787 - 14,755,787 13,956,473 - 13,956,473 799,314 - 799,314
25 466229 PPLP Sulawesi Barat 7,103,059 - 7,103,059 1,068,519 539,800 5,494,740 - 5,494,740 7,103,059 5,494,740 - 5,494,740 5,337,147 - 5,337,147 157,593 - 157,593
26 496322 PPLP Sulawesi Tenggara 7,912,331 - 7,912,331 1,207,406 747,560 5,957,365 - 5,957,365 7,912,331 5,957,365 - 5,957,365 5,900,253 - 5,900,253 57,112 - 57,112
27 496472 PPLP Bali 42,213,562 153,970,800 196,184,362 3,980,728 100,000 38,132,834 153,970,800 192,103,634 196,184,362 29,432,834 153,970,800 183,403,634 28,040,924 153,970,800 182,011,724 1,391,910 - 1,391,910
28 496545 PPLP NTB 20,465,131 - 20,465,131 4,028,681 177,000 16,259,450 - 16,259,450 20,465,131 16,259,450 - 16,259,450 12,457,422 - 12,457,422 3,802,028 - 3,802,028
29 496591 PPLP NTT 10,762,531 - 10,762,531 1,232,096 233,000 9,297,435 - 9,297,435 10,762,531 9,297,435 - 9,297,435 8,374,334 - 8,374,334 923,101 - 923,101
30 496375 PPLP Maluku 9,942,631 - 9,942,631 1,215,856 - 8,726,775 - 8,726,775 9,942,631 8,726,775 - 8,726,775 8,558,031 - 8,558,031 168,744 - 168,744
31 496715 PPLP Maluku Utara 7,147,231 - 7,147,231 977,231 200,000 5,970,000 - 5,970,000 7,147,231 5,720,000 - 5,720,000 5,703,240 - 5,703,240 16,760 - 16,760
32 496658 PPLP Papua 7,180,031 - 7,180,031 918,456 - 6,261,575 - 6,261,575 7,180,031 5,367,975 - 5,367,975 5,243,757 - 5,243,757 124,218 - 124,218
33 496834 PPLP Papua Barat 7,368,385 - 7,368,385 1,327,495 95,155 5,945,735 - 5,945,735 7,368,385 5,945,735 - 5,945,735 5,914,647 - 5,914,647 31,088 - 31,088
TOTAL 633,610,238 607,359,000 1,240,969,238 83,319,986 15,169,511 535,220,741 607,259,000 1,142,479,741 - 1,240,969,238 502,139,403 598,259,000 1,100,398,403 439,833,097 598,258,420 1,038,091,517 62,306,306 580 62,306,886
TOTAL
PAGU (Rp)
TOTAL RPM
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM PHLN TOTALPHLN TOTAL RPM
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
NOKODE
SATKERNAMA SATUAN KERJA
PAGU
RUPIAH MURNI PLN TOTAL SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM
KONTRAKTUAL
≤ 100 JTPHLN
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 69,247,123 22,000,000 91,247,123 33,811,730 37.06 40.56 11,097,699 3,011,365 14,109,064 15.46 24.00 (19,702,666) (21.59)
1 466190 Direktorat Pengembangan Penyehatan Lingkungan Permukiman 69,247,123 22,000,000 91,247,123 33,811,730 37.06 40.56 11,097,699 3,011,365 14,109,064 15.46 24.00 (19,702,666) (21.59)
Satker Propinsi 564,363,115 585,359,000 1,149,722,115 556,529,632 48.41 52.43 180,012,993 233,318,541 413,331,534 35.95 35.99 (143,198,098) (12.46)
1 494880 Pengembangan PLP NAD 13,180,232 385,388,200 398,568,432 173,327,803 43.49 48.49 3,204,037 190,738,973 193,943,010 48.66 40.74 20,615,207 5.17
2 494956 Pengembangan PLP Sumatera Utara 17,315,451 2,000,000 19,315,451 7,015,197 36.32 39.82 7,164,418 - 7,164,418 37.09 42.74 149,221 0.77
3 495007 Pengembangan PLP Sumatera Barat 26,759,831 - 26,759,831 9,935,303 37.13 40.63 14,631,069 - 14,631,069 54.68 58.05 4,695,766 17.55
4 495050 Pengembangan PLP Riau 11,016,721 - 11,016,721 4,030,433 36.58 40.08 3,211,175 - 3,211,175 29.15 34.34 (819,258) (7.44)
5 495370 Pengembangan PLP Kepulauan Riau 9,373,631 - 9,373,631 3,442,131 36.72 40.22 2,161,874 - 2,161,874 23.06 34.60 (1,280,257) (13.66)
6 495090 Pengembangan PLP Jambi 9,605,750 - 9,605,750 3,577,532 37.24 40.74 2,806,692 - 2,806,692 29.22 23.97 (770,840) (8.02)
7 495276 Pengembangan PLP Bengkulu 9,920,452 - 9,920,452 3,644,095 36.73 40.23 4,217,940 - 4,217,940 42.52 37.25 573,845 5.78
8 495188 Pengembangan PLP Sumatera Selatan 16,391,415 - 16,391,415 6,196,904 37.81 41.31 4,606,074 - 4,606,074 28.10 28.88 (1,590,830) (9.71)
9 495311 Pengembangan PLP Bangka Belitung 12,242,231 - 12,242,231 4,469,353 36.51 40.01 5,401,518 - 5,401,518 44.12 47.41 932,165 7.61
10 495239 Pengembangan PLP Lampung 8,115,231 - 8,115,231 2,998,072 36.94 40.44 4,432,832 - 4,432,832 54.62 60.77 1,434,760 17.68
11 496061 Pengembangan PLP Banten 11,881,531 - 11,881,531 5,504,744 46.33 49.83 2,919,481 - 2,919,481 24.57 23.31 (2,585,263) (21.76)
12 448333 Pengembangan PLP DKI 12,206,900 1,000,000 13,206,900 7,362,949 55.75 59.25 1,482,746 - 1,482,746 11.23 13.00 (5,880,203) (44.52)
13 495616 Pengembangan PLP Jawa Barat 43,445,475 - 43,445,475 22,751,147 52.37 55.87 6,599,770 - 6,599,770 15.19 2.93 (16,151,377) (37.18)
14 495704 Pengembangan PLP Jawa Tengah 30,229,431 40,000,000 70,229,431 38,686,004 55.09 58.59 8,384,589 10,607,627 18,992,216 27.04 48.21 (19,693,788) (28.04)
15 495750 Pengembangan PLP DIY 7,768,731 2,000,000 9,768,731 6,087,990 62.32 65.82 1,284,704 - 1,284,704 13.15 15.97 (4,803,286) (49.17)
16 495832 Pengembangan PLP Jawa Timur 92,339,350 - 92,339,350 64,296,129 69.63 73.13 21,345,548 - 21,345,548 23.12 15.56 (42,950,581) (46.51)
17 495885 Pengembangan PLP Kalimantan Barat 8,803,031 - 8,803,031 6,116,320 69.48 72.98 3,491,368 - 3,491,368 39.66 50.59 (2,624,952) (29.82)
18 495936 Pengembangan PLP Kalimantan Tengah 9,941,831 - 9,941,831 5,561,746 55.94 59.44 4,448,360 - 4,448,360 44.74 74.05 (1,113,386) (11.20)
19 495973 Pengembangan PLP Kalimantan Selatan 29,526,031 - 29,526,031 19,730,005 66.82 70.32 9,985,623 - 9,985,623 33.82 42.96 (9,744,382) (33.00)
20 496018 Pengembangan PLP KalimantanTimur 17,229,931 - 17,229,931 9,850,476 57.17 60.67 7,770,713 - 7,770,713 45.10 56.67 (2,079,763) (12.07)
21 496137 Pengembangan PLP Sulawesi Utara 12,762,231 - 12,762,231 8,654,637 67.81 71.31 4,037,731 - 4,037,731 31.64 30.20 (4,616,906) (36.18)
22 496761 Pengembangan PLP Gorontalo 7,281,975 - 7,281,975 5,005,448 68.74 72.24 1,436,338 - 1,436,338 19.72 21.71 (3,569,110) (49.01)
23 496180 Pengembangan PLP Sulawesi Tengah 6,851,231 - 6,851,231 2,045,624 29.86 33.36 1,388,069 - 1,388,069 20.26 60.05 (657,555) (9.60)
24 496262 Pengembangan PLP Sulawesi Selatan 20,079,599 1,000,000 21,079,599 14,130,899 67.04 70.54 10,210,697 - 10,210,697 48.44 54.85 (3,920,202) (18.60)
25 466229 Pengembangan PLP Sulawesi Barat 7,103,059 - 7,103,059 4,784,554 67.36 70.86 1,448,785 - 1,448,785 20.40 29.40 (3,335,769) (46.96)
26 496322 Pengembangan PLP Sulawesi Tenggara 7,912,331 - 7,912,331 5,434,157 68.68 72.18 3,295,995 - 3,295,995 41.66 53.47 (2,138,162) (27.02)
27 496472 Pengembangan PLP Bali 42,213,562 153,970,800 196,184,362 74,717,479 38.09 41.59 17,087,597 31,971,941 49,059,538 25.01 29.60 (25,657,941) (13.08)
28 496545 Pengembangan PLP NTB 20,465,131 - 20,465,131 12,373,887 60.46 63.96 7,157,688 - 7,157,688 34.98 49.50 (5,216,199) (25.49)
29 496591 Pengembangan PLP NTT 10,762,531 - 10,762,531 5,841,455 54.28 57.78 2,499,886 - 2,499,886 23.23 21.50 (3,341,569) (31.05)
30 496375 Pengembangan PLP Maluku 9,942,631 - 9,942,631 7,740,006 77.85 81.35 3,545,567 - 3,545,567 35.66 47.51 (4,194,439) (42.19)
31 496715 Pengembangan PLP Maluku Utara 7,147,231 - 7,147,231 2,252,364 31.51 35.01 1,525,772 - 1,525,772 21.35 30.52 (726,592) (10.17)
32 496658 Pengembangan PLP Papua 7,180,031 - 7,180,031 3,892,833 54.22 57.72 3,163,507 - 3,163,507 44.06 62.07 (729,326) (10.16)
33 496834 Pengembangan PLP Papua Barat 7,368,385 - 7,368,385 5,071,957 68.83 72.33 3,664,830 - 3,664,830 49.74 51.97 (1,407,127) (19.10)
TOTAL 633,610,238 607,359,000 1,240,969,238 590,341,362 47.57 51.55 191,110,692 236,329,906 427,440,598 34.44 35.11 (162,900,764) (13.13)
RENCANA PENYERAPAN
AKHIR BULAN JULI
KEUANGAN PHLN
DEVIASIREALISASI
RUPIAH
MURNI
KEUANGAN
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
RUPIAH MURNI
NO
TOTALPLN
NAMA SATUAN KERJAKODE
SATKER
TOTAL
PAGU
FISIK
(%)
KEU FISIK
(%) (%)
1 Dit. PPLP (Pusat) 15.46 24.00 1. 3 paket pendampingan penyusunan Strategi Sanitasi Kota (SSK) terlambat menarik
uang muka
Percepatan proses penagihan termin I
2. Paket penyusunan Masterplan Air Limbah Kota Balikpapan gagal tender Usulan revisi DIPA (bersama dana sisa
lelang) untuk kegiatan sosialisasi DAK SLBM,
Pelatihan TFL DAK/Sanimas, Operasional
PMU/PIU/Satgas
3. Supervisi Semarang Urban Drainage belum ada penyerapan menunggu addendum
kontrak
Penyelesaian addendum kontrak dan proses
penagihan
Saat ini sedang
pengajuan ke
KPPN menunggu
Withdrawal
Aplication
4 Pekerjaan Peningkatan Kapasitas SDM/Outbond (Swakelola) belum dilaksanakan.
Penyedian akomodasi harus melalui pelelangan
Penyediaan dokumen lelang untuk
penyediaan akomodasi (hotel)
5. WASAP-D masih dalam proses lelang Revisi DIPA untuk pencantuman nomor
register
2 DKI Jakarta 11.23 13.00 1. Ada sanggah banding untuk pembangunan Tempat Pengolahan Sampah Terpadu
(TPST). Kontrak minggu ke 3 Juli 2010.
Rencana penarikan uang muka + 600 Juta
Rupiah (SPM 30/07/2010)
2. Jakarta Urgent Flood & Mitigation Project (JUFMP) Loan belum efektif
3 Jawa Barat 15.19 2.93 1. DED yang ada tidak sesuai dengan kondisi lapangan dan Evaluasi lelang
bertambah 2 bulan untuk paket pembangunan Land Fill TPA Regional Nambo
Kabupaten Bogor
Review DED dengan berkoordinasi dengan
BPSR (Badan Pengelola Sampah Regional)
Sudah dalam masa
pelaksanaan
kontrak
2. DED yang ada tidak sesuai dengan lapangan untuk paket peningkatan Prasarana
dan Sarana TPA Pecuk Kabupaten Indramayu
Review DED dikerjakan oleh Dinas
Kebersihan dan Pertamanan Kab. Indramayu
TA. 2010
Sudah dalam masa
pelaksanaan
kontrak
SATKER/PROVINSI TINDAK LANJUT KETERANGAN
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA. 2010
DIREKTORAT PENGEMBANGAN PENYEHATAN LINGKUNGAN PERMUKIMAN
STATUS: 29 JULI 2010
ALASAN KETERLAMBATAN
PROGRES
NO
KEU FISIK
(%) (%)
3 Jawa Barat 15.19 2.93 3. Perlu Koordinasi dan Pembahasan dengan Pemeritah Kota Depok dalam
pembuatan TOR dan evaluasi lelang lama (5 bulan) untuk paket penyusunan
Master Plan dan DED Drainase Perkotaan Kota Depok
Dilakukan koordinasi dengan Walikota dan
unsur terkait dalam penyusunan TOR
Sudah dalam masa
pelaksanaan
kontrak
4. Dana yang ada tidak cukup untuk satu kota (perlu foto udara) dan evaluasi untuk
penyusunan Master Plan dan DED Drainase Perkotaan Kota Bekasi lelang lama (5
bulan)
Dilaksanakan 1/2 kota Sudah dalam masa
pelaksanaan
kontrak
5. Perpindahan lokasi pada paket pembangunan Air Limbah Terpusat Skala Kawasan
(RSH Tenjoresmi ) Kabupaten Sukabumi
Dilakukan survey ulang muli tg 8 Juli 2010
dan akan dibuatkan DED oleh satker PLP
Pengumuman
lelang 30 Juli 2010
6. Pada paket pembangunan PS. Air Limbah Terpusat Kota Bandung (Lanjutan) :
- DED belum siap dilelang (waktu pengumuman lelang mundur 2 bln) Diperbaiki/direview oleh PDAM Kota Bandung Sudah dalam masa
pelaksanaan
kontrak
- Proses perijinan pelintasan sungai terlambat Tgl 23 Juli 2010 kordinasi dengan BBWS
Citarum/Dirjen SDA. Tanggal 30 Juli 2010
Pembahasan Rekomendasi Teknis
Ada permintaan
rekomendasi teknis
dari Dirjen SDA
kepada BBWS
Citarum
- Ijin penggunaan rumija dari Dirjen Bina Marga sudah ada th 2008, Untuk
pelaksanaan TA 2010 menunggu persetujuan Balai Besar Pelaksana Jalan
Nasional IV
Tgl. 26 Juli 2010 kordinasi dan mengirim
surat perihal permohonan percepatan
perijinan dari BBPJN IV. Tanggal 31 juli 2010
Peninjauan Lapangan
Ada permintaan
rekomendasi teknis
dari Dirjen SDA
kepada BBWS
Citarum
- Ada Pengaduan dari Masyarakat yang perlu dikonsultasikan ke BPKSDM dan
dikonfirmasi ke KPPU
Dilakukan konsultasi ke BPKSDM dan sudah
melayangkan surat ke KPPU
Menunggu surat
balasan dari KPPU
sebagai dasar
dalam
menandatangani
kontrak
- Kepolisian minta untuk lokasi Jl. Soekarno Hatta dikerjakan setelah lebaran Penyesuain jadwal, dan penambahan alat
SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN
PROGRES
NO
KEU FISIK
(%) (%)
3 Jawa Barat 15.19 2.93 7. Pada paket pembangunan PS. Air Limbah Terpusat Kota Cirebon :
- DED dari PDAM Kota Cirebon belum siap dilelang Pembuatan DED oleh PDAM Kota Cirebon Sudah dalam
pelaksanaan
kontrak
- Perijinan pelintasan rel Kereta Api dan surat pernyataan dari Dinas LH Kt. Cirebon
(tgl. 2 Agustus 2010)
Perijinan pelintasan rel Kereta Api diproses
oleh PDAM Kota Cirebon
Menunggu
persetujuan dari
Direktora
Perkeretaapian
Kementrian
Perhubungan
- Perlu proses perijinan jalan Nasional Tgl. 26 Juli 2010 koordinasi dengan BBPJN
IV dan menyampaikan surat permohonan ijin
dari Satker PPLP
Menunggu
perijinan dan
Rekomendasi
Teknis dari BBPJN
IV
4 D.I. Yogyakarta 13.15 15.97 1. Menunggu penyelesaian DED untuk pekerjaan pembangunan TPST UGM Penyelesaian DED Sudah
dilaksanakan
2 Tender ulang dan dan menunggu kesepakatan Pemkab dan masyarakat untuk
ujicoba pengelolaan TPA Kulonprogo
Percepatan proses tender ulang
3 Pembangunan PS Air Limbah Terpusat (MSMHP) belum ditanda tangani Loan
Agreementnya (Loan belum efektif)
Persiapan pemaketan pelelangan
4 Tender ulang untuk pekerjaan masterplan dan DED TPA Gunung Kidul Percepatan proses tender ulang
5 Gorontalo 19.72 21.71 1. 2 paket pembangunan 3R dalam proses lelang (Kab. Pahuwato & Kab. Gorontalo
Utara)
Akan mempercepat proses evaluasi lelang
2. Tender ulang pada paket bantuan perencanaan PS sampah terpadu 3R Kab.
Gorontalo Utara dan Kab. Pohuwato
Akan mempercepat proses tender ulang Status lelang
sudah sampai
evaluasi
penawaran usulan
teknis
3 Ada sanggah pada paket pembangunan TPA sampah Polohungo Kab. Boalemo Penyelesaiaan sanggahan Tidak ada sanggah
banding, paket
sudah terkontrak
SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN
PROGRES
NO
KEU FISIK
(%) (%)
4 MoU antara Kota, Kab. dan Provinsi Gorontalo baru selesai, dan tender ulang pada
paket bantuan teknis penyiapan kelembagaan UPTD yang akan menerapkan PPK
BLUD pada TPA Regional Talumelito
Akan mempercepat proses tender ulang Status lelang
sudah sampai
penetapan hasil
prakualifikasi
6 Sulawesi Tengah 20.26 60.05 Keterlambatan kontraktor melakukan penagihan untuk pekerjaan peningkaan
kinerja TPA Kota Palu
Akan mempercepat proses penagihan
7 Sulawesi Barat 20.40 29.40 1. Paket pemberdayaan, pembangunan 3R belum lelang Mempercepat penyusunan DED
8 Maluku Utara 21.35 30.52 1. Bintang di DIPA pada paket pengadaan mobil penyuluhan kampanye dan edukasi
3R bidang PLP
Revisi DIPA Revisi DIPA ditolak
DJA
2. DED TPA Marabose yang belum valid Mereview kembali DED TPA Marabose
3. Perubahan lokasi pembangunan PS Sampah Terpadu 3R Koordinasi dengan Pemda setempat
4. Terlambatnya menemukan lokasi untuk pembangunan PS Sampah Terpadu 3R Penambahan Tenaga Kerja untuk pembangunan
PS Sampah Terpadu 3R
SATKER/PROVINSI TINDAK LANJUT KETERANGANALASAN KETERLAMBATAN
PROGRES
NO
1,240,969
- 4,054 19,316 38,158
105,066
219,814
398,758
590,341
788,455
977,078
1,104,924
1,179,442
1,240,969
- -
199 868 4,458
46,627
54,688 109,724
145,087 155,717
198,635
281,632
295,132
427,441
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENYEHATAN LINGKUNGAN DAN PERMUKIMAN
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
a. Satker Pusat 345,524,135 24,000,000 369,524,135 35,334,980 899,000 309,290,155 24,000,000 333,290,155 - 369,524,135 47 50 97 20 2 - - 18 - 7 - - 50 57,298,759
1 452771 Dit. Bangkim 36,263,947 36,263,947 24,030,573 - 12,233,374 - 12,233,374 - 36,263,947 14 - 14 - - 14 11,187,149
2 488822 Penyediaan PS Agropolitan 6,791,452 6,791,452 3,641,452 - 3,150,000 - 3,150,000 - 6,791,452 4 4 - - 4 2,927,883
3 493181 Pelak. Bangkim (Rusunawa) 300,468,736 300,468,736 5,662,955 899,000 293,906,781 - 293,906,781 - 300,468,736 28 50 78 20 2 - 18 7 31 19,183,727
4 487760 NUSSP 2,000,000 24,000,000 26,000,000 2,000,000 - - 24,000,000 24,000,000 - 26,000,000 1 - 1 1 24,000,000
b. Satker Propinsi 553,799,525 - 553,799,525 52,024,867 30,616,239 471,158,419 - 471,158,419 - 553,799,525 116 482 598 1 - - - 3 - 4 1 6 583 394,962,966
Wilayah 1 62 206 268 1 - - - 2 - 3 - 3 259 189,016,732
1 486479 Bangkim NAD 16,015,681 16,015,681 1,397,256 910,000 13,708,425 - 13,708,425 - 16,015,681 5 14 19 19 11,521,634
2 486485 Bangkim Sumatera Utara 19,694,531 19,694,531 1,361,167 1,026,259 17,307,105 - 17,307,105 - 19,694,531 3 19 22 22 16,013,960
3 486491 Bangkim Sumatera Barat 19,807,195 19,807,195 1,397,360 1,369,580 17,040,255 - 17,040,255 - 19,807,195 3 17 20 2 18 11,345,172
4 486505 Bangkim Riau 17,695,426 17,695,426 1,511,311 1,257,000 14,927,115 - 14,927,115 - 17,695,426 4 13 17 1 16 11,199,467
5 493336 Bangkim Kepulauan Riau 17,666,453 17,666,453 2,201,583 1,946,000 13,518,870 - 13,518,870 - 17,666,453 3 7 10 10 11,849,816
6 486511 Bangkim Jambi 12,400,907 12,400,907 1,181,327 605,700 10,613,880 - 10,613,880 - 12,400,907 3 12 15 15 10,283,675
7 486686 Bangkim Bengkulu 14,506,843 14,506,843 2,456,323 780,805 11,269,715 - 11,269,715 - 14,506,843 2 18 20 20 11,106,928
8 486520 Bangkim Sumatera Selatan 19,016,673 19,016,673 1,353,908 1,409,500 16,253,265 - 16,253,265 - 19,016,673 3 14 17 1 16 13,955,095
9 487723 Bangkim Bangka Belitung 12,343,747 12,343,747 1,309,487 1,181,380 9,852,880 - 9,852,880 - 12,343,747 6 5 11 1 10 7,858,885
10 486536 Bangkim Lampung 14,831,581 14,831,581 1,157,926 1,945,031 11,728,624 - 11,728,624 - 14,831,581 3 9 12 12 11,467,575
11 487732 Bangkim Banten 15,064,735 15,064,735 1,242,175 883,125 12,939,435 - 12,939,435 - 15,064,735 4 12 16 16 12,699,735
12 486432 Bangkim Jawa Barat 21,344,247 21,344,247 1,321,234 935,000 19,088,013 - 19,088,013 - 21,344,247 5 15 20 1 19 14,830,044
13 486448 Bangkim Jawa Tengah 27,775,972 27,775,972 1,752,852 1,185,000 24,838,120 - 24,838,120 - 27,775,972 9 26 35 3 32 18,215,434
14 486454 Bangkim D.I.Yogyakarta 13,543,216 13,543,216 1,119,560 900,000 11,523,656 - 11,523,656 - 13,543,216 2 10 12 12 8,315,310
15 486460 Bangkim Jawa Timur 26,324,870 26,324,870 2,393,500 2,730 23,928,640 - 23,928,640 - 26,324,870 7 15 22 22 18,354,002
Wilayah 2 54 276 330 - - - - 1 - 1 1 3 324 205,946,234
16 486542 Bangkim Kalimantan Barat 28,503,078 28,503,078 2,010,848 1,525,000 24,967,230 - 24,967,230 - 28,503,078 2 22 24 24 23,567,969
17 486551 Bangkim Kalimantan Tengah 16,187,052 16,187,052 1,069,593 450,000 14,667,459 - 14,667,459 - 16,187,052 5 17 22 22 14,507,267
18 486567 Bangkim Kalimantan Selatan 16,309,887 16,309,887 1,222,642 1,328,500 13,758,745 - 13,758,745 - 16,309,887 2 14 16 3 13 6,652,536
19 486573 Bangkim Kalimantan Timur 15,987,138 15,987,138 1,645,258 850,000 13,491,880 - 13,491,880 - 15,987,138 3 8 11 11 11,324,458
20 486582 Bangkim Sulawesi Utara 17,405,359 17,405,359 1,740,969 855,000 14,809,390 - 14,809,390 - 17,405,359 - 25 25 25 12,995,146
21 487748 Bangkim Gorontalo 12,910,704 12,910,704 2,069,254 147,282 10,694,168 - 10,694,168 - 12,910,704 2 11 13 1 1 11 6,626,379
22 486598 Bangkim Sulawesi Tengah 15,364,778 15,364,778 1,389,378 1,223,867 12,751,533 - 12,751,533 - 15,364,778 2 30 32 32 11,810,747
23 486602 Bangkim Sulawesi Selatan 23,813,207 23,813,207 2,933,302 219,930 20,659,975 - 20,659,975 - 23,813,207 4 35 39 39 17,265,193
24 452796 Bangkim Sulawesi Barat 13,778,243 13,778,243 1,376,384 1,650,000 10,751,859 - 10,751,859 - 13,778,243 1 15 16 16 9,377,969
25 486618 Bangkim Sulawesi Tenggara 18,469,102 18,469,102 2,357,802 375,000 15,736,300 - 15,736,300 - 18,469,102 2 13 15 15 15,569,109
26 486649 Bangkim Bali 20,534,704 20,534,704 1,113,289 825,000 18,596,415 - 18,596,415 - 20,534,704 12 18 30 30 13,410,328
27 486655 Bangkim Nusa Tenggara Barat 17,595,022 17,595,022 1,615,022 2,125,000 13,855,000 - 13,855,000 - 17,595,022 2 16 18 18 8,846,499
28 486661 Bangkim Nusa Tenggara Timur 14,757,214 14,757,214 2,436,839 (700,000) 13,020,375 - 13,020,375 - 14,757,214 9 8 17 1 16 10,085,656
29 486624 Bangkim Maluku 15,863,485 15,863,485 1,541,470 914,550 13,407,465 - 13,407,465 - 15,863,485 2 12 14 14 13,243,588
30 486630 Bangkim Maluku Utara 12,259,539 12,259,539 1,438,329 300,000 10,521,210 - 10,521,210 - 12,259,539 2 11 13 13 10,090,263
31 486670 Bangkim Papua 13,326,883 13,326,883 1,501,443 885,000 10,940,440 - 10,940,440 - 13,326,883 3 8 11 11 10,654,223
32 493769 Bangkim Papua Barat 12,702,053 12,702,053 1,406,076 1,305,000 9,990,977 - 9,990,977 - 12,702,053 1 13 14 14 9,918,904
TOTAL 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 163 532 695 21 2 - - 21 - 11 1 6 633 452,261,725
Keterangan :
1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran
2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang
3 Penyusunan shortlist 8 Penetapan Pemenang
4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja
5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak
STATUS : 29 JULI 2010, JAM 08.00 WIB
NILAI
KONTRAK
(Rp. x 1.000) 7654
NON
FISIK PLN
RUPIAH
MURNI321BLM FISIK 8TOTALTOTAL
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN PERMUKIMAN
NOKODE
SATKERNAMA SATUAN KERJA
PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK
SWAKELOLA +
AP
KONTRAKTUAL > 100 JT109TOTAL
PAKET > RP 100 JUTA
PAGU (Rp)
KONTRAKTUAL
≤ 100 JT
NO. URAIAN PERMASALAHAN TINDAK LANJUT KETERANGAN
1 Persiapan Lelang 21 Perincian paket terlampir.
2 Proses Lelang 41
3 Proses Sanggah Banding -
4 Proses Tender Ulang -
5 Review DED -
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif -
b. Menunggu Penandatanganan Loan Agreement -
c. Tanggap Darurat -
d. Revisi Kegiatan -
e. Belum tersedia dokumen RPIJM -
f. Menunggu persyaratan pembuktian BMN -
7 Pemindahan Lokasi
62
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DIREKTORAT PENGEMBANGAN PERMUKIMAN
STATUS : 29 JULI 2010
JUMLAH
PAKET
TOTAL
1 RUSUNAWA 20 45,756,781
1 Perbaikan Rusunawa di Medan 600,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
2 Perbaikan Rusunawa di Bandar Lampung 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
3 Perbaikan Rusunawa di Bogor 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
4 Perbaikan Rusunawa di Jogja 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
5 Perbaikan Rusunawa di Sumsel 200,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
6 Perbaikan Rusunawa di Bengkulu 300,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
7 Perbaikan rusunawa di Padang 500,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
8 Perbaikan Rusunawa di Cingised, Bandung 900,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
9 Perbaikan Rusunawa di Solo 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
10 Perbaikan Rusunawa di Sleman 300,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
11 Perbaikan Rusunawa di Cilacap 400,000 Dilelang pada awal Agustus Menginventarisir data-data Kerusakan Pasca
Gempa & Persiapan Dok. Lelang
12 Pembuatan Sewage Treatmen Plant di Kws Rusunami Pulo Gebang Jakarta Timur 3,600,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
13 Pembangunan PSD di Kawasan Rusunawa Sidoarjo Ngelom, Jawa Timur 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
14 Pembuatan MCK di Kws Kumuh Rel Kereta Api di Tanjung Priok Jakarta Utara 550,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
15 Pembuatan PSD di Kws Rusunawa Pringwulung Condongcatur Kota Sleman Jogyakarta 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
16 Pembangunan PSD dan Pengadaan Perlengkapan Sarana Gedung di Kws Rusunawa Kendari,
Sulawesi Tenggara
578,252 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
17 Pembangunan PSD di Kws Rusunawa Bau Bau, Sulawesi Tenggara 1,000,000 Dilelang pada akhir Juli Menginventarisir lahan-lahan yang siap &
Persiapan Dok. Lelang
18 Pembangunan Rusunawa Lokasi Rempoa 13,628,529
19 Pembangunan Rusunawa Lokasi Surabaya 5,950,000
20 Pembangunan Rusunawa Lokasi Padang 13,650,000
2 BANGKA BELITUNG 1 1,474,505
- Pembangunan Jalan Poros Lokasi Kws.Salepliat Kabupaten Bangka Selatan 1,474,505 Revisi ulang POK sudah selesai, tetapi belum
dilelangkan karena sedang dalam proses ex-
officio
21 47,231,286
KETERANGANPENJELASAN BELUM DILELANGKAN TINDAK LANJUTPAKET KONTRAK/RINCIAN KEGIATANNO
PERMASALAHAN PAKET BELUM LELANG
TOTAL
PAGU
(X Rp.1000)SATKER/PROVINSI
JML PAKET
BELUM
LELANG
DIREKTORAT PENGEMBANGAN PERMUKIMAN
STATUS : 29 JULI 2010
RPM PHLN TOTAL
Satker Pusat 345,524,135 24,000,000 369,524,135 35,334,980 899,000 309,290,155 24,000,000 333,290,155 - 369,524,135 35,483,374 24,000,000 59,483,374 33,298,759 24,000,000 57,298,759 2,184,615 - 2,184,615
1 452771 Dit. Bangkim 36,263,947 - 36,263,947 24,030,573 - 12,233,374 12,233,374 36,263,947 12,233,374 - 12,233,374 11,187,149 - 11,187,149 1,046,225 - 1,046,225
2 488822 Penyediaan PS Agropolitan 6,791,452 - 6,791,452 3,641,452 - 3,150,000 3,150,000 6,791,452 3,150,000 - 3,150,000 2,927,883 - 2,927,883 222,117 - 222,117
3 493181 Pelak. Bangkim (Rusunawa) 300,468,736 - 300,468,736 5,662,955 899,000 293,906,781 293,906,781 300,468,736 20,100,000 - 20,100,000 19,183,727 - 19,183,727 916,273 - 916,273
4 487760 NUSSP 2,000,000 24,000,000 26,000,000 2,000,000 - 24,000,000 24,000,000 26,000,000 - 24,000,000 24,000,000 - 24,000,000 24,000,000 - - -
SATKER PROPINSI 553,799,525 - 553,799,525 52,024,867 30,616,239 471,158,419 - 471,158,419 - 553,799,525 455,378,996 - 455,378,996 394,962,966 - 394,962,966 60,416,030 - 60,416,030
Wilayah 1 268,032,077 - 268,032,077 23,156,969 16,337,110 228,537,998 - 228,537,998 - 268,032,077 221,393,493 - 221,393,493 189,016,732 - 189,016,732 32,376,761 - 32,376,761
1 486479 Bangkim NAD 16,015,681 - 16,015,681 1,397,256 910,000 13,708,425 13,708,425 16,015,681 13,708,425 13,708,425 11,521,634 11,521,634 2,186,791 - 2,186,791
2 486485 Bangkim Sumatera Utara 19,694,531 - 19,694,531 1,361,167 1,026,259 17,307,105 17,307,105 19,694,531 17,307,105 17,307,105 16,013,960 16,013,960 1,293,145 - 1,293,145
3 486491 Bangkim Sumatera Barat 19,807,195 - 19,807,195 1,397,360 1,369,580 17,040,255 17,040,255 19,807,195 15,090,255 15,090,255 11,345,172 11,345,172 3,745,083 - 3,745,083
4 486505 Bangkim Riau 17,695,426 - 17,695,426 1,511,311 1,257,000 14,927,115 14,927,115 17,695,426 13,977,115 13,977,115 11,199,467 11,199,467 2,777,648 - 2,777,648
5 493336 Bangkim Kepulauan Riau 17,666,453 - 17,666,453 2,201,583 1,946,000 13,518,870 13,518,870 17,666,453 13,518,870 13,518,870 11,849,816 11,849,816 1,669,054 - 1,669,054
6 486511 Bangkim Jambi 12,400,907 - 12,400,907 1,181,327 605,700 10,613,880 10,613,880 12,400,907 10,613,880 10,613,880 10,283,675 10,283,675 330,205 - 330,205
7 486686 Bangkim Bengkulu 14,506,843 - 14,506,843 2,456,323 780,805 11,269,715 11,269,715 14,506,843 11,269,715 11,269,715 11,106,928 11,106,928 162,787 - 162,787
8 486520 Bangkim Sumatera Selatan 19,016,673 - 19,016,673 1,353,908 1,409,500 16,253,265 16,253,265 19,016,673 14,303,265 14,303,265 13,955,095 13,955,095 348,170 - 348,170
9 487723 Bangkim Bangka Belitung 12,343,747 - 12,343,747 1,309,487 1,181,380 9,852,880 9,852,880 12,343,747 8,378,375 8,378,375 7,858,885 7,858,885 519,490 - 519,490
10 486536 Bangkim Lampung 14,831,581 - 14,831,581 1,157,926 1,945,031 11,728,624 11,728,624 14,831,581 11,728,624 11,728,624 11,467,575 11,467,575 261,049 - 261,049
11 487732 Bangkim Banten 15,064,735 - 15,064,735 1,242,175 883,125 12,939,435 12,939,435 15,064,735 12,939,435 12,939,435 12,699,735 12,699,735 239,700 - 239,700
12 486432 Bangkim Jawa Barat 21,344,247 - 21,344,247 1,321,234 935,000 19,088,013 19,088,013 21,344,247 18,818,013 18,818,013 14,830,044 14,830,044 3,987,969 - 3,987,969
13 486448 Bangkim Jawa Tengah 27,775,972 - 27,775,972 1,752,852 1,185,000 24,838,120 24,838,120 27,775,972 24,288,120 24,288,120 18,215,434 18,215,434 6,072,686 - 6,072,686
14 486454 Bangkim D.I.Yogyakarta 13,543,216 - 13,543,216 1,119,560 900,000 11,523,656 11,523,656 13,543,216 11,523,656 11,523,656 8,315,310 8,315,310 3,208,346 - 3,208,346
15 486460 Bangkim Jawa Timur 26,324,870 - 26,324,870 2,393,500 2,730 23,928,640 23,928,640 26,324,870 23,928,640 23,928,640 18,354,002 18,354,002 5,574,638 - 5,574,638
Wilayah 2 285,767,448 - 285,767,448 28,867,898 14,279,129 242,620,421 - 242,620,421 - 285,767,448 233,985,503 - 233,985,503 205,946,234 - 205,946,234 28,039,269 - 28,039,269
16 486542 Bangkim Kalimantan Barat 28,503,078 - 28,503,078 2,010,848 1,525,000 24,967,230 24,967,230 28,503,078 24,967,230 24,967,230 23,567,969 23,567,969 1,399,261 - 1,399,261
17 486551 Bangkim Kalimantan Tengah 16,187,052 - 16,187,052 1,069,593 450,000 14,667,459 14,667,459 16,187,052 14,667,459 14,667,459 14,507,267 14,507,267 160,192 - 160,192
18 486567 Bangkim Kalimantan Selatan 16,309,887 - 16,309,887 1,222,642 1,328,500 13,758,745 13,758,745 16,309,887 8,585,745 8,585,745 6,652,536 6,652,536 1,933,209 - 1,933,209
19 486573 Bangkim Kalimantan Timur 15,987,138 - 15,987,138 1,645,258 850,000 13,491,880 13,491,880 15,987,138 13,491,880 13,491,880 11,324,458 11,324,458 2,167,422 - 2,167,422
20 486582 Bangkim Sulawesi Utara 17,405,359 - 17,405,359 1,740,969 855,000 14,809,390 14,809,390 17,405,359 14,809,390 14,809,390 12,995,146 12,995,146 1,814,244 - 1,814,244
21 487748 Bangkim Gorontalo 12,910,704 - 12,910,704 2,069,254 147,282 10,694,168 10,694,168 12,910,704 8,082,250 8,082,250 6,626,379 6,626,379 1,455,871 - 1,455,871
22 486598 Bangkim Sulawesi Tengah 15,364,778 - 15,364,778 1,389,378 1,223,867 12,751,533 12,751,533 15,364,778 12,751,533 12,751,533 11,810,747 11,810,747 940,786 - 940,786
23 486602 Bangkim Sulawesi Selatan 23,813,207 - 23,813,207 2,933,302 219,930 20,659,975 20,659,975 23,813,207 20,659,975 20,659,975 17,265,193 17,265,193 3,394,782 - 3,394,782
24 452796 Bangkim Sulawesi Barat 13,778,243 - 13,778,243 1,376,384 1,650,000 10,751,859 10,751,859 13,778,243 10,751,859 10,751,859 9,377,969 9,377,969 1,373,890 - 1,373,890
25 486618 Bangkim Sulawesi Tenggara 18,469,102 - 18,469,102 2,357,802 375,000 15,736,300 15,736,300 18,469,102 15,736,300 15,736,300 15,569,109 15,569,109 167,191 - 167,191
26 486649 Bangkim Bali 20,534,704 - 20,534,704 1,113,289 825,000 18,596,415 18,596,415 20,534,704 18,596,415 18,596,415 13,410,328 13,410,328 5,186,087 - 5,186,087
27 486655 Bangkim Nusa Tenggara Barat 17,595,022 - 17,595,022 1,615,022 2,125,000 13,855,000 13,855,000 17,595,022 13,855,000 13,855,000 8,846,499 8,846,499 5,008,501 - 5,008,501
28 486661 Bangkim Nusa Tenggara Timur 14,757,214 - 14,757,214 2,436,839 (700,000) 13,020,375 13,020,375 14,757,214 12,170,375 12,170,375 10,085,656 10,085,656 2,084,719 - 2,084,719
29 486624 Bangkim Maluku 15,863,485 - 15,863,485 1,541,470 914,550 13,407,465 13,407,465 15,863,485 13,407,465 13,407,465 13,243,588 13,243,588 163,877 - 163,877
30 486630 Bangkim Maluku Utara 12,259,539 - 12,259,539 1,438,329 300,000 10,521,210 10,521,210 12,259,539 10,521,210 10,521,210 10,090,263 10,090,263 430,947 - 430,947
31 486670 Bangkim Papua 13,326,883 - 13,326,883 1,501,443 885,000 10,940,440 10,940,440 13,326,883 10,940,440 10,940,440 10,654,223 10,654,223 286,217 - 286,217
32 493769 Bangkim Papua Barat 12,702,053 - 12,702,053 1,406,076 1,305,000 9,990,977 9,990,977 12,702,053 9,990,977 9,990,977 9,918,904 9,918,904 72,073 - 72,073
TOTAL 899,323,660 24,000,000 923,323,660 87,359,847 31,515,239 780,448,574 24,000,000 804,448,574 - 923,323,660 490,862,370 24,000,000 514,862,370 428,261,725 24,000,000 452,261,725 62,600,645 - 62,600,645
TOTAL
PAGU (Rp)
TOTAL RPM
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM PHLN TOTALPHLN TOTAL RPM
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENGEMBANGAN PERMUKIMAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
NOKODE
SATKERNAMA SATUAN KERJA
PAGU
RUPIAH MURNI PLN TOTAL SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM
KONTRAKTUAL
≤ 100 JTPHLN
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 345,524,135 24,000,000 369,524,135 66,792,183 18.08 20.68 21,432,455 13,273,079 34,705,534 9.39 9.11 (32,086,649) (8.68)
1 452771 Pengembangan Permukiman 36,263,947 36,263,947 15,493,298 42.72 42.74 15,384,033 - 15,384,033 42.42 46.83 (109,265) (0.30)
2 488822 Penyediaan PS Agropolitan 6,791,452 6,791,452 2,733,916 40.26 27.45 1,754,686 - 1,754,686 25.84 26.71 (979,230) (14.42)
3 493181 Pelaksanaan Pengembangan Permukiman (Rusunawa) 300,468,736 300,468,736 33,395,959 11.11 15.26 3,385,473 - 3,385,473 1.13 0.22 (30,010,486) (9.99)
4 487760 Pembinaan Teknis Penataan Lingkungan Permukiman (NUSSP) 2,000,000 24,000,000 26,000,000 15,169,010 58.34 50.73 908,263 13,273,079 14,181,342 54.54 54.63 (987,668) (3.80)
SATKER PROPINSI 553,799,525 - 553,799,525 212,336,565 38.34 39.57 218,893,458 - 218,893,458 39.53 56.03 6,556,893 1.18
Wilayah 1 268,032,077 - 268,032,077 93,142,762 34.75 35.56 104,239,842 - 104,239,842 38.89 55.80 11,097,080 4.14
1 486479 Pengembangan Kawasan Permukiman & Perbatasan NAD 16,015,681 16,015,681 5,449,927 34.03 34.53 5,223,223 - 5,223,223 32.61 66.20 (226,704) (1.42)
2 486485 Pengembangan Kawasan Permukiman & Perbatasan Sumatera Utara 19,694,531 19,694,531 6,543,451 33.22 33.72 7,808,290 - 7,808,290 39.65 45.09 1,264,839 6.42
3 486491 Pengembangan Kawasan Permukiman Sumatera Barat 19,807,195 19,807,195 6,727,433 33.96 34.46 5,141,839 - 5,141,839 25.96 37.62 (1,585,594) (8.01)
4 486505 Pengembangan Kawasan Permukiman & Perbatasan Riau 17,695,426 17,695,426 6,075,988 34.34 34.84 5,582,090 - 5,582,090 31.55 32.24 (493,898) (2.79)
5 493336 Pengembangan Kawasan Permukiman & Perbatasan Kepulauan Riau 17,666,453 17,666,453 6,943,196 39.30 39.80 6,493,706 - 6,493,706 36.76 56.62 (449,490) (2.54)
6 486511 Pengembangan Kawasan Permukiman Jambi 12,400,907 12,400,907 4,134,798 33.34 33.84 6,801,391 - 6,801,391 54.85 63.80 2,666,593 21.50
7 486686 Pengembangan Kawasan Permukiman Bengkulu 14,506,843 14,506,843 5,005,836 34.51 38.62 6,296,130 - 6,296,130 43.40 70.34 1,290,294 8.89
8 486520 Pengembangan Kawasan Permukiman Sumatera Selatan 19,016,673 19,016,673 6,418,728 33.75 34.25 3,778,992 - 3,778,992 19.87 38.17 (2,639,736) (13.88)
9 487723 Pengembangan Kawasan Permukiman Bangka Belitung 12,343,747 12,343,747 4,630,361 37.51 38.01 3,851,077 - 3,851,077 31.20 46.46 (779,284) (6.31)
10 486536 Pengembangan Kawasan Permukiman Lampung 14,831,581 14,831,581 5,813,702 39.20 39.70 10,903,152 - 10,903,152 73.51 86.03 5,089,450 34.31
11 487732 Pengembangan Kawasan Permukiman Banten 15,064,735 15,064,735 5,189,103 34.45 34.95 10,557,964 - 10,557,964 70.08 74.26 5,368,861 35.64
12 486432 Pengembangan Kawasan Permukiman Jawa Barat 21,344,247 21,344,247 7,708,800 36.12 36.62 10,760,767 - 10,760,767 50.42 67.36 3,051,967 14.30
13 486448 Pengembangan Kawasan Permukiman Jawa Tengah 27,775,972 27,775,972 9,546,559 34.37 34.87 8,266,826 - 8,266,826 29.76 48.17 (1,279,733) (4.61)
14 486454 Pengembangan Kawasan Permukiman D.I.Yogyakarta 13,543,216 13,543,216 4,728,377 34.91 35.41 6,830,988 - 6,830,988 50.44 86.35 2,102,611 15.53
15 486460 Pengembangan Kawasan Permukiman Jawa Timur 26,324,870 26,324,870 8,226,505 31.25 32.87 5,943,407 - 5,943,407 22.58 47.10 (2,283,098) (8.67)
Wilayah 2 285,767,448 - 285,767,448 119,193,802 41.71 43.34 114,653,616 - 114,653,616 40.12 56.25 (4,540,186) (2)
16 486542 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Barat 28,503,078 28,503,078 7,502,909 26.32 26.92 7,717,342 - 7,717,342 27.08 47.61 214,433 0.75
17 486551 Pengembangan Kawasan Permukiman Kalimantan Tengah 16,187,052 16,187,052 9,440,507 58.32 59.65 10,173,372 - 10,173,372 62.85 86.94 732,865 4.53
18 486567 Pengembangan Kawasan Permukiman Kalimantan Selatan 16,309,887 16,309,887 5,999,033 36.78 37.62 2,207,761 - 2,207,761 13.54 15.99 (3,791,272) (23.25)
19 486573 Pengembangan Kawasan Permukiman & Perbatasan Kalimantan Timur 15,987,138 15,987,138 8,247,552 51.59 52.76 4,904,919 - 4,904,919 30.68 48.49 (3,342,633) (20.91)
20 486582 Pengembangan Kawasan Permukiman & Perbatasan Sulawesi Utara 17,405,359 17,405,359 6,075,949 34.91 35.70 9,693,346 - 9,693,346 55.69 73.73 3,617,397 20.78
21 487748 Pengembangan Kawasan Permukiman Gorontalo 12,910,704 12,910,704 7,159,937 55.46 60.23 1,910,219 - 1,910,219 14.80 21.62 (5,249,718) (40.66)
22 486598 Pengembangan Kawasan Permukiman Sulawesi Tengah 15,364,778 15,364,778 7,603,013 49.48 50.61 6,240,306 - 6,240,306 40.61 61.02 (1,362,707) (8.87)
23 486602 Pengembangan Kawasan Permukiman Sulawesi Selatan 23,813,207 23,813,207 11,501,108 48.30 52.82 14,462,643 - 14,462,643 60.73 78.24 2,961,535 12.44
24 452796 Pengembangan Kawasan Permukiman Sulawesi Barat 13,778,243 13,778,243 4,480,862 32.52 33.26 745,705 - 745,705 5.41 - (3,735,157) (27.11)
25 486618 Pengembangan Kawasan Permukiman Sulawesi Tenggara 18,469,102 18,469,102 6,174,611 33.43 35.69 9,583,396 - 9,583,396 51.89 61.39 3,408,785 18.46
26 486649 Pengembangan Kawasan Permukiman Bali 20,534,704 20,534,704 10,850,060 52.84 54.04 6,963,535 - 6,963,535 33.91 65.37 (3,886,525) (18.93)
27 486655 Pengembangan Kawasan Permukiman Nusa Tenggara Barat 17,595,022 17,595,022 6,665,090 37.88 38.74 4,871,604 - 4,871,604 27.69 61.18 (1,793,486) (10.19)
28 486661 Pengembangan Kawasan Permukiman & Perbatasan NTT 14,757,214 14,757,214 5,949,671 40.32 43.91 3,513,580 - 3,513,580 23.81 30.79 (2,436,091) (16.51)
29 486624 Pengembangan Kawasan Permukiman & Perbatasan Maluku 15,863,485 15,863,485 6,287,052 39.63 40.53 11,936,159 - 11,936,159 75.24 91.27 5,649,107 35.61
30 486630 Pengembangan Kawasan Permukiman & Perbatasan Maluku Utara 12,259,539 12,259,539 3,368,858 27.48 28.10 4,884,885 - 4,884,885 39.85 32.67 1,516,027 12.37
31 486670 Pengembangan Kawasan Permukiman & Perbatasan Papua 13,326,883 13,326,883 6,908,432 51.84 53.02 8,593,168 - 8,593,168 64.48 70.93 1,684,736 12.64
32 493769 Pengembangan Kawasan Permukiman & Perbatasan Papua Barat 12,702,053 12,702,053 4,979,156 39.20 40.09 6,251,676 - 6,251,676 49.22 87.45 1,272,520 10.02
TOTAL 899,323,660 24,000,000 923,323,660 279,128,748 30.23 32.01 240,325,913 13,273,079 253,598,992 27.47 37.25 (25,529,756) (2.76)
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
DIREKTORAT PENGEMBANGAN PERMUKIMAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
PAGU REALISASI RENCANA PENYERAPAN
AKHIR BULAN JULINO
RUPIAH
MURNIPHLN
KODE
SATKERNAMA SATUAN KERJA
DEVIASI
KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL
FISIK
(%)
NO. KEU FISIK ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN
% %
1 Pelaksanaan Pengembangan
Permukiman
1.13 0.22 - Pekerjaan Fisik Rusunawa Kupang (1TB) mengalami
ketelambatan dalam proses kontrak sehingga mengalami deviasi
dari rencana penyerapan.
- Satker melakukan percepatan dan reschedule ulang rencana
penyerapan.
Sudah Terkontrak
- Pekerjaan Fisik Rusunawa Padang (2TB) mengalami
ketelambatan dalam proses kontrak sehingga mengalami deviasi
dari rencana penyerapan.
- Satker melakukan percepatan dan reschedule ulang rencana
penyerapan.
- Proses Multiyears dari Ditjen Anggaran yang memakan waktu
lama
- Dalam proses pengajuan kembali untuk proses Multiyears
2 Sumatera Selatan 19.87 38.17 - Terdapat 1 paket kegiatan fisik (kumuh perkotaan) yang belum
terkontrak: Pembangunan jalan poros dan saluran kawasan
kumuh Kel. 3-4, kec. Sebrang Ulu 1, Palembang pagu Rp
1.950.000
- Mempercepat proses kontrak dan pengambilan uang muka
3 Kalimantan Selatan 13.54 15.99 - Dari 14 paket fisik, 11 paket baru terkontrak (sudah mengambil
uang muka) dan 3 paket fisik (kumuh perkotaan) masih proses
lelang.
- Mempercepat proses kontrak dan pengambilan uang muka 11 Paket fisik sudah terkontrak 2 Juli
2010 (selesai masa sanggah per 25
Juni 2010 surat BPKSDM Tanggal 25
Juni 2010 ; Nomor : HK.0202-KK/960)
- 20 paket non fisik (DED & Supervisi) sudah kontrak tetapi belum
ada penyerapan (termin)
- Segera melakukan pengambilan uang muka dan termin
4 Gorontalo 14.80 21.62 - 1 Paket fisik (kumuh Perkotaan) belum terkontrak: pembangunan
jalan lingkungan dan MCK di Desa Moluo, Kec. Kwandang, Kab.
Gorontalo Utara, pagu Rp 1.909.200.000
Lelang ulang karena peserta tidak memenuhi syarat (hanya 2
peserta)
- 1 Paket fisik Agropolitan sedang proses SKPA: peningkatan jalan
usaha tani Ds. Tolango Kws. Anggrek Kab. Gorontalo Utara, pagu
Rp 902.918.000
5 Sulawesi Barat 5.41 0.00 Proses "Evaluasi Ulang" sudah selesai dan 15 paket fisik sudah
terkontrak
13 paket sudah mengambil uang
muka.
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010
DIREKTORAT PENGEMBANGAN PERMUKIMAN
STATUS : 29 JULI 2010
SATKER/PROVINSI
PROGRES
923,324
- 1,023 6,464 22,779
39,713
86,530
168,293
279,129
424,591
587,157
695,250
802,035
923,324
-287 574 1,499 1,766 9,453 18,333
37,958
62,468
89,929 107,498
154,348
192,259 215,805
253,599
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENGEMBANGAN PERMUKIMAN
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
Satker Pusat 88,003,156 150,933,280 238,936,436 38,297,556 1,412,500 48,293,100 150,933,280 199,226,380 - 238,936,436 72 7 79 9 1 - 2 2 1 - 1 1 62 155,512,639 1 452780 Dit PBL 40,754,374 - 40,754,374 22,152,599 500,000 18,101,775 - 18,101,775 - 40,754,374 27 - 27 27 16,559,221 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 22,493,537 3,648,212 400,000 18,445,325 - 18,445,325 - 22,493,537 7 4 11 2 1 2 2 1 3 1,353,200 3 493217 P2KP-PNPM 9,688,600 135,368,280 145,056,880 7,748,600 - 1,940,000 135,368,280 137,308,280 - 145,056,880 30 - 30 5 1 1 23 114,919,905 4 505137 Rehab. Bangunan Gedung Negara 10,350,000 10,350,000 1,381,500 412,500 8,556,000 - 8,556,000 - 10,350,000 1 3 4 2 2 5,865,313 5 449582 Rehab./Rekon DIY & Jateng 4,716,645 15,565,000 20,281,645 3,366,645 100,000 1,250,000 15,565,000 16,815,000 - 20,281,645 7 - 7 7 16,815,000
Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 407,454,718 5,680,200 179,464,595 - 179,464,595 - 592,599,513 129 101 230 3 1 5 1 11 - 1 - 3 205 132,569,780
1 493342 PBL NAD 10,036,964 19,746,710 29,783,674 21,813,565 170,109 7,800,000 - 7,800,000 - 29,783,674 5 4 9 9 6,779,706 2 493351 PBL Sumatera Utara 11,585,680 23,038,700 34,624,380 25,154,271 140,000 9,330,109 - 9,330,109 - 34,624,380 9 8 17 17 9,092,056 3 493367 PBL Sumatera Barat 15,000,156 21,657,500 36,657,656 23,834,987 240,000 12,582,669 - 12,582,669 - 36,657,656 9 6 15 1 1 13 7,584,310 4 493373 PBL Riau 16,350,616 3,951,580 20,302,196 5,810,087 420,000 14,072,109 - 14,072,109 - 20,302,196 7 5 12 1 1 10 9,307,111 5 493382 PBL Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,312,334 - 7,270,109 - 7,270,109 - 12,582,443 8 4 12 1 11 5,829,976 6 493398 PBL Jambi 15,655,301 2,449,650 18,104,951 4,284,842 320,000 13,500,109 - 13,500,109 - 18,104,951 8 6 14 14 13,053,431 7 493424 PBL Bengkulu 17,690,241 6,551,010 24,241,251 8,586,142 315,000 15,340,109 - 15,340,109 - 24,241,251 8 12 20 20 15,178,929 8 493482 PBL Sumatera Selatan 11,583,567 8,763,520 20,347,087 10,626,978 220,000 9,500,109 - 9,500,109 - 20,347,087 9 6 15 15 9,312,948 9 493418 PBL Bangka Belitung 11,124,789 5,748,420 16,873,209 7,403,100 45,000 9,425,109 - 9,425,109 - 16,873,209 9 3 12 3 9 6,051,128
10 493430 PBL Lampung 8,448,092 6,767,480 15,215,572 8,535,463 243,000 6,437,109 - 6,437,109 - 15,215,572 7 3 10 10 6,301,061 11 493552 PBL Banten 8,275,863 14,750,500 23,026,363 16,556,254 505,109 5,965,000 - 5,965,000 - 23,026,363 7 4 11 11 5,735,683 12 493543 PBL DKI Jakarta 10,309,066 4,336,990 14,646,056 5,631,056 - 9,015,000 - 9,015,000 - 14,646,056 4 4 8 4 4 1,413,434 13 493568 PBL Jawa Barat 19,712,853 57,050,300 76,763,153 59,193,044 1,500,000 16,070,109 - 16,070,109 - 76,763,153 11 9 20 3 2 15 7,098,381 14 493574 PBL Jawa Tengah 21,058,483 110,179,660 131,238,143 112,666,780 683,246 17,888,117 - 17,888,117 - 131,238,143 9 12 21 7 14 8,717,997 15 493580 PBL D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 41,344,361 362,736 13,044,719 - 13,044,719 - 54,751,816 9 8 17 17 10,371,625 16 493599 PBL Jawa Timur 14,934,353 48,507,210 63,441,563 50,701,454 516,000 12,224,109 - 12,224,109 - 63,441,563 10 7 17 1 16 10,742,004
PBL Wilayah II 228,042,513 110,545,760 338,588,273 142,509,722 5,902,724 190,175,827 - 190,175,827 - 338,588,273 127 92 219 - - - - - - - 2 4 213 168,461,097 17 493600 PBL Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,284,380 345,000 11,625,109 - 11,625,109 - 20,254,489 7 5 12 12 11,471,907 18 493625 PBL Kalimantan Tengah 18,152,334 2,103,550 20,255,884 3,906,815 280,000 16,069,069 - 16,069,069 - 20,255,884 10 6 16 16 15,178,089 19 493619 PBL Kalimantan Selatan 15,447,817 13,329,120 28,776,937 15,014,828 533,000 13,229,109 - 13,229,109 - 28,776,937 8 6 14 14 10,339,176 20 493631 PBL Kalimantan Timur 12,088,156 9,715,010 21,803,166 11,583,057 595,109 9,625,000 - 9,625,000 - 21,803,166 8 4 12 12 8,982,705 21 493775 PBL Sulawesi Utara 10,417,304 9,385,380 19,802,684 11,332,575 1,009,311 7,460,798 - 7,460,798 - 19,802,684 7 10 17 17 7,255,385 22 493781 PBL Gorontalo 11,923,411 3,667,430 15,590,841 5,473,471 270,109 9,847,261 - 9,847,261 - 15,590,841 7 5 12 1 11 8,374,072 23 493790 PBL Sulawesi Tengah 12,939,961 3,212,900 16,152,861 5,075,752 170,109 10,907,000 - 10,907,000 - 16,152,861 7 4 11 11 10,618,034 24 493801 PBL Sulawesi Selatan 15,322,796 18,836,370 34,159,166 20,939,057 360,000 12,860,109 - 12,860,109 - 34,159,166 9 5 14 14 11,176,898 25 452800 PBL Sulawesi Barat 9,156,627 1,952,430 11,109,057 3,638,948 179,109 7,291,000 - 7,291,000 - 11,109,057 7 5 12 12 6,912,158 26 493810 PBL Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 12,001,598 403,759 12,657,870 - 12,657,870 - 25,063,227 7 6 13 13 12,514,833 27 493826 PBL Bali 13,757,857 4,212,900 17,970,757 5,933,648 787,000 11,250,109 - 11,250,109 - 17,970,757 5 6 11 11 8,498,766 28 493832 PBL NTB 12,854,000 13,010,960 25,864,960 14,894,851 245,000 10,725,109 - 10,725,109 - 25,864,960 7 5 12 2 10 6,068,948 29 493841 PBL NTT 14,821,959 4,107,330 18,929,289 6,201,223 260,000 12,468,066 - 12,468,066 - 18,929,289 8 5 13 13 12,002,231 30 493857 PBL Maluku 8,907,780 3,026,570 11,934,350 4,964,241 170,109 6,800,000 - 6,800,000 - 11,934,350 7 4 11 11 6,704,912 31 493863 PBL Maluku Utara 9,724,390 4,915,900 14,640,290 6,670,181 170,109 7,800,000 - 7,800,000 - 14,640,290 7 4 11 3 8 3,256,269 32 493872 PBL Papua 19,286,865 1,280,650 20,567,515 3,402,406 - 17,165,109 - 17,165,109 - 20,567,515 8 8 16 16 16,786,523 33 493888 PBL Papua Barat 14,495,790 1,217,010 15,712,800 3,192,691 125,000 12,395,109 - 12,395,109 - 15,712,800 8 4 12 12 12,320,191
TOTAL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 328 200 528 12 2 5 3 13 1 1 3 8 480 456,543,516
Keterangan :
1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran
2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang
3 Penyusunan shortlist 8 Penetapan Pemenang
4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja
5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak
7 5 6 4 3
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK
STATUS : 29 JULI 2010, JAM 08.00 WIB
PAKET > RP 100 JUTA
NILAI
KONTRAK
(Rp. x 1.000) RUPIAH
MURNI
NAMA SATUAN KERJAKODE
SATKERNO
10 9 8 TOTAL 2 SWAKELOLA +
APPLN
KONTRAKTUAL > 100 JT
PAGU (Rp)
FISIK NON
FISIK 1 TOTALTOTAL
KONTRAKTUAL
≤ 100 JTBLM
NO. URAIAN PERMASALAHAN PAKET KETERANGAN
> 100 Juta
1 Persiapan Lelang 10 -
2 Proses Lelang 35 -
3 Sanggah Banding 0 -
4 Tender Ulang 0 -
5 Review DED 0 -
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif 0
b. Menunggu Penandatanganan Loan Agreement 0
c. Tanggap Darurat 0
d. Revisi Kegiatan 3
1 Supervisi Penataan dan Revitalisasi Kawasan Kota Pacitan
2 Pelaksanaan Penataan dan Revitalisasi Kawasan Kota Pacitan
3 Penataan dan Revitalisasi Kawasan Kota Lama Sawahlunto No. 3 : Sedang dalam
proses lelang, posisi
aanwizjin (no.5).
e. Belum tersedia dokumen RPIJM 0 -
f. Menunggu persyaratan pembuktian BMN 0 -
7 Pemindahan Lokasi 0 -
48TOTAL
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
STATUS : 29 JULI 2010, JAM 08.00
TINDAK LANJUT
Penataan dan Revitalisasi Kawasan :
No 1 dan 2 : Menunggu
arahan Menteri Pekerjaan
1
PENATAAN DAN
REVITALISASI KAWASAN 2
1 Supervisi Penataan dan Revitalisasi Kawasan Kota
Pacitan
160.000 No. 1 s/d 2 : telah dikirimkan memo dinas Direktur
Jenderal Cipta Karya kepada Menteri Pekerjaan
Umum perihal Galeri Kota Pacitan, Nomor : 46/MD-
DC/2010, tanggal 7 Juli 2010.
Menunggu arahan
Menteri Pekerjaan Umum.
2 Pelaksanaan Penataan dan Revitalisasi Kawasan
Kota Pacitan
5,220.000
2 51 Evaluation Consultant - Baseline ND 1,150.402
2 Evaluation Consultant - Impact PAKET 1,134.568
3 Evaluation Consultant - Kelembagaan BKM -
Indikator Pengukuran Kinerja
2,347.371
4 Konsultan Evaluasi IDB PNPM 2 500.000 No. 4 : Berdasarkan midterm yang baru akan
dilaksanakan setelah 6 bulan masa pelaksanaan,
diperkirakan lelang dilaksanakan di bulan November
2010.
No.4 : Berdasarkan hasil
supervisi IDB, disepakati
kegiatan ini masuk dalam
lingkup pekerjaan
baseline survey yang
statusnya saat ini adalah
penetapan pemenang
(no.8).
5 Good and Service Advance 10,000.000 No. 5 : Menunggu WB mengumumkan di UNDP dan
DG's Market.
No. 5 : Sudah
pengumuman lelang,
tinggal update
emonitoring (masuk no.2)
3 3
1 DUKUNGAN PSD KWS. TRADISIONAL KEL.
KUTO PANJI KEC. BELINYU
2.000.000
2 DUKUNGAN PRASARANA DAN SARANA RUANG
TERBUKA HIJAU KEL. SRI MENANTI KEC.
SUNGAILIAT
750.000
3 PENDAMPINGAN FISIK TRADISIONAL 125.109 Mengikuti pekerjaan fisik
PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X Rp.1000)
No. 1 dan 2 : Masih menunggu kesepakatan lokasi
dengan Pemda (Bappeda Kab. Bangka), dimana
lokasi yang ditetapkan oleh Bappeda kab. Bangka
tidak masuk dalam 4 pilihan lokasi perencanaan RTH
dan tidak memenuhi kriteria kawasan tradisional.
Pada tanggal 13 Juli
2010, Kepala Dinas
Pekerjaan Umum Prov.
Bangka Belitung telah
melayangkan surat ke
Bupati Bangka untuk
menjelaskan
permasalahan tersebut.
PERMASALAHAN PAKET BELUM LELANG
DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
> 100 JUTA
STATUS : 29 JULI 2010, JAM 08.00
NO SATKER/PROVINSI
JML
PAKET
BELUM
LELANG
PENJELASAN BELUM LELANG TINDAK LANJUT
PENANGGULANGAN
KEMISKINAN DI
PERKOTAAN
No. 1 s/d 3 :Berdasarkan hasil diskusi dengan WB, 3
kajian evaluasi ini akan menggunakan perusahaan
survey untuk pengumpulan data dan konsultan
individual untuk analisa sampai pelaporan lelang
hanya untuk perusahaan survey dengan rencana
lelang di bulan Oktober.
No. 1 s/d 3 :Percepatan
penyelesaian dan
pembahasan TOR dan
dokumen lelang dengan
WB.
PENATAAN BANGUNAN
DAN LINGKUNGAN
BANGKA BELITUNG
4 2 1 Lanjutan Revitalisasi Kompleks Perkantoran Cipta
Karya Werdha Pura Sanur Bali
2.200.000 No. 1 : Menunggu revisi DIPA
2 Rehabilitasi Gedung Kantor Cipta Karya (Ruang
Kerja Subdit PGRN) dan Rumah Dinas
489.500 No. 2 : Minggu ke-4 Juni akan dilakukan
pengumuman lelang.
PAKET KONTRAK/RINCIAN KEGIATAN PAGU (X Rp.1000)NO SATKER/PROVINSI
JML
PAKET
BELUM
LELANG
REHABILITASI DAN
PEMBANGUNAN
GEDUNG NEGARA
TOTAL 12 21,876.950
PENJELASAN BELUM LELANG TINDAK LANJUT
RPM PHLN TOTAL
Satker Pusat 88,003,156 150,933,280 238,936,436 38,297,556 1,412,500 48,293,100 150,933,280 199,226,380 - 238,936,436 28,848,100 128,544,905 157,393,005 26,967,734 128,544,905 155,512,639 1,880,366 - 1,880,366 1 452780 Dit PBL 40,754,374 - 40,754,374 22,152,599 500,000 18,101,775 - 18,101,775 - 40,754,374 18,101,775 - 18,101,775 16,559,221 - 16,559,221 1,542,554 - 1,542,554 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 - 22,493,537 3,648,212 400,000 18,445,325 - 18,445,325 - 22,493,537 1,525,325 - 1,525,325 1,353,200 - 1,353,200 172,125 - 172,125 3 493217 P2KP-PNPM 9,688,600 135,368,280 145,056,880 7,748,600 - 1,940,000 135,368,280 137,308,280 - 145,056,880 1,940,000 112,979,905 114,919,905 1,940,000 112,979,905 114,919,905 - - - 4 505137 Rehab. Bangunan Gedung Negara 10,350,000 - 10,350,000 1,381,500 412,500 8,556,000 - 8,556,000 - 10,350,000 6,031,000 - 6,031,000 5,865,313 - 5,865,313 165,687 - 165,687 5 449582 Rehab./Rekon DIY & Jateng 4,716,645 15,565,000 20,281,645 3,366,645 100,000 1,250,000 15,565,000 16,815,000 - 20,281,645 1,250,000 15,565,000 16,815,000 1,250,000 15,565,000 16,815,000 - - -
Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 407,454,718 5,680,200 179,464,595 - 179,464,595 - 592,599,513 145,996,470 - 145,996,470 132,569,780 - 132,569,780 13,426,690 - 13,426,690
1 493342 PBL NAD 10,036,964 19,746,710 29,783,674 21,813,565 170,109 7,800,000 - 7,800,000 - 29,783,674 7,800,000 - 7,800,000 6,779,706 - 6,779,706 1,020,294 - 1,020,294 2 493351 PBL Sumatera Utara 11,585,680 23,038,700 34,624,380 25,154,271 140,000 9,330,109 - 9,330,109 - 34,624,380 9,330,109 - 9,330,109 9,092,056 - 9,092,056 238,053 - 238,053 3 493367 PBL Sumatera Barat 15,000,156 21,657,500 36,657,656 23,834,987 240,000 12,582,669 - 12,582,669 - 36,657,656 9,148,812 - 9,148,812 7,584,310 - 7,584,310 1,564,502 - 1,564,502 4 493373 PBL Riau 16,350,616 3,951,580 20,302,196 5,810,087 420,000 14,072,109 - 14,072,109 - 20,302,196 10,650,109 - 10,650,109 9,307,111 - 9,307,111 1,342,998 - 1,342,998 5 493382 PBL Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,312,334 - 7,270,109 - 7,270,109 - 12,582,443 6,770,109 - 6,770,109 5,829,976 - 5,829,976 940,133 - 940,133 6 493398 PBL Jambi 15,655,301 2,449,650 18,104,951 4,284,842 320,000 13,500,109 - 13,500,109 - 18,104,951 13,500,109 - 13,500,109 13,053,431 - 13,053,431 446,678 - 446,678 7 493424 PBL Bengkulu 17,690,241 6,551,010 24,241,251 8,586,142 315,000 15,340,109 - 15,340,109 - 24,241,251 15,340,109 - 15,340,109 15,178,929 - 15,178,929 161,180 - 161,180 8 493482 PBL Sumatera Selatan 11,583,567 8,763,520 20,347,087 10,626,978 220,000 9,500,109 - 9,500,109 - 20,347,087 9,500,109 - 9,500,109 9,312,948 - 9,312,948 187,161 - 187,161 9 493418 PBL Bangka Belitung 11,124,789 5,748,420 16,873,209 7,403,100 45,000 9,425,109 - 9,425,109 - 16,873,209 6,550,000 - 6,550,000 6,051,128 - 6,051,128 498,872 - 498,872
10 493430 PBL Lampung 8,448,092 6,767,480 15,215,572 8,535,463 243,000 6,437,109 - 6,437,109 - 15,215,572 6,437,109 - 6,437,109 6,301,061 - 6,301,061 136,048 - 136,048 11 493552 PBL Banten 8,275,863 14,750,500 23,026,363 16,556,254 505,109 5,965,000 - 5,965,000 - 23,026,363 5,865,000 - 5,865,000 5,735,683 - 5,735,683 129,317 - 129,317 12 493543 PBL DKI Jakarta 10,309,066 4,336,990 14,646,056 5,631,056 - 9,015,000 - 9,015,000 - 14,646,056 1,550,000 - 1,550,000 1,413,434 - 1,413,434 136,566 - 136,566 13 493568 PBL Jawa Barat 19,712,853 57,050,300 76,763,153 59,193,044 1,500,000 16,070,109 - 16,070,109 - 76,763,153 8,036,000 - 8,036,000 7,098,381 - 7,098,381 937,619 - 937,619 14 493574 PBL Jawa Tengah 21,058,483 110,179,660 131,238,143 112,666,780 683,246 17,888,117 - 17,888,117 - 131,238,143 10,450,067 - 10,450,067 8,717,997 - 8,717,997 1,732,070 - 1,732,070 15 493580 PBL D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 41,344,361 362,736 13,044,719 - 13,044,719 - 54,751,816 13,044,719 - 13,044,719 10,371,625 - 10,371,625 2,673,094 - 2,673,094 16 493599 PBL Jawa Timur 14,934,353 48,507,210 63,441,563 50,701,454 516,000 12,224,109 - 12,224,109 - 63,441,563 12,024,109 - 12,024,109 10,742,004 - 10,742,004 1,282,105 - 1,282,105
PBL Wilayah II 228,042,513 110,545,760 338,588,273 142,509,722 5,902,724 190,175,827 - 190,175,827 - 338,588,273 182,166,827 - 182,166,827 168,461,097 - 168,461,097 13,705,730 - 13,705,730 17 493600 PBL Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,284,380 345,000 11,625,109 - 11,625,109 - 20,254,489 11,625,109 - 11,625,109 11,471,907 - 11,471,907 153,202 - 153,202 18 493625 PBL Kalimantan Tengah 18,152,334 2,103,550 20,255,884 3,906,815 280,000 16,069,069 - 16,069,069 - 20,255,884 16,069,069 - 16,069,069 15,178,089 - 15,178,089 890,980 - 890,980 19 493619 PBL Kalimantan Selatan 15,447,817 13,329,120 28,776,937 15,014,828 533,000 13,229,109 - 13,229,109 - 28,776,937 13,229,109 - 13,229,109 10,339,176 - 10,339,176 2,889,933 - 2,889,933 20 493631 PBL Kalimantan Timur 12,088,156 9,715,010 21,803,166 11,583,057 595,109 9,625,000 - 9,625,000 - 21,803,166 9,625,000 - 9,625,000 8,982,705 - 8,982,705 642,295 - 642,295 21 493775 PBL Sulawesi Utara 10,417,304 9,385,380 19,802,684 11,332,575 1,009,311 7,460,798 - 7,460,798 - 19,802,684 7,360,798 - 7,360,798 7,255,385 - 7,255,385 105,413 - 105,413 22 493781 PBL Gorontalo 11,923,411 3,667,430 15,590,841 5,473,471 270,109 9,847,261 - 9,847,261 - 15,590,841 9,347,261 - 9,347,261 8,374,072 - 8,374,072 973,189 - 973,189 23 493790 PBL Sulawesi Tengah 12,939,961 3,212,900 16,152,861 5,075,752 170,109 10,907,000 - 10,907,000 - 16,152,861 10,907,000 - 10,907,000 10,618,034 - 10,618,034 288,966 - 288,966 24 493801 PBL Sulawesi Selatan 15,322,796 18,836,370 34,159,166 20,939,057 360,000 12,860,109 - 12,860,109 - 34,159,166 12,860,109 - 12,860,109 11,176,898 - 11,176,898 1,683,211 - 1,683,211 25 452800 PBL Sulawesi Barat 9,156,627 1,952,430 11,109,057 3,638,948 179,109 7,291,000 - 7,291,000 - 11,109,057 7,291,000 - 7,291,000 6,912,158 - 6,912,158 378,842 - 378,842 26 493810 PBL Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 12,001,598 403,759 12,657,870 - 12,657,870 - 25,063,227 12,657,870 - 12,657,870 12,514,833 - 12,514,833 143,037 - 143,037 27 493826 PBL Bali 13,757,857 4,212,900 17,970,757 5,933,648 787,000 11,250,109 - 11,250,109 - 17,970,757 11,250,109 - 11,250,109 8,498,766 - 8,498,766 2,751,343 - 2,751,343 28 493832 PBL NTB 12,854,000 13,010,960 25,864,960 14,894,851 245,000 10,725,109 - 10,725,109 - 25,864,960 7,975,109 - 7,975,109 6,068,948 - 6,068,948 1,906,161 - 1,906,161 29 493841 PBL NTT 14,821,959 4,107,330 18,929,289 6,201,223 260,000 12,468,066 - 12,468,066 - 18,929,289 12,468,066 - 12,468,066 12,002,231 - 12,002,231 465,835 - 465,835 30 493857 PBL Maluku 8,907,780 3,026,570 11,934,350 4,964,241 170,109 6,800,000 - 6,800,000 - 11,934,350 6,800,000 - 6,800,000 6,704,912 - 6,704,912 95,088 - 95,088 31 493863 PBL Maluku Utara 9,724,390 4,915,900 14,640,290 6,670,181 170,109 7,800,000 - 7,800,000 - 14,640,290 3,300,000 - 3,300,000 3,256,269 - 3,256,269 43,731 - 43,731 32 493872 PBL Papua 19,286,865 1,280,650 20,567,515 3,402,406 - 17,165,109 - 17,165,109 - 20,567,515 17,006,109 - 17,006,109 16,786,523 - 16,786,523 219,586 - 219,586 33 493888 PBL Papua Barat 14,495,790 1,217,010 15,712,800 3,192,691 125,000 12,395,109 - 12,395,109 - 15,712,800 12,395,109 - 12,395,109 12,320,191 - 12,320,191 74,918 - 74,918
TOTAL 532,249,922 637,874,300 1,170,124,222 588,261,996 12,995,424 417,933,522 150,933,280 568,866,802 - 1,170,124,222 357,011,397 128,544,905 485,556,302 327,998,611 128,544,905 456,543,516 29,012,786 - 29,012,786
TOTAL
PAGU (Rp)
TOTAL RPM
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM PHLN TOTAL PHLN TOTAL RPM
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
NOKODE
SATKERNAMA SATUAN KERJA
PAGU
RUPIAH
MURNIPLN TOTAL
SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM
KONTRAKTUAL
≤ 100 JTPHLN
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 88,003,156 150,933,280 238,936,436 83,084,732 34.77 48.74 18,978,974 58,669,852 77,648,826 32.50 33.36 (5,435,906) (2.28) 1 452780 Direktorat Penataan Bangunan & Lingkungan 40,754,374 - 40,754,374 13,815,965 33.90 44.90 10,986,100 - 10,986,100 26.96 29.41 (2,829,865) (6.94) 2 483690 Penataan & Revitalisasi Kawasan 22,493,537 22,493,537 5,629,644 25.03 60.03 701,484 - 701,484 3.12 6.25 (4,928,160) (21.91) 3 493217 Penanggulangan Kemiskinan di Perkotaan (P2KP-PNPM) 9,688,600 135,368,280 145,056,880 53,232,560 36.70 46.73 3,738,419 53,235,490 56,973,909 39.28 39.28 3,741,349 2.58 4 505137 Rehabilitasi dan Pembangunan Gedung Negara 10,350,000 10,350,000 2,416,990 23.35 56.35 2,046,305 - 2,046,305 19.77 20.10 (370,685) (3.58) 5 449582 Rehab./Rekon Rumah Pasca Gempa Bumi DIY & Jateng 4,716,645 15,565,000 20,281,645 7,989,573 39.39 54.40 1,506,666 5,434,362 6,941,028 34.22 35.79 (1,048,545) (5.17)
Satker PropinsiPBL Wilayah I 216,204,253 376,395,260 592,599,513 236,719,794 39.95 64.11 57,338,776 135,444,704 192,783,480 32.53 35.50 (43,936,314) (7.41)
1 493342 Penataan Bangunan & Lingkungan NAD 10,036,964 19,746,710 29,783,674 10,928,149 36.69 61.69 2,046,136 5,853,714 7,899,850 26.52 32.59 (3,028,299) (10.17) 2 493351 Penataan Bangunan & Lingkungan Sumatera Utara 11,585,680 23,038,700 34,624,380 16,667,783 48.14 64.79 6,898,346 8,608,535 15,506,881 44.79 45.20 (1,160,902) (3.35) 3 493367 Penataan Bangunan & Lingkungan Sumatera Barat 15,000,156 21,657,500 36,657,656 13,150,149 35.87 61.05 2,831,974 4,814,234 7,646,208 20.86 21.30 (5,503,941) (15.01) 4 493373 Penataan Bangunan & Lingkungan Riau 16,350,616 3,951,580 20,302,196 9,147,358 45.06 70.06 3,143,239 1,657,300 4,800,539 23.65 23.96 (4,346,819) (21.41) 5 493382 Penataan Bangunan & Lingkungan Kepulauan Riau 9,131,613 3,450,830 12,582,443 5,296,701 42.10 67.10 2,060,151 1,459,800 3,519,951 27.98 30.23 (1,776,750) (14.12) 6 493398 Penataan Bangunan & Lingkungan Jambi 15,655,301 2,449,650 18,104,951 8,235,243 45.49 70.49 6,074,605 918,013 6,992,618 38.62 43.74 (1,242,625) (6.86) 7 493424 Penataan Bangunan & Lingkungan Bengkulu 17,690,241 6,551,010 24,241,251 10,562,096 43.57 68.49 6,536,398 1,670,400 8,206,798 33.85 40.90 (2,355,298) (9.72) 8 493482 Penataan Bangunan & Lingkungan Sumatera Selatan 11,583,567 8,763,520 20,347,087 8,482,110 41.69 66.69 3,201,381 3,275,144 6,476,525 31.83 32.13 (2,005,585) (9.86) 9 493418 Penataan Bangunan & Lingkungan Bangka Belitung 11,124,789 5,748,420 16,873,209 6,583,762 39.02 64.02 2,275,398 1,078,394 3,353,792 19.88 20.62 (3,229,970) (19.14)
10 493430 Penataan Bangunan & Lingkungan Lampung 8,448,092 6,767,480 15,215,572 5,757,675 37.84 62.84 3,988,245 1,756,050 5,744,295 37.75 54.34 (13,380) (0.09) 11 493552 Penataan Bangunan & Lingkungan Banten 8,275,863 14,750,500 23,026,363 8,352,463 36.27 61.28 2,579,263 5,070,976 7,650,239 33.22 47.94 (702,224) (3.05) 12 493543 Penataan Bangunan & Lingkungan DKI Jakarta 10,309,066 4,336,990 14,646,056 6,567,943 44.84 69.85 265,805 3,990,786 4,256,591 29.06 29.35 (2,311,352) (15.78) 13 493568 Penataan Bangunan & Lingkungan Jawa Barat 19,712,853 57,050,300 76,763,153 34,239,691 44.60 58.94 2,318,824 19,625,812 21,944,636 28.59 29.01 (12,295,055) (16.02) 14 493574 Penataan Bangunan & Lingkungan Jawa Tengah 21,058,483 110,179,660 131,238,143 46,179,273 35.19 64.14 2,862,476 28,733,025 31,595,501 24.07 25.27 (14,583,772) (11.11) 15 493580 Penataan Bangunan & Lingkungan D.I.Yogyakarta 15,306,616 39,445,200 54,751,816 17,285,499 31.57 69.87 4,010,439 23,201,164 27,211,603 49.70 55.16 9,926,104 18.13 16 493599 Penataan Bangunan & Lingkungan Jawa Timur 14,934,353 48,507,210 63,441,563 29,283,898 46.16 61.11 6,246,096 23,731,357 29,977,453 47.25 49.61 693,555 1.09
PBL Wilayah II 228,042,513 110,545,760 338,588,273 144,721,504 42.74 60.74 74,581,003 33,263,806 107,844,809 31.85 39.87 (36,876,695) (10.89) 17 493600 Penataan Bangunan & Lingkungan Kalimantan Barat 13,949,149 6,305,340 20,254,489 8,157,456 40.27 60.28 4,751,530 2,679,900 7,431,430 36.69 39.06 (726,026) (3.58) 18 493625 Penataan Bangunan & Lingkungan Kalimantan Tengah 18,152,334 2,103,550 20,255,884 9,103,443 44.94 64.94 6,025,032 606,720 6,631,752 32.74 58.96 (2,471,691) (12.20) 19 493619 Penataan Bangunan & Lingkungan Kalimantan Selatan 15,447,817 13,329,120 28,776,937 10,713,058 37.23 47.23 2,962,691 3,345,326 6,308,017 21.92 33.12 (4,405,041) (15.31) 20 493631 Penataan Bangunan & Lingkungan Kalimantan Timur 12,088,156 9,715,010 21,803,166 8,362,790 38.36 58.36 2,749,766 1,779,887 4,529,653 20.78 23.34 (3,833,137) (17.58) 21 493775 Penataan Bangunan & Lingkungan Sulawesi Utara 10,417,304 9,385,380 19,802,684 9,592,750 48.44 59.39 4,232,714 4,380,916 8,613,630 43.50 50.19 (979,120) (4.94) 22 493781 Penataan Bangunan & Lingkungan Gorontalo 11,923,411 3,667,430 15,590,841 6,396,613 41.03 61.03 2,772,349 899,032 3,671,381 23.55 27.74 (2,725,232) (17.48) 23 493790 Penataan Bangunan & Lingkungan Sulawesi Tengah 12,939,961 3,212,900 16,152,861 6,746,331 41.77 61.77 4,547,177 911,950 5,459,127 33.80 31.28 (1,287,204) (7.97) 24 493801 Penataan Bangunan & Lingkungan Sulawesi Selatan 15,322,796 18,836,370 34,159,166 14,525,432 42.52 51.12 3,451,719 5,600,058 9,051,777 26.50 27.15 (5,473,655) (16.02) 25 452800 Penataan Bangunan & Lingkungan Sulawesi Barat 9,156,627 1,952,430 11,109,057 4,792,034 43.14 63.14 2,328,187 502,400 2,830,587 25.48 33.08 (1,961,447) (17.66) 26 493810 Penataan Bangunan & Lingkungan Sulawesi Tenggara 14,796,317 10,266,910 25,063,227 9,446,261 37.69 57.69 3,546,870 1,816,015 5,362,885 21.40 31.62 (4,083,376) (16.29) 27 493826 Penataan Bangunan & Lingkungan Bali 13,757,857 4,212,900 17,970,757 8,155,994 45.38 65.44 3,494,625 1,345,200 4,839,825 26.93 47.49 (3,316,169) (18.45) 28 493832 Penataan Bangunan & Lingkungan NTB 12,854,000 13,010,960 25,864,960 10,814,462 41.81 56.08 3,170,506 3,490,988 6,661,494 25.75 27.81 (4,152,968) (16.06) 29 493841 Penataan Bangunan & Lingkungan NTT 14,821,959 4,107,330 18,929,289 8,336,404 44.04 64.04 2,982,048 1,569,321 4,551,369 24.04 26.05 (3,785,035) (20.00) 30 493857 Penataan Bangunan & Lingkungan Maluku 8,907,780 3,026,570 11,934,350 4,983,341 41.76 61.76 3,663,623 1,229,858 4,893,481 41.00 66.67 (89,860) (0.75) 31 493863 Penataan Bangunan & Lingkungan Maluku Utara 9,724,390 4,915,900 14,640,290 6,169,625 42.14 62.14 1,506,589 2,059,785 3,566,374 24.36 25.13 (2,603,251) (17.78) 32 493872 Penataan Bangunan & Lingkungan Papua 19,286,865 1,280,650 20,567,515 10,466,467 50.89 66.74 8,928,626 566,000 9,494,626 46.16 66.54 (971,841) (4.73) 33 493888 Penataan Bangunan & Lingkungan Papua Barat 14,495,790 1,217,010 15,712,800 7,959,043 50.65 96.87 13,466,951 480,450 13,947,401 88.76 91.24 5,988,358 38.11
TOTAL 532,249,922 637,874,300 1,170,124,222 464,526,030 39.70 60.00 150,898,753 227,378,362 378,277,115 32.33 36.33 (86,248,915) (7.37)
RENCANA PENYERAPAN DAN PROGRES KEUANGANDIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
PAGU REALISASI RENCANA PENYERAPAN
AKHIR BULAN JULINO
RUPIAH
MURNIPHLN
KODE
SATKERNAMA SATUAN KERJA
DEVIASI
KEUANGAN KEUANGAN RUPIAH MURNI PLN TOTAL TOTAL
FISIK
(%)
KEU FISIK
% %
1 Penataan dan Revitalisasi
Kawasan
3.12 6.25 1 3 paket pekerjaan DED Sawahlunto, Design Kawasan
Pacitan dan Fisik Masjid Surabaya lelang ulang.
Dokumen tagihan siap, setalah revisi
POK, langsung proses.
2 Revisi POK sudah di Dit. Bina Program.
2 Rehabilitasi dan
Pembangunan Gedung
Negara
19.77 20.10 Status tanggal 29 Juli 2010
jam , keuangan
3 Penataan Bangunan &
Lingkungan Bangka Belitung
19.88 20.62 Akan diadakan rapat dengan pihak
Pemda, jika masih mengalami
kendala kemungkinan akan ada
pemindahan lokasi
4 Penataan Bangunan &
Lingkungan Kalimantan
Selatan
21.92 33.12 DDUB untuk PAKET dalam proses
ABT di kab/Kota-nya.
5 Penataan Bangunan &
Lingkungan Kalimantan Timur
20.78 23.34 1 Status per tanggal 29 Juli 2010 jam 11.26 sudah
mencapai keuangan 29,18, dan fisik 31,04.
2 Pembayaran Fixed cost P2KP yang direncanakan cair
pada bulan Juli 2010 terkendala dengan belum
terbitnya SK yang memuat perhitungan dana fixed cost.
Fixed Cost akan diproses setelah infentarisasi laporan
fixed cost 2009 diselesaikan.
Menunggu proses inventarisasi
laporan fixed cost.
6 Penataan Bangunan &
Lingkungan Sulawesi
Tenggara
21.40 31.62 Untuk PAKET, menunggu
rekomendasi pencairan dari Satker
P2KP Pusat.
Dana P2KP untuk PAKET dan ND baru bisa cair bulan
November (lebih kurang 6,8M)
PAKET dan ND P2KP belum cair. Khusus untuk ND,
pencairan baru bisa dilaksanakan bulan September.
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010DIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
STATUS : 29 JULI 2010, JAM 08.00 WIB
NO SATKER
PROGRES
ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN
Penetapan Lokasi RTH dan Tradisional masih mengalami
hambatan, belum adanya kesepakatan dengan pemerintah
daerah (Bappeda)
1,170,124
- -30,072
72,030
130,482
217,864
334,251
464,526
654,685
809,843
954,704
1,110,097
1,170,124
-418 837 17,998
21,219 47,037 73,717
96,536 128,269
160,172
206,967
258,717 286,090
331,015
378,277
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANDIREKTORAT PENATAAN BANGUNAN DAN LINGKUNGAN
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
a. Satker Pusat 397,375,532 148,471,500 545,847,032 397,857,324 467,500 45,484,188 102,038,020 147,522,208 - 545,847,032 80 2 82 2 - 13 - - 2 - - - 65 119,943,595
1 466162 Dit Bina Program 66,532,332 10,000,000 76,532,332 42,289,224 300,000 24,043,108 9,900,000 33,943,108 - 76,532,332 32 1 33 2 - - - - 2 - - - 29 26,516,954
2 505138 Pembinaan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 355,568,100 167,500 21,441,080 92,138,020 113,579,100 - 469,314,700 48 1 49 - - 13 - - - - - - 36 93,426,641
b. Satker Propinsi 143,567,000 - 143,567,000 119,593,282 591,400 23,382,318 - 23,382,318 - 143,567,000 30 - 30 - - - - - - - - - 30 21,320,772
1 505730 PIP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 2,316,000 - 600,000 - 600,000 - 2,916,000 1 - 1 - - - - - - - - - 1 572,950
2 505749 PIP Sumatera Utara 1,910,000 - 1,910,000 1,870,000 40,000 - - - - 1,910,000 - - - - - - - - - - - - - -
3 505755 PIP Sumatera Barat 3,649,152 - 3,649,152 2,832,912 - 816,240 - 816,240 - 3,649,152 1 - 1 - - - - - - - - - 1 815,914
4 505761 PIP Riau 16,343,000 - 16,343,000 16,303,000 40,000 - - - - 16,343,000 - - - - - - - - - - - - - -
5 505097 PIP Kepri 1,036,000 - 1,036,000 1,036,000 - - - - - 1,036,000 - - - - - - - - - - - - - -
6 505786 PIP Sumatera Selatan 14,612,288 - 14,612,288 14,612,288 - - - - - 14,612,288 - - - - - - - - - - - - - -
7 505100 PIP Bangka Belitung 1,213,000 - 1,213,000 1,213,000 - - - - - 1,213,000 - - - - - - - - - - - - - -
8 505770 PIP Jambi 7,263,000 - 7,263,000 7,223,000 40,000 - - - - 7,263,000 - - - - - - - - - - - - - -
9 505792 PIP Bengkulu 2,917,000 - 2,917,000 2,067,000 40,000 810,000 - 810,000 - 2,917,000 1 - 1 - - - - - - - - - 1 769,835
10 505821 PIP Lampung 12,503,000 - 12,503,000 12,503,000 - - - - - 12,503,000 - - - - - - - - - - - - - -
11 505840 PIP Banten 2,442,000 - 2,442,000 1,804,000 - 638,000 - 638,000 - 2,442,000 1 - 1 - - - - - - - - - 1 576,605
12 505837 PIP Jawa Barat 6,823,000 - 6,823,000 4,461,350 - 2,361,650 - 2,361,650 - 6,823,000 3 - 3 - - - - - - - - 3 2,260,315
13 505843 PIP Jawa Tengah 5,941,000 - 5,941,000 4,181,000 - 1,760,000 - 1,760,000 - 5,941,000 2 - 2 - - - - - - - - - 2 1,351,933
14 505868 PIP Jawa Timur 7,545,000 - 7,545,000 5,030,000 40,000 2,475,000 - 2,475,000 - 7,545,000 3 - 3 - - - - - - - - 3 2,215,994
15 505101 PIP DI Yogyakarta 941,000 - 941,000 941,000 - - - - - 941,000 - - - - - - - - - - - - - -
16 505106 PIP Bali 1,077,000 - 1,077,000 1,037,000 40,000 - - - - 1,077,000 - - - - - - - - - - - - - -
17 505993 PIP Nusa Tenggara Timur 5,676,000 - 5,676,000 4,031,600 40,000 1,604,400 - 1,604,400 - 5,676,000 2 - 2 - - - - - - - - - 2 1,582,845
18 505107 PIP NTB 2,806,000 - 2,806,000 2,046,000 40,000 720,000 - 720,000 - 2,806,000 1 - 1 - - - - - - - - - 1 496,719
19 505874 PIP Kalimantan Barat 3,844,000 - 3,844,000 2,960,800 - 883,200 - 883,200 - 3,844,000 1 - 1 - - - - - - - - - 1 769,037
20 505880 PIP Kalimantan Tengah 3,036,424 - 3,036,424 2,316,424 - 720,000 - 720,000 - 3,036,424 1 - 1 - - - - - - - - - 1 715,864
21 505899 PIP Kalimantan Selatan 3,738,136 - 3,738,136 2,599,216 191,400 947,520 - 947,520 - 3,738,136 1 - 1 - - - - - - - - - 1 911,190
22 505900 PIP Kalimantan Timur 3,753,000 - 3,753,000 2,825,000 - 928,000 - 928,000 - 3,753,000 1 - 1 - - - - - - - - - 1 887,480
23 505104 PIP Sulawesi Barat 2,294,000 - 2,294,000 1,613,000 40,000 641,000 - 641,000 - 2,294,000 1 - 1 - - - - - - - - - 1 612,500
24 505940 PIP Sulawesi Selatan 6,851,000 - 6,851,000 4,656,300 - 2,194,700 - 2,194,700 - 6,851,000 3 - 3 - - - - - - - - - 3 2,030,386
25 505931 PIP Sulawesi Tengah 2,718,000 - 2,718,000 1,624,000 - 1,094,000 - 1,094,000 - 2,718,000 1 - 1 - - - - - - - - - 1 665,070
26 505102 PIP Sulawesi Utara 3,243,000 - 3,243,000 2,443,000 - 800,000 - 800,000 - 3,243,000 1 - 1 - - - - - - - - 1 766,590
27 505105 PIP Sulawesi Tenggara 3,353,000 - 3,353,000 2,533,000 - 820,000 - 820,000 - 3,353,000 1 - 1 - - - - - - - - - 1 816,750
28 505103 PIP Gorontalo 2,434,000 - 2,434,000 1,794,000 40,000 600,000 - 600,000 - 2,434,000 1 - 1 - - - - - - - - - 1 562,170
29 505108 PIP Maluku 3,612,000 - 3,612,000 2,638,392 - 973,608 - 973,608 - 3,612,000 2 - 2 - - - - - - - - - 2 959,400
30 505110 PIP Maluku Utara 1,120,000 - 1,120,000 1,120,000 - - - - - 1,120,000 - - - - - - - - - - - - - -
31 506022 PIP Papua 4,518,000 - 4,518,000 3,523,000 - 995,000 - 995,000 - 4,518,000 1 - 1 - - - - - - - - - 1 981,225
32 506038 PIP Papua Barat 1,439,000 - 1,439,000 1,439,000 - - - - - 1,439,000 - - - - - - - - - - - - - -
TOTAL 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 110 2 112 2 - 13 - - 2 - - - 95 141,264,367
Keterangan :
1 Penyiapan Dokumen Lelang 6 Pemasukan Penawaran
2 Pengumuman Lelang/Prakualifikasi 7 Usulan Pemenang
3 Penyusunan shortlist 8 Penetapan Pemenang
4 Undangan Pelelangan 9 Penerbitan Surat Perintah Mulai Kerja
5 Penjelasan Pekerjaan Aanwyzing 10 Penandatangan Kontrak
PAGU (Rp)
PAKET > RP 100 JUTA
STATUS : 29 JULI 2010, JAM 08.00 WIB
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
DIREKTORAT BINA PROGRAM
NOKODE
SATKERNAMA SATUAN KERJA
PAGU
9
PAKET KONTRAK
10
JUMLAH PAKET DALAM PROSES PRA KONTRAK
RUPIAH
MURNIPLN TOTAL FISIK
SWAKELOLA
+ AP
KONTRAKTUAL > 100 JTBLM TOTAL
NON
FISIK
KONTRAKTUAL
≤ 100 JT
NILAI
KONTRAK
(Rp. x 1.000) 5 6 7 8TOTAL 1 2 3 4
NO. URAIAN PERMASALAHAN PAKET KETERANGAN
1 Persiapan Lelang 2 Satker Bina Program
1. Paket Persentation Room, Adanya perubahan layout
desain ruangan
Saat ini sedang proses akan memasuki
pengumuman lelang
2. Paket LED and Business Plan, KAK baru saja disetujui
oleh World Bank
Saat ini sedang mengajukan Draft
Pengumuman untuk lelang
2 Proses Lelang 15
3 Sanggah Banding -
4 Tender Ulang -
5 Review DED -
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran -
a. Loan belum efektif
b. Menunggu Penandatanganan Loan Agreement
c. Tanggap Darurat
d. Revisi Kegiatan
e. Belum tersedia dokumen RPIJM
f. Menunggu persyaratan pembuktian BMN
7 Pemindahan Lokasi -
17
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN DIREKTORAT BINA PROGRAM
STATUS: 29 JULI 2010
TOTAL
TINDAK LANJUT
1. DIREKTORAT BINA PROGRAM 2 1. Paket Persentation Room, 350,000 Adanya perubahan layout
desain ruangan
Saat ini sedang proses akan memasuki
pengumuman lelang
2. Paket LED and Business Plan, 350,000 Baru mendapatkan persetujuan
KAK dari Worldbank
Sekarang sedang mengajukan draft
pengumuman untuk lelang
2 700,000 T O T A L
TINDAK LANJUT
PERMASALAHAN PAKET BELUM LELANG
DIREKTORAT BINA PROGRAM
STATUS : 29 JULI 2010
NO SATKER/PROVINSI
JML
PAKET
BELUM
LELANG
PAKET KONTRAK/RINCIAN KEGIATANPAGU
(X Rp.1000)PERMASALAHAN
RPM PHLN TOTAL
a. Satker Pusat 397,375,532 148,471,500 545,847,032 397,857,324 467,500 45,484,188 102,038,020 147,522,208 - 545,847,032 40,804,622 83,622,963 124,427,585 36,320,632 83,622,963 119,943,595 4,483,990 - 4,483,990 1 466162 Dit Bina Program 66,532,332 10,000,000 76,532,332 42,289,224 300,000 24,043,108 9,900,000 33,943,108 - 76,532,332 19,363,542 9,550,000 28,913,542 16,966,954 9,550,000 26,516,954 2,396,588 - 2,396,588 2 505138 Pembinaan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 355,568,100 167,500 21,441,080 92,138,020 113,579,100 - 469,314,700 21,441,080 74,072,963 95,514,043 19,353,678 74,072,963 93,426,641 2,087,402 - 2,087,402
- b. Satker Propinsi 143,567,000 - 143,567,000 119,593,282 591,400 23,382,318 - 23,382,318 - 143,567,000 23,382,318 - 23,382,318 21,345,467 - 21,320,772 2,036,851 - 2,036,851
1 505730 PIP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 2,316,000 600,000 - 600,000 - 2,916,000 600,000 - 600,000 572,950 - 572,950 27,050 - 27,050
2 505749 PIP Sumatera Utara 1,910,000 - 1,910,000 1,870,000 40,000 - - - - 1,910,000 - - - - - - - -
3 505755 PIP Sumatera Barat 3,649,152 - 3,649,152 2,832,912 - 816,240 - 816,240 - 3,649,152 816,240 - 816,240 815,914 - 815,914 326 - 326 4 505761 PIP Riau 16,343,000 - 16,343,000 16,303,000 40,000 - - - - 16,343,000 - - - - - - - - - 5 505097 PIP Kepri 1,036,000 - 1,036,000 1,036,000 - - - - - 1,036,000 - - - - - - - - - 6 505786 PIP Sumatera Selatan 14,612,288 - 14,612,288 14,612,288 - - - - - 14,612,288 - - - - - - - - - 7 505100 PIP Bangka Belitung 1,213,000 - 1,213,000 1,213,000 - - - - - 1,213,000 - - - - - - - - - 8 505770 PIP Jambi 7,263,000 - 7,263,000 7,223,000 40,000 - - - - 7,263,000 - - - - - - - - - 9 505792 PIP Bengkulu 2,917,000 - 2,917,000 2,067,000 40,000 810,000 - 810,000 - 2,917,000 810,000 - 810,000 769,835 - 769,835 40,165 - 40,165
10 505821 PIP Lampung 12,503,000 - 12,503,000 12,503,000 - - - - - 12,503,000 - - - - - - - - - 11 505840 PIP Banten 2,442,000 - 2,442,000 1,804,000 - 638,000 - 638,000 - 2,442,000 638,000 - 638,000 576,605 - 576,605 61,395 - 61,395 12 505837 PIP Jawa Barat 6,823,000 - 6,823,000 4,461,350 - 2,361,650 - 2,361,650 - 6,823,000 2,361,650 - 2,361,650 2,260,315 - 2,260,315 101,335 - 101,335 13 505843 PIP Jawa Tengah 5,941,000 - 5,941,000 4,181,000 - 1,760,000 - 1,760,000 - 5,941,000 1,760,000 - 1,760,000 1,376,628 - 1,351,933 383,372 - 383,372 14 505868 PIP Jawa Timur 7,545,000 - 7,545,000 5,030,000 40,000 2,475,000 - 2,475,000 - 7,545,000 2,475,000 - 2,475,000 2,215,994 - 2,215,994 259,006 - 259,006 15 505101 PIP DI Yogyakarta 941,000 - 941,000 941,000 - - - - - 941,000 - - - - - - - - - 16 505106 PIP Bali 1,077,000 - 1,077,000 1,037,000 40,000 - - - - 1,077,000 - - - - - - - - - 17 505993 PIP Nusa Tenggara Timur 5,676,000 - 5,676,000 4,031,600 40,000 1,604,400 - 1,604,400 - 5,676,000 1,604,400 - 1,604,400 1,582,845 - 1,582,845 21,555 - 21,555 18 505107 PIP NTB 2,806,000 - 2,806,000 2,046,000 40,000 720,000 - 720,000 - 2,806,000 720,000 - 720,000 496,719 - 496,719 223,281 - 223,281 19 505874 PIP Kalimantan Barat 3,844,000 - 3,844,000 2,960,800 - 883,200 - 883,200 - 3,844,000 883,200 - 883,200 769,037 - 769,037 114,163 - 114,163 20 505880 PIP Kalimantan Tengah 3,036,424 - 3,036,424 2,316,424 - 720,000 - 720,000 - 3,036,424 720,000 - 720,000 715,864 - 715,864 4,136 - 4,136
21 505899 PIP Kalimantan Selatan 3,738,136 - 3,738,136 2,599,216 191,400 947,520 - 947,520 - 3,738,136 947,520 - 947,520 911,190 - 911,190 36,330 - 36,330
22 505900 PIP Kalimantan Timur 3,753,000 - 3,753,000 2,825,000 - 928,000 - 928,000 - 3,753,000 928,000 - 928,000 887,480 - 887,480 40,520 - 40,520 23 505104 PIP Sulawesi Barat 2,294,000 - 2,294,000 1,613,000 40,000 641,000 - 641,000 - 2,294,000 641,000 - 641,000 612,500 - 612,500 28,500 - 28,500 24 505940 PIP Sulawesi Selatan 6,851,000 - 6,851,000 4,656,300 - 2,194,700 - 2,194,700 - 6,851,000 2,194,700 - 2,194,700 2,030,386 - 2,030,386 164,314 - 164,314 25 505931 PIP Sulawesi Tengah 2,718,000 - 2,718,000 1,624,000 - 1,094,000 - 1,094,000 - 2,718,000 1,094,000 - 1,094,000 665,070 - 665,070 428,930 - 428,930 26 505102 PIP Sulawesi Utara 3,243,000 - 3,243,000 2,443,000 - 800,000 - 800,000 - 3,243,000 800,000 - 800,000 766,590 - 766,590 33,410 - 33,410 27 505105 PIP Sulawesi Tenggara 3,353,000 - 3,353,000 2,533,000 - 820,000 - 820,000 - 3,353,000 820,000 - 820,000 816,750 - 816,750 3,250 - 3,250 28 505103 PIP Gorontalo 2,434,000 - 2,434,000 1,794,000 40,000 600,000 - 600,000 - 2,434,000 600,000 - 600,000 562,170 - 562,170 37,830 - 37,830 29 505108 PIP Maluku 3,612,000 - 3,612,000 2,638,392 - 973,608 - 973,608 - 3,612,000 973,608 - 973,608 959,400 - 959,400 14,208 - 14,208 30 505110 PIP Maluku Utara 1,120,000 - 1,120,000 1,120,000 - - - - - 1,120,000 - - - - - - - - - 31 506022 PIP Papua 4,518,000 - 4,518,000 3,523,000 - 995,000 - 995,000 - 4,518,000 995,000 - 995,000 981,225 - 981,225 13,775 - 13,775 32 506038 PIP Papua Barat 1,439,000 - 1,439,000 1,439,000 - - - - - 1,439,000 - - - - - - - - -
TOTAL 540,942,532 148,471,500 689,414,032 517,450,606 1,058,900 68,866,506 102,038,020 170,904,526 - 689,414,032 64,186,940 83,622,963 147,809,903 57,666,099 83,622,963 141,264,367 6,520,841 - 6,520,841
TOTAL RPM PHLN TOTAL RPM
PAGU TERKONTRAK NILAI KONTRAK SISA PAGU KONTRAK
RPM
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
DIREKTORAT BINA PROGRAM
STATUS : 29 JULI 2010, JAM 08.00 WIB( x Rp. 1.000 )
NOKODE
SATKERNAMA SATUAN KERJA
PAGU
RUPIAH
MURNIPHLN TOTALPHLNTOTAL
PAGU (Rp)
PLN TOTAL SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM
KONTRAKTUAL
≤ 100 JT
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 397,375,532 148,471,500 545,847,032 120,172,897 22.02 22.02 41,672,177 40,340,008 82,012,185 15.02 19.19 (38,160,712) (6.99)
1 466162 Direktorat Bina Program 66,532,332 10,000,000 76,532,332 37,815,529 49.41 49.41 25,667,984 3,645,758 29,313,742 38.30 38.69 (8,501,787) (11.11)
2 505138 Pembinaan Pembangunan Infrastruktur Perdesaan 330,843,200 138,471,500 469,314,700 82,357,368 17.55 17.55 16,004,193 36,694,250 52,698,443 11.23 16.01 (29,658,925) (6.32)
Satuan Propinsi 143,567,000 - 143,567,000 49,693,237 34.61 34.61 47,119,794 - 47,119,794 32.82 36.06 (2,573,443) (1.79)
1 505730 Pembangunan IP Nanggroe Aceh Darussalam 2,916,000 - 2,916,000 1,020,600 35.00 35.00 1,315,230 - 1,315,230 45.10 45.53 294,630 10.10
2 505749 Pembangunan IP Sumatera Utara 1,910,000 - 1,910,000 668,500 35.00 35.00 409,343 - 409,343 21.43 21.43 (259,157) (13.57)
3 505755 Pembangunan IP Sumatera Barat 3,649,152 - 3,649,152 1,277,203 35.00 35.00 1,173,622 - 1,173,622 32.16 33.12 (103,581) (2.84)
4 505761 Pembangunan IP Riau 16,343,000 - 16,343,000 5,556,620 34.00 34.00 3,426,298 - 3,426,298 20.96 20.97 (2,130,322) (13.04)
5 505097 Pembangunan IP Kepri 1,036,000 - 1,036,000 362,600 35.00 35.00 495,868 - 495,868 47.86 47.87 133,268 12.86
6 505786 Pembangunan IP Sumatera Selatan 14,612,288 - 14,612,288 4,968,178 34.00 34.00 2,692,964 - 2,692,964 18.43 20.32 (2,275,214) (15.57)
7 505100 Pembangunan IP Bangka Belitung 1,213,000 - 1,213,000 424,550 35.00 35.00 581,624 - 581,624 47.95 47.95 157,074 12.95
8 505770 Pembangunan IP Jambi 7,263,000 - 7,263,000 2,542,050 35.00 35.00 2,087,309 - 2,087,309 28.74 28.94 (454,741) (6.26)
9 505792 Pembangunan IP Bengkulu 2,917,000 - 2,917,000 1,020,950 35.00 35.00 1,358,453 - 1,358,453 46.57 49.07 337,503 11.57
10 505821 Pembangunan IP Lampung 12,503,000 - 12,503,000 4,251,020 34.00 34.00 3,558,084 - 3,558,084 28.46 28.46 (692,936) (5.54)
11 505840 Pembangunan IP Banten 2,442,000 - 2,442,000 854,700 35.00 35.00 592,262 - 592,262 24.25 24.88 (262,438) (10.75)
12 505837 Pembangunan IP Jawa Barat 6,823,000 - 6,823,000 2,388,050 35.00 35.00 3,076,786 - 3,076,786 45.09 48.27 688,736 10.09
13 505843 Pembangunan IP Jawa Tengah 5,941,000 - 5,941,000 2,079,350 35.00 35.00 2,666,650 - 2,666,650 44.89 52.53 587,300 9.89
14 505868 Pembangunan IP Jawa Timur 7,545,000 - 7,545,000 2,565,300 34.00 34.00 2,087,461 - 2,087,461 27.67 42.19 (477,839) (6.33)
15 505101 Pembangunan IP DI Yogyakarta 941,000 - 941,000 329,350 35.00 35.00 440,904 - 440,904 46.85 46.85 111,554 11.85
16 505106 Pembangunan IP Bali 1,077,000 - 1,077,000 376,950 35.00 35.00 335,652 - 335,652 31.17 43.50 (41,298) (3.83)
17 505993 Pembangunan IP Nusa Tenggara Timur 5,676,000 - 5,676,000 1,986,600 35.00 35.00 2,507,776 - 2,507,776 44.18 47.37 521,176 9.18
18 505107 Pembangunan IP Nusa Tenggara Barat 2,806,000 - 2,806,000 982,100 35.00 35.00 852,347 - 852,347 30.38 33.00 (129,753) (4.62)
19 505874 Pembangunan IP Kalimantan Barat 3,844,000 - 3,844,000 1,345,400 35.00 35.00 1,167,967 - 1,167,967 30.38 45.48 (177,433) (4.62)
20 505880 Pembangunan IP Kalimantan Tengah 3,036,424 - 3,036,424 1,062,748 35.00 35.00 1,077,527 - 1,077,527 35.49 37.91 14,779 0.49
21 505899 Pembangunan IP Kalimantan Selatan 3,738,136 - 3,738,136 1,308,348 35.00 35.00 1,163,217 - 1,163,217 31.12 32.93 (145,131) (3.88)
22 505900 Pembangunan IP Kalimantan Timur 3,753,000 - 3,753,000 1,313,550 35.00 35.00 908,899 - 908,899 24.22 23.65 (404,651) (10.78)
23 505104 Pembangunan IP Sulawesi Barat 2,294,000 - 2,294,000 802,900 35.00 35.00 1,052,067 - 1,052,067 45.86 46.44 249,167 10.86
24 505940 Pembangunan IP Sulawesi Selatan 6,851,000 - 6,851,000 2,397,850 35.00 35.00 2,573,835 - 2,573,835 37.57 38.50 175,985 2.57
25 505931 Pembangunan IP Sulawesi Tengah 2,718,000 - 2,718,000 951,300 35.00 35.00 1,197,439 - 1,197,439 44.06 52.31 246,139 9.06
26 505102 Pembangunan IP Sulawesi Utara 3,243,000 - 3,243,000 1,135,050 35.00 35.00 1,620,350 - 1,620,350 49.96 50.48 485,300 14.96
27 505105 Pembangunan IP Sulawesi Tenggara 3,353,000 - 3,353,000 1,173,550 35.00 35.00 1,346,492 - 1,346,492 40.16 40.20 172,942 5.16
28 505103 Pembangunan IP Gorontalo 2,434,000 - 2,434,000 851,900 35.00 35.00 1,097,171 - 1,097,171 45.08 45.14 245,271 10.08
29 505108 Pembangunan IP Maluku 3,612,000 - 3,612,000 1,264,200 35.00 35.00 1,622,935 - 1,622,935 44.93 52.92 358,735 9.93
30 505110 Pembangunan IP Maluku Utara 1,120,000 - 1,120,000 392,000 35.00 35.00 435,548 - 435,548 38.89 38.89 43,548 3.89
31 506022 Pembangunan IP Papua 4,518,000 - 4,518,000 1,536,120 34.00 34.00 1,208,386 - 1,208,386 26.75 43.66 (327,734) (7.25)
32 506038 Pembangunan IP Papua Barat 1,439,000 - 1,439,000 503,650 35.00 35.00 989,328 - 989,328 68.75 68.75 485,678 33.75
TOTAL 540,942,532 148,471,500 689,414,032 169,866,134 24.64 24.64 88,791,971 40,340,008 129,131,979 18.73 22.70 (40,734,155) (5.91)
RENCANA PENYERAPAN
AKHIR BULAN JULI
FISIK
(%)
KEUANGAN
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
DIREKTORAT BINA PROGRAM
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
NO
REALISASI KODE
SATKER
RUPIAH MURNI TOTAL
PAGU
PLN
DEVIASI
NAMA SATUAN KERJA
TOTALRUPIAH
MURNIPHLN
KEUANGAN
BINA PROGRAM
NO. SATKER KEU FISIK ALASAN KETERLAMBATAN TINDAK LANJUT KETERANGAN
% %
1 Pembinaan Pembangunan
Infrastruktur Perdesaan
11.23 16.01
- PAMSIMAS Rp. 6.308.000.000,-
- PPIP Rp. 225.000.000.000,-
2 Pembangunan IP Sumatera
Utara
21.43 21.43
3 Pembangunan IP Riau 20.96 20.97
4 Pembangunan IP Sumatera
Selatan
18.43 20.32
PERMASALAHAN DAN TINDAK LANJUT PROGRES KEGIATAN TA 2010
DI LINGKUNGAN DITJEN CIPTA KARYA
STATUS : 29 JULI 2010
PROGRES
Kegiatan penyerapan dana BLM yang dialokasikan pada
DIPA Satker PPIP Pusat baru saja selesai pembukan tanda
(*), dan saat ini masih menunggu proses SKPA yang saat ini
masih berada di Ditjen Anggaran sebesar :
Mempercepat persetujuan penerbitan SKPA,
sehingga akan meningkatkan penyerapan
mengakibatkan tertundanya pelaksanaan Bantuan Langsung
Masyarakat pada desa-desa sasaran
sedang di proses penyerapannya, akan terserap
kurang lebih Rp. 200 juta di akhir juli
Akan terserap dari gaji Fasilitator Masyarakat (FM)
sebesar Rp 571 Juta pada pertengahan Agustus
2010.
Pertengahan Agustus akan terserap gaji fasilitator
sebesar 1 Milyar.
Baru direkrut sebanyak 206 org dari total 390 orang
Fasilitator Masyarakat (FM). yang terkontrak 1 Juni 2010.
sisanya akan terkontrak 1 Agustus 2010
Fasilitator baru di Kontrak fasilitator awal Mei 2010, dan baru
dibayarkan gaji 1 bulan.
Baru selesai melaksanakan Workshop Perencanaan dan
pengendalian
689,414
- 2,484 11,702
31,016
56,109
86,865
123,128
169,866
361,951
487,093
617,223
661,096
689,414
458 916 1,850 2,090 5,171 11,733 15,295
39,172 45,114 61,493
84,263 99,560
111,338 129,132
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANDIREKTORAT BINA PROGRAM
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
RPM PHLN TOTAL
1 622213 SETDITJEN 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 4 2 14 16,244,090
TOTAL 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 6 14 20 - 4 - - - - - 2 - 14 16,244,090
Keterangan :
1 Penyiapan Dokumen Lelang
2 Pengumuman Lelang/Prakualifikasi
3 Penyusunan shortlist
4 Undangan Pelelangan
5 Penjelasan Pekerjaan Aanwyzing
6 Pemasukan Penawaran
7 Usulan Pemenang
8 Penetapan Pemenang
9 Penerbitan Surat Perintah Mulai Kerja
10 Penandatangan Kontrak
PAKET > RP 100 JUTA
10RUPIAH
MURNIPLN TOTAL 5 6 7 8 9TOTAL 1
PAGU (Rp)
3BLM TOTAL FISIK
LAPORAN PELAKSANAAN PELELANGAN BARANG/JASA TA 2010
SEKRETARIAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB
NOKODE
SATKER
NAMA
SATUAN KERJA
PAGU PAKET KONTRAK JUMLAH PAKET DALAM PROSES PRA KONTRAK NILAI
KONTRAK
(Rp. x 1.000) SWAKELOLA +
AP
KONTRAKTUAL > 100 JT2
NON
FISIK 4
KONTRAKTUAL
≤ 100 JT
NO. URAIAN PERMASALAHAN JUMLAH PAKET KETERANGAN
1 Persiapan Lelang -
2 Proses Lelang 6
3 Sanggah Banding -
4 Tender Ulang -
5 Review DED -
6 Diblokir (Tanda Bintang) oleh Ditjen Anggaran
a. Loan belum efektif -
b. Menunggu Penandatanganan Loan Agreement -
c. Tanggap Darurat -
d. Revisi Kegiatan -
e. Belum tersedia dokumen RPIJM -
f. Menunggu persyaratan pembuktian BMN -
7 Pemindahan Lokasi -
6
RINGKASAN PERMASALAHAN PROGRES PELELANGAN TA.2010
DI LINGKUNGAN SEKRETARIAT DIREKTORAT JENDERAL CIPTA KARYA
STATUS: 29 JULI 2010
TOTAL
TINDAK LANJUT
RPM PHLN TOTAL
1 622213 SETDITJEN 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 19,352,947 16,244,090 16,244,090 3,108,857 - 3,108,857
TOTAL 114,266,503 1,000,000 115,266,503 78,441,953 490,143 35,334,407 1,000,000 36,334,407 - 115,266,503 19,352,947 - 19,352,947 16,244,090 - 16,244,090 3,108,857 - 3,108,857
LAPORAN SISA PAGU PELELANGAN BARANG/JASA TA 2010
SEKRETARIAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB
PLN
( x Rp. 1.000 )
NOKODE
SATKER RPM
PAGUNAMA
SATUAN KERJA PHLN TOTAL RPM
NILAI KONTRAK SISA PAGU KONTRAK
PHLN TOTALRPMRUPIAH
MURNI
PAGU TERKONTRAK
PHLN TOTALTOTAL SWAKELOLA +
AP
KONTRAKTUAL > 100 JTBLM TOTAL
PAGU (Rp)
KONTRAKTUAL
≤ 100 JT
KEU. FISIK
(RP) % % % (RP) %
Satker Pusat 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)
1 622213 Sekretariat Direktorat Jenderal
Cipta Karya114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)
TOTAL 114,266,503 1,000,000 115,266,503 62,193,118 53.96 55.96 45,840,133 - 45,840,133 39.77 40.87 (16,352,985) (14.19)
FISIK
(%)
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
SEKRETARIAT JENDERAL CIPTA KARYA
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
KEUANGAN KEUANGAN NO
TOTAL
PAGUKODE
SATKERNAMA SATUAN KERJA
RUPIAH MURNI PLN TOTAL
DEVIASIRENCANA PENYERAPAN
AKHIR BULAN JULI
PHLN
REALISASI
RUPIAH
MURNI
115,267
-
4,302
9,696
16,426
24,562
33,719
47,666
62,193
76,616
88,468
102,659
110,612
115,267
2,783 5,566 5,566
8,362 9,518 14,293
14,494 20,759
22,798 24,912
30,326
39,362
41,949 45,840
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANSETDITJEN
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
KEU. FISIK
(RP) % % % (RP) %
1 P2KP 817,891,000 61,800,000 879,691,000 284,380,000 32.33 32.33 121,867,450 14,780,000 136,647,450 15.53 6.10 (147,732,550) (16.79)
2 PPIP 375,000,000 150,000,000 525,000,000 219,600,000 41.83 36.31 - - - - - (147,120,000) (28.02)
3 PAMSIMAS - 255,100,000 255,100,000 25,487,000 9.99 9.99 - 7,390,823 7,390,823 2.90 3.14 (18,096,177) (7.09)
4 RISE - 419,500,000 419,500,000 225,125,000 53.67 53.67 - 212,727,036 212,727,036 50.71 50.85 (12,397,964) (2.96)
TOTAL 1,192,891,000 886,400,000 2,079,291,000 754,592,000 36.29 34.90 121,867,450 234,897,859 356,765,309 17.16 13.22 (325,346,691) (15.65)
REALISASI
TOTAL
RENCANA PENYERAPAN
AKHIR BULAN JULI
PHLN
DEVIASI
KEUANGAN KEUANGAN
RENCANA PENYERAPAN DAN PROGRES KEUANGAN
SATKER KABUPATEN/KOTA
STATUS : 29 JULI 2010, JAM 08.00 WIB( X Rp. 1000 )
RUPIAH
MURNI
PAGU
NAMA SATUAN KERJA
PLN
NO
TOTAL RUPIAH
MURNI
FISIK
(%)
2,079,291
- 1,733 9,741 25,487
103,717
185,952
460,042
754,592
998,892
1,428,872
1,718,944
1,901,100
2,079,291
- - - -- -
-
-
6,182 18,202 39,576
106,558
188,190
266,850
356,765
-
500,000
1,000,000
1,500,000
2,000,000
2,500,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANSATKER KABUPATEN/KOTA
TAHUN ANGGARAN 2009
PAGU
RENCANA
REALISASI
525,000
- - - - -9,600
147,180
219,600
282,680
420,000
525,000 525,000 525,000
- -- -
0
0
00 0 0 0 0 0-
100,000
200,000
300,000
400,000
500,000
600,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANPROGRAM PPIP KABUPATEN/KOTA
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
879,691 879,691
- - - - - - -26,240
70,485
121,095
219,040
342,940
505,180
658,700
752,691
838,266
- -- -
0
0
100 1,705 8,055
37,550 65,764
97,180
136,647
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANPROGRAM P2KP KABUPATEN/KOTA
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
255,100
- 866 1,733 5,737
9,741 17,614 25,487 25,487 25,487 25,487
25,487 25,487
45,696
65,904
112,832
159,759
207,430
255,100
- -- -
-
-
193 193 988 3,545 3,822 4,872
7,391 -
50,000
100,000
150,000
200,000
250,000
300,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANPROGRAM PAMSIMAS KABUPATEN/KOTA
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
419,500
- - - - - - -12,875
25,750
44,063
62,375
98,025
133,675
179,400
225,125
257,175
289,225
331,875
374,525
397,013
419,500 419,500 419,500
- -- -
-
-
5,889
16,305
30,532
65,463
118,604
164,798
212,727
-
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
JAN FEB MAR APR MEI JUN JUL AGT SEP OKT NOP DES
DA
LA
M J
UT
AA
N R
UP
IAH
BULAN
RENCANA DAN REALISASI PENYERAPANPROGRAM RISE KABUPATEN/KOTA
TAHUN ANGGARAN 2010
PAGU
RENCANA
REALISASI
Pelaksanaan Kegiatan Inpres No. 1 Tahun 2010
PENANGGUNG JAWAB INSTANSI TERKAIT
• Kementerian Pekerjaan Kab/Kota Terkait
a. 314 Lokasi SPAM Perdesaan Umum
b. 9 Kab/Kota Pemb. Sanitasi dan 10 Kab/Kota Pemb. Drainase
• Kementerian Pekerjaan Daerah terkait
a. 8,230 Kelurahan P2KP Umum
b. 237 Kecamatan PISEW
• Kementerian Pekerjaan Daerah terkait
a. 23 Kawasan Sanimas Umum
b. 1,320 Desa Pamsimas
• Kementerian Pekerjaan Kementerian Perumahan
a. Rusunawa 37 TB selesai 40% Umum
• Kementerian Pekerjaan Kab/Kota Terkait,
Umum Daerah terkait
a. 6 TPA Regional di 17 Kabupaten
b. 49 Kabupaten Sanitary Landfill
c. 50 Lokasi 3R
(N6P30A1) Pembangunan rumah susun sederhana sewa
(N9P49A1) Peningkatan pembangunan Tempat Pembuangan Akhir (TPA)
dengan menerapkan sanitary land fill dan mengoptimalkan program 3R
(reduce, reuse, recycle)
PROGRAM PRIORITAS DITJEN CIPTA KARYA (4 Program Prioritas, 5 Rencana Aksi, dan 10 Sub Rencana Aksi)
RENCANA AKSI
Program Prioritas 3 (N3): Bidang Kesehatan
Program Prioritas 4 (N4): Bidang Penanggulangan Kemiskinan
Program Prioritas 6 (N6): Bidang Infrastruktur
Program Prioritas 9 (N9): Bidang Lingkungan Hidup dan Pengelolaan Bencana
(N3P12A5) Peningkatan Pelayanan Air Minum dan Sanitasi
(N4P19A2) Pemantapan pelaksanaan PNPM Inti
(N4P19A3) Peningkatan integrasi PNPM Penguatan
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
(Status Rapat 15 Juli 2010 dengan Bapak Wakil Menteri PU)
Pelaksanaan Kegiatan Inpres No.3 Tahun 2010
PENANGGUNG JAWAB INSTANSI TERKAIT
• Kementerian Pekerjaan
Umum
Pemda Terkait
a. 314 Lokasi SPAM Perkotaan dan Perdesaan
b. 1320 desa PAMSIMAS
• Kementerian Pekerjaan
Umum
Pemda Terkait
a. 9 Kab/Kota infrastruktur air limbah off-site
b. 23 Kab/Kota infratstruktur air limbah on-site
Program Pembangunan yang Berkeadilan Direktorat Jenderal Cipta Karya
RENCANA AKSI
D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman
D3P39A95: Pengaturan, pembinaan, pengawasan, pengembangan sumber
pembiayaan dan pola investasi, serta pengembangan sistem penyediaan air
minum
D3P39A96: Pengaturan, pembinaan, pengawasan, pengembangan sumber
pembiayaan dan pola investasi, serta pengelolaan pengembangan infrastruktur
sanitasi dan persampahan
D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS
RENCANA AKSIPENANGGUNG
JAWAB
INSTANSI
TERKAIT
KRITERIA
KEBERHASILAN
UKURAN
KEBERHASILAN
UKURAN KEBERHASILAN B07, B08,
B10, B12% CAPAIAN KETERANGAN
1 2 3 4 5 6 7 8
Kementerian
Pekerjaan Umum
Pemerintah
Daerah Provinsi
Terkait
TARGET B07:
Penandatanganan kontrak 306 lokasi
dan pembangunan fisik telah
mencapai 5% pada 94 lokasi
B07: > 100% Penandatanganan
kontrak telah seselasi
untuk 306 lokasi dan
pembangunan fisik
telah mencapai rata-
rata 62,48% pada 232
lokasi
TARGET B08:
Penandatanganan kontrak 314 lokasi
dan pembangunan fisik telah
mencapai 20% pada 300 lokasi
B08: XX%
TARGET B10:
Pembangunan fisik telah mencapai
60% pada 314 lokasi
B10: XX%
TARGET B12:
Pembangunan fisik telah mencapai
100% pada 314 lokasi
B12: XX%
TARGET B07:
Penyusunan Rencana Kerja
Masyarakat (RKM) pada 654 desa
B07: > 100% RKM telah tersusun
untuk 658 desa
TARGET B08:
Pembayaran Tahap I pada 654 desa
B08: XX%
TARGET B10:
Pembayaran Tahap II pada 1.220
desa
B10: XX%
TARGET B12:
Pembayaran Tahap III pada 1.320
desa
B12: XX%
Terfasilitasinya
kawasan perkotaan
dan perdesaan yang
terlayani air minum
D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman
TARGET:
Terfasilitasinya 314
kawasan perkotaan dan
perdesaan yang terlayani
air minum
TARGET:
Terfasilitasinya 1.320
desa yang terlayani air
minum berbasis
masyarakat
D3P39A95:
Pengaturan, pembinaan,
pengawasan,
pengembangan sumber
pembiayaan dan pola
investasi, serta
pengembangan sistem
penyediaan air minum
(Status 22 Juli 2010
D3 - PENCAPAIAN MILLENIUM DEVELOPMENT GOALS
RENCANA AKSIPENANGGUNG
JAWAB
INSTANSI
TERKAIT
KRITERIA
KEBERHASILAN
UKURAN
KEBERHASILAN
UKURAN KEBERHASILAN B07, B08,
B10, B12% CAPAIAN KETERANGAN
1 2 3 4 5 6 7 8
TARGET B07:
Penandatanganan kontrak pada 5
lokasi/ kawasan dan penyiapan
dokumen lelang pada 4
lokasi/kawasan yang dibiayai
Pinjaman Luar Negeri
B07: 100%
TARGET B08:
Pembangunan fisik telah mencapai
10% pada 5 lokasi/kawasan dan
proses pelelangan pada 4
lokasi/kawasan yang dibiayai
Pinjaman Luar Negeri
B08: XX%
TARGET B10:
Pembangunan fisik telah mencapai
50% pada 5 lokasi/kawasan, dan
proses pelelangan pada 4
lokasi/kawasan yang dibiayai
Pinjaman Luar Negeri
B10: XX%
TARGET B12:
Pembangunan fisik telah mencapai
100% sesuai target 2010 pada 5
lokasi/kawasan dan
penandatanganan kontrak pada 4
lokasi/kawasan yang dibiayai
Pinjaman Luar Negeri
B12: XX%
Penandatanganan
kontrak selesai
apabila persetujuan
donor sesuai dengan
jadwal
TARGET B07:
Proses pemberdayaan selesai 100%
pada 22 lokasi/kawasan
B07: 100%
TARGET B08:
Penandatanganan kontrak 100%
pada 23 lokasi/kawasan
B08: XX%
TARGET B10:
Pembangunan fisik mencapai 50%
pada 23 lokasi/kawasan
B10: XX%
TARGET B12:
Pembangunan fisik mencapai 100%
pada 23 lokasi/kawasan
B12: XX%
D3P39A96:
Pengaturan, pembinaan,
pengawasan,
pengembangan sumber
pembiayaan dan pola
investasi, serta
pengelolaan
pengembangan
infrastruktur sanitasi dan
persampahan
Kementerian
Pekerjaan Umum
Pemerintah
Daerah Provinsi:
Sumbar, Riau,
Kepri, Bengkulu,
Sumsel, Babel,
Banten, Jabar,
Jateng, Jatim,
Kalteng, Sulsel,
Sultra, Maluku,
Papua Barat,
Sumut,
Yogyakarta,
Kalsel, Kaltim,
Sulteng, Bali
Terlayaninya
kawasan dengan
infrastruktur air
limbah melalui
sistem off-site
TARGET:
9 kabupaten/kota
Terlayaninya
kawasan dengan
infrastruktur air
limbah melalui
sistem on-site
TARGET:
23 kabupaten/kota
D3P39 : Program Pembinaan dan Pengembangan Infrastruktur Permukiman
(Status 22 Juli 2010