  • COMPANIA NATIONAL DE DRUMURI I AUTOSTRZI DIN ROMNIA

    REVIZUIRE/ELABORARE A REGLEMENTRILOR TEHNICE DIN DOMENIUL RUTIER - LOT 5

    CAIETE DE SARCINI GENERALE COMUNE LUCRARILOR DE DRUM

    Indicativ AND 589

    REDACTAREA II MAI 2016

  • CUPRINS

    - Caiet de sarcini nr. 1 Lucrari de consolidare a terasamentelor de drumuri

    - Caiet de sarcini nr. 2 Lucrri de terasamente

    - Caiet de sarcini nr. 3 Straturi de form

    - Caiet de sarcini nr. 4 Dispozitive de scurgere i evacuarea apelor de suprafa

    - Caiet de sarcini nr. 5 Fundaii de balast i/sau de balast amestec optimal

    - Caiet de sarcini nr. 6 Fundaii de piatr spart i/sau de piatr spart amestec

    optimal

    - Caiet de sarcini nr. 7 Strat rutier din agregate naturale stabilizate cu ciment sau

    liani hidraulici rutieri

    - Caiet de sarcini nr. 8 Strat rutier din beton slab

    - Caiet de sarcini nr. 9 Strat rutier din beton poros

    - Caiet de sarcini nr. 10-11 Imbracaminti si straturi de baza bituminoase din mixturi

    asfaltice executate la cald

    - Caiet de sarcini nr. 12 Straturi bituminoase foarte subiri executate la rece (slam

    bituminos)

    - Caiet de sarcini nr. 13 Reciclarea la cald a mbrcminilor rutiere bituminoase

    - Caiet de sarcini nr. 14 Reciclarea la rece a mbrcminilor rutiere bituminoase

    - Caiet de sarcini nr. 15 mbrcmini rutiere din beton de ciment

    - Caiet de sarcini nr. 16 Tratamente bituminoase

    - Caiet de sarcini nr. 17 Marcaje rutiere

    - Caiet de sarcini nr. 18 Indicatoare rutiere

  • Structuri de sprijin i consolidare din beton simplu 1

    MINISTERUL TRANSPORTURILOR

    COMPANIA NAIONAL DE AUTOSTRZI i DRUMURI NAIONALE DIN ROMNIA

    CAIET DE SARCINI NR. 1

    LUCRRI DE CONSOLIDARE A TERASAMENTELOR DE DRUM

    PARTEA I:

    STRUCTURI DE SPRIJIN I CONSOLIDARE DIN BETON SIMPLU

    REDACTAREA 2

    IULIE 2015

    S.C. PRIMACONS S.R.L.

  • Structuri de sprijin i consolidare din beton simplu 2

    CUPRINS

    1. PREVEDERI GENERALE.........................................................................................................4

    2. MATERIALE ...............................................................................................................................4

    2.1 APA.................................................................................................................................................4

    2.2 CIMENTUL ......................................................................................................................................4

    2.2.1 Caracteristici .................................................................................................................................4

    2.2.2 Controlul calitii cimentului.........................................................................................................4

    2.2.3 Livrarea cimentului........................................................................................................................4

    2.2.4 Depozitarea cimentului ..................................................................................................................5 2.3 AGREGATE NATURALE PENTRU BETON ..........................................................................................5

    2.3.1 Controlul calitii agregatelor.......................................................................................................5

    2.3.2 Manipularea i stocarea in situ......................................................................................................5

    2.3.3 Transportul agregatelor.................................................................................................................5

    2.4 BETONUL ........................................................................................................................................5

    2.4.1 Betonul proaspt ............................................................................................................................6

    2.4.2 Betonul ntrit ................................................................................................................................6

    2.5 COFRAJE I SUSINERI....................................................................................................................7

    2.6 ADITIVI...........................................................................................................................................7

    2.7 ADAOSURI ......................................................................................................................................7

    2.8 ALTE MATERIALE ...........................................................................................................................7

    2.8.1 Material geotextil ...........................................................................................................................7

    2.8.2 Bitum..............................................................................................................................................8

    2.8.3 evi PVC ........................................................................................................................................8

    3. UTILAJE ......................................................................................................................................8

    4. EXECUIA LUCRRILOR ......................................................................................................8

    4.1 LUCRRI PREGTITOARE ...............................................................................................................8

    4.2 REALIZARE TRONSON EXPERIMENTAL ...........................................................................................8

    4.3 TEHNOLOGIE DE EXECUIE ............................................................................................................8

    4.3.1 Sptura.........................................................................................................................................8

    4.3.2 Cofrarea .........................................................................................................................................9

    4.3.3 Controlul i recepia lucrrilor de cofraje.....................................................................................9

    4.3.4 Turnarea betonului ........................................................................................................................9

    4.3.5 Decofrarea i protecia betonului dupa turnare ..........................................................................10

    4.3.6 Hidroizolaia ................................................................................................................................10 4.3.7 Execuia sistemului de drenaj ......................................................................................................10

    5. CONTROLUL EXECUIEI LUCRRILOR ........................................................................10

    5.1 VERIFICAREA CALITII LUCRRILOR .........................................................................................10

    5.2 TOLERANE ..................................................................................................................................11

    5.3 DEFECIUNI I MOD DE REMEDIERE .............................................................................................12

  • Structuri de sprijin i consolidare din beton simplu 3

    6. BREVIARE DE CALCUL ........................................................................................................13

    7. PLANELE CARE GUVERNEAZA LUCRAREA ...............................................................13

    8. LISTA STANDARDELOR I NORMATIVELOR................................................................13

  • Structuri de sprijin i consolidare din beton simplu 4

    1. PREVEDERI GENERALE

    Prezentul Caiet de Sarcini se aplic structurilor de sprijin din beton simplu cu fundare direct.

    Structurile de sprijin din beton cu fundare direct sunt prevzute pentru sprijinirea corpului drumului sau a taluzurilor adiacente acestuia, acolo unde nu se pot executa taluzuri.

    Caietul de sarcini cuprinde condiiile tehnice i de calitate care trebuie s le ndeplineasc materialele, controlul de calitate al lucrrilor i criteriile de recepie a lucrrilor.

    De asemenea, ine cont de Normativele i Standardele romneti i europene valabile n luna mai 2015.

    Constructorul are obligaia de a ntocmi procedura de execuie n conformitate cu planele de execuie, cu caietul de sarcini, normativele, instruciunile i standardele nominalizate n acest caiet de sarcini, cu detalierea modului de execuie i a documentelor de recepie. Procedura de execuie va fi naintat Consultantului lucrrii spre aprobare nainte de nceperea lucrrii.

    Toate materialele care intr n lucrrile permanente vor fi supuse aprobrii Consultantului. nainte de aprovizionare, Contractorul va supune aprobrii Consultantului sursele / furnizorii acestor materiale.

    Nici un material nu va fi utilizat n lucrrile permanente nainte de a fi aprobat de Consultant.

    2. MATERIALE

    2.1 Apa

    Poate s provin din reeaua public sau dintr-o alt surs, dar n acest caz trebuie sa indeplineasc condiiile din SR EN 1008. n cazul n care apa provine din alt surs, verificarea se va face de ctre un laborator de specialitate n conformitate cu precizrile din respectivul standard.

    n timpul utilizrii pe antier se va evita ca apa s se polueze cu detergeni, materii organice, uleiuri vegetale, argile etc.

    2.2 Cimentul

    2.2.1 Caracteristici

    Cimentul utilizat este CEM I; CEM II A-S; CEM II B-S; CEM II H-S; CEM II A-LL; CEM II A-M n conformitate cu CP 012/1 Tabel F.3.1 i Tabel F.3.2.

    2.2.2 Controlul calitii cimentului

    Caracteristicile cimenturilor vor fi verificate n conformitate cu: SR EN 197-1, SR EN 196-1SR CEN/TR 196-4, SR EN 196-6, SR EN 196-8.

    Controlul calitii cimentului se va face:

    la aprovizionare: prin verificarea certificatului de calitate / garanie emis de productor sau de baza de livrare;

    nainte de utilizare, de ctre un laborator autorizat.

    2.2.3 Livrarea cimentului

    n cazul n care utilizatorul procur cimentul de la un depozit (baz de livrare) livrarea cimentului va fi insoit de o declaraie de conformitate, n care se va meniona: tipul de ciment i fabrica productoare;

  • Structuri de sprijin i consolidare din beton simplu 5

    data sosirii n depozit; termenul de expirare; nr. certificatului de calitate eliberat de productor; nr. buletinului de analiz a calitii cimentului efectuat de un laborator autorizat.

    2.2.4 Depozitarea cimentului

    Depozitarea cimentului se poate face:

    n vrac, n celule tip siloz n care nu au mai fost depozitate alte materiale; ambalat n saci, n ncperi nchise, aezai n stive pe scnduri dispuse cu interspaii pentru a

    asigura circulaia aerului. Cimentul trebuie folosit nainte de termenul de expirare.

    2.3 Agregate naturale pentru beton

    Agregatele naturale folosite pentru prepararea betonului i a umpluturii din dren trebuie s corespund calitativ cu prevederile SREN 12620+A1, CP 012/1. Staiile de producere a agregatelor vor funciona numai pe baz de atestat eliberat de o comisie intern n prezena unui reprezentant desemnat de ISC ( conform CP 012/1).

    2.3.1 Controlul calitii agregatelor

    n cazul procurrii ca atare a agregatelor, acestea vor fi achiziionate de la staii de producere autorizate.

    Controlul calitii agregatelor se va face la fiecare lot aprovizionat, conform prevederilor din CP 012/1, iar metodele de verificare vor ine cont de SREN 12620+A1.

    Laboratorul antierului va ine evidena calitii agregatelor astfel:

    ntr-un dosar vor fi cuprinse toate certificatele de calitate de la furnizor; ntr-un registru (registru pentru ncercri agregate) rezultatele determinrilor efectuate n

    laborator.

    2.3.2 Manipularea i stocarea in situ

    Aceste operaiuni se vor face n conformitate cu SREN 12620 +A1.

    Se vor depozita pe platforme betonate, avnd pante i rigole de evacuare a apelor. Pentru depozitarea diferitelor sorturi se vor amenaja compartimente cu nlimea corespunztoare n vederea evitrii amestecrii sorturilor.

    Nu se admite depozitarea direct pe pmnt sau pe platforme balastate.

    2.3.3 Transportul agregatelor

    Transportul agregatelor va fi n conformitate cu SREN 12620 +A1.

    Agregatele vor fi expediate cu mijloace de transport curate i bine nchise. Fiecare transport va fi nsoit de foaia de expediie n care se vor arta: numrul i data eliberrii foii, marca de fabric (balastiera), destinatarul, felul i sortul agregatelor, cantitatea livrat, numrul certificatului de calitate.

    2.4 Betonul

    Cerinele de baz pe care trebuie s le ndeplineasc betoanele vor fi conform CP 012/1. Dup modul de expunere al construciilor prevzute n documentaie n funcie de condiiile de mediu, se stabilete clasa de expunere (tabel 1 CP 012/1).

  • Structuri de sprijin i consolidare din beton simplu 6

    Clasa de expunere, clasa de beton i valorile limit recomandate pentru compoziia i proprietile betonului sunt specificate n planele din proiect.

    2.4.1 Betonul proaspt

    Cerinele pentru betonul proaspt trebuie s corespund specificaiilor cap. 4.2 Beton proaspt i cap. 5.4 Cerine pentru betonul proaspt - din CP 012/1.

    2.4.1.1 Compoziia betoanelor

    Compoziia betoanelor este definit de proporia n volume a diverselor categorii de agregate uscate, greutatea liantului pentru un metru cub de beton gata executat i volumul apei. Cantitile necesare pe fiecare component al betonului vor fi determinate nainte de a ncepe prepararea acestuia de catre Antreprenor.

    Determinrile caracteristicilor fizice ale betonului proaspt precum i limitele admisibile ale valorilor acestora vor respecta precizrile din tabelul de mai jos:

    Caracteristici Conform standard Valoarea

    admisibila

    Consistena:

    - prin metoda tasrii

    - prin timpul Vebe

    SREN 12350-2

    SREN 12350-3

    Grad de compactare SREN 12350-4

    Rspandirea betonului SREN 12350-5

    Densitate SREN 12350-6

    Coninutul de aer oclus (% vol.) SREN 12350-7

    Conform cu

    CP 012/1

    2.4.1.2 Prepararea i transportul betonului

    Precizrile privind aceste operaii vor fi n conformitate cu CP 012/1.

    2.4.1.3 Controlul produciei betonului

    Toate betoanele trebuie supuse controlului de producie, sub responsabilitatea productorului. Controlul produciei cuprinde toate msurile necesare pentru meninerea betonului n conformitate cu condiiile specificate n proiect. Controlul produciei betonului se realizeaz n conformitate cu CP 012/1, cap. 9 Controlul produciei.

    2.4.2 Betonul ntrit

    Betoanele prevzute n proiect vor fi grele avnd densitatea aparent a betonului ntrit la 28 de zile, cuprins ntre 2201-2500 kg/m3.

    2.4.2.1 Clasa betonului

    Clasa betonului este definit pe baza rezistenei caracteristice fck cil (fck cub), care este rezistena la compresiune n N/mm2 determinat pe cilindri de 150/300 mm, conform SR EN 12390-3 (sau pe cuburi cu latura de 150mm) la vrsta de 28 zile, sub ale carei valori se pot situa statistic cel mult 5% din rezultate.

    Definirea clasei de beton are n vedere pstrarea epruvetelor conform SREN 12390-2. Controlul calitii lucrrilor de betoane turnate pe antier, se va realiza conform SREN 12390-6 i SREN 12390-1.

  • Structuri de sprijin i consolidare din beton simplu 7

    2.4.2.2 Clasele de expunere

    Cerinele de baz pe care trebuie s le ndeplineasc betoanele vor fi conform cu CP 012/1. Dup modul de expunere al construciilor prevzute n documentaie n funcie de condiiile de mediu, se stabilete clasa de expunere (tabel 1 SR 13510).

    Clasa de expunere, clasa de beton i valorile limit recomandate pentru compoziia i proprietile betonului sunt specificate n planele din proiect, i se stabilesc n funcie de clasa de expunere la aciunea mediului nconjurtor, n conformitate cu CP 012/1, cap. 4, tab. 1 clase de expunere.

    2.5 Cofraje i susineri

    Cofrajele se pot confeciona din lemn sau produse pe baz de lemn, metal sau produse pe baz de polimeri.

    Materialele pentru confecionarea cofrajelor trebuie s fie conform urmatoarelor standarde:

    bile manele de rinoase: STAS 1040; grinzi rigle de fag i rinoase SR EN 1313-1 i SR EN 1313-2 ; placaj tego de 8 i 15mm: SR EN 313-1 i SR EN 314-1; cuie: STAS 2111.

    2.6 Aditivi

    Aditivii sunt produse chimice care se adaug n beton n cantiti mai mici sau egale cu 5% substan fa de masa cimentului n scopul modificrii / mbuntirii calitii betonului n stare proaspt i / sau ntrit.

    La folosirea aditivilor se vor respecta prevederile CP 012/1 si SR EN 934-2+A1 pentru frecvena minim de ncercri.

    n conformitate cu CP 012/1 i cu SR 13510 cap. 5.1.5, compatibilitatea aditivilor cu cimenturile utilizate trebuie verificat prin ncercri preliminare.

    2.7 Adaosuri

    Adaosurile sunt materiale anorganice fine ce se pot aduga n beton n cantiti de peste 5% substan uscat fa de masa cimentului, n vederea mbuntirii caracteristicilor acestuia sau pentru a realiza proprieti speciale.

    La folosirea adaosurilor se vor respecta prevederile CP 012/1 i ale urmtoarelor standarde:

    SR EN 12878 pentru pigmeni SR EN 450-1,2 pentru cenui volante SR EN 13263-1,2+A1 pentru silicea ultrafin

    2.8 Alte materiale

    2.8.1 Material geotextil

    Folosit ca filtru la drenul din spatele zidului de sprijin, va fi de tipul neesut i neimpregnat i se va verifica conform Normativului NP 075 - Normativ pentru utilizarea materialelor geosintetice la lucrrile de construcii i va trebui sa aib urmtoarele caracteristici:

    rezistena la traciune: min. 10 KN/m; alungirea la rupere: 1 x 10

    -4 m/s; poansonarea cu CBR >1500 N; dimensiunea porilor ce rein 90% din cantitatea de particule ce poate fi reinut de geotextil:

    d90

  • Structuri de sprijin i consolidare din beton simplu 8

    2.8.2 Bitum

    Bitumul este folosit sub form de emulsie pentru realizarea hidroizolaiei verticale la intradosul structurilor de sprijin, conform normativului AND 537.

    2.8.3 evi PVC

    evile din PVC vor trebui s corespund prevederilor din SR EN ISO 3126.

    La executarea barbacanelor la elevaia sprijinirii se vor utiliza evi din PVC tip SN4 avnd 110mm.

    Controlul calitii se va realiza prin: verificarea existenei certificatului de calitate, verificarea dup aspect (colinearitatea, seciunea liber), verificarea dimensiunilor.

    3. UTILAJE

    Utilajele necesare pentru execuia lucrrilor nu sunt specificate n caietul de sarcini, acestea vor fi adoptate n funcie de tehnologia de execuie a Antreprenorului aprobat de ctre Consultant.

    4. EXECUIA LUCRRILOR

    4.1 Lucrri pregtitoare

    nainte de nceperea execuiei lucrrilor, executantul trebuie sa desemneze un responsabil cu execuia lucrrilor i s ntocmeasc procedurile specifice de verificare, control i acceptare.

    Antreprenorul va executa lucrrile pregtitoare:

    semnalizarea zonei de lucru; verificarea existenei i poziiei eventualelor utiliti n ampriza sau n vecintatea acesteia; se

    vor lua toate msurile pentru executarea lucrrilor n siguran; trasarea lucrrilor; asigurarea scurgerii apei de pe amplasament.

    4.2 Realizare tronson experimental

    n mod obinuit, execuia unei structuri din beton simplu cu fundare direct nu necesit realizarea unui tronson experimental. Dac condiii speciale de teren sau/i de tehnologie, impun realizarea unui asemenea tronson, atunci se va detalia acest capitol n cadrul caietului special de sarcini al lucrrii respective.

    4.3 Tehnologie de execuie

    4.3.1 Sptura

    Spturile vor fi executate conform planurilor de execuie. Acestea se vor adnci pn la cota stabilit de catre Consultant n baza Proiectului de execuie.

    Pe ct posibil, spturile vor fi executate n uscat. Dac sunt necesare epuismente, acestea cad n sarcina Antreprenorului n baza caietului de sarcini speciale.

    n cazul instabilitii pereilor spaturii, se va realiza sprijinirea acestora pe baza unui proiect sau unei dispoziii de antier.

    Pmntul rezultat din sptur va fi ncrcat, transportat i depozitat ntr-o locaie stabilit de catre Consultant.

    Cnd execuia spturilor implic dezvelirea unor reele subterane existente (ap, gaze, electrice, etc.) ce rmn n funciune, trebuiesc luate msuri pentru protejarea acestora mpotriva deteriorrii.

  • Structuri de sprijin i consolidare din beton simplu 9

    Dac aceste reele nu se cunosc i apar pe parcursul executrii spturii, se vor opri lucrrile i se va anuna Consultantul pentru a lua msurile necesare.

    Ultimii 30 cm pn la cota de fundare se vor excava naintea betonrii, pentru evitarea degradrii terenului de fundare i a conturului tlpii fundaiei.

    4.3.2 Cofrarea

    Cofrajele i susinerile lor trebuie s fie astfel alcatuite nct s ndeplineasc condiiile din NE 012/2, cap. 7 Cofraje i susineri:

    s asigure obinerea formei, dimensiunilor i gradului de finisare prevzute n proiect pentru elementele ce urmeaz a fi executate, respectndu-se nscrierea n abaterile admisibile (pentru lungimea elementelor de cofraj 15 mm, pentru lime 6 mm, nlime 10 mm);

    s fie etane astfel nct s nu permit pierderea laptelui de ciment; s fie stabile i rezistente sub aciunea ncrcrilor ce apar n procesul de execuie.

    nainte de nceperea operaiei de montare a cofrajelor, se vor curi i pregti suprafeele care vin n contact cu betonul ce urmeaz a se turna i se va verifica i corecta poziia armturilor.

    Pentru a reduce aderena ntre beton i cofraje acestea se ung cu ageni de decofrare pe feele care vin n contact cu betonul imediat nainte de montare.

    Pentru tratarea arhitectural a feei vzute a elevaiei pe cofraje se pot monta elemente de amprentare conform specificaiilor din planele de detaliile de execuie din proiect. Montarea cofrajelor va cuprinde urmtoarele operaii:

    trasarea cofrajelor; asamblarea i susinerea provizorie a panourilor; ncheierea, legarea i sprijinirea definitiv a cofrajelor.

    4.3.3 Controlul i recepia lucrrilor de cofraje

    Se vor efectua verificri etapizate astfel:

    preliminar, controlndu-se lucrrile pregtitoare i elementele sau subansamblurile de cofraj i susineri;

    n cursul execuiei, verificndu-se poziionarea n raport cu trasarea i modul de fixare al elementelor;

    final, recepia cofrajelor i consemnarea constatrilor ntr-un registru de procese verbale.

    4.3.4 Turnarea betonului

    Turnarea betonului i tratarea ulterioar a acestuia se va face respectnd prevederile din NE 012/2.

    Operaiunea va fi condus de eful punctului de lucru sau de nlocuitorul desemnat al acestuia.

    Nu sunt admise depirea duratei maxime de transport, respectiv modificarea strii de consisten a betonului.

    Turnarea betonului trebuie realizat dup:

    terminarea spturii; recepia cotei i naturii terenului de fundare; montarea i recepia cofrajelor; montarea armturilor; montarea barbacanelor.

    nceperea betonrii se va aproba dup verificarea condiiilor de mai sus, pe baza proceselor verbale de lucrri ascunse i/sau de faze determinante.

    Betonul n fundaii se toarn aderent la pereii spturii.

  • Structuri de sprijin i consolidare din beton simplu 10

    Betonul trebuie s fie rspandit uniform n lungul elementului, urmrindu-se realizarea de straturi de maximum 50 cm nlime i turnarea noului strat nainte de inceperea prizei betonului turnat anterior.

    Compactarea betonului este obligatorie, realizndu-se de regul prin vibrare. Compactarea manuala (cu vergi, ipci, ciocnirea cofrajelor) se admite numai n situaii speciale (seciuni nguste, armturi dese, defeciunea temporar a vibratorului), cu acceptul Consultantului.

    nlimea liber de cdere a betonului nu va fi mai mare de 1,5 m. Rosturile de lucru trebuiesc evitate, iar n cazul n care nu se poate, acestea vor fi tratate n conformitate cu Codul de practic pentru executarea lucrrilor din beton, beton armat i beton precomprimat indicativ NE 012/2.

    4.3.5 Decofrarea i protecia betonului dupa turnare

    Structura din beton se poate decofra atunci cand betonul a atins o anumit rezisten cu respectarea prevederilor din NE 012/2 i a Caietului special de sarcini.

    n vederea obinerii tuturor caracteristicilor prevzute a betonului, suprafeele betonului trebuie protejate o anumit perioad de timp, funcie de tipul structurii, condiiile de mediu din momentul turnrii i condiiile de expunere din perioada de exploatare.

    Protecia betonului trebuie sa nceap cat mai curnd posibil dupa decofrare.

    Protecia betonului se realizeaz, n principal, mpotriva:

    - uscrii premature datorit radiaiilor solare i a vntului;

    - antrenrii pastei de ciment datorit apei din intemperii sau apelor curgtoare;

    - ngheului.

    Msuri de protecie pot fi:

    - meninerea n cofraje;

    - acoperirea cu materiale meninute n stare umed/uscat;

    - stropirea cu pelicule de protecie.

    4.3.6 Hidroizolaia

    Se realizeaz prin stropire n trei straturi cu emulsie de bitum.

    4.3.7 Execuia sistemului de drenaj

    n cazul structurilor de sprijin, drenul structurii se realizeaz din material granular i geotextil sau din material geocompozit, n concordan cu detaliile din proiect.

    Suprafaa rigolei drenului se va sclivisi cu mortar de ciment M100, apa drenat fiind evacuat prin barbacanele racordate la rigola drenului.

    5. CONTROLUL EXECUIEI LUCRRILOR

    5.1 Verificarea calitii lucrrilor

    Pe parcursul execuiei lucrrilor, se vor face urmatoarele verificri: Faza Verificare

    Spturi -poziia n plan -dimensiunile spturii

    -verificarea terenului de fundare*

    Cofraj -ncheierea cofrajelor -dimensiunile interioare ale acestora

  • Structuri de sprijin i consolidare din beton simplu 11

    Barbacane -verificarea montrii barbacanelor

    Betonarea fundaiei i elevaiei - verificarea betoanelor proaspete i a cuburilor de prob

    Drenul din spatele zidului -panta rigolei drenului -realizarea drenului

    *- se verifica natura i capacitatea portant ale terenului de fundare. Orice neconcordan observat ntre stratificaia indicat n proiect i cea real din antier, se va semnala reprezentantului Beneficiarului spre a hotr msurile necesare.

    Capacitatea portant a terenului de fundare determinat prin teste cu instalaia Lucas trebuie s ndeplineasc condiia: modulul de deformaie liniar Ev2 45 MPa (cf. indicativ AND 530). Se va efectua o ncercare pe locaie, dar nu mai puin de una la 300 m de lungime de zid.

    5.2 Tolerane

    Tolerana reprezinta diferena dintre valoarea specificat i valoarea msurat.

    La dozarea materialelor componente ale betonului (dupa stabilirea reetei) se admit urmatoarele abateri n conformitate cu CP012/1 (tab. 21):

    agregate 3%;

    ciment i apa 3%;

    adaosuri utilizate n cantitate >5% din masa cimentului 3%;

    aditivi utilizate n cantitate

  • Structuri de sprijin i consolidare din beton simplu 12

    5.3 Defeciuni i mod de remediere

    n cazul n care o parte a structurii sau ntreaga structur nu corespunde prevederilor proiectului i prezentului caiet de sarcini, Antreprenorul este obligat s execute remedierile necesare.

    Dup recunoaterea i analiza defectelor, naintea nceperii lucrrilor de remediere, Antreprenorul propune Consultantului programul de reparaii, spre aprobare.

    Reparaiile intr n sarcina Antreprenorului.

    Pentru remedierea defectelor de natur s afecteze calitatea structurii, sigurana i durabilitatea n exploatare se va proceda astfel:

    - ntocmirea releveului detaliat al defectelor;

    -cercetarea cauzelor, procedndu-se i la efectuarea de ncercri, investigatii sau calcule suplimentare;

    - evaluarea consecinelor posibile pe termen scurt sau mai lung.

    n funcie de constatrile i de studiile efectuate, Consultantul poate sa procedeze astfel:

    - s acorde viza proiectului de reparaii, cu eventuale observaii;

    - s prevad demolarea unei pari sau a ntregii lucrri;

    n cazul defectelor privind geometria lucrrii, calitatea i culoarea suprafeelor, dar care nu afecteaza sigurana i capacitatea portant a lucrrii, remedierile se pot efectua astfel:

    - defectele minore pot fi corectate prin degresare, splare, rabotare sau rostuire;

    - n cazul defeciunilor mai importante, antreprenorul va propune beneficiarului un program de remediere, pe care-l va analiza i aproba ca atare sau cu completarile necesare.

    Pe suprafeele vzute, cu parament fin, este interzis sclivisirea simpl.

    Fisurile deschise, care pot compromite durabilitatea lucrrii, ct i aspectul, se colmateaz prin injecie. Dupa injecie, fisurile sunt curate cu aer comprimat.

    Procedee de remediere a defectelor elementelor de beton:

    Tipuri de remedieri:

    Tipul 1: - Remedierea defectelor de execuie constatate la decofrarea elementelor constnd din tirbituri, zone segregate, goluri, rosturi de betonare, etc., se realizeaz n conformitate cu tabelul 1 din C 149;

    Tipul 2: - Remedierea deteriorrilor (fisuri sau striviri locale) aparute n perioada de execuie sau n cursul exploatrii ca urmare a fenomenului de contracie a betonului sau a unor solicitri cu caracter excepional (ocuri, suprancrcare, vibraii, seism, etc.) se realizeaz n conformitate cu tabelul 2 din C 149.

    Denumire lucrare Tolerane admisibile

    Fundaii structuri de sprijin

    -poziie n plan 5 cm

    -cota de fundare 5 cm

    Elevaie structuri de sprijin cu fundare direct

    -planeitate la partea superioar a coronamentului 10 mm /10m

    -rectilinitate orizontal a coronamentului 5 mm /10 m

    Sistem de drenaj -cote nivel barbacane 0.1 %

    -interdistana barbacane 10 cm

  • Structuri de sprijin i consolidare din beton simplu 13

    6. BREVIARE DE CALCUL

    Breviarele de calcul sunt prezentate ca o documentaie separat n partea scris a Proiectului (conform Borderoului) i cuprind descrierea metodologiei de calcul, notele i schemele de calcul aferente lucrrilor proiectate.

    7. PLANELE CARE GUVERNEAZA LUCRAREA

    Plan de situaie

    Profil transversal tip

    Profiluri transversale curente

    Elevaie lucrare

    Detalii cofraj

    8. LISTA STANDARDELOR I NORMATIVELOR

    Nr. Crt.

    Acte legislative/ Standarde/Normative

    Denumirea

    1 STAS 1040-85 Lemn rotund de rinoase pentru construcii. Manele i prajini

    2 STAS 10111/1-77 Poduri de cale ferat i osea. Infrastructuri de zidrie beton i beton armat. Prescripii de proiectare

    3 STAS 4606-80 Agregate naturale grele pentru betoane i mortare cu liani minerali. Metode de ncercare

    4 SR 13510:2006 Beton. Partea 1: Specificaie, performan, producie i conformitate. Document naional de aplicare a SR EN 206-1

    5 SR 13510:2006/A1:2012 Beton. Partea 1: Specificaie, performan, producie i conformitate. Document naional de aplicare a SR EN 206-1

    6 SR 13536:2009 Evaluarea agresivitii apei, solului i gazelor asupra betonului. Prelevarea i analizarea eantioanelor de ap i sol

    7 SR EN 196-1:2006 Metode de ncercri ale cimenturilor. Partea 1: Determinarea rezistenelor mecanice

    8 SR EN 196-3+A1:2009 Metode de ncercri ale cimenturilor. Partea 3: Determinarea timpului de priza i a stabilitii

    9 SR CEN/TR 196-4:2008 Metode de ncercri ale cimenturilor. Partea 4: Determinarea cantitativ a componentelor

    10 SR EN 196-5:2011 Metode de ncercri ale cimenturilor. Partea 5: ncercare de puzzolanicitate a cimentului puzzolanic

    11 SR EN 196-6:2010 Metode de ncercri ale cimenturilor. Determinarea fineii

    12 SR EN 196-8:2010 Metode de ncercri ale cimenturilor. Partea 9: Caldura de hidratare. Metoda prin dizolvare

    13 SR EN 197-1:2011 Ciment. Partea 1: Compoziie, specificatii i criterii de conformitate ale cimenturilor uzuale

    14 SR EN 206:2014 Beton. Specificaie, performan, producie i conformitate

  • Structuri de sprijin i consolidare din beton simplu 14

    15 SR EN 450-1:2012 Cenua zburatoare pentru beton. Partea 1: Definiii, condiii i criterii de conformitate

    16 SR EN 450-2:2006 Cenua zburtoare pentru beton. Partea 2: Evaluarea conformitii

    17 SR EN 480-1+A1:2015 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 1: Beton i mortar de referin pentru ncercri

    18 SR EN 480-2:2007 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 2: Determinarea timpului de priz

    19 SR EN 480-15:2013 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 15: Beton de referin i metod de ncercare a aditivilor modificatori de vscozitate

    20 SR EN 934-1:2008 Aditivi pentru beton, mortar i past. Partea 1: Cerine comune

    21 SR EN 934-2+A1:2012 Aditivi pentru beton, mortar i past. Partea 2: Aditivi pentru beton. Definiii, condiii, conformitate, marcare i etichetare

    22 SR EN 934-6:2002/A1:2006

    Aditivi pentru beton, mortar i past. Partea 6: Eantionare, control i evaluarea conformitii

    23 SR EN 1008:2003 Apa de preparare pentru beton. Specificaii pentru prelevare, ncercare i evaluare a aptitudinii de utilizare a apei, inclusiv a apelor recuperate din procese ale industriei de beton, ca apa de preparare pentru beton

    24 SR EN 1992-1-1:2004 Eurocod 2: Proiectarea structurilor de beton. Partea 1-1: Reguli generale i reguli pentru cldiri

    25 SR EN 1992-1-1:2004/NB:2008

    Eurocod 2: Proiectarea structurilor de beton. Partea 1-1: Reguli generale i reguli pentru cldiri. Anexa naional

    26 SR EN 1992-2:2006 Eurocod 2: Proiectarea structurilor de beton. Partea 2: Poduri de beton. Proiectare i prevederi constructive

    27 SR EN 1992-2:2006/NA:2009

    Eurocod 2: Proiectarea structurilor de beton. Partea 2: Poduri de beton. Proiectare i prevederi constructive. Anexa naional

    28 SR EN 1997-1:2004 Eurocod 7

    Proiectarea geotehnic. Partea 1: Reguli generale

    29 SR EN 1997-1:2004/NB:2007

    Eurocod 7: Proiectarea geotehnic. Partea 1: Reguli generale. Anex naional

    30 SR EN 12350-1:2009 ncercare pe beton proaspt. Partea 1: Eantionare

    31 SR EN 12350-2:2009 ncercare pe beton proaspt. Partea 2: ncercarea de tasare

    32 SR EN 12350-3:2009 ncercare pe beton proaspt. Partea 3: ncercare Vebe

    33 SR EN 12350-4:2009 ncercare pe beton proaspt. Partea 4: Grad de compactare

    34 SR EN 12350-5:2009 ncercare pe beton proaspt. Partea 5: ncercare cu masa de rspndire

    35 SR EN 12350-6:2009 ncercare pe beton proaspt. Partea 6: Densitate

  • Structuri de sprijin i consolidare din beton simplu 15

    36 SR EN 12350-7:2009 ncercare pe beton proaspt. Partea 7: Coninut de aer. Metode prin presiune

    37 SR EN 12350-8:2010 ncercri pe beton proaspt. Partea 8: Beton autocompactant. Tasare - ncercarea la rspndire

    38 SR EN 12350-9:2010 ncercri pe beton proaspt. Partea 9: Beton autocompactant. Metoda de determinare a timpului de curgere cu plnia V

    39 SR EN 12350-10:2010 ncercri pe beton proaspt. Partea 10: Beton autocompactant. Metoda de determinare a capacitii de curgere utiliznd cutia n L

    40 SR EN 12350-11:2010 ncercri pe beton proaspt. Partea 11: Beton autocompactant. Metoda de determinare a rezistenei la segregare utiliznd site

    41 SR EN 12350-12:2010 ncercri pe beton proaspt. Partea 12: Beton autocompactant. Metoda de determinare a capacitii de curgere cu inelul J

    42 SR EN 12390-1:2013 ncercare pe beton intarit. Partea 1: Forma, dimensiuni i alte conditii pentru epruvete i tipare

    43 SR EN 12390-1:2013 ncercare pe beton ntrit. Partea 1: Form, dimensiuni i alte condiii pentru epruvete i tipare

    44 SR EN 12390-2:2009 ncercare pe beton ntrit. Partea 2: Pregtirea i pstrarea epruvetelor pentru ncercri de rezisten

    45 SR EN 12390-3:2009 ncercare pe beton ntrit. Partea 3: Rezistena la compresiune a epruvetelor

    46 SR EN 12390-3:2009/AC:2011

    ncercare pe beton ntrit. Partea 3: Rezistena la compresiune a epruvetelor

    47 SR EN 12390-4:2002 ncercare pe beton ntrit. Partea 4: Rezistena la compresiune. Caracteristicile mainilor de ncercare

    48 SR EN 12390-5:2009 ncercare pe beton ntrit. Partea 5: Rezistena la ncovoiere a epruvetelor

    49 SR EN 12390-6/2010 ncercare pe beton intarit. Partea 6: Rezisten la intindere prin despicare a epruvetelor

    50 SR EN 12390-7:2009 ncercare pe beton ntrit. Partea 7: Densitatea betonului ntrit

    51 SR EN 12390-8:2009 ncercare pe beton ntrit. Partea 8: Adncimea de ptrundere a apei sub presiune

    52 SR CEN/TS 12390-9:2009

    ncercare pe beton ntrit. Partea 9: Rezisten la nghe-dezghe. Exfoliere

    53 SR EN 12390-13:2014 ncercare pe beton ntrit. Partea 13: Determinarea modulului secant de elasticitate n compresiune

    54 SR EN 12504-1:2009 ncercri pe beton n structuri. Partea 1: Carote. Prelevare, examinare i ncercri la compresiune

    55 SR EN 12504-2:2013 ncercri pe beton n structuri. Partea 2: ncercri nedistructive. Determinarea indicelui de recul

  • Structuri de sprijin i consolidare din beton simplu 16

    56 SR EN 12504-3:2006 ncercri pe beton n structuri. Partea 3: Determinarea forei de smulgere

    57 SR EN 12504-4:2004 ncercare pe beton n structuri. Partea 4: Determinarea vitezei de propagare a ultrasunetelor

    58 SR EN 12620+A1:2008 Agregate pentru beton

    59 SR EN 12878:2014 Pentru pigmenti - Pigmenti pentru colorarea materialelor de constructie pe baza de ciment i/sau var. Specificatii i metode de ncercare

    60 SR EN 13242+A1:2008 Agregate din materiale nelegate sau legate hidraulic pentru utilizare n inginerie civil i n construcii de drumuri

    61 SR EN 13285:2011 Amestecuri de agregate nelegate. Specificaii

    62 SR EN 13263-1+A1:2009

    Silice ultra fin pentru beton. Partea 1: Definitii, conditii i criterii de conformitate

    63 SR EN 13263-2+A1:2009

    Silice ultra fin pentru beton. Partea 2: Evaluarea conformitii

    64 SR EN 13670:2010 Execuia structurilor de beton

    65 SR EN 13791:2007 Evaluarea in-situ a rezistenei la compresiune a betonului din structuri i din elemente prefabricate

    66 SR CR 13902:2002 Metode de ncercare pentru determinarea raportului ap/ciment n betonul proaspt

    67 SR EN ISO 14688-1:2004

    Cercetri i ncercri geotehnice. Identificarea i clasificarea pmnturilor. Partea 1: Identificare i descriere

    68 SR EN ISO 14688-2:2005

    Cercetri i ncercri geotehnice. Identificarea i clasificarea pmnturilor. Partea 2: Principii pentru o clasificare

    69 NE 012/1,2-2007,2010 Normativ pentru producerea betonului i executarea lucrrilor din beton, beton armat i beton precomprimat - Partea 1: Producerea betonului, Partea 2: Executarea lucrrilor din beton

    70 CP 012-1/2007 Cod de practic pentru producerea betonului

    71 C26-1985 Normativ pentru ncercarea betonului prin metode nedistructive

    72 C56-85 Normativ pentru verificarea calitii i recepia lucrrilor de constructii i instalaii aferente

    73 C 162/1973 Normativ privind alctuirea, executarea i folosirea cofrajelor metalice plane pentru pereii din beton monolit la cldiri

    74 C 11/1974 Instruciuni tehnice privind alctuirea i folosirea n construcii a panourilor din placaj pentru cofraje

    75 C54-1981 Instruciuni tehnice pentru ncercarea betonului cu ajutorul carotelor

    76 AND 530-2012 Instruciuni privind controlul calitii terasamentelor

  • Structuri de sprijin i consolidare din beton simplu 17

    77 Legea nr. 10/18.01.1995 Privind calitatea n constructii

    78 Legea L319/2006 Securitii i sntii n munc

    79 Legea nr. 50/1991 Privind autorizarea executrii lucrrilor de construcii, republicat, cu modificrile i completrile ulterioare

    80 Hotrrea Guvernului nr. 300/2006

    Privind cerine minime pentru desfurarea antierelor temporare i mobile

    81 Hotrrea Guvernului nr. 766/1997

    Pentru aprobarea unor regulamente privind calitatea n construcii, cu modificrile ulterioare

    82 Hotrrea Guvernului nr. 525/1996

    Pentru aprobarea Regulamentului general de urbanism, republicat

  • Structuri de sprijin i consolidare din beton armat 1

    MINISTERUL TRANSPORTURILOR

    COMPANIA NAIONAL DE AUTOSTRZI i DRUMURI NAIONALE DIN ROMNIA

    CAIET DE SARCINI NR. 1

    LUCRRI DE CONSOLIDARE A TERASAMENTELOR DE DRUM

    PARTEA II:

    STRUCTURI DE SPRIJIN I CONSOLIDARE DIN BETON ARMAT

    REDACTAREA 2

    IULIE 2015

    S.C. PRIMACONS S.R.L.

  • Structuri de sprijin i consolidare din beton armat 2

    CUPRINS

    1. PREVEDERI GENERALE.........................................................................................................4

    2. MATERIALE ...............................................................................................................................4

    2.1 APA.................................................................................................................................................4

    2.2 CIMENTUL ......................................................................................................................................4

    2.2.1 Caracteristici .................................................................................................................................4

    2.2.2 Controlul calitii cimentului.........................................................................................................4

    2.2.3 Livrarea cimentului........................................................................................................................4

    2.2.4 Depozitarea cimentului ..................................................................................................................5 2.3 AGREGATE NATURALE PENTRU BETON ..........................................................................................5

    2.3.1 Controlul calitii agregatelor.......................................................................................................5

    2.3.2 Manipularea i stocarea in situ......................................................................................................5

    2.3.3 Transportul agregatelor.................................................................................................................5

    2.4 BETONUL ........................................................................................................................................5

    2.4.1 Betonul proaspt ............................................................................................................................6

    2.4.2 Betonul ntrit ................................................................................................................................6

    2.5 OEL BETON ...................................................................................................................................7

    2.6 COFRAJE I SUSINERI....................................................................................................................7

    2.7 ADITIVI...........................................................................................................................................7

    2.8 ADAOSURI ......................................................................................................................................7

    2.9 ALTE MATERIALE ...........................................................................................................................8

    2.9.1 Material geotextil ...........................................................................................................................8

    2.9.2 Bitum..............................................................................................................................................8

    2.9.3 evi PVC ........................................................................................................................................8

    3. UTILAJE ......................................................................................................................................8

    4. EXECUIA LUCRRILOR ......................................................................................................8

    4.1 LUCRRI PREGTITOARE ...............................................................................................................8

    4.2 REALIZARE TRONSON EXPERIMENTAL ...........................................................................................8

    4.3 TEHNOLOGIE DE EXECUIE ............................................................................................................9

    4.3.1 Sptura.........................................................................................................................................9

    4.3.2 Cofrarea .........................................................................................................................................9

    4.3.3 Controlul i recepia lucrrilor de cofraje.....................................................................................9

    4.3.4 Fasonarea i montarea armturilor.............................................................................................10

    4.3.5 Turnarea betonului ......................................................................................................................10 4.3.6 Decofrarea i protecia betonului dup turnare ..........................................................................11

    4.3.7 Hidroizolaia ................................................................................................................................11

    4.3.8 Execuia sistemului de drenaj ......................................................................................................11

    5. CONTROLUL EXECUIEI LUCRRILOR ........................................................................11

    5.1 VERIFICAREA CALITII LUCRRILOR .........................................................................................11

  • Structuri de sprijin i consolidare din beton armat 3

    5.2 TOLERANE ..................................................................................................................................12

    5.3 DEFECIUNI I MOD DE REMEDIERE .............................................................................................13

    6. BREVIARE DE CALCUL ........................................................................................................14

    7. PLANELE CARE GUVERNEAZA LUCRAREA ...............................................................14

    8. LISTA STANDARDELOR I NORMATIVELOR................................................................14

  • Structuri de sprijin i consolidare din beton armat 4

    1. PREVEDERI GENERALE

    Prezentul Caiet de Sarcini se aplic structurilor de sprijin din beton armat cu fundare direct.

    El cuprinde condiiile tehnice i de calitate care trebuie s le ndeplineasc materialele, controlul de calitate al lucrrilor i criteriile de recepie a lucrrilor.

    Structurile de sprijin din beton cu fundare direct sunt prevzute pentru sprijinirea corpului drumului sau a taluzurilor adiacente acestuia, acolo unde nu se pot executa taluzuri.

    Acest Caiet de Sarcini ine cont de Normativele i Standardele romneti i europene valabile n luna mai 2015.

    Constructorul are obligaia de a ntocmi procedura de execuie n conformitate cu planele de execuie, cu caietul de sarcini, normativele, instruciunile i standardele nominalizate n acest caiet de sarcini, cu detalierea modului de execuie i a documentelor de recepie. Procedura de execuie va fi naintat Consultantului lucrrii spre aprobare nainte de nceperea lucrrii.

    Toate materialele care intr n lucrrile permanente vor fi supuse aprobrii Consultantului. nainte de aprovizionare, Contractorul va supune aprobrii Consultantului sursele / furnizorii acestor materiale.

    Nici un material nu va fi utilizat n lucrrile permanente nainte de a fi aprobat de Consultant.

    2. MATERIALE

    2.1 Apa

    Poate s provin din reeaua public sau dintr-o alt surs, dar n acest caz trebuie sa indeplineasc condiiile din SR EN 1008. n cazul n care apa provine din alt surs, verificarea se va face de ctre un laborator de specialitate n conformitate cu precizrile din respectivul standard.

    n timpul utilizrii pe antier se va evita ca apa s se polueze cu detergeni, materii organice, uleiuri vegetale, argile etc.

    2.2 Cimentul

    2.2.1 Caracteristici

    Cimentul utilizat este CEM I; CEM II A-S; CEM II B-S; CEM II H-S; CEM II A-LL; CEM II A-M n conformitate cu CP 012/1, Tabel F.3.1 i Tabel F.3.2.

    2.2.2 Controlul calitii cimentului

    Caracteristicile cimenturilor vor fi verificate n conformitate cu: SR EN 197-1, SR EN 196-1SR CEN/TR 196-4, SR EN 196-6, SR EN 196-8.

    Controlul calitii cimentului se va face:

    la aprovizionare: prin verificarea certificatului de calitate / garanie emis de productor sau de baza de livrare;

    nainte de utilizare, de ctre un laborator autorizat.

    2.2.3 Livrarea cimentului

    n cazul n care utilizatorul procur cimentul de la un depozit (baz de livrare) livrarea cimentului va fi insoit de o declaraie de conformitate, n care se va meniona: tipul de ciment i fabrica productoare;

  • Structuri de sprijin i consolidare din beton armat 5

    data sosirii n depozit; termenul de expirare; nr. certificatului de calitate eliberat de productor; nr. buletinului de analiz a calitii cimentului efectuat de un laborator autorizat.

    2.2.4 Depozitarea cimentului

    Depozitarea cimentului se poate face:

    n vrac, n celule tip siloz n care nu au mai fost depozitate alte materiale; ambalat n saci, n ncperi nchise, aezai n stive pe scnduri dispuse cu interspaii pentru a

    asigura circulaia aerului. Cimentul trebuie folosit nainte de termenul de expirare.

    2.3 Agregate naturale pentru beton

    Agregatele naturale folosite pentru prepararea betonului i a umpluturii din dren trebuie s corespund calitativ cu prevederile SREN 12620+A1, CP 012/1. Staiile de producere a agregatelor vor funciona numai pe baz de atestat eliberat de o comisie intern n prezena unui reprezentant desemnat de ISC ( conform CP 012/1).

    2.3.1 Controlul calitii agregatelor

    n cazul procurrii ca atare a agregatelor, acestea vor fi achiziionate de la staii de producere autorizate.

    Controlul calitii agregatelor se va face la fiecare lot aprovizionat, conform prevederilor din CP 012/1, iar metodele de verificare vor ine cont de SREN 12620+A1.

    Laboratorul antierului va ine evidena calitii agregatelor astfel:

    ntr-un dosar vor fi cuprinse toate certificatele de calitate de la furnizor; ntr-un registru (registru pentru ncercri agregate) rezultatele determinrilor efectuate n

    laborator.

    2.3.2 Manipularea i stocarea in situ

    Aceste operaiuni se vor face n conformitate cu SREN 12620 +A1.

    Se vor depozita pe platforme betonate, avnd pante i rigole de evacuare a apelor. Pentru depozitarea diferitelor sorturi se vor amenaja compartimente cu nlimea corespunztoare n vederea evitrii amestecrii sorturilor.

    Nu se admite depozitarea direct pe pmnt sau pe platforme balastate.

    2.3.3 Transportul agregatelor

    Transportul agregatelor va fi n conformitate cu SREN 12620 +A1.

    Agregatele vor fi expediate cu mijloace de transport curate i bine nchise. Fiecare transport va fi nsoit de foaia de expediie n care se vor arta: numrul i data eliberrii foii, marca de fabric (balastiera), destinatarul, felul i sortul agregatelor, cantitatea livrat, numrul certificatului de calitate.

    2.4 Betonul

    Cerinele de baz pe care trebuie s le ndeplineasc betoanele vor fi conform CP 012/1. Dup modul de expunere al construciilor prevzute n documentaie n funcie de condiiile de mediu, se stabilete clasa de expunere (tabel 1 CP 012/1).

  • Structuri de sprijin i consolidare din beton armat 6

    Clasa de expunere, clasa de beton i valorile limit recomandate pentru compoziia i proprietile betonului sunt specificate n planele din proiect.

    2.4.1 Betonul proaspt

    Cerinele pentru betonul proaspt trebuie s corespund specificaiilor cap. 4.2 Beton proaspt i cap. 5.4 Cerine pentru betonul proaspt - din CP 012/1.

    2.4.1.1 Compoziia betoanelor

    Compoziia betoanelor este definit de proporia n volume a diverselor categorii de agregate uscate, greutatea liantului pentru un metru cub de beton gata executat i volumul apei. Cantitile necesare pe fiecare component al betonului vor fi determinate nainte de a ncepe prepararea acestuia de catre Antreprenor.

    Determinrile caracteristicilor fizice ale betonului proaspt precum i limitele admisibile ale valorilor acestora vor respecta precizrile din tabelul de mai jos:

    Caracteristici Conform standard Valoarea

    admisibila

    Consistena:

    - prin metoda tasrii

    - prin timpul Vebe

    SREN 12350-2

    SREN 12350-3

    Grad de compactare SREN 12350-4

    Rspndirea betonului SREN 12350-5

    Densitate SREN 12350-6

    Coninutul de aer oclus (% vol.) SREN 12350-7

    Conform cu

    CP 012/1

    2.4.1.2 Prepararea i transportul betonului

    Precizrile privind aceste operaii vor fi n conformitate cu CP 012/1.

    2.4.1.3 Controlul produciei betonului

    Toate betoanele trebuie supuse controlului de producie, sub responsabilitatea productorului. Controlul produciei cuprinde toate msurile necesare pentru meninerea betonului n conformitate cu condiiile specificate n proiect. Controlul produciei betonului se realizeaz n conformitate cu CP 012/1, cap. 9 Controlul produciei.

    2.4.2 Betonul ntrit

    Betoanele prevzute n proiect vor fi grele avnd densitatea aparent a betonului ntrit la 28 de zile, cuprins ntre 2201-2500 kg/m3.

    2.4.2.1 Clasa betonului

    Clasa betonului este definit pe baza rezistenei caracteristice fck cil (fck cub), care este rezistena la compresiune n N/mm2 determinat pe cilindri de 150/300 mm, conform SR EN 12390-3 (sau pe cuburi cu latura de 150 mm) la vrsta de 28zile, sub ale carei valori se pot situa statistic cel mult 5% din rezultate.

    Definirea clasei de beton are n vedere pstrarea epruvetelor conform SREN 12390-2. Controlul calitii lucrrilor de betoane turnate pe antier, se va realiza conform SREN 12390-6 i SREN 12390-1.

  • Structuri de sprijin i consolidare din beton armat 7

    2.4.2.2 Clasele de expunere

    Cerinele de baz pe care trebuie s le ndeplineasc betoanele vor fi conform cu CP 012/1. Dup modul de expunere al construciilor prevzute n documentaie n funcie de condiiile de mediu, se stabilete clasa de expunere (tabel 1 SR 13510).

    Clasa de expunere, clasa de beton i valorile limit recomandate pentru compoziia i proprietile betonului sunt specificate n planele din proiect, i se stabilesc n funcie de clasa de expunere la aciunea mediului nconjurtor, n conformitate cu CP 012/1 cap. 4, tab. 1 clase de expunere.

    2.5 Oel beton

    Oelul beton folosit va fi de tipul OB37, PC52 i BST500S clasa C de ductilitate trebuind s respecte STAS 438/1/A91/C91 i SR EN 1992-1-1/NB.

    Confecionarea i montarea barelor se va face n strict conformitate cu prevederile proiectului.

    La livrare, oelul beton trebuie sa fie nsoit de certificatul de calitate emis de productor. Controlul oelului beton va consta din:

    verificarea dimensiunilor seciunii, greutatea net; examinarea aspectului; marca produsului, tipul armturii, semnul Controlului de Calitate; verificarea ndoirii la rece; verificarea caracteristicilor mecanice (rezistena la rupere, limita de curgere, alungirea la

    rupere).

    Depozitarea oelului pentru armturi se va face separat pe tipuri, astfel nct s se asigure condiii care s nu produc corodarea armturii, murdrirea cu pmnt sau alte materiale i s poat fi identificat uor fiecare sortiment i diametru.

    2.6 Cofraje i susineri

    Cofrajele se pot confeciona din lemn sau produse pe baz de lemn, metal sau produse pe baz de polimeri.

    Materialele pentru confecionarea cofrajelor trebuie s fie conform urmtoarelor standarde:

    bile manele de rinoase: STAS 1040; grinzi rigle de fag i rinoase SR EN 1313-1 i SR EN 1313-2; placaj tego de 8 i 15mm: SR EN 313-1 i SR EN 314-1; cuie: STAS 2111.

    2.7 Aditivi

    Aditivii sunt produse chimice care se adaug n beton n cantiti mai mici sau egale cu 5% substan fa de masa cimentului n scopul modificrii / mbuntirii calitii betonului n stare proaspt i / sau ntrit.

    La folosirea aditivilor se vor respecta prevederile CP 012/1 si SR EN 934-2+A1 pentru frecvena minim de ncercri.

    In conformitate cu CP 012/1 si cu SR 13510 cap. 5.1.5, compatibilitatea aditivilor cu cimenturile utilizate trebuie verificat prin ncercri preliminare.

    2.8 Adaosuri

    Adaosurile sunt materiale anorganice fine ce se pot aduga n beton n cantitati de peste 5% substan uscat fat de masa cimentului, n vederea mbuntirii caracteristicilor acestuia sau pentru a realiza proprieti speciale.

    La folosirea adaosurilor se vor respecta prevederile CP 012/1 i ale urmtoarelor standarde:

    SR EN 12878 pentru pigmeni

  • Structuri de sprijin i consolidare din beton armat 8

    SR EN 450-1,2 pentru cenui volante SR EN 13263-1,2+A1 pentru silicea ultrafin

    2.9 Alte materiale

    2.9.1 Material geotextil

    Folosit ca filtru la drenul din spatele zidului de sprijin, va fi de tipul neesut i neimpregnat i se va verifica conform Normativului NP 075 - Normativ pentru utilizarea materialelor geosintetice la lucrrile de construcii i va trebui sa aib urmtoarele caracteristici:

    rezistena la traciune: min. 10 KN/m; alungirea la rupere: 1 x 10

    -4 m/s; poansonarea cu CBR >1500 N; dimensiunea porilor ce rein 90% din cantitatea de particule ce poate fi reinut de geotextil:

    d90

  • Structuri de sprijin i consolidare din beton armat 9

    unui asemenea tronson, atunci se va detalia acest capitol n cadrul caietului special de sarcini al lucrrii respective.

    4.3 Tehnologie de execuie

    4.3.1 Sptura

    Spturile vor fi executate conform planurilor de execuie. Acestea se vor adnci pn la cota stabilit de catre Consultant n baza Proiectului de execuie.

    Pe ct posibil, spturile vor fi executate n uscat. Daca sunt necesare epuismente, acestea cad n sarcina Antreprenorului n baza caietului de sarcini speciale.

    n cazul instabilitii pereilor spaturii, se va realiza sprijinirea acestora pe baza unui proiect sau unei dispoziii de antier.

    Pmntul rezultat din sptur va fi ncrcat, transportat i depozitat ntr-o locaie stabilit de catre Consultant.

    Cnd execuia spturilor implic dezvelirea unor reele subterane existente (ap, gaze, electrice, etc.) ce rmn n funciune, trebuiesc luate msuri pentru protejarea acestora mpotriva deteriorrii. Dac aceste reele nu se cunosc i apar pe parcursul executrii spturii, se vor opri lucrrile i se va anunta Consultantul pentru a lua msurile necesare.

    Ultimii 30 cm pn la cota de fundare se vor excava naintea betonrii, pentru evitarea degradrii terenului de fundare i a conturului tlpii fundaiei.

    4.3.2 Cofrarea

    Cofrajele i susinerile lor trebuie s fie astfel alcatuite nct sa ndeplineasc condiiile din NE 012/2, cap. 7: Cofraje i susineri:

    s asigure obinerea formei, dimensiunilor i gradului de finisare prevzute n proiect pentru elementele ce urmeaz a fi executate, respectndu-se nscrierea n abaterile admisibile (pentru lungimea elementelor de cofraj 15 mm, pentru lime 6 mm, nlime 10 mm);

    s fie etane astfel nct s nu permit pierderea laptelui de ciment; s fie stabile i rezistente sub aciunea ncrcrilor ce apar n procesul de execuie.

    nainte de nceperea operaiei de montare a cofrajelor, se vor curai i pregti suprafeele care vin n contact cu betonul ce urmeaz a se turna i se va verifica i corecta poziia armturilor.

    Pentru a reduce aderena ntre beton i cofraje acestea se ung cu ageni de decofrare pe feele care vin n contact cu betonul imediat nainte de montare.

    Pentru tratarea arhitectural a feei vzute a elevaiei pe cofraje se pot monta elemente de amprentare conform specificaiilor din planele de detalii de execuie din proiect. Montarea cofrajelor va cuprinde urmtoarele operaii:

    trasarea cofrajelor; asamblarea i susinerea provizorie a panourilor; ncheierea, legarea i sprijinirea definitiv a cofrajelor.

    4.3.3 Controlul i recepia lucrrilor de cofraje

    Se vor efectua verificri etapizate astfel:

    preliminar, controlndu-se lucrrile pregtitoare i elementele sau subansamblurile de cofraj i susineri;

  • Structuri de sprijin i consolidare din beton armat 10

    n cursul execuiei, verificndu-se poziionarea n raport cu trasarea i modul de fixare al elementelor;

    final, recepia cofrajelor i consemnarea constatrilor ntr-un registru de procese verbale.

    n cazul cofrajelor care se nchid dup montarea armturilor se va redacta un proces verbal comun pentru cofraje i armturi.

    4.3.4 Fasonarea i montarea armturilor

    Fasonarea armturilor din oel beton SR EN 1992-2/NA, se vor face conform planelor de armare din proiect.

    Aceste operaii se vor face respectnd NE 012/2, cap.8.

    nainte de a se trece la fasonarea armturilor, executantul va analiza prevederile proiectului, innd seama de posibilitile practice de montare i fixare a barelor, precum i de aspectele tehnologice de betonare i compactare. Dac se consider necesar , va face propuneri de modificare, ce vor fi supuse aprobrii Proiectantului.

    Fasonarea i manipularea armturilor se va face astfel nct s se evite:

    - deteriorarea mecanic;

    - ruperi ale sudurilor n carcase i plase sudate;

    - contactul cu substane care pot afecta proprietile de aderen ntre beton i armtur sau pot produce coroziunea.

    Se vor ndeprta:

    - impuritile de pe suprafaa barelor;

    - rugina, n special n zonele n care barele urmeaz a fi nndite prin sudur.

    Dupa ndeprtarea ruginii, reducerea seciunii barelor nu trebuie sa depeasc abaterile prevzute n normele tehnice aferente.

    Oelul beton livrat n colaci trebuie s fie ndreptat cu troliul nainte de fasonare, astfel nct alungirea maxim sa nu depeasc 1 mm/m.

    Se interzice fasonarea armturilor la temperaturi < -10 C. Barele cu profil periodic cu D>25 mm se vor fasona la cald.

    nndirea barelor se face conform prevederilor proiectului. De regul nndirea armturilor se realizeaz prin suprapunere fr sudur sau prin sudur obinuit (electric prin puncte, cap la cap prin topire intermediar, manual cu arc electric prin suprapunere cu eclise).

    4.3.5 Turnarea betonului

    Turnarea betonului i tratarea ulterioar a acestuia se va face respectnd prevederile din NE 012/2.

    Operaiunea va fi condus de eful punctului de lucru sau de nlocuitorul desemnat al acestuia.

    Nu sunt admise depirea duratei maxime de transport, respectiv modificarea strii de consisten a betonului.

    Turnarea betonului trebuie realizat dup:

    terminarea spturii; recepia cotei i naturii terenului de fundare; montarea i recepia cofrajelor; montarea armturilor; montarea barbacanelor.

    nceperea betonrii se va aproba dup verificarea condiiilor de mai sus, pe baza proceselor verbale de lucrri ascunse i/sau de faze determinante.

  • Structuri de sprijin i consolidare din beton armat 11

    Betonul n fundaii se toarn aderent la pereii spturii.

    Betonul trebuie sa fie rspndit uniform n lungul elementului, urmrindu-se realizarea de straturi de maximum 50 cm nlime i turnarea noului strat nainte de nceperea prizei betonului turnat anterior.

    Se vor lua msuri pentru a se evita deformarea sau deplasarea armturilor de pe poziiile prevzute n proiect.

    Compactarea betonului este obligatorie, realizndu-se de regul prin vibrare. Compactarea manual (cu vergi, ipci, ciocnirea cofrajelor) se admite numai n situaii speciale (seciuni nguste, armturi dese, defeciunea temporar a vibratorului), cu acceptul Consultantului.

    nlimea liber de cdere a betonului nu va fi mai mare de 1,5 m. Rosturile de lucru trebuiesc evitate, iar n cazul n care nu se poate, acestea vor fi tratate n conformitate cu Codul de practic pentru executarea lucrrilor din beton, beton armat i beton precomprimat indicativ NE 012/2.

    4.3.6 Decofrarea i protecia betonului dup turnare

    Structura din beton armat se poate decofra atunci cnd betonul a atins o anumit rezisten cu respectarea prevederilor din NE 012/2 i a Caietului special de sarcini.

    n vederea obinerii tuturor caracteristicilor prevzute a betonului, suprafeele betonului trebuie protejate o anumit perioad de timp, funcie de tipul structurii, condiiile de mediu din momentul turnrii i condiiile de expunere din perioada de exploatare.

    Protecia betonului trebuie s nceap ct mai curnd posibil dupa decofrare.

    Protecia betonului se realizeaz, n principal, mpotriva:

    - uscrii premature datorit radiaiilor solare i a vntului;

    - antrenrii pastei de ciment datorit apei din intemperii sau apelor curgtoare;

    - ngheului.

    Msuri de protecie pot fi:

    - meninerea n cofraje;

    - acoperirea cu materiale meninute n stare umed/uscat;

    - stropirea cu pelicule de protecie.

    4.3.7 Hidroizolaia

    Se realizeaz prin stropire n trei straturi cu emulsie de bitum.

    4.3.8 Execuia sistemului de drenaj

    n cazul structurilor de tipul zidurilor de sprijin, drenul zidului se realizeaz din material granular i geotextil sau din material geocompozit, n concordan cu detaliile din proiect.

    Suprafaa rigolei drenului se va sclivisi cu mortar de ciment M100, apa drenat fiind evacuat prin barbacanele racordate la rigola drenului.

    5. CONTROLUL EXECUIEI LUCRRILOR

    5.1 Verificarea calitii lucrrilor

    Pe parcursul execuiei lucrrilor, se vor face urmatoarele verificri: Faza Verificare

    Spturi -poziia n plan -dimensiunile spturii

  • Structuri de sprijin i consolidare din beton armat 12

    -verificarea terenului de fundare*

    Cofraj -ncheierea cofrajelor -dimensiunile interioare ale acestora

    Armtura, barbacane -verificarea montarii armturilor i barbacanelor

    Betonarea fundatei i elevatiei - verificarea betoanelor proaspete i a cuburilor de prob

    Drenul din spatele zidului -panta rigolei drenului -realizarea drenului

    *- se verifica natura i capacitatea portant ale terenului de fundare. Orice neconcordan observat ntre stratificaia indicat n proiect i cea real din antier, se va semnala reprezentantului Beneficiarului spre a hotr msurile necesare.

    Capacitatea portant a terenului de fundare determinat prin teste cu instalaia Lucas trebuie s ndeplineasc condiia: modulul de deformaie liniar Ev2 45MPa (cf. indicativ AND 530). Se va efectua o ncercare pe locaie, dar nu mai puin de una la 300 m de lungime de zid.

    5.2 Tolerane

    Tolerana reprezinta diferena dintre valoarea specificat i valoarea msurat.

    La dozarea materialelor componente ale betonului (dupa stabilirea reetei) se admit urmatoarele abateri n conformitate cu CP012/1 (tab. 21):

    agregate 3%;

    ciment i apa 3%;

    adaosuri utilizate n cantitate > 5% din masa cimentului 3%;

    aditivi utilizai n cantitate < 5% din masa cimentului 5%

    Pentru consistena betonului proaspt, toleranele sunt date mai jos conform tabelului 11 din CP012/1:

    Tasare Interval de valori specificate, n mm

    40 de la 50 pn la 90 100

    Tolerane, n mm 10 20 30 Timp Vebe Interval de valori specificate, n s

    11 de la 10 pn la 6 5

    Tolerane, n s 3 2 1 Interval de valori specificate

    1,26 de la 1,25 pn la 1,11

    1,10

    Tolerane 0,10 0,08 0,05 Rspndire (ntindere) Interval de valori specificate, n mm

    toate valorile

    Tolerane, n mm 30

  • Structuri de sprijin i consolidare din beton armat 13

    Toleranele pentru lucrrile executate n cadrul structurilor de sprijin din beton armat sunt stabilite n conformitate cu NE 012-2:

    5.3 Defeciuni i mod de remediere

    n cazul n care o parte a structurii sau ntreaga structur nu corespunde prevederilor proiectului i prezentului caiet de sarcini, Antreprenorul este obligat s execute remedierile necesare.

    Dup recunoaterea i analiza defectelor, naintea nceperii lucrrilor de remediere, Antreprenorul propune Consultantului programul de reparaii, spre aprobare.

    Reparaiile intr n sarcina Antreprenorului.

    Pentru remedierea defectelor de natur s afecteze calitatea structurii, sigurana i durabilitatea n exploatare se va proceda astfel:

    - ntocmirea releveului detaliat al defectelor;

    - cercetarea cauzelor, procedndu-se i la efectuarea de ncercri, investigaii sau calcule suplimentare;

    - evaluarea consecinelor posibile pe termen scurt sau mai lung.

    n funcie de constatrile i de studiile efectuate, Consultantul poate s procedeze astfel:

    - s acorde viza proiectului de reparaii, cu eventuale observaii;

    - s prevad demolarea unei pari sau a ntregii lucrri.

    n cazul defectelor privind geometria lucrrii, calitatea i culoarea suprafeelor, dar care nu afecteaza sigurana i capacitatea portant a lucrrii, remedierile se pot efectua astfel:

    - defectele minore pot fi corectate prin degresare, splare, rabotare sau rostuire;

    Denumire lucrare Tolerane admisibile

    Fundaii structuri de sprijin

    -poziie n plan 5 cm

    -cota de fundare 5 cm

    Elevaie structuri de sprijin cu fundare direct

    -planeitate la partea superioar a coronamentului 10 mm /10m

    -rectilinitate orizontal a coronamentului 5 mm /10 m

    Sistem de drenaj -cote nivel barbacane 0.1 %

    -interdistana barbacane 10 cm

    Carcase de armturi

    -lungimi pariale, totale 10 mm

    -rectilinitate 5 mm/5 m

    -distane ntre armturi 20 mm

    -distana ntre plasele de armtur 20 mm

    -stratul de acoperire cu beton 15 mm

  • Structuri de sprijin i consolidare din beton armat 14

    - n cazul defeciunilor mai importante, antreprenorul va propune beneficiarului un program de remediere, pe care-l va analiza i aproba ca atare sau cu completrile necesare.

    Pe suprafeele vzute, cu parament fin, este interzis sclivisirea simpl.

    Fisurile deschise, care pot compromite durabilitatea lucrrii, ct i aspectul, se colmateaz prin injecie. Dupa injecie, fisurile sunt curate cu aer comprimat.

    Procedee de remediere a defectelor elementelor de beton i beton armat(conf. C 149):

    Tipuri de remedieri:

    Tipul 1: - Remedierea defectelor de execuie constatate la decofrarea elementelor constnd din tirbituri, zone segregate, goluri, rosturi de betonare, etc., se realizeaz n conformitate cu tabelul 1 din C 149;

    Tipul 2: - Remedierea deteriorrilor (fisuri sau striviri locale) aparute n perioada de execuie sau n cursul exploatrii ca urmare a fenomenului de contracie a betonului sau a unor solicitri cu caracter excepional (ocuri, suprancrcare, vibraii, seism, etc.) se realizeaz n conformitate cu tabelul 2 din C 149.

    6. BREVIARE DE CALCUL

    Breviarele de calcul sunt prezentate ca o documentaie separat n partea scris a Proiectului (conform Borderoului) i cuprind descrierea metodologiei de calcul, notele i schemele de calcul aferente lucrrilor proiectate.

    7. PLANELE CARE GUVERNEAZA LUCRAREA

    Plan de situaie

    Profil transversal tip

    Profiluri transversale curente

    Elevaie lucrare

    Detalii cofraj i armare elemente din beton armat

    8. LISTA STANDARDELOR I NORMATIVELOR

    Nr. Crt.

    Acte legislative/ Standarde/Normative

    Denumirea

    1 STAS 1040-85 Lemn rotund de rinoase pentru construcii. Manele i prajini

    2 STAS 10111/1-77 Poduri de cale ferat i osea. Infrastructuri de zidrie beton i beton armat. Prescripii de proiectare

    3 STAS 4606-80 Agregate naturale grele pentru betoane i mortare cu liani minerali. Metode de ncercare

    4 STAS 5511-89 ncercri pe betoane. Determinarea aderenei dintre beton i armtur. Metoda prin smulgere

    5 STAS 12287-85 ncercrile metalelor. ncercri mecanice ale mbinrilor sudate din bare de oel beton

    6 SR 438-1:2012 Produse de oel pentru armarea betonului. Partea 1: Oel beton laminat la cald. Mrci i condiii tehnice de calitate

  • Structuri de sprijin i consolidare din beton armat 15

    7 SR 438-2:2012 Produse de oel pentru armarea betonului. Partea 2: Srm rotund trefilat

    8 SR 438-3:2012 Produse de oel pentru armarea betonului. Partea 3: Plase sudate

    9 SR 438-4:2012 Produse de oel pentru armarea betonului. Partea 4: Srm cu profil periodic obinut prin deformare plastic la rece

    10 SR 13510:2006 Beton. Partea 1: Specificaie, performan, producie i conformitate. Document naional de aplicare a SR EN 206-1

    11 SR 13510:2006/A1:2012 Beton. Partea 1: Specificaie, performan, producie i conformitate. Document naional de aplicare a SR EN 206-1

    12 SR 13536:2009 Evaluarea agresivitii apei, solului i gazelor asupra betonului. Prelevarea i analizarea eantioanelor de ap i sol

    13 SR EN 196-1:2006 Metode de ncercri ale cimenturilor. Partea 1: Determinarea rezistenelor mecanice

    14 SR EN 196-3+A1:2009 Metode de ncercri ale cimenturilor. Partea 3: Determinarea timpului de priza i a stabilitii

    15 SR CEN/TR 196-4:2008 Metode de ncercri ale cimenturilor. Partea 4: Determinarea cantitativ a componentelor

    16 SR EN 196-5:2011 Metode de ncercri ale cimenturilor. Partea 5: ncercare de puzzolanicitate a cimentului puzzolanic

    17 SR EN 196-6:2010 Metode de ncercri ale cimenturilor. Determinarea fineii

    18 SR EN 196-8:2010 Metode de ncercri ale cimenturilor. Partea 9: Caldura de hidratare. Metoda prin dizolvare

    19 SR EN 197-1:2011 Ciment. Partea 1: Compoziie, specificatii i criterii de conformitate ale cimenturilor uzuale

    20 SR EN 206:2014 Beton. Specificaie, performan, producie i conformitate

    21 SR EN 450-1:2012 Cenua zburatoare pentru beton. Partea 1: Definiii, condiii i criterii de conformitate

    22 SR EN 450-2:2006 Cenua zburtoare pentru beton. Partea 2: Evaluarea conformitii

    23 SR EN 480-1+A1:2015 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 1: Beton i mortar de referin pentru ncercri

    24 SR EN 480-2:2007 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 2: Determinarea timpului de priz

    25 SR EN 480-15:2013 Aditivi pentru beton, mortar i past. Metode de ncercare. Partea 15: Beton de referin i metod de ncercare a aditivilor modificatori de vscozitate

    26 SR EN 934-1:2008 Aditivi pentru beton, mortar i past. Partea 1: Cerine comune

    27 SR EN 934-2+A1:2012 Aditivi pentru beton, mortar i past. Partea 2: Aditivi pentru beton. Definiii, condiii, conformitate, marcare i etichetare

  • Structuri de sprijin i consolidare din beton armat 16

    28 SR EN 934-6:2002/A1:2006

    Aditivi pentru beton, mortar i past. Partea 6: Eantionare, control i evaluarea conformitii

    29 SR EN 1008:2003 Apa de preparare pentru beton. Specificaii pentru prelevare, ncercare i evaluare a aptitudinii de utilizare a apei, inclusiv a apelor recuperate din procese ale industriei de beton, ca apa de preparare pentru beton

    30 SR EN 1992-1-1:2004 Eurocod 2: Proiectarea structurilor de beton. Partea 1-1: Reguli generale i reguli pentru cldiri

    31 SR EN 1992-1-1:2004/NB:2008

    Eurocod 2: Proiectarea structurilor de beton. Partea 1-1: Reguli generale i reguli pentru cldiri. Anexa naional

    32 SR EN 1992-2:2006 Eurocod 2: Proiectarea structurilor de beton. Partea 2: Poduri de beton. Proiectare i prevederi constructive

    33 SR EN 1992-2:2006/NA:2009

    Eurocod 2: Proiectarea structurilor de beton. Partea 2: Poduri de beton. Proiectare i prevederi constructive. Anexa naional

    34 SR EN 1997-1:2004 Eurocod 7

    Proiectarea geotehnic. Partea 1: Reguli generale

    35 SR EN 1997-1:2004/NB:2007

    Eurocod 7: Proiectarea geotehnic. Partea 1: Reguli generale. Anex naional

    36 SR EN 10020:2003 Definirea i clasificarea mrcilor de oel

    37 SR EN 10079:2007 Definirea produselor de oel

    38 SR EN 10080:2005 Oeluri pentru armarea betonului. Oeluri sudabile pentru beton armat. Generaliti

    39 SR EN 12350-1:2009 ncercare pe beton proaspt. Partea 1: Eantionare

    40 SR EN 12350-2:2009 ncercare pe beton proaspt. Partea 2: ncercarea de tasare

    41 SR EN 12350-3:2009 ncercare pe beton proaspt. Partea 3: ncercare Vebe

    42 SR EN 12350-4:2009 ncercare pe beton proaspt. Partea 4: Grad de compactare

    43 SR EN 12350-5:2009 ncercare pe beton proaspt. Partea 5: ncercare cu masa de rspndire

    44 SR EN 12350-6:2009 ncercare pe beton proaspt. Partea 6: Densitate

    45 SR EN 12350-7:2009 ncercare pe beton proaspt. Partea 7: Coninut de aer. Metode prin presiune

    46 SR EN 12350-8:2010 ncercri pe beton proaspt. Partea 8: Beton autocompactant. Tasare - ncercarea la rspndire

    47 SR EN 12350-9:2010 ncercri pe beton proaspt. Partea 9: Beton autocompactant. Metoda de determinare a timpului de curgere cu plnia V

    48 SR EN 12350-10:2010 ncercri pe beton proaspt. Partea 10: Beton autocompactant. Metoda de determinare a capacitii de curgere utiliznd cutia n L

    49 SR EN 12350-11:2010 ncercri pe beton proaspt. Partea 11: Beton autocompactant.

  • Structuri de sprijin i consolidare din beton armat 17

    Metoda de determinare a rezistenei la segregare utiliznd site

    50 SR EN 12350-12:2010 ncercri pe beton proaspt. Partea 12: Beton autocompactant. Metoda de determinare a capacitii de curgere cu inelul J

    51 SR EN 12390-1:2013 ncercare pe beton intarit. Partea 1: Forma, dimensiuni i alte conditii pentru epruvete i tipare

    52 SR EN 12390-1:2013 ncercare pe beton ntrit. Partea 1: Form, dimensiuni i alte condiii pentru epruvete i tipare

    53 SR EN 12390-2:2009 ncercare pe beton ntrit. Partea 2: Pregtirea i pstrarea epruvetelor pentru ncercri de rezisten

    54 SR EN 12390-3:2009 ncercare pe beton ntrit. Partea 3: Rezistena la compresiune a epruvetelor

    55 SR EN 12390-3:2009/AC:2011

    ncercare pe beton ntrit. Partea 3: Rezistena la compresiune a epruvetelor

    56 SR EN 12390-4:2002 ncercare pe beton ntrit. Partea 4: Rezistena la compresiune. Caracteristicile mainilor de ncercare

    57 SR EN 12390-5:2009 ncercare pe beton ntrit. Partea 5: Rezistena la ncovoiere a epruvetelor

    58 SR EN 12390-6/2010 ncercare pe beton intarit. Partea 6: Rezisten la intindere prin despicare a epruvetelor

    59 SR EN 12390-7:2009 ncercare pe beton ntrit. Partea 7: Densitatea betonului ntrit

    60 SR EN 12390-8:2009 ncercare pe beton ntrit. Partea 8: Adncimea de ptrundere a apei sub presiune

    61 SR CEN/TS 12390-9:2009

    ncercare pe beton ntrit. Partea 9: Rezisten la nghe-dezghe. Exfoliere

    62 SR EN 12390-13:2014 ncercare pe beton ntrit. Partea 13: Determinarea modulului secant de elasticitate n compresiune

    63 SR EN 12504-1:2009 ncercri pe beton n structuri. Partea 1: Carote. Prelevare, examinare i ncercri la compresiune

    64 SR EN 12504-2:2013 ncercri pe beton n structuri. Partea 2: ncercri nedistructive. Determinarea indicelui de recul

    65 SR EN 12504-3:2006 ncercri pe beton n structuri. Partea 3: Determinarea forei de smulgere

    66 SR EN 12504-4:2004 ncercare pe beton n structuri. Partea 4: Determinarea vitezei de propagare a ultrasunetelor

    67 SR EN 12620+A1:2008 Agregate pentru beton

    68 SR EN 12878:2014 Pentru pigmenti - Pigmenti pentru colorarea materialelor de constructie pe baza de ciment i/sau var. Specificatii i metode de ncercare

    69 SR EN 13242+A1:2008 Agregate din materiale nelegate sau legate hidraulic pentru utilizare

  • Structuri de sprijin i consolidare din beton armat 18

    n inginerie civil i n construcii de drumuri

    70 SR EN 13285:2011 Amestecuri de agregate nelegate. Specificaii

    71 SR EN 13263-1+A1:2009

    Silice ultra fin pentru beton. Partea 1: Definitii, conditii i criterii de conformitate

    72 SR EN 13263-2+A1:2009

    Silice ultra fin pentru beton. Partea 2: Evaluarea conformitii

    73 SR EN 13670:2010 Execuia structurilor de beton

    74 SR EN 13791:2007 Evaluarea in-situ a rezistenei la compresiune a betonului din structuri i din elemente prefabricate

    75 SR CR 13902:2002 Metode de ncercare pentru determinarea raportului ap/ciment n betonul proaspt

    76 SR EN ISO 377:2013 Oel i produse de oel. Poziionarea i pregtirea probelor i epruvetelor pentru ncercri mecanice

    77 SR EN ISO 14688-1:2004

    Cercetri i ncercri geotehnice. Identificarea i clasificarea pmnturilor. Partea 1: Identificare i descriere

    78 SR EN ISO 14688-2:2005

    Cercetri i ncercri geotehnice. Identificarea i clasificarea pmnturilor. Partea 2: Principii pentru o clasificare

    79 SR EN ISO 15630-1:2011

    Oel pentru armarea i precomprimarea betonului. Metode de ncercare. Partea 1: Bare, srme laminate i srme pentru armarea betonului

    80 SR EN ISO 17660-1:2007

    Sudare. Sudarea oelului beton. Partea 1: mbinri sudate care transmit ncrcri

    81 SR EN ISO 17660-2:2007

    Sudare. Sudarea oelului beton. Partea 2: mbinri sudate care nu transmit ncrcri

    82 NE 012/1,2-2007,2010 Normativ pentru producerea betonului i executarea lucrrilor din beton, beton armat i beton precomprimat - Partea 1: Producerea betonului, Partea 2: Executarea lucrrilor din beton

    83 CP 012-1/2007 Cod de practic pentru producerea betonului

    84 NP 074-2007 Normativ privind documentaiile geotehnice pentru construcii

    85 C26-1985 Normativ pentru ncercarea betonului prin metode nedistructive

    86 C56-85 Normativ pentru verificarea calitii i recepia lucrrilor de constructii i instalaii aferente

    87 C 162/1973 Normativ privind alctuirea, executarea i folosirea cofrajelor metalice plane pentru pereii din beton monolit la cldiri

    88 C 11/1974 Instruciuni tehnice privind alctuirea i folosirea n construcii a panourilor din placaj pentru cofraje

    89 C28-1983 Instruciuni tehnice pentru sudarea armturilor din otel beton

    90 C54-1981 Instruciuni tehnice pentru ncercarea betonului cu ajutorul

  • Structuri de sprijin i consolidare din beton armat 19

    carotelor

    91 Legea nr. 10/18.01.1995 Privind calitatea n constructii

    92 Legea L319/2006 Securitii i sntii n munc

    93 Legea nr. 50/1991 Privind autorizarea executrii lucrrilor de construcii, republicat, cu modificrile i completrile ulterioare

    94 Hotrrea Guvernului nr. 300/2006

    Privind cerine minime pentru desfurarea antierelor temporare i mobile

    95 Hotrrea Guvernului nr. 766/1997

    Pentru aprobarea unor regulamente privind calitatea n construcii, cu modificrile ulterioare

    96 Hotrrea Guvernului nr. 525/1996

    Pentru aprobarea Regulamentului general de urbanism, republicat

  • Structuri de sprijin din gabioane 1

    MINISTERUL TRANSPORTURILOR

    COMPANIA NAIONAL DE AUTOSTRZI i DRUMURI NAIONALE DIN ROMNIA

    CAIET DE SARCINI NR. 1

    LUCRRI DE CONSOLIDARE A TERASAMENTELOR DE DRUM

    PARTEA III:

    STRUCTURI DE SPRIJIN DIN GABIOANE

    REDACTAREA 2

    IULIE 2015

    S.C. PRIMACONS S.R.L.

    CUPRINS

  • Structuri de sprijin din gabioane 2

    1. PREVEDERI GENERALE.........................................................................................................3

    2. MATERIALE ...............................................................................................................................3

    2.1. PIATRA BRUT PENTRU ZIDARIA USCAT ......................................................................................3

    2.1.1. Condiii tehnice .............................................................................................................3

    2.2. GEOTEXTIL .....................................................................................................................................4

    2.3. PLASA DIN SRM ..........................................................................................................................4

    2.4. CONFECIONAREA CUTIILOR DE GABIOANE...................................................................................5

    3. UTILAJE ......................................................................................................................................5

    4. EXECUIA LUCRRILOR ......................................................................................................5

    4.1. LUCRRI PREGTITOARE ...............................................................................................................5

    4.2. DESCRIEREA OPERAIUNILOR ........................................................................................................6

    4.3. PREGTIREA PLATFORMEI DE LUCRU PENTRU DEPOZITAREA MATERIALELOR I CONFECIONAREA CUTIILOR DE GABIOANE .............................................................................................6

    4.4. PREGTIREA I COMPACTAREA TERENULUI SUPORT PENTRU STRUCTURA DE SPRIJIN DIN GABIOANE .................................................................................................................................................6

    4.5. CONFECIONAREA CUTIILOR DE GABIOANE DIN CADRE RIGIDE DIN BARE DE OEL BETON ..........6

    4.6. UMPLEREA GABIONULUI CU PIATR, ARANJAREA MANUAL A PIETREI PE FAADA GABIONULUI (LA INTERIOR) I NCHIDEREA GABIONULUI .............................................................................................7

    5. CONTROLUL EXECUIEI.......................................................................................................7

    5.1. TOLERANE ....................................................................................................................................7

    5.2. DEFECIUNI I MOD DE REMEDIERE ...............................................................................................7 5.3. ACCEPTAREA STRUCTURII DE SPRIJIN ............................................................................................8

    5.4. RECEPIA LUCRRILOR ..................................................................................................................8

    6. BREVIARE DE CALCUL ..........................................................................................................9

    7. PLANELE CARE GUVERNEAZA LUCRAREA .................................................................9

    8. LISTA STANDARDELOR I NORMATIVELOR..................................................................9

  • Structuri de sprijin din gabioane 3

    1. PREVEDERI GENERALE

    Prezentul Caiet de Sarcini se refer la realizarea structurilor din gabioane folosite pentru susinerea taluzurilor i versanilor, ct i pentru retenia materialului provenit din eroziunea acestor pante, n conformitate cu detaliile din proiect.

    Gabioanele au urmtoarele caracteristici:

    - sunt structuri elastice, fiind capabile s reziste n bune condiii la oricare tip de solicitare;

    - sunt structuri la care deformaia limitat nu este un defect ci un factor funcional, care confirm conlucrarea tuturor elementelor construciei fr s reduc rezistena acesteia;

    - sunt structuri drenante.

    Gabioanele sunt cutii umplute cu piatr brut, fiind confecionate din plas de srm de oel moale zincat masiv, dublu rsucit, cu ochiuri hexagonale. Plasa este prins cu srm moale pe un schelet metalic din bare de oel beton. Cutiile se umplu cu piatr brut n amplasamentul lucrrii. Caietul de sarcini cuprinde condiiile tehnice i de calitate care trebuie s le ndeplineasc materialele, controlul de calitate al lucrrilor i criteriile de recepie a lucrrilor.

    De asemenea, ine cont de Normativele i Standardele romneti i europene valabile n luna mai