OBRA :
01.00.00 TR A BA JOS PR OV I SI ON A LES
ITEM DESCRIPCION DE LA PARTIDA
01.01.00 CARTEL DE OBRA
METRADO UND
ITEM DESCRIPCION DE LA PARTIDA
01.02.00 ALMA CEN PROVISIONAL
METRADO GLB
02.00.00 TR A BA JOS PR ELI M I N A RES
ITEM DESCRIPCION DE LA PARTIDA
02.01.00 TRAZO Y REPLANTEO
METRADO M2
ITEM DESCRIPCION DE LA PARTIDA
02.02.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA
METRADO GLB.
03.00.00 M OV I M I EN TO D E TI ERR A S
ITEM DESCRIPCION DE LA PARTIDA
03.01.00 CORTE DE MATERIAL CONGLOMERADO
69423.73 M3
SECCION AREA LONGITUD VOLUMEN
TOTAL 77137.48
PORCENTAJE DE CONGLOMERADO 90.00% 69423.73
ITEM DESCRIPCION DE LA PARTIDA
03.02.00 CORTE EN ROCA Y DESQUINCHE
7713.75 M3
VOLUMEN TOTAL % VOLUMEN
METRADO 77137.48 10.00% 7713.748
MEJORAM IENT O TROCH A CARROZABLE SAN JUAN - CRUCE H UANAYÓ
UNIDAD
1
UNIDAD
UNIDAD
1
UNIDAD
METRADO
METRADO
UNIDAD
71157.02
OBSERVACIONES: ASUMIENDO 10% DE ROCA EN LA TROCHA
OBSERVACIONES: LAS AREAS DE CORTE SE OBTIENEN DEL AUTOCAD (VER PLANOS)
1
UNIDAD
7/24/2019 Metrado Trocha
http://slidepdf.com/reader/full/metrado-trocha 2/4
ITEM DESCRIPCION DE LA PARTIDA
03.03.00 RELLENO CON MATERIAL PROPIO
1020.77 M3
ITEM DESCRIPCION DE LA PARTIDA
03.04.00 REMOSIÓN, TRATAMIENTO DE SUELO Y COMPACTADO
71157.02 M2
LONGITUD ANCHO AREA
METRADO 11859.50 6 71157.018
ITEM DESCRIPCION DE LA PARTIDA
03.05.00 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO
76116.71 M3
04.00.00 A LCA N TA R I LLA S TI PO M A RCO
ITEM DESCRIPCION DE LA PARTIDA
04.01.00 EXCAVACIÓN MANUAL DE ZANJA Y COMPACTADO
895.07 M3
LARGO ANCHO ALTO Nº VECES
ALCANTARILLA 9.78 1.3 2.2 32
ITEM DESCRIPCION DE LA PARTIDA
04.02.00 ENCOFRADO Y DESENCOFRADO NORMAL
2217.48 M2
AREA Nº VECES DESPERDICIO AREA
CABEZAL DE ENTRADA
Muro 1 2.21 64 3.00% 145.68
Muro 2 3.40 64 3.00% 224.13
Muro 3 1.44 128 3.00% 189.85
Piso 1.16 32 3.00% 38.23
MARCO 40.17 32 3.00% 1324.14
CABEZAL DE SALIDA
Aletas 1.43 128 3.00% 188.53
Frontal 0.88 64 3.00% 58.01
Piso 1.48 32 3.00% 48.91
UNIDAD
UNIDAD
METRADO
OBSERVACIONES: LAS AREAS SE OBTIENEN DEL AUTOCAD (VER PLANOS)
METRADO
METRADO
OBSERVACIONES:
UNIDAD
METRADO
OBSERVACIONES:
UNIDAD
UNIDAD
METRADO
7/24/2019 Metrado Trocha
http://slidepdf.com/reader/full/metrado-trocha 3/4
ITEM DESCRIPCION DE LA PARTIDA
04.03.00 CONCRETO F'C=175 KG/CM2
357.72 M3
AREA LONGITUD Nº VECES DESPERDICIO VOLUMEN
CABEZAL DE ENTRADA
Muro 1 0.26 1.7 32 5.00% 14.85
Muro 2 0.40 1.7 32 5.00% 22.85
Muro 3 1.44 0.2 64 5.00% 19.35
Piso 0.24 1.7 32 5.00% 13.71
MARCO 0.88 7.58 32 5.00% 224.13
CABEZAL DE SALIDA
Aletas 1.43 0.2 64 5.00% 19.22
Frontal 0.88 0.2 32 5.00% 5.91
Piso 2.30 0.3 32 5.00% 23.18
Uñas 0.12 3.6 32 5.00% 14.52
ITEM DESCRIPCION DE LA PARTIDA
04.04.00 ACERO ESTRUCTURAL FY=4,200 KG/CM2
15330.41 KG
DESRIPCION GRAFICO LONGITUD Nº VECES DESPERDICIO PESO/ML PESO
T1: Ø = 3/8" VER PLANOS 1.29 1248 5.00% 0.56 946.63
T2: Ø = 1/2" VER PLANOS 1.29 1248 5.00% 0.99 1673.51
T3: Ø = 3/8" VER PLANOS 8.68 544 5.00% 0.56 2776.49
T4: Ø = 3/8" VER PLANOS 3.24 1248 5.00% 0.56 2377.59
T5: Ø = 3/8" VER PLANOS 5.3 192 5.00% 0.56 598.35
T6: Ø = 3/8" VER PLANOS 2.25 320 5.00% 0.56 423.36
T7: Ø = 3/8" VER PLANOS 5.2 192 5.00% 0.56 587.06
T8: Ø = 3/8" VER PLANOS 1.72 160 5.00% 0.56 161.82
T9: Ø = 3/8" VER PLANOS 1.23 320 5.00% 0.56 231.44
T10: Ø = 3/8" VER PLANOS 1.27 320 5.00% 0.56 238.96
T11: Ø = 3/8" VER PLANOS 1.5 32 5.00% 0.56 28.22
T12: Ø = 1/2" VER PLANOS 2.28 480 5.00% 0.99 1137.63
T13: Ø = 1/2" VER PLANOS 3.55 128 5.00% 0.99 472.35
T14: Ø = 1/2" VER PLANOS 4.78 224 5.00% 0.99 1113.01
UNIDAD
METRADO
UNIDAD
METRADO
OBSERVACIONES: LAS AREAS SE OBTIENEN DEL AUTOCAD (VER PLANOS)
7/24/2019 Metrado Trocha
http://slidepdf.com/reader/full/metrado-trocha 4/4
T15: Ø = 1/2" VER PLANOS 1.38 448 5.00% 0.99 642.66
T16: Ø = 1/2" VER PLANOS 1.54 384 5.00% 0.99 614.72
T17: Ø = 1/2" VER PLANOS 1.29 128 5.00% 0.99 171.64
T18: Ø = 1/2" VER PLANOS 0.91 128 5.00% 0.99 121.08
T19: Ø = 1/2" VER PLANOS 2.11 64 5.00% 0.99 140.37
T20: Ø = 1/2" VER PLANOS 4.37 64 5.00% 0.99 290.73
T21: Ø = 1/2" VER PLANOS 0.74 128 5.00% 0.99 98.46
T22: Ø = 1/2" VER PLANOS 1.82 256 5.00% 0.99 484.32
ITEM DESCRIPCION DE LA PARTIDA
04.05.00 RELLENO CON MATERIAL PROPIO Y COMPACTACION MANUAL
406.85 M3
LARGO ANCHO ALTO Nº VECES
ALCANTARILLA 9.78 1.3 1 32
05.00.00 OTROS
ITEM DESCRIPCION DE LA PARTIDA
05.01.00 MOVILIDAD
132.00 DIA
ITEM DESCRIPCION DE LA PARTIDA
05.02.00 IMPACTO AMBIENTAL
1.00 GLB
ITEM DESCRIPCION DE LA PARTIDA
05.03.00 COMPRA DE TERRENOS AFECTADOS E IMPREVISTOS
23719.01 M2
LARGO ANCHO AREA
11859.50 2 23719.006
ITEM DESCRIPCION DE LA PARTIDA
05.04.00 FLETE TERRESTRE
1.00 GLB
OBSERVACIONES: LAS AREAS SE OBTIENEN DEL AUTOCAD (VER PLANOS)
UNIDAD
METRADO
OBSERVACIONES:
UNIDAD
METRADO
UNIDAD
METRADO
UNIDAD
METRADO
METRADO
UNIDAD