109
Southern Transportation Trunk Perfecting Project for Sewage Treatment in Bailonggang Area, Shanghai Puxi Section Project Resettlement Action Plan 1 Puxi Section Project of Southern Transportation Trunk Perfecting Project of Bailonggang Area, Shanghai ——Funded by World RP707 V3

宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Southern Transportation Trunk Perfecting Project for Sewage Treatment in Bailonggang Area, Shanghai

Puxi Section Project

Resettlement Action Plan

Shanghai Urban Drainage Corporation

August,2008

1

Puxi Section Project of Southern Transportation Trunk Perfecting Project of Bailonggang Area, Shanghai

——Funded by World Bank

RP707

V3

Page 2: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Endorsement Letter for the Resettlement Plan

Shanghai Municipal Government has applied for a loan from WB to finance Shanghai Southern Transportation Trunk Perfecting Project for Sewage Treatment Bailonggang Area. Therefore, the Project must be implemented in compliance with ADB safeguard requirements. This Resettlement Plan is prepared in accordance with the laws of the PRC, Shanghai Municipality, as well as WB’s Policy on Involuntary Resettlement and it constitutes the basis for land acquisition, house demolition and resettlement of the project.

Shanghai Municipal Government hereby confirms the content of this Resettlement Plan and will guarantee the land acquisition, compensation and relocation budget being provided according to the provisions of this Resettlement Plan. This Resettlement Plan is based on the feasibility study report and the initial surveys. If the final implemented components are different from the contents described in the feasibility study report and that will cause the substantial impact on the Resettlement Plan, this Resettlement Plan should be future modified and approved by WB before its implementation.

Shanghai Municipal People’s Government

__________ (Signature) _____________ (Date)

2

Page 3: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Preface

I. The objective of Resettlement Action Plan1 This Resettlement Action Plan is formulated on the basis of the laws,

regulations and policies of the People’s Republic of China, and Local Government as well as the Guidelines of the World Bank (Operational Directive for Involuntary Resettlement OP 4.12). The purpose of this document is to set out an Action plan for the Resettlement and Rehabilitation of the Displaced persons (DPs) to ensure that they will benefit from the project and their standards of living will be improved or at least be restored after the project impact.

II. Definition of Relative TermsDPs2 Criteria for Eligibility. Displaced persons may be classified in one of the following

three groups:

(a) those who have formal legal rights to land (including customary and traditional rights recognized under the laws of the country);

(b) those who do not have formal legal rights to land at the time the census begins but have a claim to such land or assets—provided that such claims are recognized under the laws of the country or become recognized through a process identified in the resettlement plan; and

(c) Those who have no recognizable legal right or claim to the land they are occupying.

3 Persons covered under 2(a) and 2(b) are provided compensation for the land they lose and other assistance. Persons covered under 2(c) are provided resettlement assistance in lieu of compensation for land they occupy and other assistance, as necessary, to achieve objectives set out in this policy, if they occupy the project area prior to a cut-off date established by the borrower and acceptable to the World Bank1 . Those who encroach on this area after cut-off date are not entitled to the compensation or any other resettlement assistance. All persons included in 2(a), 2(b) and 2(c) are provided compensation for loss of assets other than land.

Compensation and Resettlement Measures4 In order to address the impacts caused by compulsive land acquisition resulting

in (i) relocating or loss of shelter; (ii) lost of assets or access to assets; (iii) loss of income source or means of livelihood, wheatear or not the affected persons must move to another location, an RAP or Resettlement Policy Framework (RPF) should be prepared that covers the following:

(a) The resettlement plan or resettlement policy framework includes measures to ensure DPs are

(i) Informed about their options and rights pertaining to resettlement;

(ii) Consulted on, offered choices among, and provided with technically and economically feasible resettlement alternatives; and

1 Normally, the cut-off date is the date the census begins. The cut-off date could also be the date the project area was delineated, prior to the census, provided that there has been an effective public dissemination of information on the area delineated and systematic and continuous dissemination subsequent to the delineation to prevent further population influx.

3

Page 4: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

(iii) Provided prompt and effective compensation at replacement cost2 for losses of assets attributable directly to the project.

(b) if the impacts include physical relocation, the resettlement or resettlement policy framework should include measure to ensure that the displaced persons are

(i) provided assistance (such as moving allowance) during the relocation;

(ii) provided with residential house, or house sites, as required, agricultural sites for which a combination of productive potential, location advantages, and other factors is at least equivalent to the advantages of the old site.

(c) Where necessary to achieve the objectives of the policy, the resettlement plan or resettlement policy framework also include measures to ensure that displaced persons are

(i) offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living;

(ii) Provided with development assistance in addition to compensation measures described in paragraph 4(a) (iii), such as land preparation, credit facilities, training, or job opportunities.

5 cut-off date: the date in this project refers to the date that bulletin of land acquisition and house demolition is issued. DPs are not allowed to build new house, expand the building, rebuild, change the usage of house and land, lease land, or rent/bargain the house. Besides, persons moving into project areas after this date are not entitled to be compensated.

2 Replacement Cost means the method of valuing assets to replace the loss at market value plus any transaction costs. When this method is adopted, the depreciation of construction and property is left out of account.

4

Page 5: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Abbreviations

AAOV Average Annual Output Value

APs Affected Persons

DPs Displaced Persons

DI Design Institute

FSR Feasibility Study Report

IA Implementation Agency

M&E Monitoring and Evaluation

PAPs Project Affected Persons

PRC People’s Republic of China

RAP, RP Resettlement (Action) Plan

RIB Resettlement Information Booklet

RPF Resettlement Policy Framework

STTP Southern Transportation Trunk Project

STTPP Southern Transportation Trunk Perfecting Project

SPMO Shanghai Project Management Office

WB World Bank

mm Millimeters

% Percentage

mu Chinese Area Unit of Land, 1 mu = 1/15 ha (1 ha = 15 mu)

Yuan Chinese Current unit of Money, 1 Yuan = 1/7 dollar (1 dollar = 7 Yuan )

5

Page 6: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

CONTENT1 Project introduction............................................................................................................................11.1 BRIEF INTRODUCTION.............................................................................................................11.2 BENEFICIAL AND AFFECTED AREAS OF PROJECT.................................................................2

1.2.1 Beneficial Areas...................................................................................................................21.2.2 Affected Areas......................................................................................................................2

1.3 SOCIAL ECONOMIC BACKGROUND OF PROJECT AFFECTED AREAS....................................31.4 TOTAL INVESTMENT AND CAPITAL SOURCE..........................................................................51.5 MEASURES TO AVOID AFFECTS..............................................................................................51.6 LINKAGE PROJECTS................................................................................................................6

2 PROJECT IMPACTS......................................................................................................................72.1 PROJEC IMPACT SURVEY........................................................................................................72.2 PROJECT IMPACT SCOPE........................................................................................................72.3 PERMANENT STATE-OWNED LAND OCCUPATION.................................................................72.4 TEMPORARY LAND OCCUPATION...........................................................................................82.5 AFFECTED ENTERPRISES.........................................................................................................92.6 AFFECTED UNLICENSED STRUCTURE.....................................................................................92.7 AFFECTED POPULATION........................................................................................................102.8 AFFECTED INFRASTRUCTURE AND GROUND ATTACHMENTS.............................................10

3 ANALYSIS ON RESETTLEMENT IMPACTS.........................................................................123.1 IMPACTS ANALYSIS ON TEMPORARY LAND ACQUISITION.................................................123.2 IMPACTS ANALYSIS ON ENTERPRISES..................................................................................12

4 LEGAL AND POLICY FRAMEWORK.....................................................................................144.1 LAWS AND POLICIES REFERRED IN RESETTLEMENT..........................................................144.2 RESETTLEMENT POLICIES OF THE PROJECT.......................................................................14

4.2.1 Resettlement Policy of Demolished Enterprise..................................................................144.2.2 Compensation Policy for Affected Ground Attachments...................................................16

5 COMPENSATION STANDARD..................................................................................................175.1 COMPENSATION STANDARD FOR STATE-OWNED LAND......................................................175.2 COMPENSATION FOR TEMPORARY LAND ACQUISITION.......................................................175.3 COMPENSATION FOR HOUSE DEMOLITION...........................................................................18

5.3.1 Rural non-residential house...............................................................................................185.3.2 Urban non-residential houses............................................................................................18

5.4 COMPENSATION FOR THE IMPACTS ON ENTERPRISES PRODUCTION AND OPERATION......195.5 COMPENSATION STANDARD FOR INFRASTRUCTURES..........................................................195.6 OTHER COMPENSATION STANDARD......................................................................................20

6 RESETTLEMENT SCHEME......................................................................................................216.1 RESETTLEMENT OBJECTIVES...............................................................................................216.2 RESETTLEMENT PRINCIPLES................................................................................................21

6.2.1 Principle of Reducing Resettlers as much as possible.......................................................216.2.2 Principle of Equally Compensating...................................................................................216.2.3 Principle of Focusing on Emphasis...................................................................................22

6.3 RESTORATION OF TEMPORRILY-OCCUPIED LAND.............................................................226.4 RESETTLEMENT FOR NON-RESIDENTIAL HOUSES DEMOLITION.........................................23

6.4.1 Demolished enterprises......................................................................................................236.5 AFFECTED INFRASTRUCTURE AND GROUND ATTACHMENT...............................................24

7 PUBLIC PARTICIPATION.........................................................................................................257.1 PUBLIC PARTICIPATION AND STRATEGY..............................................................................257.2 PUBLIC PARTICIPATION PROCESS AND POLICY DISCLOSURE............................................26

8 GREIVANCE AND COMPLAINT PROCEDURE....................................................................289 INSTITUTION...............................................................................................................................299.1 RESETTLEMENT AGENCY......................................................................................................299.2 ORGANIZATION CHART.........................................................................................................319.3 RESPONSIBILITIES..................................................................................................................32

9.3.1 Shanghai Develope and Reform Committee, Shanghai Construction and Management Committee & Shanghai Water Affairs Bureau.................................................................................329.3.2 Shanghai Urban Drainage Co., Ltd...................................................................................32

1

Page 7: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

9.3.3 Shanghai Urban Planning and Adminisitration Bureau & Shanghai Housing and Land Administration Bureau.....................................................................................................................329.3.4 Demolition Management Office and water affair bureau of Districts...............................339.3.5 Shanghai Municipal Designing Institution........................................................................339.3.6 Resettlement Monitoring Agency.......................................................................................33

9.4 ORGANIZATION ABILITY AND STAFFING.............................................................................349.5 MEASURES FOR STRENGTHENING INSTITUTIONAL CAPACITY...........................................35

10 TABLE OF IMPLEMENTATION SCHEDULE........................................................................3710.1 PRINCIPLE OF PROGRESS JOINT OF RESETTLEMENT AND CONSTURCTIO........................3710.2 TIMETABLE OF KEY TASKS IN RESETTLEMENT IMPLEMENTATION..................................37

10.2.1 Principles of Scheduling....................................................................................................3710.2.2 Overall Schedule of Resettlement......................................................................................38

11 EXPENSE AND BUDGET............................................................................................................4011.1 EXPENSE.................................................................................................................................4011.2 ANNUAL CAPITAL UTILIZING PLAN.....................................................................................4311.3 RESETTLEMENT CAPITAL RESOURCE..................................................................................4311.4 CAPITAL FLOW AND ALLOCATION PLAN............................................................................43

11.4.1 Capital Flow......................................................................................................................4311.4.2 Allocation and Management..............................................................................................44

12 MONITORING AND EVALUATION.........................................................................................4512.1 INTERNAL MONITORING.......................................................................................................45

12.1.1 Implementation Procudures...............................................................................................4612.1.2 Monitoring Content............................................................................................................4612.1.3 Internal Monitoring Report...............................................................................................46

12.2 EXTERNAL MONITORING AND EVALUATION.......................................................................4612.2.1 Independent Monitoring Institute......................................................................................4612.2.2 Monitoring Procedure and Contents.................................................................................47

12.3 MONITORING INDICATOR.....................................................................................................4812.4 POST EVALUATION................................................................................................................49

13 ENTITLEMENT MATRIX..........................................................................................................50APPENDIX1. PROJECT SKETCH MAP............................................................................................52APPENDIX2. EXTERNAL MONITORING AND EVALUATION FRAMEWORK.....................53APPENDIX3. RESETTLEMENT INFORMATION BOOKLET......................................................56

2

Page 8: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

TABLE LISTTABLE 1-1 SUMMARY OF PROJECT RESETTLEMENT IMPACTS.................................................................2TABLE 2-1 VILLAGES AFFECTED BY THE PROJECT....................................................................................7TABLE 2-2 LIST OF TEMOPRARY COLLECTIVE OCCUPATION....................................................................8TABLE 2-3 LIST OF TEMPORARY STATE-OWNED LAND OCCUPATION........................................................8TABLE 2-4 LIST OF AFFECTED ENTERPRISES...........................................................................................9TABLE 2-5 LIST OF AFFECTED POPULATION............................................................................................10TABLE 2-6 AFFECTED INFRASTRUCTURE AND GROUD ATTEACHMENTS...............................................10TABLE 3-1 EFFECT TO EACH ENTERPRISE...............................................................................................13TABLE 5-1 COMPENSATION STANDARD OF RURAL NON-RESIDENTIAL HOUSES.....................................18TABLE 5-2 COMPENSATION STANDARD OF URBAN NON-RESIDENTIAL HOUSE.......................................18TABLE 5-3 COMPENSATION STANDARD FOR INFRASTRUCTURES...........................................................19TABLE 5-4 RELEVANT COST AND FEE......................................................................................................20TABLE 7-1 PUBLIC PARTICIPATION PROCESS OF AFFECTED POPULATION...........................................26TABLE 7-2 POLICY DISCLOSURE PROCESS.............................................................................................27TABLE 9-1 STAFFING OF THE RESETTLEMENT INSTITUTES INVOLVED IN THE PROJECT........................34TABLE 10-1 SCHEDULE FOR LAND ACQUISITION AND HOUSE DEMOLITION............................................39TABLE 11-1 BUDGET FOR RESETTLEMENT COMPENSATION...................................................................40TABLE 11-2 ANNUAL INVESTMENT PLAN..................................................................................................43Table 13-1 Entitlement Matrix...............................................................................................................50

Chart ListCHART 8-1 GRIEVANCE AND COMPLAINT PROCEDURE..........................................................................28Chart 11-1 Capital flow...........................................................................................................................44

1

Page 9: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

1 Project introduction

1.1 Brief Introduction

According to latest investigation data, sewage quantity increased faster in Bailonggang area, Shanghai in recent years. The inflow discharge of Bailonggang Sewage Treatment Plant would be 1900 thousand m3/d until 2008. The situation above proves that the collecting sewage quantity of Bailonggang has exceeded the designed trunk scale which is 1721 thousand m3/d. (Feasibility Study Report, 2008).

To develop economy, environmental protection should be top-priority. With a new round development and opening of Shanghai, and rapid development of urban construction, the increasing sewage quantity of Pudong New Developed District, Minhang, Nanhui and other area is in a dire need of an outlet, so it has no time to delay to improve the discharge ability of sewage trunk line in Bailonggang area. In order to provide necessary environment capacity and self-contained infrastructure for local economy development, then improve the regional water environment quality, and accelerate the harmony development of economy and environment, Southern Transportation Trunk Project (STTP) has been the urgent affair of optimizing and improving sewage treatment system in Bailonggang area.

The service region of STTP belongs to Bailonggang area, of which, the north is in the southern side of Zuyuan, the west is in the Minhang boundary, the south is in the Minhang boundary and Nanhui airport express way, the east is in the Changjiang River. The area of service region is 1255km2, and the population is 7120 thousands. STTP includes Western Section Project of Southern Trunk and Southern Trunk Transportation Perfecting Project (STTPP). Presently the western section project has been completed and connected with middle trunk to the Bailonggang Sewage Treatment Plant. Because the actual sewage quantity has disparity with the planning, the eastern section project of southern trunk is suspended. STTPP in Bailonggang area) includes eastern section project and Puxi River-Crossing Pipe and the connection pipe. The purpose of STTPP is to perfect the southern transportation trunk. The project will start from June, 2009, and end in 2012.

STTPP could be divided into 2 parts: Puxi Section Project, including Puxi River-Crossing Pipe, the connecting pipe, and the pumping station; Pudong Section Project, including East Section of Southern Transportation Trunk and Pudong collecting branches. Shanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project, and compile Resettlement Action Plan (RAP). As to Pudong Section project, construction would be done with domestic capital, however, the project scope

1

Page 10: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

has not been confirmed, and so Resettlement Policy Framework (RPF) is compiled.

1.2 Beneficial and Affected Areas of Project

1.2.1 Beneficial Areas

Beneficial areas of Puxi river-crossing pipe, connecting pipe, and river-crossing pump station include:

Shanghai

Shanghai is making effort to be a national sanitary city, the main standard of which is a good environment protection, including solid waste treatment, sewage treatment, air pollution control and noise control. STTP will create favorable conditions to improve the rate of piped sewage after its construction, so that it could reduce quantity of sewage discharged into Inland River; achieve the goal of improving Inland River’s water quality. STTP has a significant meaning for upgrading the whole sanitary environment of Shanghai, and provides good conditions for creating national sanitary city.

Puxi Central Urban Area

Because the discharged sewage from the sixth anabranch and Wumin has exceeded the designed scale, sewage from Puxi has no way to cross Huangpujiang River, and only could be discharged into Huangpujiang which is polluted gravely. STTPP would solve the sewage discharged into Huangpujiang in the rain season in this area completely, and have a very important meaning for improving the water quality in Huangpujiang.

1.2.2 Affected Areas

The impacts of land acquisition and house demolition in Puxi Section Project involve 3 districts of Shanghai: Minhang, Xuhui and Pudong New Area.

Table 1-1 Summary of Project Resettlement Impacts District Minhan

gXuhu

iPudon

g Subtotal Remark

Township/Street 1 1 1 3  Village 1 1 2  Permanent State-owned Land Acquisition (Mu) 11 11  

Temporary Land Acquisition

State-owned Land(m²) 625 1625 4300 6550(about

9.8 Mu)Including virescence belt & national roads

Collective Land(m²) / 1125 800 1925(about 2.9 Mu)

Non-agricultural land but for construction Of which:Farmland

Affected House Demolition(m2) 175 2110 2285  2

Page 11: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

District Minhang

Xuhui

Pudong Subtotal Remark

Enterprises

Auxiliary Construction(m2) 3345 3345  Affected Enterprises 1 4 5  Affected Population 3 18 21  

Total Affected Population   3 18 / 21  

1.3 Social Economic Background of Project Affected Areas

MinhangMinhang District, located in the southwestern part of Shanghai, is shaped

like a key. Situated in 31.05’N and 121.25’E, the district is bordered on the eastern side of Xuhui District, Pudong New Area and Nanhui District. It meets Songjiang and Qingpu Districts in west and Changning and Jiading Districts in east.

Hongqiao international Airport is within the district’s borderline. The Wusong River and Huangpu River also run through the district. Minhang is an important traffic transit hub, a big industrial base in the city’s southwest and an emerging center of scientific technology and aerospace industry.

Minhang’s area accounts for 5.86 percent of Shanghai and its permanent population is about 10 percent of Shanghai .Its gross regional product accounts for 8.2 percent, ranked the third in the city. Minghang is an important base of equipment and manufacturing industry and a center of information technology. Its secondary and tertiary industries are developing quickly in the recent years. The district’s main economic index is always among the tops in Shanghai, No.2 in its fiscal revenues, No.3 in the value-added of Industry, No.4 in the total social retail sales of consumer goods, No.2 in investment absorption and No.1 in sales of newly-built real estate.

Minhang District administers nine towns, one city-rated industrial park and three sub districts with a total of 163 villagers’ committees and 311 residents’ committees.

By the end of last year, the district’s population is 885.8 thousand, 15.2% more than the previous year. About 778 thousand are city dwellers, 6.5% more than the previous year.

In 2007, the added value of the whole district was 97.6 billion Yuan, 15.2% increased by the previous year; financial gross income was 27.22 billion Yuan, 19.6% increased by, including district financial income of 8.57 billion Yuan, 25.4% increased; total industrial value of 333.5 billion Yuan, 10.1% increased; and total retail sale of consumer goods 27.4 billion Yuan, 16% increased by the previous year.

3

Page 12: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

XuhuiXuhui is one of the central urban zones of Shanghai, with an area of

54.8km² and a resident population of 1.06million. 12 colleges including Jiao Tong University, Medical College of Fudan University and 117 scientific research institutions including Shanghai Branch of Chinese Academy of Sciences are located here.

Commercial development has shown a good trend. Residents’ consumption ability is obviously improved; consumption on cars, communication products and goods related to housing is further enlarged. Commodity structure is adjusted in business circle of Xujiahui Area and attention is paid to the economic benefits. Total retail sale of consumer goods is total to be 6.075 billion Yuan finished by Shopping malls such as Ganghui, Dongfang, Liubai, Huijin, the Pacific, and Huilian and computer markets such as the Pacific and Bainaohui. Commerce develops fast.

District economy keeps a fast development and economic structure is further optimized. The annual gross production value of the district is 65.059 billion Yuan, 12.5% increased in terms of comparable price and increase amplitude 3.3 percentage points more than the previous year (see chart 1). Effective progress is made in the adjustment of district economical structure. Added value of the secondary industry is 15.886 billion Yuan, 5.6% increased; added value of the tertiary industry is 49.173 billion Yuan, 14.9% increased. The increase amplitude of added value of the tertiary industry is 9.3 percentage points more than the secondary industry and 2.4 percentage points more than the district economy. Structure proportion of the secondary industry to the tertiary industry is 24.4:75.6. Production value of the tertiary industry is increased by 1.3% to the previous year.

PudongPudong New Area lies in the east of Shanghai and Yangtze River delta,

with Changjiang estuary to the east, Nanhui and Minghang on the south, and Huangpu River on the west and north opposite to Xuhui, Luwan, Huangpu, Hongkou, Yangpu and Baoshan.

Urban comprehensive function of Pudong New Area is quickly improved in the last 10 more years of Reform and Opening. 4 national development zones are taken as the main carrier and promote the function development.

National economy grows sustain ably and rapidly, with production value increased from 6 billion Yuan in 1990 to 210 billion Yuan in 2005 and doubling that for 2000. The average annual growth rate of district total production value is higher than 15%. New industry system, with advanced manufacturing industry and modern service industry as the leading factor, gets further improved with its gross industrial output value beyond 420 billion Yuan (1/4 of

4

Page 13: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

gross industrial value of Shanghai). Among it, the added value of the tertiary industry accounts for 49% or so of the output value. In 2005, total retail sale of consumer goods broke through 40 billion Yuan, and the total volume of foreign export and import amounted to 90 billion dollars, including export trade volume of 37.2 billion dollars.

1.4 Total investment and Capital source

STTPP is a project of urban infrastructure, for which Shanghai City Government takes the responsibility of construction. The construction fund is made up of domestic fund and Word Bank loan. The total investment of STTPP is 438.5 million Yuan, of which the resettlement cost is 36.57 million

Yuan(8.3% of the total), and the resettlement cost is from domestic fund.

1.5 Measures to Avoid Affects

In the period of project planning and designing, in order to decrease the impacts to local socio-economic induced by the project; some effective measures are taken by designing institution and project owner:

A 、 In the period of project planning, while choosing and comparing optimization options, they tried best to consider the impacts on local socio-economic, and took it as key factor for comparing optimization options.2 schemes are made for route of Puxi River-Crossing Pipe: one is laid “along Laomin Road to Huajing Road”; the other is laid “along South Road of Meinan to Fanghe Road”. Through comparison, the first scheme is chosen, for its demolition and environment impact is less than the second.

B、 Optimization design. To reduce demolition and resettlement, pipe-jacking construction is adopted in the whole project, no road-surface excavation included. The site for all the working wells is selected far away from house and cultivated land as much as possible. For those affecting house, the site are chosen in the non-body part of the house, such as fencing wall, flooring and so on.

C、In July, 2008, pipeline designing scheme was readjusted and feasibility research report was renewed. Collective land acquisition in Linjiang village, Sanlin Town in Pudong New Area in the previous designing scheme is avoided and resettlement impact is reduced.

In the period of resettlement action plan and implementation, once land acquisition and house demolition cannot be avoided, following measures should be taken to decrease affects on local community:

5

Page 14: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

A、To strengthen collection of basic information, and make further analysis of local socio-economic actuality and future development, and formulate feasible resettlement action plan combining with local real condition, so it can guarantee DPs don't make a loss due to project.

B、To encourage public participation and accept the supervision from the mass. In the compilation of RAP, suggestions of different parties are accepted, especially those of the affected units and persons.

C、To emphasize internal and external monitoring, and set up effective and smooth feedback mechanism and channel, try all best to shorten the period of information treatment, in order to safeguard all kinds of issues, emerging in construction implementation, would be settled timely.

1.6 Linkage Projects

Sewage collected by the completed trunk in Puxi Section Project will be drained to Bailonggang Sewage Treatment Plant along Southern

Transportation Trunk( including Eastern Section of Southern Trunk which will

be constructed by Pudong Section Project ) , therefore, Pudong Section Project is linked with Puxi Section Project on their function. The total investment in Pudong Section is 3290.3283 million Yuan with a domestic construction and investment. The project is planned to begin in 2010 and be put into operation in the end of 2012. So, resettlement policy frame is compiled for Pudong Section Project.

6

Page 15: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

2 Project Impacts

2.1 Project Impact Survey

In April, May and July, according to the requirement of World Bank, Shanghai Urban Drainage Corporation organized together a special investigating group to investigate the impacts of land acquisition and house demolition caused by the project. The mode of combination of investigating households one by one and interview are adopted. It covers the quantity of affected households, family population, condition of affected enterprises and institutes, condition of shops and resettlement option. When the survey was carried out, displaced persons participated in the whole process. The opinions on land acquisition and resettlement of village committee and villagers are taken into consideration and wide discussion is carried out also.

2.2 Project Impact Scope

The project is concerned about 3 administration districts of Shanghai (Minhang, Xuhui and Pudong), shown in Table 2-2. In August, 2008, according to the latest changing, resettlement investigation team investigated the resettlement impacts of the newly-adding pipeline along Changhua Road. Because pipe-jacking construction measure is adopted, and the working wells having been designed could also be used for the construction of this section, it is affirmed there is no resettlement impacts.

Table 2-2 Villages affected by the project

Impact Type

Permanent Land Acquisition Temporary Land Acquisition

Land Acquisition

Area(Mu)

Affected

Household

Affected

Population(Person)

Affected

Enterprises

Land Acquisition

Area(m2)

Affected

Household

Affected

Population(Person)

Affected

Enterprises

Bailonggang Southern Trunk SewerOf which:Puxi Crossing and Connection Pipe (Bank Financed)

Minhang

0 0 0 0 625 0 0 1

Xuh 11 0 0 0 2750 0 0 4

7

Page 16: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

uiPudong

0 0 0 0 5100 0 0 0

Pudong Section:FSR is not finally approved, so the resettlement impacts could not be affirmed.

Total

11 0 0 0 8475 0 0 5

2.3 Permanent State-Owned Land Occupation

11 Mu state-owned lands are occupied permanently by river-crossing pump station of Puxi Section Project. The site is selected in Huajing Harbor on the side of Huangpujiang River which now has been programmed as ecological and greening land.

2.4 Temporary Land Occupation

Temporarily occupied land in this project is caused by the pavement for working wells. Both collective land and state-owned land are temporarily occupied, including 1925 m2 (about 2.9 Mu) temporary collective land occupation, in Table 2-3; and 6550 m2 (about 9.8 Mu) state-owned land, in .

Table 2-3 List of Temporary Collective Occupation

Project NameWorking

WellDistrict Town Village

Collective Non-agricultural

land (m2) Affected

PopulationConstruction

Land

Virescence

Belt

Puxi River-

crossing and

connection

pipe

Laomin

Rd. 2# Xuhui Huajing Huapu

625   None

Huajing

Rd. 3#500 None

Linpu

Rd. 1# Pudong Sanlin Linjiang

  400 None

Linpu

Rd. 2#   400 None

Total 1125 800 None

Table 2-4 List of temporary state-owned land occupation Project Name Working Well District state-owned land (m2) Affected

8

Page 17: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

UnitRoadVirescence

BeltOther

Puxi River-crossing

and connection

pipe

Laomin Rd. 1# Minhang 625Meilong

Gas Station

Huajing Rd. 1#

Xuhui

300 200 Xuhui Gym

Huajing Rd. 2# 400 100

City

Planning

and

Gardening

Department

Huajing Rd. 4# 625Huajing

Park

Outer Ring Rd. 1#

Pudong

200 800Gardening

Department

Outer Ring Rd. 2# 200 800Gardening

Department

Outer Ring Rd. 3# 100 2200Gardening

Department

Total 1200 4525 825  2.5 Affected Enterprises

5 enterprises are affected by the project: 1 is in Minhang District, and 4 are in Xuhui District. 2 enterprises are on the collective land, and the other 3 are on the state-owned land. 2285 m2 houses are demolished, including 1100m2 storehouses, 1000m2 brick-mixed storied building, 155m2 brick-mixes bungalow, 30m2 simple houses. 3345m2 auxiliary buildings are demolished, of which 290m2 bounding wall, and 3055m2 grounds. Details could be seen in Table 2-5.

Table 2-5 List of Affected Enterprises

Project Name

Working Well

Enterprise

House Demolition

Remark

Main Building(m2)Auxiliary

Building(m2)

Rd.No

.

Storehous

e

Brick-

mixed

Storied

Building

Brick-

mixed

Bungalow

Simpl

e

House

Boundin

g Wall

Groun

d

Puxi River-

crossing and

Connection

Pipe

Laomi

n

1# Meilong

Gas

Station

155 20 On the

State-

owned land

2# Shanghai 600 100 On the

9

Page 18: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Project Name

Working Well

Enterprise

House Demolition

Remark

Zhangqin

Corporatio

n

collective

land

Huajin

g

1# Xuhui Gym 10 50 625

On the

State-

owned land

3#

Linzhi

Electric

Corporatio

n

500 300

On the

collective

land

Pump Station

Shanghai

Zhuan

Corporatio

n

1000 240 2030

On the

State-

owned land

Total 1100 1000 155 30 290 3055

2.6 Affected Unlicensed Structure

Unlicensed structure refers to those houses that are constructed privately without any relative licenses issued by house property department, or land department. Besides, overdue temporary structures also are involved.

The resettlement investigation team affirms that there is no unlicensed structure in this project after field survey.

2.7 Affected Population

Through investigation, resettlement impact is little. One part of the temporary land occupation is collective land; the other part is state-owned land, so there is no affected population. The enterprises demolition doesn’t cause shutout and idleness, so only the managers and legal persons are affected. 5 enterprises and 21 persons are affected. Details could be seen in Table 2-6.

Table 2-6 List of Affected Population

Item

ShanghaiSubtota

lMinhan

gXuhui

Pudon

g

Affected

enterprises

Quantity 1 4 5

Of which: Enterprises of which the 0 2 2

10

Page 19: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Item

ShanghaiSubtota

lMinhan

gXuhui

Pudon

g

houses are rented from village

Enterprises of which the houses

are owned by the legal person and

constructed in state-owned land

1 2 3

Affected Population 3 18 21

Of which:Manager and Legal Person 3 18 21

Employee / / / /

2.8 Affected Infrastructure and Ground Attachments

There are 5 ground attachments affected by the project, including street trees, watch boxes, virescence belt, canals, and so on. See details in Table 2-7.

Table 2-7 Affected Infrastructure and Ground Attachments

ItemAffected Infrastructure and Ground Attachments

Name Unit Quantity

Puxi River-crossing and connection pipe

Street trees / 8

Watch boxes set 1

Virescence belts m2 3000

Overhead pipeline

Communication cable (type of six) KM 12

High pressure electric pole / 1

Communication copper cable (type of 4) KM 0.1

Aerial cable (type of 4) KM 0.2

Street lamp pole / 1

Aerial electric pole / 1

Underground pipeline

Water pipe (type of 300) KM 0.04

Water pipe (type of 250) KM  Communication copper cable (type of 2) KM 4

Electric cable (type of 2) / 2

11

Page 20: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

3 Analysis on Resettlement Impacts

To know project impacts, according to the requirements of the world bank, in May, 2008, investigation on land acquisition and house demolition were carried on to Puxi River-crossing and connection pipe project, by a special investigation team organized by Shanghai Urban Drainage Corporation and Shanghai Design Institute, and analyses were made to different resettlement impacts. During the process of resettlement impacts investigation, there is no minority population, and the investigation team affirmed no minority area in the project area.

3.1 Impacts Analysis on Temporary Land Acquisition

An area of 8475 m2 (12.7mu) is temporarily occupied in the project, including collective land 1925 m2 (2.9mu) and state-owned land 6550 m2 (9.8mu). Its temporary occupation period is below one year, and the land will be leveled and recovered immediately after construction.

In the temporarily acquired collective land, 1125m2 is land for the tertiary industry, and 800 m2 is greenbelt. The houses on the affected land for the tertiary industry are all rent out for commercial use. For the amount of the affected land for the tertiary industry is little and it’s dispersed, no stop-production is caused to the impacted enterprises. The affected plants for greening etc. could be recovered with little effect.

Road and greenbelt take the main part in the temporarily-occupied state-

owned land, totally 5725 m2(8.6mu) ,the rest occupied land is the road or

site of some enterprises, totally to be 825 m2 (1.2mu) based on the investigation. State-owned road and greenbelt could get immediate recovery after the occupation period and little impact is caused. Through on-site survey, no impact will be caused to the operation of the enterprises by the land occupation.

3.2 Impacts Analysis on Enterprises

Five enterprises are affected in the project, 2 of which rent rural collective housing for the tertiary industry, and the rest three of which are the direct

12

Page 21: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

property owner. Through investigation, houses of the 5 enterprises are little affected, so no impact will be caused to its regular production or operation and no direct effect will be caused to its workers.

House demolition of the affected 5 enterprises is divided into 2 parts: one is of the main body part and the other is of the auxiliary buildings (such as fencing wall and site).

As to the main body part demolition: 4 enterprises are partly demolished, including houses, storehouse, or simple houses; and 1 enterprise which has been bankrupted is totally demolished.

As to the auxiliary building demolition: all the 5 enterprises are involved, with only a little impact.

Effect to each enterprise are shown in Table 3-8

Table 3-8 Impact to each enterprise

EnterpriseImpact analysis

Main buildingImpact degree

Auxiliary buildingImpact degree

Meilong gas stationPartly demolished, the affected house is for storage.

Tiny

Only part of the fencing wall and site with a small area is affected

Tiny

Shanghai Zhangqing Commercial and Trade Co., Ltd.

Storehouse is partly demolished.

Tiny Tiny

Xuhui Gymnasium Simple house is partly demolished, which is used as doorkeeper pavilion.

Tiny Tiny

Lingzhi Electrical Device Company

Simple house is partly demolished, which has been abandoned.

Tiny Tiny

Shanghai Zhuan Co., Ltd.

Totally demolished Small Small

13

Page 22: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

4 Legal and Policy Framework

4.1 Laws and Policies Referred in Resettlement

The Land Administration Law of P.R.C. (effective on January 1 1999, revised in August 28, 2004)

The Urban Real Estate Administration Law of P.R.C. (effective on January 1, 1995)

The Urban House Demolition Administrative Regulations (effective on January 1, 2001)

Shanghai Implementation Measures on Land Administration Law of PRC (Shanghai government, No.41 in 2000)

Implementing Rules of Shanghai Municipality for the Administration of Urban Houses Demolishment (Shanghai government, No.111 in 2001)

The Measures of Rural House Demolition Management for Urban Construction in Shanghai (effective on February 1, 2000)

The Measures of Granting Land Use Right in Shanghai (effective on October 30, 1996)

Compensation Standard for Collective Land and property Acquisition in

Shanghai (trial implementation) (Hu Fang Di zi [2005] No. 203)

World Bank OP4.12 Involuntary Resettlement and Appendix (January 1st 2002)

4.2 Resettlement Policies of the Project

All the resettlement policies carried out in this project are under resettlement policies of P.R.C, Shanghai People's Government and of the World Bank, Minhang District Government, Xuhui District Government, Pudong New Area Government and World Bank.

4.2.1 Resettlement Policy of Demolished Enterprise Appraisal

The replacement price of demolished enterprises and establishments

14

Page 23: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

should be appraised by legal and qualified real estate evaluation institution. The compensation price of demolished houses should be made on the basis of benchmark price issued by the government when the House Demolition License is granted, considering house location, construction structure, construction area, floor, fitment and other elements. Before the appraisal price is confirmed, the appraisal institution should take the affected persons’ suggestion into consideration.

Resettlement Policy

Demolishing the enterprises of which the houses are rented from collective economic group’s houses for tertiary industry:

Through investigation, impact on enterprises of this type is little. After negotiation among project unit, village committees and enterprises, the monetary compensation would be adopt, and the compensation fund for building should be obtained by the village economic group who is the property owner. By affirming together, project owner and enterprise owners agree that resettlement is unnecessary because the project has no impact on the management and production activity.

Because the land on which the enterprises houses are demolished is acquired temporarily, the project owner would entrust the construction units to recover the land, and the village economic group would resume the former buildings on the ground, when the construction is completed (might be 1 year).

Demolishing the enterprises of which the houses are on the state-owned land and owned by the legal persons or managers:

Through investigation, and after negotiation between project owner and principal of demolished enterprises, it is determined to adopting monetary compensate to the lightly demolished enterprises (except Shanghai Zhuan Co., Ltd.)

Because the land on which the enterprises houses are demolished is acquired temporarily, the project owner would entrust the construction units to recover the land, and the enterprises themselves would resume the former buildings on the ground, when the construction is completed (might be 1 year)

All the buildings of Shanghai Zhuan Co., Ltd. Would be demolished, however, the monetary compensation would be adopt because the enterprise

15

Page 24: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

has been shutoff even before this project, and all the production and business activities are stopped.

4.2.2 Compensation Policy for Affected Ground Attachments

Affected infrastructure and ground attachment will be compensated by project construction institutes and be reconstructed by owners. Those that have brought into engineering project will be reconstructed by project construction institutes.

16

Page 25: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

5 Compensation Standard

The compensation standard is decided according to the above legal framework and actual conditions in the affected municipalities.

5.1 Compensation Standard for State-owned Land

Through investigation, the state-owned land to be permanently acquired has been programmed as ecological and greening land, so the land would be obtained by remising way. As to the land remising price, in the first half year of 2008, PMO negotiated with Shanghai Housing and Land Administration Bureau, Shanghai Planning Bureau, Shanghai Construction Committee and so on several times. Finally the remising price is determined as following.

Remising price: 1600 thousand Yuan/Mu。5.2 Compensation for temporary land acquisition

The temporary land acquisition of this project involves rural collective land, enterprises’ land, and other state-owned land. By consulting with the affected collective economic groups, enterprises and relevant units, the compensation standard is made as follows:

Rural collective land3

Temporary land acquisition fee:24 Yuan/m2 per year(Minhang, Xuhui) 22 Yuan/m2 per year(Pudong)Common virescence compensation: 300 Yuan/ m2

State-owned virescence belt(According to compensation standard of

temporary greenbelt acquisition in Shanghai)3 For the rural land, no matter which type and usage of the land are, the compensation standard would be made according to vegetable land of 5 crops a year. It means the compensation standard would be calculated as 5 times of the young crops compensation standard of vegetable land. However, there is no young crops compensation for the land, because the affected land is not used for agricultural planting, but for tertiary industry.

17

Page 26: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Temporary land acquisition fee(According to greenbelt of level 1): 3 Yuan/ m2 per year

Virescence belt compensation: 450 Yuan/ m2

5.3 Compensation for house demolition

5.3.1 Rural non-residential house

Rural non-residential houses of this project include the houses on the collective land for the business activity of enterprises and shops. Because the land where the houses locate would not be permanently acquired, the demolished houses would only be compensated according to the buildings’ value. The detail compensated standard is made on the basis of Compensation Standard for Collective Land and Property Acquisition in Shanghai (trial implementation). See Table 5-9.

Table 5-9 Compensation standard of rural non-residential houses

Type Content UnitCompensation

Standard(Yuan/unit) Remark

Main

Building

Brick-mixed bungalow M2 526

Storehouse M2 418

Simple house M2 150

Auxiliar

y

Building

Fencing wall M2 140

Ground M2 82

5.3.2 Urban non-residential houses

Urban non-residential houses of this project include enterprises’ houses on the state-owned land. According to Implementing Rules of Shanghai Municipality for the Administration of Urban Houses Demolishment and the lowest compensation price of urban house demolition, the standard is made as follows:

Table 5-10 Compensation standard of urban non-residential house Type District Standard(Yuan/m2)

Main BuildingXuhui 3700

Minhang 3590

Simple House 150

Fencing Wall 140

18

Page 27: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Ground 82

5.4 Compensation for the impacts on enterprises production and operation

Because it is a type of pipeline project, the demolition would not cause stopping production to the enterprises, however, considering the construction period might be half a year to one year, the project management office decides to give proper compensation which would be calculated by the demolished house area, after negotiating with affected units. The standard is made as follows:

Enterprises on the collective land:250Yuan/m2; Enterprises on the state-owned land:300Yuan/m2。

5.5 Compensation standard for infrastructures

After the negotiation with relevant property owners, the compensation standard for infrastructures is made as following:

Table 5-11 Compensation standard for infrastructures

No. Name UnitStandard(Yuan/

unit)

1 Street trees / 2500

2 Watch box / 50000

3 Overhead pipeline    3.1 Ventilation cable (type of six) KM 180000

3.2 High pressure electric pole / 200000

3.3 Communication copper cable (type of 4) KM 200000

3.4 Aerial cable (type of 4) KM 1200000

3.5 Street lamp pole / 230000

3.6 Overhead electric pole / 40000

4 Underground pipeline    4.1 Water pipe (type of 300) KM 1340000

4.2 Water pipe (type of 250) KM 1000000

4.3 Communication copper cable (type of 2) KM 240000

4.4 Electric cable (type of 2) KM 40000

19

Page 28: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

5.6 Other compensation standard

According to the resettlement impact types and relevant standard in Shanghai, following standard is made in Table 5-12.

Table 5-12 Relevant cost and fee No. Item Standard Receiving object

1

Fee of

reconnaissance,

design and scientific

research

3% of the total land acquisition and

house demolition fund 

2Management fee of im

plementation

5% of the total land acquisition and

house demolition fund 

3 Technical training fee3% of the total land acquisition and

house demolition fund 

4 Contingency cost10% of the total land acquisition fund and

house demolition fund 

5External monitoring fe

e2% of the total resettlement fund

Exterior Monitoring

Unit

6 Internal monitoring fee 1% of the total resettlement fund Interior Monitoring Unit

20

Page 29: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

6 Resettlement Scheme

6.1 Resettlement Objectives

The displaced persons should be ensured to gain compensation for all of their loss, to share project benefit by proper resettlement and good restoration, to provide subsidy for their temporary difficulties, and to increase their income level, living standard or at least to restore them. Enterprise production, profit making abilities should be improved or at least equal level prior to the beginning of project implementation. Considering the resettlement impact analysis (see Chapter 3), the resettlement scheme is made.

6.2 Resettlement Principles

6.2.1 Principle of Reducing Resettlers as much as possible

With the characteristics of zonal construction in the project, the design direction can be altered properly to reduce the affected area of the project as much as possible, so as to reduce resettlers.

6.2.2 Principle of Equally Compensating

In order to ensure resettlers’ living standard do not decrease because of project, principle of equally compensating should be employed which including two parts, one is to compensate property by replacement cost, the other one is to compensate as actual for other damages.

1. Resettlement family shall gain resettlement house whose transportation, all kinds of affiliated facilities and surroundings is equal to the original house or the same value of original house.

2. The enterprises will keep original organizational chart and house scale with same functions to restore original business environment as much as possible or gain the same valuable compensation. Meanwhile, production stop and shutout affected by project should be compensated, which is called shutout compensation.

3. Public facilities will be restored fully and their functions should not be lower than original level at least to guarantee unmoving residents’ natural living in the surroundings of project.

4. Those who do not affected temporarily and those whose property has

21

Page 30: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

been damaged partly but no need to move, equal compensation will be allocated too.

6.2.3 Principle of Focusing on Emphasis

1. The vulnerable groups should be paid attention in the project (such as the old who has no adult children living together with, widows, single family, the handicapped, chronic patients and poor families). In movement, the preferential policies including housing, employment will favor them. Meanwhile, after movement regular re-visit will be done too for help to particular difficulties until transferring them to local civil governmental departments.

2. Project will plan exploitative movement to mobilize local governments’ power to carry out resettlers’ employment training and create employment opportunity as much as possible to accustom resettlers to resettlement environment in short time, therefore to transfer the responsibilities of resettlement from resettlement organizations to resettlers themselves.

3. Project will try its best to maximize cost and benefit of resettlement to develop resettlement ability of the organizations, to standardize resettlement behavior, to establish perfect inside control system, to prevent fund wasting, cutting, embezzling and corrupting to utilize resettlement funds well to reach best resettlement effect; that is to say, in indicators of enacted resettlement effect, project is to try best to reduce resettlement cost.

6.3 Restoration of Temporarily-Occupied Land

Resettlement scheme is established under combination with analysis on impacts of temporary land acquisition and full consultation with the APs. The scheme is shown as following:

Affected village

The village economic group should obtain the temporary land acquisition compensation according to standard;

After the construction period, the construction unit should level and recover the land.

Affected enterprises who rent the village’s buildings for tertiary industry

For those enterprises, they could obtain compensation on the affected production and operation, on basis of the standard consulted and confirmed

22

Page 31: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

by project office and the affected units;

And after construction, the construction units are required to be in charge of land-leveling.

Enterprises on the affected state-owned land

For enterprises on state-owned land, they could obtain compensation on the affected production and operation, on basis of the standard consulted and confirmed by project office and the affected units;

And after construction, the construction units are required to be in charge of land-leveling.

Landscape greening department

Landscape greening department will obtain monetary compensation on its greening belt according to the actual value;

And could get temporary land acquisition fee;

After construction, the construction units are required to be in charge of land-leveling.

Municipal road department

After the period of temporary land occupation, the construction units are in charge of road recovery.

6.4 Resettlement for non-residential houses demolition 6.4.1Demolished enterprises

For the demolished enterprises, because the resettlement impact is little (see chapter 3.4), moving and stopping-production is not caused, and there is no need to resettle any person. Of which:

Enterprises of which the houses are rented from collective economic groups’ houses for tertiary industry, the demolition compensation fund would be given to village economic group directly, and then village economic group should give proper compensation to the enterprises according to the use of the houses. Detail compensation way and standard should be determined on the basis of negotiation result. When the construction period is finished, the project owner should entrust the construction unit to level and recover the ground and the village economic group should rebuild the former buildings (fencing wall etc.) for

23

Page 32: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

the enterprises

For the enterprises of which the houses are owned by the legal persons or managers, they will directly get the compensation fund for the demolished buildings. The permanently acquired land is only the land where Shanghai Zhuan Co., Ltd locates, and the land of the other 3 enterprises would be leveled and recovered after the construction, so the enterprises could rebuild the former buildings with the compensation fund. The land where Shanghai Zhuan Corporation locates has been programmed as ecological and greening land by Xuhui District Government, so the land would be acquired by remising way after negotiating with land administration department, planning department and greening department in Xuhui District. The remising fee would be paid to Housing and Land Administration Bureau of Xuhui. Now Shanghai Zhuan Corporation is bankrupted, so the monetary compensation would be adopt through negotiation between the principal of the corporation and the project owner.

6.5 Affected Infrastructure and Ground Attachment

The affected infrastructure and ground attachments should be compensated to ownership enterprises by project organizations and then reconstructed by the ownership enterprises.

The rehabilitation measures on demolished facilities should be planned and disposed in advance. And in the actual implementing, due to different conditions different measures should be made for safety, high efficiency, being in time and exact to reduce bad effect on the surrounding groups as much as possible.

As for the affected municipal public facilities, the demolishers should demolish according to project’s stakes map on the principle of no impact on project construction to reduce movement as much as possible. As for movement of the affected pipelines, demolishers should reconstruct (or remove) before demolish to ensure nature living of residents along the lines including the residents who do not need to move.

24

Page 33: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

7 Public Participation

7.1 Public Participation and strategy

According to national, Shanghai policies and regulations about land acquisition and demolition, project should protect the legal rights of displaced persons and enterprises reduce the discontent and dispute. So, at the rebuild and construction of project, displacement and resettlement policy and implementation rules, resettlement plan should be prepared well to achieve the goal of resettlement successfully and this project pays much attention to consult with displaced person and listen to their opinions on resettlement policy, plan and implementation.

During the project preparing phase--feasibility study phase, Shanghai Urban Drainage Corporation has consulted the opinions and suggestion on resettlement and the project from affected persons and units.

Publish the RAP. The RAP will be placed in Shanghai Urban Drainage Corporation and on the webpage of affected towns after it is approved by World Bank. May 2008, and will be propagated the notice in local newspapers so that DPs and Non-governmental Organizations can look it up. Main contents of RAP are compiled as information handbook of displaced persons, which should be put out to enterprise and representative shops after project was evaluated before the movement. Main contents of information handbook of displaced persons are: general situation of project, project effects, compensation policy, implementing agency, appeal channel, etc.

7.2 Public Participation Process and Policy Disclosure

To correctly and timely deal the problems and requests of affected persons occurred in land acquisition and house demolition, further consultation should be carried out so that all problems can be solved before the implementation of RAP. Resettlement implementation institutes will arrange public participation meetings, so as to provide affected persons with opportunity to consult with resettlement implementation institutes before signing demolition compensation contract.

25

Page 34: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Table 7-13 Public Participation Process of Affected PopulationTime Place Participator Content Remark

April, 2008Affected township go

vernment

Representatives from

township government

and affected units

Social economic

investigation,

resettlement impact

investigation

Resettlement impact

during the social

economic investigation

period

May, 2008

Hangnan Village,

Meilong Town,

Minhang District

The representative of

cadres of villages,

affected units and

persons

Compensation and

resettlement policy

and the draft

resettlement scheme

Primary negotiation in

preparation for

resettlement plan

May, 2008Affected township go

vernment

Representatives from

township government

and affected units

Compensation and

resettlement policies

and resettlement

programming

Further negotiation of

compensation policies

and rehabilitation plan in

amending resettlement

May, 2008

Shanghai Jingyang

Real Estate

Company

Representatives from

project owner unit and

Shanghai Jingyang Real

Estate Company

Resettlement policies

and particular

questions of

programming

Makeup negotiation for

particular questions in

final version of

resettlement

Table 7-14 Policy Disclosure Process

ItemPublicizing Type and

used languageDate Place

Project introdution Chinese,project

introduction handbillMarch, 2008 Affected town

General introduction of

information on land

acquisition and house

demolition

Chinese, prophase esti

mation handbillApril, 2008 Affected town

Land acquisition and house

demolition policy of

Shanghai

Chinese, policy test April, 2008 Affected town

Notice on publishing RAP Chinese, RAP text After approval from World Bank Community

Publicizing the RAP on

newspaperChinese, newspaper August, 2008 Newspaper

RAP information brochureChinese, delivered to

the APs After approval from World Bank Community

RAP Chinese,English After approval from World Bank Libraries

26

Page 35: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

8 Greivance and Complaint Procedure

During the compilation and implementation of project resettlement plan, the affected people and institutions were and will be always put a high value upon and the grievance mechanism was established. Four phases of grievance are as

follows:Chart 8-1 Grievance and Complaint Procedure

Phase 1:If the affected persons feel damaged by resettlement activity, they could appeal by verbal or paper way to: (1) Resettlement office in Shanghai Urban Drainage Corporation; (2) Local Housing Management Office. If by verbal way, disposal and written record are needed, and the relevant agencies should solve it in 2 weeks.

Phase 2:If displaced persons are still unsatisfied with the decision of phrase 1, they can appeal to local housing management office after being noticed the decision. At the same time, demolished persons who have dissensions about the appraisal results, they could appeal to Shanghai Real Estate Assessor Committee for further appraisal.

Phase 3:If displaced persons are still unsatisfied with the decision of phrase 2 or get no answer from local housing management office after 15 days, they could appeal to Shanghai Housing and Land Administration Bureau (SHLAB) during 3 months. And SHLAB should make a decision during 1 month.

Phase 4: If displaced persons are still unsatisfied with the decision of phrase 3, they could appeal to people court during 15 days according to administration procedure law.

27

Page 36: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

9 Institution

9.1 Resettlement Agency

To ensure the smooth implementation of this RAP, organizations should be established for the planning, harmonizing and monitoring of resettlement activities. The institutions responsible for planning, implementation, management and monitoring of resettlement activities involved in STTPP are:

Shanghai Develope and Reform Committee

Shanghai Construction and Management Committee

Shanghai Water Affairs Bureau

Shanghai Urban Drainage Co., Ltd

Shanghai Urban Planning and Administration Bureau

Shanghai Housing and Land Administration Bureau

Demolition Management Office of Districts

Shanghai Municipal Designing Institution

Resettlement Monitoring Agency

Shanghai Develop and Reform Committee & Shanghai Construction and

Management Committee is responsible for land acquisition, demolition, directing

resettlement implementation, making policy and examining the RAP.

Shanghai Water Affairs Bureau is responsible for coordinating the

administration work, collecting the special capital of water affairs and answer for

the appeal from APs.

Shanghai Urban Drainage Co., Ltd is responsible for coordinating the

project construction work and contacting with World Bank, such as:

Entrusts designing institutes to define the scope of affected area.

Appeals to municipal planning bureau for “License of planning using

land”, and to housing and land administration bureau for “License of

construction land” and “License of house demolition”.

28

Page 37: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Investigates all the residential houses and enterprises in the range of

land acquisition area.

Signs agent agreements with demolition units in the district.

Answer for the persons or units affected by demolition.

Shanghai Urban Planning Administration Bureau: check the application of

“License of planning using land” from Shanghai Urban Drainage Corporation and

the approval documents for the preliminary design, affirming the land acquisition

range, and granting “License of planning using land”.

Shanghai Housing and Land Administration Bureau: granting “License of

construction land” and “License of house demolition”, and monitoring the

implementation of resettlement process.

Demolition management office of Districts: is the main agency of

resettlement, Measuring and check the land acquisition area, land property,

affected population and investigating the land using situation, resettlement

activity, and comparing with RAP.

Shanghai Municipal Design Institution: affirming the project design and

demolition area.

Independent Resettlement Monitoring Agency: monitoring the resettlement

activity.

29

Page 38: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

9.2 Organization Chart

City government

City Construction Committee City Develope and Reform Committee

City Housing and Land Administration Bureau

City Water Affair Bureau

City Planning Bureau

Shanghai Urban Dainage Co., Ltd District Planning Bureau

Project design Agency

Project construction and Administration Agency

District Construction Committee, District Water Affair Bureau, and demolition management department

Independent monitoring agency Township government, Village Committee

Demolition company

Affected household Affected enterprise

30

Page 39: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

9.3 Responsibilities

9.3.1 Shanghai Develop and Reform Committee, Shanghai Construction and Management Committee & Shanghai Water Affairs Bureau

Responsible for directing, organizing, coordinating, making policies, reviewing the RAP, implementing interior inspection and making decision of important issues in resettlement.

9.3.2 Shanghai Urban Drainage Co., Ltd

Entrusts designing institutes to define the scope of affected area.

Organizes to conduct socio-economy survey.

Consults and organizes the RAP, and participates in its compilation

Implements RAP

Arranges and coordinates the implementation of RAP according to project construction schedule

Appropriates fund and supervises its use

Organizes and carries out internal monitoring, chooses and determines external monitoring institution and coordinates external monitoring activities.

Organizes and carries out internal monitoring, chooses and determines external monitoring institution and coordinates external monitoring activities.

Check the monitoring report

Deals with conflicts and complains

Regularly submits reports on land acquisition progress, utilization of fund, the implementation quality and so on

9.3.3 Shanghai Urban Planning and Administration Bureau & Shanghai Housing and Land Administration Bureau

Carries out related national policies and regulation of project construction land.

Participates in examining compensation rate for land acquisition and attachments.

Goes through approval procedures for land acquisition.

Participates in socio-economic survey.

Participates in compiling and examining RAP.

31

Page 40: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Issues prejudication report of construction land.

Directs, coordinates and supervises land acquisition and resettlement implementation activities.

Assists to coordinate and resolve conflicts and problems in the process of land acquisition and money-transferring.

9.3.4 Demolition Management Office and water affair bureau of Districts

Participates in socio-economy survey.

Consults to compiling resettlement methods with affected units and participate compiling RAP.

Approval for related demolition formality.

Conducts information management of land acquisition, house demolition and resettlement.

Assists to resolve issues in resettlement.

9.3.5 Shanghai Municipal Designing Institution

Reduces project effects through optimization of design.

Determines affected scale of land acquisition and house demolition.

9.3.6 Resettlement Monitoring Agency

As an independent monitoring institution, it will monitor each aspect of RAP and its implementation, and submit independent monitoring and evaluating report to Shanghai Urban Drainage Co., Ltd. and the World Bank. Detailed responsibilities are as follows:

(1) Carries out socio-economy survey in programming areas;

(2) Evaluates detailed impacts and restoration of DPs’ production and livelihoods;

(3) Analyzes data;

(4) Monitors the whole process of RAP implementation, and submits monitoring report to Shanghai Urban Drainage Co., Ltd and the World Bank. The detailed responsibilities of the institute are explained in the part of external monitoring and evaluation.

32

Page 41: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

9.4 Organization Ability and Staffing

The leading team of the project is composed of Shanghai City Government and cadres of the administration departments. They are full of experiences, and can organize and coordinate the resettlement activity well.

Resettlement agency is equipped well and the staffs are professional. The information channel is smooth. The management and implementation agencies have good communication and transportation equipments. There are 22 professional staffs, even more as 43 during high peak period. Details could be seen in Table 9-15.

Table 9-15 staffing of the resettlement institutes involved in the project

Resettlement institutesFull-time sta

ff (person)

Staff at peak

hours (person)Staff composition

Shanghai Develop and Reform

Committee2 3 Governmental personnel

Shanghai Construction Management C

ommittee2 4

Governmental personnel, engineerin

g technician

Shanghai Water Affiair Bureau 2 3Governmental personnel, engineerin

g technician

Shanghai Urban Drainage Co., Ltd. 3 7Governmental personnel, engineerin

g technician

Shanghai Planning Administration Bure

au2 3

Governmental personnel, engineerin

g technician

Shanghai Housing and Land

administration Bureau2 4

Governmental personnel, engineerin

g technician

Demolition Management Office of

District3 7

Governmental personnel, engineerin

g technician

Shanghai Municipal Design Institution 2 4 Senior engineers, engineers

Independent Exterior Monitoring Agenc

y4 8

Experts on resettlement and

sociologists

Total 22 43

9.5 Measures for Strengthening Institutional Capacity

In November and December 2007, engineering technicians of Shanghai WB Project Office have provided training for staffs on land acquisition, house demolition and resettlement, including the World Bank OP4.12, related land acquisition and demolition laws, socio-economic survey theory and methods etc.

Before the implementation of RAP, the staffs will receive trainings about resettlement operation rules of the World Bank, the regulations

33

Page 42: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

of land acquisition and house demolition, implementation and management of resettlement, in order to increase the professional quality and the abilities of policy-handling.

In the implementation of RAP, it is planned to organize key staffs engaging in resettlement to study and investigate other domestic projects financed by World Bank, and offer resettlement policy training and other professional training to them. Meanwhile, skill trains will be provided to strengthen employment capacity of affected persons irregularly.

To ensure that funds and equipment can be obtained in time to increase work efficiency.

Rational division of labor; establish and improve the reward and punishment system for staffs of land acquisition, house demolition and resettlement to arouse their initiative.

To establish a demolition and resettlement information management system. With its help, to manage the data of land acquisition and demolition, to strengthen information feedback, and ensure that each department is well informed. Important problems will be discussed and decided by the leading team.

To strengthen report system and internal monitoring, and resolve the problems promptly.

To strengthen the independent monitoring and evaluation. The independent monitoring and evaluation institution should promptly report to relevant department about the problems and provide suggestions to solve them.

34

Page 43: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

10 Table of Implementation Schedule

10.1Principle of Progress Joint of Resettlement and Construction

According to the schedule, the project is to be finished from July, 2009 to June, 2012, and the involved civil construction will be completed in December, 2011. For the project is carried on by stages and effects occur by stages, the schedule for resettlement goes with the schedule of each sub-project. The main work is planned to begin in June, 2009 and end in November, 2011. The basic principles of connecting the projects are as following:

Land acquisition and house demolition should be finished one month before project begins. The time to start the project will be decided on the basis of land acquisition, house demolition and resettlement.

Before project begins, enough time should be reserved for land acquisition, house demolition and resettlement.

10.2Timetable of Key Tasks in Resettlement Implementation

10.2.1 Principles of Scheduling

Land acquisition and demolition scope of the project will be eventually decided based on each sub-projects’ designing plan and should be finished before the actual measurement and calculation of land acquisition and demolition.

The measurement and calculation of the affected objects will be done, before signing resettlement compensation agreement, jointly by Shanghai Urban Drainage Corporation, related departments and property owners according to red-line maps.

Shanghai Urban Drainage Corporation holds mobilization meetings with attendants of re-settlers and the demolished enterprises to publicize relevant policies of land acquisition, demolition and compensation and resettlement methods before signing resettlement compensation agreement. After the meeting, the notice of land acquisition and demolition should be publicized officially.

Resettlement and compensation agreement with the demolishers and the demolished should be signed after the actual measurement and calculation, and notice of land acquisition and demolition.

Infrastructure should be constructed before demolition.

35

Page 44: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Compensation fund should be settled and released after signing agreement and before moving.

Resettlement work should be examined to make the re-settlers satisfied.

10.2.2 Overall Schedule of Resettlement

According to the preparation and implementation progress, the overall schedule of resettlement in this project is drafted. Proper adjustment will be made due to some little deviation from the plan. Details are shown in Table 10-16.

36

Page 45: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Table 10-16 Schedule for land acquisition and house demolition

37

Page 46: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

11 Expense and Budget

11.1Expense

Expense in the process of land acquisition and resettlement should be included in the general budget. Based on the price of July, 2008, total expense of resettlement compensation is about 36.57 million Yuan, among which, 17.60 million Yuan is for permanent state-owned land acquisition, accounting for 48%; 2.33 million Yuan is for compensation on temporary land occupation, accounting for 6.4%; compensation for house demolition is 4.75 million Yuan (total to be non-residential house), accounting for 13%; compensation for enterprises on impacts of their production and operation is 0.63 million Yuan, accounting for 1.7%; compensation for infrastructures and ground attachments is 4.1736 million Yuan, accounting for 11.41%; all kinds of tax & fee is 7.08 million Yuan, accounting for 19%. Resettlement cost estimation is shown in Table 11-17.

Table 11-17 Budget for resettlement compensation

No. Item Unit Amount

Compensation

standard

(Yuan/unit)

Cost (Yuan) Percentage

1Permanent state-owned land acquisition

      17600000 48.13%

1.1 Land remising fee Mu 11 1600000 17600000 48.13%

2Compensation on temporary land acquisition

      2334425 6.38%

2.1 Collective non-agricultural land       284600 0.78%

2.1.1 Temporary land acquisition fee m21125 24 27000 0.07%

800 22 17600 0.05%

2.1.2Common virescence

compensation m2 800 300 240000 0.66%

2.2 State-owned land       2049825 5.61%

2.2.1Temporary green-land

acquisition fee m2 4525 3 13575 0.04%

2.2.2 Greenbelt m2 4525 450 2036250 5.57%

3Non-residential house demolition

      4753550 13.00%

3.1House demolition of enterprises

on state-owned land       4260950 11.65%

38

Page 47: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

No. Item Unit Amount

Compensation

standard

(Yuan/unit)

Cost (Yuan) Percentage

3.1.1 Main housem2 1000 3700 3700000 10.12%

m2 155 3590 556450 1.52%

3.1.2 Simple house m2 30 150 4500 0.01%

3.1.3 Fencing wall m2 290 140 40600 0.11%

3.1.4 Site m2 2655 82 217710 0.60%

3.2Non-residential house

demolition on collective land      459800 1.26%

3.2.3 Store-house m2 1100 418 459800 1.26%

3.3 Auxiliary house       32800 0.09%

3.3.1 Site m2 400 82 32800 0.09%

4

Compensation for enterprises on impacts of their production and operation

      630500 1.72%

4.1 Enterprises on collective land m2 1100 250 275000 0.75%

4.2Enterprises on state-owned

landm2 1185 300 355500 0.97%

5Infrastructures and ground attachments

      4173600 11.41%

5.1 Street trees / 8 2500 20000 0.05%

5.2 Watch box / 1 50000 50000 0.14%

5.3 Overhead pipeline       2890000 7.90%

5.3.1 Ventilation cable (type of six) KM 12 180000 2160000 5.91%

5.3.2 High pressure electric pole / 1 200000 200000 0.55%

5.3.3Communication copper cable

(type of 4)KM 0.1 200000 20000 0.05%

5.3.4 Aerial cable (type of 4) KM 0.2 1200000 240000 0.66%

5.3.5 Street lamp pole / 1 230000 230000 0.63%

5.3.6 Overhead electric pole / 1 40000 40000 0.11%

5.4 Underground pipeline       1213600 3.32%

5.4.1 Water pipe (type of 300) KM 0.04 1340000 53600 0.15%

5.4.2 Water pipe (type of 250) KM 0.12 1000000 120000 0.33%

5.4.3Communication copper cable

(type of 2)KM 4 240000 960000 2.63%

5.4.4 Electric cable (type of 2) KM 2 40000 80000 0.22%

Subtotal of items 1-5       29492075 80.65%

6 Other taxes and fees       7078098 19.35%

6.4Fee of reconnaissance, design

and scientific research

3% of the total land acquisition

and house demolition fund884762 2.42%

39

Page 48: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

No. Item Unit Amount

Compensation

standard

(Yuan/unit)

Cost (Yuan) Percentage

6.5Management fee of implementa

tion

5% of the total land acquisition

and house demolition fund1474604 4.03%

6.6 Technical training fee3% of the total land acquisition

and house demolition fund884762 2.42%

6.7 Contingency cost10% of the total land acquisition

fund and house demolition fund2949208 8.06%

6.8 External monitoring fee2% of the total resettlement fund

of items 1-5589842 1.61%

6.9 Internal monitoring fee1% of the total resettlement fund

of items 1-5294921 0.81%

7 Total 36570173 100.00%

40

Page 49: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

11.2Annual Capital Utilizing Plan

According to implementation schedule of the project, annual disbursement plan of resettlement compensation was compiled. Details are shown in Table11-18.

Table 11-18 annual investment plan Year 2009 2010 2011 Subtotal

Investment (104 Yuan) 1463 1097 1097 3657

Proportion (%) 40% 30% 30% 100%

11.3Resettlement Capital Resource

According to the project schedule, engineering capital comes from loans of domestic and foreign bank and financial transfer and all resettlement capital comes from owners.

11.4Capital Flow and Allocation Plan

11.4.1 Capital Flow

To ensure that the compensation can be paid to the DPs timely and sufficiently according to the compensation policy and compensation rate in RAP, the capital flow in this project is as following: Shanghai Urban Drainage Corporation directly pays the relevant tax fee to the affected units and Land and House Management Bureau, and at the same time, deposits house demolition compensation, land compensation and resettlement subsidy in bank or credit cooperative based on related agreements. Then the bank or credit cooperative pays the money to affected streets or communities; Young crop compensation and non-residential house demolition compensation will be directly paid to the DPs. Infrastructure compensation and ground attachment compensation are paid to related departments or individuals.

Capital flow is shown in Chart 11-2.

41

Page 50: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Chart 11-2 Capital flow

11.4.2 Allocation and Management

[1] All the expenditure related to demolition and resettlement should be included in the overall budgetary estimate of the project.

[2] Land compensation and house demolition compensation should be allocated before land acquisition and house demolition to ensure appropriate resettlement to DPs.

[3] To ensure land acquisition and resettlement of a smooth implementation, all kinds of financial and supervising organizations should be established to ensure all funds on position in time.

Shanghai Urban Drainage Corporation

The affected units and streets or communities of the APs

办公室(宁波市自来水总公司)

Residents house

Property ow

ners of ground attachent

House and land management bureau

townsBank or credit coorperative

Village com

mittee

The AP

S

shops

Enterpris

and institutions

Counterpart funds of project owner

42

Page 51: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

12 Monitoring and Evaluation

To ensure a smooth implementation of RAP and achieve the aim of properly resettled, according to the requirements of the World Bank Operational Policies OP4.12 <Involuntary Resettlement> and <Resettlement Monitoring and Evaluation of the World Bank Loan Projects in China Business Guide>; the project will monitor and evaluate the implementation of land acquisition and house demolition and resettlement activities regularly. Independent monitoring bodies have two parts: internal monitoring and independent external monitoring.

Internal monitoring is carried out by Shanghai Urban Drainage Corporation, to ensure that land acquisition and house demolition is implemented according to the principle and timetable of RAP. The purpose of internal monitoring is to make resettlement agencies keep good functions in implementation process.

Independent monitoring is carried on to provide a tracking, monitoring and evaluation of land acquisition, house demolition, resettlement and APs’ productivity & living standard by an organization independent from the project implementation agencies. Independent monitoring agency will follow the resettlement activities to evaluate whether the goals of resettlement are achieved through observing <1>RAP, <2> the application of the laws of P.R.C. concerned on resettlement, <3> compliance with the principles of the World Bank’s Operational Directive O.P. 4.12 on Involuntary Resettlement, <4> an improvement in the standards of living of the DPs or at least maintenance of the former living standards. The Independent Monitoring Institution provides suggestions to the institutions for demolition implementation, so as the problems encountered in the implementation can be resolved in time.

12.1 Internal Monitoring

Shanghai Urban Drainage Co., Ltd operates an internal monitoring mechanism to detect resettlement activities. The project office builds a basic database of land acquisition and house demolition and resettlement and uses it to work out RAP, monitor all the resettled households, demolished agencies and shops, and carry out internal monitoring on the whole preparation and

43

Page 52: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

implementation process.

12.1.1 Implementation Procedures

During the implementation, based on the monitoring samples, Shanghai Urban Drainage Co., Ltd. collects and records resettlement information, and will make regular supervision to the project resettlement.

In the above monitoring mechanisms, there is a continuous flow of information with a regular format, to make information correct and clear. As the important component of the internal monitoring system, Shanghai Urban Drainage Corporation, Shanghai Municipal (district) Land and Natural Resource Bureau will carry out periodic supervision and verifications.

12.1.2 Monitoring Content

Resettlement for rural re-settlers

Payment of compensation for re-settlers

Compensation on residential house demolition and resettlement

Compensation on demolition for enterprises and institutions and shops, and resettlement

Restoration and reconstruction of infrastructure

Staffing, training, working schedule and effectiveness of the institutions

Registration and disposal of complain and appeal from re-settlers

12.1.3 Internal Monitoring Report

Shanghai Urban Drainage Corporation will compile an internal monitoring report and submit it to the World Bank every half year.

12.2External Monitoring and Evaluation

12.2.1 Independent Monitoring Institute

Shanghai Urban Drainage Corporation will retain independent monitoring institute to carry out external monitoring and evaluation.

Independent monitoring institution will periodically monitor and evaluate the implementation of RAP, including the progress, quality of resettlement, utilization of funds. It will give advice and suggestions. After tracking

44

Page 53: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

monitoring DPs’ living standard and production condition, the independent monitoring institution will submit monitoring and evaluation reports to the World Bank.

12.2.2 Monitoring Procedure and Contents

⑴To compile working outline for M&E

To⑵ develop software of resettlement M&E information system

⑶To prepare survey outline, questionnaire forms, and recording card of DPs, sampling enterprises and institution

⑷To design sampling-investigation scheme

Sampling scale: for effect in the project is little, complete sampling investigation is adopted.

⑸Basement survey

A basement survey is carried out on the households and the enterprises and institutions affected by land acquisition and house demolition, so as to obtain basement data about their living standards and production condition (including living, business and income).

⑹To establish monitoring and evaluation information system

A monitoring and evaluation information system is established in which all the data are classified and stored in different databank in computer for convenience to analysis and tracking monitoring.

⑺To conduct monitoring survey

Capacity evaluation to resettlement implementation institution: doing survey on its working ability and efficiency

The progress, compensation standard and payment of resettlement

Impact analysis on land acquisition and house demolition

Monitoring shops: on allocation of compensation, the houses for resettlement, moving progress, production restoration, workers’ income, and resettlement quality

Monitoring enterprises and institutions: on allocation of compensation, land acquisition for new site, house building, moving progress, production restoration, income restoration, resettlement quality

Restoration measures for Vulnerable group

45

Page 54: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Public facility: monitoring on allocation of compensation, rehabilitation of its functions, reconstruction progress

Public consultation: participation in compiling RAP and DPs’ participation during implementation, monitoring effects of participation

Appeal of re-settlers: monitoring registration and disposal of DPs’ appeal

To sort monitoring data and to establish databank⑻

⑼To conduct comparing analysis

To compile M&E report based on monitoring pla⑽ n

In June 2009, independent monitoring and evaluation team is established to compile working outline;

In July 2009, preparation should be made for independent monitoring and evaluation, including: working out survey outline and questionnaire, establishing monitoring system, definition task, and choosing monitoring sites;

In Sept 2009, to submit M&E report No.1 (baseline survey report)

Monitoring and evaluation cycle should be reasonably arranged on basis of the actual resettlement progress, until resettlement effect is restored;

To compile post-evaluation report after finishing resettlement.

12.3Monitoring Indicator

Socio- economic indicator: income per capita, GDP, employment rate

Institution indication: staff composition, staff quality, regulations, equipment, efficiency

Re-settlers affected by land acquisition and occupation: compensation fund appropriative rate, production resettlement measure, income changing rate, satisfaction level to resettlement

Demolished residents: compensation fund appropriative rate, satisfaction level to resettlement

Shops: compensation fund appropriative rate, business housing, location changing, operation environment changing, changing rate of worker income, satisfaction level to resettlement

Enterprises and institutions: compensation fund appropriative rate, satisfaction level to resettlement

46

Page 55: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Infrastructure: compensation fund appropriative rate, and function restoration rate

12.4Post Evaluation

After completing the project, based on monitoring and evaluation, post-evaluation will be carried out on resettlement activities. The experiences of success and the lessons to be drawn from land acquisition, resettlement etc. will be summed up to contribute to resettlement in the future. Post evaluation will be conducted by external independent monitoring and evaluation agency entrusted by Shanghai Urban Drainage Corporation. The independent monitoring and evaluation agency should compile working outline of post-evaluation and develop evaluation indicators. It will conduct socio-economic analysis survey, compile post-evaluation report on resettlement of Puxi Section Project of STTPP in Bailonggang Area, and submit it to the World Bank.

47

Page 56: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

13 Entitlement Matrix

Table 13-19 Entitlement Matrix Types of affected DPs Compensation and resettlement policy Standard

Enterprise and institution demolition

Demolish 2285m2

enterprises’ houses, 3345m2

attached buildings. (5 enterprises are affected, 2 renting rural collective houses for the tertiary industry, 3 being the direct property owners)

Enterprises on the state-owned land (holding house property right)

Obtain compensation for enterprises on building demolition and impacts to its production and operation

Main house : 3700Yuan/m2

(Xuhui ) 、 3590Yuan/m2

(Minhang);Simple house:150Yuan/m2;fencing wall:140Yuan/m2;Site:82Yuan/m2;Compensation on impacts to production and operation :300Yuan/m2。

Enterprises (renting house)

Property owner (rural collective economic organization)

Obtain compensation on building demolition

Brick-concrete plain house :526Yuan/m2;Store house: 418Yuan/m2;Simple house:150Yuan/m2;Fencing wall:140Yuan/m2;Site:82Yuan/m2;

Lessee (enterprises)

Obtain compensation on impacts to its production and operation

Compensation on impacts to production and operation :250Yuan/m2。

Temporary land occupation

Temporarily acquire 1925m2

collective land, of which there are 800m2

collective greenbelt;Temporarily acquire 6550m2

state-owned land, of which there are 4525

Land users

Rural collective economic organization

Compensation should be paid according to the occupation time and the lossAfter land occupation, the occupied land should be recovered and provided with compensation on temporary land occupation

Compensation on temporary land occupation:24Yuan/m2(Minhang, Xuhui)、22Yuan/m2(Pudong New Area)Compensation on common greening:300Yuan/m2。Compensation on temporary land occupation :150Yuan/m2。

48

Page 57: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Types of affected DPs Compensation and resettlement policy Standard

state-owned virescence belt.

Landscaping and greening bureau

Compensation should be paid according to the occupation time and the loss, and after land occupation, the occupied land should be recovered and provided with compensation on temporary Greenland occupationGet compensation on afforestation seedlings

Compensation on temporary land occupation:3Yuan/m2;Compensation on greenbelt:450Yuan/m2。

Ground attachment

Totally affect 5 types of public infrastructures and ground attachments, including common street trees, watch box, virescence belt, overhead pipeline, underground pipeline.

Property owners Compensation to units with property rights, from project unit  

49

Page 58: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Appendix1. Project Sketch Map

Note: The line in red color is the project scope.

50

Page 59: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Appendix2. External Monitoring and Evaluation Framework

A. Objectives of resettlement monitoring and evaluationAccording to the request of the World Bank OP4.12 operational guidelines

<Involuntary resettlement>, Annex 3 <monitoring and evaluation of non-voluntary resettlement Technical Guides> of technical papers NO.80 <development project loans from the World Bank—the involuntary resettlement of the policy guidelines> and <resettlement and evaluation of World Bank loan projects in China Business Guide> to independently monitor and evaluate resettlement of Puxi Section Project of STTPP in Bailonggang Area, Shanghai. By checking the progress, fund, management of residential housing demolition and resettlement, and enterprise’s relocation and resettlement, project resettlement is tracked to evaluate. When regularly (two times a year) reporting to the World Bank, project office and the relevant administration department, the independent external monitoring agency should also provide information and suggestion for each unit for reference in making decisions. Through independent monitoring and evaluation, the World Bank and the administration department could full know whether house demolition and resettlement is done on time and achieves the desired objectives in quality, point out the problems and put forward suggestions to improve them.

B Main content of monitoring and evaluation(1) Monitoring and evaluation of procedure in temporary land acquisition

Including: acquisition period① ; ② compensation ; ③ recovering

progress;

(2) Progress of demolition and resettlement of enterprise

Including: house demolition progress and compensation① ;② resettlement;③ production restoration.

(3) Capital implementation and monitoring & evaluation

including:① availability of fund appropriation;② fund using(planned

and actual).

(4) Monitoring and evaluation of resettlement living level

including : ① living condition before house demolition ; ② living

condition after house demolition ; ③ comparative analysis and

evaluation of employment and living level before and after house

demolition

51

Page 60: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

(5) Resettlement Organization Ability assessment and public

participation, complaint

C Technical routeTechnical route of external monitoring and evaluation is shown in the

following.

establishment

Work out an outline of monitoring and evaluation

Establish survey program, survey format, and record cards of typical household

Monitoring investigation

Monitoring ofimplementation organization Monitor affected

householdsMonitor affected

communities

Tidy monitoring data, establish database

Comparative analysis and assessment

Working out M&E report

Whether completing resettlement monitoring

Design sampling investigation programme

Basement survey

Establish information system of monitoring and evaluation

The end

no

Local social-eco. investigation

52

Page 61: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

D External monitoring organizationThe external monitoring and evaluation of the resettlement is carried out

the external monitoring organization approved by the World Bank entrusted by Shanghai Urban Drainage Co., Ltd.

E Organization and division of resettlement monitoring and evaluation External monitoring organization composes of “resettlement monitoring

and evaluation team” being responsible for the specific survey, data collecting, analysis of monitoring and evaluation, and reviewing the results.

According to the involuntary resettlement policy of the World Bank, monitor and evaluate the project resettlement, take charge of preparing the framework of monitoring and evaluation, set monitoring site, be responsible for monitoring and investigation on the spot and analysis of the business, and be responsible for preparing the report of resettlement monitoring and evaluation.

F Methods to resettlement monitoring and evaluation Monitoring and evaluation use a combination method of spot

investigation, counting analysis and expert comprehensive

assessment.

The investigation is done from point to side. The progress, fund,

organization and management of implementation need to be fully

investigated. Sampling survey is done to resettled households.

Sampling survey uses the method of classification random sampling to

track to investigate typical sampling resettled households. The

sampling proportion: 50% of demolition-affected enterprises.

Comprehensive survey uses the method of survey formats, informal

discussion, and inquiry of documents and files and so on.

Except textual information, pay attention to collecting photographs,

audio, video, and other physical information.

G External monitoring and evaluation reportExternal monitoring unit hands in M&E report to Shanghai PMO/Shanghai

Urban Drainage Co., Ltd. and the World Bank every half-year.

53

Page 62: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Appendix3. Resettlement Information Booklet

It is a part of information publication work to notify the policies of land acquisition, house demolition, compensation, payment for discharges, the treatment of complaints as well as accusation procedures. The project IAs shall distribute the Handbooks to the affected villages and APs before close measures and investigation.

A. Project background

1. Project scope

The service region of STTP belongs to Bailonggang area, of which, the north is in the southern side of Zuyuan, the west is in the Minhang boundary, the south is in the Minhang boundary and Nanhui airport express way, the east is in the Changjiang River. The area of service region is 1255km2, and the population is 7120 thousands. STTP includes Western Section Project of Southern Trunk and Southern Trunk Transportation Perfecting Project (STTPP). Presently the western section project has been completed and connected with middle trunk to the Bailonggang Sewage Treatment Plant. Because the actual sewage quantity has disparity with the planning, the eastern section project of southern trunk is suspended. STTPP in Bailonggang area) includes eastern section project and Puxi River-Crossing Pipe and the connection pipe.

2. Project components

STTPP could be divided into 2 parts: Pixy Section Project, including Puxi River-Crossing Pipe, the connecting pipe, and the pumping station; Pudong Section Project, including East Section of Southern Transportation Trunk and Pudong collecting branches. Shanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project, and compile Resettlement Action Plan (RAP). As to Pudong Section project, construction would be done with domestic capital, however, the project scope has not been confirmed, and so Resettlement Policy Framework (RPF) is compiled.

B. Project Impacts

The project is concerned about 3 administration districts of Shanghai (Minhang, Xuhui and Pudong), 2 villages, and 3 towns/streets in Huangyuan County.

Table 1 Villages affected by the project

54

Page 63: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Project Name District Township/Street Village

Puxi river-crossing and connection

pipe

Minhang Meilong /Xuhui Huajing Huapu

Pudong Sanlin Linjiang

11 Mu state-owned lands are occupied permanently by river-crossing pump station of Puxi Section Project.

Temporarily occupied land in this project is caused by the pavement for working wells. Both collective land and state-owned land are temporarily occupied, including 1925 m2 (about 2.9 Mu) temporary collective land occupation, and 6550 m2 (about 9.8 Mu) state-owned land.

5 enterprises are affected by the project: 1 is in Minhang District, and 4 are in Xuhui District. 2 enterprises are on the collective land, and the other 3 are on the state-owned land. 2285 m2 houses are demolished, including 1100m2 storehouses, 1000m2 brick-mixed storied building, 155m2 brick-mixes bungalow, 30m2 simple houses. 3345m2 auxiliary buildings are demolished, of which 290m2 bounding wall, and 3055m2 grounds.

5 enterprises and 21 persons are affected. Details could be seen in the following table.

Table 2 Project Impacts Persons

ItemShanghai Subtota

lMinhang

Xuhui

Pudong

Affected enterprises

Quantity 1 4 5 Of which:Enterprises of which the houses are rented from village

0 2 2

Enterprises of which the houses are owned by the legal person and constructed in state-owned land

1 2 3

Affected Population 3 18 21 Of which:Manager and Legal Person

3 18 21

Employee / / / /

C. Resettlement Policies

1.Policies basis

The Land Administration Law of P.R.C. (effective on January 1 1999, revised in August 28, 2004)

The Urban Real Estate Administration Law of P.R.C. (effective on January 1, 1995)

55

Page 64: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

The Urban House Demolition Administrative Regulations (effective on January 1, 2001)

Shanghai Implementation Measures on Land Administration Law of PRC (Shanghai government, No.41 in 2000)

Implementing Rules of Shanghai Municipality for the Administration of Urban Houses Demolishment (Shanghai government, No.111 in 2001)

The Measures of Rural House Demolition Management for Urban Construction in Shanghai (effective on February 1, 2000)

The Measures of Granting Land Use Right in Shanghai (effective on October 30, 1996)

Compensation Standard for Collective Land and property Acquisition in Shanghai (trial implementation) (Hu Fang Di zi [2005] No. 203)

World Bank OP4.12 Involuntary Resettlement and Appendix (January 1st 2002)

2.Policy objectives

(1) The compensation and titles gained by the affected people shall at least enable them to maintain the same living standards as “without project” or even better;

(2) In the preparatory stage of this subproject, social and economic survey must be conducted before compiling corresponding resettlement plan;

(3) All affected people regardless of the legal titles shall be entitled to get compensation and demolition assistance;

(4) Vulnerable groups shall receive special assistance and treatment so that they can live better.

(5) All displaced people and the original residents within the resettlement area shall be benefited from the project construction.

(6) The affected people shall have good understanding of the qualification, means and standards of compensation, livelihood and restoration plan as well as project construction arrangement etc., and participate in the implementation of the resettlement plan.

D .Arrangement of the implementing agency

To ensure the smooth implementation of this RAP, organizations should be established for the planning, harmonizing and monitoring of resettlement activities. The institutions responsible for planning, implementation, management and monitoring of resettlement activities involved in STTPP are:

56

Page 65: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

Shanghai Develope and Reform Committee

Shanghai Construction and Management Committee

Shanghai Water Affairs Bureau

Shanghai Urban Drainage Co., Ltd

Shanghai Urban Planning and Administration Bureau

Shanghai Housing and Land Administration Bureau

Demolition Management Office of Districts

Shanghai Develop and Reform Committee & Shanghai Construction and

Management Committee is responsible for land acquisition, demolition,

directing resettlement implementation, making policy and examining the RAP.

Shanghai Water Affairs Bureau is responsible for coordinating the

administration work, collecting the special capital of water affairs and answer for

the appeal from APs.

Shanghai Urban Drainage Co., Ltd is responsible for coordinating the

project construction work and contacting with World Bank, such as:

Entrusts designing institutes to define the scope of affected area.

Appeals to municipal planning bureau for “License of planning using

land”, and to housing and land administration bureau for “License of

construction land” and “License of house demolition”.

Investigates all the residential houses and enterprises in the range of

land acquisition area.

Signs agent agreements with demolition units in the district.

Answer for the persons or units affected by demolition.

Shanghai Urban Planning Administration Bureau: check the application of

“License of planning using land” from Shanghai Urban Drainage Corporation

and the approval documents for the preliminary design, affirming the land

acquisition range, and granting “License of planning using land”.

Shanghai Housing and Land Administration Bureau: granting “License of

construction land” and “License of house demolition”, and monitoring the

implementation of resettlement process.

Demolition management office of Districts: is the main agency of

resettlement, Measuring and check the land acquisition area, land property,

affected population and investigating the land using situation, resettlement

activity, and comparing with RAP.

57

Page 66: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

E. Grievance Procedure

During the compilation and implementation of project resettlement plan,

the affected people and institutions were and will be always put a high value

upon and the grievance mechanism was established. Four phases of

grievance are as follows:Phase 1:If the affected persons feel damaged by resettlement activity, they could appeal by verbal or paper way to: (1) Resettlement office in Shanghai Urban Drainage Corporation; (2) Local Housing Management Office. If by verbal way, disposal and written record are needed, and the relevant agencies should solve it in 2 weeks.

Phase 2:If displaced persons are still unsatisfied with the decision of phrase 1, they can appeal to local housing management office after being noticed the decision. At the same time, demolished persons who have dissensions about the appraisal results, they could appeal to Shanghai Real Estate Assessor Committee for further appraisal.

Phase 3:If displaced persons are still unsatisfied with the decision of phrase 2 or get no answer from local housing management office after 15 days, they could appeal to Shanghai Housing and Land Administration Bureau (SHLAB) during 3 months. And SHLAB should make a decision during 1 month.

Phase 4: If displaced persons are still unsatisfied with the decision of phrase 3, they could appeal to people court during 15 days according to administration procedure law.

58

Page 67: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

F. Entitlements Matrix

Types of affected DPs

Compensation

and resettlement

policy

Standard

Enterprise

and

institution

demolition

Demolish

2285m2

enterprises’

houses,

3345m2

attached

buildings. (5

enterprises

are affected, 2

renting rural

collective

houses for the

tertiary

industry, 3

being the

direct property

owners)

Enterprises on the state-

owned land (holding

house property right)

Obtain

compensation for

enterprises on

building

demolition and

impacts to its

production and

operation

Main house :3700Yuan/m2

(Xuhui)、3590Yuan/

m2 (Minhang);Simple house :150Yuan/m2;fencing wall :140Yuan/m2;Site:82Yuan/m2;Compensation on

impacts to production

and operation :300Yuan/m2。

Enterprise

s (renting

house)

Property

owner (rural

collective

economic

organization

)

Obtain

compensation on

building

demolition

Brick-concrete plain

house: 526Yuan/m2

;Store house:

418Yuan/m2;Simple house :150Yuan/m2;Fencing wall :140Yuan/m2;Site:82Yuan/m2;

Lessee

(enterprises

)

Obtain

compensation on

impacts to its

production and

operation

Compensation on

impacts to production

and operation :250Yuan/m2。

Temporar

y land

occupatio

n

Temporarily

acquire

1925m2

collective

land,of which

there are

800m2

collective

greenbelt;

Temporarily

Land

users

Rural

collective

economic

organization

Compensation

should be paid

according to the

occupation time

and the loss

After land

occupation, the

occupied land

should be

recovered and

Compensation on

temporary land

occupation:24Yuan/m2 ( Minhang,

Xuhui)、22Yuan/m2

( Pudong New

Area)Compensation on

common greening :300Yuan/m2。

Page 68: 宁波市江东南区污水处理厂及 - World Bank€¦  · Web viewShanghai Urban Drainage Corporation, as the project owner, plans to apply World Bank loan to Puxi Section Project,

acquire

6550m2 state-

owned land, of

which there

are 4525

state-owned

virescence

belt.

provided with

compensation on

temporary land

occupation

Compensation on

temporary land

occupation :150Yuan/m2。

Landscapin

g and

greening

bureau

Compensation

should be paid

according to the

occupation time

and the loss, and

after land

occupation, the

occupied land

should be

recovered and

provided with

compensation on

temporary

Greenland

occupation

Get

compensation on

afforestation

seedlings

Compensation on

temporary land

occupation :3Yuan/m2;Compensation on

greenbelt :450Yuan/m2。

Ground

attachment

Totally affect

5 types of

public

infrastructure

s and ground

attachments,

including

common

street trees,

watch box,

virescence

belt,

overhead

pipeline,

underground

pipeline.

Property owners

Compensation to

units with

property rights,

from project unit

 

60