7
ANALISIS PENGARUH POLA RANGKAIAN PELEDAKAN TERHADAP TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) PADA PT. CIPTA KRIDATAMA JOBSITE PT. MULTI HARAPAN UTAMA, KABUPATEN KUTAI KARTANEGARA, KALIMANTAN TIMUR PROPOSAL PENELITIAN Oleh : M.DISTYAN AFRIWIJYA 112.13.0142

Sampul Proposal Ian Mppi

Embed Size (px)

DESCRIPTION

SA

Citation preview

Page 1: Sampul Proposal Ian Mppi

ANALISIS PENGARUH POLA RANGKAIAN PELEDAKAN TERHADAP TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) PADA PT. CIPTA KRIDATAMA

JOBSITE PT. MULTI HARAPAN UTAMA, KABUPATEN KUTAI KARTANEGARA, KALIMANTAN TIMUR

PROPOSAL PENELITIAN

Oleh :

M.DISTYAN AFRIWIJYA

112.13.0142

JURUSAN TEKNIK PERTAMBANGANFAKULTAS TEKNOLOGI MINERAL

UNIVERSITAS PEMBANGUNAN NASIONA“VETERAN”YOGYAKARTA

Page 2: Sampul Proposal Ian Mppi

2015ANALISIS PENGARUH POLA RANGKAIAN PELEDAKAN

TERHADAP TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) PADA PT. CIPTA KRIDATAMA

JOBSITE PT. MULTI HARAPAN UTAMA, KABUPATEN KUTAI KARTANEGARA, KALIMANTAN TIMUR

Oleh :

M.DISTYAN AFRIWIJYA

112.13.0142

Disetujui Untuk

Program Studi Teknik Pertambangan

Fakultas Teknologi Mineral

Universitas Pembangunan Nasional “Veteran” Yogyakarta

Tanggal : .........................

Pembimbing I, Pembimbing II,

Page 3: Sampul Proposal Ian Mppi

(NamadanGelar) (NamadanGelar)

DAFTAR ISI

Halaman

LEMBAR PENGESAHAN................................................................................ii

DAFTAR ISI.......................................................................................................iii

BAB

I. PENDAHULUUAN..................................................................................1

I.1 Latar Belakang.....................................................................................1I.2 Rumusan Masalah................................................................................1I.3 Tujuan Penelitian.................................................................................12I.4 Batasan Masalah..................................................................................13

II. METODOLOGI PENELITIAN.......................................................................................15

II.1DasarTeori...........................................................................................15II.1.1 Pola Pemboran .......................................................................15II.1.2 Pola Peledakan .......................................................................15II.1.3 Geometri Peledakan ...............................................................15II.1.4 Getaran dan Gelombang ........................................................15II.1.5 Getaran Tanah (Ground Vibration)........................................15II.1.6 Gelombang .............................................................................15II.1.7 Kontrol Vibrasi ......................................................................15II.1.8 Standart Vibrasi .....................................................................15

II.2TeknikPengambilan Data.....................................................................15II.2.1 Metode Langsung ( Primer ) .................................................15II.2.2 Metode Tidak Langsung ( Sekunder ) ...................................15

III. RENCANA PENYELESAIAN MASALAH ............................................15

III.1............................................................................................................Pengolahan Data ....................................................................................15III.1.1 Geometri Peledakan ...............................................................15III.1.2 Pola Rangkaian Peledakan .....................................................15

III.2............................................................................................................Analisa Data ..........................................................................................15

III.3............................................................................................................Re

ncana Jadwal Penelitian ......................................................................15

DAFTAR PUSTAKA.........................................................................................iv

Page 4: Sampul Proposal Ian Mppi

LAMPIRAN

BAB IV

DAFTAR PUSTAKA

1. Anonim, 2004, Pengukuran Vibrasi Peledakan, PAMA Persada Nusantara: Banjarmasin

2. BadanStandarisasi Nasional Nomor SNI 7571:2010, Baku tingkat getaran peledakan pada kegiatan tambang terbuka terhadap bangunan,

3. Baku Tingkat Getaran, KeputusanMenteri Negara LingkunganHidup No: Kep- 49/MENLH/11/1996.

4. Balfas, M.D. 2011. Buku Panduan Skripsi/Tugas Akhir, Seminar, dan Praktek Kerja Lapangan. Universitas Mulawarman, Samarinda

5. Mostafa Mohamed, 2010, Vibration Control, ISBN: 978-953-307-117-6, InTech, Available from: http://www.intechopen.com/books/vibration-control/vibration- control.

6. Pusdiklat TMB. 2004. Modul Juru Ledak kelas II. Bandung: DISTAMBEN RI

7. ReviaOktaviani. 2006. Jurnal Ground Vibration. ATVINDO: Samarinda. 8. ReviaOktaviani. 2012. Jurnal Analisis Uj iGetaran Peledakan Pada

Tambang. UNMUL: Samarinda. 9. SilitongaMartahan, 1997, Teknik Peledakan, Pusat Penelitian dan

Pengembangan Teknologi Mineral: Bandung. 10. Wandaris David, P, 1996, Analisis Tingkat GetaranBumi, JurusanTeknik

Pertambangan, ITB: Bandung.