    Equipment Inspection Acceptance Criteria

    Equip. Cat.Para

    NoParameter to measure Crit. No

    Pressure vessels 1 Wall thickness 1

    (In general) 2

    2 Diff. pressure across the vessel 1

    Heat Exchangers , 1 Loss of diff. temp. 1

    Coolers and Fin Fan

    Coolers

    2 Diff. pressure or temp. 1

    Filters 1 Diff. pressure across the vessel 1

    Fired heaters 1 Casing skin temp. 1

    2 Tube skin temp., TST 1

    3 Stack Gas outlet temp. 1

    Machinery 1 Vibraion level 1

    Piping 1 Wall thickness 1

    Valves 1 Leakage past 1

    All equipment 1 Process performance 1

    Notes

    Specific limits to be set for each equipment depending on its design parameters and operating parameters/conditions

    Production Staff input needed to minimize unspection/cleaning costs/downtimes within the availability requirments.

    Rev 2 Date 26-Feb-04 Page 1 of 1

    Date:

    WEPCO Approval:

    First Engineering & Software Systems

    Originator:

    First Engineering & Software Systems

    If the pressure, temperature, flowrate, process quality or any other

    deteriorates below certain limits, equipment to Isolated and truned acleaned etc.

    If vibration speed limit exceeded

    Same as pressure vessels

    If valves shows leakage (detected by UT or other techniques.

    If casing sin temp. exceeds specifiied design limit

    If TST exceed design limits

    If the percentage of tubes plugged due to leakage, piching or cracki

    If stack gas outlet temp. exceed limits

    If either Delta P or Delta T exceeds limits

    If delta P across the vessel exceeds the allowable limit

    Criteria

    If current wall thickness (WT) is less than design WT

    If remaining life calculations give a WT less than design wall thicknes

    Maintenance &Inspection WorkInstruction

    If delta P across the vessel exceeds the allowable limit

  • 7/29/2019 mechnical equip Acceptance Criteria.xls

    2/4

    Equipment Inspection Acceptance Criteria

    Equip. Cat. Para Parameter to measure Crit. Criteria

    No No.

    Pressure vessels 1 Wall thickness 1 If current wall thickness (WT) is less than design WT

    (In general) 2 If remaining life calculations give a WT less than design wall thickness

    2 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit

    the vessel

    Heat Exchangers , 1 Loss of diff. temp. 1 If the percentage of tubes plugged due to leakage, piching or cracking

    Coolers and Fin Fan

    2 Diff. pressure or temp. 1 If either Delta P or Delta T exceeds limits

    Filters 1 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limitthe vessel

    Fire heaters 1 Casing skin temp. 1 If casing sin temp. exceeds specifiied design limit

    2 Tube skin temp., TST 1 If TST exceed design limits

    3 Stack Gas outlet temp. 1 If stack gas outlet temp. exceed limits

    Machinary 1 Vibraion level 1 If vibration speed limit exceeded

    Piping 1 Wall thickness 1 Same as pressure vessels

    Valves 1 Leakage past 1 If valves shows leakage (detected by UT or other techniques.

    All equipment 1 Process performance 1 If the pressure, temperature, flowrate, process quality or any other

    performance parameter deteriorates below certain limits, equipment to

    Isolated and truned around (overhauled, cleaned etc.)

    Notes

    Specific limits to be set for each equipment depending on its design parameters and operating parameters/conditionsProduction Staff input needed to minimize unspection/cleaning costs/downtimes within the availability requirments.

  • 7/29/2019 mechnical equip Acceptance Criteria.xls

    3/4

    Equip. Cat. Para Parameter to measure Crit. Criteria

    No No.

    Pressure vessels 1 Wall thickness 1 If current wall thickness (WT) is less than design WT

    (In general) 2 If remaining life calculations give a WT less than design wall thickness

    2 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit

    the vessel

    Heat Exchangers , 1 Loss of diff. temp. 1 If the percentage of tubes plugged due to leakage, piching or cracking

    Coolers and Fin Fan

    2 Diff. pressure or temp. 1 If either Delta P or Delta T exceeds limits

    Filters 1 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit

    the vessel

    Fire heaters 1 Casing skin temp. 1 If casing sin temp. exceeds specifiied design limit

    2 Tube skin temp., TST 1 If TST exceed design limits

    3 Stack Gas outlet temp. 1 If stack gas outlet temp. exceed limits

    Machinary 1 Vibraion level 1 If vibration speed limit exceeded

    Piping 1 Wall thickness 1 Same as pressure vesselsValves 1 Leakage past 1 If valves shows leakage (detected by UT or other techniques.

    All equipment 1 Process performance 1 If the pressure, temperature, flowrate, process quality or any other

    performance parameter deteriorates below certain limits, equipment to

    Isolated and truned around (overhauled, cleaned etc.)

  • 7/29/2019 mechnical equip Acceptance Criteria.xls

    4/4

    Rev 2 Date 26-Feb-04 Page 1 of 1 Task code: MX0503M378

    First Engineering & Software Systems Date:

    Originator: WEPCO Approval: