20
Pinehurst Country Club Green Committee Meeting January 10, 2013

Pcc green comm_jan_10_13

  • Upload
    ssarro

  • View
    63

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Pcc green comm_jan_10_13

Pinehurst Country ClubGreen Committee Meeting

January 10, 2013

Page 2: Pcc green comm_jan_10_13

Agenda

Chairperson Report – Erich Tiepel Approval of minutes

General Manager’s Report – Loren Pippin Grounds Report – Steve Sarro

Driving Range Status Report on Safety Nets Discussion on Integrated Plan

Course Preview Tree Care

Winter Care for Trees Update on DuPont Imprelis

Tee boxes Winter/Spring Schedule

Sand replacement in bunkers Winter/Spring Schedule

Water Update Harriman Construction Water Supply Acquisition Status – Paul Motzkus Outlook on 2013

Water Spring/Summer schedule for turf maintenance Update on Native Area Plans

New Business

Page 3: Pcc green comm_jan_10_13

Tanner Consulting

Hired to create ball trajectory study and recommend options for improving the safety and overall health of the driving range.

Improvements take into account variables such as elevation, club speed, temperature, etc.

Developed four options for improvements. Combinations of options can be implemented as well.

Page 4: Pcc green comm_jan_10_13
Page 5: Pcc green comm_jan_10_13
Page 6: Pcc green comm_jan_10_13

Tree Care

Pruning will begin in JanuarySeeking arborist hazardous opinion on

cottonwood fate on #7 green.Removing dead trees on 2, 14, 15Imprelis Update

Page 7: Pcc green comm_jan_10_13

Tee Boxes

Fall of 2012: forward tees on Pfluger #2 & #6. Increased tee space, due to open in spring of 2013.

Page 8: Pcc green comm_jan_10_13

Maxwell 5 middle tee

Page 9: Pcc green comm_jan_10_13

Maxwell 8 middle tee

Page 10: Pcc green comm_jan_10_13

Maxwell 15 back tee

Page 11: Pcc green comm_jan_10_13

Maxwell 17 middle and forward tee

Page 12: Pcc green comm_jan_10_13

18 Fairway Bunker Management

Goal: Perform the model bunker for Pinehurst CC and future bunker renovations.

Removed contaminated sandReplace drain linesRe-sod edgesInstall irrigationApply liner to prevent future

contaminationInstall sand

Page 13: Pcc green comm_jan_10_13

Harriman Construction

Completed outlet structure was poured incorrectly the first time and is the reason for delays.

The dam inspector was pleased with the dam overall this week.

Denver Water hopes to begin filling by February.

Page 14: Pcc green comm_jan_10_13

Harriman Construction

These gauges manage flow for the Johnson Lateral and eventually the Ft. Logan Ditch.

Page 15: Pcc green comm_jan_10_13

Harriman Construction

Bear Creek is currently running near 10 cfs.

Since November 1st, Bowles Reservoir and Soda Lakes have been filling.

Once Harriman is ready to fill, it has first priority to fill.

Page 16: Pcc green comm_jan_10_13

2013 Turf Maintenance

1. Identify more areas of the course that can sustain lower maintenance inputs

2. Aesthetically pleasing areas out of play

3. Less water, mowing, fertilizer

4. Over seed with native or drought tolerant turfgrass species

Page 17: Pcc green comm_jan_10_13

Pfluger

Page 18: Pcc green comm_jan_10_13

Maxwell

Page 19: Pcc green comm_jan_10_13

Other Spring Projects

3 Dam Repairs and pavingJohnson Lateral CleaningIrrigation upgradesFlower Beds aroundbio bathroomsIncrease gardens

Page 20: Pcc green comm_jan_10_13

Future Dates

Green Committee Dates:Thursday, February 14th 2013 at 4pmThursday, March 14th 2013 at 4pm*