MDBPROJECT: PRIVATE VILLA G+1DETAILS OF CONNECTED LOAD / MAX DEMAND & kWH METERINGAREA:DUBAI LANDPLANNED COMPLETION DATE: OCT-2013CLIENT: MR.MOHAMED ROSHANALI MERALI DEWJI.PLOT:RC-089MDB-: BY DEWA( SHEET 1 OF 1 )CONSULTANT:AL WAHA ENGINEERING CONSULTANTLOCATION:BOUNDRY WALLCIRCUIT / FEEDER / DB No.SP / TPRATING (AMPS)FAULT DUTY KAPVC/*/ XLPECABLE SIZELength of Cable ( Mtrs.)ECC SIZECONNECTED LOAD - kWPROPOSED TYPE & NOS. OF kWHr METERREMARKSF/S ISOACB/ MCCB________2/4 X2/3/4 C1cR-PH kWY-PH kWB-PH kWTOTAL kW1-PH (1)3-PH (2)3-PH (3)LV / HV CT(4)SWA/PVC1C mm^2mm^2mm^2INCOMING4P200Amps35BY DEWA26.4126.5129.6582.571OUTGOINGDB-GTP8025XLPE/SWA/PVC4CX251CX169.008.6010.1027.70DB-FTP6025XLPE/SWA/PVC4CX161CX104.605.504.8014.90DB-ACTP10025XLPE/SWA/PVC4CX351CX1612.8112.8114.3539.97MDB CONNECTED TO: DEWA LV DB / TRANSFORMERTOTAL CONNECTED LOAD PER PHASE:26.4126.9129.2582.571TOTALSMDB CONNECTED TO :DEMAND FACTOR =0.90MAX. DEMAND =74.31TOTAL CONNECTED LOAD =82.57TOTAL BUILD-UP AREA =CONTRACTOR:TELEPHONE:FAX:TYPE OF METER ( RATING OF INCOMER ): 200 A(1) Up to 60 A (2) Up to 100 A (3) 125 - 160 A (4) LV CT /300A / HV CT ./..A( 1 Phase )( 3 Phase )