    MRP-Material Requirement Planning

  • 8/12/2019 MRP PP-PPT

    2/28

    PP ProcessMaterial Requirement Planning

    Planned Orders

    Production Order

    Purchase Requisition

    Confirmation

    Capacity

    Planning

    Material Master

    Bill of Material

    Work Center

    Routing

    Sales Reqmt

    Make to Order

    DM/PIR

    Order

    MRP

    PIR/SL/Quota

    Goods Receipts

    Purchase Order

    PO Print

    Release

    Goods

    Movement

  • 8/12/2019 MRP PP-PPT

    3/28

    R

    Sales order /

    PlannedIndRequirementPlanned order

    Purchase requisition

    Dependent requirement

    Planned order

    Dependent requirement

    FinishedFinishedproductproduct

    Assembly 2Assembly 1

    Raw

    material 3

    Raw

    material 1

    Raw

    material 2

    R/3s MRP is for unconstraint-based planning,

    APO is for the constraint-based planning

  • 8/12/2019 MRP PP-PPT

    4/28

    PP ProcessDemand Management

    DEMAND MANAGEMENT

    PURPOSE :

    Demand management is to determine requirement quantities and delivery dates for

    finished product assemblies. DM uses planned independent requirements and customer

    requirements as input.

    Source of Demand

    Annual Sales Plan

    Sales Order

  • 8/12/2019 MRP PP-PPT

    5/28

    PP ProcessDemand Management

    Splitting

  • 8/12/2019 MRP PP-PPT

    6/28

    PP ProcessDemand Management

    Splitting

  • 8/12/2019 MRP PP-PPT

    7/28

    PP ProcessMaterial Requirement Planning

    Objective of MRP

    Guarantee Material Availability

    Generate In-house/External Production and

    Procurement Plan

    MRP tries to strike the best balance possible

    between

    -optimizing the service leveland

    -minimizing costsand capital lockup

    MATERIAL REQUIREMENT PLANNING

  • 8/12/2019 MRP PP-PPT

    8/28

    How the Planning Run Works

    Net Requirements Calculation

    1. Determine Available Warehouse Stock

    2. Determine Planned Receipts (after considering existing issues and receipts)

    3. Calculate the Shortage Quantity Lot Size Calculation

    Determine the lot size of each plan order. R3 Lot Sizing falls into 3

    categories : Static Lot Size, Optimum Lot Size or Period Lot Size

    Procurement Type & Scheduling

    In-house Production or External Procurement & Backward Scheduling or

    Forward Scheduling

    BOM Explosion

    Determine the valid BOM for explosion

    Quota Arrangement

    A lot can further be split by quota arrangements

    Net Requirements Calculation ---> Lot Size Calculation ---->-------> Scheduling --------> BOM Explosion ----->

    -------> Quota Arrangement

  • 8/12/2019 MRP PP-PPT

    9/28

    Basic Parameters for MRP MRP Type

    Lot Size Safety Stock / Safety Time

    Reorder Point

    Rounding Value Procurement Type (In-house/Ext/Both)

    Quota Arrangement

    In-house Production days / Planned DeliveryTime

    GR Processing Time

  • 8/12/2019 MRP PP-PPT

    10/28

    Planning Parameter - MRP Type

    Key that determines whether and how the

    material is planned

    No Planning

    Manual reorder point planning

    Automatic reorder point planning

    Material requirements planning

    Master production scheduling (MPS)

  • 8/12/2019 MRP PP-PPT

    11/28

    Parameters for MRP-MRPType

    No Planning ND

    EX:- If we keep no planning for Material then

    the results are as follows for BENT ROD

  • 8/12/2019 MRP PP-PPT

    12/28

    Parameters for MRP-MRP Type

    MRP type - PD (Planning Required) MRP type PD means the material will be

    considered by MRP run for planning and triggerthe Procurement Proposals after Net reqt

    calculation MRP Type - M0 (MPS)

    This is set for critical material which are excludedfrom MRP Run. However planning for these

    materials are done thru separate routine MRP type - VB (Manual Re-order Point)

    Plans as per the Re-order level set for thematerial

  • 8/12/2019 MRP PP-PPT

    13/28

    BOM Explosion

    Scheduling

    Procurement type

    Lot-size calculation

    Net Reqmts CalculationNet Reqmts Calculation

    Overview:Net Requirements Calculation

  • 8/12/2019 MRP PP-PPT

    14/28

    MRP:Net Requirements Calculation

    ShortageShortage

    SalesSalesOrdersOrders

    Planned Ind ReqmtsPlanned Ind Reqmts

    Dependent ReqmtsDependent Reqmts

    ReservationsReservations

    PlannedOrders

    ProductionOrders

    Purchase Requisitions

    Purchase orders

    WarehouseStock

    LotSize

    SafetySafetyStockStock

    CompareCompare

    DemandSupply

    MRP will compare the requirement and supply to get a shortage gap.A comparison is made between warehouse stock and the appropriatereceipts and issue.

  • 8/12/2019 MRP PP-PPT

    15/28

    BOM Explosion

    Scheduling

    Procurement type

    Lot-Lot-size calculationsize calculation

    Net Requirements

    Calculation

    Overview:Lot-Size Calculation

  • 8/12/2019 MRP PP-PPT

    16/28

    Parameters for MRP-LOT SIZE

    Lot SizeUsed to consolidate

    demand/dependent reqmt as per the setbusiness rules.

    Lot Size Procedures

    Static lot-sizing procedures

    Period lot-sizing procedures

  • 8/12/2019 MRP PP-PPT

    17/28

    Parameters for MRP-LOT SIZE

    Static lot-sizing procedures

    In static lot-sizing procedures, the lot size is

    calculated by means of the quantity

    specifications recorded in the material master

    record.

    There are three different criteria according to

    which the lot size can be calculated:

    Lot-for-Lot Order Quantity

    Fixed Lot Size

    Replenishment up to Maximum Stock Level

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275de454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275eb454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275eb454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275de454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    18/28

    Parameters for MRP-LOT SIZE

    Static lot-sizing procedures

    Lot-for-Lot Order Quantity

    after MRP run the order proposals as follows

    Date Order proposals

    14.11 Purchase order 20 15.11 Purchase order 30

    16.11 Purchase order 50 .

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    19/28

    Parameters for MRP-LOT SIZE Static lot-sizing procedures

    Fixed Lot Size

    Fixed Lot Size set in Material Master as Ex-10 the results

    as follows Date Order proposals 14.11 Purchase order 10 14.11 Purchase order 10 15.11 Purchase order 10

    15.11 Purchase order 10 15.11 Purchase order 10 16.11 Purchase order 10 16.11 Purchase order 10..

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275de454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275de454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    20/28

    Parameters for MRP-LOT SIZE

    Static lot-sizing procedures

    Replenishment up to Maximum Stock Levelif you want to fill the stock up to the highest possible level or if

    you can only store a certain quantity of a material due to the

    container size. This applies to a tank, for example. The capacity of

    the tank determines the maximum stock level.

    Maximum Stock Level:-100 EA

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275eb454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275eb454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275d1454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    21/28

    Parameters for MRP-LOT SIZE

    Period Lot-Sizing Procedures

    In period lot-sizing procedures, therequirement quantities from one or fromseveral periods are grouped together to form alot. The SAP System supports various periods.You can determine the number of periodswhich are to be grouped together into an orderproposal. You have the choice between

    Daily lot sizeWeekly lot size

    Monthly lot size

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    22/28

    Parameters for MRP-LOT SIZE

    Period Lot-Sizing Procedures

    Daily lot size EX:-Argo-2000

    Date Order Proposals

    14.11 20

    15.11 30 16.11 50

    17.11 60.

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    23/28

    Parameters for MRP-LOT SIZE

    Period Lot-Sizing Procedures

    Weekly lot size

    EX:-Argo-2000

    Date Order Proposals

    14.11 290 21.11 240

    28.11 250

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    24/28

    Parameters for MRP-LOT SIZE

    Period Lot-Sizing Procedures

    EX:- Monthly lot size

    Argo-2000

    Date Order Proposals

    30.11 780

    http://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htmhttp://help.sap.com/saphelp_40b/helpdata/en/7d/c275f8454011d182b40000e829fbfe/content.htm
  • 8/12/2019 MRP PP-PPT

    25/28

    BOM Explosion

    SchedulingScheduling

    Procurement typeProcurement type

    Lot-size calculation

    Net Requirements Calculation

    Overview:Scheduling

  • 8/12/2019 MRP PP-PPT

    26/28

    External procurementStockStocktransfertransfer

    Procurement TypesProcurement Types

    In-In-househouse

    productionproduction

    SubcontractingSubcontracting VendorProductionProduction inin

    ownownplantplant

    ProductionProduction inin

    anotheranotherplantplant

    Reservation inReservation in

    anotheranotherplantplantComponentsComponentsComponents

    Procurement typesSpecial procurement types

    ProcurementTypes

  • 8/12/2019 MRP PP-PPT

    27/28

    Scheduling

    The following times are taken into account : processing time required by purchasing

    department (workdays)

    planned delivery time of the material (calendar

    days)

    goods receipt processing time (workdays)

    These times will be used to determine the

    release date of the planned order orpurchase requisition.

  • 8/12/2019 MRP PP-PPT

    28/28

    Planned Orders for manufactured material

    Purchase Requisition for external procurement

    Action Messages & Planning related MIS