Repair, NOTscrap

Embed Size (px)

Citation preview

  • 8/2/2019 Repair, NOTscrap

    1/10

    Sulzer Turbo Services

    Sulzer Turbo Services Venlo B.V.Spikweien 36NL-5943 AD Lomm, The NetherlandsPhone +31 77 473 8666Fax +31 77 473 2785www.sulzerts.com

    To Whom it my concern Our ref.

    Phone direct

    Fax direct

    E-Mail direct

    Document

    Date

    +31 77 473 8666

    +41 77 473 2785

    [email protected]

    SULZER TURBO SERVICES VENLO Capabilities: REPAIR, NOT SCRAP !!

    Rescued from scrap

    Sulzer Turbo Services Venlo (TS Venlo) has always pushed the boundaries and is a pioneer in

    the search for new techniques to repair even the worst condition parts. For this we have

    successfully developed repairs using laser welding and other special processes. We have

    attached a few examples were we have rescued components from SCRAP were other

    competitors, including the OEM, were not able to repair. These parts are now running safely in

    turbines.

    Lowest price suppliers in many cases scrap or reject many components since these companies

    are both financially as well as technically not able to effectively refurbish gas turbine hot section

    parts. TS Venlo however is recognized in the Industry for the low scrap rates and high quality

    and therefore we have rescued/repaired a lot of parts for customers and prevented the

    customer to buy very expensive NEW parts from the OEM. If orders would have been evaluated

    afterwards and not only at the tender opening, TS Venlo would have been the better

    alternative, taking into account that NO replacement of scrap parts by NEW parts would have

    been necessary.

    We at TS Venlo have invested a lot of efforts in the Research & Development for new repair

    techniques to RESCUE customers parts from being scrapped. We are successfully offering

    these special repairs to our customers.

    On the following pages several of many examples are showed to emphasize which parts &developments (processes) we have used to rescue components from scrap. In addition, TS

    Venlo is able to provide non-OEM new manufacturing of gas turbine components instead of our

    existing refurbishment technology, if customer wishes.

    For more information, Please do not hesitate to contact us.

    Yours sincerely,

    Peter van NeervenRegional Sales ManagerSulzer TS Venlo

  • 8/2/2019 Repair, NOTscrap

    2/10

    Sulzer Turbo Services

    RESCUED FROM SCRAP(Few examples out of many repairs)

    ABB13E2 stage 1 vane NEW Version A(Meishi , China)

    scrapped by OEM and UK repair companybecause of extensive airfoil & platform cracks

    ABB13E2 stage 1 vane NEW Version A(Meishi , China)

    Rescued by coupon repair using laser welding

    ABB13E2 stage 1 vane Version 96 (Indonesia / other)

    Scrapped by OEM and non-OEM

    Rescued by (several shapes of) coupon repairs using laser welding

  • 8/2/2019 Repair, NOTscrap

    3/10

    Sulzer Turbo Services

    ABB13E2 stage 1 blade Version 96 (various customers)

    Scrapped by OEM and non-OEM

    Rescued by special repair using laser welding

    X: Area of

    concern in case

    of cracks

  • 8/2/2019 Repair, NOTscrap

    4/10

    Sulzer Turbo Services

    ABB11D/13D3 stage 1 blades

    (Saudia, Bahrain-ALBA/other)

    Scrapped by OEM and non-OEM

    Rescued by coupon repair using laser welding

    Before and after coupon repair

  • 8/2/2019 Repair, NOTscrap

    5/10

    Sulzer Turbo Services

    Siemens V64.3 stage 1 vanes (Amata, Thailand)

    Scrapped by others and rescued by coupon repair using laser welding

    GE F6 stage 1 nozzle (Oman)

    Scrapped by OEM and other local repair companies

    Rescued by heavy coupon repair

  • 8/2/2019 Repair, NOTscrap

    6/10

    Sulzer Turbo Services

    GE F9E stage 1 buckets set (SEWA, Sharjah UAE)

    Scrapped by OEM and others for heavy FOD

    Rescued by special welding processes and running for > 2 years in GT

    We also delivered NEW F9E components to SEWA which are fitted in a GT and started up

    early June 2005 (stage 1-2-3 buckets, stage 2 nozzle, shroud blocks, TPs and C/L)

    GE F6B stage 1 buckets set (JinHua P/S China)

    Scrapped by UK repair company for heavy FOD

    Rescued by laser welding (April 2005)

  • 8/2/2019 Repair, NOTscrap

    7/10

    Sulzer Turbo Services

    GE F9E stage 1 buckets (Iran/other)

    LE cracks, scrapped by OEM and UK repair company

    several sets rescued by Powder laser welding

  • 8/2/2019 Repair, NOTscrap

    8/10

    Sulzer Turbo Services

    GE F9E stage 2 Nozzle (Shenzhen Nanshan P/S, China)

    Scrapped by OEM and others for heavy FOD and overheating

    Rescued by inserting casted Leading Edge sections and special welding & brazing processes

    Alternatively we are able to deliver NEW F9E stage 1-2-3 nozzles when necessary

    GE F6B stage 1 nozzel (Shaoxing P/S China)

    Scrapped by OEM and non-OEM repair company for heavy FOD

    Rescued by inserting new casted trailing edge patches (2005)

  • 8/2/2019 Repair, NOTscrap

    9/10

    Sulzer Turbo Services

    GE F9E complete rotor overhaul AES Elsta The Netherlands

    (Rescued from GE Scrap by machining & powder welding of heavilycracked shaft: Bearing did not get oil for 3 minutes)

    ABB13D3 complete rotor overhaul Pakka Malaysia

    (Rescued from OEM Scrap :rotor was heavily damaged and bent as result of a failure)

  • 8/2/2019 Repair, NOTscrap

    10/10

    Sulzer Turbo Services

    GE F9FA complete rotor overhaul UK customer

    (Rescued from GE Scrap ; compressor rotor failed 4 times and Sulzer TS Venlo reverse engineered allcompressor blades & vanes and made some modifications to prevent shim migration)

    GE F9FA complete rotor overhaul & casing repair UK customer

    (Rescued from OEM Scrap : GE F-casings suffer from heavy deformations causing compressor blade tiprubbing and finally causing catastrophic failure. Sulzer TS Venlo repaired the casings and bring back to

    original shape)