ProjectName : Dredging and EmbankmentofCideng -ThamrinDrain Sub-ProjectJUFMP-3
Con tra cto r : P T. D UT ARAYA DI NAM ET RO
C on tr ac t No . : H K. 02 .0 3/ JU FM P- FS K/ XI /1
Date : 15 November 2013
A me ne dm en ts -1 : 1 9 M ar et 2 01 4
Day : 7 30 Days
QUANTITY RATE AMOUNT
(Rp ) ( Rp )
A. GENERAL ITEM
101 Preparation Works lump sum 1.00 930,000,000.00 930,000,000.00 1.516 0.758 0.758
103 Temporary Cofferdam with Dewatering lump sum 1.00 332,475,000.00 332,475,000.00 0.542 0.181 0.181 0.181
104 Dutch Cone Penetration Test (DCPT) point 130.00 186,000.00 24,180,000.00 0.039 0.013 0.013 0.013
105 Exploratory Boring m 2,290.00 268,770.00 615,483,300.00 1.003 0.334 0.334 0.334 106 Standard Penetration Test (SPT) times 1,422.00 97,650.00 138,858,300.00 0.226 0.075 0.075 0.075
107 Unconfined Compression Test sample 131.00 267,375.00 35,026,125.00 0.057 0.019 0.019 0.019
108 UU Triaxial Compression Test sample 131.00 267,375.00 35,026,125.00 0.057 0.019 0.019 0.019
109 CU Triaxial Compression Test sample 131.00 267,375.00 35,026,125.00 0.057 0.019 0.019 0.019
110 Undisturbed Sampling from Core Boring sample 131.00 182,280.00 23,878,680.00 0.039 0.013 0.013 0.013
111 Consolidation Test for Sample Soil from Boring sample 131.00 213,900.00 28,020,900.00 0.046 0.015 0.015 0.015
112 Physical Test of Sample Soil from Boring sample 604.00 372,000.00 224,688,000.00 0.366 0.122 0.122 0.122
113 Environment Monitoring and Management lump sum 1.00 139,500,000.00 139,500,000.00 0.227 0.114 0.114
115 GPS V ehicle Tracking (Monitoring System) +Server set 35.00 4,185,000.00 146,475,000.00 0.239 0.239
B. DREDGING WORKS
201 Dredging and Disposal m³ 44,301.00 80,384.00 3,561,091,584.00 5.803 0.967 0.967 0.967 0.967 0.967 0.967
203 Excavated Garbage with hauling distance 20 - 30 km m³ 810.00 143,816.00 116,490,960.00 0.190 0.032 0.032 0.032 0.032 0.032 0.032
204 Equipment for Water Injection hour 871.00 144,205.70 125,603,163.10 0.205 0.034 0.034 0.034 0.034 0.034 0.034
205 Rent of Equipment for Spreading on Dumping Area hour 284.00 625,866.80 177,746,170.84 0.290 0.048 0.048 0.048 0.048 0.048 0.048
Manual Dredging and Disposal m³ 4,112.72 143,816.00 591,474,939.52 0.964 0.161 0.161 0.161 0.161 0.161 0.161
D. CONCRETE WORKS
221 Concrete Type-A m³ 898.80 804,670.00 723,237,396.00 1.179 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.045 0.045
222 Formwork Type-A m² 4,066.00 115,253.00 468,618,698.00 0.764 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.029 0.029
224 Reinforcement Bar, Deformed ton 57.85 13,077,430.00 756,529,325.50 1.233 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.047 0.047
E . PI LL ING WORK S I L =1 4 M'
231 Furnishing of Corrugated Pre-Stress C oncrete Pile W.325 m 8,433.00 783,511.00 6,607,348,263.00 10.768 2.692 2.692 2.692 2.692
232 Driving of Corrugated Pre-Stress Concrete Pile W.325 m 8,433.00 171,550.00 1,446,681,150.00 2.358 0.589 0.589 0.589 0.589
F . PI LL ING WORK S II L= 16 M '
Fu rn is hi ng of Cor ru ga ted P re- St ress C onc ret e Pi le W. 35 0 m 2 4, 60 8. 00 976,000.00 24,017,408,000.00 39.141 4.349 4.349 4.349 4.349 2.759 5.939 4.349 4.349 4.349
Dri vi ng of Corrugat ed Pre-St ress C oncret ePil eW.350 m 24,608.00 335,595.00 8,258,321,760.00 13.458 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495 1.495
G . P IL LI NG W OR KS I I I ( Un de r t he B ri dg e)
Furnishing of Medium Stell Pipe Ø6" m 18,960.00 254,000.00 4,815,840,000.00 7.848 0.785 0.785 0.785 1.570 1.570 0.785 0.785 0.785
Driving of Pile Pipe Ø6" m 18,960.00 156,300.00 2,963,448,000.00 4.829 0.483 0.483 0.483 0.966 0.966 0.483 0.483 0.483
Precast 1.5 x 0.4 x 0.10 m pcs 3,160.00 347,500.00 1,098,100,000.00 1.790 0.179 0.179 0.179 0.358 0.358 0.179 0.179 0.179
Concrete Type-A m³ 533.96 804,670.00 429,661,593.20 0.700 0.070 0.070 0.070 0.140 0.140 0.070 0.070 0.070
Formwork Type-A m² 900.60 115,253.00 103,796,851.80 0.169 0.017 0.017 0.017 0.034 0.034 0.017 0.017 0.017
Reinforcement Bar, Deformed ton 42.77 13,077,430.00 559,321,681.10 0.912 0.091 0.091 0.091 0.182 0.182 0.091 0.091 0.091
Stell Plate 4mm ton 4.31 13,658,000.00 58,865,980.00 0.096 0.010 0.010 0.010 0.019 0.019 0.010 0.010 0.010
H. MI SCE LL ANE OUS W ORKS
241 Demolition and Disposal E xisting Concrete m³ 50.00 307,910.00 15,395,500.00 0.025 0.025
242 Demolition and Disposal Existing Stone Masonry m³ 54.00 99,356.00 5,365,224.00 0.009 0.009
Demolition Existing Concrete under water m³ 344.25 1,193,800.00 410,965,650.00 0.670 0.670
I . RE PAIR PI LE E XI ST ING 45 M'
Manual Excavation m³ 225.00 107,300.00 24,142,500.00 0.039 0.013 0.013 0.013
Demolition and Disposal Existing Concrete m³ 74.25 307,910.00 22,862,317.50 0.037 0.012 0.012 0.012
Concrete Type-A m³ 96.03 804,670.00 77,272,460.10 0.126 0.042 0.042 0.042
Formwork Type-A m² 174.75 115,253.00 20,140,461.75 0.033 0.011 0.011 0.011
Formwork Type-B m² 310.50 128,551.00 39,915,085.50 0.065 0.022 0.022 0.022
Reinforcement Bar, Deformed ton 4.02 13,077,430.00 52,571,268.60 0.086 0.029 0.029 0.029
Furnishing of Corrugated Pre-Stress C oncret ePile W.350 m' 720.00 976,000.00 702,720,000.00 1.145 0.382 0.382 0.382
Driving of Corrugated Pre-Stress Concrete Pile W.350 m' 720.00 335,595.00 241,628,400.00 0.394 0.131 0.131 0.131
Logging the Tree tree 25.00 366,900.00 9,172,500.00 0.015 0.005 0.005 0.005
Replace the Tree tree 250.00 589,500.00 147,375,000.00 0.240 0.080 0.080 0.080
Manual Stuffing Soil m³ 112.50 35,100.00 3,948,750.00 0.006 0.002 0.002 0.002
Total 61,361,698,188.52 PLANPROGRESS 0.758 0.758 0.811 0.811 0.811 3.281 3.281 3.281 3.281 6.089 6.089 6.931 9.235 6.862 9.313 9.357 9.357 7.723 3.359 3.121 1.486 1.364 1.364 1.242 0.034
inc. PPN10 % 6,136,169,818.85 PLANCOMMULATIVE 0.758 1.516 2.326 3.137 3.948 7.230 10.511 13.792 17.074 23.162 29.251 36.182 45.417 52.279 61.592 70.950 80.307 88.030 91.389 94.510 95.996 97.360 98.724 99.966 100.000
Grand Total 67,497,868,007.37
Round 67,497,868,000.00
PERCENTAGE (%) 0 .7 58 % 1 .5 16 % 2 .3 26 % 3 .1 37 % 3 .9 48 % 7 .2 30 % 1 0. 51 1 % 1 3. 79 2 % 1 7. 07 4 % 2 3. 16 2 % 2 9. 25 1 % 3 6. 18 2 % 4 5. 41 7 % 5 2. 27 9 % 6 1. 59 2 % 7 0. 95 0 % 8 0. 30 7 % 8 8. 03 0 % 9 1. 38 9 % 9 4. 51 0 % 9 5. 99 6 % 9 7. 36 0 % 9 8. 72 4 % 9 9. 96 6 % 1 00 .0 00 %
TIME SCHEDULE AMANDEMEN 2
MINISTRYOFPUBLIC WORKS
DIRECTORATE GENERAL OF HUMANSETTLEMENTS
SATUANKERJAPENGEMBANGANPENYEHATANLINGKUNGANPERMUKIMAN
NO DESCRIPTION UNIT
AMENDMENTS2
WEIGHTNOV
2013 2014 2015
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT OCT NOVJUN JUL AUG SEPDEC JAN FEB MAR APR MAY
Submitted by :Contractor
PT. Dutaraya Dinametro
Ir. Hanura
Project Manager