MAANTEEAMET. SAAREMAA PÜSIÜHENDUS. URMAS KONSAP Europrogrammide osakonna juhataja. Saaremaa püsiühenduse arendamise hetkeseis Sõitjate ja veoste üle Suure väina veo perspektiivse korraldamise kava ja KSH Võtmeküsimused Mis edasi ?. LIIKLUS ÜLE SUURE VÄINA. - PowerPoint PPT Presentation
Citation preview
SAAREMAA PSIHENDUSURMAS KONSAPEuroprogrammide osakonna juhataja
Saaremaa psihenduse arendamise hetkeseisSitjate ja veoste le Suure vina veo perspektiivse korraldamise kava ja KSHVtmeksimusedMis edasi ?
LIIKLUS LE SUURE VINA2005 - 3200 reisijat ja 1170 sidukit pevas2000-2005 - liikluse kasv ~10 % aastas2006 - 3586 reisijat ja 1308 sidukit pevas2006/2005 reisijate kasv 5,8% ja sidukid 9.9%2006-2010 liikluse kasvu prognoos 5,5% aastasPeale psihenduse avamist liikluse kasv 25-28% (2233)
Chart1
117011701170
1640.9855249191529.1432074991423.483895808
1954.44001594691745.00642867171578.242040057
2071.70641690371823.53171796191633.480511459
2720.15052539462232.91458864431779.3503211322
3642.43176772092704.59614667712082.9964385696
4422.92654307172982.93032382022186.7859408008
4978.042790213104.04925651782230.8507722676
6794.35146265523955.4580441192635.0087155272
7501.51302011144157.22615711792701.5459875978
8282.27652045994369.28647166962769.7634091679
Optimistlik
Mdukas
Pessimistlik
AKPL
Liiklus le Suure vina
Graph
Aasta20052010201320142014202020252029203020352040
Optimistlik11701641195420722720364244234978679475028282
Mdukas11701529174518242233270529833104395541574369
Pessimistlik11701423157816331779208321872231263527022770
Graph
Optimistlik
Mdukas
Pessimistlik
AADT
Traffic Across Suur Strait
Central
Trafic growth rates
TrafficPer day
Central scenarioAADTGen growth2004378000Abolishing
YearTotalCars/vanBusesLorriesAVGfactor/yearCarsbusesLorries20053987901093
200511705.5%5.5%5.5%5.5%3780001.05
201015295.5%5.5%5.5%5.5%396900
201115984.5%4.5%4.0%4.5%365
201216704.5%4.5%4.0%4.5%1087.3972602745%
201317454.5%4.5%4.0%4.5%1141.7671232877
201418244.5%
Opening year 201422331960100172122.5%25.0%10.0%5.0%curiosity trips90
2015242321391041804.5%4.5%4.0%4.5%curiosity trips90
2016240521131071853.0%3.0%2.5%3.0%Negative curiosity trips 90
2017247721761101913.0%3.0%2.5%3.0%
2018255022411121973.0%3.0%2.5%3.0%
2019262623091152033.0%3.0%2.5%3.0%
2020270523781182093.0%3.0%2.5%3.0%
20212.0%2.0%1.5%2.0%
20222.0%2.0%1.5%2.0%
20232.0%2.0%1.5%2.0%
20242.0%2.0%1.5%2.0%
2025298326251272302.0%2.0%1.5%2.0%
20261.0%Commercial trips5%
20271.0%according to Hillar Varik about 5-6%
20281.0%
2029310427321322401.0%1.0%1.0%1.0%%5 more trip
Abolishing toll
20303955355115225230%15.0%5.0%Loading capacity rate avg55%
20311.0%
20321.0%
20331.0%
20341.0%
2035415737331602651.0%1.0%1.0%1.0%
20361.0%
20371.0%
20381.0%
20391.0%
2040436939231682781.0%1.0%1.0%1.0%
High
Trafic growth rates
TrafficPer day
High scenarioAADTGen growth2004378000Abolishing
YearTotalCars/vanBusesLorriesAVGfactor/yearCarsbusesLorries20053987901093
200511707.0%7.0%6.0%7.0%3780001.05
201016417.0%7.0%6.0%7.0%396900
201117396.0%6.0%6.0%7.0%365
201218446.0%6.0%6.0%7.0%1087.3972602745%
201319546.0%6.0%6.0%6.0%+10% cars1141.7671232877
201420726.0%6.0%6.0%6.0%
Opening year 201427202405119196131.3%35%15%5%Curiosity+5% cars
2015295526261242065.0%5.0%4.0%5.0%Curiosity100
2016300126571292165.0%5.0%4.0%5.0%-100
2017315027901342275.0%5.0%4.0%5.0%
2018330629291392385.0%5.0%4.0%5.0%
2019347030761452505.0%5.0%4.0%5.0%
2020364232291512625.0%5.0%4.0%5.0%
20214.0%4.0%3.0%4.0%
20224.0%4.0%3.0%4.0%
20234.0%4.0%3.0%4.0%
20244.0%4.0%3.0%4.0%
2025442339291753194.0%4.0%3.0%4.0%
20263.0%3.0%3.0%3.0%5%
20273.0%3.0%3.0%3.0%Commercial trips
20283.0%3.0%3.0%3.0%according to Hillar Varik about 5-6%
2029497844221973593.0%3.0%3.0%3.0%
Abolishing toll%5 more trip
20306794619122637740%15.0%5.0%55%
20312.0%Loading capacity rate avg
20322.0%
20332.0%
20342.0%
2035750268352504162.0%2.0%2.0%2.0%
20362.0%
20372.0%
20382.0%
20392.0%
2040828275472764602.0%
LOW
Trafic growth rates
TrafficPer day
LOW scenarioAADTGen growth2004378000Abolishing
YearTotalCars/vanBusesLorriesAVGfactor/yearCarsbusesLorries20053987901093
200511704.0%4.0%3.5%3.5%3780001.05
201014234.0%4.0%3.5%3.5%396900
201114733.5%3.5%3.0%3.5%365
201215253.5%3.5%3.0%3.5%1087.3972602745%
201315783.5%3.5%3.0%3.5%1141.7671232877
201416333.5%
Opening year 20141779154584150108.9%10%3%2%Curiosity80
201519211679871553.5%3.5%3.0%3.5%Curiosity80
201618891641881592.5%2.5%2.0%2.5%
201719361682901632.5%2.5%2.0%2.5%
201819841724921672.5%2.5%2.0%2.5%
201920331768941712.5%2.5%2.0%2.5%
202020831812961762.5%2.5%2.0%2.5%
20211.0%1.0%0.5%1.0%
20221.0%1.0%0.5%1.0%
20231.0%1.0%0.5%1.0%
20241.0%1.0%0.5%1.0%
202521871904981851.0%1.0%0.5%1.0%
20260.5%0.5%0.5%0.5%Commercial trips5%
20270.5%0.5%0.5%0.5%according to Hillar Varik about 5-6%
20280.5%0.5%0.5%0.5%
2029223119431001880.5%0.5%0.5%0.5%%5 more trip
Abolishing toll3.0%
20302635233111019420%10.0%3.0%Loading capacity rate avg55%
20310.5%
20320.5%
20330.5%
20340.5%
2035270223901131990.5%0.5%0.5%0.5%
20360.5%
20370.5%
20380.5%
20390.5%
2040277024501162040.5%0.5%0.5%0.5%
PSIHENDUSE VIMALUSED
MAJANDUSLIK- JA FINANTSANALSMajandusanals koostatud perioodile kuni 2040Eeldused:Ehitusperiood 2010 - 2013Keskmine letustasu tnastes hindades - 110 kr. siduauto kohta koos reisijategaPlaneeritav letustasu thistamine 2030
Majanduslik sisemine tasuvusmr: silla variantidel 5,8 - 7,1% tunneli variandil 1%
PSIHENDUSE MAKSUMUSED mln.kr.
Chart2
64.90242.322.602
66.245.620.6
79.849.130.7
81.153.227.9
108.56048.5
111.663.348.3
185.678.4107.2
194.793.5101.2
261.3111.6149.7
271.9123.2148.7
283.5129.5154
296136.1159.9
372.1143.1229
Kogukulu
Tulu piletimgist
Dotatsioon
Aasta
Mln EEK
Praamiliikluse kulud ja dotatsioon
Cantilever
Route III -bridgeCentral
Cantilever Bridge3660
Investment costMill. EEKCost factor1.000Ferry subs1.00
Bridge including appr.roads2,750
Factor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs2,770O&M
NPV,Inv-1,867Kmcauseways/ramps6.67km1200.6'000 EEK
Total length to drive10.2kmCosts732m EEK
O & M costs0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.5%1.5%1.5%1.5%1.5%1.5%
Rate of interets in calculations6.00%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-2,0190000-581,700-880,860-889,170-592,780
Residual value268.30000000000000000000000000000002062500
Operation & maintenance-116.500000000-8,889-8,889-8,889-8,889-8,889-8,889-8,889-8,889-8,889-8,889-8,889-18,979-18,979-18,979-18,979-18,979-18,979-18,979-18,979-18,979-18,979-29,069-29,069-29,069-29,069-29,069-29,069
Time savings1016.60000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-393.100000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261
Induced traffic
time savings148.50000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-39.000000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696
Externalities
Impact on accidents114.00000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles72.9000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,63810,63810,63810,63810,63810,63810,63810,63810,63810,638
CO219.9000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidies1112.400000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth127.80000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM
312.9
NPV312.90000-581,700-880,860-889,170-592,780157,061165,700172,904180,410188,238196,410251,207255,312259,592264,055268,711261,883266,231270,718275,349283,298306,642312,964319,475326,182333,090336,130343,458351,007358,782366,7902,506,626
EIRR7.0%
NPV bridge cost-1,867
Increasestraffic+income
4%5.5%
4%8.5%Economic growthEUREEK
3%6.0%GDP per capita, Estonia480073440per capita
2%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
1.58
3.9%
Increased traffic
growth 2005-2010
2011-20155.5%
2016-20204.5%
2021-20253.0%
2026-20302.0%
Cable Stayed_central
Route III -bridgeCentral
Cable Stayed Bridge3660
Investment costMill. EEKCost factor1.000Ferry subs1.00
Bridge including appr.roads2,860
Factor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs2,880O&M
NPV,Inv-1,943Kmcauseways/ramps6.67km1201'000 EEK
Total length to drive10.2kmCosts732m EEK
O & M costs0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%0.5%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.0%1.5%1.5%1.5%1.5%1.5%1.5%
Rate of interets in calculations6.00%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-2,0990000-604,800-915,840-924,480-616,320
Residual value279.10000000000000000000000000000002145000
Operation & maintenance-123.400000000-9,439-9,439-9,439-9,439-9,439-9,439-9,439-9,439-9,439-9,439-9,439-20,079-20,079-20,079-20,079-20,079-20,079-20,079-20,079-20,079-20,079-30,719-30,719-30,719-30,719-30,719-30,719
Time savings1016.60000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-393.100000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261-63,261
Induced traffic
time savings148.50000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-39.000000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696-5,696
Externalities
Impact on accidents114.00000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles72.9000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,63810,63810,63810,63810,63810,63810,63810,63810,63810,638
CO219.9000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidies1112.400000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth127.80000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM
236.6
0236.60000-604,800-915,840-924,480-616,320156,511165,150172,354179,860187,688195,860250,657254,762259,042263,505268,161260,783265,131269,618274,249282,198305,542311,864318,375325,082331,990334,480341,808349,357357,132365,1402,587,476
Interne Rente % p.a6.7%
NPV bridge cost-1,943
Increasestraffic+income
4%5.5%
4%8.5%Economic growthEUREEK
3%6.0%GDP per capita, Estonia480073440per capita
2%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
1.58
3.9%
Increased traffic
growth 2005-2010
2011-20155.5%
2016-20204.5%
2021-20253.0%
2026-20302.0%
&L&D&T&C&F
Tunnel_D&B
Tunnel, Drill & BlastCentral
Route III8520
Investment costMill. EEKCost factor1.000Ferry subs1.00
Tunnel, Drill & Blast5,520
Factor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs5,540O&M
NPV,Inv-3,752Kmcauseways/ramps3.5km630'000 EEK
Total length to drive10.0kmCosts284m EEK
O & M costs63.0%3.0%3.0%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%3.5%
Rate of interest in calculations10.0%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-3,1820000-1,163,400-1,761,720-1,778,340-1,185,560
Residual value147.30000000000000000000000000000004140000
Operation & maintenance-716.700000000-156,450-156,450-156,450-156,450-156,450-156,450-156,450-156,450-156,450-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630-182,630
Time savings486.00000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-194.900000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,893-64,532-65,178-65,829-66,488-67,153-67,824-68,502-69,187-69,879
Induced traffic
time savings69.70000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-19.600000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,753-5,810-5,868-5,927-5,986-6,046-6,107-6,168-6,229-6,292
Externalities
Impact on accidents56.80000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles36.6000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,74410,85210,96011,07011,18111,29311,40511,52011,63511,751
CO210.3000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidy552.800000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth57.60000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM-2696.5
'NPV-2696.50000-1,163,400-1,761,720-1,778,340-1,185,5609,50018,13925,34432,84940,67748,849103,647107,752112,03190,31594,97098,233102,580107,067111,698119,648142,992148,730154,652160,764167,071179,594186,310193,239200,389207,7664,424,464
IRR %0.9%
NPV bridge cost-3,182
increasetraffic
4%5.5%
4%8.5%Economic growthEUREEK
3%6.0%GDP per capita, Estonia480073440per capita
2%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
1.58
3.9%
5.5%
4.5%
3.0%
2.0%
1.0%
Tunnel_TBM
Tunnel, TBMCentral
Route III8575
Investment costMill. EEKCost factor1.000Ferry subs1.00
Tunnel, TBM6,120
Factor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs6,140O&M
NPV,Inv-5,185Kmcauseways/ramps4.4km792'000 EEK
Total length to drive10.0kmCosts343m EEK
O & M costs2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%
Rate of interest in calculations6.0%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-4,4750000-1,289,400-1,952,520-1,970,940-1,313,960
Residual value597.20000000000000000000000000000004590000
Operation & maintenance-1306.600000000-143,633-143,633-143,633-143,633-143,633-143,633-143,633-143,633-143,633-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518-172,518
Time savings1016.60000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-398.700000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,893-64,532-65,178-65,829-66,488-67,153-67,824-68,502-69,187-69,879
Induced traffic
time savings148.50000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-39.500000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,753-5,810-5,868-5,927-5,986-6,046-6,107-6,168-6,229-6,292
Externalities
Impact on accidents114.00000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles73.9000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,74410,85210,96011,07011,18111,29311,40511,52011,63511,751
CO219.9000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidy1112.400000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth127.80000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM-3009.8
'NPV-3009.80000-1,289,400-1,952,520-1,970,940-1,313,96022,31730,95638,16145,66653,49461,666116,464120,569124,848100,427105,082108,345112,692117,179121,810129,760153,104158,842164,764170,876177,183189,706196,422203,351210,501217,8784,884,576
IRR %0.9%
NPV bridge cost-4,475
increasetraffic
4%5.5%
4%8.5%Economic growthEUREEK
3%6.0%GDP per capita, Estonia480073440per capita
2%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
1.58
3.9%
5.5%
4.5%
3.0%
2.0%
1.0%
D&B_short
Tunnel, Drill & Blast, shortCentral
Route III
Investment costMill. EEKCost factor1.000
Tunnel, Drill & Blast4,888
SHORT Tunnel1kmFactor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs4,908
Total length to drive10.0km
O & M costs2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%
Rate of interest in calculations6.0%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-3,3670000-981,600-1,472,400-1,472,400-981,600
Residual value477.00000000000000000000000000000003666000
Operation & maintenance-1111.100000000-122,200-122,200-122,200-122,200-122,200-122,200-122,200-122,200-122,200-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640-146,640
Time savings1016.60000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-398.700000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,893-64,532-65,178-65,829-66,488-67,153-67,824-68,502-69,187-69,879
Induced traffic
time savings148.50000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-39.500000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,753-5,810-5,868-5,927-5,986-6,046-6,107-6,168-6,229-6,292
Externalities
Impact on accidents114.00000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles73.9000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,74410,85210,96011,07011,18111,29311,40511,52011,63511,751
CO219.9000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidy1112.400000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth127.80000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM-1825.9
'NPV-1825.90000-981,600-1,472,400-1,472,400-981,60043,75052,38959,59467,09974,92783,099137,897142,002146,281126,305130,960134,223138,570143,057147,688155,638178,982184,720190,642196,754203,061215,584222,300229,229236,379243,7563,986,454
IRR %2.1%
NPV bridge cost-3,367
Real salaryincreasetraffic
growth 2005-20104%5.5%
2011-20154%8.5%Economic growthEUREEK
2016-20203%6.0%GDP per capita, Estonia480073440per capita
2021-20302%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
Beregnet stigning1.58
gns rlig3.9%
Increased traffic
growth 2005-2010
2011-20155.5%
2016-20204.5%
2021-20253.0%
2026-20302.0%
2031-20401.0%
TBM_short
Tunnel, TBM, shortCentral
Route III
Investment costMill. EEKCost factor1.000
Tunnel, Drill & Blast5,280
1kmFactor1.15
Toll station2040.3m EURtime savings1.0
Total inv. costs5,300O&M
6.67km1200.6'000 EEK
Total length to drive10.0km732m EEK
O & M costs2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%2.5%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%3.0%
Rate of interets in calculations6.0%
NPV mill EEK20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
Total investment cost-3,6350000-1,060,000-1,590,000-1,590,000-1,060,000
Residual value515.20000000000000000000000000000003960000
Operation & maintenance-1200.200000000-132,000-132,000-132,000-132,000-132,000-132,000-132,000-132,000-132,000-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400-158,400
Time savings1016.60000000072,79278,97983,71888,74194,06699,710105,692108,863112,129115,493118,957122,526126,202129,988133,888137,904163,348168,248173,295178,494183,849189,365195,046200,897206,924213,132219,525
add km -cost-398.700000000-33,003-34,488-36,040-37,662-39,357-41,128-42,978-44,268-45,596-46,964-48,373-49,824-50,820-51,837-52,873-53,931-63,261-63,893-64,532-65,178-65,829-66,488-67,153-67,824-68,502-69,187-69,879
Induced traffic
time savings148.50000000090609,83010,66511,57212,55613,62314,44015,30716,22517,19918,23018,77719,34119,92120,51924,30425,03325,78426,55827,35528,17529,02129,89130,78831,71232,66333,643
add km cost-39.500000000-3417-3,571-3,732-3,900-4,075-4,258-4,450-4,584-4,721-4,863-5,009-5,159-5,262-5,367-5,475-5,584-5,696-5,753-5,810-5,868-5,927-5,986-6,046-6,107-6,168-6,229-6,292
Externalities
Impact on accidents114.00000000010,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,89416,89416,89416,89416,89416,89416,89416,89416,89416,89416,894
CO, Nox, particles73.9000000006,3826,6706,9707,2837,6117,9548,3118,5618,8189,0829,3559,6359,82810,02410,22510,42910,63810,74410,85210,96011,07011,18111,29311,40511,52011,63511,751
CO219.9000000002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,4002,400
Saved ferry subsidy1112.400000000101,209101,209101,209101,209101,209101,209149,709149,709149,709149,709149,709148,662148,662148,662148,662148,662153,923153,923153,923153,923153,923159,938159,938159,938159,938159,938229,02600000
Expected additional ec. growth127.80000000002,7175,4358,15210,86913,58614,40215,26616,18217,15318,18219,27319,85120,44621,06021,69122,34223,01223,70324,41425,14625,90126,67827,47828,30229,15130,026
SUM-2145.6
'NPV-2145.60000-1,060,000-1,590,000-1,590,000-1,060,00033,95042,58949,79457,29965,12773,299128,097132,202136,481114,545119,200122,463126,810131,297135,928143,878167,222172,960178,882184,994191,301203,824210,540217,469224,619231,9964,268,694
IRR %1.7%
NPV construc. cost-3,635
Real salaryincreasetraffic
growth 2005-20104%5.5%
2011-20154%8.5%Economic growthEUREEK
2016-20203%6.0%GDP per capita, Estonia480073440per capita
2021-20302%3.00%In Saaremaa
3700027172801000 EEK0
0.5%ekstra135861000 EEK
Beregnet stigning1.58
gns rlig3.9%
Increased traffic
growth 2005-2010
2011-20155.5%
2016-20204.5%
2021-20253.0%
2026-20302.0%
2031-20401.0%
Time_savings
Unit costs , based on
EEK
2003200420052006-10
GDP real growth5.0%5.0%5.0%5.0%
persons/vehicl
Time valuesCarsvansbusestrucks
Pass/vehicle2.51.8251.3
Avg/vehicle55.689.8682.3164HUSK waiting time factor 1.2!!!
Per hours commercial89
Per hours com 2014126.3
Hourly cost, 20057500EEK/month
Per hour 200546.9EEK per hr
Per hour 201466.7
all trips 200515.6EEK per hr
all trips 201422.2
Cars/vansBusesLorries
Distribution of vehiclesYear 201688%0%4%8%Check,sum615,722incl 5% com trips
AADT 20131745153607014017451687per day
Savings per per tripminutes
Existing crossing time353535Waiting time factor1.2
waiting time25
Summer, waiting502732all year
non-summer3525
Pct.
Distribution of traffic
Summer, waiting
non-summer
Driving time, bridge+ extra rd112014 values
Time savings incl.fact.1.2Distrib'000 EEKper vehicper yearInduced42
Carsminutes000 EEK
Summer8450%21814EEKtraffic x0.533
Non-summer6650%171391000 EEKAVG75
Cars all trips one year3895369.538,9538,972
Time savings buses56.4100%16339641.316,33957
Time savings trucks62.4100%8701170.88,70130
Value of timesavings all vehicles63,9939060
2014 level
Induced traffic
per hourPer vehicper year
Capcity cost buses per hour56.4106992,529
capacity cost lorries per hour62.41181236,270
8,799
Saved time and capacity cost72,792
waiting_time
Virtsu -KuivastuAvg
Waiting timeSummer weekendsbookedunbooked
Waiting time30125
Crossing time =waiting time + 35 minutesTransfer time3535
Main flow105Total time65160
Minor flow6570%30%Total
CarsAVG45.54893.5
Number of vehicles/day18001600
Directional flow75%25%
AVG crossing+ waiting time95
Ferry time35
summerWeekendsnormal daysAVGWaiting time40%
Cars95758550
buses70606530
other75657035
Non-summer monthsmin
Weekendsnormal daysAVGWaiting time60%
Cars75657035
buses65556025
lorries70606530
Capacity cost
Kilometr cost, 2003,EEK/km
IRISAPAVAAB (bus??)AR (Trucks??)
mm/mCarTimeTotalVehicleTimeTotalVehicleTimeTotalTime cost driver
13.130.083.2111.451.1412.5916.070.7716.8437.5
23.140.083.2211.471.1412.6116.140.7716.9140000km /year
33.150.083.2311.571.1412.7116.30.7817.0820Capacity cost
43.270.093.3612.321.1413.4617.30.7818.08
53.390.093.4813.061.1514.2118.280.7919.07
63.520.093.6113.721.1814.919.130.8219.95Bus cost EEK
73.660.093.7514.331.2415.5719.910.8820.79New bus1,500,00013years
83.80.13.914.911.3216.2320.680.9821.66-211,1681 year
106EEK per hpur
LorryLorry
1,800,00015years
-236,6531 year
118EEK per hpur
Discription of vehickles
SAPAVehickles less 6 m
Cars and vans 94%
Small buses 2,5%
Small lorries 3,5%
VAABVehickles 6-12 m
Lorries 77%
Buses 23%
ARVehickles over 12 m
Lorries or car trains 95%
Big buses 5%
Capacity cost
3.2112.5916.84
3.2212.6116.91
3.2312.7117.08
3.3613.4618.08
3.4814.2119.07
3.6114.919.95
3.7515.5720.79
3.916.2321.66
SAPA
VAAB (bus??)
AR (Trucks??)
IRI, mm/m
kr.-/km
Add_km
Year 2014 figures
EEK 1000per vehicInduced
Km extraBridgeLand sideTotal1000 EEKekstra km cost
6.503.7010.201000 EEK
Vehicles1536
Km cost, cars3.520,01013.033,001
Buses70
Km cost, buses14.03,63852.12181.91
Lorries140
Km cost, lorries18.09,35567.01233.88
Total ekstra cost for additional km33,0033,417
Excluding time
Capacity cost
Excl drivers time
Driver time cost
+ capacity cost
Source: VOC data from Technical Centre
Traffic_growth
Yearly traffic growth rates
88%4%8%Distribution 2016
Traffic240521131071857Per day
Central scenarioAADTCars/vanBusesLorriesGnsGen growth2004378000Abolishing
YearTotal86%5%9%factor/yearCarsbusestrucks20053987901093
200511705.5%5.5%5.5%5.5%
201015295.5%5.5%5.5%5.5%
201115984.5%4.5%4.0%4.5%
201216704.5%4.5%4.0%4.5%5%
201317454.5%4.5%4.0%4.5%AHAA effekt+10% cars
201418244.5%
Op effect201422331960100172122.5%25.0%10.0%5.0%curiosity trips90
2015242321391041804.5%4.5%4.0%4.5%curiosity trips90
2016240521131071853.0%3.0%2.5%3.0%Negative curiosity trips 90
2017247721761101913.0%3.0%2.5%3.0%
2018255022411121973.0%3.0%2.5%3.0%
2019262623091152033.0%3.0%2.5%3.0%
2020270523781182093.0%3.0%2.5%3.0%
20212.0%2.0%1.5%2.0%
20222.0%2.0%1.5%2.0%
20232.0%2.0%1.5%2.0%
20242.0%2.0%1.5%2.0%
2025298326251272302.0%2.0%1.5%2.0%298301.10408080322.00%
20261.0%Commercial trips5%
20271.0%according to Hillar Varik about 5-6%
20281.0%
2029310427321322401.0%1.0%1.0%1.0%%5 more trip
Abolishing toll
2030395535511522521.0%30%15.0%5.0%Loading capacity rate avg55%
20311.0%
20321.0%
20331.0%
20341.0%
20351.0%
20361.0%
20371.0%
20381.0%
20391.0%
2040436939231682781.0%
&L&F&D
Accidents
1000 EEK200320052006200720082009201020112012201320142015201620172018201920202021202220232024202520262027202820292030
Cost per fatality14,40814,84015,28515,74416,21616,70317,20417,72018,25218,79919,36319,94420,54221,15921,79322,44723,12123,81424,52925,26526,02226,80327,60728,43529,28830,167
Benefits0.568068.488,3118,5608,8179,0819,3549,6349,92310,22110,52810,84311,16911,50411,84912,20412,57012,94813,33613,73614,14814,57315,01015,46015,92416,40216,894
Cost serious injured
Antal0.700.500.520.530.550.560.580.600.610.500.500.500.500.500.510.520.530.540.550.570.580.6
vkst3.0%
Value of saved acc0.011,3518,3518,8609,4009,97210,57911,22411,90712,63210,57910,89711,22411,56011,90712,51013,13813,79214,47415,18416,20816,98718,100
Uheld 20080.3
Unit_costs
Unit cost , based on
2003200420052006-10
GDP real growth5.0%5.0%5.0%5.0%
persons/vehicl
Time valuesCarsvansbusestrucks
Pass/vehicle2.51.7251.6
Avg/vehicle39.149.9453.099.75
Per hours commercial62
Other trips22.2
Hourly cost7500EEK/month
Per hour46.875
all trips15.6EEK per hr2005 level
all trips 2014 level22.2EEK per hr
In 2005 level
In 2010 level0.00
Beregning0.001.7926.250.00
Km omk, 20031.891.553.011.94
Km omk, 20051.981.633.162.04
Graph
Year2000200120022003200520062010201420202025203020352040
Total cost64.966.279.881.1108.5111.6185.6194.7261.3271.9283.5296.0372.1
Ticket income42.345.649.153.260.063.378.493.5111.6123.2129.5136.1143.1
Subsidy22.620.630.727.948.548.3107.2101.2149.7148.7154.0159.9229.0
Graph
00
00
00
00
00
00
00
00
00
Ticket income
Subsidy
Graph2
Year2000200120022003200520062010201420202025203020352040
Kogukulu64.966.279.881.1108.5111.6185.6194.7261.3271.9283.5296.0372.1
Tulu piletimgist42.345.649.153.260.063.378.493.5111.6123.2129.5136.1143.1
Dotatsioon22.620.630.727.948.548.3107.2101.2149.7148.7154.0159.9229.0
Graph2
000
000
000
000
000
000
000
000
000
000
000
000
000
Kogukulu
Tulu piletimgist
Dotatsioon
Year
Mill. EEK
Ferry Cost and Subsidy
Ferry cost_sub
Ferry cost MediumC.
1000 EEK
1998199920002001200220032005 Est.20062010201420202025203020352040
3 ferries4 ferries5 ferries
Cost46,53856,37564,90266,22779,84381,113101,391
here off fuel19%11,86210,98313,85726,40027,72037,06338,56845,03547,33249,74752,28460,446
Repair cost12%12,16712,16718,25018,25024,27324,27324,27324,27330,341
Salaries and admin cost incl soc tax26%26,36227,68044,74852,34979,48587,75896,892106,977141,733
Port fees15%15,20915,66530,08030,08030,08030,08030,08030,08030,080
Insurance3%3,0423,0424,5634,5636,0686,0686,0686,0687,585
Depreciation and lease20%20,27820,27843,27843,27866,27866,27866,27866,27889,278
Other5%5,0705,0707,6047,60410,11410,11410,11410,11412,642
100%
Total cost46,53856,37564,90266,22779,84381,113108,527111,621185,586194,692261,333271,903283,452296,074372,106
Piletitulu3279335,54042,33745,58849,09553,23359,98063,27978,39193,483111,624123,242129,528136,136143,080
Dotatsioon13,74520,83522,56520,63930,74827,88048,54748,342107,195101,209149,709148,662153,923159,938229,026
Subsidy as percentage of total cost30%37%35%31%39%34%45%43%58%52%57%55%54%54%62%
Vehicles per year excluding commercial trips 1)273,000283,400285,853307,733349,242357,004398,577420,499520,924621,212741,759818,962860,737904,644950,790
AADT, on scheduled trips748776783843957978109211521427170220322244235824782605
AVG cost per vehicle EEK170199227215229227272265356313352332329327391
AVG income per vehicle EEK120125148148141149150150150150150150150150150
Subsidy per vehicle, EEK507479678878122115206163202182179177241
Growth factor, revenue
2005-20105.50%
2011-20154.50%Note: the number of trips included commercial trips. The number of vehicle crossing on the scheduled trips is about 5% lower.
2016-20203.00%The subsidy is based on scheduled trips.
2021-20252.00%Year
2026-20401.00%20062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040
NPV total cost200000000195204213223234245261264267269272272275277280283283286289292295296299302305308372
Interest rate6%2,264
NPV(ferry cost)2014-20202021-20302031-2040
Growth factors2005-20102010-20152015-20202020-20252025-2030Average growth in ferry cost4.7%1.0%1.0%
vehicle %0.0550.0450.030.010.01
Ticket income00000
Capacity increase compared to 20032000
Ilmar Pihlak
Cost:
Salaries54967223.2258520912
Social tax18142384.0850974697
Fuel695013857
Repair cost546710359.6416687697
Port fee755114308.6984161112
Insurance10211934.7346156601
Other expenss600711382.9097319004
Amortisation849116089.9428223018
Finance exp2769
Finance result-2762
Operating cost4280477540.2382043042
Factor from
Cost escalating factors1998199920002001200220031998-2003
General1.31426962370.090.0430.0530.0580.0440.0241.3142696237
Salaries1.89494085760.150.0860.1140.1270.1140.1071.8949408576
Fuel
&LFerry_cost
Ferry cost NPV
Ferry cost
1000 EEK
2005 Est.200620062007200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040204120422043
2 ferries3 feries4 feries5 ferriesPct.
Cost101,391
here off fuel21,00022,982
Repair cost12,16715,437
Salaries and admin costincl soc tax26,36234,600
Port fees15,20920,532
Insurance3,0424,563
Depreciation and lease20,27828,243
Other5,0706,337
185,586190,226194,982199,856
Total cost103,127132,69200000000194,692199,559204,548209,662214,904220,276261,333263,947266,586269,252271,944271,903274,622277,369280,142282,944283,452286,286289,149292,041294,961296,074299,035302,025305,045308,096372,106375,827379,586383,381
Increase
AVG annual increase
Annual growth in total cost without an extra ferry2.50%
Annual growth in total cost without an extra ferry1%
NPV total cost2,102bn EEK
Interest rate6%
Growth factors
vehicle %
Ticket income
Capacity increase compared to 2003
Ticket income
Ticket income
EEK*+ ResAVG totalDistribReduced fares 50%
Cars 2.5 persons1705018085%153136.1723%
Buses 217307305%36.532.485
lorry small155601674%6.686.68
lorry huge 11m3501653836%22.9822.98
219.16198.315
Income from tickets
2004based on report to the ministryNumber of
Tick pass+ vehiclesBooking feesTotalvehiclesAVG income
per vehicle
1. quarter6766523728958023125.6225979353
2. quarter1472979315522101252153.3006755422
3. quarter 1-32059197521566135742158.8749244891
4. quarter9255599.19854.182781119.0381850908
54231377798143.5452278731
5.5%57,214commercial trips
+2004>200560,0752005 ticekt income
Source: Info from Shipping company to MoEAC5%
5.5%
54,231
57,214
Ticket incomefor 2005 of 59980EEK has been based on unit income of 150EEK per vehicle
Environment
Saaremaa
Environmental aspectsAntaget rlig vkst1.8%jf. Ngletals katalog side 5
Savings
quantitiesVrdiVrdiTrafikarb.410362km
201420162017201820192020202120222023202420252026202720282029203020052003Vrdi r 2018
Changes per yearper enhedper enhed
CO20000000000000000135.2130kr/ton04,493,464kr34565tons CO2
Omkostning, 1000 kr.Value/tonnes0.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0
EEK
CO, tons28474747460.1300000000000-0.4914.714kr/ton-2122.88
Nox, tons30,000210209207.91206.870.000.000.000.000.000.000.000.000.000.000.000.001560015000kr/ton0
SO2, tons68,0000.010.013536034000kr/ton-204
Partikler3,00027-0.05-0.041569.361509kr/ton78
88.37107.1
Value of CO, Nox, HC particles6,3823,2603,2433,2270000000000000
in 1000 EEK
r 2005r 2003
02423210000000000006345058871per SBT0
0
01,5231,4591,3320000000000000
18
per year
per triptonnes
Fuel emissionsgram11000Saved
Stigning i emissioner per dgnNOX20000220209.87I alt0
Beregnet gns rlig stigningHC140015.413.83
2008- 201820082018CO50005547.09ADT 20142100
Particles250027.527.00Per yeartonnes
Stigning0.00Nox/kmHC/kmCO/kmParticles/kmNoxHCCOParticles
Beregnet stigning0.95Diesel lorries8.001.25.000.505.520.833.450.34
gns rlig-0.5%Diesel buses8.001.104.000.363.070.421.530.14
Cars gasoline0.200.050.501.170.292.910.00
cars diesel0.500.040.020.020.380.030.020.02
2018-203010.131.577.910.50
Stigning1.2119497567
Beregnet stigning1.21
gns rlig1.6%
Stj -SBT
Beregnet gns rlig stigning
2008- 201820082018
Stigning0.00
Beregnet stigning1.22
gns rlig2.0%
2018-2030
Stigning0.00
Beregnet stigning2.25
gns rlig7.0%
TAGASIMAKSMISAASTAVLA TAGASIMAKSEPERIOOD RIIKLIK TOETUSmln. kr.
PSIHENDUSE KESKKONNAMJUlindudele ja Vinamere looduskaitsealadele sh Natura 2000 aladeleSuure vina veevahetuselemereelustikule - kalad (eriti rnne) ja hlged
kaldaprotsessidele ehitusaegsed mjud psihenduse kasutamisaegsed sotsiaalsed ja kultuurilised mjud
Sgis 2005 - Saaremaa psihenduse finants- majanduslikud ja keskkonnaalased uuringud 10.03.06 - VV korraldus nr.170 Sitjate ja veoste le Suure vina veo perspektiivse korraldamise kava koostamiseks ja KSH lbiviimiseks04.09.06 - MKM kskkiri Kava KSH algatamise kohta Nov-dets.06 - Asutuste ja organisatsioonide seisukohad KSH programmi kohtaJaan-veebr.2007 - KSH programmi avalikustamine Veebr.2007 - KSH programmi tiendamine
Sitjate ja veoste le suure vina veo perspektiivse korraldamise kavaEESMRK - vrrelda erinevaid liiklusviise le Suure vina ja hinnata nende majanduslikke, sotsiaalseid, kultuurilisi ja keskkonnamjusid ning vlja selgitada sobivaim liiklushendusviis koos rahastamisskeemiga
Sitjate ja veoste le suure vina veo perspektiivse korraldamise kavaKava iguslik staatusAnalsitakse olemasolevat olukordaLiikluse prognoosTeiste maade kogemusedErinevate Suure vina letusvimaluste kirjeldusTranspordivoo mju regiooni looduslikele. sotsiaalsetele, majanduslikele ja kultuurilistele aspektideleLiiklushendusviiside mju mbritsevale keskkonnaleRakendusplaan sh. meetmed. ressursid, juhtimisstruktuur
KSH PROGRAMMKSH eesmrgiks on Kava elluviimisega kaasnevate keskkonnamjude prognoosimine ja hindamine, alternatiivide kirjeldamine ja hindamine, positiivsete mjude (hinnatavate alternatiivide eeliste) vljatoomine ning vimalike negatiivsete mjude vltimise ja leevendamise meetmete kavandamine, et tagada keskkonnakaalutluste integreerimine Kavasse.
VTMEKSIMUSEDLooduskeskkond - Natura 2000 ala ? - Kuidas kaitsta mjualal esinevaid EL Nukogu direktiivi 92/43/EM looduslike elupaikade ning loodusliku taimestiku ja loomastiku kaitse kohta thenduses esmathtsaid looduslikke elupaigatpe ja esmathtsaid liike ? - Milline on Muhu ja Saaremaa looduskeskkonna koormustaluvus ?
VTMEKSIMUSEDMillised on sotsiaalsed ja kultuurilised mjud? sh: - elutingimustele ? - rahvastiku arengule ?
JRGNEVAD TEGEVUSEDKSH programmi tiendamine - 02/07KSH programmi heakskiitmine KKM poolt - 03/07 Kava koostamise ja KSH riigihange - 03/07Kava koostamine ja KSH lbiviimine - 07/07-07/08Kava kinnitamine VV poolt - 09/08vs