آﻣﻮزﺷﻲ دورهPFD-P&ID PFD-P&ID training course ﮐﻨﻨﺪه ﺗﻬﻴﻪ: ﺑﻬﺰادي ﻣﺤﻤﺪMohammad Behzadi آﻣﻮزﺷ وﺑﻼگ: com . mihanblog . mblastsavior . www اﻟﮑﺘﺮوﻧﻴﮑ ﭘﺴﺖ: [email protected] رادﭘﻮر ﺳﻌﻴﺪ ﺑﺮادرم ﺑﻪ ﺗﻘﺪﻳﻢ ﺑﻮد زﻧﺪﮔﻴﻢ ﻣﺴﻴﺮ در ﻋﻠﻤﻲ ﻧﻤﺎي ﻗﻄﺐ و اﺳﺘﺎد ﺧﻮد ﺑﻴﺪرﻳﻎ ﻋﻠﻤﻲ ﺑﺨﺸﺶ ﺑﺎ ﮐﻪ ﺗﺬﮐﺮ: آﮐﺮوﺑﺎت از ﺗﺎ اﺳﺖ ﻻزم ﻣﻄﺎﻟﺐ راﻫﻨﻤﺎي دﻳﺪن ﺑﺮاي7 ﺷﻮد اﺳﺘﻔﺎده ﺑﺎﻻﺗﺮ ﻳﺎAcrobat 7.0 or higher is needed for view commenting!

PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

  • Upload
    others

  • View
    62

  • Download
    6

Embed Size (px)

Citation preview

Page 1: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

PFD-P&ID دوره آموزشي

PFD-P&ID training course

Mohammad Behzadiمحمد بهزادي: تهيه کننده

com.mihanblog.mblastsavior.www: يوبالگ آموزش [email protected]: يپست الکترونيک

که با بخشش علمي بيدريغ خود استاد و قطب نماي علمي در مسير زندگيم بودتقديم به برادرم سعيد رادپور

يا باالتر استفاده شود7براي ديدن راهنماي مطالب الزم است تا از آکروبات :تذکر

Acrobat 7.0 or higher is needed for view commenting!

Page 2: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

1

PFDPFD--P&ID courseP&ID coursePiping coursePiping course

Produced Produced by:Mohammadby:Mohammad BehzadiBehzadiمحمد بهزادي محمد بهزادي : : تهیه کننده تهیه کننده

13871387خرداد خرداد

Page 3: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 2 2

منابع مطالعاتی منابع مطالعاتی

www.mblasts

avior.m

ihanblog.com

Page 4: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 3 3

Page 5: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

4

Page 6: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

5

Page 7: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

6

Page 8: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

7

Standards

Why do we apply standards?Work UniformityIncrease of safetyImprovement in qualification of design and operating

conditionDecrease of design and selection of material

Page 9: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

8

Standards

APIAmerican Petroleum Institute

ASMEAmerican Society of Mechanical Engineers

ANSIAmerican National Standard Institute

ASTMAmerican Society for Testing and Material

ISAInstrumentation System and Automation Society

NACENational Association of Corrosion Engineers

Page 10: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

9

Standards

NFPANational Fire Protection Association

TEMATubular Exchanger Manufactures Association

DINDeutshes Institute fur Normung

BSIBritish Standards Institution

ISOInternational Organization for Standardization

AWWAAmerican Water Works Association

Page 11: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

10

Standards

IPSIranian Petroleum Standard

IGSIRANIAN GAS STANDARDS

NPCSNational Petrochemical Company Standard

Page 12: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

11

API

API-RP-520: Sizing, Selection, and Installation Of Pressure-Relieving Devices in Refinery

API-RP-521: Guide For Pressure-Relieving and Depressuring SystemAPI-RP-14E: Recommend Practice for Design and Installation of Offshore

Production Platform Piping SystemAPI-STD-2000: Venting Atmospheric and Low-Pressure Storage TanksAPI-STD-530: Calculation of Heat-Tube Thickness in Petroleum

Page 13: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

12

IPS

IPS-E-PR-308: Engineering Standard For Process Design for Numbering System

IPS-E-PR-750: Engineering Standard For Process Design of Compressor

IPS-E-PR-330: Engineering Standard For Process Design of Compressor Air System

IPS-E-PR-440: Engineering Standard For Process Design of Piping System

IPS-E-PR-700: Engineering Standard For Process Design for Process Design of Crude Oil Electrostatic Desalter

Page 14: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

13

NFPA

NFPA 20: Standard for the Installation of Centrifugal Fire PumpNFPA 15: Standard for Water Spray Fixed System for Fire

ProtectionNFPA 11: Foam Extinguishing SystemNFPA 12: Standard on Carbon Dioxide Extinguishing SystemNFPA 13: Standard for the Installation of Sprinkler SystemNFPA 72E: Automatic Fire Detector

Page 15: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 14 14

EPCC

EngineeringProcurementConstruction

Commissioning

Page 16: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

15

ENGINEERING DISCIPLINESدیسیپلینهاي مهندسی

•Process•HSE•Piping•Instrument•Mechanic A .Fixed Equipments-Vessel-Tank-Tower-Exchanger-… B. Rotary Machineries-Pump-Compressor-Mixer-Air Cooler

•Civil-Structure-Architecture•Electrical

Page 17: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

16

ENGINEERING COMPANY دیسیپلینهاي کلی یک شرکت

ManagementProcurementProjectsProposalsBudget-&-Control AccountingConstruction – SupervisionEngineeringEstimatingHR-CommunicationInformation – TechnologySupport-Services

Page 18: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

17

از لحاظ ارزشPFDانواع مدارك First Issue (FI):Release for proposal (Conclusion of estimate, study)-Main equipment (Tagged)-Main Process Lines-Battery Limit-Main control concept (control & switch)-Package unit Limits

Issued For Information (IFI) : it is not used in constuctionIssued For Comment (IFC): between client and contractor and after

that will be issued to owner(some kind of internal issue!!)

Issued For Approval (IFA):Release for Basic Engineering In addition to contents 1.-Important valve ( isolation, manual control)-Essential process shutdown circuits-Important start up lines-Definition of heat exchanger type

Page 19: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

18

از لحاظ ارزشPFDانواع مدارك Issued For Design (IFD):Release for Basic Engineering Development (Conclusion

of verification Phase and Basic Eng.)-Content as 1. & 2. however adjusted to the contract

conditions

Approved For Design (AFD):Release for Detail Engineering (End of Basic Eng.)-Crosscheck with P&ID, release detail engineering

Page 20: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

19

از لحاظ ارزشPFDانواع مدارك Approved For Construction (AFC):Release for Construction phase (End of Detail Eng)-Final issue of PFD in Detail phase

As Built (ASB):End of construction-Includes all of the changes in commissioning and

construction phase

Issued For Construction (IFC):Release for Detail Engineering Development-Crosscheck with P&ID, release for purchase of bulk

material

Page 21: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 20 20

تفاوت کد و استاندارد

کد توصیه هایی براي طراحی و عملیاتاستاندارد شامل اندازه ها و اجزا

Design factor) درصد10مثال براي دبی (ایمنی

www.mblastsavior.mihanblog.com

Page 22: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

21

اعضاي تیم پروسس ï PM(Projectمدیر پروژه manager)ï PEM(Projectمدیر واحد مهندسی Enginnering manager)

ï Process team membersñ Process Dept.Manager

ï کارشناس ارشد Process Senior Engineerñ Process Engineerکارشناس

ñ نقشه کشñ Process Senior Draftsman

ï Process Draftsman

Page 23: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

22

PROCESS DEPARTMENT ACTIVITIES

Process Department’s Activities in the following engineering stages:

1. Feasibility Study (FS)2. Proposal Preparation (PP)3. Basic Engineering (BE)4. Detail Engineering (DE)

Page 24: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

23

PFD, DEFINITION, PREPARATION SEQUENCE. ACCORDING TO IPS-E-PR-170

Feasibility StudyProcess Design Basis

Conceptual Design

Feasibility StudyProcess Design Basis

Conceptual Design

Steady StateProcess Simulation(HYSYS-ASPEN-CHEMCAD-PROII)

Steady StateProcess Simulation(HYSYS-ASPEN-CHEMCAD-PROII)

PFDHeat & Material Balance(H&M)

PFDHeat & Material Balance(H&M)

Simplified Flow-SheetSimplified Flow-Sheet

Page 25: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

24

PROCESS DEPARTMENT ACTIVITIES

ï BFDï Simulationï PFDï UFDï Process Descriptionï Heat & Material Balance(H&M)ï P&IDï Process Design Criteriaï Utility Consumptionï Chemical Consumptionsï Line List (For Piping Discipline)ï Instrument PROCESS Data Sheet (For Instrument Discipline)ï Equipment PROCESS Data Sheet (For mechanic Discipline)ï Process Data Sheet For Piping Special Item (For Piping Discipline)

Page 26: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

25

BFDA BFD is a simple breakdown of a process into blocks or

units of operations which represent major parts of of the process being depicted.

PFDA PFD is a detailed breakdown of a process into symbols

which represent all major equipment and pipelines which are part of a process as defined by the BFD.

A PFD consists of the following:• Diagram Drawing• Numbered Pipelines which indicate Flow Conditions• Major Control Loops

Page 27: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

26

P&ID

A P&ID is a document which is developed and used by Engineers,Technicians, Technologists, Maintenance and Operations personnel to define a manufacturing system. It's intent is to communicate in detail the controls, instruments, piping, and equipment used to implement that system.

Page 28: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

27

P&ID

A P&ID consists of the following:• Diagram Drawing• Equipment List information• Piping Equipment List information• Pipeline List Information• Instrument List information (both local and

DCS I PLC)• Notes and Details• Line slope and Flow direction

Page 29: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

28

PROCESS DEPARTMENT ACTIVITIES

1. DOCUMENTED ACTIVITIES2. NON-DOCUMENTED ACTIVITIES

Page 30: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

29

PROCESS DEPARTMENT ACTIVITIESBASIC & DETAILED ENGINEERING

Page 31: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

30

PROCESS DEPARTMENT ACTIVITIESDETAILED ENGINEERING

Page 32: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

31

PROCESS DEPARTMENT ACTIVITIESDETAILED ENGINEERING

Page 33: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

32

PROCESS DEPARTMENT ACTIVITIESDETAILED ENGINEERING

Page 34: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 33 33

) پروسس (استانداردهاي معروف براي دیسیپلین هاي مختلف

DESIGN CODES, STANDARDS & REFERENCES

IPS E PR 230 Piping & Instrumentation Diagrams (P&IDsAPI Spec 12J Specification for Oil and Gas SeparatorIPS E PR 880 Engineering Standard for Process of Gas (Vapor) – Liquid SeparatorsIPS E PR 850 Engineering Standard for Process Requirements of Vessels, Reactors and SeparatorsAPI RP 520 Sizing, Selection and Installation of Pressure-Relieving Devices in Refineries (PSV)API RP 521 Guide for Pressure-Relieving and Depressuring Systems (PSV)API STD 2000 Venting Atmosphere and Low-Pressure Storage Tanks Non-Refrigerated and RefrigeratedIPS E PR 460 Engineering Standard for Process Design of Flare and Blow-down SystemsIPS E SF 860 Engineering Standard for Air Pollution Control

Page 35: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 34 34

استانداردهاي معروف براي دیسیپلین هاي مختلف

API STD 610 Centrifugal Pumps for General Refinery ServicesAPI STD 674 Positive Displacement Pumps-ReciprocatingAPI STD 675 Positive Displacement Pumps-Controlled VolumeAPI STD 676 Positive Displacement Pumps-RotaryAPI STD 681 Liquid Ring Vacuum Pumps and Compressors for Petroleum, Chemical

and Gas Industry ServicesAPI RP 50 Natural Gas Processing Plant Practices for Petroleum of the EnvironmentAPI RP 51 Onshore Oil and Gas Production Practices for Petroleum of the EnvironmentAPI RP 551 Process Measurement Instrumentation

Page 36: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 35 35

استانداردهاي معروف براي دیسیپلین هاي مختلف

API RP 14E Recommended Practice for Design and Installation of Offshore Production Platform Piping Systems

API Spec 5L Specification for Line PipeNACE RP 0169 Recommended Practice-Control of External Corrosion on Underground or

Submerged Metallic Piping SystemsNACE RP 0175 Recommended Practice-Control of Internal Corrosion in Steel Pipelines and Piping

SystemsNACE MR 0175 Material Requirement-Sulfide Stress Cracking Resistant Metallic Material for Oil Field

Equipment)

Page 37: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 36 36

www.mblasts

avior.m

ihanblog.com

استانداردهاي معروف براي دیسیپلین هاي مختلف استانداردهاي معروف براي دیسیپلین هاي مختلف

Page 38: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 37 37

www.mblastsavior.mihanblog.com

استانداردهاي معروف براي دیسیپلین هاي مختلف استانداردهاي معروف براي دیسیپلین هاي مختلف

Page 39: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 38 38

استانداردهاي معروف براي دیسیپلین هاي مختلف استانداردهاي معروف براي دیسیپلین هاي مختلف

Page 40: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 39 39

Flowsheets

Basic Design(BDP:BASIC DESIGN PACKAGE)Detailed Design

Basic Design

BFD (BLOCK FLOW DIAGRAM)PFD (PROCESS FLOW DIAGRAM)P&ID (Piping & INSTRUMENTATION DIAGRAM)UFD (UTILITY FLOW DIAGRAM)UHD (UTILITY HEADER DIAGRAM)

UDFD (UTILITY DISTRIBUTION FLOW DIGRAM)

www.mblastsavior.mihanblog.com

Page 41: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 40 40

Coal carbonization block Coal carbonization block flowsheetflowsheet. .

Quantities(MASSQuantities(MASS BALANCE)BALANCE) are in lb/hrare in lb/hr

BFDBFD (BLOCK FLOW DIAGRAM)(BLOCK FLOW DIAGRAM)بلوکھا معموال از دایره و مربعبلوکھا معموال از دایره و مربع

www.mblas

tsav

ior.b

logfa.com

Page 42: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

41

BFDمنابع تهیه

ï BFDñContractñTechnical Proposalñ Preliminary Eng. Study

Page 43: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

42

PFDHeat & Material Balance(H&M)

Electrical Eng.

Haz

ard

Sour

ce L

ist

Proc

ess P

ower

Con

sum

er

List

Proc

ess

Load

List

Process Engineering

(P&ID)

Con

trol,

Equi

p. S

eq.,

Pipi

ng,

I/O, B

.L.,

etc.

Control & Instrument Engineering.

Con

trol P

hilo

soph

y,

Inst

rum

ent

Proc

ess C

ondi

tions

Plot PlanEquip. Type, No., Process Sequence

Package Unit Specification

MR(MaterialRequisition)

Piping Engineering

Serv

ice,

C

ompo

sitio

n,

Con

ditio

n

Material Selection

Major Process Equipment

Sizing

Feed

, Pro

d,

Con

d., C

ap.,

Spec

.

Data/Spec. Sheets

با سایر دیسیپلینها PFDارتباط مدرك

Material Selection

Major Process Equipment

mechanical Eng.

Page 44: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

43

PFDDEFINITION

SYMBOL AND LEGEND(SYMBOLOGY)

H&M

P&IDVALVE

LINE

ALL EQUIPMENTS

PROCESS CONTROL PARAMETER

ADVANCE CONTROL SYSTEM

ALL EQUIPMENTS

ScalePFDs should not be drafted to scale. However, their size should be compatible with that of equipment drawings.

Flow DirectionAs a rule, PFDs should be drawn from the left to the right in accordance with process flows.

SizeThe size of PFD should normally be A1 (594 mm × 841 mm).

Page 45: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 44 44

www.mblastsavior.mihanblog.com

Page 46: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 45 45

www.mblastsavior.mihanblog.com

Page 47: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 46 46

PFD الزامات موجود در

Page 48: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

47

Minimum Information Requirements For Equipments حداقل اطالعات الزم براي تجهیزات

ï 1. Designated streamsï a) Stream numbers should be serially denoted by Decimal numbers.ï b) Fluid name.ï c) Total flow rate.ï d) Density and/or molecular mass (weight) if required.ï e) Operating pressure and temperature if required.

www.mblastsavior.mihanblog.com

PFD الزامات موجود در

Page 49: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

48

ï 2. Heat exchangersï a) Identification number and service name.ï b) Operating heat duty.ï c) Inlet and outlet temperatures on both shell and tube sides.

ï 3. Furnacesï a) Identification number and service name.ï b) Operating absorbed heat duty.ï c) Inlet and outlet operating temperatures on tube side.

Minimum Information Requirements For Equipments حداقل اطالعات الزم براي تجهیزات

PFD الزامات موجود در

Page 50: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

49

ï 4. Reactorsï a) Identification number and service name.ï b) Inlet and outlet operation temperature.ï c) Inlet and/or outlet pressure.

ï 5. Columnsï a) Identification number and service name.ï b) Tray numbers, operating temperature and pressure for top and

bottom traysï and also for special trays such as feed and draw-off, etc.ï c) Trays shall be numbered from bottom to top.

Minimum Information Requirements For Equipments حداقل اطالعات الزم براي تجهیزات

www.mblasts

avior.m

ihanblog.com

PFD الزامات موجود در

Page 51: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

50

ï 6. Drumsï a) Identification number and service name.ï b) Operating temperature.ï c) Operating pressure.

ï 7. Pumpsï a) Identification number and service name.ï b) Normal operating capacity and differential pressure.

Minimum Information Requirements For Equipments حداقل اطالعات الزم براي تجهیزات

www.mblasts

avior.m

ihanblog.com

PFD الزامات موجود در

Page 52: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

51

Minimum Information Requirements For Equipmentsحداقل اطالعات الزم براي تجهیزات

PFD الزامات موجود در

Page 53: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

52

KIND OF LINES انواع خطوط و ضحامتهاي استاندارد آنها

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

PFD الزامات موجود در

Page 54: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

53

LINE CROSSOVER گذر خطوط و نقاط تقاطع

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

PFD الزامات موجود در

Page 55: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

54

TP(TIE IN POINT) نقاط تعیین کننده مرز پروژه

www.mblasts

avior.m

ihanblog.com

PFD الزامات موجود در

Page 56: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 55 55

www.mblastsavior.mihanblog.com

www.mblasts

avior.m

ihanblog.com

Page 57: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 56 56

www.mblastsavior.mihanblog.com

Page 58: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 57 57

) منسوخ ( PFD انواع قدیمی دیگر

Page 59: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 58 58

) منسوخ ( PFD انواع قدیمی دیگر

Page 60: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 59 59

الگوهاي مختلف مورد استفاده در رسم نمودار جریانالگوهاي مختلف مورد استفاده در رسم نمودار جریان

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

پمپ و کمپرسورپمپ و کمپرسور مبدلهاي حرارتی ، ریبویلرها و کوره هامبدلهاي حرارتی ، ریبویلرها و کوره ها مخازنمخازن

Page 61: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 60 60

www.mblastsavior.mihanblog.com

الگوهاي مختلف مورد استفاده در رسم نمودار جریانالگوهاي مختلف مورد استفاده در رسم نمودار جریان برجهابرجهادرامهادرامها

Page 62: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 61 61

ww

w.m

bla

stsa

vior.

blo

gfa

.com

الگوهاي مختلف مورد استفاده در رسم نمودار جریانالگوهاي مختلف مورد استفاده در رسم نمودار جریانموتورها و توربین هاموتورها و توربین ها

Page 63: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 62 62

الگوهاي مختلف مورد استفاده در رسم نمودار جریانالگوهاي مختلف مورد استفاده در رسم نمودار جریان

مهممهم

Page 64: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 63 63

ExampleExamplePFD وP&ID آن را به طور

کامل رسم کنیداز چپ به راست با حفظ (

!!)تقارنAutoCADترسیم با

Page 65: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 64 64

UFD-UHD مدارك الزم براي تهیه

Project design criteriaPFDP&IDPlot Plansymbology

Page 66: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 65 65

UTILITY FLOWSHEETS UFD (UTILITY FLOW DIAGRAM)UHD (UTILITY HEADER DIAGRAM)UDFD (UTILITY DISTRIBUTION FLOW DIGRAM)

These are UFD diagrams(LIKE P&ID) for individual utilities such as

steam condensate (HPS,MPS,LPS)cooling water(CWS,CWR,RWA,DWA(demin water))

NIT(NITROGEN) inert blanketing gases or purging or catalyst regeneration,

Page 67: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

P&ID

Instrument

Page 68: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

67

P&ID Symbols:

P&ID Equipment Symbols P&ID General Symbols P&ID Instrument Symbols (Typical Hook-

Up) P&ID Instrument Symbols (Valve Symbol)

Page 69: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

68محمد بهزادي : تهیه کننده 68

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 70: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

69محمد بهزادي : تهیه کننده 69

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

طرق مختلف نمایش خطوط فرآیندي طرق مختلف نمایش خطوط فرآیندي www.mblastsavior.mihanblog.com

Page 71: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

70محمد بهزادي : تهیه کننده 70

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 72: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

71محمد بهزادي : تهیه کننده 71

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

Page 73: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

72محمد بهزادي : تهیه کننده 72

یک پروژهSymbology و Legendمدارك صفحه اول www.mblastsavior.mihanblog.comطرق مختلف نمایش پکیجطرق مختلف نمایش پکیجصفحه اول

Page 74: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

73محمد بهزادي : تهیه کننده 73

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

www.mblastsavior.mihanblog.com

Page 75: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

74محمد بهزادي : تهیه کننده 74

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

طرق مختلف نمایش طرق مختلف نمایش تغییر شماره خطتغییر شماره خط

www.mblastsavior.mihanblog.com

Page 76: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

75محمد بهزادي : تهیه کننده 75

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

شماره گذاري نواحیشماره گذاري نواحیwww.mblastsavior.mihanblog.com

Page 77: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

76محمد بهزادي : تهیه کننده 76

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

اختصارات مختلف پایپینگ اختصارات مختلف پایپینگ w

ww

.mbl

asts

avio

r.mih

anbl

og.c

om

Page 78: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

77محمد بهزادي : تهیه کننده 77

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

Page 79: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

78محمد بهزادي : تهیه کننده 78

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

اختصارات عایقها اختصارات عایقها

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 80: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

79محمد بهزادي : تهیه کننده 79

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

اختصارات مختلف اختصارات مختلف

www.mblasts

avior.m

ihanblog.com

Page 81: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

80محمد بهزادي : تهیه کننده 80

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

اختصارات مختلف اختصارات مختلف

Page 82: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

81محمد بهزادي : تهیه کننده 81

یک پروژهSymbology و Legendمدارك صفحه اول صفحه اول

طرق مختلف اتصال خطوط بین مدارك طرق مختلف اتصال خطوط بین مدارك

طرق مختلف نمایش خطوط تریس طرق مختلف نمایش خطوط تریس

Page 83: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

82محمد بهزادي : تهیه کننده 82

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 84: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

83محمد بهزادي : تهیه کننده 83

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

شکلهاي شیرهاي مختلف شکلهاي شیرهاي مختلف

Page 85: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

84محمد بهزادي : تهیه کننده 84

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

شرایط انتخاب شیرهاي مختلف شرایط انتخاب شیرهاي مختلف

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 86: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

85محمد بهزادي : تهیه کننده 85

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

طریقه نمایش حوضچه شستشو طریقه نمایش حوضچه شستشو

Page 87: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

86محمد بهزادي : تهیه کننده 86

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

شکلهاي مختلف سیستمهاي تله بخار شکلهاي مختلف سیستمهاي تله بخار فشار باالفشار باالبا ریکاوريبا ریکاوري

بدون ریکاوريبدون ریکاوري

Page 88: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

87محمد بهزادي : تهیه کننده 87

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

شکلهاي مختلف سیستمهاي تله بخار شکلهاي مختلف سیستمهاي تله بخار فشار پایینفشار پایین

بدون ریکاوريبدون ریکاوري

Page 89: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

88محمد بهزادي : تهیه کننده 88

یک پروژهSymbology و Legendمدارك صفحه دوم صفحه دوم

شکلهاي مختلف سیستمهاي تله بخار شکلهاي مختلف سیستمهاي تله بخار

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 90: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

89محمد بهزادي : تهیه کننده 89

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 91: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

90محمد بهزادي : تهیه کننده 90

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شماره گذاري پکیجشماره گذاري پکیجشماره گذاري تجهیزاتشماره گذاري تجهیزات

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 92: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

91محمد بهزادي : تهیه کننده 91

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

اختصارات تجهیزاتاختصارات تجهیزات

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 93: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

92محمد بهزادي : تهیه کننده 92

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف درامشکلهاي مختلف درام

Page 94: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

93محمد بهزادي : تهیه کننده 93

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف پمپشکلهاي مختلف پمپ

شکلهاي مختلف برج شکلهاي مختلف برج

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 95: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

94محمد بهزادي : تهیه کننده 94

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف کمپرسور شکلهاي مختلف کمپرسور

شکلهاي مختلف مبدلهاي هواخنک شکلهاي مختلف مبدلهاي هواخنک

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 96: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

95محمد بهزادي : تهیه کننده 95

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف مبدلهاي حرارتی شکلهاي مختلف مبدلهاي حرارتی

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 97: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

96محمد بهزادي : تهیه کننده 96

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف منابع انرژي شکلهاي مختلف منابع انرژي

www.mblasts

avior.m

ihanblog.com

Page 98: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

97محمد بهزادي : تهیه کننده 97

یک پروژهSymbology و Legendمدارك صفحه سوم صفحه سوم

شکلهاي مختلف مخازن ذخیره شکلهاي مختلف مخازن ذخیره

www.mblastsavior.mihanblog.com

Page 99: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

98محمد بهزادي : تهیه کننده 98

صفحه چهارم صفحه چهارم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 100: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

99محمد بهزادي : تهیه کننده 99

یک پروژهSymbology و Legendمدارك صفحه چهارم صفحه چهارم

www.mblastsavior.mihanblog.com

Page 101: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

100محمد بهزادي : تهیه کننده 100

یک پروژهSymbology و Legendمدارك صفحه چهارم صفحه چهارم

www.mblasts

avior.m

ihanblog.com

Page 102: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

101محمد بهزادي : تهیه کننده 101

یک پروژهSymbology و Legendمدارك صفحه چهارم صفحه چهارم

www.mblastsavior.mihanblog.com

Page 103: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

102محمد بهزادي : تهیه کننده 102

یک پروژهSymbology و Legendمدارك صفحه چهارم صفحه چهارم

www.mblastsavior.mihanblog.com

Page 104: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

103محمد بهزادي : تهیه کننده 103

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

Page 105: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

104محمد بهزادي : تهیه کننده 104

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 106: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

105محمد بهزادي : تهیه کننده 105

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 107: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

106محمد بهزادي : تهیه کننده 106

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

طرق مختلف اندازه گیري دبی طرق مختلف اندازه گیري دبی

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 108: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

107محمد بهزادي : تهیه کننده 107

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

خطوط ابزار دقیق خطوط ابزار دقیق

طرق مختلف اندازه گیري سطح مایع طرق مختلف اندازه گیري سطح مایع

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 109: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

108محمد بهزادي : تهیه کننده 108

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

کالس فشاري ابزار دقیق کالس فشاري ابزار دقیق طرق مختلف اندازه گیري دما طرق مختلف اندازه گیري دما

www.mblasts

avior.m

ihanblog.com

Page 110: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

109محمد بهزادي : تهیه کننده 109

یک پروژهSymbology و Legendمدارك صفحه چهارم صفحه چهارم

شماره گذاري ابزار دقیقشماره گذاري ابزار دقیق

Page 111: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

110محمد بهزادي : تهیه کننده 110

یک پروژهSymbology و Legendمدارك صفحه پنجمصفحه پنجم

اندازه نازل ابزار دقیق اندازه نازل ابزار دقیق

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 112: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

111محمد بهزادي : تهیه کننده 111

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 113: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

112محمد بهزادي : تهیه کننده 112

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 114: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

113محمد بهزادي : تهیه کننده 113

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

Page 115: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

114محمد بهزادي : تهیه کننده 114

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

Page 116: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

115محمد بهزادي : تهیه کننده 115

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 117: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

116محمد بهزادي : تهیه کننده 116

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 118: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

117محمد بهزادي : تهیه کننده 117

یک پروژهSymbology و Legendمدارك صفحه ششمصفحه ششم

Page 119: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 118 118

P&ID Symbols from Aspen-IcarusENGINEERING FLOWSHEET OR ENGINEERING LINE DIAGRAM

BS1646

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 120: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 119 119

www.mblastsavior.mihanblog.com

P&ID Symbols from Aspen-Icarus manualENGINEERING FLOWSHEET OR ENGINEERING LINE DIAGRAM

Page 121: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 120 120

www.mblastsavior.mihanblog.com

P&ID Symbols from Aspen-Icarus manualENGINEERING FLOWSHEET OR ENGINEERING LINE DIAGRAM

Page 122: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 121 121

P&ID Samples from walas book

www.mblasts

avior.m

ihanblog.com

چند مثالچند مثال

Page 123: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

122

Page 124: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

123

Page 125: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

124

Page 126: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

125

Page 127: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

126

Page 128: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

127

Page 129: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

128

Page 130: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

129

Page 131: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

130

P&ID, VALVES, CONTROL VALVE. IPS-E-PR-230, IPS-E-PR-830

x”, 150#

BLOCK VALVE

BLOCK VALVE

BLOCK VALVE

BLOCK VALVE

BLEEDVALVE

BLEEDVALVE

BLEED VALVEBLEED VALVE

FAIL CLOSED

MOST OF PROCESS CONTROL VALVES

STEAM, FUEL GAS SUPPLY

FAIL OPENED

COOLING WATER, INSTRUMENT AIR SUPPLY

PUMP MINIMUM FLOW

COMPRESSOR SPILL BACK

PROCESS FLOW TO FIRED HEATER

LIMIT SWITCHPOSITIONER

LIMIT SWITCHPOSITIONER

BY PASS LINESIZE: API RP 550

NC

¾”¾”

NORMALLY CLOSED

Page 132: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

131

Fail Open / Closed (Control Valve): The safe position of a valve which will shift to upon loss of the power medium.

Normal Position (Valve): The position of a valve in Normal Condition of the process (N.O. , N.C.)

Page 133: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

132

ï Plant Shutdown: The shutting in of all process stations of a Plant Production process and all support equipment for the process.

ï Process Shutdown: The isolation of a given process station from the process by closing appropriate SDVs to shut-in flow to the process station or divert flow to another process station.

ï Shutdown Valve (SDV): An automatically operated Normally Closed valve used for isolating a process station.

ï Emergency Shutdown System (ESD): A system of stations which when activated initiate plant shutdown.

Page 134: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

133

Pressure Safety Valve (PSV): A pressure relief device designed to open and relieve excess pressure and to reclose and prevent the further flow of fluid after normal conditions have been restored.

Depressurization: When metal exposed to fire on one side with vapor on the other side, the metal temp. may reach a level at which metal rupture due to stress may occur, even though the pressure does not exceed the allowable overpressure. An emergency depressurization (blow down) system is provided to avoid such an occurrence.

Page 135: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 134 134

P&ID Symbols from walas

www.mblasts

avior.m

ihanblog.com

مثالی از روشهاي مختلف کنترلمثالی از روشهاي مختلف کنترل

Page 136: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

135

مدارك پایپینگ هاي دیگر در حوزه تخصصی حائز اهمیت است که هر کدام از شاخه ها از هدف کاري که توسط شاخه بسیار.باشند هانجام می گیرد آگاه باشند و همکاري و همگامی با شاخه هاي دیگر داشت انهآ

اطالعات الزم براي تهیه، ،یا پایپینگ و نقشه هاي ابزار دقیق تهیه شدهتجهیزات از فلوشیت مکانیکال . به دست می ایدخریداري یا ساخت تجهیزات و ماشین آالت الزم

(plot Plant).قرار می گیرد را تعریف می کندجانمایی سایت، محدوده هاي جغرافیایی زمینی که کارخانه

نقشه هاي مخازن و تجهیزاتنازل تهیه می شوند و ممکن است شامل این نقشه ها براي نمایش پیرامون تجهیزات به همراه حداقل احتیاجات

.نیاز است شود جزئیات ساخت در جاهایی که مورد

Page 137: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

136

نقشه هاي ایزومتریک

:این نقشه ها براي دستیابی به اهداف ذیل تهیه می شوند)شامل زانویی ها(کامل سیستم پایپینگ ایزومتریکهاي سیستم براي نشان دادن •)توسط نرم افزار سزار ( براي تخمین تنش اولیه لوله ها-ایزومتریکهاي تنش اولیه•آنالیز تنش تکمیلی لوله هاي ایزومتریک تهیه شده براساس-ایینهایزومتریکهاي تنش •سیستم که براي ساخت یا نقشه هاي اسپول (Spool)-نقشه هاي ایزومتریک از برشهاي •

.مونتاژ قبل از نصب مناسب هستند

مدارك پایپینگ

Page 138: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

137

(Equipment list)لیست تجهیزاتتعداد هر یک از تجهیزات و همچنین لیست تجهیزات براي هر سیستم به طور جداگانه تهیه می شودو و

.می دهد ا را شرحنهمحل و موقعیت آاندازه ،

(valve list)لیست شیرها .استخراج می شود، تهیه می گردد P&IDلیست شیرها براي هر سیستم از اطالعاتی که از

(line list)لیست خطوط هدف از تهیه . به دست می آید تهیه می شودP&IDلیست خطوط بایستی با استفاده از اطالعاتی که از

بندي خطوط در ارتباط با چیدمان کلی پایپینگ و نقشه ه اي مختلف این لیست، شماره.ایزومتریک می باشد

(Hanger schedule)جدول آویزهاتهیه متریال اولیه الزم جهت جداولی که در ارتباط با سیستمهاي پایپینگ تهیه می شوند تا امکان

.ساپورت گذاري لوله کشی فراهم شود

مدارك پایپینگ

Page 139: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

138

(As built) نقشه هاي ازبیلتکه در حین ساخت در پروژه نقشه هاي ازبیلت کپی هایی از نقشه هاي قرارداد هستند که تغییراتی

.ا اعمال می شودنهانجام گرفته در آ

(Report drawings) نقشه هاي گزارشیجزئیات بایستی . روندا اشاره شده به کار مینهبراي نمایش آیتمهاي خاص که در گزارشها به آ

.نظر مد نظر قرار گیرندحداقل باشند و وضوح و کیفیت نمایش متریال مورد

(Foreign drawings) نقشه هاي خارجیتامین کنندگان خارج از نقشه ها ي ا اسناد دیگري هستند که توسط پیمانکاران ي ا فروشندگان و

ا تامین می شوند را ارائه نهدستگاهی که توسط آشرکت تهیه شده اند تا جزئیات کار، پروژه ي ا.می دهند

مدارك پایپینگ

Page 140: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

139

IPSبخشPFD –P&ID

Page 141: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 140 140

Process Flow DiagramThese preparation stages describe the following three

main phases which can be distinguished in every project & include, but not be limited to:

Phase I: Basic Design Stages (containing seven Standards)

Phase II: Detailed Design, Engineering and Procurement Stages (containing two Standards)

Phase III: Start-Up Sequence and General Commissioning Procedures (containing two Standards)

Page 142: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 141 141

Phase I: Basic Design Stages (containing 7 Standards)

STANDARD CODE STANDARD TITLEI) Manuals of Phase I (Numbers 1 - 7)IPS-E-PR-150 "Basic Design Package"IPS-E-PR-170 "Process Flow Diagram"IPS-E-PR-190 "Layout and Spacing"IPS-E-PR-200 "Basic Engineering Design Data"IPS-E-PR-230 "Piping & Instrumentation Diagrams (P&IDs)"IPS-E-PR-250 "Performance Guarantee"IPS-E-PR-308 "Numbering System"

براي این بخش IPSمنابع

Page 143: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 142 142

Phase II: Detailed Design, Engineering and Procurement Stages (containing 2 Standards)

I) Manuals of Phase II (Numbers 8&9)IPS-E-PR-260 "Detailed Design, Engineering and Procurement"IPS-E-PR-300 "Plant Technical and Equipment Manuals (Engineering

Dossiers)“

III) Manuals of Phase III (Numbers10&11)IPS-E-PR-280 "Start-Up Sequence and General Commissioning

Procedures"IPS-E-PR-290 "Plant Operating Manuals"

Phase III: Phase III: StartStart--UpUp Sequence and General Commissioning Procedures Sequence and General Commissioning Procedures (containing two Standards)(containing two Standards)

براي این بخش IPSمنابع

Page 144: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 143 143

Scope

This Standard is also intended to establish uniform symbols for equipment, piping and instrumentation on P&IDs and UDFDs throughout the Oil, Gas and Petrochemical (OGP) projects.

براي این بخش IPSهدف

Page 145: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 144 144

Flowsheets

the Piping and Instrumentation Diagrams (P&IDs) Utility Distribution Flow Diagrams (UDFDs,UHD,UFD)

Process flow diagram(PFD)

براي این بخش IPSتعاریف Nomenclature or Terminology

Page 146: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 145 145

REFERENCES

ASME (AMERICAN SOCIETY OF MECHANICAL ENGINEERS)ASME Code.

ANSI (AMERICAN NATIONAL STANDARD INSTITUTE)ANSI B 16.1 "Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125,

250 and 800"1st. Ed., 1989

IPS (IRANIAN PETROLEUM STANDARDS)IPS-E-PR-200 "Basic Engineering Design Data"IPS-E-PR-308 "Numbering System"IPS-E-PR-725 "Process Design of Plant Waste Sewer

Systems"IPS-G-IN-160 "Control Valves"IPS-D-AR-010 "Abbreviations & Symbols for HVAC&R Drawings"IPS-D-AR-011 "General Notes for HVAC & R System"

Page 147: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 146 146

REFERENCESISA (INSTRUMENT SOCIETY OF AMERICA)ISA-S5.1 "Instrumentation Symbols and Identification" 1st. Ed., 1984ISA-S5.2 "Binary Logic Diagrams for Process Operations" 2nd. Ed., 1981 (

Reaffirmed 1992 )ISA-S5.3 "Graphic symbols for distributed control / shared display

instrumentation, logic and computer systems “Ed.,1983ISA-S5.4 "Instrument Loop Diagrams" Ed., 1991ISA-S5.5 "Graphic Symbols for Process Displays" 1st. Ed., 1985ISA-S18.1 "Annunciator Sequences and Specifications" 1st. Ed., 1979

(Reaffirmed 1992)ISA-S50.1 "Compatibility of analogue signals for electronic industrial process

instruments” 1st. Ed., 1975 ( Reaffirmed 1995)ISA-S51.1 "Process Instrumentation Terminology" 1st. Ed., 1979

Page 148: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 147 147

REFERENCESISO (INTERNATIONAL ORGANIZATION FOR STANDARDIZATION)ISO 3098: Part 1 "Technical Drawings-Lettering, Part 1: Currently Used Characters"1st. Ed. 1974ISO 3511: Part 1 & Part 4 "Process measurement control functions and instrumentation-symbolic representation-Part

1: Basic requirements, 1st.Ed. 1977;Part 4: Basic symbols for process computer, Interface, and shared display/control functions" Ed. 1985

1st. Ed., 1984ISO 6708 "Pipe component definition of nominal size" Ed., 1995.

API (AMERICAN PETROLEUM INSTITUTE)API Standard 602 "Compact steel gate valves-flanged, threaded, welding and extended body ends “nine Ed.,

1995

GPSA (Gas Process System Analysis)

Page 149: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي :تهیه کننده 148 148

TERMINOLOGY:

Company or Employer/Owner :affiliated companies of the Iranian ministry of

petroleum :National Iranian Oil Company (NIOC)National Iranian Gas Company (NIGC)National Petrochemical Company (NPC)

اصطالحات

www.mblastsavior.mihanblog.com

Page 150: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

149

SYMBOLS AND ABBREVIATIONSIMORTANTS AND COMMONS IN RED

قرمزها حفظ گردد

Page 151: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده150 150

Drain / Sewer SymbolsAMN Amine Drains (MEA,MDEA)AY Amine Drain Funnel (MEA,MDEA)CAU Caustic Sewer(NAOH)CDB Concrete Drain BoxCSW Chemical SewerCY Chemical Drain PitDC Drain ConnectionDWW Desalter Waste WaterNSW Non Oily Water SewerOPD Open DrainOSW Oily Water SewerSSW Sanitary Water SewerSWA Stripped Sour WaterTY Toxic Drain FunnelY Drain Funnel (General)

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 152: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده151 151

Letters at Individual Valves DesignationsB Monel Valve (grease sealed seat and packing)BV Ball ValveCAO Close-Automatic-OpenCC Cable ControlCO Chain OperatedCHV Check ValveD DrainFB Full BoreFC Fail Close (closes on minimum signal to valve actuator)FO Fail Open (opens on minimum signal to valve actuator)FD Flex Disc Valve (Diapheragm Valve)

Monelالیاژى از نیکل و کبالت که در برابر خوردگى مقاوم استFlex شو خم

www.mblasts

avior.m

ihanblog.com

Page 153: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده152 152

Letters at Individual Valves DesignationsMOV Motorized Valve(motor operated valve)NC Normally Closed(like by-pass valve for control valves)NO Normally OpenNV Needle Valve (Plug valve)OV Operating ValvePIVA Post Indicator Valve(if it is Closed or open)PSE Rupture Disk Assembly (Pressure Safety Equipment)PSV Pressure Safety Relief ValveP PluggedSR Split RangeSSV Stainless Steel ValveT TrapV VentWP(J) Jacketed Plug ValveXCV Steam Trap with Integral Strainer

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 154: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده153 153

Piping AbbreviationsCS Carbon SteelDN Diameter NominalFF Flat FaceFS Forged SteelLJ Lap JointMI Mallable IronPN Pressure NominalRF Raised FaceRS Removable SpoolSF Socket Weld Line Blind with Flexitallic GasketsSB Spectacle BlindSO Slip onSS Stainless SteelST(H) Steam Trap (Heat Conservation)SW Socket WeldWN Weld Neck

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 155: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده154 154

Miscellaneous DesignationsAG Above GroundBL Battery LimitDCS Distributed Control SystemHCB HydrocarbonHCH Hydrocarbon with HydrogenHHLL High High Liquid LevelHLL High Liquid LevelLG Level GageLLL Low Liquid LevelLLLL Low Low Liquid LevelMW ManwayNLL Normal Liquid LevelP PressurePB Push BottomPFD Process Flow DiagramPG Pressure GagePI Pressure Indicator

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 156: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده155 155

Miscellaneous DesignationsP&ID Piping & Instrumentation DiagramPO Pump OutPT Pressure Test ConnectionRES ResidueRG Refrigerant GasRL Refrigerant LiquidRTD Resistance Temperature DetectorRVP Reid Vapor PressureSC Sample ConnectionSCL Sample CoolerSG Sight GlassSP Set PointSP.GR. Relative Mass Density (Specific Gravity)STO Steam OutTI Temperature IndicatorT/T Tangent to TangentUFD Utility Flow DiagramUG Under GroundVB Vortex Breaker

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 157: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده156 156

Utility Services AbbreviationsBFW Boiler Feed WaterCLW Chlorinated WaterCW Cooling WaterCWR Cooling Water ReturnCWS Cooling Water SupplyDMW Demineralized WaterDSW Desalinated WaterDWA Drinking WaterFLG Fuel GasFLR Flare DischargeFOR Fuel Oil ReturnFOS Fuel Oil SupplyFWA Fire WaterHBW High Pressure Boiler Feed WaterHPC High Pressure CondensateHPS High Pressure Steam

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 158: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده157 157

Utility Services AbbreviationsISA Instrument AirLLPS Low Low Pressure SteamLPC Low Pressure CondensateLPS Low Pressure SteamMBW Medium Pressure Boiler Feed WaterMPC Medium Pressure CondensateMPS Medium Pressure SteamNG Natural GasNIT NitrogenPLA Plant AirPWA Plant Water(service water)RFO Refinery Fuel OilRFW Refrigerated waterRWA Raw WaterSWA Sour WaterTWA Treated WaterWAT Water

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 159: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده158 158

power supply AS Air Supply

ISA Instrument AirPLA Plant Air

ES Electric SupplyGS Gas SupplyHS Hydraulic Supply(Water)NS Nitrogen SupplySS Steam Supply

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 160: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده159 159

SYMBOL DESCRIPTION

Main process line (arrow of 30indicatesDirection of fluid flow )

Heat traced pipe line Underground pipeline

Existing line

Future line

Vendor package

Jackated or double containment pipeline

Line crossing (connected)

انواع خطوطانواع خطوط

Page 161: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده160 160

Line crossing (nconnected)Lines junction

Dripe funnelPlatformRemovable spoolpiceMinimum distance

Indication of point of change:a)change in sloop b) change in piping classc)change in responsibility

www.mblastsavior.mihanblog.com

Page 162: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده161 161

Outlet to the atmosphere for steam / gasFlow / motion in diraction of arrowArrow for inlet or outlet of essential substancesSlopeLevel referenceLimit , generalContractor/ vendorBattery limitHood , general (Furnace)

Distribution device for fluids , spray nozzleSiphon with dip length

www.mblastsavior.mihanblog.com

Page 163: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده162 162

Open ventSyphon drain( seal leg)Liquid seal, oenLiquid seal ,closedButsting discSight glassLevel gageLevel gage on standpipe (vertical pipe)

www.mblastsavior.mihanblog.com

Page 164: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده163 163

Interlock logic

symbols

ww

w.m

blastsavior.mihanblog.com

Page 165: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده164 164

Butt welded jointFlanged jointScrewed joint (arrow : 90)Socket welded jointSocket and spigot jointCompression jointSwivel jointEnd cap ,but weldedEnd flanged and boltedEnd cap ,fillet welded (socket)End cap ,screwed (arrow:90)

ww

w.m

blastsavior.mihanblog.com

Page 166: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده165 165

Symbols for manually operated and miscellaneous valves and monitors

Gate valve (basic symbol)Globe valveCheck valve (general)Gate valve behind offAngle valveBall valveFourway valve

Gate valve with body bleedButterfly valveHydraulic control (water force)Metering cockNeedle valvePlug valve

S=solenoid valveR= Manual reset when indicated

Diaphragm valvew

ww

.mblastsavior.m

ihanblog.com

!!!!مهممهم

Page 167: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

166

ww

w.m

blastsavior.mihanblog.com

PLCPLCاشکال مختلف ابزار دقیق براي سیستم اشکال مختلف ابزار دقیق براي سیستم

DCSDCSاشکال مختلف ابزار دقیق براي سیستم اشکال مختلف ابزار دقیق براي سیستم

Page 168: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

167

ww

w.m

blastsavior.mihanblog.com

Page 169: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

168

ww

w.m

blastsavior.mihanblog.com

کاهنده متقارنکاهنده متقارن

کاهنده نامتقارن کاهنده نامتقارن

صفحه عینکی صفحه عینکی

تله بخار با صافی تله بخار با صافی

تله بخار بدون صافی تله بخار بدون صافی

تله بخار با شیر یک طرفه تله بخار با شیر یک طرفه

Page 170: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

169

ww

w.m

blastsavior.mihanblog.com

Page 171: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

170

ww

w.m

blastsavior.mihanblog.com

Page 172: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

171

ww

w.m

blastsavior.mihanblog.com

Page 173: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

172

ww

w.m

blastsavior.mihanblog.com

Page 174: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

173

ww

w.m

blastsavior.mihanblog.com

Page 175: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

174

ww

w.m

blastsavior.mihanblog.com

Page 176: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

175

ww

w.m

blastsavior.mihanblog.com

Page 177: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

176

ww

w.m

blastsavior.mihanblog.com

Page 178: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

177

Page 179: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

178

www.mblastsavior.mihanblog.com

Page 180: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

179

Page 181: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

180

Page 182: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

181

ww

w.m

blastsavior.mihanblog.com

Page 183: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده182 182

Equipment:Tower, column, vessel and

reactor

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 184: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده183 183

www.mbla

stsav

ior.bl

ogfa.

com

www.mblastsavior.mihanblog.com

Page 185: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده184 184

Note:All tanks and spheres on each flow diagram are to be shown in Approximate relative size to each other

Page 186: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده185 185

www.mblastsavior.mihanblog.com

Page 187: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده186 186

www.mblastsavior.blogfa.com

www.mblastsavior.mihanblog.com

Page 188: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده187 187

Page 189: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده188 188

Air coolers

www.mblasts

avior.m

ihanblog.com

Page 190: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده189 189

Pumps

Page 191: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

190

ww

w.m

blastsavior.mihanblog.com

Page 192: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده191 191

NOZZLES IDENTIFICATIONS ON VESSELS, REACTORS AND TOWERSNOZZLE IDENTIFICATION SYMBOL

A,A2 InletsB OutletC CondensateD Drain or Draw-offE*F FeedG Level gage or gage glassH HandholdJ PumpoutK*L Level instrument (also LT, LI)M ManholeN Reboiler connectionP Pressure connection (also PT, PI)R RefluxS Steam or sample connectionT Temperature connection (also TI, TE, TW)

V Vapor or ventW Relief valve connection

(Oversize unless actual size known)*Use E or K when non of the other symbols apply. Do not use I, O, Q, U, X, Y, or Z.

Page 193: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده192 192

www.mblastsavior.mihanblog.com اصطالحاتمتفاوت با

معانی یکسان در زبانهاي

انگلیسی و آمریکایی

Page 194: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده193 193

اصطالحات متفاوت با

معانی یکسان در زبانهاي

انگلیسی و آمریکایی

Page 195: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده194 194

اصطالحات متفاوت با

معانی یکسان در زبانهاي

انگلیسی و آمریکایی w

ww

.mbl

asts

avio

r.mih

anbl

og.c

om

Page 196: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده195 195

اصطالحات متفاوت با

معانی یکسان در زبانهاي

انگلیسی و آمریکایی

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 197: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده196 196

www.mblastsavior.mihanblog.com

اصطالحات متفاوت با

معانی یکسان در زبانهاي

انگلیسی و آمریکایی

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 198: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

197

Numbering System Numbering System

IPSIPSبر مبناي بر مبناي

Page 199: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده198 198

شماره گذاري مدارك ،ابزار دقیق، جریانها و تجهیزات شماره گذاري مدارك ،ابزار دقیق، جریانها و تجهیزات

instrumentation identificationsinstrumentation identificationsequipment abbreviations (codes)equipment abbreviations (codes)fluid abbreviationsfluid abbreviationspainting, insulation and heat tracing designations.painting, insulation and heat tracing designations.

Page 200: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده199 199

SCOPESCOPEnumbering for instrument and electrical numbering for instrument and electrical

equipment, piping line and engineering equipment, piping line and engineering documents such as specifications, purchase documents such as specifications, purchase orders, and other facilities. orders, and other facilities.

Page 201: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده200 200

REFERENCESREFERENCESISAISA (INSTRUMENT SOCIETY OF AMERICA)(INSTRUMENT SOCIETY OF AMERICA)

S 5.1S 5.1--1984.1984. ““Instrumentations Symbol and Identification FormerlyInstrumentations Symbol and Identification Formerly””, Ed. , Ed. 19891989

ISO ISO (INTERNATIONAL ORGANIZATION FOR STANDARDIZATION)(INTERNATIONAL ORGANIZATION FOR STANDARDIZATION)67086708--1995 (E) 1995 (E) "Pipe Components Definition and Selection of "Pipe Components Definition and Selection of

Nominal Size", 2nd. Ed., 1995.Nominal Size", 2nd. Ed., 1995.

Page 202: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

201

EQUIPMENTEQUIPMENT NUMBERINGNUMBERING SYSTEMSYSTEM

شماره گذاري تجهیزاتشماره گذاري تجهیزات

Page 203: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده202 202

Main Equipment & Package UnitMain Equipment & Package Unit

www.mblastsavior.blogfa.comwww.mblastsavior.blogfa.com

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 204: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده203 203

Notes:1) Unit number for the equipment shall start from 1 (not from 01).

For a typical refinery units see Appendix A.2) Serial number for equipment including mechanical,

machinery, electrical, ancillary facilities, buildings, general items, etc., shall be from 01 to 99 unless otherwise specified. The numbering of instruments and control equipment should be from 001 to 999. For the units with more than one section (e.g., crude and vacuum distillation unit, etc.), equipment serial number to be utilized for each section shall be determined by the Contractor (e.g., from 01 t0 50 and from 50 to 99 to crude distillation and vacuum distillation sections respectively).

Page 205: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده204 204

APPENDIX BAPPENDIX B EQUIPMENT CATEGORY SYMBOLEQUIPMENT CATEGORY SYMBOLAGITATOR AGAIR CONDITIONER ACBLENDER BR COMPRESSOR CCONTINUOUS MIXER, PLASTICS CMCONTROL PANEL CPLCONVEYOR, MECHANICAL OR PNEUMATIC CVCOOLING TOWER CT CRANE CNCRUSHER CRCRYSTALLIZER CSCUTTER CUCYCLONE AND HYDROCLONE CYDESALTER DEEVAPORATOR EVEXCHANGER, SHELL-AND TUBE, DOUBLE PIPE, PLATE, ECOILS, AIR COOLED, REBOILER, BOX COOLER,CASCADE COOLER, SURFACE CONDENSER

EXTRUDER EX

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 206: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده205 205

APPENDIX BAPPENDIX B EQUIPMENT CATEGORY SYMBOLEQUIPMENT CATEGORY SYMBOLFAN FAN FAFAFILTER FFFLARE STACKFLARE STACK FSTFSTHEATER, FIRED HHLOADING ARM LOADING ARM LALAMILL MILL MIMIPUMP PPREACTOR RRSAMPLER SAMPLER SASASEPARATOR, ATMOSPHERIC SEPARATOR, ATMOSPHERIC SESESPECIALITY MOBILE EQUIPMENT, (FIRE TRUCK, SNOW REMOVAL)SPECIALITY MOBILE EQUIPMENT, (FIRE TRUCK, SNOW REMOVAL) SMSMSTACK, CHIMNEY STACK, CHIMNEY SSSTEAM TRAP STPSTPSTRAINER STRAINER STRSTRSUMP SUMP SUSUTANK; API, SILO, HOPPER ; API, SILO, HOPPER TKTKVALVE, SLIDE (SEE GATE, SLIDE)VALVE, SLIDE (SEE GATE, SLIDE) SGSGVALVE, ROTARY VALVE, ROTARY RVRVVALVE, MOTORIZED VALVE, MOTORIZED MOVMOVVESSEL, PRESSURE (COLUMN, ACCUMULATOR, K.O. DRUM SPHERE, BULLET)) VV

Page 207: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده206 206

Appendix AAppendix AUNIT IDENTIFICATION NUMBERUNIT IDENTIFICATION NUMBER

for a typical refineryfor a typical refinery

Page 208: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده207 207

www.mblastsavior.mihanblog.com

Page 209: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده208 208

Drivers for Main EquipmentDrivers for Main EquipmentDrivers for main equipment shall be numbered as follows:Drivers for main equipment shall be numbered as follows:

Note:Note:Type of drivers shall be as follows:Type of drivers shall be as follows:DE : Diesel EngineDE : Diesel EngineGE : Gas EngineGE : Gas EngineGT : Gas TurbineGT : Gas TurbineHT : Hydraulic TurbineHT : Hydraulic TurbineM : Electric MotorST : Steam TurbineST : Steam TurbineTEX: Turbo Expander.TEX: Turbo Expander.

www.mblastsavior.blogfa.comwww.mblastsavior.blogfa.com

Page 210: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده209 209

PIPING LINE NUMBERING SYSTEMPIPING LINE NUMBERING SYSTEMPiping lines shall be numbered in the following manner:Piping lines shall be numbered in the following manner:

Numbering of All Lines Excluding Steam Tracing SpoolsNumbering of All Lines Excluding Steam Tracing Spools

www.mblastsavior.mihanblog.com

شماره گذاري جریانها

Page 211: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده210 210

Notes:Notes:

1) Piping serial number, in general is started from 0001 and Up except for the units which are characterized by more than one section such as crude and vacuum distillation unit. In such cases, split of piping serial numbers to be assigned for each section of the unit shall be determined by the Contractor.

Special number 7001 : 9999 shall be used for all drains, relief headers and utility services including fuel oil and fuel gas for all units except for the units which are producing the subject utility services.

For assigning the piping serial number, the following items should be taken into consideration:a) The individual line number shall be held up to the point where the line ends at the inlet of

equipment such as a vessel, exchanger, pump, etc., an other number is required for the line downstream of the equipment.

b) All utility headers (systems) shall be numbered with their respective units. All branches serving a specific unit will be numbered with that unit.

f) All firewater and sewer branches serving a specific unit shall be numbered.2) Piping class code shall be in accordance with the line classes utilized in project piping material

specification.3) Piping components not identified by instrument or mechanical equipment numbers, etc., and

not covered by the piping material specification, are identified by a special item number.4) Unit number of the plant shall start from 1 (not from 01). For a typical refinery units see

Appendix A.

Page 212: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده211 211

Steam Tracing SpoolsSteam Tracing Spools

For steam tracing numbering and material take For steam tracing numbering and material take off, the contractor can use his own system.off, the contractor can use his own system.

Page 213: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده212 212

APPENDIX IFLUID ABBREVIATION SYMBOLS

a) Air SystemsISA Instrument AirPLA Plant Air

b) Blowdown and Pump Out SystemsBDN BlowdownCBD Continuous BlowdownIBD Intermittent Blowdown

c) Condensate SystemsCOC Cold CondensateHPC High Pressure CondensateLPC Low Pressure CondensateMPC Medium Pressure Condensate

d) Drain (Sewer) SystemsCDH Closed Drain HeaderCSW Chemical SewerNSW Non Oily SewerOSW Oily SewerSSW Sanitary Sewer

e) Flare SystemsFL Flare (Normal)HFL High Pressure FlareLFL Low Pressure Flare

f) FuelsFLG Fuel GasFLO Fuel OilNG Natural GasRFO Refinery Fuel Oil

حروف اختصاري جریانهاي مختلف

Page 214: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده213 213

APPENDIX IAPPENDIX IFLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLS

g) Special Gas Systemsg) Special Gas SystemsACGACG Acid GasAcid GasAIRAIR AirAir (Drying Service)(Drying Service)CHLCHL ChlorineChlorineHELHEL HeliumHeliumHYDHYD HydrogenHydrogenNITNIT NitrogenNitrogenNOXNOX Nitrous OxideNitrous OxideOXYOXY OxygenOxygenUTAUTA Utility AirUtility Air

h) Special Chemical and Solvent Systemsh) Special Chemical and Solvent SystemsAMNAMN AmineAmineAMOAMO AmmoniaAmmoniaCAUCAU Caustic SodaCaustic SodaCHMCHM ChemicalsChemicalsDEADEA didi--Ethanol AmineEthanol AmineDGADGA didi--GlycoleGlycole AmineAmineFSFS Flushing SolventFlushing SolventMEAMEA monomono--Ethanol AmineEthanol AmineMEKMEK Methyl Ethyl Methyl Ethyl KetoneKetoneTOLTOL TolueneToluene

حروف اختصاري جریانهاي مختلف

Page 215: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده214 214

APPENDIX IFLUID ABBREVIATION SYMBOLS

i) Oil Utility SystemsINO Injection OilLBO Lubricating OilSLO Seal Oil

j) Steam systemsDKS Decoking SteamDLS Dilution SteamHOR Hot Oil ReturnHOS Hot Oil SupplyHPS High Pressure SteamLLS Low Low Pressure SteamLPS Low Pressure SteamMPS Medium Pressure Steaml) Water SystemsBFW Boiler Feed WaterCLW Chlorinated WaterCWR Cooling Water ReturnCWS Cooling Water SupplyDIW Distilled WaterHWS Hot Water SupplyHWR Hot Water ReturnTWR Tempered Water ReturnTWS Tempered Water SupplyDMW Demineralized WaterDWA Drinking WaterFWA Fire WaterHBW High Pressure Boiler Feed WaterHCW Hot and Chilled WaterMBW Medium Pressure Boiler Feed WaterPHW Phenol WaterPRW Process WaterPWA Plant WaterPTW Potable WaterQHW Quench WaterRWA Raw WaterSWA Sour WaterTWA Treated WaterWAT Water

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

حروف اختصاري جریانهاي مختلف

Page 216: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده215 215

Appendix Appendix I:ProcessI:Process ServicesServicesACE AcetyleneALC AlchoholASP AsphaltBZN BenzeneBUT ButaneCAT CatalystCRD CrudeCRG Cracked GasETA EthaneETN EthyleneFOP Fuel Oil ProductGAS GasGHS Natural Gas with Hydrogen and SteamGSL Gasoline بنزینGSO Gas oil نفت گاز HRG Hydrogen Rich GasHCB HydrocarbonHCH Hydrocarbon with HydrogenHSR Heavy Straight Run NaphthaHNA Heavy NaphthaJP4 Jet Fuel (JP-4)JTA Jet A-1KER KeroseneNGH Natural Gas with Hydrogen

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

حروف اختصاري جریانهاي مختلف فرآیندي

Page 217: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده216 216

Appendix Appendix I:ProcessI:Process ServicesServicesLNA LNA Light NaphthaLight NaphthaLPGLPG Liquefied Petroleum GasLiquefied Petroleum GasMELMEL MethanolMethanolMET MET MethaneMethaneNAP NAP NaphthaNaphthaPNT PNT PentanePentanePRP PRP PropanePropanePPN PPN PropylenePropylenePRA PRA Process AirProcess AirPRO PRO Process FluidProcess FluidRAF RAF RaffinateRaffinateREG REG Recycle GasRecycle GasRESRES ResidueResidueSLG SLG Sludge Sludge لجن غلیظ رسوب مخازن سوخت لجن غلیظ رسوب مخازن سوختSLPSLP Slop Slop لجن لجنSUL SUL SulfurSulfur

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 218: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده217 217

APPENDIX LAPPENDIX LDEFINITION OF NOMINAL SIZEDEFINITION OF NOMINAL SIZE

1) DefinitionNominal size (DN): A numerical designation of size which is common to all

components in a piping system other than components designed by outside diameters or by thread size. It is a convenient round number for reference purposes and is only loosely related to manufacturing dimensions.

Notes:1) It is designated by DN followed by a number.2) It should be noted that not all piping components are designated by

nominal size, for example steel tubes are designated and ordered by outside diameter and thickness.

3) The nominal size DN cannot be subject to measurement and shall not be used for purposes of calculation.

Page 219: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده218 218

www.mblastsavior.mihanblog.com

جدول معادل سازي اندازه

Page 220: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده219 219

ATM

www.mblastsavior.mihanblog.com

جدول معادل سازي فشار

Page 221: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده220 220

APPENDIX EAPPENDIX EPAINTING, INSULATION AND HEAT TRACING DESIGNATIONPAINTING, INSULATION AND HEAT TRACING DESIGNATION

INSULATION OR HEATINSULATION OR HEAT

TRACING TYPETRACING TYPE SERVICESERVICE

ETET Electrical Traced and InsulatedElectrical Traced and InsulatedETT ETT Electrical Traced With Heat Transfer Cement and insulatedElectrical Traced With Heat Transfer Cement and insulatedISIS Insulation for Personnel ProtectionInsulation for Personnel ProtectionSJ SJ Steam Jacketed and InsulatedSteam Jacketed and InsulatedSTST Steam Traced and InsulatedSteam Traced and InsulatedSTSSTS Steam Traced With Spacers and InsulatedSteam Traced With Spacers and InsulatedSTT STT Steam Traced with Heat Transfer Cement and InsulatedSteam Traced with Heat Transfer Cement and InsulatedTB TB Trace Body and InsulateTrace Body and InsulatePTPT PaintingPaintingNPNP NO Painting, No InsulationNO Painting, No InsulationUW UW Underground WrappingUnderground Wrapping

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 222: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده221 221

Numbering for StructureNumbering for Structure

Structure and pipe rack shall be numbered in the following manneStructure and pipe rack shall be numbered in the following manner:r:Notes:Notes:1) Structure Identification1) Structure IdentificationAT = Antenna TowerAT = Antenna TowerCPS = Concrete Pipe SleeperCPS = Concrete Pipe SleeperMP = Miscellaneous PlatformMP = Miscellaneous PlatformPS = Pipe SupportPS = Pipe SupportSL = Stiles SL = Stiles نردبان نردبانSS = Steel StructureSS = Steel Structure2) Structure numbering shall be South to North and West to East.2) Structure numbering shall be South to North and West to East.

Page 223: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده222 222

Drawing title blockDrawing title block

The following requirements shall be shown on the title block of The following requirements shall be shown on the title block of each drawing each drawing (see Appendix B):(see Appendix B):

-- revision table;revision table;-- main Companymain Company’’s name (e.g., National Iranian Oil Company);s name (e.g., National Iranian Oil Company);-- name of Company Relevant Organization, (if any), (e.g., Refinername of Company Relevant Organization, (if any), (e.g., Refineries ies

Engineering and Construction);Engineering and Construction);-- name of refinery or plant (name of refinery or plant (in English and Persian wordsin English and Persian words););-- CompanyCompany’’s emblem;s emblem;-- ContractorContractor’’s name;s name;-- drawing title;drawing title;-- CompanyCompany’’s project No.;s project No.;-- ContractorContractor’’s job No. s job No. (optional(optional););-- ContractorContractor’’s drawing No. (s drawing No. (optionaloptional););-- CompanyCompany’’s drawing No.s drawing No.

Page 224: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده223 223

Title block sizes and drawing dimensions shall Title block sizes and drawing dimensions shall be as follows:be as follows:

Page 225: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده224 224

www.mblastsavior.mihanblog.com

یک مثال

Page 226: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده225 225

Line widthsLine widthsضخامت خطوط براي جریانهاي مختلفضخامت خطوط براي جریانهاي مختلف

To obtain a clear representation, different line widths shall be used. Main flow lines or main piping shall be highlighted.

The following line widths shall be applied:- 0.8 mm for main process lines;- 0.5 mm for other process lines; utility lines, and underground lines;- 0.5 mm for graphical symbols for equipment and machinery, except valves and fittings and

piping accessories;- 0.5 mm for rectangular boxes for illustrating Unit operations, process equipment, etc.;- 0.5 mm for subsidiary flow lines or subsidiary product lines and for energy carrier lines and

auxiliary system lines;- 0.4 mm for class changes designation;- 0.3 mm for graphical symbols for valves and fittings and piping accessories and for symbols for

process measurement and control functions, control and data transmission lines;- 0.3 mm for all electrical, computer and instrument signals;- 0.3 mm for reference lines;Line widths of less than 0.3 mm shall not be used.

Page 227: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده226 226

Drawings Title block sizeDrawings Title block size

Note:The final (As Built) isometric drawings shall include the material take off table and should be in A3 size.

www.mblastsavior.mihanblog.com

Page 228: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده227 227

Drawing ScalesDrawing ScalesDrawings scales shall be any of the following:Drawings scales shall be any of the following:1: 101: 101 : 201 : 201: 251: 251 : 331 : 33--1/31/31 : 501 : 501 : 1001 : 1001 : 2501 : 2501 : 5001 : 5001 : 10001 : 10001 : 2500 (Overall Plot Plan Only)1 : 2500 (Overall Plot Plan Only)

www.mblastsavior.mihanblog.com

Page 229: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده228 228

NUMBERING OF PROJECT SPECIFICATIONS AND DATA SHEETSاختصارات حروف انواع مختلف مدارك

SP - SpecificationDW - DrawingsPC - Performance CurvesFS - Fabrication ScheduleDS - Data SheetsPR - ProceduresCE - CertificatesWS - Welding SpecificationIR - Inspection RecordCA - CalculationsMU - ManualsOT - Others

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 230: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده229 229

Engineering Disciplines Codingاختصارات حروف دیسیپلینهاي مختلف

AC Heating, Ventilation, Air conditioning & Refrigeration EngineeriHeating, Ventilation, Air conditioning & Refrigeration EngineeringngCICI Civil Engineering (General) including ArchitecturalCivil Engineering (General) including ArchitecturalEL Electrical EngineeringElectrical EngineeringGM GM General MachineriesGeneral MachineriesGN GN GeneralGeneralHM and/or HM and/or Heat and Mass Transfer Engineering (Thermal Equipment EngineerinHeat and Mass Transfer Engineering (Thermal Equipment Engineering)g)IN Instrumentation EngineeringInstrumentation EngineeringME Fixed Mechanical Equipment Engineering (Non Rotating Equipment Fixed Mechanical Equipment Engineering (Non Rotating Equipment

Engineering)Engineering)PI Piping Engineering (General Mechanical and Interconnection Piping Engineering (General Mechanical and Interconnection

Engineering)Engineering)PR Process and Chemicals EngineeringProcess and Chemicals EngineeringPV PV Pressure Vessel Engineering (Generally, Vessels Engineering)Pressure Vessel Engineering (Generally, Vessels Engineering)RE and/orRE and/or Rotating Equipment and/or (Process Machineries) EngineeringRotating Equipment and/or (Process Machineries) Engineering(PM)(PM)SF Safety, Fire Fighting & Environmental Control EngineeringSafety, Fire Fighting & Environmental Control EngineeringSTST Structural EngineeringStructural EngineeringTCTC Telecommunication EngineeringTelecommunication EngineeringTP TP Technical Protection EngineeringTechnical Protection Engineering

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 231: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده230 230

Commodity Account No.:Commodity Account No.:-- CivilCivil 0101-- Instrumentation Instrumentation 0202-- Electrical Electrical 0303-- Machinery Machinery 0404-- Heaters Heaters 0505-- Heat Exchangers (including Heat Exchangers (including reboilersreboilers, coolers, double pipe heat exchangers, coils, , coolers, double pipe heat exchangers, coils,

plate heat exchangers, etc.)plate heat exchangers, etc.) 0606-- Vessels, Towers or Drums Vessels, Towers or Drums 0707-- Tanks and Spheres Tanks and Spheres 0808-- Package Units Package Units 0909-- Miscellaneous Mechanical Miscellaneous Mechanical 1010-- Piping Piping 1111-- ManagementManagement 1212-- Site Construction Site Construction 1313-- Miscellaneous Miscellaneous 1414

www.mblasts

avior.m

ihanblog.com

Page 232: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده231 231

Project Sections CodingProject Sections CodingAC AC AccountingAccountingCCCC Cost ControlCost ControlCN CN ConstructionConstructionDC DC Document CenterDocument CenterFN FN FinanceFinanceGN GN GeneralGeneralPC PC Project CoordinationProject CoordinationPE PE Project EngineeringProject EngineeringPNPN PlanningPlanningPM PM Project ManagementProject ManagementPQ PQ ProcurementProcurementQA QA Quality AssuranceQuality AssuranceQC QC Quality ControlQuality Control

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 233: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده232 232

Notes:1) Two drawings may have the same serial number but different unit number.2) When drawings have same title and function, they shall have the same serial number and shall be identified by using Sequential No./Total No.

Numbering of Drawings

نامگذاري مداركwww.mblastsavior.mihanblog.com

Page 234: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده233 233

Numbering of Isometric DrawingsNumbering of Isometric DrawingsNumbering of Isometric Drawings shall be the same as the piping Numbering of Isometric Drawings shall be the same as the piping line number line number

which is shown on the Isometric Drawing.which is shown on the Isometric Drawing.

www.mblastsavior.mihanblog.com

Page 235: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده234 234

SYMBOLS AND ABBREVIATIONSSYMBOLS AND ABBREVIATIONSSYMBOL/ABBREVIATIONSYMBOL/ABBREVIATION DESCRIPTIONDESCRIPTIONAK AK ArakArakBDBD BuildingBuildingCRD CRD CrudeCrudeDN DN Diameter Nominal, in (mm)Diameter Nominal, in (mm)HVACHVAC Heating Ventilation and CoolingHeating Ventilation and CoolingLG LG Level GageLevel GagePDB PDB Distribution Panel BoardDistribution Panel BoardPFD PFD Process Flow DiagramProcess Flow DiagramP & IDsP & IDs Piping and Instrument DiagramsPiping and Instrument DiagramsPO PO Purchase OrderPurchase OrderPS PS Pipe SupportPipe SupportPSVPSV Pressure Safety ValvePressure Safety ValveSI SI System InternationalSystem InternationalTEL TEL Tetra Ethyl LeadTetra Ethyl Lead

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 236: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده235 235

DRAWING SERIAL NUMBERشماره سریال انواع مختلف مدارك

TYPE OF DRAWING TYPE OF DRAWING SERIAL NUMBER (4 Digits)SERIAL NUMBER (4 Digits)-- PROCESS FLOW DIAGRAM PROCESS FLOW DIAGRAM 0001 0001 -- 00990099-- MECHANICAL FLOW DIAGRAMS (P & IDs) MECHANICAL FLOW DIAGRAMS (P & IDs) 0100 0100 -- 01990199-- UTILITY FLOW DIAGRAM UTILITY FLOW DIAGRAM 0200 0200 -- 03990399-- PLOT PLAN PLOT PLAN 0500 0500 -- 05990599-- CONCRETE CONCRETE 1000 1000 -- 19991999-- STRUCTURAL STEEL STRUCTURAL STEEL 2000 2000 -- 29992999-- VESSEL VESSEL 4000 4000 -- 49994999-- PIPING PIPING 5000 5000 -- 59995999-- ELECTRICAL ELECTRICAL 6000 6000 -- 69996999-- INSTRUMENT INSTRUMENT 7000 7000 -- 79997999-- INSULATION INSULATION 8000 8000 -- 89998999-- MISCELLANEOUS MISCELLANEOUS 9000 9000 -- 99999999

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 237: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده236 236

Special Chemical and Solvent SystemsSpecial Chemical and Solvent Systems

AMNAMN AmineAmineAMOAMO AmmoniaAmmoniaCAUCAU Caustic SodaCaustic SodaCHMCHM ChemicalsChemicalsDEADEA didi--Ethanol AmineEthanol AmineDGADGA didi--GlycoleGlycole AmineAmineMEAMEA monomono--Ethanol AmineEthanol AmineMEKMEK Methyl Ethyl Methyl Ethyl KetoneKetoneTOLTOL TolueneToluene

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 238: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده237 237

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSa) Air Systemsa) Air Systems

ISA ISA Instrument AirInstrument AirPLA PLA Plant AirPlant Air

b) b) BlowdownBlowdown and Pump Out Systemsand Pump Out SystemsBDN BDN BlowdownBlowdownCBDCBD Continuous Continuous BlowdownBlowdownIBD IBD Intermittent Intermittent BlowdownBlowdown

c) Condensate Systemsc) Condensate SystemsCOCCOC Cold CondensateCold CondensateHPC HPC High Pressure CondensateHigh Pressure CondensateLPCLPC Low Pressure CondensateLow Pressure CondensateMPCMPC Medium Pressure CondensateMedium Pressure Condensate

d) Drain (Sewer) Systemsd) Drain (Sewer) SystemsCSWCSW Chemical SewerChemical SewerNSWNSW Non Oily SewerNon Oily SewerOSWOSW Oily SewerOily SewerSSWSSW Sanitary SewerSanitary Sewer

Page 239: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده238 238

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSe) Flare Systemse) Flare Systems

FLFL Flare (Normal)Flare (Normal)HFLHFL High Pressure FlareHigh Pressure FlareLFLLFL Low Pressure FlareLow Pressure Flare

f) Fuelsf) FuelsFLGFLG Fuel GasFuel GasFLOFLO Fuel OilFuel OilNGNG Natural GasNatural GasRFORFO Refinery Fuel OilRefinery Fuel Oil

g) Special Gas Systemsg) Special Gas SystemsACGACG Acid GasAcid GasCHLCHL ChlorineChlorineHELHEL HeliumHeliumHYDHYD HydrogenHydrogenNITNIT NitrogenNitrogenOXYOXY OxygenOxygenUTAUTA Utility AirUtility Air

Page 240: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده239 239

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSi) Oil Utility Systemsi) Oil Utility Systems

LBOLBO Lubricating OilLubricating OilSLOSLO Seal OilSeal OilFGOFGO Flushing OilFlushing Oil

j) Steam systemsj) Steam systemsDLSDLS Dilution SteamDilution SteamHORHOR Hot Oil ReturnHot Oil ReturnHOSHOS Hot Oil SupplyHot Oil SupplyHPSHPS High Pressure SteamHigh Pressure SteamLLSLLS Low Low LowLow Pressure SteamPressure SteamLPSLPS Low Pressure SteamLow Pressure SteamMPSMPS Medium Pressure SteamMedium Pressure Steam

Page 241: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده240 240

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSl) Water Systemsl) Water SystemsBFWBFW Boiler Feed WaterBoiler Feed WaterCLW CLW Chlorinated WaterChlorinated WaterCWRCWR Cooling Water ReturnCooling Water ReturnCWSCWS Cooling Water SupplyCooling Water SupplyDIWDIW Distilled WaterDistilled WaterHWSHWS Hot Water SupplyHot Water SupplyHWRHWR Hot Water ReturnHot Water ReturnTWRTWR Tempered Water ReturnTempered Water ReturnTWSTWS Tempered Water SupplyTempered Water SupplyDMWDMW DemineralizedDemineralized WaterWaterDWADWA Drinking WaterDrinking WaterFWA FWA Fire WaterFire WaterHBWHBW High Pressure Boiler Feed WaterHigh Pressure Boiler Feed WaterHCWHCW Hot and Chilled WaterHot and Chilled WaterMBWMBW Medium Pressure Boiler Feed WaterMedium Pressure Boiler Feed WaterPRWPRW Process WaterProcess WaterPWAPWA Plant WaterPlant WaterRWARWA Raw WaterRaw WaterSWASWA Sour WaterSour WaterTWATWA Treated WaterTreated WaterWATWAT WaterWater

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 242: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده241 241

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSk) Process Servicesk) Process ServicesACEACE AcetyleneAcetyleneALCALC AlchoholAlchoholASPASP AsphaltAsphaltBZNBZN BenzeneBenzeneBUTBUT ButaneButaneCATCAT CatalystCatalystETAETA EthaneEthaneETNETN EthyleneEthyleneFOPFOP Fuel Oil ProductFuel Oil ProductGASGAS GasGasGSLGSL GasolineGasolineGSOGSO Gas oilGas oilHRGHRG Hydrogen Rich GasHydrogen Rich GasHCBHCB HydrocarbonHydrocarbonHCHHCH Hydrocarbon with HydrogenHydrocarbon with HydrogenJP4JP4 Jet Fuel (JPJet Fuel (JP--4)4)JTAJTA Jet AJet A--11KER KER KeroseneKeroseneNGHNGH Natural Gas with HydrogenNatural Gas with HydrogenRGHRGH Reformed Gas with HydrogenReformed Gas with Hydrogen

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 243: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده242 242

FLUID ABBREVIATION SYMBOLSFLUID ABBREVIATION SYMBOLSLNA LNA Light NaphthaLight NaphthaLPG LPG Liquefied Petroleum GasLiquefied Petroleum GasMELMEL MethanolMethanolMET MET MethaneMethaneNAP NAP NaphthaNaphthaPNT PNT PentanePentanePRP PRP PropanePropanePPN PPN PropylenePropylenePRA PRA Process AirProcess AirPRO PRO Process FluidProcess FluidRAF RAF RaffinateRaffinateREF REF ReformateReformateREG REG Recycle GasRecycle GasRES RES ResidueResidueSLG SLG SludgeSludgeSLP SLP SlopSlopSUL SUL SulfurSulfur

ww

w.m

blas

tsav

ior.m

ihan

blog

.com

Page 244: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده 243

ENGINEERING STANDARDFORPROCESS DESIGN OF VALVESANDCONTROL VALVES

استاندارد انتخاب شیرها و شیرهاي کنترل

Page 245: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده244 244

Page 246: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده245 245

Page 247: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده246 246

Page 248: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده247 247

Page 249: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده248 248

Page 250: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده249 249

Page 251: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده250 250

Page 252: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده251 251

Page 253: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده252 252

Page 254: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده253 253

Page 255: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده254 254

Page 256: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده255 255

Page 257: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده256 256

Page 258: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

257

Page 259: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

258

Page 260: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

259

Page 261: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

260

Page 262: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

261

Page 263: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

262

Page 264: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

263

Page 265: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

264

Page 266: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

265

Page 267: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

266

Page 268: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

267

Page 269: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

268

Page 270: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

269

Page 271: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

270

جدول مهمجدول مهم

Page 272: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

271

جدول مهمجدول مهم

Page 273: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

272

جدول مهمجدول مهم

Page 274: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده273 273

جدول مهمجدول مهم

Page 275: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

274

Page 276: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

275

Page 277: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

276

Page 278: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

277

Page 279: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

278

Page 280: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

279

Page 281: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

280

Page 282: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

281

Engineering SpecificationforSite Conditions

مشخصات سایت

Page 283: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده282 282

Page 284: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده283 283

Page 285: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده284 284

Page 286: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده285 285

Page 287: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده286 286

Page 288: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده287 287

Page 289: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده288 288

Page 290: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده289 289

Page 291: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده290 290

Page 292: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

291

Page 293: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

292

Page 294: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

293

Page 295: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده 294294

BaseicBaseic engineering Design Dataengineering Design Data

EE--PRPR--200200جمع آوري اطالعات الزم براي یک پروژه جمع آوري اطالعات الزم براي یک پروژه

Page 296: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده295 295295

BEDD BEDD Basic Engineering Design DataBasic Engineering Design DataBEDQBEDQ Basic Engineering Design Questionnaire Basic Engineering Design Questionnaire CON CON ContractorContractor

Page 297: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

296

Page 298: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

297

Page 299: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

298

Page 300: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

299

Page 301: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

300

Page 302: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

301

Page 303: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

302

Page 304: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

303

Page 305: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

304

Page 306: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

305

Page 307: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

306

Page 308: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

307

Page 309: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده308308 308308

Utility servicesThe following utility services shall be covered in the BEDD as applicable.- Steam.- Water.- Condensate.- Fuel.- Air.- Nitrogen.- Electrical Power.- Others.

Page 310: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده309309 309309

Water operating and design conditionsThis section shall include the following types of waters where applicable:a) HP Boiler Feed Water.b) MP Boiler Feed Water.c) Cooling Water Supply.d) Cooling Water Return.e) Raw Water.f) Plant (Service) Water.g) Drinking Water.h) Fire Water.i) Demineralized Water.j) Desalinated Water.

Page 311: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

310

Page 312: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده311 311

Page 313: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده312312 312312

Water specificationA table (see Table A.4 in Appendix A) shall be provided to cover the followingcharacteristics for the services such as circulating cooling water, cooling tower make-up,

raw water/sea water and treated boiler feed water (where applicable):a) Source and Return (if needed).b) Availability over use, in (dm³/s).c) Value, in (cent/1,000 dm³).d) pH.e) Total Hardness as CaCO3, in (mg/kg).f) Calcium as CaCO3, in (mg/kg).g) Magnesium as CaCO3, in (mg/kg).h) Total Alkalinity as CaCO3, in (mg/kg).i) Sodium as CaCO3, in (mg/kg).l) Potassium as CaCO3, in (mg/kg).j) Sulfate as CaCO3, in (mg/kg).k) Chloride as CaCO3, in (mg/kg).m) Nitrate as CaCO3, in (mg/kg).n) Silica as SiO2, in (mg/kg).o) Total Iron, in (mg/kg).p) Suspended Solids, in (mg/kg).q) Dissolved Solids, in (mg/kg).r) COD, in (mg/kg).s) Other

Page 314: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده313313 313313

The The wet bulbwet bulb temperature used for temperature used for cooling cooling towertower design should be based on the design should be based on the locallocalconditionsconditions and effect of cooling tower and effect of cooling tower vaporization.vaporization.

Page 315: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده314314 314314

Gaseous EffluentsGaseous EffluentsRegarding the gaseous effluents to be discharged to the atmospheRegarding the gaseous effluents to be discharged to the atmosphere such as re such as

fired heater flue gas, boiler flue gas, vent gas and etc., the dfired heater flue gas, boiler flue gas, vent gas and etc., the discharging ischarging amounts of the pollutants described below shall be calculated peamounts of the pollutants described below shall be calculated per source.r source.

a) a) SOxSOx..b) b) NOxNOx..c) Solid Particles.c) Solid Particles.d) H2S, NH3, d) H2S, NH3, HClHCl, HF, etc.., HF, etc..e) Cl2, F2.e) Cl2, F2.f) CO.f) CO.g) Hydrocarbons.g) Hydrocarbons.h) Metal and its compounds; Hg, Cu, As, h) Metal and its compounds; Hg, Cu, As, PbPb, , CdCd, etc., etc.

Page 316: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده315315 315315

Chemicals and AdditivesChemicals and AdditivesThe following chemicals shall be stipulated:The following chemicals shall be stipulated:a) Solvents such as Furfural, etc..a) Solvents such as Furfural, etc..b) b) NaOHNaOH, H2SO4, , H2SO4, HClHCl, etc.., etc..c) Inhibitors for corrosion, fouling, polymerization, etc..c) Inhibitors for corrosion, fouling, polymerization, etc..d) d) AntifoamerAntifoamer..e) Additives for lube oil, finished products, BFW, etc..e) Additives for lube oil, finished products, BFW, etc..f) Amines such as MEA, DEA, DGA, etc..f) Amines such as MEA, DEA, DGA, etc..g) Glycol, methanol, etc..g) Glycol, methanol, etc..h) Refrigerant;h) Refrigerant;i) Emulsion breaker, filter aids, etc.;i) Emulsion breaker, filter aids, etc.;j) pH control agent;j) pH control agent;k) k) FlocculantFlocculant and coagulant.and coagulant.

Page 317: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

316محمد بهزادي : تهیه کننده 316

Page 318: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

317محمد بهزادي : تهیه کننده 317

Page 319: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

318محمد بهزادي : تهیه کننده 318

Page 320: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

319محمد بهزادي : تهیه کننده 319

Page 321: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

320

Page 322: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

321محمد بهزادي : تهیه کننده 321

Page 323: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

322

Page 324: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

323

Page 325: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده324 324

Page 326: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده325 325

Page 327: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده326326 326326

AirAir

a) Plant Air.a) Plant Air.b) Instrument Air.b) Instrument Air.c) Catalyst regeneration Air.c) Catalyst regeneration Air.A separate table (see Table A.10 of Appendix A) shall be A separate table (see Table A.10 of Appendix A) shall be

provided to cover all services mentioned in 6.5.3.2.7.1 provided to cover all services mentioned in 6.5.3.2.7.1 above for the following above for the following informationsinformations

a) Availability, N ma) Availability, N m³³/h./h.b) Driver Type of Compressor.b) Driver Type of Compressor.c) Dry Air Dew Point.c) Dry Air Dew Point.d) Oil Free Air Requirement.d) Oil Free Air Requirement.

Page 328: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

327

Page 329: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

328

Page 330: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

329

Page 331: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

330

Page 332: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

331

Page 333: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

332

Page 334: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده333 333

Page 335: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

334

Page 336: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده335335 335335

Vessels and columnsVessels and columnsThe following basic design data requirements shall be included iThe following basic design data requirements shall be included in "BEDD" if not n "BEDD" if not

specified in the design criteria:specified in the design criteria:Types of traysTypes of trays, , packing and/or materialspacking and/or materials which are required.which are required.Minimum tray spacing.Minimum tray spacing.Flooding factorsFlooding factors for hydraulic design of towers.for hydraulic design of towers.Required Required residence time for all vessels, columns, KO Drums and all drawresidence time for all vessels, columns, KO Drums and all draw--offsoffs..Minimum and maximum percent of normal flow rate which should be Minimum and maximum percent of normal flow rate which should be considered for considered for

design of tower hydraulic.design of tower hydraulic.Towers, vessels and vessel boots minimum diameterTowers, vessels and vessel boots minimum diameter..Any known Any known diameter, length, or mass limitationdiameter, length, or mass limitation for shipping or shop fabrication of for shipping or shop fabrication of

vessels (if any).vessels (if any).Provision of separate steam out nozzle on all vessels.Provision of separate steam out nozzle on all vessels.Vessel nozzle identification shall be according to the table shoVessel nozzle identification shall be according to the table shown in Appendix B.wn in Appendix B.Vent, steam out and drain nozzles shall be according to the follVent, steam out and drain nozzles shall be according to the following table:owing table:

Page 337: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده336 336

Page 338: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده337337 337337

On all On all horizontalhorizontal vessels, a vessels, a blanked offblanked off ventilation nozzle should be provided on ventilation nozzle should be provided on the top of the vessel near the end the top of the vessel near the end opposite the opposite the manwaymanway. The ventilation . The ventilation nozzle will be sized as follows:nozzle will be sized as follows:

-- DN 100 (4")DN 100 (4") nozzle for vessels up nozzle for vessels up to 4,450 mm tangent lengthto 4,450 mm tangent length;;-- DN 150 (6")DN 150 (6") nozzle for vessels nozzle for vessels 4500 to 7450 mm tangent length4500 to 7450 mm tangent length;;-- DN 200 (8")DN 200 (8") nozzle for vessels nozzle for vessels 7500 mm and longer tangent7500 mm and longer tangent length.length.

Page 339: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده338338 338338

Storage tanks and offsite facilitiesStorage tanks and offsite facilitiesThe following requirements shall be specified on "BEDD".The following requirements shall be specified on "BEDD".Numbers and capacity selection policy of storage tanks, separateNumbers and capacity selection policy of storage tanks, separately for the following ly for the following

cases:cases:-- Feed Tanks.Feed Tanks.-- Intermediate Product Tanks.Intermediate Product Tanks.-- Finished Product Tanks.Finished Product Tanks.Maximum blending time for preparation of each finished product.Maximum blending time for preparation of each finished product.Type of blending of the finished products.Type of blending of the finished products.Basic philosophy for selection of type of the tanks.Basic philosophy for selection of type of the tanks.Height of the tanks.Height of the tanks.Type of fire fighting facilitiesType of fire fighting facilities to be considered for various types of tanks.to be considered for various types of tanks.Type of product loading and Type of product loading and maximum operating time per day of the loading facilities.maximum operating time per day of the loading facilities.Gas blanketing source and requirement for the storage tanksGas blanketing source and requirement for the storage tanks if applicable.if applicable.

Page 340: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

339

Page 341: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

340

Page 342: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

341

Page 343: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

342

Page 344: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

343

Page 345: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

344

Page 346: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

345

Page 347: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

346

Page 348: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

347

Page 349: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

348

Page 350: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده349 349

Page 351: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

350محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده 350350

The process and utility battery limit conditions shall cover theThe process and utility battery limit conditions shall cover thefollowings:followings:

a) a) Producer Battery Limit (Pressure and Temperature).Producer Battery Limit (Pressure and Temperature).b) b) Consumer Battery Limit (Pressure and Temperature).Consumer Battery Limit (Pressure and Temperature).The equipment mechanical design conditions shall cover the The equipment mechanical design conditions shall cover the

followings:followings:a) a) Piping (Design Pressure and Design Temperature).Piping (Design Pressure and Design Temperature).b) b) Vessels and Exchangers (Design Pressure and Design Vessels and Exchangers (Design Pressure and Design

Temperature).Temperature).c) c) Turbines (Design Pressure and Design Temperature).Turbines (Design Pressure and Design Temperature).

Page 352: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

351

Page 353: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

352

Page 354: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بھزادیمحمد بھزادی::تھیھ کنندهتھیھ کننده353353 353353

Climatic dataClimatic dataTemperature:Temperature:-- Maximum recorded.Maximum recorded.-- Minimum recorded.Minimum recorded.-- Winterizing.Winterizing.-- Wet bulb*.Wet bulb*.-- Dry bulb.Dry bulb.

Page 355: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

354

Page 356: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

355

Page 357: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

356

Page 358: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

357

Page 359: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

358

Page 360: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

359

Page 361: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

360

Page 362: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

361

Page 363: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

362

Page 364: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

363

Page 365: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

364

Page 366: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

365

Page 367: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

366

Process Design Criteria

Page 368: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده367 367

Page 369: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده368 368

Page 370: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده369 369

Page 371: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده370 370

Page 372: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده371 371

Page 373: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده372 372

Page 374: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده373 373

Page 375: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده374 374

Page 376: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده375 375

Page 377: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده376 376

Page 378: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده377 377

Page 379: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده378 378

Page 380: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده379 379

Page 381: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده380 380

Page 382: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده381 381

Page 383: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده382 382

Page 384: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده383 383

Page 385: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده384 384

Page 386: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده385 385

Page 387: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده386 386

Page 388: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي : تهیه کننده387 387

Page 389: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

ENGINEERING STANDARDFOR

PRESSURE STORAGE SPHERES FOR (LPG)

Page 390: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

389

Page 391: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

390

Page 392: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

391

Page 393: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

392

Page 394: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

393

Page 395: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

394

Page 396: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

395

Page 397: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

396

Page 398: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

397

Page 399: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

398

Page 400: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

399

Page 401: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

400

Page 402: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

401

Page 403: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

402

ENGINEERING STANDARDENGINEERING STANDARDFORFOR

LAYOUT AND SPACINGLAYOUT AND SPACING

Page 404: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده403 403

This Standard Specification covers the basic This Standard Specification covers the basic requirements of the plant layout and spacing requirements of the plant layout and spacing of oil & gas refineries, petrochemical and of oil & gas refineries, petrochemical and similar chemical plants to ensure similar chemical plants to ensure safetysafety and and fire preventionfire prevention together with ease of operation together with ease of operation and maintenance.and maintenance.

Page 405: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده404 404

API API (AMERICAN PETROLEUM INSTITUTE)(AMERICAN PETROLEUM INSTITUTE)RPRP--500 A 500 A "Recommended Practice for Classification of Location for Electri"Recommended Practice for Classification of Location for Electrical cal

Installation in Petroleum Refineries", Edition Fourth, Jan. 1982Installation in Petroleum Refineries", Edition Fourth, Jan. 1982API Std. 620 API Std. 620 "On Large, Welded, Low Pressure Storage Tanks""On Large, Welded, Low Pressure Storage Tanks"API Std. 650API Std. 650 "On Welded Steel Tanks for Oil Storage""On Welded Steel Tanks for Oil Storage"ASME ASME (AMERICAN SOCIETY OF MECHANICAL ENGINEERS)(AMERICAN SOCIETY OF MECHANICAL ENGINEERS)

"Boilers and Pressure Vessel Codes":"Boilers and Pressure Vessel Codes":-- Section I, Power BoilersSection I, Power Boilers-- Section VIII, Pressure VesselsSection VIII, Pressure Vessels

ASCE ASCE (AMERICAN SOCIETY OF CIVIL ENGINEERS)(AMERICAN SOCIETY OF CIVIL ENGINEERS)"Minimum Design Loads for Structures""Minimum Design Loads for Structures"

IPS IPS (IRANIAN PETROLEUM STANDARDS)(IRANIAN PETROLEUM STANDARDS)IPSIPS--CC--MEME--100100 "Atmospheric Above Ground Welded Steel Storage Tanks""Atmospheric Above Ground Welded Steel Storage Tanks"IPSIPS--EE--ELEL--110110 "Electrical Area Classification & Extent""Electrical Area Classification & Extent"IPSIPS--CC--MEME--110110 "Large Welded Low Pressure Storage Tanks""Large Welded Low Pressure Storage Tanks"IPSIPS--CC--MEME--120120 "Aviation Turbine Fuel Storage Tanks""Aviation Turbine Fuel Storage Tanks"IPSIPS--CC--MEME--130130 "Pressure Storage & Spheres (for LPG)""Pressure Storage & Spheres (for LPG)"IPSIPS--EE--CECE--160160 "Geometric Design of Roads""Geometric Design of Roads"IPSIPS--GG--PIPI--280 280 "Pipe Supports""Pipe Supports"IPSIPS--EE--PRPR--360360 ““ Process design of liquid & gas transfer & Process design of liquid & gas transfer &

storage storage ““IPSIPS--EE--SFSF--200200 "Fire Fighting Sprinkler Systems""Fire Fighting Sprinkler Systems"IPSIPS--CC--SFSF--550550 "Safety Boundary Limits""Safety Boundary Limits"IPSIPS--DD--PIPI--102 102 "Typical Unit Plot Arrangement & "Typical Unit Plot Arrangement & PipewayPipeway Layout"Layout"IPSIPS--DD--PIPI--103 103 "Pipeline Spacing""Pipeline Spacing"

Page 406: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده405 405

ANSI ANSI (AMERICAN NATIONAL STANDARD INSTITUTE)(AMERICAN NATIONAL STANDARD INSTITUTE)ANSIANSI--MSS Standards,MSS Standards, "Piping Hanger and Supports", 1969 Edition"Piping Hanger and Supports", 1969 Edition

NFPA NFPA (NATIONAL FIRE PROTECTION ASSOCIATION)(NATIONAL FIRE PROTECTION ASSOCIATION)NFPA NFPA "Recommendation Codes and Standards" (See Table A"Recommendation Codes and Standards" (See Table A--1 in Appendix A)1 in Appendix A)NFPA, 59 NFPA, 59 "Standard for the Storage and Handling of Liquefied Petroleum "Standard for the Storage and Handling of Liquefied Petroleum

Gases", Ed. 1989Gases", Ed. 1989NFPA, 251 NFPA, 251 "Standard Methods of Fire Tests of Building, Construction and "Standard Methods of Fire Tests of Building, Construction and

Materials", Ed. 1985Materials", Ed. 1985

IRI IRI (INDUSTRIAL RISK INSURANCE )(INDUSTRIAL RISK INSURANCE )"Requirement on Spacing of Flare""Requirement on Spacing of Flare"

TEMATEMA (TUBULAR EXCHANGER MFRS. ASSN. STANDARD)(TUBULAR EXCHANGER MFRS. ASSN. STANDARD)Uniform Building Uniform Building "From International Conference of Building Office", 1991 Ed."From International Conference of Building Office", 1991 Ed.Code, (UBC)Code, (UBC)

Page 407: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

406

DEFINITIONS AND TERMINOLOGYDEFINITIONS AND TERMINOLOGY

Page 408: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده407 407

DikeDike بند بند Is an earth or concrete wall providing a specified liquid Is an earth or concrete wall providing a specified liquid

retention capacity.retention capacity.Diversion WallDiversion WallIs an earth or concrete wall which directs spills to a Is an earth or concrete wall which directs spills to a

safe disposal area.safe disposal area.Fire ResistiveFire ResistiveFire resistance rating, as the time in minutes or hours, Fire resistance rating, as the time in minutes or hours,

that materials or assemblies have withstand a fire that materials or assemblies have withstand a fire exposure as established in accordance with the test exposure as established in accordance with the test of of NFPA 251.NFPA 251.

L3

Page 409: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

Slide 407

L3 نگھداریLastsavior; 2007/08/23

Page 410: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده408 408

High Flash StockHigh Flash StockAre those having a closed up Are those having a closed up flash point of 55flash point of 55°°C or overC or over (such (such

as as heavyheavy fuel oil, lubricating oilsfuel oil, lubricating oils, etc.)., etc.).This category does not include any stock that may be stored at This category does not include any stock that may be stored at

temperatures above or within 8temperatures above or within 8°°C of its flash point.C of its flash point.LowLow--Flash StocksFlash StocksAre those having a closed up flash point Are those having a closed up flash point under 55under 55°°CC such as such as

gasolinegasoline, , kerosenekerosene, , jet fuelsjet fuels, , some heating oilssome heating oils, , diesel fuelsdiesel fuelsand and any other stock that may be stored at any other stock that may be stored at temperatures temperatures above or within 8above or within 8°°C of itC of it’’s flash point.s flash point.

NonNon--CombustibleCombustibleMaterial incapable of igniting or supporting combustion.Material incapable of igniting or supporting combustion.

Page 411: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده409 409

Pipe RackPipe RackThe pipe rack is the elevated supporting structure used The pipe rack is the elevated supporting structure used

to convey piping between equipment. This structure to convey piping between equipment. This structure is also utilized for is also utilized for cable trayscable trays associated with electricassociated with electric--power distribution and for power distribution and for instrument trayinstrument tray..

Plot PlanPlot PlanThe plot plan is the The plot plan is the scaled planscaled plan drawing of the drawing of the

processing facility.processing facility.SleepersSleepers

The sleepers comprise the gradeThe sleepers comprise the grade--level supporting level supporting structure for piping between equipment for facilities, structure for piping between equipment for facilities, e.g., tank farm or other remote areas.e.g., tank farm or other remote areas.

Page 412: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده410 410

Toe WallToe WallIs a low earth, concrete, or Is a low earth, concrete, or masonerymasonery unit curb without unit curb without

capacity requirements for the retention of small leaks capacity requirements for the retention of small leaks or spills.or spills.

Vessel DiameterVessel DiameterWhere vessel spacing is expressed in terms of vessel Where vessel spacing is expressed in terms of vessel

diameter, the diameter of the diameter, the diameter of the largest vessellargest vessel is used. is used. For spheroids, the diameter at the For spheroids, the diameter at the maximum equatormaximum equatoris used.is used.

Vessel SpacingVessel SpacingIs the unobstructed distance between vessel shells or Is the unobstructed distance between vessel shells or

between between vessel shellsvessel shells and nearest edge of and nearest edge of adjacentadjacentequipmentequipment, property lines, or buildings., property lines, or buildings.

Page 413: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده411 411

SYMBOLS AND SYMBOLS AND ABBREVIATIONSABBREVIATIONS

BP BP == Boiling PointBoiling PointHVAC HVAC == Heating, Ventilation and Air Heating, Ventilation and Air

ConditioningConditioningIC IC = = IncombustiblesIncombustiblesIRI IRI == Industrial Risk InsuranceIndustrial Risk InsuranceLPG LPG = = Liquefied Petroleum GasLiquefied Petroleum GasNFPANFPA == National Fire Protection AssociationNational Fire Protection AssociationOD OD == Outside DiameterOutside DiameterOGP OGP == Oil, Gas and PetrochemicalOil, Gas and PetrochemicalOIA OIA == Oil Insurance AssociationOil Insurance AssociationSIC SIC == Sheathed IncombustibleSheathed IncombustibleTEMA TEMA == Thermal Thermal ExchargersExchargers Manufacturers Manufacturers

AssociationAssociation

Page 414: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده412 412

SOME KEY ISSUES RELATED TO LAYOUTSOME KEY ISSUES RELATED TO LAYOUTSafety and EnvironmentSafety and EnvironmentFamiliarization with pertinent Environmental Regulations, Familiarization with pertinent Environmental Regulations,

(Local, National and International), and how they might (Local, National and International), and how they might change is essential change is essential periorperior to conclusion of preto conclusion of pre--project project studies.studies.

Attention shall be given to the pertinent safety regulations, Attention shall be given to the pertinent safety regulations, including health and welfare needs. Hazardous and including health and welfare needs. Hazardous and flammable materials require special handling, which can flammable materials require special handling, which can take up layout space.take up layout space.

If the process fluids are especially toxic, layout is affected If the process fluids are especially toxic, layout is affected by the need for close chemical sewers and other by the need for close chemical sewers and other protection measures. Security requirements may require protection measures. Security requirements may require special layout design when the plant produces a highspecial layout design when the plant produces a high--value product.value product.

If a plant site is governed by particular building, piping, If a plant site is governed by particular building, piping, plumbing, electrical and other codes, these can affect plumbing, electrical and other codes, these can affect plant layout. Similar governing standards and regulation plant layout. Similar governing standards and regulation in plant site affects the layout concept.in plant site affects the layout concept.

Page 415: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده413 413

ThroughputThroughput

It is important not only to know the initial capacity but also tIt is important not only to know the initial capacity but also to o have a good feel for how much the plant might be expanded have a good feel for how much the plant might be expanded in the future, as well as how likely the process technology is in the future, as well as how likely the process technology is to be modernized. These factors indicate how much space to be modernized. These factors indicate how much space should be left for additional equipment.should be left for additional equipment.

Multiple processing lines (trains), are often required for the pMultiple processing lines (trains), are often required for the plant. lant. Pairs of trains can either be identical or be mirror images. ThePairs of trains can either be identical or be mirror images. Theformer option is less expensive. But the mirror image former option is less expensive. But the mirror image approach is sometimes preferable for layout reasons. Two approach is sometimes preferable for layout reasons. Two such reasons are:such reasons are:

a) a) For operator access via a central aisle.For operator access via a central aisle.b) b) The need that the outlet sides of two lines of equipment The need that the outlet sides of two lines of equipment

(pumps, for instance) point toward each other so that they can (pumps, for instance) point toward each other so that they can be readily hooked to one common line.be readily hooked to one common line.

www.mblastsavior.mihanblog.com

Page 416: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده414 414

BASIC CONSIDERATIONSBASIC CONSIDERATIONSGeneralGeneral

The plant layout shall be arranged for:The plant layout shall be arranged for:a) a) maximization of safetymaximization of safety;;b) b) prevention of the spread of fireprevention of the spread of fire and also and also ease of operationease of operation;;c) c) maintenance consistent with maintenance consistent with economical designeconomical design and and future future

expansionexpansion..BlockingBlockingThe plant site shall be blocked in consideration of hazards The plant site shall be blocked in consideration of hazards

attendant to plant operation in the area. All blocked areas attendant to plant operation in the area. All blocked areas shall be formed as square as possible by divided access shall be formed as square as possible by divided access roads and/or boundary lines.roads and/or boundary lines.

Location and WeatherLocation and WeatherThe plant layout shall be arranged in consideration of The plant layout shall be arranged in consideration of

geographic location and geographic location and weatherweather in the region of the site.in the region of the site.

Page 417: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده415 415

Prevailing WindPrevailing WindWhere the prevailing wind is defined, the administration and Where the prevailing wind is defined, the administration and

service facilities and directly fired equipment, etc., shall be service facilities and directly fired equipment, etc., shall be located located windwardwindward of of process Units and storage tanksprocess Units and storage tanks, etc., etc.

Layout IndicationLayout IndicationThe basic requirements to be met in the appropriate diagram The basic requirements to be met in the appropriate diagram

when making a piping and equipment layout are:when making a piping and equipment layout are:All All equipmentequipment, , laddersladders, , structuresstructures, shall be indicated., shall be indicated.All All instrumentinstrument shall be located and indicated.shall be located and indicated.All All valvingvalving and and handwheelhandwheel orientationsorientations shall be indicated.shall be indicated.Drip funnelDrip funnel locations for locations for underground drainsunderground drains shall be indicated.shall be indicated.All All electrical switchelectrical switch grearsgrears, , lighting lighting pannelspannels shall be indicated.shall be indicated.All All sample systemssample systems shall be indicatedshall be indicated

www.mblastsavior.mihanblog.com

Page 418: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده416 416

PLANT LAYOUTPLANT LAYOUTArea ArrangementArea ArrangementClassified blocked areas, such as Classified blocked areas, such as process areasprocess areas, , storage areasstorage areas, , utilities areasutilities areas, a, administrationdministration and and

service areasservice areas, and other areas shall be arranged as follows:, and other areas shall be arranged as follows:1) 1) The The process areaprocess area shall be located in the most convenient place for operating theshall be located in the most convenient place for operating the process Unit.process Unit.2) 2) The The storage areastorage area shall be located shall be located as far as possibleas far as possible from from buildings occupied by personnelbuildings occupied by personnel at the at the

site, but should be located site, but should be located near the process areanear the process area for ready operation of the feed stocks and for ready operation of the feed stocks and product runproduct run--downs.downs.

3) 3) The The utilitiesutilities area shall be located area shall be located beside the process areabeside the process area for ready supply of utilities.for ready supply of utilities.4) 4) Loading and unloadingLoading and unloading area shall be located on a area shall be located on a cornercorner of the site with capable of the site with capable connectionconnection to to

public roadpublic road directly, for directly, for inland trafficsinland traffics. For . For marine transportationmarine transportation, the area shall be located on the , the area shall be located on the seaside or riverside in the plant site.seaside or riverside in the plant site.

5) 5) The administration and service areaThe administration and service area shall be located at a shall be located at a safesafe place on the site in order to protect place on the site in order to protect personnel from hazards. It shall preferably be located personnel from hazards. It shall preferably be located near the main gatenear the main gate alongsidealongside the the main roadmain roadof the plant.of the plant.

6) 6) Flare and burn pitFlare and burn pit shall be located at the shall be located at the endend of the site with of the site with sufficient distancesufficient distance to prevent to prevent personnelpersonnelhazard.hazard.

7) 7) Waste waterWaste water treating Unit shall be located near at the treating Unit shall be located near at the lowest pointlowest point of the site so as to collect all of of the site so as to collect all of effluent streams from the processing Unit.effluent streams from the processing Unit.

8) 8) The process Unit to which the The process Unit to which the feed stock is charged firstfeed stock is charged first, shall be located on the side , shall be located on the side nearnear the the feed feed stock tanksstock tanks, to minimize the length of the feed line., to minimize the length of the feed line.

9) 9) The process Unit from which the final The process Unit from which the final product(sproduct(s) is (are) withdrawn, shall be located on the side near ) is (are) withdrawn, shall be located on the side near the products tanks to minimize the length of the product runthe products tanks to minimize the length of the product run--down line.down line.

10) 10) Process Units in which Process Units in which large quantities of utilitieslarge quantities of utilities are consumed, should be preferably located on are consumed, should be preferably located on the side the side near the utilitynear the utility centercenter..

Page 419: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده417 417

RoadwaysRoadways

1) 1) Road and access ways shall offer easy access for Road and access ways shall offer easy access for mobile equipment during constructionmobile equipment during construction and and maintenance, maintenance, fire fightingfire fighting and and emergency escapeemergency escape in in a fire situation.a fire situation.

2) 2) Unless otherwise specified by the Company, the Unless otherwise specified by the Company, the defined roads shall be made as stated in defined roads shall be made as stated in IPSIPS--EE--CECE--160160, ", "Geometric Design of RoadsGeometric Design of Roads".".

3) 3) Access roads shall be Access roads shall be at least 3 mat least 3 m from processing from processing equipment between road edges equipment between road edges to prevent vehicle to prevent vehicle collisions.collisions.

Page 420: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده418 418

PiperacksPiperacks and Sleepersand Sleepers

piperackpiperack for process Units and pipe sleeps for for process Units and pipe sleeps for the offthe off--site facilities shall be considered as the site facilities shall be considered as the principals support of the pipe way principals support of the pipe way

Single level pipe racks are preferred, if more Single level pipe racks are preferred, if more than one level is required, the distance than one level is required, the distance between levels oriented in the same direction between levels oriented in the same direction shall be adequate for maintenance but not shall be adequate for maintenance but not less than 1.25 meters less than 1.25 meters

Page 421: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده419 419

Maximum Maximum piperackpiperack widths shall be 10 m. If widths shall be 10 m. If widths larger than 10 m are required, the widths larger than 10 m are required, the piperackpiperack shall be designed to be of two stage. shall be designed to be of two stage. Actual widths shall be 110% of the required Actual widths shall be 110% of the required widths or the required widths plus 1m. In widths or the required widths plus 1m. In cases where air fin coolers are to be placed on cases where air fin coolers are to be placed on the the piperackspiperacks, the , the piperackpiperack widths shall be widths shall be adjusted based on the length of the air adjusted based on the length of the air coolers.coolers.

Page 422: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده420 420

Allow ample space for routing instrument lines Allow ample space for routing instrument lines and electrical conduit. Provide 25% additional and electrical conduit. Provide 25% additional space for future instrument lines and electrical space for future instrument lines and electrical

Provide 20% additional space on the pipe rack Provide 20% additional space on the pipe rack for future piping for future piping

Pipe racks outside process areas shall have the Pipe racks outside process areas shall have the following minimum overhead refinery/plant following minimum overhead refinery/plant clearances: main roadway clearances: main roadway --5 meters , access 5 meters , access roads roads --4.5 meters, railroads 4.5 meters, railroads --6.7 meters above 6.7 meters above top of rail.top of rail.

Page 423: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده421 421

Typical layout of Typical layout of piperackpiperack, for process plants depending on the , for process plants depending on the number of process Units incorporated and the process complexitienumber of process Units incorporated and the process complexities s are given in Figs. 1 through 4 with reference descriptions as foare given in Figs. 1 through 4 with reference descriptions as follow:llow:

a) a) "Single Rack Type" layout, is suitable for small scale process "Single Rack Type" layout, is suitable for small scale process complex consisting of twocomplex consisting of two--three process Units. It is economical three process Units. It is economical without requiring any large area.without requiring any large area.

Page 424: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده422 422

"Comb Type" layout shown in Fig. 2, is recommended for use in pr"Comb Type" layout shown in Fig. 2, is recommended for use in process, ocess, complex consisting of three or more process Units. "Single Rack complex consisting of three or more process Units. "Single Rack Type" in this Type" in this case will not be suitable since separate maintenance and utilitycase will not be suitable since separate maintenance and utility administration administration in normal operation will be difficult because of the utility andin normal operation will be difficult because of the utility and flare line which flare line which are placed on the common rack.are placed on the common rack.

Page 425: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده423 423

"Double Comb Type" layout is an expansion of the "Comb Type" wh"Double Comb Type" layout is an expansion of the "Comb Type" which is ich is recommended for the use in recommended for the use in largescalelargescale process complexes where five to ten process complexes where five to ten process Units are to be arranged. This layout as shown below in process Units are to be arranged. This layout as shown below in Fig. 3, can Fig. 3, can be conveniently utilized.be conveniently utilized.

Page 426: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده424 424

"U Type" layout shown in Fig. 4, is recommended to be used in ca"U Type" layout shown in Fig. 4, is recommended to be used in case of process se of process Units whose maintenance cannot be conducted separately, within tUnits whose maintenance cannot be conducted separately, within the he complex. This type can be regarded as an expansion of the "Singlcomplex. This type can be regarded as an expansion of the "Single Rack e Rack Type". Even process complexes of this nature, can be regarded asType". Even process complexes of this nature, can be regarded as one one process Unit in the planning of their layout.process Unit in the planning of their layout.

www.mblastsavior.mihanblog.com

Page 427: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده425 425

The control room and substation shall be The control room and substation shall be located from an economical standpoint so as located from an economical standpoint so as to minimize the length of electrical and to minimize the length of electrical and instrument cables entering and leaving instrument cables entering and leaving therefromtherefrom

The control room shall be positioned so that the The control room shall be positioned so that the operator can command a view of the whole operator can command a view of the whole system which is under control. Large system which is under control. Large buildings, or equipment shall not be placed in buildings, or equipment shall not be placed in front of the control room.front of the control room.

Page 428: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده426 426

Page 429: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده427 427

Page 430: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

محمد بهزادي:تهیه کننده428 428

Page 431: PFD-P&ID training courseeng-chem.ir/wp-content/uploads/2020/07/PFD-PID-دوره.pdfPFD-P&ID ﻲﺷزﻮﻣآ هرود PFD-P&ID training course Mohammad Behzadi يداﺰﻬﺑ ﺪﻤﺤﻣ

سخن پایانی ترقی پیدا کردن ومن آن را عصر روشن ایران می نامم، مهمترین دغدغه براي پیشرفت و به نظر می رسد در عصري که آن را عصرانفجار اطالعات نامیده اند

بهترین سیستم آموزشی براي ف در جزوات اخیر سعی شده است بر اساس تجربه و مطالعه چندین منبع مختل .منابع درست مطالعاتی می باشد.سریعترین نتیجه گیري ارائه شود

این درسی است که از طبیعت گرفتم ! م را بر روي خود گشوده خواهید دیدمطمئن باشید که با بخشش علمی به اطرافیان درهاي پنهان و ناگشوده عل .انتقال دانش به دیگران همان منشا خال علمی شماست .دقدرتمندي و ویران کنندگی یک گردباد به میزان خال درون آن بستگی دار.

.این حقیر بودنداین جزوه تقدیم می شود به پدر و مادرم که پشتوانه اي بی بدیل براي !!دم به ایران فردا به دلیل بخشندگی و تواضع علمی این گروه اندك است و با تشکر از تمام کسانی که صمیمانه در این راه یاورم بودند که امی

:اده شده استاز منابع دوستان با تشکر فراوان از زحمات این عزیزان در جزوات استفغالمرضا باغمیشه -نوشته رضا درستی Hysysاموزش غالمرضا باغمیشه -نوشته رضا درستی Aspen Plusاموزش نوشته محمد پوربافرانی Aspen Plusاموزش

مهندسین مشاور تهران رایمند روشهاي کنترل فرآیندمهندس محسن تقوي فرابزار دقیق و کنترل فرآیند

Rules of thumb for chemical engineers Carl BrananApplied process design ernest ludwigChemical process equipment Stanley walas

.اري نماییدخواهشمند است در تصحیح و بهتر نمودن آن از طریق تماس این حقیر را ی . به طور قطع این جزوه خالی از اشکال نمی باشد!طح علمی طرفین خواهم بوددر صورت تمایل آماده به همکاري علمی با دوستان جدیدم براي افزایش س

. جزوات با اینجانب تماس و هماهنگی فرمایید رایگانبراي دریافت )بخش مهندسی شیمی.(ی باشدهمواره آخرین جزوه به روز شده هر مبحث از طریق وبالگ قابل دانلود م