12
Pondugala (PDGL) 143.35 Nadikude Jn.(NDKD) 152.69 Macherla (MCLA) 130.26 Donakonda (DKD) 120.08 N a l l ap a d u (NLP D ) 5 .0 0 Guntur Jn.(GNT)0.00 Krishna canal Jn..(KCC) 423.71 Miryalaguda (MRGA)114.40 Giddalur (GID) 203.78 Cumbum (CBM) 170.04 Vinukonda (VKN) 82.65 Markapur Rd. (MRK) 143.97 Narasaraopet (NRT) 45.30 Repalle (RAL) 33.85 Tenali Jn.(TEL) 397.25 Vijayawada Jn..(BZA) Vishnupuram (VNUP) 134.97 Nandyal (NDL) 256.98 Mangalagiri (MAG) 20.28 Reddipal e m (REP) 2.47 To Chennai Vejendla (VJA) 14.00 Sangam jagarlamudi (SJL) 8.27 Vemuru (VMU) 13.77 Piduguralla (PGRL) 74.10 Tummalacheruvu (TMLU) 83.34 Bellamkonda (BMKD) 60.42 Reddigudem (REM) 54.29 Sattenapalli (SAP) 42.37 Pedakurapadu (PKPU) 29.64 Siripuram (SRPM) 22.96 Bandarupalli (BDPL) 13.58 Nagireddipalli ( NRDP ) 19.44 Valigonda ( VLG ) 29.47 Ramannapet ( RMNP ) 42.12 Chityala ( CTYL ) 51.08 Srirampuram ( SRMR ) 66.31 Nalgonda ( NLDA ) 76.71 Thipparti ( TPPI ) 94.11 T o Ka z i p e t T o G u n t a k a l Border at Km. 4.50 B ord e r at km . 261 . 91 Bor de r at km. 25.36 GNT at km.25.47 S o u t h Ce n t r a l R a ilw a y G u n t u r D i v i s i o n - J u ri s d i c t i o n m a p Pagidipalli ( PGDP ) 4.02 Reference 1. DEN/North/GNT Jurisdiction c. ADEN/West/GNT Jurisdiction 2. DEN/West/GNT Jurisdiction b. ADEN/NLDA Jurisdiction a. ADEN/North/GNT Jurisdiction 3. Double line d. ADEN/NDL Jurisdiction Kodrapol ( KDGL ) 125.92 Janpahad (JPD )10.74 Kms. " B " Route " D " Route " E " Route Total 1 Route Kms. 551.41 35.01 42.80 629.22 2 Track Kms. ( Main line ) 581.77 35.01 42.80 659.58 3 Track Kms. ( Loops & S ings ) id 97.428 3.05 3.74 104.218 4 Electrified section 55.64 0 0 55.64 5 Double line 30.36 0 0 30.36

S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

Pondugala (PDGL) 143.35

Nadikude Jn.(NDKD) 152.69

Macherla (MCLA) 130.26

Donakonda (DKD) 120.08

Nal lapadu (NLPD) 5.00

Guntur J

n.(GNT)0

.00

Krishna canal Jn..(K

CC) 423.71Miryalaguda (MRGA)114.40

Giddalur (GID) 203.78

Cumbum (CBM) 170.04

Vinukonda (VKN) 82.65

Markapur Rd. (MRK) 143.97

Narasaraopet (NRT) 45.30Repalle (RAL) 33.85

Tenali Jn.(TEL) 3

97.25

Vijayawada Jn..(BZA)

Vishnupuram (VNUP) 134.97

Nandyal (NDL) 256.98

Mangalagir i (MAG) 20.28Reddipalem (REP) 2.47

To C

henn

ai

Vejend

la (V

JA) 1

4.00

Sanga

m jaga

rlamud

i (SJL

) 8.27 Vemuru (V

MU) 13.77

Pid

ugur

alla

(PG

RL)

74.

10

Tum

mal

ache

ruvu

(TM

LU) 8

3.34

Bel

lam

kond

a (B

MKD

) 60 .

42R

eddi

gude

m (R

EM) 5

4.29

Sat

tena

palli

(SAP

) 42.

37P

edak

urap

adu

(PKP

U) 2

9.64

Siri

p ura

m (S

RPM

) 22.

96

Ban

daru

palli

(BD

PL)

13.

58

Nagireddipalli ( NRDP ) 19.44

Valigonda ( VLG ) 29.47

Ramannapet ( RMNP ) 42.12

Chityala ( CTYL ) 51.08Srirampuram ( SRMR ) 66.31

Nalgonda ( NLDA ) 76.71

Thipparti ( TPPI ) 94.11

To Kazipet

To Guntakal

Border at Km. 4.50

Border at km. 261.91

Border at km. 25.36

GNT at k

m.25.47

South Central RailwayGuntur Division - Jurisdiction mapPagidipalli ( PGDP ) 4.02

Reference

1. DEN/North/GNT Jurisdic tion

c. ADEN/West/GNT Jurisdiction

2. DEN/West/GNT Jurisdictionb. ADEN/NLDA Jurisdictiona. ADEN/North/GNT Jurisdiction

3. Double line

d. ADEN/NDL Jurisdiction

Kodrapol ( KDGL ) 125.92

Janp

ahad

(JPD

)10.

74

   Kms.  " B " Route  " D " Route  " E " Route  Total  1 Route Kms.  551.41  35.01  42.80  629.22 2 Track Kms. ( Main line )  581.77  35.01  42.80  659.58 3 Track Kms. ( Loops & S ings ) id 97.428  3.05  3.74  104.218 4 Electrified section  55.64  0  0  55.64 5 Double line  30.36  0  0  30.36 

Page 2: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

GUNTUR DIVISION – KEY STATISTICS- 2012-13

1 Track

1. Route Kilometers 629.22

Double Line 30.36

Single Line 598.86

2. Total Track Kilometers 659.58

Double Line 60.72

Single Line 598.86

3. Electrified Route Kilometers 55.64

Double Line 30.36

Single Line 25.28

2 Volume of Traffic

1. No. of passenger carrying trains (average/daily) 93

MEMU 12

DEMU 16

Conventional 65

2. Average no. of Freight Trains (Daily) 33

3. Passengers originating (2012-13) (In Millions) 25.974

4. Originating freight loading (2012-13) (In Millions Tonnes ) 3.127

3 Financial

1. Gross Traffic Receipts (2012-13) (In ` Crores) 467.76

Goods 372.42

Passenger 82.18

Others 13.15

2. Ordinary working expenses (2012-13) (In ` Crores) 205.09

3. Performance Efficiency Index (2012-13) 43.85

4 Personnel ( as on 01-07-2013 )

1. Total sanctioned 4939

2. Actual on roll 4031

3. Officers sanctioned 45

4. Officers on roll 43

5 No. of Stations 72

6 Miscellaneous

1. No. of LC gates ( as on 01-07-2013) 309

Unmanned 148

Manned 161

2. Coaches (Inclusive of consists) 174

3. No. of Stations where PRS/UTS Installed 53

4. Coaching Depot 1

5. No. of Health Units 4

Page 3: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

INTRODUCTION

Evolution of Guntur Division

Guntur is a very ancient town. References to Guntur are found in inscriptions of 922-929 AD and 1147, 1158 AD. The original Sanskrit name (ancient Vedic culture/tradition) for Guntur was Garthapuri (a place surrounded by water ponds ('garta = gunta')). The city was founded in the mid-eighth century by the French who ruled over the city for nearly ten centuries until it was ceded permanently to the British in 1788. Guntur district occupies an area of approximately 11,391 square kilometres (4,398 sq mi).It is one of the oldest municipalities that have been constituted in 1866.

The Guntur region played a significant role in the struggle for independence and the formation of Andhra Pradesh. India's independence came in 1947, and Madras Presidency became Madras state. The northern, Telugu-speaking districts of Madras state, including Guntur, advocated for a separate state, and the new state of Andhra Pradesh was created in 1953 from the eleven northern districts of Madras.

Guntur District –Information

Population(2011) 48,89,230

Density 429 per sq. km

Location 16.200 N 80.27

0 E

Economy Cotton, Tobacco, Chilli

Industrialisation Cement, Jute mills, Granite, Handloom, Silk, Sangam Dairy

Crops Paddy, Jowar, Cotton, Turmeric, Maize, Arhar, Chillies, Sugarcane, and Sesame

Research centres

Agricultural Research Center,Lam of ANGRAU, Institute of Pharmaceutical Sciences at Lam, Indian Tobacco Board

Educational Institutions

Acharya Nagarjuna University, Two deemed universities i.e., Vignan University & K.L. University .Hindu College,AC College, TJPS College, MBTS Polytechnic, Katuri Medical College, Jagarlamudi KuppuSwamy Chowdary College, Guntur Medical College, RVR & JC College of Engineering, NRI Medical Collegeand Bhashyam Group of Institutions.

Health Guntur Medical College, NRI Medical College, The Sankar Hospital, Kugler Hospital,

In order to strengthen the rail infrastructure of this region, Ministry of

Railways sanctioned the formation of Guntur Division in the year 1995-96. Guntur Division was operationalised on 1st April, 2003 with 618.48 Route Kilometres by amalgamating 3 sections taken from 3 Divisions viz., 369.39 Kms. from BZA Division, 141.29 from Guntakal Division and 107.88 Kms, from Secunderabad Division. Now, with the addition of 10.74 route kilometers of Vishnupuram-Janpahad section, the Division route kilometers enhanced to 629.22 Kms.

Page 4: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

Jurisdiction

The jurisdiction of the Division is from Krishna Canal (Excl.) to Guntur Jn., Guntur Jn. to Nandyal (incl.); Repalle to Tenali Jn. (Excl.) Guntur Jn. to Pagidipalli Jn. (Excl.), Nadikude Jn. to Macherla. It has 629.22 B.G. route Kms. all on 'B' route, except Repalle-Tenali and Nadikude-Macherla (E route).

From To Distance in Kms.

Line Traction

Krishna Canal Junction [excl.] Guntur Jn. 25.36 Double Electric Guntur Jn. Nallapadu Jn. 5.00 Double Electric Tenali Jn. [excl.] Guntur Jn. 25.28 Single Electric Nallapadu Jn. Pagidipalli Jn [excl.] 238.86 Single Diesel Nallapdu Jn. Nandyal [incl.] 256.91 Single Diesel Repalle Tenali Jn. [excl.] 32.06 Single Diesel Nadikude Jn. Macherla 35.01 Single Diesel Vishnupuram Janpahad 10.74 Single Diesel

Total Kms. 629.22

Revenue Districts covered by Division

Guntur Division of South Central Railway covers four Revenue Districts of Andhra Pradesh State viz., Guntur, Nalgonda, Prakasam and Kurnool Districts.

Page 5: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

NDKD 152.69

MCLA 130.26

DKD

120.08

Nallapadu (NLPD) 5.00

Gun

tur J

n.(GNT)

0.00

Krishna canal J

n..(KCC) 4

23.71

MRGA 114.40

GID

203.78

CBM

170.04

MRK 1

43.97

NRT 45

.30

Repalle (R

AL) 33.85

Tenali Jn.(T

EL) 397.25

Vijayawada Jn

..(BZA)

VNUP 134.97

Nan

dyal (ND

L) 256.98

NGNT/ REP 2.47

To C

henn

ai

PG

RL 7

4.1

0

SA

P 4

2.3

7

BD

PL 1

3.5

8

NRDP 19.44

CTYL 51.08

NLDA 76.71

To Kazipet

To Guntakal

Border at Km. 4.50

Border at km. 261.91

South Central RailwayGuntur Division

Pagidipalli ( PGDP ) 4.02

Reference

1. DEN/North/GNT Jurisdiction

c . ADEN/West/GNT Jurisdiction

2. DEN/West/GNT Jurisdiction

b. ADEN/NLDA Jurisdiction

a . ADEN/North/GNT Jurisdiction

3. Double line

d. ADEN/NDL Jurisdiction

GZA

106

.98

Janpa

had

Km.10.64

G.Rice

Steel pipes

G.Rice & Quartz

G.Rice&Cement

Cement

Cem

ent

Containers &Multicommodities

G.R

ice

Tim

ber waste

G.R

ice & Fertilizers

Re - booking

Cement

FCI Siding

G.Rice

FCI Siding

G.Rice

MATRIX siding

G.Rice

India Cement Siding

Cement

Penna Cement siding

Cement

KCP Siding

Cement

Loading stations & Sidings

Page 6: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

NDKD 152.69

MCLA 130.26

DKD

120.08

Nallapadu (NLPD) 5.00

Gun

tur J

n.(G

NT)

0.00

Krishna canal J

n..(KCC) 4

23.71

MRGA 114.40

GID

203.78

CBM

170.04

MRK 1

43.97

NRT 45

.30

Repalle (R

AL) 33.85

Tenali Jn.(T

EL) 397.25

Vijayawada Jn

..(BZA)

VNUP 134.97

Nan

dyal (ND

L) 256.98

NGNT/ REP 2.47

To C

henn

ai

PG

RL 7

4.1

0

SA

P 4

2.3

7

BD

PL 1

3.5

8

NRDP 19.44

CTYL 51.08

NLDA 76.71

To Kazipet

To Guntakal

Border at Km. 4.50

Border at km. 261.91

South Central RailwayGuntur Division

Pagidipalli ( PGDP ) 4.02

Reference

1. DEN/North/GNT Jurisdiction

c. ADEN/West/GNT Jurisdiction

2. DEN/West/GNT Jurisdiction

b. ADEN/NLDA Jurisdiction

a . ADEN/North/GNT Jurisdiction

3. Double line

d. ADEN/NDL Jurisdiction

GZA

106

.98

Janpa

had

Km.10.64

Coal,

Steel pipes

G.Rice

G.Rice& Fertilizers

Coal

Cem

ent

Fertilizers &Containers

Fertilizers

G.R

ice & Fertilizers

Coal

FCI Siding

G.Rice

FCI Siding

G.Rice

India Cement Siding

Coal

Penna Cement siding

Coal

UnLoading stations & Sidings

PDGL 143.35Coal

Page 7: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

Passenger Amenities / Freight facilities over Guntur Division.

Model Stations 4 Nalgonda, Nadikudi, Guntur, Nandyal

Aadarsh 8 Nalgonda, Nandyal, Narasaraopet, Guntur, Sattenapalli,Pidugurall,Macherla, Vinukonda

“Touch & Feel” items Stations

5 Nalgonda, Nadikudi, Guntur , Narasaraopet, Nandyal.

Unified locations ( UTS +PRS)

27

Ramannapet, Chityala, Miryalaguda, Vishnupuram, Macherla, Nadikudi, Piduguralla, Sattenapalli, Pedakurapadu, Siripuram, New Guntur, Mangalagiri, Vejendla, Chinnaravuru, Vemuru, Bhattiprolu, Pallikona, Perecherla, Phirangipuram, Narasaraopet, Vinukonda, Kurichedu, Donakonda, Markapur Road, Cumbum, Giddalur and , Gazulapalli. ( All Thinclients)

PRS locations 4 Nalgonda, Guntur, Repalle and Nandyal (Dumb Terminals)

UTS Locations

26

Nagireddipalli, Valigonda, Srirampuram, Nalgonda, Thipparthi, Pondugula, Tummalacheruvu, Reddigudem, Bellamkonda, Bandarupalli, Nallapadu, Guntur, Nambur, Sangamjagarlamudi, Repalle, Satulur,Munumaka, Santamagulur, Savalyapuram, Gundlakamma, Gajjelakonda, Tarlupadu, Somidevipalle, Digivametta,Chelama and Nandyal. ( All Thinclients)

India Post PRS Centers

5 Miryalaguda ,Deverakonda, Santamagulur, Markapuram, Srisailam Temple PO.

Computerized PA System

19 Nalgonda, Miryalaguda, Macherla, Nadikudi, Piduguralla, Sattenapalli, Nallapadu,Guntur, Nambur, Mangalagiri, Repalle, Phirangipuram, Narasaraopet, Vinukonda, Donakonda, Markapur Road, Cumbum, Giddalur, and Nandyal.

POET locations 14 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli, Guntur(4), Mangalagiri, Repalle, Narasaraopet, Markapur Road, Giddalur, Nandyal and New Guntur, Cumbum.

NTES 1 At two locations: Control office/GNT and Information Facilitation Center/GNT.

Electronic Reservation chart system

1 Guntur

Retiring Rooms/Dormitories

3 Guntur, Nandyal, Markapuram

FOIS 10 Reddipalem, Nadikude, ICL siding/VNUP, Vishnupuram, Miryalaguda, Nalgonda, Chityala, Narasaraopet, Donakonda & Nandyal

E-Payment 12 ICLV, Matrix/MRGA, FCI@NDKD, MRGA, NLDA, CTYL, NRT, Penna cements/VNUP, Deccan Cements/VNUP, MY Home Cements/MRGA, Bhavya Cement Ltd.,/NDKD, West Coast paper Mills/DKD

Exceptional Data Report(EDR)

1 Guntur. 2 more stations RAL & NDL are identified for EDR and likely to commence soon. EDRs are fed for 13 trains.

Train Indication Boards – 23

TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli, Guntur(15), Narasaraopet, Markapur Road, Giddalur and Nandyal.

LED boards 3 Guntur(3), Markapur Road, Giddalur

At a Glance 10 Nalgonda, Miryalaguda, Nadikudi, Sattenapalli, Guntur (7), Repalle, Narasaraopet, Markapur Road, Giddalur and Nandyal.

Coach Indication Boards

8 Nalgonda (2), Miryalaguda, Nadikudi (2), Guntur (7), Narasaraopet (2), Markapur Road, Giddalur and Nandyal (2).

ATM locations 4 Nalgonda,Guntur(2), Repalle ,Nandyal.

IFC 1 Guntur

Locations identified for Parcel Management System

1 Guntur

Multi Functional Complex identified

1 Guntur

Page 8: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

Freight Facilities

STATIONS OPENED FOR FULL RAKE TRAFFIC

Description No. of Stns Stations

Stations opened for full rake traffic

13

Chityala, Nalgonda, Miryalaguda, Vishnupuram, Nadikude, Gurajala - (Outlaying siding), Reddipalem Goods shed, Narasaraopet, Vinukonda, Donakonda, Nandyal, Janpahad, Pondugala (unloading only)

SIDINGS – FULL RAKE SIDINGS

Cement 2 M/s India Cements Ltd – Vishnupuram, Penna Cement siding - Janpahad

FCI sidings 3

Food Corporation of India - Nalgonda (PFCI), Food Corporation of India – Miryalaguda (FCIM), M/s Matrix warehousing Pvt. Ltd – Miryalaguda (MWMS)

Non-functioning sidings 2

KCP (Ramakrishna) Ltd – Macherla (KCPM) & Central Warehousing Corporation – Namburu (MCWH)

CONCOR 2 Guntur Concor siding (CNGT) Miryalaguda

HALF RAKE SIDINGS: - NIL -

Major Commodities

Description Commodities

Major commodities – Loading Cement, Clinker, G.Rice, Trade Rice, Multi commodities, C.S.Husk, N.G.Bales, Boiled Rice, Timber waste, Steel pipes.

Major commodities – Unloading Fertilizers, Rice, Coal / Gypsum, Manganese ore, Flat Iron, Steel billets, Containers

Electronic in motion Weighbridges -

ICL/VNUP (Private) & NLPD (RLY)

Container Rail terminal - Guntur Concor siding (CNGT) Miryalaguda,

TMS Locations -

1.Miryalaguda, 2.Vishnupuram stn, 3.Nalgonda, 4.Donakonda, 5. Narasaraopet, 6.Nadikudi, 7. Chityal 8. Reddipalem 9. ICL/VNUP 10. Nandyal

Page 9: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

PERFORMANCE HIGHLIGHTS

i) Loading: (Figures in million tonnes)

For the month of Mar’2013 Cumulative up to Mar’2013

Prop. Target

Prev Year

Current Year

Var. w.r.t Pr.yr

Prop. Target Prev Year Current Year Var.

w.r.t Pr.yr

0.421 0.337 0.431 28% 4.000 3.103 3.127 1%

ii) Originating Earnings:

(` In Crores)

Head

For the month of Mar’ 2013 Cumulative up to Mar’ 2013

Current Year B.P

Last Year

Current

Year

% Var w.r.t B.P

Cur-rent Year B.P

Last Year

Current Year

% Var. w.r.t B.P.

% Var w.r.t. Pr.Yr

Passenger 10.22 6.93 7.78 -23.92 102.68 77.60 82.18 -19.96 5.91

Other Chg 0.83 0.60 0.69 -17.28 9.22 7.45 8.50 -7.81 14.11

Goods 54.75 37.93 46.53 -15.00 475.98 298.17 372.42 -21.8 25

Sundries 0.69 0.48 0.21 -69.39 5.52 4.64 4.65 -15.81 0.34

Total 66.49 45.94 55.20 -16.97 593.40 387.85 467.76 -21.17 20.60

iii) Performance Efficiency Index (PEI %):

For the month of Mar’13 Target to end of Mar’ 2013

Cumulative up to Mar’13

Pre. Yr Curr. Yr Pre. Yr Curr. Yr

44.81% 27.75% -- 48.68% 43.85%

iv) Punctuality:

Actual 2011-12

Target 2012-13

Cumulative up to Mar 12

Cumulative Target up to Mar 13

Actual for Mar 2013

Cumulative up to Mar 2013

95.7% 95% 95.7% 95.0% 98.8% 96.3%

v) Accidents:

Actual 2011-12 Cumulative up to Mar’13 For the month of Mar’13 Remarks

03 02 NIL

vi) Terminal Detentions:

Loading Rakes Avg. Detention Unloading Rakes Avg. Detention

Mar ‘13 113 23:38 Mar ‘13 28 23:08

Mar ‘12 98 24:18 Mar ‘12 47 23:23

vii) Scrap Disposal: (in MTs.)

viii) Staff surrenders:

Sanctioned Actual Surrenders

Actual for 2011-12

Target for 2012-13

For the month of Mar’13

Cum up to Mar’13

4669 3656 50 45 - 45

Item 2011-12 2012-13 Cum. up to Mar’13 For the month of Mar’13

Target for the year 9814 12,342 11,314 1029

Disposal for the year 10,042 7,902 718

Page 10: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

ix) Ticket Checking performance:

Particulars

For the month of Mar’13 Up to the month of Mar’13

Prop. Target

2011-12 2012-13 % Var. w.r.t. Pr.Yr

Prop. Target

2011-12 2012-13 % Var. w.r.t. Pr.Yr

Cases 16254 13245 21.361 61.27 195000 161447 190427 17.95

Amount

` in Lakhs 29.55 28.05 32.27 15.05 354.67 296.174 364.79 23.17

Others:

1. Surveillance Camera connectivity for PRS & UTS booking counters at Guntur station extended to the chambers of DRM & Sr.DCM through dedicated OFC Ethernet for monitoring.

2. Guntur Running Room was awarded Rly. Minister’s shield for Best Running Room, during the Rly. Week Awards Ceremony at New Delhi on 16th Apr’12.

3. FOIS was commissioned at NDL station on May’12. With this the total number of FOIS locations has gone up to 10 over the Division.

4. Tejaswini Squad was formed with a batch of 7 lady TTEs to conduct checks in on board trains over Guntur Division.

5. ‘Electrical Safety Week’ observed from 1st to 07th May’12 in the Division. Wide publicity was given at all the electrical depots, major stations of the Division by exhibiting Flexi banners on Electrical Safety and counselled the staff on the importance of Electrical Safety.

6. A full scale mock drill of ART/GNT and 140T BD Crane/BZA was conducted on coal loaded wagon bearing No.SE BOXN 1207061604(L) without any abnormality from 08.17 hrs to 14.00 hrs on 24th May’12 in which all concerned Officers and staff have participated.

7. Staff Grievances Redressal Camp was conducted on 19th June’12 at Nandyal station. A total of 52 grievances was registered, out of which 10 have been disposed off on the spot. The pending are targeted for disposal by 20th July’12. Such Camps will be held in all major stations.

8. From the month of June’12 onwards “Man/Woman of the month Award” has been introduced for those employees who have done exemplary work done connected with safety & train operations, innovations, savings and earnings during the month. A cash Award and certificate will be handed over to the concerned employees.

9. PRS facility was provided at Srisailam temple post office on 06th July’12. With this, there are total 05 numbers of PRS functioning at Post office on this Division.

10. Second siren motor erected on the top of portico of station building with 5HP capacity motor. With this the sound of siren will be audible to all concerned in emergency, which is an important safety requirement.

11. Mega Safety Seminar was conducted at Rail Mahal, Guntur on 22nd Aug’12 on safety issues related to various branches. CSO/SC was the Chief Guest for the Seminar. About 400 employees & officers participated.

12. A total of 63 wards of the employees who had opted for LARSGESS 2011 and January’12 have been appointed (60 trackmen in Civil Engineering Department, 01 Trolley man & 2 Khalasis in S&T Department).

Page 11: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

13. Increased the Speed limit of loop lines from 15 to 30 Kmph of the stations between NLPD-NDKD section w.e.f 21.09.12. It will help in improving the Punctuality of Passenger/Express trains.

14. Safety Drive was launched from 21st to 30th Sep’12 on opening of Relay Room and effective working of signals.

15. An Awareness camp was conducted on the occasion of “World Heart Day” at the Amaravathi Annexe, Rail Vikas Bhavan, Guntur on 28th Sep’12. The eminent cardiologists of Guntur, Sri Dr. Murali Babu Rao, Sri Dr. Michael and Smt. Dr. Sharmila, Physician explained about causes and preventive methods of Heart Diseases. Precautionary medical tests have been done to 156 employees attended the camp.

16. Work of second pit line at Guntur and Freight examination facility at Nallapadu has started.

17. Janpahad goods loading has commenced w.e.f 14th Oct’12. 4 cement rakes with 168 wagons weighing 10,668 tonnes were loaded by Deccan Cement Ltd, fetching a

freight earning of ` 1.82 cr to the Division.

18. ‘Touch Screen System’ is commissioned at Guntur Station for the facility of passengers for spot your train, PNR, Reservation Enquiry etc.

19. Payment of Imprest Cash through ATM cards was inaugurated by GM/SC on 18th Oct’12.

20. Computerised issue of passes has been inaugurated by DRM on 17th Oct’12.

21. Sending of SMS about passing of withdrawal of amount from PF of employees on their mobiles has been inaugurated by DRM on 19th Nov’12.

22. Group SMS solution has been implemented in Dec’12 at Control Office, Guntur in order to disseminate the information of unusual, accidents, failures, etc., in one click.

23. Smoke detector system provided at all three SSI Cabins of Nallapadu station.

24. ‘Child Care Assistance Booth’ first of its kind in the Zone, has been inaugurated at Guntur station on 26th January’13.

25. Speed on loop lines has been increased from 15 KMPH to 30 KMPH between PGDP-NDKD section excluding VNUP station w.e.f 26.01.13.

26. Washable Apron’ work of Plat No.5 of Guntur completed on 13th Jan’13

27. Commissioned Warning/Display systems for non-operation of points against occupied line at Nadikudi, Nagireddypalli, Nallagonda, Miryalaguda and Piduguralla stations.

28. New Running Room, Officers’ Rest House, TTE & Supervisors’ Rest House at Nandyal and Rest House for Track Machine Staff at Cumbum were inaugurated on 27th Feb’13. New AC Dormitory at Nandyal has also become operational.

29. A new Solar Powered ‘Medical Stores’ & a Canteen are opened on 20th Feb’13 in the premises of RH/GNT.

30. 24 RCC boxes have been put in for RUB at Kankaragunta ROB, Guntur.

31. Achieved highest ever originating loading & freight earning during the year 2012-13

i.e, 3.127 million tones/` 372.42 cr which surpasses the previous best of 3.103

million tones/ ` 298.17 cr respectively.

32. Best ever punctuality performance of 99.6% for Mail/Express was achieved during the month of March’13. Best ever punctuality performance of 95.5% (cumulative) for

Page 12: S ou th C en tr al R ilw yscr.indianrailways.gov.in/cris//uploads/files/...Train Indication Boards – 23 TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli,

Mail/Express trains was achieved and best ever punctuality performance of 97.1% (cumulative) for passenger trains was achieved.