Upload
jada-roy
View
212
Download
0
Embed Size (px)
Citation preview
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Al-Meyyah ProgrammeSupporting Management of Water Services in
Jordan
PMU Director: Basem TelfahMarch 2011
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Historical Background-Historical Background- PMU EU PMU EU SupportSupport
1st1st F.A F.A
5 M 5 M
EuroGrantEuroGrant
2000 – 20042000 – 2004
PMU 1PMU 1
Adden # 1Adden # 1
2 M Euro Grant2 M Euro Grant
2004 - 4/20062004 - 4/2006
PMU 1PMU 1
GAWSIP GAWSIP
MCMC
GSGS
1999-1999-
20002000
Al-Meyyah FA
5 M Grant
WAJ 1.3 M
4/06-12/2009
Rider No 2
Al-Meyyah FA
5 M Grant
WAJ 1.3 M
1/1/2010-
30-6-2011
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
PMU(I) Components and Achievements
Capital Investment (CI)Management Contract (MC)BOT As-Samra WWTPGovernorate Support (GS)Non-Revenue Water (NRW)Supervisory Control And Data Acquisition
(SCADA)Geographical Information Systems (GIS)
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Current Jordan Water and Wastewater Situation
98% of Jordan's population is served through networks; MWI aims to maintain this ratio.
63% of Jordan Population is served with wastewater networks. MWI
aims to increase this percentage to 85% during the next ten years. The average per capita share of supplied water in Jordan is 145
liters /day (ranging between 71liter/Capita/day in Jarash to 230 liter/capita/day in Ma’an)
The average per capita share of billed water in Jordan is 81 liters
/day.( ranging from 49 liters/capita/day in Jarash to 101 liters /capita/day in Amman)
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Limited water resources
In Jordan, the per capita consumption is 85 liters out
of supplied 145 liters /capita/day (despite the
limited water resources).
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
الزراعة باستثناء الكامل الطلب المصادر كامل
100 MCM Disi Conveyor replaces 40 MCM of
Agriculture use
الزراعة بدون الطلب مجموعاالضافية والطاقة
بدون الطلب مجموع الزراعة
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Al-Meyyah ObjectiveWAJ/MWI efforts to change the WS from a plainly
technically driven, rather static public administration into a more business oriented and technically improved structure.
Al-Meyyah- enhance and accelerate the development through a systematic, sector oriented approach in support of Jordan's adopted Water Strategies and Policies.
Goal: transform the current structure into a service industry to provide services in a cost-efficient and socially responsive manner. Regulated Sector (roles Separated) Commercial Principles and PSP
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
PMU mandate in the Second Stage
Operate Utilities under commercial Principles
Prepare the sector for Audit and regulation Environment
Wider utilization of (PSP)
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Reduce burden on public sector Advance sustainable development Work with private sector to help Leverage
Water Sector’s limited resources Create a model that the Government can
use again Encourage development of infrastructures
for basic human needs, promoting sound resource management, focusing on Water and Energy
Expand opportunities for businesses
Achieving AL-Meyyah will
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and IrrigationWater Reallocation Regulation
This strategy aims to reallocate the available domestic water resources between
governorates to economically meet the subscribers' needs
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Constraints and Risks Associated with Project Design
Short Time frame for PM acceptance of global change needs time. Auditing acceptance is not common in
the sector traditions.Dependence of results on projects financed
from different donors.Auditing and monitoring the utilities while
under development is questioned in terms of effectiveness.
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Monitoring Objectives / immediate
Monitoring of performance using established PI’s and BM develop PI’s and IMS improved planning and decision making.
Audit and Monitor performance against statutory and contracted obligations and report the results to the appropriate contracting authorities performance reporting encouraging improved operational and
investment efficiency. monitoring, auditing and evaluating performance relative to contracted
obligations support operating contract administration functions evaluate water and wastewater services development policy
and strategy provide an information service to the MoWI and WAJ.
Providing advice to the Minister on other issues, Pricing/ tariff adjustment (advisory to the Minister) Capital investment planning
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Monitoring Objectives/ Medium to Longer term
environment conducive for private sectoreconomic efficiency through financial
viability improve the operating and financial
efficiencyensure compliance with statutory service
obligationsprotect scarce water resourcesprotect customersinsulate the sector from inappropriate
political influence
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Strands of Commercialisation in Jordan
Modernisation (Modern computerised MIS’s)
Consolidation (to create economies of scope and scale )
Decentralisation
• Private Sector Participation wider use of partnerships with the private sector (PSP)
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Competencies for being FULL FLEGED WSAU
PI’s System 52 Water PI’s:
Water Resources (3) Personnel (10) Physical (3) Operations (19) Quality of Services (12) Financial (5)
WW PI’sBOT PI’s
Water Volume, 11
Physical, 4
Operational, 20
Demogr., 8
Quality, 9
Finance, 7
Personnel, 8
VARIABLES
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
AWC reportsMiyahuna AAMPBP1.79 M TA with
IPA STE’s
Competencies for being FULL FLEGED WSAU
Monitoring Sys. and Experience
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Competencies for being FULL FLEGED
EMB of PMU and reportingCapabilities:
NRW PSP & PPP Institutional Development and SRRehab., CIP and PMTech & Financial Audit and Monitoring, ManagementPI’s & BM
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Achievements Financial sustainability of the sector supportedCustomers benefiting from improved quality of
service Commercialization principles effectively promoted
and reflected in the Water Strategy and actionsDecentralization of water retail serviceCapacities for management of PPP developed and
sustainedService auditing capacities developedWater Tariffs Model developed and tariffs revision
approvedDraft law enabling establishment of a regulatory
commission developed and awaiting the government’s decision
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Achievements1- Financial sustainability of the sector
supported
Miyahuna 1.Red =Cost recovery current prices2.Blue =Cost Recovery using 2000
Prices
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Achievements: Customers benefiting from improved quality of service
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Principles of new Tariff Structure and Cost Recovery
Protecting the PoorAffordabilityRegulating Demand-Conservation of
waterIncreasing Tariff slicesEasing the ability to payTowards cost recovery
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
Commercialization CoverageCoverage Indicator Status
before 2006Current Status
Future Target (2013)
Population served by companies (%) 2.2 % 69.0 % 84.0 %
Population served by commercialization models other than company (%)
39.6 % *(Amman MC)
14.7% 56.8 % **
Population served under commercial principles (%)
41.8% 83.6% 98.6%
Vol. Water supplied 46.0% 84.0% 98.5%
Number of water Connections served by commercial principles
48.2% 85.7% 98.7%
Number of Wastewater Connections 63.3% 84.4% 99.6%
Operating Revenues Coverage 66.6% 90.1% 99.0%
Geographical Area 16.7% 92.3% 97.6%
Performance Management Unit واالدارة التخطيط وحدة
Ministry of Water and Irrigation
THANK YOU
Basem TelfahPMU Director [email protected]