22
HA GIANG PEOPLE'S COMMITTEE •ĐỊA CHỈ LIÊN HỆ: •TRUNG TÂM TƯ VẤN VÀ XÚC TIẾN ĐẦU TƯ – SỞ KẾ HOẠCH VÀ ĐẦU TƯ TỈNH HÀ GIANG •Địa chỉ: Số 188, đường Trần Hưng Đạo, phường Nguyễn Trãi, Thành phố Hà Giang. •Điện thoại: 0219.3860.566; Di động: 0949.538.558 •Fax: 0219.3867.623 •Emaill: [email protected] •Website:httt://xuctiendautuhagiang.gov.vn www.xuctiendautuhagiang.gov.vn CALLING FOR INVESTMENT IN HA GIANG LIST OF PROJECTS PERIOD 2017-2020 •Youtube: Invest Ha Giang Youtube: Invest Ha Giang

LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

HA GIANG PEOPLE'S COMMITTEE

• ĐỊA CHỈ LIÊN HỆ:

• TRUNG TÂM TƯ VẤN VÀ XÚC TIẾN ĐẦU TƯ – SỞ KẾ HOẠCH VÀ ĐẦU TƯ TỈNH HÀ GIANG• Địa chỉ: Số 188, đường Trần Hưng Đạo, phường Nguyễn Trãi, Thành phố Hà Giang.

• Điện thoại: 0219.3860.566; Di động: 0949.538.558• Fax: 0219.3867.623

• Emaill: [email protected]• Website:httt://xuctiendautuhagiang.gov.vn

www.xuctiendautuhagiang.gov.vn

CALLING FOR INVESTMENT

IN HA GIANG

LIST OF PROJECTS

PERIOD 2017-2020

• Youtube: Invest Ha Giang

Youtube: Invest Ha Giang

Page 2: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Dear valued investors,

Ha Giang is a mountainous province in the North of Vietnam, 320 km from Hanoi. The road transport system consists of national highways (NH2, NH4, NH34, NH279, NH18, NH17), which have been completely upgraded, especially the key routes favorable for socio-economic development. Ha Giang is a province with a long history of culture and many sites associated with famous landmarks. Ha Giang people are traditionally known to be hard-working, studious, active and creative.

In the past years, Ha Giang has developed economically with focus on infrastructure improvement which brings about positive impacts on social-cultural development. Gross Regional Domestic Product (GRDP) in 2016 increased 6.5% compared to 2015, local budget revenue reached over 10.722 billion, state budget revenue reached 1.786 billion, increased 7.2% compared to 2015. The total output per capita was VND

20.5 million (an increase of 6.8% or VND 1.3 million). In 2016, the PCI index of the province increased 3 levels compared to 2015, the index of information technology application ranks 16 out of 63 provinces and cities.

Those remarkable achievements have been brought about by important contributions of investors, businesses in the province. Ha Giang always promote the main role of enterprises in socio-economic development and implement effective solutions to improve the investment and business environment such as: plans to improve basic infrastructure, human resources, services quality and special emphasis on reform of administrative procedures to ensure openness and transparency under the "one-stop shop" mechanism at Ha Giang public administrative center to shorten time from 1/3 to ½ and create the best condition for investors to conduct business efficiently.

Ha Giang is striving to become a developing province of Northern midland and mountainous region, a national hub for tourism and pharmaceutical destination. That goal requires Ha Giang to take full advantage of its resources for business development. Ha Giang invites interested investors to invest in luxury hotels, resorts, hi-tech agriculture, agro-forestry processing, pharmaceutical planting and processing, industrial zone infrastructure and logistics services.

With the motto "Investors in Ha Giang are citizens of Ha Giang; the success of the business is the success of the province", Ha Giang welcomes domestic and foreign investors to make Ha Giang richer, more and more beautiful, prosperous and civilized.

Good luck to our investors!

OPEN LETTER OF CHAIRMAN OF HA GIANG PEOPLE'S COMMITTE

PROJECT'S NAME LOCATION

Mo Neo Mountain Resort

Quan Ba Entertainment Complex

Nho Que Resort Complex

Na Khe Resort Complex

Nam Choong Mineral River Resort

Thien Son Resort

Chieu Lau Thi Nature Preserve and Resort

Animal feed processing plant

Orange juice processing factory and cold storage for orange products

Local medicinal plants cultivation and processing project

PART A: RECOMMENDED PRIORITY INVESTMENT PROJECTS

Mo Neo Mountain, Ha Giang City

Quan Ba Commune, Quan Ba District

Pai Lung – Pa Vi Commune, Meo Vac District

Na Khe Commune, Yen Minh District Xã

Quang Nguyen Commune, Xin Man District

Viet Quang Town, Bac Quang District

Ho Thau Commune, Hoang Su Phi District

Tan Bac Industrial Complex, , Quang Binh District

Vinh Tuy Town, Bac Quang District

Duong Am Commune, Bac Me District

CHỦ TỊCH UBND TỈNH

CHỦ TỊCH UBND TỈNH Nguyễn Văn Sơn.

Page 3: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT I: MO NEO MOUNTAIN RESORTLOCATIONMo Neo Mountain, Ha Giang City, Ha Giang Province.

AREA100 hectares.

SCALE- Design capacity: about 400.000 visitors per year - Hotel: 500 rooms; Villas: 250 units; Entertainment and spiritual area: 50 hectares.

PROJECT CAPITAL Proposed by investors

FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: The project land area is about 100 hectares, divided into three �at areas, located in Ha Giang city, the economic center of the province, 23 km from the Vietnam - China border and 320 km from Hanoi. The status of the land is mainly forest land with beautiful natural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city.OBJECTIVES: To build an eco-tourist site in combination with spiritual cultural tourism, exploit and preserve forest landscape and provide high-class resort and recreation services for domestic and international tourists.PROJECT BACKGROUND:Decision No.4611/QD-UBND dated 31 December 2008 of Ha Giang People's Committee approving the master plan on construction of Ha Giang town (city), period 2007-2025.Decision No.1646/QĐ-UBND dated 20 August 2014 of Ha Giang People's Committee approving the master plan on tourism development in Ha Giang province to 2020, vision to 2030.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is

Mặt bằng hiện trạng dự án Núi Mỏ Neo: https://www.youtube.com/watch?v=WBmCWuupGNc&t=28s

Page 4: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for accommodation and restaurants: The level of support is from 20-40 million VND/room for new construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Te c h n i c a l i n f r a s t r u c t u r e : Pr o v i d e electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 5: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT II:

QUAN BA ENTERTAINMENT COMPLEX LOCATIONQuan Ba Commune, Quan Ba DistrictAREA47 hectaresSCALE- Scale of construction architecture:+ Sports green park;+ Service area for trade, tourist information;+ Entertainment center;+ Service area of restaurants, hotels;+ High-end villas;+ The land for external communications, green trees and water surface.

PROJECT CAPITAL200 billon VND.

FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: The project land area is about 47 hectares, located in Quan Ba commune, Quan Ba district, 3 km from the district center and 49 km from Ha Giang city, at convenient transportation position (along National Highway 4C), gateway to the Dong Van Karst Plateau Global Geo-park. The land is mainly agricultural land with beautiful natural scenery, near the famous tourist sites such as Double Mountain, Quan Ba Sky Gate, Lung Khuy Cave, Dao Ethnic Village of Nam Dam Village, Lung Tam linen weaving co-operative...OBJECTIVES:To build a complex of entertainment park and resorts to serve the diverse needs of domestic and international tourists to Dong Van Karst Plateau Global Geo-park.PROJECT BACKGROUND:The master plan on socio-economic development of Quan Ba District to 2020, vision to 2030.

Decision No.438/QD-TTg dated 7 April 2007 of the Prime Minister approving the planning on construction of Dong Van Karst Plateau Global Geo-park until 2030.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=y1pXBmAqRlI

Page 6: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Investment support for accommodation and restaurants: The level of support is from 2 0 - 4 0 m i l l i o n V N D / r o o m f o r n e w construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construc t ion projec ts and projec ts upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 7: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT III:

NHO QUE RESORT COMPLEX LOCATIONPa Vi – Pai Lung Commune, Meo Vac DistrictAREA9.12 hectaresSCALEScale construction:+ Hi-end bungalow: 20 units;+ Adventure Sports Park;+ Restaurant service area;+ The land for external communications, green trees and water surface.PROJECT CAPITAL150 billion VND.FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: The project area is about 9.12 hectares, located in Pa Lung and Pa Vi communes, Meo Vac District, Ha Giang Province, on Ma Pi Leng Pass at an altitude of 1,500m above sea level, among unique geological features and natural landscape of Dong Van Karst Plateau Global Geo-park. The land is mainly agricultural land, rocky hills overlooking the Nho Que River, one of the most beautiful panoramic views in Vietnam.OBJECTIVES:To build a high-class resort combining services building, adventure tourism and nature preservation in the Dong Van Karst Plateau, bringing wonderful experience to domestic and international tourists.PROJECT BACKGROUND: The master plan for socio-economic development of Meo

Kiến trúc nhà ở trong khu nghỉ dưỡng

Vac District to 2020, vision to 2030.Decision No.438/QD-TTg dated 7 April 2007 of the Prime Minister approving the plan on construction of Dong Van Karst Plateau Global Geo-park to 2030.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=Dh0O-WoANjc

Page 8: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Investment support for accommodation and restaurants: The level of support is from 20-40 million VND/room for new construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 9: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT IV:NA KHE RESORT COMPLEX

LOCATIONNa Khe Commune, Yen Minh DistrictAREA5 hectaresSCALE

- Design capacity: 40,000 - 60,000 visitors per year.- Scale construction:+ 30 mini villas.+ Service buildings.+ Reception area system, staff house, warehouse.+ Internal transportation system.PROJECT CAPITAL150 billon VND.FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: The project land area is about 5 hectares, located in Na Khe commune, Yen Minh District, 15 km from center of the district. The land is mainly agricultural and forest land with beautiful natural scenery, near famous tourist sites such as Yen Minh pine forest, Du Gia national park, French architectural vestiges.OBJECTIVES:To build a forest ecological resort combining service works to preserve natural landscapes in the global geological park of Dong Van Karst Plateau Global Geo-park, serving the need of domestic and international tourists.PROJECT BACKGROUND:Decision No. 438/QD-TTg dated 7 April 2007 of the Prime Minister approving the plan on construction of Dong Van Karst Plateau Global Geo-park Ha Giang province through 2030.The master plan on socio-economic development of Yen Minh District to 2020, vision to 2030.The project of developing tourism in Yen Minh District to 2020 with a vision toward 2030INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=T0UHLp9qBH0&t=207s

Page 10: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for accommodation and restaurants: The level of support is from 20-40 million VND/room for new construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one -stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 11: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT V:NAM CHOONG MINERAL RIVER RESORT IN QUANG NGUYEN COMMUNE, XIN MAN DISTRICT

LOCATION DESCRIPTION: The project land area is about 2.17 hectares, located in Quang Nguyen Commune, Xin Man District, 30 km South of the district center, convenient for transportation. The land is mainly agricultural land, having hot mineral springs with temperature and mineral content quali�ed for healing and relaxing skin. The land is located near famous tourist sites such as Hoang Su Phi terraced �elds, Angel Waterfall and Wind Pass, ancient stone mushroom �elds in the tourist area west of Ha Giang province and the travelling route Hanoi - Sa Pa - Xin Man - Ha Giang.OBJECTIVES: To build a spa resort with health care services in order to fully exploit the natural potentials, develop a diversi�ed range of tourism products to meet the needs of domestic and international touristsPROJECT BACKGROUND:- Pursuant to Program No.29-CTr/TU dated 24 July 2017 of Ha Giang Provincial Party Committee on the implementation of Resolution No 08-NQ / TW dated January 16th, 2017 to Politburo taps tourism as spearhead economic sector- Pursuant to Decision No.2421/QD-UBND dated 11 September 2003 of Ha Giang People's Committee approving the master plan for tourism development in Ha Giang in the period of 2002-2010 with an orientation to 2020.- Pursuant to Program No 22-CT/HU dated 28 September 2017 of the Party Committee of Xin

LOCATIONQuang Nguyen Commune, Xin Man District, Ha Giang Province

AREA2.17 hectares

SCALE+ The central stilt house, home stay+ Service area+ Bungalows: 8 units+ Mineral bath area+ Factories producing handicrafts, mineral water+ The auxiliary area including green areas, roads, parking lots.

PROJECT CAPITAL90 billion VND.

FINANCEDomestic capital, joint-venture capital and 100% foreign capital

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=Thh8crck568

Page 12: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Man Commune, Action Plan of the Party Committee of Xin Man District to develop tourism into spearhead economic sector in the period of 2017 - 2020.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for accommodation and restaurants: The level of support is from 20-40 million VND/room for new construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 13: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT VI:THIEN SON RESORT

LOCATION DESCRIPTION:The project area is located in the tourist development area of B ac Quang District, the �rst Southern gateway of Ha Giang province, 60 km North of Ha Giang city and 260 km South of Ha Noi, convenient for transportation (1.5 km from National Highway). The land is mainly forest land, located at 1,200m above sea level. The climate is cool all year round with diverse natural forest ecosystems, rich in precious medicinal plants. Waterfall (4 cascades) creates a stream of water �owing throughout the year, during the four seasons. The project area is

LOCATIONViet Quang Commune, Bac Quang District, Ha Giang Province.

AREA92.51 hectares

SCALE- Design capacity: about 100,000 visitors per year.- Scale construction:+ Entertainment center;+ Service area of restaurants, hotels;+ High-end villas;+ Spiritual cultural area;+ Ecotourism area;+ The land for external traffic, trees.

PROJECT CAPITAL110 billion VND.

FINANCEDomestic capital, joint-venture capital and 100% foreign capital

famous for Thien An pagoda with beautiful architecture, large scale with ancient designs and is associated with the pure name of Dao ethnic people who are known for long history of residence and the traditional culture still uniquely intact.OBJECTIVES: To develop spiritual cultural tourism in combination with eco-tourism, explore the natural landscape and experience the local culture. Thien Son Resort will become a tourist center in the South of Ha Giang, thus creating more jobs and contributing to socio-economic development in the region.PROJECT BACKGROUND:- Decision No.1552/QD-UBND dated September 9, 2012 of Ha Giang People's Committee on the master plan for socio-economic development of Bac Quang District.- Decision No.1646/QĐ-UBND dated 20 August 2014 of Ha Giang People's Committee on the master plan for tourism development of Ha Giang province to 2020, vision to 2030.

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=CJd3kOVsmZU

Page 14: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for accommodation and restaurants: The level of support is from 2 0 - 4 0 m i l l i o n V N D / ro o m fo r n e w construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 15: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

CHIEU LAU THI NATURE PRESERVE AND RESORT

LOCATION DESCRIPTION: The project area is about 354 hectares, located in Chieu Lau Thi mountain area, Ho Thau commune, Hoang Su Phi District, 100 km West of Ha Giang city. Chieu Lau Peak, being the second highest mountain in Ha Giang, is 2,402 m above sea level in Tay Con Linh Range. The land is mainly agricultural and forestland with diverse natural forest ecosystem, majestic natural scenery, near the national terraces Hoang Su Phi.OBJECTIVES: To build infrastructure for tourist resorts, service works associated with the development of cultural, spiritual and ecological tourism in the Chieu Lau Thi mountain area, Hoang Su Phi District; create attractive tourism products for domestic and international visitors to explore the natural landscape of the tourism development area West of Ha Giang province.

PROJECT BACKGROUND: Project No.03/DA-UBND dated 16 June 2016 of the District People's Committee on cultural development in association with tourism of Hoang Su Phi District in the period of 2016 - 2020;Plan No.228/KH-UBND dated 22 November 2016 of the District People's Committee on the construction of Chieu Lau Thi tourist site in Ho Thau commune, in the period of 2016-2020;Decision No.49/QD-UBND dated 24 January 2017 of the District People's Committee approving the master plan for tourism development in Hoang Su Phi District through 2021 with a vision toward 2030;INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years

PROJECT VII:

LOCATIONHo Thau Commune, Hoang Su Phi District, Ha Giang Province.AREA354 hectaresSCALE- Design capacity: 50,000 - 70,000 visitors per year.- Scale construction:+ Hotel area: 60 rooms;+ Villas, ecological rest houses;+ Spiritual area;+ The reservation area of precious trees and wild animals;+ Landscape works and trees.

PROJECT CAPITAL70 billion VND.FINANCEDomestic capital, joint-venture capital and 100% foreign capital

Mặt bằng hiện trạng dự án: https://www.youtube.com/watch?v=szTfe-PydLo

Page 16: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for accommodation and restaurants: The level of support is from 20-40 million VND/room for new construction projects of up to three-star standard or higher according to the State regulations; The level of support from 300,000 to 500,000 VND/m2 for new construction projects and projects upgraded to standard tourism service.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism,

Page 17: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT VIII:ANIMAL FEED PROCESSING PLANT

LOCATIONTan Bac Industrial Complex, Tan Bac Commune, Quang Binh District.AREA5 hectaresSCALE- Design capacity: 50 tons of raw material per day- Scale of construction architecture: system of workshops, packing house, storage and waste treatment systemPROJECT CAPITAL50 billion VND.FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: Tan Bac Industrial Complex is in Tan Bac Commune, Quang Binh District. It is located along National Highway 279 linking Lao Cai and Bac Quang District, 12 km from Quang Binh District and Bac Quang District, near the raw material resources for production. The land has been cleared to make space for the industrial complex construction. OBJECTIVES:To build feed processing plants (cattle, poultry and waterfowl) with capacity of 50 tons of raw materials per day, to supply the market inside and outside the province as well as to export to other countries in the region; create output market for local agricultural products; generate stable jobs, improve people's lives, contribute to poverty reduction and local economic development.PROJECT BACKGROUNDDecision No.1838/QĐ-UBND dated 23 September 2015 of Ha Giang People's Committee approving the project on Restructuring Agriculture in the period of 2016 - 2020.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of issuance of the decision on land lease; Exemption from land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.

Page 18: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolv ing the procedures for land acquis i t ion, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for manufacturing plant: Support up to 10 billion VND for an animal feed processing plant.Technical infrastructure: Provide electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 19: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT IX: ORANGE JUICE PROCESSING FACTORY AND COLD STORAGE FOR ORANGE PRODUCTS

LOCATIONVinh Tuy Commune, Bac Quang District, Ha Giang Province.AREA

2Land use area: 3,945 m .SCALE- Design capacity: Cold storage of 5,000 tons of orange and production line of 20,000 bottles / hour.- Scale construction:+ Main production plant;+ Orange cold storage, �nished goods warehouses, raw material warehouses;+ Monitor houses, guard houses, worker houses and other auxiliary items;+ Water supply and waste water treatment system.

PROJECT CAPITAL 50 billion VND.FINANCEDomestic capital, joint-venture capital and 100% foreign capital

LOCATION DESCRIPTION: The project is located in Bac Quang District, the Southern gateway of Ha Giang province, about 80 km North of Ha Giang city, 240 km South of Hanoi. The status of the land is the fruit market of Vinh Tuy town (clean land managed by the state), with convenient transportation (along Highway 2 with the length of 82.5m, depth of about 45m.) The project is located in the raw materials area of Ha Giang province with an area of 8,850 hectares and output of about 48,000 tons per year.OBJECTIVES:To build a processing plant and cold storage for orange products to make use of available high-quality raw materials, thus contributing to the expansion of oranges and tangerines area, creating stable incomes for farmers and promote local economic and social development.PROJECT BACKGROUND:- Decision No.1552/QD-UBND dated 09 August 2012 of Ha Giang People's Committee approving the master plan on socio-economic development in Bac Quang District.- Decision No.3233/QD-UBND dated 26 December 2016 of Ha Giang People's Committee approving the plan on development of Ha Giang industry to 2020 and vision to 2030.

Page 20: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of the decision on land lease; Exemption of land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for establishment of factories and processing plants:- Support 100% loan interest within 36 months for Orange storage projects.- Support for trade-mark registration.Te c h n i c a l i n f r a s t r u c t u r e : Pr o v i d e electricity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 21: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PROJECT X: LOCAL MEDICINAL PLANTS CULTIVATION AND PROCESSING PROJECT

LOCATIONDuong Am CommuneAREA500 hectaresSCALE- To develop a star anise area of 500 ha- Building a star anise oil processing factory with capacity of 10 tons of essential oil per year.PROJECT CAPITALProposed by investorsFINANCEDomestic capital, joint-venture capital and100% foreign capital

LOCATION DESCRIPTION: The project land is in Duong Am commune, 3 2 k m S o u t h o f B a c M e D i s t r i c t , geographically bordered with Yen Tho Commune, Bao Lam District (Cao Bang province) on the East; Yen Cuong Commune, Bac Me District on the West; Thuong Giap Commune, Na Hang District (Tuyen Quang province) on the South; Phu Nam Commune, Bac Me District on the North. The land is mainly production forest land managed by the State. The soil properties are suitable for the development of star anise, with convenient transportation, near the area of cultivated star anise materials of about 150 hectares.OBJECTIVES: - Forming an area of medicinal plants (star anise) to serve the processing of essential

oils, creating a brand for the development of local medicinal herbs.- Generate income and create jobs for local people, contributing to promoting socio-economic development.PROJECT BACKGROUND- Master plan on socio-economic development of Bac Me District to 2020, vision to 2030.- Project on Restructuring Agriculture in Ha Giang Province, period 2016-2020, promulgated in conjunction with Decision No.1838/QĐ-UBND dated 23 September 2015 of Ha Giang People's Committee.INVESTMENT PREFERENCE POLICIES:Land lease fee preferences: Exemption from land lease fee during the basic construction period of up to 3 years from the date of the decision on land lease; Exemption of land lease fee for 11 years after completion of construction.Corporate income tax incentives: Tax exemption for 4 years after taxable income is generated; 50% reduction of tax payable for the next 9 years; Apply a tax rate of 10% within 15 years from the commencement of business operations.

Import tax incentives: The project is exempted from import duties on goods imported to create �xed assets for the project.Provincial investment preference policies: Land clearance: Ha Giang province is committed to resolving the procedures for land acquisition, compensation for ground clearance and resettlement to create clean land fund for the project.Investment support for establishment of factories and processing plants:- Support loan interest for production, up to 15 billion VND for a pharmaceutical processing plant (according to standards of the Ministry of Health)- Support for trade-mark registration.Technical infrastructure: Provide electr icity, water, communication and roads to the fence of the project.Administrative procedures: To settle administrative procedures under the "one-stop shop" mechanism, investors submit application and receive results at Ha Giang Public Administrative Center.

Page 22: LIST OF PROJECTS of projects.pdfnatural landscape, temperate climate and diverse ecosystems with the whole view of Ha Giang city. OBJECTIVES: To build an eco-tourist site in combination

PART B: LIST OF PROJECTS CALLING FOR INVESTMENT PERIOD 2017-2020NO PROJECT'S NAME

TECHNICAL SPECIFICATIONS (OBJECTIVES, SCALE) LOCATION FINANCE LAND STATUS

PROJECT CAPITAL

(BILLION VND)

I. TOURISM – SERVICE INDUSTRY (8 PROJECTS)

Nine-hole golf course

The Maze Rock multi-adventure

Resort

Ta Lung Resort

Lung Tien Entertainment

Complex

Conservation and ecological tourism;

exploration and adventure tourism;

conquering Tay Con Linh and

surrounding areas.

Viet Quang Hotel

To build a nine-hole golf course and provide associated services;

Estimated area: 81.5 ha

To build infrastructure and service works;

Estimated area: 29.57 ha

To build a sports complex; luxury resort; resort facilities;

Estimated area: 16.7 ha

To build an entertainment complex and ecotourism resort;

Estimated area: 4.5 ha

To build infrastructure for tourist resorts, natural

conservation zone, service worksEstimated area: 260 ha

Land used area: 3000 m2;3-star standard

Sang Phang Village, Dong Ha Commune,

Quan Ba District

Khau Vai Commune,

Meo Vac District

Thao Chu Tung Village,

Ta Lung Commune, Meo Vac District

Ha Thanh Village, Phuong Do Commune,

Ha Giang City

Tung San Commune,

Hoang Su Phi District

Viet Quang Town

Domestic capital, joint-venture

capital and 100% foreign capital

Agricultural land: 46.2 ha; Forestry land: 30.2 ha;

Land managed by local authority: 3.4 ha;

Agricultural land

Agricultural land:1 ha;

Mountainous land: 15.7 ha

Area of stream bed: 0.54 ha; Residential

land: 0.04 ha;Forest land: 3.92 ha.

Total area: 260 ha. Of which, special-use forest land is 217.1 ha,

accoun�ng for 83.5%; Land for annual crops is 3.6 ha,

accoun�ng for 1.38%; The area of p roduc�on forest land is 39.3 ha,

accoun�ng for 15.12%.

Land of the cultural center: 1,500 m2;

Outdoor stage area: 1,500m2

500

250

150

80

50

70

Park scenic tourism associated with the history and spiritual

culture of Tran Phu Ward

Pa Then communal cultural

tourism village

To build infrastructure for tourist sites and spiritual projects;

Estimated area: 95 ha

Group 17 Tran Phu Ward, Ha Giang City

To build infrastructures and tourist buildings;Estimated area: 2.3 ha

My Bac Village, Tan Bac Commune, Quang Binh District

Residential land area: 6.5 ha; Agricultural land:

1.2 ha; Forestry land: 76.8 ha; Religious land, historical sites:

1.7 ha; Land for transportation, national defense and

security: 3.5 ha

Total estimated area: 2.34 ha. Of which, Agricultural land:

0.24 ha, Production forest land: 2.1 ha

50

30

1

2

3

4

5

7

8

II. AGRICULTURE – PROCESSING INDUSTRY (4 PROJECTS)

To develop animal breeding industry and build animal processing plants

Golden Beef Processing Factory

Liquor production and processing

of products from buckwheat �ower

Thuong Son Tea Factory

To build two concentrated cow farms; a processing factory with capacity

of 500 tons of food from animals per year including slaughtering area, preliminary processing area and

safe food processing area.

Construction of factory system, packing house, storage system

and waste treatment system: 2 ha

Factory 800 m2; Combined production with 200 households

Infrastructure construction on an area of 2 hectares,

with imported machinery and equipment, the production capacity

is estimated at 500 tons per year

Minh Ngoc Commune,

Bac Me District

Pho My Village, Ta Lung Commune,

Meo Vac District

Lung Tao Commune,

Dong Van District

Thuong Son Commune,

Vi Xuyen District

The area of l and used is186 ha, of which the

land area managed by the State is 67 ha,

and the land allocated to households is 119 ha.

Agricultural land: 2 ha

Project land is the the old warehouse of the cooperative

Agricultural land

55

50

20

20

III. URBAN INFRASTRUCTURE - INDUSTRIAL ZONE (3 PROJECTS)

Open road at 238 landmark,

Lao Chai Commune, Mung Tung, China

To build infrastructure for the 238 landmark area including

transportation, water, electricity, administrative houses and the

commercial centers and border markets. Estimated area: 30 ha

Lao Chai Commune

PPP

Viet Lam high quality clinic

To build clinics and treatment rooms according to the Ministry of Health

standards; Invest in modern medical equipment to meet the needs of high

quality medical examination. Scale of 50-70 beds.

Forestry land 255

Km 25 Viet Lam Town,

Vi Xuyen District

PPP The old infrastructure of the Viet Lam Health station

Km 38 Industrial Complex,

Tan Xa Phin Village, Nam Ty Commune

Invest in industrial infrastructure and related

service areas; Area used: 5.6 ha

Nam Ty Commune, Hoang Su Phi

District

100% investor capital, PPP

Agricultural land accounts for 20%; Agricultural land accounts for 80%

50

30

1

2

3

4

1

2

3

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

6

NO PROJECT'S NAMETECHNICAL SPECIFICATIONS

(OBJECTIVES, SCALE) LOCATION FINANCE LAND STATUSPROJECT CAPITAL

(BILLION VND)

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital

Domestic capital, joint-venture

capital and 100% foreign capital