16
7/21/2019 Proposal Desember - Fire Water http://slidepdf.com/reader/full/proposal-desember-fire-water 1/16 Daftar Isi BAB 1. PENDAHULUAN............................................................................ 2 1.1 Latar Belakang............................................................................... 2 1.2 Rumusan Masalah...........................................................................3 1.3 Tujuan Penelitian............................................................................ 3 1.4 Batasan Penelitian...........................................................................3 1.5 Luaran Penelitian............................................................................ 4 1.6 Manfaat Penelitian..........................................................................4 BAB.2 TINJAUAN PUSTAKA.....................................................................5 2.1 Sistem Perpipaan............................................................................5 2.1.1 kuran pipa............................................................................5 2.1.2 Te!al Pipa "#all thi$kness Pipe% ...................................................6 2.1.3 &'mp'nen pa(a Sistem Perpipaan.................................................6 2.2 &lasifikasi Material Pipa................................................................... 9 2.2.1 &lasifikasi Baja......................................................................10 2.2.2 )iagram *asa Besi &ar!'n "*e+,% ...............................................12 2.2.3 ,ar!'n Steel..........................................................................13 2.3 )a-a.......................................................................................... 14 BAB.3 METODOLOGI PENELITIAN........................................................15 3.1 aris Besar Penelitian.................................................................... 15  

Proposal Desember - Fire Water

Embed Size (px)

DESCRIPTION

fire water skripsi ni

Citation preview

Page 1: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 1/16

Daftar Isi

BAB 1. PENDAHULUAN............................................................................2

1.1 Latar Belakang...............................................................................2

1.2 Rumusan Masalah...........................................................................3

1.3 Tujuan Penelitian............................................................................3

1.4 Batasan Penelitian...........................................................................3

1.5 Luaran Penelitian............................................................................4

1.6 Manfaat Penelitian..........................................................................4

BAB.2 TINJAUAN PUSTAKA.....................................................................5

2.1 Sistem Perpipaan............................................................................5

2.1.1 kuran pipa............................................................................5

2.1.2 Te!al Pipa "#all thi$kness Pipe%...................................................6

2.1.3 &'mp'nen pa(a Sistem Perpipaan.................................................6

2.2 &lasifikasi Material Pipa...................................................................9

2.2.1 &lasifikasi Baja......................................................................10

2.2.2 )iagram *asa Besi &ar!'n "*e+,%...............................................12

2.2.3 ,ar!'n Steel..........................................................................13

2.3 )a-a..........................................................................................14

BAB.3 METODOLOGI PENELITIAN........................................................15

3.1 aris Besar Penelitian....................................................................15

 

Page 2: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 2/16

BAB 1. PENDAHULUAN

1.1 Latar Belaka!

&'n/ersi energi (ari min-ak ke gas saat ini semakin !erkem!ang0

hal ini mengaki!atkan !an-akn-a pem!angunan (i!i(ang pipa pen-aluran

gas. Pipa pen-alur -ang !erfungsi mengalirkan flui(a min-ak atau gas (ari

suatu  plant   ke  plant   lainn-a (ise!ut  pipeline. as alam merupakan salah

satu sum!er energi -ang tak tergantikanti(ak (apat (iper!aharui0 (imana

 pr'ses ekspl'rasi0 peng'lahan (an (istri!usi mem!utuhkan in/estasi -ang

sangat !esar0 'leh karena itu perlu (ilakukan kajian tentang efisiensi (esign

sistem pipa gas. &ajian terse!ut (apat menja(i a$uan refrensi (esign -ang

 paling menguntungkan (engan !ia-a instalasi (an 'perasi'naln-a ti(ak 

han-a $en(erung terjangkau tetapi juga aman sesuai (engan !atasan

stan(ar( -ang !erlaku.

Perusahaan as egara "P% akan mem!angun Metering Station

 Japanan !erl'kasi (i Pasuruan -ang aman0 han(al0 (an tahan lama serta

tersam!ung (engan  pipeline  jaringan (istri!usi gas (ari Pasuruan ke area

M'j'kert' ",P+1%. Gas metering station  ini !erfungsi se!agai stasiun

untuk melakukan akti/itas pengukuran laju alir gas "metering %. Pr'ses

transp'rtasi atau pengiriman gas hi(r'kar!'n (ari satu 'perasi ke 'perasi

lain ini umumn-a (ikenal (engan istilah custody transfer 0 (i(efinisikan

se!agai titik pengukuran (imana flui(a (iukur untuk (ijual ke pihak atau

 perusahaan lain.

Pratii Putri Sulung se!agai salah satu perusahaan su!k'ntrakt'r (an vendor  -ang memiliki !an-ak client  (alam (i/isi metering 0 salah satu

 permintaan client   terse!ut a(alah meran$ang  gas  metering station. Pa(a

tugas akhir ini0 akan mem!ahas analisa efisiensi (esain jalur pipeline (inilai

(ari !ia-a instalasi (an 'perasi'nal selama satu tahun0 mem!an(ingan pipa

 spec  permintaan $lient menggunakan carbon steel   PS 12 S7 8399

-ang memiliki jalur pipa sepanjang 2 kil'meter (engan pipa PS : S7

8399 material carbon steel . &alkulasi per!e(aan  pipe sizing   ini akan

Page 3: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 3/16

mengetahui per!e(aan pa(a (a-a p'mpa0 !ia-a pengelasan0 serta lifetime

(esign pipeline -ang nantin-a (apat menja(i estimat'r !agi perusahaan lain

untuk meminimalisir !ia-a instalasi (an 'perasi'nal sistem  pipeline

"(istri!usi gas%.

1.2 "#$#sa Masala%

Rumusan masalah -ang akan (i!ahas (alam tugas akhir ini a(alah ;

1. Bagaimana nilai head losses min'r (an ma-'r serta (a-a -ang hilang (ari

masing+masing material.

2. Berapa !esar !ia-a peng'perasian (an instalasi (ari jalur  pipelinePasuruan < M'j'kert'.

3. Bagaimana per!an(ingan tingkat efisiensi antara ke(ua material.

1.3 T#&#a Peelitia

Tujuan (ari penelitian ini a(alah se!agai !erikut ;

1. Mengetahui per!an(ingan nilai head losses min'r (an ma-'r serta (a-a

-ang hilang (ari carbon steel  PS 12 S7 8399 (an PS : S7

8399.

2. Men(apatkan !esar !ia-a peng'perasian (an instalasi (ari jalur pipeline

Pasuruan < M'j'kert'.

3. Melakukan analisa per!an(ingan antara material manakah -ang le!ih

efisien.

1.' Batasa Peelitia

Batasan -ang (igunakan (alam penelitian ini antara lain ;

1. nalisa kalkulasi sistem  pipeline  (ilakukan pa(a pr'-ek penga(aan

 Japanan Metering Station Contrac !acage "o.1# $C!%1#&  jaringan(istri!usi gas (ari Pasuruan ke area M'j'kert'.

2. Material pipeline  -ang (igunakan (alam penelitian a(alah carbon steel 

(engan stan(ar( STM (an P7 spec 5L=46  grade B PSL2

3. kuran pipa a(alah PS 12 S7 8399 (an PS : S7 8399.

'. Tekanan (esain gas a(alah 29 Psig "S7 3998% (engan temperatur 

139 >*

(. *lui(a -ang mengalir (i(alam  pipeline  a(alah gas (an (iasumsikan

(alam kea(aan satu fase.

). ?stimasi !ia-a instalasi (an 'perasi'nal han-a untuk ke!utuhan pipa.

Ini bener kah

spec nya

Std nya sudah bnr

blm?

Batasannya perlu

ditmbh lai?

Page 4: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 4/16

#. Bia-a instalasi trenching* stringing* lo+ering crossing   jalan (ianggap

sama (ikarenakan menggunakan stan(ar( (an pr'ses -ang sama.

1.( L#ara Peelitia

Luaran (ari penelitian ini antara lain ;

1. )ihasilkan se!uah !uku Lap'ran Tugas khir -ang !erju(ul @?fisiensi

(esign jalur  pipeline (inilai (ari !ia-a instalasi (an 'perasi'nal pa(a

 Japanan Metering Station (i Pasuruan.

2. )ihasilkan jurnal -ang !erju(ul @?fisiensi (esign jalur  pipeline  (inilai

(ari !ia-a instalasi (an 'perasi'nal pa(a  Japanan Metering Station  (i

Pasuruan.

1.) Mafaat Peelitia

(apun manfaat -ang (apat (iam!il !er(asarkan tujuan (ari

 penelitian ini antara lain ;

1. )apat (ija(ikan rujukan client  untuk mengganti (iameter pipa -ang le!ih

ek'n'mis serta masih masuk (alam stan(art ti(ak mempengaruhi

operating design (alam meran$ang pipeline.

2. Aasil penelitian ini (apat (ija(ikan refrensi !agi mas-arakat umum

maupun mahasisa untuk men-elesaikan stu(i kasus -ang i(entik 

(engan permasalahan -ang (i!ahas.

BAB.2 TINJAUAN PUSTAKA

 !udulnya sudah

match kah?

 "e#ri y perlu dibahas

apa sa$a?

Page 5: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 5/16

2.1 Siste$ Per*i*aa

)alam (unia in(ustri0 khususn-a oil and gas  !aik skala ke$il

hingga !esar0 sistem perpipaan merupakan !agian -ang $ukup !erperan (anmemiliki efek -ang $ukup !esar atas ke!erhasilan pr'-ek in(ustri. Sistem

 perpipaan !agaikan urat na(i (alam (unia in(ustri !aik min-ak (an gas

"migas% ataupun in(ustri pr'ses lainn-a. 7n(ustri migas (alam pemakaian

 pipa menja(i pilihan utama karena le!ih 'ptimal (an peng'perasiann-a

le!ih mu(ah.

Penggunaan-a $ukup !eragam antara lain (igunakan untuk 

men-alurkan flui(a (ari sumur "+ellpad& menuju tempat peng'lahan

" production plant&*  men-alurkan flui(a (ari !angunan anjungan lepas

 pantai "offshore facility& langsung ke (arat "onshore facility&  ataupun

se!alikn-a men-alurkan flui(a -ang a(a (i (arat "onshore facility&

langsung ke !angunan anjungan lepas pantai "offshore facility&.)istri!usi

gas !umi (engan sistem perpipaan meli!atkan k'mp'nen+k'mp'nen -ang

umum ter(apat pa(a sistem perpipaan seperti p'mpa0 pipa (an katup+katup

$valve&.

2.1.1 Uk#ra *i*a

kuran pipa (i i(entifikasi (engan kateg'ri ukuran0 -akni nominal 

 pipe size "PS% * outside diameter ")% (an inside diameter "7)%.

am!ar 2.1 )iameter pipa

"Pipe )rafting an( )esign0 2992%

Page 6: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 6/16

2.1.2 Te+al Pi*a ,-all t%ikess Pi*e/

Te!al pipa "#allthi$kness% a(alah istilah untuk te!al (in(ing pipa0

-ang menga$u pa(a pipeCs eight -aitu  standard* e,tra strong (andouble e,tra strong. Saat ini juga (ikenal se!agai schedule* -aitu S190

S290 S39 (st.

am!ar 2.2 -hicness !ipe

"Pipe )rafting an( )esign0 2992%

Ta!el 2.1 Carbon Steel !ipe all -hicness"Pipe )rafting an( )esign0 2992%

2.1.3 K0$*0e *aa Siste$ Per*i*aa

Sistem perpipaan ti(ak han-a ter(iri (ari pipa+pipa saja0 tetapi sangat

memerlukan a(an-a k'mp'nen lain -ang (ikenal (alam (unia  piping 

(engan nama  fittings. ,'nt'h  fittings  antara lain seperti elbo+*

 flanges* +eldolet* threadolet* tee0 (an k'mp'nen lainn-a. Material

Page 7: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 7/16

 fittings terse!ut (i!uat (ari material -ang sama (engan material pipa

(imana fittings terse!ut akan (isam!ungkan0 antara lain seperti ductile

or cast iron0 malleable iron0 brass* copper* cast steel* forged steel 0 (an

+rought steel . Material non ferrous  lainn-a (alam !entuk cast   (an

+rought fitting.Stan(ar -ang sering (igunakan untunk pem!uatan

 fittings a(alah se!agai !erikut ;

a% S7 B16.1 ,ast 7r'n Pipe *langes D *lange( *ittings

 !% S7 B16.3 Mellea!le 7r'n Threa(e( *ittings

$% S7 B16.4 re- 7r'n Threa(e( *ittings

(% S7 B16.5 Pipe *langes an( *lange( *ittings

e% S7 B16.E *a$t'r- ma(e #r'ught Steel Butt eling

f% S7 B16.11 *'rge( fittings0 s'$ket el(ing an( threa(g% S7 B16.2: #r'ught steel Buttel(ing sh'rt ra(ius ?l!'

h% S7 B16.42 )u$tile ir'n Pipe *langes an( *lange( *ittings

i% S7 B16.4E Buttel(ing in(u$ti'n !en(s f'r transp'rtati'n an(

(istri!uti'n s-stem

 j% BS 1649 Buttel( *ittings

k% BS 3EE S'$ketel( an( S$ree( fittings

l% BS 25E: lass Pipelines an( *ittings

m% 7S 153: ,ast 7r'n fittings

n% MSS+SP+43 Stainless Steel *ittings

Fenis fittings -ang !an-ak (igunakan pa(a sistem perpipaan0 -aitu ;

a%  /lbo+ a(alah jenis fitting -ang (igunakan untuk meru!ah arah aliran

 pipa. Peru!ahan arah terse!ut !isa (alam !entuk su(ut 45 (eg atau E9

(eg.  /lbo+ terse(ia (alam (ua tipe -aitu tipe  short radius -aitu

(imana jarak (ari pusat elbo+ ke ujungn-a sama (engan PSn-a (an

tipe long radius* 0aranya adalah 1*( ali  PS. )iameter pipa

umumn-a pa(a sisi masuk akan sama (engan sisi keluar. Pa(a kasus

tertentu apa!ila ter(apat per!e(aan (iameter maka k'mp'nen ini

(inamakan (engan reducing elbo+.

Page 8: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 8/16

am!ar 2.3 /lbo+ long%radius (an short%radius

"Pipe )rafting an( )esign0 2992%

b& -ee a(alah jenis fitting -ang (igunakan untuk mem!agi aliran flui(a

(alam pipa menja(i (ua arah atau se!alikn-a mengga!ungkan (ua

aliran flui(a menja(i satu (i(alam pipa selanjutn-a. Tipe tee -ang

-ang paling umum a(alah tee -ang memiliki ukuran (iameter -ang

sama antara masuk "inlet& (an keluar "outlet&.

am!ar 2.4 /ual -ee

"Pipe )rafting an( )esign0 2992%

$%  educer  jenis  fitting -ang (igunakan untuk mengurangi atau

menam!ah (iameter (ari (iameter ke$il ke -ang le!ih !esar atau

se!alikn-a sesuai (egan pers-aratan process engineering. (a (ua

 jenis re(u$er -ang umum (ikenal -aitu tipe -ang mempun-ai

 per!e(aan garis tengah "$enter line% antara pipa (engan re(u$er. Tipe

ini (ise!ut (engan e$$entri$ re(u$er. P'la peletakan-a !isa (ua $ara

-aitu flat+!'tt'm merupakan !agian ratan-a !era(a (i!aah atau

se!alikn-a serta !agian ratan-a (iatas -ang (ise!ut juga (engan flat+

t'p.,ara mana -ang akan (igunakan tergantung (ari (imana

e$$entri$ re(u$er ini akan (itempatkan. *lat+!'tt'm re(u$er !iasan-a

(itempatkan (i pipera$k se(angkan flat+t'p !an-ak (iaplikasikan

(i(ekat n'GGle pump.

Page 9: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 9/16

Page 10: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 10/16

Penggunaan steel !er(asarkan temperatur se$ara umum a(alah;

• ,ar!'n steel (igunakan sampai (engan temperature :99 * "425 ,%ᵒ ᵒ

• L' temperature steel. )igunakan (i!aah temperature +29 * "+2E ,%ᵒ ᵒ

• ll'- ,ar!'n steel ",S%. )igunakan (iatas temperature :99 * "425 ,%ᵒ ᵒ

• ntuk k'r'sif flui(e0 se!agaimana rek'men(asi (ari li$enser.

Seluruh material pipa -ang !an-ak (igunakan (i in(ustr- migas a(alah

 !er!ahan !esi !aja " steel&* (engan karakteristik utama se!agai !erikut;

• &imia; elemen utama "!esi untuk ferrous metal%0 elemen pa(uan "ni$kel0

$hr'mium%0 impurities0 (an lainn-a.

•  Sifat fisik; kerapatan "density%0 m'(ulus elastisitas0 k'efisien thermal 

ekspansi0 (an lain<lain.

• Struktur mikr'; struktur mikr'; struktur at'm0 phase metalurgi0 tipe0 (an

ukuran !utir.

• Sifat mekanik; kekuatan " yield strength* ultimate strength* elongation%

(an ketangguhan "toughness%.

2.2.1 Klasifikasi Ba&a

Besi (an !aja merupakan l'gam -ang !an-ak (igunakan (alam

 pa(uan antara !esi "*e% (engan unsur+unsur lain seperti ; &ar!'n0

Mangan0 Silik'n0 Ph'sp'r0 Belerang0 (an lain+lain. Besi (an !aja

(i!e(akan menurut ka(ar kar!'nn-a0 (engan !aja -ang mempun-ai

ka(ar kar!'nn-a leih ke$il (ari 10 H0 se(angkan !esi mempun-ai

ka(ar kar!'nn-a le!ih !esar (ari 10 H. Baja mempun-ai unsur+unsur 

lain se!agai pema(u -ang (apat mempengaruhi sifat (ari !aja.

Penam!ahan unsur+unsur (alam !aja kar!'n (engan satu unsur atau

le!ih0 tergantung pa(a karakterstik !aja kar!'n -ang (i!uat.

ntuk memper'leh sifat tertentu pa(a !aja (imasukan $ampuran

unsur+unsur antara lain ; Mangan0 Silik'n0 Iana(ium0 ,hr'um0

M'l-!(enum0 (an ,'!alt serta unsur+unsur lainn-a -ang merupakan

$ampuran -ang sulit (ihilangkan ketika pr'ses pem!uatan !aja

terja(i. Se$ara umum (apat (ise!utkan !e!erapa sifat !aja antara

lain ; kekerasan0 kekuatan0 ketangguhan0 keuletan. Sifat+sifat !aja

Page 11: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 11/16

-ang (igunakan (apat (iatur sesuai (engan k'mp'sisi -ang (i!erikan

terutama ka(ar kar!'nn-a.

• Baja kar!'n ren(ah

Baja kar!'n "lo+ carbon steel& mengan(ung kar!'! antara 90925H+

9025H ,. Setiap satu t'n !aja kar!'n ren(ah mengan(ung 19+39 kg

kar!'n. Baja kar!'n ini (alam per(agangan (i!uat (alam plat !aja0

 !aja strip (an !aja !atangan atau pr'fil.

Ber(asarkan jumlah kar!'n -ang terkan(ung (alam !aja0 maka !aja

kar!'n ren(ah (apat (igunakan atau (ija(ikan !aja+!aja se!agai

 !erikut ;

1. Baja kar!'n ren(ah $lo+ carbon steel&  -ang mengan(ung 9094H+

9019H , untuk (ija(ikan !aja+!aja plat atau strip.

2. Baja kar!'n ren(ah -ang ren(ah mengan(ung 9095H , (igunakan

untuk keperluan !a(an+!a(an ken(araan.

3. Baja kar!'n ren(ah -ang mengan(ung 9051H+9029H , (igunakan

untuk k'nstruksi jem!atan0 !angunan0 mem!uat !aut atau (ija(ikan

 !aja k'nstruksi.

• Baja kar!'n menengah

Baja kar!'n menengah "me(ium $ar!'n steel%0 mengan(ung kar!'n

antara 9025H+9055H , (an setiap satu t'n !aja kar!'n mengan(ung

kar!'n antara 39+69 kg. Baja kar!'n menengah ini !an-ak (igunakan

untuk keperluan alat+alat perkakas !agian mesin. Ber(asarkan jumlah

kar!'n -ang terkan(ung (alam !aja maka !aja kar!'n ini (apat

(igunakan untuk keperluan seperti in(ustr- ken(araan0 r'(a gigi0

 pegas0 (an se!again-a.

• Baja kar!'n tinggi

Baja kar!'n tinggi $high carbon steel&  mengan(ung ka(ar kar!'n

antara 9056H+10H , (an setiap stau t'n !aja kar!'n tinggi

mengan(ung kar!'n antara 9+139 kg. Baja ini mempun-ai tegangan

tarik paling tinggi (an !an-ak (igunakan untuk material t''ls. Salah

satu aplikasi (ari !aja ini a(alah (alam pem!uatan kaat !aja (an

ka!el !aja. Ber(asarkan jumlah kar!'n -ang terkan(ung (i(alam !aja

maka !aja kar!'n ini !an-ak (igunakan (alam pem!uatan pegas0 alat+

Page 12: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 12/16

alat perkakas seperti ; palu0 gergaji atau pahat p't'ng. Selain itu !aja

 jenis ini !an-ak (igunakan untuk keperluan in(ustr- lain seperti

 pem!uatan kikir0 pisau $ukur0 mata gergaji0 (an lain se!agin-a.

2.2.2 Dia!ra$ asa Besi Kar+0 ,e4/

)iagram fasa *e+, atau !iasa (ise!ut (iagram kesetim!angan !esi

$ar!'n merupakan (iagram -ang menja(i parameter untuk mengetahui

segala jenis fasa -ang terja(i (i(alam !aja0 serta untuk mengetahui

fakt'r+fakt'r apa saja -ang terja(i pa(a pa(uan !aja (engan segala

 perlakuann-a.

am!ar 2. )iagram fasa *e+,

"M'(ul uji !ahan0 2913%

2.2.3 4ar+0 Steel

Pipa ,ar!'n Steel a(alah pipa -ang paling luas penggunaan-a (alam

in(ustri migas maupun in(ustri lainn-a. Material pipa jenis ini a(alah

-ang paling !an-ak (igunakan0 spesifikasin-a !an-ak (itemukan

(alam STM "meri$an S'$iet- 'f Testing an( Materials% (an

SM? "meri$an S'$iet- 'f Me$hani$al ?ngineering%.

(a 3 jenis pipa material ini -ang paling sering (igunakan;

• STM 196. Ter!agi (alam 3 gra(e0 tergantung tensile strengh+n-aJ

ra(e "4: ksi%0 ra(e B "69 ksi%0 (an ra(e , "9 ksi%.

•   STM 53. Material pipa ini -ang !iasan-a (ilapisi 'leh Gin$

Page 13: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 13/16

"gal/aniGe(%0 -ang !iasan-a merupakan alternatif (ari STM 196.

Material ini juga ter!agi (alam 3 gra(e0 0 B (an ,0 (an memiliki 3

tipeJ Tipe ? "?le$tri$al Resistan$e #el(%0 Tipe * "*urna$e Butt #el(%0

(an Tipe S "Seamless%. ra(e (an B pa(a STM 196 memiliki

tensile strength -ang sama (engan ra(e (an B pa(a STM 53.

• STM 333. Material ini !iasa (igunakan pa(a flui(a -ang

memiliki temperatur ren(ah0 mulai (ari +59 (erajat *ahrenheit.

2.3 Da5a

)a-a (ihitung (engan mengalikan jumlah flui(a -ang mengalir per (etik 

"Kg% (engan energ- A (alam F. Fa(i menghasilkan persamaan;

)a-a P Kg A "(alam Fs atau att%

)engan A a(alah hea( p'mpa0 jika -ang (ihitung a(alah (a-a tur!in0 maka

A a(alah hea( tur!in.

Page 14: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 14/16

BAB.3 METODOLOGI PENELITIAN

3.1 Garis Besar Peelitia

Penelitian -ang (ilakukan pa(a tugas akhir ini se$ara umum

(igunakan untuk menganalisa efisiensi (esain jalur  pipeline  (inilai (ari

 !ia-a instalasi (an 'perasi'nal pa(a jaringan (istri!usi gas (ari Pasuruan ke

area M'j'kert' sesuai !atasan STM (an P7 spec 5L=46  grade B PSL2.

nalisa (ilakukan (engan menggunakan  soft+are ,,,  (an perhitungan

manual. Ga$+ar 3.1  memperlihatkan ran$angan penelitian !er(asarkan

runtutan kegiatan se$ara sistematis.

1. Ta%a* Ietifikasi A6al

Tahap 7(entifikasi aal (itujukan untuk menetepkan tujuan (an

melakukan i(entifikasi mengenai permasalahn (alam penelitian ini.

(apun isi (ari tahap ini antara lain ;

a. Pelaksanaan FT

Selama pelaksanaan FT untuk men(apatkan inf'rmasi tentang

ran$angan jalur  pipeline -ang akan (i!angun (i(apatkan melalui

PD7) (an isometric Japanan Metering Station -ang (i!uat 'leh

 perusahaan. Pengamatan melalui PD7) (an isometric  ini (ilakukan

untuk memper'leh inf'rmasi tentang ran$angan sistem pipeline.

 !. 7(entifikasi masalah (an Penetapan ju(ul

Pa(a tahap ini (ilakukan i(entifikasi !e!erapa permasalahan -ang

(i(apatkan pa(a saat melakukan pengamatan (an pemikiran sehingga

 !isa (ilakukan se!uah penelitian. Pa(a tahap ini juga (ilakukan

 penetapan tujuan tentang apa -ang ini (i$apai (an manfaatn-a !agi

%erlu s#&t'are

kah?apa?

Page 15: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 15/16

 pihak terkait serta !agi penelitian selanjutn-a. Tahap+tahap ini

merupakan (asar tentang apa -ang (ilakukan selama penelitian. Tugas

akhir ini mengangkat permasalahan mengenai analisa (ari (esain jalur 

 pipeline jaringan (istri!usi gas (ari Pasuruan ke area M'j'kert' pa(a

 Japanan Metering Station  (i Pasuruan. nalisa -ang (ituju a(alah

mengenai efisiensi (esign jalur pipeline (inilai (ari !ia-a instalasi (an

'perasi'nal -ang menggunakan pipacarbon steel   PS 12 S7 8399

(an PS : S7 8399 memiliki tekanan (esain gas a(alah 29 Psig

"S7 3998% (engan temperatur 139 >*.

c. Stu(i literature (an !r'singPa(a tahap ini (ilakukan pengumpulan te'ri+te'ri -ang rela/an (engan

 penelitian ini -ang nantin-a akan (igunakan se!agai a$uan (alam

 penelitian ini. )alam penelitian ini te'ri -ang (iangkat a(alah te'ri

-ang !erhu!ungan (engan kekuatan mekanik material0 mekanika

flui(a0 perhitungan ek'n'mi.

2. Ta%a* Pe!#$*#la Data

Tahap pengumpulan (ata merupakan tahap untuk mengumpulkan (ata

-ang !erhu!ungan (engan permasalahan -ang (iha(api (an

men(ukung (alam penelitian -ang (ilaksanakan. )ata -ang

(ikumpulkan !erupa (ata primer (an (ata sekun(er.

a. )ata primer 

)ata primer -ang ter(apat (alam penelitian ini antara lain chemical 

composition fluida* spesifikasi material carbon steel 0 serta rumus

menghitung hea(l'sses (an (a-a p'mpa.

 !. )ata sekun(er 

)ata sekun(er (ija(ikan se!agai pen(ukung (ari (ata primer. )atasekun(er -ang se!agai a$uan antara lain piping an( instrument 

diagram "PD7)%0 process flo+ diagram* katal'g pipa $ar!'n steel.

 "e#ri nya apa

sa$a?

Page 16: Proposal Desember - Fire Water

7/21/2019 Proposal Desember - Fire Water

http://slidepdf.com/reader/full/proposal-desember-fire-water 16/16

 

(ay#ut kasar nnt dianti ke

ms.)isi#.t#l#n dik#reksi

*ulai

%enetapan tu$uan

 "ahap %en#lan

"ahap Identi+kasi

-esimpulan

nalisis biaya#peratin

 /a

bukan

 

tidarequire client design

 /a

Desain yang biaya instalasi

 perthn lebih rendah

-alkulasi $#int

'eldin dan biaya

-alkulasi daya

-alkulasi

headl#sess

comparing design

-alkulasi dimensi

pipa ,

ata primer

7chemical compositionfuida7 spec carbon steel7 rumus headloses

ata sekunder

7%,I !*S7 8#' diaram7 catalog pipa

%enumpulan