Quality Management
Plan Procedure
Procedures are subject to change without notice.
Check the Capital Project Delivery website
to ensure this is the current version.
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
2/13
Table of Contents
Quality Management Plan Overview .................................................................. 1
Introduction ............................................................................................... 1
Objectives .................................................................................................. 1
Quality Management Plan Preparation ............................................................ 2
Basic Requirements and Scope ..................................................................... 2
Quality Management Plan Requirements ........................................................... 3
Management Responsibility .......................................................................... 3
Quality Documentation ................................................................................ 4
Design Review ............................................................................................ 4
Design Control ............................................................................................ 5
Document Control ....................................................................................... 6
Control of Consultants and Sub-Consultants ................................................... 6
Control of Department Supplied Materials: ..................................................... 7
Design Process Control ................................................................................ 7
Control of Non-Conforming Design ................................................................ 7
Corrective and Preventive Action ................................................................... 8
Control of Quality Records ............................................................................ 9
Quality Audits ........................................................................................... 10
Training ................................................................................................... 10
Handling, Storage, Packaging, Preservation and Delivery ............................... 11
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
3/13
Program Ma
Revision 2
Quality Management Pl
Quality Management Pl
Introduction
Quality is defined as the degree
expectations. A Quality Manag
standards, quality practices, res
describes how an organization
Management Plan will be custo
specific QM requirements shall
Statement for the project.
Every capital project initiated b
requirements. Establishing org
effectively serve the public by
A designer (prime consultant)
Plan from the Departments Pr
Consultant Agreement with the
Quality Management Plan by th
execution of an Agreement by t
In the event that a firm is select
that the selected firm does not hhave 10 business days (busines
the date of receipt of written no
Quality Management Plan from
approved Quality Management
Consultant Selection Committe
another qualified firm. The CS
another qualified firm.
Objectives
All Designers (Prime consultan
managing all phases of the Capi
The Designer is responsible for
controls that will be applied d
and Construction.
agement Office
Rel
an Procedure
an Overview
to which the product or the service performed meet
ement (QM) Plan is a document or set of document
urces, and processes pertinent to an organization.
ill implement the Quality Management Policy. Th
mized to establish the projects specific QM require
be placed within the Design Communications Repo
y NJDOT will utilize the QM Plan to establish proj
nizational Quality Management Plans will enable
aving a common quality standard for all projects.
ho has failed to submit and obtain an approved Qu
gram Management Office will not be permitted to e
New Jersey Department of Transportation (NJDOT
e NJDOT is a prerequisite of the designer (prime c
he NJDOT.
d by the Consultant Selection Committee (CSC) an
ave an approved Quality Management Plan, the selday is any day exclusive of Saturdays, Sundays an
tice of their firm being selected to submit and attain
the NJDOT Program Management Office. Failure t
Plan within the specified 10 business day period wil
voiding the selection of the firm and the CSC will
shall follow Policy & Procedure 312 for guidance
ts and NJDOT In-House Design) will examine thei
tal Program and develop a Quality Management Pl
developing the QM Plan. The plan will document t
uring Concept Development, Preliminary Engineer
leased: 09/2011
s the customer's
that describe the
he QM Plan
Quality
ents. Project
rt and the Scope
ct specific QM
JDOT to
lity Management
nter into a
. Approval of a
nsultant) prior to
d it is determined
cted firm willholidays)from
approval of a
o attain an
l result in the
make selection of
in selecting
role in efficiently
n.
he specific quality
ing, Final Design,
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
4/13
Proced
Check the Capital Proj
Revision 2
Quality Management Plans s
elimination of any QM Plan re
and approval.
Quality Management P
This procedure has been prep
elements required for all Desig
All Designers (in-house and c
Management Plan. The Design
Project Delivery Website, Des
Management Plans, and perf
controlled and executed by th
CPM Audit Procedure goal i
Procedures and Quality Manag
The PMO will also provide
technology and products, act a
recommend improvements, as n
Basic Requirements a
This section defines the requ
establish, implement and exec
design, specified materials, ba
with design requirements.
The Designer shall be rthis end, the Designer s
shall be maintained by
All surveys, design calbridge and highway de
deviations are specifica
Such deviations must b
using the Interactive C
During all phases of thEngineering, Final Desi
assurance functions on
of the Quality Manage
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 2 of 11 Rel
hall address all requirements described herein.
quirements shall require Program Management Of
lan Preparation
ared to provide a general outline of the Quality
ers.
nsultant) are required to create and electronically
er will upload the Quality Management Plan onto t
igner Upload page. The PMO will review and a
rm periodic quality audits. The CPM Audit
PMO and Capital Program Management senior
s to evaluate a projects quality level and com
ment Policy.
for training of all personnel as needed, promot
quality management representatives in dealing wi
eeded.
d Scope
irements of the Quality Management Plan that t
ute before and during the performance of the des
seline survey, design processes and studies that a
esponsible for providing a quality product to/for the
hall have planned and established a Quality Manage
the organization.
ulations and studies shall be in accordance with cur
ign. Failure of the Designer to follow standard desi
lly described, shall constitute justification for rejecti
documented in the projects Design Communicati
mmunications Procedure.
Capital Delivery Process, (Concept Development,
gn and Construction) of the project, the PMO shall
the Designers projects. These functions shall inclu
ent Plan via the Audit Procedure. The quality assur
nt version.
leased: 09/2011
The reduction or
ice (PMO) review
Management Plan
submit a Quality
he NJDOT Capital
prove all Quality
rocedure will be
anagement. The
liance to NJDOT
the use of new
h the FHWA, and
he Designer shall
ign to furnish the
e in conformance
Department. To
ment Plan that
rent standards for
n practice, unless
on of the work.
ns Report (DCR)
Preliminary
perform quality
e random checks
ance functions
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
5/13
Proced
Check the Capital Proj
Revision 2
shall be performed ind
responsibilities.
The quality review pro
Process. Project Mana
resources will be held a
Preliminary Engineerin
Quality Management Pl
Quality Management Plans shal
Procedure and only the14 elem
elements shall not to be added.
they shall not to be included as
Management Responsi
Quality Management P
statement of its beliefs about qu
The Quality Management Pla
documents the quality goals, th
Responsibility and Autho
Project Manager and Des
The Project Manager a The Project Manager a
procedures.
The Project Manager aunderstood, implement
Program Management O
The PMO will review a The PMO will be respo
compliance to NJDOT
Resources:The Quality Man
assignment of trained personnel
(Names of the individuals are n
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 3 of 11 Rel
pendent of and in addition to the Designer's quality
esses will be integrated into the phases of the Capit
ers, Designers, Subject Matter Experts (SMEs), an
ccountable for project quality for the Concept Deve
g, Final Design and Construction phases and submi
an Requirements
l specifically address the required 14 elements of th
nts. (The 14 elements shall not to be renamed or re
hecklists and forms should be maintained in the O
Attachments or Appendices).
bility
licy: Quality Management Policy is an orga
ality, how quality will come about and its expected
n shall be consistent with the Quality Manage
expectations, and needs of the NJDOT on capital
rity:
gner:
d Designer are responsible for the projects overall
d Designer will be compliant to all NJDOT quality
d Designer shall assure that the quality policies and
d and maintained within the project team.
fice (PMO):
nd approve the Quality Management Plan.
nsible for performing internal and external Quality
uality standards and the Quality Management Plan.
agement Plan will identify resource requirements, i
for management, performance of work and verifica
t to be provided provide titles only)
nt version.
leased: 09/2011
control
l Delivery
external
lopment,
sions.
QM Plan
umbered. New
ganizations files;
izations general
results.
ent Policy which
rojects.
quality.
policies and
procedures are
udits, assuring
cluding the
tion activities.
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
6/13
Proced
Check the Capital Proj
Revision 2
Quality Documentatio
General:Quality Documentat
responsibilities and procedures
The Designer shall establish, d
providing a design product that
shall include or make reference
used in the Quality Managemen
Quality Management Pla
documented procedures consist
A Quality Management Plan is
practices, resources and proces
The Quality Management Plan
met. The plan shall be consiste
when applicable the consultant'
Design Review
The Quality Management Plan
of all applicable activities to ve
Review and modification
responsibilities for coordinating
and the process for identifying
reviewed and agreed upon by t
Records:Records of design r
personnel directly involved in t
used to record all design review
Communications Report.
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 4 of 11 Rel
ion is a formalized system that documents the struct
required to achieve effective quality management.
cument and maintain a Quality Management Plan a
conforms to specified requirements. The Quality M
to the work procedures and outline the structure of
t Policy (Policy and Procedure 360).
:The Quality Management Plan will have project
nt with the requirements within the Quality Manag
a document or set of documents that describe the st
es pertinent to an organization.
shall define and document how the requirements for
t with all other requirements of the Quality Manage
s quality policy.
shall document procedures for design reviews and f
ify that the services meet NJDOT requirements.
to the Design:The Quality Management Plan s
and conducting design reviews, distribution of doc
nd modifying discrepancies. All design commitme
e Project Manager.
views and modifications shall be maintained and m
e review process. The Interactive Communication
s and modifications, which shall be recorded in the
nt version.
leased: 09/2011
ure,
a means of
nagement Plan
he documentation
pecific
ment Policy.
ndards, quality
quality will be
ment Policy, and
r the coordination
all document the
ments for review,
ts shall be
ade accessible to
Procedure will be
Design
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
7/13
Proced
Check the Capital Proj
Revision 2
Design Control
General:The Quality Manag
design meets the specified requ
Design Input:A framework
Designer shall record and verif
design criteria, including codes
personnel.
Design schedules and design co
any deviations.
The Interactive Communication
comments from NJDOT units a
Manager and the Designer.
Design Output:The Design
completed designs are construc
established regulatory standard
External Resources shall establi
revisions to written procedures,
These reviews and procedures
Design Changes:Before i
identified, documented, review
Communication and Coo
groups that have input into the
documented, transmitted and re
reached through communicatio
Report of the Interactive Com
These groups shall include theand applicable outside agencies
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 5 of 11 Rel
ment Plan shall document procedures to control an
irements.
for initial design planning activities shall be establi
information and data on field surveys and inspecti
and standards, shall be established and made availa
st estimates shall be monitored and adhered to, with
s Procedure is the documented procedure for respo
nd External Resources that have been coordinated b
r shall establish methods and implement reviews to
table, functional, meet the requirements of the NJD
.
sh and implement procedures to determine that only
codes, standards and relevant documents are used.
ust be compliant to the Interactive Communication
plementation, all design changes and modifications
d and reported to the Project Manager and Designe
dination:Communication and coordination betw
esign process shall be defined and the necessary in
gularly reviewed, as per the Quality Management Pl
and coordination will be documented in the Desig
unications Procedures.
rogram Managers, Project Managers, Designers, E.
nt version.
leased: 09/2011
verify that the
hed. The
ns. All relevant
le to design
documentation of
ding to all
y the Project
determine that
T and conform to
the most recent
s Procedures.
shall be
for approval.
en different
ormation
an. Agreements
Communications
ternal Resources,
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
8/13
Proced
Check the Capital Proj
Revision 2
Document Control
General:The Quality Manag
data that relate to the requireme
external origin such as studies,
shall control the generation, dis
system to identify, collect, inde
in the form of any media, such
Document and Data App
approved for adequacy by auth
control procedure identifying th
readily available to preclude th
Document and Data Cha
approved by the same functions
unless specifically designated o
to pertinent background inform
Where practical, the nature of t
attachments.
Control of Consultants
General:A documented proc
conform to specified requireme
Evaluation of Consultant
Note:
Internal NJDOT projects will r
Procedure for consultants, sub-
The Consultant shall:
Select Sub-consultantsspecific Quality Contro
implement the Consult
approval by the Consul
Define the type and extInclude a description o
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 6 of 11 Rel
ment Plan shall document procedures to control all
nts of this section including to the extent applicable,
reports, calculations, standards and record drawings.
tribution and confidentiality of all documents, as we
x, file, maintain and dispose of all records. Docume
s hard copy or electronic media.
oval and Issue:The documents and data shall
rized personnel prior to issue. A master list or equi
e current revision status of documents shall be esta
use of invalid and/or obsolete documents.
ges:Changes to documents and data shall be revi
or organizations that performed the original review
therwise. The designated functions or organization
tion upon which to base their review and approval.
e change shall be identified in the document or the
and Sub-Consultants
dure to provide External Resources or purchased se
ts shall be included in the Quality Management Pl
and Sub-Consultants:
ference and be compliant to NJDOT Performance
onsultants, or purchased services.
on the basis of their ability to meet design requirem
l requirements. The Sub-consultant shall be require
nts Quality Management Plan or to submit their o
tant.
ent of control exercised by the Consultant over Sub-
the system used to review and monitor the activitie
nt version.
leased: 09/2011
documents and
documents of
These procedures
ll as establish a
ts and data can be
e reviewed and
alent document
lished and be
wed and
and approval,
hall have access
appropriate
rvices that
n.
valuation
nts and any
to accept and
n for review and
consultants.
s and submissions
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
9/13
Proced
Check the Capital Proj
Revision 2
of the Sub-consultant.
a subcontracted service
Quality Audit reports a
Review Quality recordAssurance data for the
The NJDOT PMO hasSub-consultant level. T
Control of Department
Procedures for the control, veri
materials, such as record drawi
or for related activities, will bematerial that is lost, damaged,
NJDOT.
Design Process Contro
The Quality Management Plan
affect quality and shall carry ou
shall include the following:
Documented procedurecould adversely affect
Compliance with refere Monitoring and control Criteria for workmansh
written standards, repre
Suitable maintenance o A detailed description
Control of Non-Confor
General:A Non-Conforming
meet specified requirements. T
documented in the projects Sc
reports, designs, studies, calcul
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 7 of 11 Rel
his control shall be dependent upon the type of ser
on the Quality of the design and, where applicable,
d/or Quality records of the Sub-consultants.
of Sub-consultants consisting of Quality Control a
roject.
he option to perform a Quality Audit at the External
his will be done in accordance to the Audit Procedu
Supplied Materials:
ication, storage and maintenance of NJDOT suppli
gs or special equipment, provided for incorporation
included in the Quality Management Plan. Any sucr is otherwise unsuitable for use shall be recorded a
l
shall identify, plan, and document the design proces
t these processes under controlled conditions. Contr
s defining the manner of design where the absenceuality;
nced standards/codes and/or documented procedure
of suitable process parameters;
ip, which shall be stipulated in the clearest practical
sentative samples or illustrations);
f equipment, if applicable, to provide continuing pr
f unique procedures.
ing Design
Design is a design that has one or more characterist
e specified requirements are the customers expect
pe and/or Statement of Work. Designs could includ
tions, letters, memos or services performed for the
nt version.
leased: 09/2011
ice, the impact of
dependent on the
d Quality
Resource and the
es.
d products and
into the contract
product andd reported to the
s which directly
olled conditions
f such procedures
s;
manner (i.e.,
cess capability;
ics which fail to
tions, which are
e items produced,
ustomer.
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
10/13
Proced
Check the Capital Proj
Revision 2
The Project Manager shall be c
Does not meet the proj
The non-conforming dThe Quality Management Plan
does not conform to specified r
These procedures shall provide
the non-conforming work, and
thereof.
Review and Disposition
Corrected to meet the s Accepted with or witho Considered for alternati Rejected or scrapped.
Where required, the proposed u
requirements may be presented
that has been accepted or corre
Procedure.
Corrected designs shall be re-c
Corrective and Preven
General:A Corrective Action
problem.
A Preventive Action is an actio
occurrences of a non-conforma
The Quality Management Plan
and preventive actions. Correcti
potential, design non-conformit
commensurate with the risks enThe Project Manager and Desig
procedures resulting from corre
utilizing the Interactive Commu
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 8 of 11 Rel
mpliant to NJDOT procedures that determine if a d
cts specified requirements;
sign is not submitted and is prevented from unintenshall provide documented procedures to determine t
quirements is not submitted and is prevented from
for the identification, documentation, evaluation an
or notification to the NJDOT and other agencies ha
f Non-conforming Designs:A non-conformi
pecified requirements;
ut correction by concession;
ve applications; or
se or correction of a design that does not conform t
for consideration to the NJDOT. The description of
ted shall be documented utilizing the Interactive Co
ecked against the original specification.
ive Action
is an action or solution meant to reduce or eliminat
taken to remove or improve a process to prevent p
ce.
shall document the procedures to be utilized to impl
ve or preventive action taken to eliminate actual, or
ies shall be to a degree appropriate to the magnitude
countered.ner shall implement and record any changes to the d
ctive and preventive action. These changes shall be
nications Procedure.
nt version.
leased: 09/2011
esign:
ed use.at a design that
nintended use.
disposition of
ing jurisdiction
g design may be:
specified
a non-conformity
mmunications
an identified
tential future
ment corrective
minimize
of problems and
ocumented
documented
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
11/13
Proced
Check the Capital Proj
Revision 2
Corrective Action:The cor
shall include:
The effective handlingdeveloping interim me
Conducting an investigprocess and Quality M
Determination of the cconformities.
Application of measureeffective.
Preventive Action:The princlude:
The use of appropriateconcessions, audit resul
analyze, and eliminate
Determination of the st Initiation of preventive
effective;
Confirmation that relevConsultant managemen
Control of Quality Rec
The Quality Management Plan
access, filing, storage, mainten
any type of media, such as hard
The Quality Management Plan
requirements and the effective
The Quality Management Plan
readily retrievable in files that
loss.
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 9 of 11 Rel
ective action procedures to eliminate actual non-co
f observations and reports of design non-conformit
sures if warranted, to correct an actual non-confor
ation into the root cause of non-conformities relatin
nagement System, and recording the results of the i
rrective action needed to eliminate the cause of the
s to determine that corrective action has been taken
cedures for preventive action to minimize non-conf
sources of information relating to the quality of the
ts, quality records, service reports and NJDOT com
otential causes of non-conformities;
ps needed to deal with any problems requiring prev
action and appropriate follow-up reviews to determi
ant information on actions taken is submitted for NJ
t review.
rds
shall document procedures for identification, collect
nce, and disposition of quality records. Records ma
copy or electronic media.
shall be maintained to demonstrate conformance to
peration of all quality documentation.
shall be legible and shall be retained in such a way t
rovide a suitable environment to prevent damage, d
nt version.
leased: 09/2011
forming design
ies, including
ity.
to the design,
vestigation.
esign non-
and that it is
rmities shall
esign (such as
laints) to detect,
entive action;
ne that it is
DOT and
ion, indexing,
be in the form of
pecified
hat they are
terioration or
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
12/13
Proced
Check the Capital Proj
Revision 2
Quality Audits
A Quality Audit is a systematic
Whether quality activiti Whether these Quality
achieve the quality obj
The Quality Management Plan
process.
The Audit Procedure document
audit. The Project Manager shal
Note:
The PMO can audit an external
Policies and Procedures.
Training
The Quality Management Plan
for the training of all personnel
assigned tasks shall be qualifie
required. Appropriate records o
Note:
The PMO is responsible for the
training of all NJDOT personne
referred to in the NJDOT Quali
Note:
The Project Manager will assur
Quality Management Policy an
Note:
If a project team member is not
Project Manager can have that i
Note:
The PMO can audit an external
procedures.
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 10 of 11 Rel
, independent examination and review to determine:
es and related results comply with Quality Manage
anagement Plans are implemented effectively and
ctives.
shall refer to the Audit Procedure that documents th
s the audit criteria, audit schedules, and the individu
ll take timely corrective action on deficiencies foun
consultant to determine if the consultant is complia
will document procedures for identifying training n
performing activities affecting quality. Personnel p
on the basis of appropriate education, training and/
f training shall be maintained.
procedures that identify the training needs and prov
l performing activities affecting quality. These proc
ty Management Plan.
that all project team members have been trained to
Quality Management Procedures.
trained to the current Quality Procedures and Quali
ndividual trained or replaced.
consultant to determine if the consultant is complia
nt version.
leased: 09/2011
ent Plans
are suitable to
Quality Audit
als performing the
during the audit.
t to their Quality
eds and provide
rforming specific
or experience, as
ide for the
dures will be
the current
y Policy, the
t to their training
8/12/2019 Plan de Calidad - Ejemplo #1.pdf
13/13
Proced
Check the Capital Proj
Revision 2
Handling, Storage, Pa
General: The Quality Manage
and delivery of the design. It wi
Handling: Provide methods of
incorrect identification.
Storage:The use designated ar
studies or reports prior to use o
from such areas shall be stipula
Packaging:The control packag
specified requirements.
Preservation: The application
documents, plans, studies or re
Delivery:The protection of the
shipment. Where contractually
destination.
res are subject to change without notice.
ct Delivery website to ensure this is the curr
Page 11 of 11 Rel
kaging, Preservation and Delivery
ent Plan will document procedures for handling, st
ll consist of the following elements where applicabl
handling its design to minimize damage, deteriorati
as or files to minimize damage or deterioration to d
delivery. Appropriate methods for authorizing rece
ted.
ing and labeling processes to the extent necessary t
f appropriate methods for preservation and segrega
orts when they are under its control.
documents, plans, studies or reports after final chec
specified, this protection shall be extended to includ
nt version.
leased: 09/2011
rage, packaging,
e:
n, loss or
ocuments, plans,
ipt to and dispatch
conform to
tion of the
king prior to
delivery to the