Equipment Inspection Acceptance Criteria
Equip. Cat.Para
NoParameter to measure Crit. No
Pressure vessels 1 Wall thickness 1
(In general) 2
2 Diff. pressure across the vessel 1
Heat Exchangers , 1 Loss of diff. temp. 1
Coolers and Fin Fan
Coolers
2 Diff. pressure or temp. 1
Filters 1 Diff. pressure across the vessel 1
Fired heaters 1 Casing skin temp. 1
2 Tube skin temp., TST 1
3 Stack Gas outlet temp. 1
Machinery 1 Vibraion level 1
Piping 1 Wall thickness 1
Valves 1 Leakage past 1
All equipment 1 Process performance 1
Notes
Specific limits to be set for each equipment depending on its design parameters and operating parameters/conditions
Production Staff input needed to minimize unspection/cleaning costs/downtimes within the availability requirments.
Rev 2 Date 26-Feb-04 Page 1 of 1
Date:
WEPCO Approval:
First Engineering & Software Systems
Originator:
First Engineering & Software Systems
If the pressure, temperature, flowrate, process quality or any other
deteriorates below certain limits, equipment to Isolated and truned acleaned etc.
If vibration speed limit exceeded
Same as pressure vessels
If valves shows leakage (detected by UT or other techniques.
If casing sin temp. exceeds specifiied design limit
If TST exceed design limits
If the percentage of tubes plugged due to leakage, piching or cracki
If stack gas outlet temp. exceed limits
If either Delta P or Delta T exceeds limits
If delta P across the vessel exceeds the allowable limit
Criteria
If current wall thickness (WT) is less than design WT
If remaining life calculations give a WT less than design wall thicknes
Maintenance &Inspection WorkInstruction
If delta P across the vessel exceeds the allowable limit
7/29/2019 mechnical equip Acceptance Criteria.xls
2/4
Equipment Inspection Acceptance Criteria
Equip. Cat. Para Parameter to measure Crit. Criteria
No No.
Pressure vessels 1 Wall thickness 1 If current wall thickness (WT) is less than design WT
(In general) 2 If remaining life calculations give a WT less than design wall thickness
2 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit
the vessel
Heat Exchangers , 1 Loss of diff. temp. 1 If the percentage of tubes plugged due to leakage, piching or cracking
Coolers and Fin Fan
2 Diff. pressure or temp. 1 If either Delta P or Delta T exceeds limits
Filters 1 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limitthe vessel
Fire heaters 1 Casing skin temp. 1 If casing sin temp. exceeds specifiied design limit
2 Tube skin temp., TST 1 If TST exceed design limits
3 Stack Gas outlet temp. 1 If stack gas outlet temp. exceed limits
Machinary 1 Vibraion level 1 If vibration speed limit exceeded
Piping 1 Wall thickness 1 Same as pressure vessels
Valves 1 Leakage past 1 If valves shows leakage (detected by UT or other techniques.
All equipment 1 Process performance 1 If the pressure, temperature, flowrate, process quality or any other
performance parameter deteriorates below certain limits, equipment to
Isolated and truned around (overhauled, cleaned etc.)
Notes
Specific limits to be set for each equipment depending on its design parameters and operating parameters/conditionsProduction Staff input needed to minimize unspection/cleaning costs/downtimes within the availability requirments.
7/29/2019 mechnical equip Acceptance Criteria.xls
3/4
Equip. Cat. Para Parameter to measure Crit. Criteria
No No.
Pressure vessels 1 Wall thickness 1 If current wall thickness (WT) is less than design WT
(In general) 2 If remaining life calculations give a WT less than design wall thickness
2 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit
the vessel
Heat Exchangers , 1 Loss of diff. temp. 1 If the percentage of tubes plugged due to leakage, piching or cracking
Coolers and Fin Fan
2 Diff. pressure or temp. 1 If either Delta P or Delta T exceeds limits
Filters 1 Diff. pressure across 1 If delta P across the vessel exceeds the allowable limit
the vessel
Fire heaters 1 Casing skin temp. 1 If casing sin temp. exceeds specifiied design limit
2 Tube skin temp., TST 1 If TST exceed design limits
3 Stack Gas outlet temp. 1 If stack gas outlet temp. exceed limits
Machinary 1 Vibraion level 1 If vibration speed limit exceeded
Piping 1 Wall thickness 1 Same as pressure vesselsValves 1 Leakage past 1 If valves shows leakage (detected by UT or other techniques.
All equipment 1 Process performance 1 If the pressure, temperature, flowrate, process quality or any other
performance parameter deteriorates below certain limits, equipment to
Isolated and truned around (overhauled, cleaned etc.)
7/29/2019 mechnical equip Acceptance Criteria.xls
4/4
Rev 2 Date 26-Feb-04 Page 1 of 1 Task code: MX0503M378
First Engineering & Software Systems Date: