12
Project Lists C

Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

  • Upload
    lykiet

  • View
    222

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Project ListsC

Page 2: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-2

IntroductionThis appendix lists the regionally significant projects included in the 2035 MTP/SCS. Tables starting with “C-1” list projects and corresponding costs that are included in the revenue constrained network. Regionally significant unconstrained projects are shown in tables starting with “C-2.” These unconstrained projects have no funding identified. Please refer to the Regional Transportation Planning Agency’s Regional Transportation Plan for more detailed information on the complete list of transportation projects.

Page 3: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-3

ID Number Project Title Project Description Constrained Project Cost

MON-CT008-UM SR1 Operational Improvements Constructs one new northbound climbing lane between Rio Road and Carmel Valley Road, modifies intersections and enhances turn movements.

$ 3,600

MON-CT011-CT SR 68 - Commuter Improvements Widen existing roadway to 4-lanes between existing 4 lane segment at Toro Park and Corral de Tierra Road (MON-68-4.0/15.0).

$ 25,555

MON-CT015-CT SR 1 Interchange and related local road improvements in the vicinity of Canyon Del Rey and Fremont Avenues. The TAMC Impact Fee Program includes this project as "SR 1 - Widening" and includes widening SR 1 to six lanes from Fremont Ave to at least Canyon Del Rey. The widening component of this project is unconstrained in the Metropolitan Transportation Plan and Regional Transportation Plan.

$ 9,000

MON-CT017-CT SR 68 - (Holman Hwy - access to Community Hospital)

Widen Holman Highway SR 68 from CHOMP to SR 1 to 4 lanes and make operational improvements at the SR 68 – SR 1 EA interchange. (EA 05-44800) PM 3.8/L4.3

$ 26,620

MON-CT022-CT SR 156 - Widening (Phase 2) Interchange modifications at US 156 and 101 $ 133,130

MON-CT030-SL US 101 - Salinas Corridor Widen US 101 to 6 lanes within the existing right of way at locations where feasible.

$ 52,000

MON-CT031-CT US 101 - South County Frontage Roads

Construct Frontage Roads from Harris Road to Chualar, then to Soledad. (EA 05-OH330)

$ 112,000

MON-CT036-CT SR 156 - West Corridor (Phase I) Widen existing highway to 4 lanes and upgrade highway to Freeway status with appropriate interchanges. Interchange modification at US 156 and 101. (EA 05-31600) PM R1.8/T4.8

$ 109,000

MON-CT044-SL US 101 - Harris Road Interchange Construct new Interchange on US 101 at Harris Road . PM 83.71 $ 57,662

MON-CT045-MA SR 1 - Monterey Rd Interchange Construct new interchange. (PM EB R80.75/R83.27) $ 25,935

MON-GON015-GO US 101 Gloria Road Interchange US 101/Gloria Road Interchange Improvements.(EA 05-OP930) PM 68.4/70.4

$ 39,505

MON-GRN008-GR US 101 - Walnut Avenue Interchange Relocate and replace existing US 101/Walnut Avenue Interchange and widen to six lanes. (EA 05-OP160) PM 53.4/54.3

$ 28,784

MON-KCY006-CK US 101 - 1st Street Interchange (Lonoak Street I/C)

Extend San Antonio over railroad tracks from Lonoak to US 101/First Street Interchange. (PM R39.77)

$ 42,592

MON-MAR001-MA Marina-Salinas Corridor Widen Davis Rd to 4 lanes from Blanco Rd to Reservation Rd, Construct new 4 lane bridge over the Salinas River, Widen Reservation Rd to 4 lanes from Davis Rd to existing 4 lane section adjacent to East Garrison at Intergarrison Road, Widen Imjin Pkwy to 4 lanes from Reservation Rd to Imjin Rd, construct new Imjin Parkway interchange at SR 1. Include accomodations for bicyclists, pedestrians and transit; consider highqualitytransit service along corridor.

$ 90,508

MON-MRY005-MY Del Monte Corridor Add eastbound lane from El Estero to Sloat Ave. Intersection improvements to Sloat Ave and Aguajito Ave including addition of left turn lanes and signal operations improvements.

$ 30,000

Table C-1a: Monterey County Regionally Significant Constrained Project List

Page 4: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-4

ID Number Project Title Project Description Constrained Project Cost

MON-MRY027-MY SR 68 - SR 1 Interchange Improvements

Construct new interchange improvements at SR 68 (Holman Highway) and SR 1.

$ 6,850

MON-MST008-MST Salinas-Marina Multimodal Corridor Construct multimodal Bus Rapid Transit Improvements between Salinas and Marina, including a multimodal transit corridor through the former Fort Ord in Marina.

$ 60,000

MON-MST011-MST Salinas Bus Rapid Transit Construct Bus Rapid Transit improvements along Alisal Street and North Main Street.

$ 20,000

MON-MST015-MST Transit Capacity for SR 1 Construct improvements to accommodate regional MST bus service along SR 1 during peak travel periods.

$ 16,000

MON-MST016-MST South Monterey County Regional Transit Improvements

Increases the frequency of MST Line 23 service between King City and Salinas and constructs improvements along Abbott Street between US 101 and Romie Way in Salinas. Stops in King City, Greenfield, Soledad, Gonzales, Chualar and Salinas.

$ 27,500

MON-MYC147-UM Castroville Improvements / Blackie Road

Construct new road from Castroville Blvd to Blackie Rd. $ 18,000

MON-MYC153-UM SR 68 - Corral de Tierra Install dual left turn lanes on westbound Hwy 68, add a merge lane on southbound Corral de Tierra, add right-turn lane on northbound Corral de Tierra.(EA 05-OH823) (PM 12.8/13.2)

$ 2,860

MON-MYC181-UM G12 San Miguel Canyon Operational and capacity improvements, including road widening, turning lanes, signalization and intersection improvements, and bicycle and pedestrian facilities.

$ 55,000

MON-SNS006-SL US 101 - Alvin Drive overpass/underpass and Bypass

Construct overpass/underpass and 4 lane street structure. $ 12,325

MON-SNS050-SL Russell Rd Widening Widen Street from US 101 to San Juan Grade Rd. $ 3,078

MON-SNS122-SL US 101 / Sanborn/Elvee HWY Off ramp/Intersection Improvements $ 3,100

MON-SOL002-SO US 101 - North Interchange Install new interchange north of US 101 and Front Street. $ 17,490

MON-SOL003-SO US 101 - South Interchange Install new interchange south of US 101 and Front Street. $ 18,810

MON-SOL014-SO SR 146 Bypass Construct to 4 lanes from SR 146 (Metz Road) to Nestles Road. Install Class II bike facility.

$ 21,000

MON-TAMC001-TAMC Monterey Branch Line Light Rail The Monterey Branch Line Light Rail project will provide light rail transit service using the existing 16 mile Monterey Branch Line between Monterey and Castroville adjacent to Highway 1. Phase 1 will include reconstruction of tracks, construction of stations, purchase of vehicles and operating costs for service between Monterey and Marina. Phase 2 will include reconstruction of tracks to connect to the planned commuter rail station in Castroville and include operating costs to Castroville and increased frequencies.

$ 255,000

MON-TAMC002-TAMC Monterey Branch Line Light Rail - Salinas River Bridge Replacement

Construct new rail bridge on the Monterey Branch Line over the Salinas River.

$ 15,000

MON-TAMC003-TAMC Rail Extension to Monterey County Extends existing rail service from San Jose to Salinas and constructs station improvements in Gilroy, Pajaro, Castroville and Salinas. Kickstart phase to be completed by 2020 will establish stops in Gilroy and Salinas with limited Salinas station improvements.

$ 135,710

Table C-1a: Monterey County Regionally Significant Constrained Project List (Continued)

Page 5: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-5

ID Number Project Title Project Description Constrained Project Cost

MON-CT008-UM SR1 Operational Improvements Constructs one new northbound climbing lane between Rio Road and Carmel Valley Road, modifies intersections and enhances turn movements.

$ 3,600

MON-CT011-CT SR 68 - Commuter Improvements Widen existing roadway to 4-lanes between existing 4 lane segment at Toro Park and Corral de Tierra Road (MON-68-4.0/15.0).

$ 25,555

MON-CT015-CT SR 1 Interchange and related local road improvements in the vicinity of Canyon Del Rey and Fremont Avenues. The TAMC Impact Fee Program includes this project as "SR 1 - Widening" and includes widening SR 1 to six lanes from Fremont Ave to at least Canyon Del Rey. The widening component of this project is unconstrained in the Metropolitan Transportation Plan and Regional Transportation Plan.

$ 9,000

MON-CT017-CT SR 68 - (Holman Hwy - access to Community Hospital)

Widen Holman Highway SR 68 from CHOMP to SR 1 to 4 lanes and make operational improvements at the SR 68 – SR 1 EA interchange. (EA 05-44800) PM 3.8/L4.3

$ 26,620

MON-CT022-CT SR 156 - Widening (Phase 2) Interchange modifications at US 156 and 101 $ 133,130

MON-CT030-SL US 101 - Salinas Corridor Widen US 101 to 6 lanes within the existing right of way at locations where feasible.

$ 52,000

MON-CT031-CT US 101 - South County Frontage Roads

Construct Frontage Roads from Harris Road to Chualar, then to Soledad. (EA 05-OH330)

$ 112,000

MON-CT036-CT SR 156 - West Corridor (Phase I) Widen existing highway to 4 lanes and upgrade highway to Freeway status with appropriate interchanges. Interchange modification at US 156 and 101. (EA 05-31600) PM R1.8/T4.8

$ 109,000

MON-CT044-SL US 101 - Harris Road Interchange Construct new Interchange on US 101 at Harris Road . PM 83.71 $ 57,662

MON-CT045-MA SR 1 - Monterey Rd Interchange Construct new interchange. (PM EB R80.75/R83.27) $ 25,935

MON-GON015-GO US 101 Gloria Road Interchange US 101/Gloria Road Interchange Improvements.(EA 05-OP930) PM 68.4/70.4

$ 39,505

MON-GRN008-GR US 101 - Walnut Avenue Interchange Relocate and replace existing US 101/Walnut Avenue Interchange and widen to six lanes. (EA 05-OP160) PM 53.4/54.3

$ 28,784

MON-KCY006-CK US 101 - 1st Street Interchange (Lonoak Street I/C)

Extend San Antonio over railroad tracks from Lonoak to US 101/First Street Interchange. (PM R39.77)

$ 42,592

MON-MAR001-MA Marina-Salinas Corridor Widen Davis Rd to 4 lanes from Blanco Rd to Reservation Rd, Construct new 4 lane bridge over the Salinas River, Widen Reservation Rd to 4 lanes from Davis Rd to existing 4 lane section adjacent to East Garrison at Intergarrison Road, Widen Imjin Pkwy to 4 lanes from Reservation Rd to Imjin Rd, construct new Imjin Parkway interchange at SR 1. Include accomodations for bicyclists, pedestrians and transit; consider highqualitytransit service along corridor.

$ 90,508

MON-MRY005-MY Del Monte Corridor Add eastbound lane from El Estero to Sloat Ave. Intersection improvements to Sloat Ave and Aguajito Ave including addition of left turn lanes and signal operations improvements.

$ 30,000

Table C-1a: Monterey County Regionally Significant Constrained Project List (Continued)

Page 6: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-6

ID Number Project Title Project Description Constrained Project Cost

SB-COG-A53 Vanpool Program Provide vanpool planning and coordination service $ 352

SB-CT-A01 San Benito Route 156 Improvement Project

Construct a four-lane expressway south of the existing State Route 156 and use the existing State Route 156 as the northern frontage road.

$ 48,520

SB-CT-A02 Highway 156/Fairview Road Intersection Improvements

Construct new turn lanes at the intersection $ 6,044

SB-CT-A03 Highway 25 Widening - Operational Improvements

Construct passing lanes $ 4,200

SB-LTA-A38 Express Bus Service to Gilroy - Gavilan

Express bus service from the City of Hollister to Gavilan College $ 267

SB-LTA-A39 Express Bus Service to Gilroy - Caltrain

Express bus service from the City of Hollister to Gilroy Caltrain Station

$ 89

SB-LTA-A42 Regional Transit Planning Planning transit infrastucture, new service, and operational improvements

$ 880

SB-LTA-A46 Regional Transit Connection to Salinas

Transit connection from City of Hollister to City of Salinas $ 2,125

SB-LTA-A47 Regional Transit Connection to Watsonville

Transit connection from City of Hollister to City of Watsonville $ 2,225

SB-SBC-A04 Union Road Widening (East): San Benito Street to Highway 25

Widen to 4-lane arterial $ 3,730

SB-SBC-A05 Union Road Widening (West) San Benito Street to Highway 156

Widen to 4-lane arterial $ 11,502

Table C-1b: San Benito County Regionally Significant Constrained Project List

Page 7: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-7

ID Number Project Title Project Description Constrained Project Cost

SC-CO-P26a-USC 41st Ave Improvements Phase 2 (Hwy 1 Interchange to Soquel Dr)

Roadway and roadside improvements including bike lanes, sidewalks, transit turnouts, left turn pockets, merge lanes and intersection improvements.

$ 300

SC-MTD-P10-MTD Local Transit - Continuation of Existing Service Levels 2010-2035

Operation & maintenance cost of existing local fixed route bus service (Based on 2014budget-$37M/year).

$ 817,000

SC-MTD-P10B-MTD Hwy 17 Express Service - Cont. of Existing Service Levels

Operation & maintenance cost of existing bus service. Avg annual cost: $2.4M.

$ 53,000

SC-MTD-P12-MTD Hwy 17 Express Service Expansion Add trips to extend service hours for Highway 17 express. Capital and Operating costs. Annual expansion cost: $175K/yr.

$ 2,250

SC-MTD-P13-MTD UCSC Bus Service Expansion Increase frequency on routes serving UCSC to eliminate standing loads: Capital and Operating costs.

$ 7,000

SC-MTD-P14-MTD Local Transit Service Restoration and Expansion

Restore local service to 2001 levels, then expand service 10% including expanded service within SLV, City of SC and Watsonville, express buses, improved service to industrial areas. $6.7M/yr operating, $9M capital costs (9 buses & onetime replacement).

$ 7,080

SC-MTD-P15-MTD Bus Rapid Transit Construct park & ride lots, transit centers and grade-separation where feasible to operate bus rapid transit to reduce congestion on Highway 1.

$ 23,328

SC-RTC 24e-RTC 3 - Hwy 1: Park Avenue to Bay/Porter Auxiliary Lanes

Construct auxiliary lanes and reconstruct Capitola Avenue overcrossing. [Part of Highway 1 CIP project (RTC 24k) but listed here as a standalone project. (EA 05-0L090)].

$ 23,000

RTC 24fSC 2 - Hwy 1: 41st to Soquel Av Auxiliary Lanes and Chanticleer Bike/Ped Bridge

Construct auxiliary lanes and a bicycle/pedestrian overcrossing of Hwy 1 at Chanticleer Ave. [Project level design/environmental analysis is currently underway as part of combined Tier 1/Tier 2 environmental effort to establish a Highway 1 Corridor Investment Program (Tier 1) and take a first step toward implementation with this project (Tier 2) upon approval of the final environmental document.]

$ 27,000

SC-RTC 24g-RTC 4 - Hwy 1: State Park Dr. to Park Ave. Auxiliary Lanes

Construct auxiliary lanes. [Part of Highway 1 CIP project (RTC 24k), but listed as a standalone project.]

$ 34,250

SC-RTC 27a-RTC Monterey Bay Sanctuary Scenic Trail Network - Design, Environmental Clearance, and Construction

Design, environmental clearance and construction of a 50+ mile network of bicycle and pedestrian facilities on or near the coast, with the rail trail as the spine and additional spur trails to connect to key destinations. (Funded segments listed individually.)

$ 40,000

SC-RTC 27b-RTC Monterey Bay Sanctuary Scenic Trail Network - Maintenance

Maintenance of the Monterey Bay Sanctuary Scenic Trail Network - ongoing clean-up, trash/recycling removal, graffiti abatement, brush clearance, surface repairs (from drainage issues, tree root intrusion) etc.

$ 2,000

SC-RTC 27c-RTC Monterey Bay Sanctuary Scenic Trail Network - Trail Management Program

Coordinate trail implementation as it traverses multiple jurisdictions to ensure uniformity; serve as Project Manager for construction of some segments; handle environmental clearance; coordinate use in respect to other requirements (closures for ag spraying, etc); solicit ongoing funding and distribute funds to implementing entities through MOUs; coordinate with community initiatives; etc.

$ 500

SC-RTC-P02-RTC Rail Transit: Watsonville-Santa Cruz Corridor

Design, construction, and operation of fixed guideway public transit between Santa Cruz and Watsonville. May be a joint project with the SCCRTC, SCMTD, and local jurisdictions. Annual op cost est: $3M/yr; capital: $2.5M/yr.

$ 82,500

Table C-1c: Santa Cruz County Regionally Significant Constrained Project List

Page 8: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-8

ID Number Project Title Project Description Constrained Project Cost

SC 25SC Hwy 1/9 Intersection Modifications Intersection modifications including new turn lanes, bike lanes/shoulders. Includes adding second left-turn lane on Highway 1 southbound to Highway 9 northbound; second northbound through lane and shoulder on northbound Highway 9, from Highway 1 to Fern Street; a right-turn lane and shoulder on northbound Highway 9; through-left turn lane on northbound River St; replace channelizers on Highway 9 at the intersection of Coral Street; sufficient lane width along the northbound through/left turn lane on Highway 9 from Fern Street to Encinal Street; new sidewalk along the east side of Highway 9 from Fern Street north to Encinal Street; new through/left turn lane on southbound Highway 9; Traffic Signal interconnect to adjacent signals. (Caltrans project ID - EA05-46580)

$ 6,200

SC-SC-P81-SCR Hwy 1/Mission St at Chestnut/King/Union Intersection Modification

Modify design of existing intersections to add lanes and upgrade the traffic signal operations to add capacity, reduce delay and improve safety. Provide acess ramps and bike lanes on King and Mission. Includes traffic signal coordination.

$ 4,500

SC-SC-P87-SCR Soquel Ave Corridor Widening (Branciforte-Morrissey)

Minor widening and signal modifications along Soquel Ave corridor from Branciforte to Morrissey Blvd to widen sidewalks, transit improvements, improve pedestrian and bicycle detection and crossings, add a travel lane, maintain some commercial parking and improve exitsing bike lanes. Replacing the split phasing with protected left-turns at Branciforte to reduce delays for all modes of travel and GHG.

$ 500

TRL 07SC Rail Trail: Segment 7 (Natural Bridges to Pacific Ave)

2.4 miles of Monterey Bay Sanctuary Scenic Trail Network (MBSST) Segment 7 (excluding Moore Creek rail trestle bridge and trail to Natural Bridges Drive) along rail line. One water crossing at Neary Lagoon (not a bridge), one rail crossing near Rankin Street and two at the Neary Lagoon “Y”. Retaining structures adjacent to the Wastewater Treatment Facility and fifteen street crossings.

$ 5,300

TRL 18L MBSST Rail Trail: Lee Road, 4000 feet east to City Slough Trail connection

Construction of 4000-foot long pathway parallel to the railroad tracks: eight-foot width asphalt (hma) and two-foot base rock shoulders on each side. A 500 foot long retaining wall up to three foot tall with fence will be needed near Lee Road. A four foot by six foot railroad building at the Ohlone Parkway will need to be relocated. A drainage structure east of Ohlone Parkway will need to be modified.Connection to Lee Road shall require installation of pathway or sidewalk to link to the existing sidewalk. At grade crossing at Ohlone Parkway and at a spur line located between Lee Road and Highway 1.

$ 1,300

Table C-1c: Santa Cruz County Regionally Significant Constrained Project List (Continued)

Page 9: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-9

ID Number Project Title Project Description Unconstrained Project Cost

MON-CT015-CT SR 1 - Widening Seaside to Sand City Widen SR 1 to six lanes from Fremont Ave to at least Canyon Del Rey

MON-MAR115-MA Imjin Parkway full widening Widen from 4 lanes to 6 lanes and construct turning lanes. $ 5,000

MON-MRY025-MY SR 68 - SR 1 Overcrossing Reconstruct Highway 1 overcrossing near Holman Highway. $ 20,000

MON-MRY028-MY SR 68 Roundabout at CHOMP Construct roundabout at Community Hospital of Monterey Peninsula on SR 68.

$ 23,000

MON-KCY020-CK US 101 - Broadway Interchange Install dual on and off ramps. (PM BB R41.17/EB R 41.20) $ 30,000

MON-SNS001-SL Westside Bypass Construct 4-lane westside bypass around Salinas from Boranda to Davis Rd, including 4-lane Rossi St connector. Includes widening of Davis to 4 lanes from bypass connection to W Blanco Rd.

$ 50,472

MON-CT016-CT SR 68 - Bypass or Widening Construct 4-lane bypass along Ft. Ord ROW or widen existing roadway to 4-lanes (MON-68-4.0/15.0).

$ 436,000

Table C-2a: Monterey County Regionally Significant Unconstrained Project List

Page 10: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-10

Table C-2b: San Benito County Regionally Significant Unconstrained Project List

ID Number Project Title Project Description Unconstrained Project Cost

TBD Highway 25 Widening: Phase I Widen to 4-lanes $ 67,591

TBD Highway 25 Widening: Phase II Widen to 4-lanes $ 181,000

TBD Memorial Drive Extension - Santa Ana Raod to Flynn Road

New 4-lane roadway construction $ 13,842

TBD Fairview Rd./San Felipe Rd. - East West Arterial (new road)

New roadway construction TBD

TBD Fairview Rd./Memorial Dr. - East West Arterial (new road

New roadway construction TBD

TBD US 101: Las Aromitas - Monterey/San Benito County Line to SR 156, Widen to 6-Lanes

Widen from 4-lanes to 6-lanes TBD

TBD US 101: SR 156 to SR 129, Widen to 6-Lanes

Widen from 4-lanes to 6-lanes TBD

TBD Railroad Multi-Use Path Construct multi-use path adjacent to the rail branch line TBD

TBD ITS Implement projects identified in the Central Coast Intelligent Transportation Systems Plan

$ 7,355

TBD Passenger Rail to Santa Clara County Extend passenger rail service from Santa Clara to Hollister TBD

Page 11: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-11

Table C-2c: Santa Cruz County Regionally Significant Unconstrained Project List

ID Number Project Title Project Description Unconstrained Project Cost

SC-CAP-P01-CAP Hwy 1/41st Avenue Interchange Implement 41st Avenue & Bay Ave/Porter Ave single interchange improvements as detailed and expensed in Hwy 1 HOV project (RTC 24) as a stand alone project if the RTC project does not proceed. ($117M)

$ 0

SC-CT-P01-RTC Hwy 1 Ramp Metering: Southern Sections

Installation of ramp meters at interchanges from Mar Monte Ave to Hwy 129/Riverside Dr.

$ 20,000

SC-CT-P32-WAT Riverside Drive/Hwy 129 Widening (Union-Bridge St)

Widen Riverside Drive (SR 129) from 2 to 4 lanes, reconstruct existing street (Union St to Bridge St.)

$ 8,000

SC-CT-P33-WAT East Lake/Hwy 152 Widening (Martinelli-Holohan)

Widen East Lake Av. (SR 152) from 2 to 4 lanes (Martinelli St-Holohan).

$ 1,000

RTC 24SC 91 - Hwy 1: HOV Lanes from Morrissey to San Andreas Rd

Construct HOV or Carpool lanes on Highway 1 from San Andreas/Larkin Valley to Morrissey Boulevard, including auxiliary lanes, reconstruction of interchanges with enhanced bike and pedestrian facilities, arterial and ramp modifications to allow ramp metering, a new bike/ped crossing at Trevethan, and traffic operation system (TOS) element. [Cost if built in entirety: $585,700. See stand alone projects (RTC24f,e,g,h,I,j,a,m) for cost of incremental implementation.]

$ 0

SC-RTC 24a-RTC 8 - Hwy 1: Reconstruct Remaining Interchanges, Auxiliary Lanes and Install Ramp Metering

Auxiliary Lanes and interchange modifications not identified as separate projects (San Andreas/Larkin Valley, Freedom, Rio Del Mar, State Park and Park Avenue) , including reconfiguration of ramps and local streets for ramp meters, enhanced pedestrian and bike treatments (such as buffered or painted facilities) in each direction and sufficient width to allow addition of HOV lanes. Includes reconstruction of 2 railroad crossings in Aptos, bridge over Aptos Creek, and bike/ped overcrossing at Trevethan. [Part of the Highway 1 CIP project (RTC 24k), but is listed here as a standalone project.]

$ 250,000

SC-RTC 24h-RTC 5 - Hwy 1: Reconstruct Morrissey Interchange

Reconstruct Morrissey overcrossing with enhanced pedestrian and bicycletreatments (such as buffered or painted facilities) on both sides of the overcrossing, reconfigure ramps and local streets to accommodate the new interchange, and ramp metering.[Part of Highway 1 CIP project (RTC 24k), but listed here as standalone project.]

$ 35,300

SC-RTC 24i-RTC 6 - Hwy 1: Reconstruct Soquel Avenue Interchange

Reconstruct the overcrossing with enhanced pedestrian and bicycle facilities on both sides, reconfigure ramps and local streets to accommodate the new interchange, and ramp metering. [Part of Highway 1 CIP project (RTC 24k), but listed here as standalone project.]

$ 63,300

SC-RTC 24j-RTC 7 - Hwy 1: Reconstruct Bay/Porter and 41st Avenue Interchange

Reconstruct highway to operate as a single interchange. Includes construction of a frontage road that includes bike lanes and sidewalks connecting the Bay/Porter and 41st Ave intersections ; reconstruction of the Bay/Porter undercrossing and the 41st Avenue overcrossing with enhanced pedestrian and bicycle treatments on both sides, and reconfiguration of ramps and local streets to accommodate local traffic and ramp metering. [Part of the Highway 1 CIP project (RTC 24k), but is listed here as a standalone project.]

$ 107,500

SC-RTC 24k-RTC 1 - Hwy 1 Corridor Investment Program

Tier 1 – program level design/environmental analysis to establish a Corridor Investment Program (CIP) to reduce congestion along the 9 mile section of Highway 1 between San Andreas/Larkin Valley Road (Aptos) and Morrissey Boulevard (Santa Cruz). [Projects identified below are increments of the Highway 1 CIP.]

$ 0

Page 12: Project Lists - home | AMBAGambag.org/programs/met_transp_plann/documents/Final_2035_MTP_S… · Appendix C: Project Lists ... Appendix C: Project Lists oin orrd ontere 2035 C-3

Appendix C: Project Lists

Moving Forward Monterey Bay 2035 C-12

ID Number Project Title Project Description Unconstrained Project Cost

SC-RTC 24m-RTC 9 - Hwy 1: Construction of HOV Lanes from Morrissey to San Andreas Rd

Construction of High Occupancy Vehicle (HOV or Carpool) Lanes on Highway 1 from San Andreas/Larkin Valley to Morrissey Boulevard. Cost excludes auxiliary lanes, reconstruction of interchanges for ramp metering, over and under crossings, new bike/ped crossing at Trevethan, and traffic operation system (TOS) elements on the corridor. [These costs are listed separately (RTC 24 a,e,f,g,h,I,j). Could be expensed under a complete Hwy 1 HOV Lane project (RTC 24, $585,700) but currently expensed as a standalone project.]

$ 60,000

SC-RTC 24n-RTC 92 - Hwy 1: TSM Project from Morrissey to San Andreas Rd.

Construct the TSM project alternative as described in the Tier 1 environmental study to establish a Highway 1 Corridor Investment Program. Project includes auxiliary lanes, modifications of interchanges with enhanced bike and pedestrian treatment, arterial and ramp modifications to allow ramp metering, a new bike/ped crossing at Trevethan, and traffic operation system (TOS) element. [Cost if built in entirety, rather than incrementally: $249,100. Assumes RTC 24f has been completed.]

$ 0

SC-RTC 25-RTC Recreational Rail Infrastructure Seasonal passenger rail service on Santa Cruz Branch rail line. Infrastructure needed for the service is listed here (e.g. platforms, sidings, pedestrian & disabled access, rail vehicles). Unsubsidized operations will be provided by a private operator and operating costs are therefore not included here. All costs are estimated.

$ 5,000

SC-SC-P108-SCR Hwy 1 - Harvey West Area Alternative Access

Development of an on/off ramp from NB Highway 1 to Harvey West Boulevard/Evergreen St, to improve access, especially during peak congestion times and emergencies.

$ 4,000

SC-SV-P01-SCV Hwy 17/Midtown Interchange Construct new SR17 interchange midway between Mt. Hermon Rd and Granite Creek Rd. Will require right-of-way.

$ 30,000

SC-SV-P44-SCV Mt. Hermon Rd./Hwy 17 Ramps Intersection Operations Improvement Project

Add lane to SB off-ramp at Mt. Hermon/SR-17 interchange. $ 1,000

Table C-2c: Santa Cruz County Unconstrained Project List (Continued)