    REPUBLIK INDONESIAKEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

    DIREKTORAT JENDERAL BINA MARGAULP KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

    WILAYAH SULAWESI UTARAKELOMPOK KERJA PENGADAAN BARANG/JASA PEMERINTAH

    DOKUMEN PENGADAAN

    PAKET PEKERJAAN :

    PELEBARAN JALAN MANADO BYPASS

    (WINANGUN-MAUMBI) (MYC) 

    SUMBER DANA : APBN

    TAHUN ANGGARAN 2016

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    2/243

     

    DOKUMEN PENGADAAN

    PEKERJAAN KONSTRUKSI PASCA KUALIFIKASI

    KONTRAK HARGA SATUAN

    UNTUK KONTRAK TAHUN JAMAK

    Nomor: 199/Pokja Wil I-Sulut/APBN/2016 

    Tanggal: 1 April 2016 

    PAKET PEKERJAAN : PELEBARAN JALAN MANADO BYPASS

    (WINANGUN-MAUMBI) (MYC) 

    SUMBER DANA : APBN

    TAHUN ANGGARAN : 2016 

    PROPINSI : SULAWESI UTARA

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    3/243

     

    DOKUMEN PENGADAAN PEKERJAAN KONSTRUKSI

    PELELANGAN UMUM PASCAKUALIFIKASI, KONTRAK HARGA SATUAN

    Nomor: 199/Pokja Wil I-Sulut/APBN/2016

    Tanggal: 1 April 2016 

    Pengadaan Paket :

    PELEBARAN JALAN MANADO BYPASS

    (WINANGUN-MAUMBI) (MYC) 

    Kelompok Kerja Unit Layanan Pengadaan: Balai Pelaksanaan Jalan Nasional XI

     

    Satuan Kerja Pelaksanaan Jalan Nasional Wilayah I Provinsi Sulawesi Utara

    Tahun Anggaran: 2016

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    4/243

     

    DAFTAR ISI

    A D D E N D U M I ............................ ........................... ......... ERROR! BOOKMARK NOT DEFINED. 

    DOKUMEN PENGADAAN................................................... ........................... ............................ ...... 1 

    DAFTAR ISI ....................................................................................................................................... I 

    BAB I UMUM .................................................................................................................................. 1 

    BAB II  ........................................................................................................................................... 6 

    INSTRUKSI KEPADA PESERTA (IKP) ........................... ............................ ........................ 6 

    A. UMUM  ...................................................................................................................................... 6 

    1.  L INGKUP PEKERJAAN ................................................................................................................6 

    2.  SUMBER DANA............................................................................................................................6 3.  PESERTA .......................................................................................................................................6 

    4.  L ARANGAN KORUPSI,  KOLUSI,  DAN NEPOTISME (KKN),  PENYALAH-GUNAAN

    WEWENANG SERTA PENIPUAN ................................................................................................8 5.  L ARANGAN PERTENTANG-AN KEPENTINGAN ........................................................................9 

    6.  ALIH PENGALAMAN DAN PENDAYA-GUNAAN PRODUKSI DALAM NEGERI .................. 10 

    7.  SATU PENAWARAN T IAP PESERTA ....................................................................................... 12 B. DOKUMEN PENGADAAN ............................. ........................... ............................ ............. 12 

    8.  PENGAMBIL -AN DOKUMEN PENGADAAN ........................................................................... 12 9.  ISI DOKUMEN PENGADAAN PEKERJAAN KONSTRUKSI ................................................... 12 10.  BAHASA DOKUMEN PENGADAAN ......................................................................................... 14 

    11.  PEMBERIAN PENJELASAN ...................................................................................................... 14 12.  PERUBAHAN DOKUMEN PENGADAAN ................................................................................. 17 13.   T AMBAHAN WAKTU PEMASUKAN DOKUMEN PENAWARAN ............................................ 17 

    C. PENYIAPAN DOKUMEN PENAWARAN .......................... ............................ ................. 17 

    14.  BIAYA DALAM PENYIAPAN PENAWARAN .............................................................................. 17 

    15.  BAHASA PENAWARAN ............................................................................................................. 17 

    16.  DOKUMEN PENAWARAN ......................................................................................................... 18 17.  HARGA PENAWARAN ............................................................................................................... 18 

    18.  MATA UANG PENAWARAN DAN CARA PEMBAYAR-AN ..................................................... 19 19.  MASA BERLAKU PENAWARAN............................................................................................... 19 20.  BENTUK DOKUMEN PENAWARAN ........................................................................................ 20 21.  PAKTA INTEGRITAS .................................................................................................................. 20 

    22.  PENGISIAN DATA KUALIFIKASI ............................................................................................. 20 23.   JAMINAN PENAWARAN ............................................................................................................ 22 

    D. DOKUMEN PENAWARAN ................................................................................................ 25 

    24.  PEMASUKAN DAN CARA PENYAMPAI-AN DOKUMEN PENAWARAN ............................... 25 

    25.  BATAS AKHIR PEMASUKAN PENAWARAN ........................................................................... 25 

    E. PEMBUKAAN DAN EVALUASI PENAWARAN ................................................... ........ 25 

    26.  PEMBUKAAN PENAWARAN ..................................................................................................... 25 27.  KLARIFIKASI DAN KONFIRMASI PENAWARAN.................................................................... 28 28.  HAK MENOLAK ATAU MENERIMA PENAWARAN................................................................ 28 

    29.  EVALUASI PENAWARAN .......................................................................................................... 28 30.  EVALUASI KUALIFIKASI .......................................................................................................... 45 

    30.1  EVALUASI DILAKUKAN TERHADAP CALON PEMENANG PELELANGAN DAN CALONPEMENANG CADANGAN 1 DAN 2 (APABILA ADA)............................................................... 45 

    30.2  EVALUASI KUALIFIKASI DILAKUKAN DENGAN MENGGUNAKAN METODE PENILAIAN

    SISTEM GUGUR. ....................................................................................................................... 45 30.3  PAKTA INTEGRITAS TELAH DIISI DAN DITANDATANGANI OLEH PESERTA ANGGOTA

    KEMITRAAN/KSO  SEBELUM PEMASUKAN PENAWARAN,  APABILA TIDAK

    DITANDATANGANI MAKA TIDAK DIEVALUASI LEBIH LANJUT . ......................................... 45 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    5/243

     

    30.4  T ATA CARA EVALUASI KUALIFIKASI DILAKUKAN SESUAI DENGAN KETENTUAN DALAM

    DOKUMEN KUALIFIKASI. ....................................................................................................... 45 30.5  APABILA TIDAK ADA CALON PEMENANG YANG LULUS EVALUASI KUALIFIKASI, MAKA

    LELANG DINYATAKAN GAGAL . ............................................................................................... 45 31.  PEMBUKTIAN KUALIFIKASI .................................................................................................... 45 31.1  PEMBUKTIAN KUALIFIKASI TERHADAP PESERTA YANG MEMENUHI PERSYARATAN

    KUALIFIKASI DILAKUKAN SETELAH EVALUASI KUALIFIKASI. .......................................... 45 31.2  PEMBUKTIAN KUALIFIKASI DILAKUKAN DENGAN CARA MELIHAT KEASLIAN DOKUMEN

    DARI DOKUMEN ASLI ATAU SALINAN DOKUMEN YANG SUDAH DILEGALISIR OLEH

    PEJABAT YANG BERWENANG DAN MEMINTA SALINAN DOKUMEN TERSEBUT . ........... 45 31.3  POKJA ULP  MELAKUKAN KLARIFIKASI DAN/ATAU VERIFIKASI KEPADA PENERBIT

    DOKUMEN, APABILA DOKUMEN YANG DIGUNAKAN DALAM PEMBUKTIAN KUALIFIKASI

    MASIH DIRAGUKAN KEBENARANNYA. .................................................................................. 46 31.6  APABILA TIDAK ADA CALON PEMENANG YANG LULUS PEMBUKTIAN KUALIFIKASI, 

    MAKA LELANG DINYATAKAN GAGAL . .................................................................................... 46 32.  KLARIFIKASI DAN NEGOSIASI TEKNIS DAN HARGA ........................................................... 46 

    DALAM HAL YANG MEMASUKKAN PENAWARAN KURANG DARI 3 ( TIGA) DILAKUKAN DENGANKETENTUAN: ............................................................................................................................. 46 

    F. PENETAPAN PEMENANG ............................................................................................... 47 

    33.  PENETAPAN PEMENANG ......................................................................................................... 47 33.6  PENETAPAN PEMENANG DISUSUN SESUAI DENGAN URUTANNYA DAN HARUS

    MEMUAT : ................................................................................................................................... 49 33.7  DATA PENDUKUNG YANG DIPERLUKAN UNTUK MENETAPKAN PEMENANG ADALAH: 49 33.8  APABILA TERJADI KETERLAMBATAN DALAM MENETAPKAN PEMENANG DAN

    MENGAKIBATKAN SURAT PENAWARAN DAN  JAMINAN PENAWARAN HABIS MASA

    BERLAKUNYA,  DILAKUKAN KONFIRMASI KEPADA CALON PEMENANG,  CALONPEMENANG CADANGAN 1  DAN 2  (APABILA ADA)  UNTUK MEMPERPANJANG MASABERLAKU SURAT PENAWARAN DAN  JAMINAN PENAWARAN SAMPAI DENGAN

    PERKIRAAN JADWAL PENANDATANGANAN KONTRAK.  CALON PEMENANG,  CALON

    PEMENANG CADANGAN 1  DAN 2  (APABILA ADA)  YANG TIDAK BERSEDIAMEMPERPANJANG SURAT PENAWARAN DAN  JAMINAN PENAWARAN DAPATMENGUNDURKAN DIRI TANPA DIKENAKAN SANKSI........................................................... 49 

    34.  PENGUMUM-AN PEMENANG.................................................................................................. 50 35.  SANGGAHAN ............................................................................................................................. 50 35.1  PESERTA YANG MEMASUKKAN PENAWARAN DAPAT MENYAMPAIKAN SANGGAHAN

    SECARA ELEKTRONIK ATAS PENETAPAN PEMENANG KEPADA POKJA ULP  DISERTAIBUKTI TERJADINYA PENYIMPANGAN MELALUI WEBSITE , DENGAN TEMBUSAN KEPADAPPK,  PA/KPA  DAN APIP  KEMENTERIAN/  L EMBAGA/  PEMERINTAH DAERAH/ INSTITUSI SEBAGAIMANA TERCANTUM DALAM LDP, DENGAN KETENTUAN: ............. 50 

    35.2  SANGGAHAN DIAJUKAN OLEH PESERTA BAIK SECARA SENDIRI-SENDIRI MAUPUN

    BERSAMA-SAMA DENGAN PESERTA LAIN. .......................................................................... 50 35.3  SANGGAHAN DIAJUKAN APABILA TERJADI PENYIMPANGAN PROSEDUR MELIPUTI:... 50 35.4  APABILA SANGGAHAN DINYATAKAN BENAR MAKA POKJA ULP  MENYATAKAN

    PELELANGAN GAGAL . .............................................................................................................. 51 35.5  SANGGAHAN YANG DIAJUKAN BUKAN DARI PESERTA DIANGGAP SEBAGAI

    PENGADUAN DAN TETAP HARUS DITINDAKLANJUTI SERTA TIDAK MENGHENTIKAN

    PROSES PELELANGAN. ............................................................................................................ 51 35.6  SANGGAHAN YANG DISAMPAIKAN KEPADA PA/KPA,  PPK  ATAU DISAMPAIKAN DAN

    DITERIMA DILUAR MASA SANGGAH,  DIANGGAP SEBAGAI PENGADUAN DAN TETAP

    HARUS DITINDAKLANJUTI SERTA TIDAK MENGHENTIKAN PROSES PELELANGAN. ..... 51 G. PENUNJUKAN PEMENANG PENGADAAN .................................................... ............. 51 

    36.  PENUNJUKAN PENYEDIA BARANG/JASA ........................................................................... 51 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    6/243

     

    36.1  POKJA ULP  MENYAMPAIKAN BERITA ACARA HASIL PELELANGAN (BAHP)  KEPADA

    PPK  DENGAN TEMBUSAN KEPADA KEPALA ULP  SEBAGAI DASAR UNTUKMENERBITKAN SURAT PENUNJUKAN PENYEDIA BARANG/JASA (SPPBJ). ............... 51 

    36.2  PPK MENERBITKAN SPPBJ, DENGAN KETENTUAN APABILA: ....................................... 51  36.4  PENYEDIA YANG DITUNJUK WAJIB MENERIMA KEPUTUSAN TERSEBUT ,  DENGAN

    KETENTUAN: ............................................................................................................................. 52 

    36.6  APABILA SEMUA PEMENANG YANG DITUNJUK MENGUNDURKAN DIRI,  MAKAPELELANGAN DINYATAKAN GAGAL OLEH PA/KPA  SETELAH MENDAPAT LAPORANDARI PPK. ................................................................................................................................. 53 

    36.7  SPPBJ HARUS DITERBITKAN, DENGAN KETENTUAN: ..................................................... 53 36.8  DI DALAM SPPBJ  DISEBUTKAN/  DITEGASKAN/  DITULIS BAHWA PENYEDIA HARUS

    MENYIAPKAN JAMINAN PELAKSANAAN SEBELUM PENANDATANGANAN KONTRAK. ... 53 

    37.  KERAHASIAAN PROSES .......................................................................................................... 53 37.1  PROSES EVALUASI DOKUMEN PENAWARAN BERSIFAT RAHASIA DAN DILAKSANAKAN

    OLEH POKJA ULP SECARA INDEPENDEN. .......................................................................... 53 37.2  INFORMASI YANG BERHUBUNGAN DENGAN PENELITIAN,  EVALUASI,  KLARIFIKASI, 

    KONFIRMASI,  DAN USULAN CALON PEMENANG TIDAK BOLEH DIBERITAHUKANKEPADA PESERTA,  ATAU ORANG LAIN YANG TIDAK BERKEPENTINGAN SAMPAIKEPUTUSAN PEMENANG DIUMUMKAN. ............................................................................... 53 

    37.3  SETIAP USAHA PESERTA LELANG MENCAMPURI PROSES EVALUASI DOKUMENPENAWARAN ATAU KEPUTUSAN PEMENANG AKAN MENGAKIBATKAN DITOLAKNYA

    PENAWARAN YANG BERSANGKUTAN. ................................................................................... 53 37.4  EVALUASI PENAWARAN YANG DISIMPULKAN DALAM BERITA ACARA HASIL

    PELELANGAN (BAHP) OLEH POKJA ULP BERSIFAT RAHASIA SAMPAI DENGAN SAATPENGUMUMAN PEMENANG. ................................................................................................... 53 

    H. PELELANGAN GAGAL  ...................................................................................................... 54 

    38.  PELELANGAN GAGAL .............................................................................................................. 54 38.1  POKJA ULP MENYATAKAN PELELANGAN GAGAL , APABILA:............................................ 54 

    38.2  PA/KPASEBAGAIMANA TERCANTUM DALAM LDP MENYATAKAN PELELANGAN GAGAL , 

    APABILA: .................................................................................................................................... 54 38.3  MENTERI/KEPALA L EMBAGA/PIMPINAN INSTITUSI MENYATAKAN PELELANGAN

    GAGAL ,  APABILAPENGADUAN MASYARAKAT ATAS TERJADINYA KKN  YANG

    MELIBATKAN KPA, TERNYATA BENAR. ............................................................................... 55 38.4  KEPALA DAERAH MENYATAKAN PELELANGAN GAGAL ,  APABILAPENGADUAN

    MASYARAKAT ATAS TERJADINYA KKN  YANG MELIBATKAN PA  DAN/ATAU KPA, 

     TERNYATA BENAR. ................................................................................................................... 55 38.5  SETELAH PELELANGAN DINYATAKAN GAGAL ,  MAKA POKJA ULP MEMBERITAHUKAN

    KEPADA SELURUH PESERTA. ................................................................................................ 55 38.6  SETELAH PEMBERITAHUAN ADANYA PELELANGAN GAGAL , POKJA ULP ATAU POKJA

    ULP  PENGGANTI (APABILA DIGANTI)  MENELITI DAN MENGANALISIS PENYEBAB

     TERJADINYA PELELANGAN GAGAL ,  UNTUK MENENTUKAN LANGKAH SELANJUTNYA, YAITU MELAKUKAN: ................................................................................................................. 55 

    I.  SURAT JAMINAN PELAKSANAAN ......................... ............................ .......................... 56 

    39.  SURAT JAMINAN PELAKSANAAN........................................................................................... 56 

    39.1  SURAT JAMINAN PELAKSANAAN MEMENUHI KETENTUAN SEBAGAI BERIKUT : .......... 56 39.2  KEGAGALAN PENYEDIA YANG DITUNJUK UNTUK MENYERAHKAN SURAT  JAMINAN

    PELAKSANAAN DIPERSAMAKAN DENGAN MENOLAK UNTUK MENANDATANGANIKONTRAK ATAU TIDAK MENERIMA KEPUTUSAN PENUNJUKAN SEBAGAI PENYEDIA

    BARANG/ JASA, MAKA AKAN DIKENAKAN SANKSI. ............................................................ 57 39.3  KETENTUAN LEBIH LANJUT MENGENAI PENCAIRAN SURAT JAMINAN PELAKSANAAN

    DIATUR DALAM SYARAT -SYARAT UMUM KONTRAK. ........................................................ 57

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    7/243

     

    J. PENANDATANGANAN KONTRAK ................................................................................ 58 

    40.  PENANDA- TANGANAN KONTRAK........................................................................................... 58 40.1  PENANDATANGANAN KONTRAK PENGADAAN BARANG/JASADILAKUKAN SETELAH

    DIPA/DPA DITETAPKAN. ...................................................................................................... 58 40.2  SEBELUM PENANDATANGANAN KONTRAK PPK  WAJIB MEMASTIKAN ISIAN

    KUALIFIKASI MASIH BERLAKU/VALID.  APABILA TERDAPAT DATA ISIAN KUALIFIKASI

     TIDAK VALID, MAKA KONTRAK TIDAK DITANDATANGANI. ................................................ 58 40.3  PENANDATANGANAN KONTRAK DILAKUKAN SETELAH PENYEDIA MENYERAHKAN

     JAMINAN PELAKSANAAN, DENGAN KETENTUAN: .............................................................. 58 40.4  PPK  DAN PENYEDIA TIDAK DIPERKENANKAN MENGUBAH SUBSTANSI DOKUMEN

    PENGADAAN SAMPAI DENGAN PENANDATANGANAN KONTRAK,  KECUALIMEMPERSINGKAT WAKTU PELAKSANAAN PEKERJAAN DIKARENAKAN JADWAL

    PELAKSANAAN PEKERJAAN YANG DITETAPKAN SEBELUMNYA AKAN MELEWATI BATAS

     TAHUN ANGGARAN. ................................................................................................................. 58 

    40.5  DALAM HAL PERUBAHAN WAKTU PELAKSANAAN PEKERJAAN MELEWATI BATAS TAHUNANGGARAN,  PENANDATANGANAN KONTRAK DILAKUKAN SETELAH MENDAPATPERSETUJUAN KONTRAK TAHUN JAMAK. ........................................................................... 58 

    40.6  PPK  DAN PENYEDIA WAJIB MEMERIKSA KONSEP KONTRAK MELIPUTI SUBSTANSI, BAHASA,  REDAKSIONAL ,  ANGKA DAN HURUF SERTA MEMBUBUHKAN PARAF PADASETIAP LEMBAR DOKUMEN KONTRAK. ............................................................................... 58 

    40.7  MENETAPKAN URUTAN HIRARKI BAGIAN-BAGIAN DOKUMEN KONTRAK DALAM SURAT

    PERJANJIAN,  DENGAN MAKSUD APABILA TERJADI PERTENTANGAN KETENTUANANTARA BAGIAN SATU DENGAN BAGIAN YANG LAIN, MAKA BERLAKU URUTAN SEBAGAIBERIKUT : ................................................................................................................................... 59 

    40.8  BANYAKNYA RANGKAP KONTRAK DIBUAT SESUAI KEBUTUHAN, YAITU: ...................... 59 

    40.9  PENANDATANGANAN KONTRAK BERNILAI DIATAS RP100.000.000.000,00 (SERATUS MILIAR RUPIAH)  DILAKUKAN SETELAH MEMPEROLEH PENDAPAT AHLIHUKUM KONTRAK ATAU  T IM OPINI HUKUM KONTRAK YANG DIBENTUK OLEH

    K/L/D/I YANG BERSANGKUTAN. ....................................................................................... 59 

    40.10PIHAK YANG BERWENANG MENANDATANGANI KONTRAK ATAS NAMA PENYEDIAADALAH DIREKSI YANG DISEBUTKAN NAMANYA DALAM AKTA PENDIRIAN/ ANGGARAN DASAR,  YANG TELAH DIDAFTARKAN SESUAI DENGAN PERATURAN

    PERUNDANG-UNDANGAN. ...................................................................................................... 59 BAB III LEMBAR DATA PEMILIHAN .......................... ........................... ............................ ............. 61 

    A.  LINGKUP P EKERJAAN ..................................................................................................................... 61 B.  SUMBER DANA ............................................................................................................................. 61 C.  P ENDAYAGUNAAN P RODUKSI DALAM NEGERI ............................................................................... 61 D.  P EMBERIAN P ENJELASAN DOKUMEN P ENGADAAN DAN P ENINJAUAN LAPANGAN ............................ 62 E.  DOKUMEN P ENAWARAN ............................................................................................................... 62 F.  MATA UANG P ENAWARAN DAN CARA P EMBAYARAN .................................................................... 63 G.  MASA BERLAKUNYA P ENAWARAN ................................................................................................. 63 

    H.   JAMINAN P ENAWARAN .................................................................................................................. 63 I.  P ENYAMPAIAN DOKUMEN P ENAWARAN........................................................................................ 63 

     J.  BATAS AKHIR WAKTU P EMASUKAN P ENAWARAN .......................................................................... 64 K.  P EMBUKAAN P ENAWARAN ............................................................................................................ 64 L.  AMBANG BATAS ............................................................................................................................ 64 M.  SANGGAHAN ................................................................................................................................. 64 

    BAB IV LEMBAR DATA KUALIFIKASI ................................ ............................ ............................ .... 65 

    A.  LINGKUP K UALIFIKASI ................................................................................................................... 65 B.  P ERSYARATAN K UALIFIKASI ........................................................................................................... 65 

    BAB V68 

    BENTUK DOKUMEN PENAWARAN................................................................................... 68 

    A.  BENTUK  SURAT   PENAWARAN  PESERTA  BADAN  USAHA/KEMITRAAN (KSO) ......................................................................................................................................... 68 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    8/243

     

    B.  BENTUK SURAT  KUASA................................................................................................... 70 

    C.  BENTUK PERJANJIAN KEMITRAAN/KERJA SAMA OPERASI (KSO) ........... 73 D.  BENTUK DOKUMEN PENAWARAN  TEKNIS ............................................................ 77 E.  BENTUK FORMULIR REKAPITULASI PERHITUNGAN  TINGKAT  KOMPONEN 

    DALAM NEGERI (TKDN) ................................................................................................... 79 F.  BENTUK DAFTAR BARANG YANG DIIMPOR ........................................................... 80 

    DAFTAR BARANG YANG DIIMPOR ........................................................................................ 80 G.  BENTUK  RENCANA  KESELAMATAN  DAN  KESEHATAN  KERJA 

    KONSTRUKSI(RK3K) .......................................................................................................... 81 

    H.  BENTUK RINCIAN/URAIAN HARGA SATUAN PEKERJAAN (HSP)............... 101 I.  BENTUK  JAMINAN PENAWARAN DARI BANK ..................................................... 102 

     J.  BENTUK   JAMINAN  PENAWARAN  DARI  ASURANSI/  PERUSAHAAN 

    PENJAMINAN  ATAU  KONSORSIUM  PERUSAHAAN  ASURANSI UMUM/LEMBAGA PENJAMINAN/ PERUSAHAAN PENJAMINAN ............... 104 

    K.  BENTUK PAKTA INTEGRITAS ...................................................................................... 105 L.  BENTUK FORMULIR ISIAN KUALIFIKASI .............................................................. 107 

    BAB VI....................................................................................................................................... 113 

    PETUNJUK PENGISIAN FORMULIR KUALIFIKASI ................... ............................ .. 113 A.  DATA ADMINISTRASI ............................................................................................................. 113 B.  IZIN USAHA ............................................................................................................................. 113 C.  SERTIFIKAT BADAN USAHA ................................................................................................. 113 

    D.  IZIN L AINNYA (APABILA DIPERSYARATKAN, YANG SESUAI DENGAN PEKERJAAN YANGDILELANGKAN) ........................................................................................................................ 113 

    E.  L ANDASAN HUKUM PENDIRIAN BADAN USAHA ............................................................. 113 F.  PENGELOLA BADAN USAHA (PENGAWAS/PENGURUS) ................................................ 114 

    G.  DATA KEUANGAN .................................................................................................................. 114 H.  DATA PERSONIL INTI ............................................................................................................ 114 I.  DATA PERALATAN .................................................................................................................. 114 

     J.  DATA PENGALAMAN PERUSAHAAN .................................................................................... 114 K.  DATA PENGALAMAN PERUSAHAAN DALAM 5 TAHUN TERAKHIR ................................. 115 

    L.  DATA PEKERJAAN YANG SEDANG DILAKSANAKAN ....................................................... 115 M.  MODAL KERJA ....................................................................................................................... 115 

    N.  KEMITRAAN/KSO ................................................................................................................. 115 BAB VII ......................... ............................ ............................ ............................ ........................ 116 

    TATA CARA EVALUASI KUALIFIKASI ......................................................................... 116 

    BAB VIII ................................................................................................................................... 120 

    BENTUK RANCANGAN KONTRAK.................................................................................. 120 

    SURAT  PERJANJIAN ................................................................................................................. 120 SURAT  PERJANJIAN ................................................................................................................. 126 

    BAB IX ...................................................................................................................................... 132 SYARAT-SYARAT UMUM KONTRAK ......................... ............................ ........................ 132 

    A. KETENTUAN UMUM ....................................................................................................... 132 

    1.  DEFINISI .................................................................................................................................. 132 2. PENERAPAN ................................................................................................................................. 137 

    2.  BAHASA DAN HUKUM ........................................................................................................... 137 4.  L ARANGAN KORUPSI,  KOLUSI DAN NEPOTISME (KKN),  PENYALAHGUNAAN

    WEWENANG SERTA PENIPUAN ........................................................................................... 138 5.  ASAL MATERIAL /BAHAN ..................................................................................................... 139 

    6.  KORESPONDENSI ................................................................................................................... 139 7.  WAKIL SAH PARA PIHAK ...................................................................................................... 139 

    8.  PEMBUKUAN ........................................................................................................................... 139 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    9/243

     

    9.  PERPAJAKAN ........................................................................................................................... 140 

    10.  PENGALIHAN DAN/ATAU SUBKONTRAK ........................................................................... 140 11.  PENGABAIAN ........................................................................................................................... 140 12.  PENYEDIA MANDIRI .............................................................................................................. 140 13.  KEMITRAAN/KSO ................................................................................................................. 141 

    14.  PENGAWASAN PELAKSANAAN PEKERJAAN ...................................................................... 141 

    15.  PERSETUJUAN A TAU PERNYATAAN  T IDAK BERKEBERATAN DARI PENGAWASPEKERJAAN ............................................................................................................................. 141 

    16.  PERINTAH ................................................................................................................................ 141 

    17.  PENEMUAN-PENEMUAN ....................................................................................................... 142 18.  AKSES KE L OKASI KERJA .................................................................................................... 142 

    B. PELAKSANAAN, PENYELESAIAN, ADENDUM DAN PEMUTUSAN KONTRAK  143 

    19.  MASA PELAKSANAAN (JANGKA WAKTU PELAKSANAAN) PEKERJAAN ........................ 143 B.1  PELAKSANAAN PEKERJAAN .......................... ........................... ......................... 143 

    20.  PENYERAHAN L OKASI KERJA ............................................................................................. 143 21.  SURAT PERINTAH MULAI KERJA (SPMK) ....................................................................... 144 

    22.  PROGRAM MUTU ................................................................................................................... 144 23.  RENCANA KESELAMATAN DAN KESEHATAN KERJA KONSTRUKSI (RK3K) .............. 145 24.  RAPAT PERSIAPAN PELAKSANAAN KONTRAK .................................................................. 145 25.  MOBILISASI ............................................................................................................................. 146 26.  PENGUKURAN/ PEMERIKSAAN BERSAMA ....................................................................... 146 27.  PENGGUNAAN PRODUKSI DALAM NEGERI ...................................................................... 147 

    B.2  PENGENDALIAN WAKTU ...................................................................................... 147 

    28.  WAKTU PENYELESAIAN PEKERJAAN ................................................................................. 147 29.  PERPANJANGAN WAKTU ...................................................................................................... 148 30.  PENUNDAAN OLEH PENGAWAS PEKERJAAN ................................................................... 149 

    31.  RAPAT PEMANTAUAN ............................................................................................................ 149 32.  PERINGATAN DINI .................................................................................................................. 149 

    B.3  PENYELESAIAN KONTRAK ......................... ............................ ........................... .. 150 

    33.  SERAH T ERIMA PEKERJAAN ............................................................................................... 150 34.  PENGAMBILALIH-AN .............................................................................................................. 151 35.  PEDOMAN PENGOPERASIAN DAN PERAWATAN/ PEMELIHARAAN .............................. 151 

    B.4  ADENDUM ......................... ............................ ............................ ............................ ...... 152 

    36.  PERUBAHAN KONTRAK ......................................................................................................... 152 37.  PERUBAHAN L INGKUP PEKERJAAN ................................................................................... 152 

    38.  PERUBAHAN KUANTITAS DAN HARGA............................................................................... 153 39.  PERUBAHAN JADWAL PELAKSANAAN PEKERJAAN ........................................................ 154 

    40.  PENYESUAIAN HARGA (ESKALASI/DE-ESKALASI) ......................................................... 154 B.5  KEADAAN KAHAR ............................................... ........................... ......................... 156 

    41.  KEADAAN KAHAR .................................................................................................................. 156 B.6  PENGHENTIAN DAN PEMUTUSAN KONTRAK ........................................ ...... 157 

    42.  PENGHENTIAN DAN PEMUTUSAN KONTRAK .................................................................... 157 

    43.  KETERLAMBATAN PELAKSANAAN PEKERJAAN DAN KONTRAK KRITIS ...................... 159 44.  PENINGGALAN ........................................................................................................................ 162 

    C. HAK DAN KEWAJIBAN PARA PIHAK............................ ............................ ............... 162 

    45.  HAK DAN KEWAJIBAN PARA PIHAK .................................................................................. 162 

    46.  PENGGUNAAN DOKUMEN-DOKUMEN KONTRAK DAN INFORMASI.............................. 164 47.  HAK KEKAYAAN INTELEKTUAL ........................................................................................... 164 48.  PENANGGUNGAN DAN RISIKO ............................................................................................. 164 

    49.  PERLINDUNGAN T ENAGA KERJA........................................................................................ 165 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    10/243

     

    50.  PEMELIHARAAN L INGKUNGAN ............................................................................................ 166 

    51.  ASURANSI ................................................................................................................................ 166 52.   T INDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPK  ATAU PENGAWAS

    PEKERJAAN ............................................................................................................................. 166 53.  L APORAN HASIL PEKERJAAN .............................................................................................. 167 

    A.   JENIS DAN KUANTITAS BAHAN YANG BERADA DI LOKASI PEKERJAAN; ...................... 167 

    B.  PENEMPATAN TENAGA KERJA UNTUK TIAP MACAM TUGASNYA; .................................. 167 C.   JENIS, JUMLAH DAN KONDISI PERALATAN; ...................................................................... 167 D.   JENIS DAN KUANTITAS PEKERJAAN YANG DILAKSANAKAN; .......................................... 167 

    E.  KEADAAN CUACA TERMASUK HUJAN,  BANJIR DAN PERISTIWA ALAM LAINNYA YANGBERPENGARUH TERHADAP KELANCARAN PEKERJAAN; DAN........................................ 167 

    F.  CATATAN-CATATAN LAIN YANG BERKENAAN DENGAN PELAKSANAAN. ....................... 168 

    54.  KEPEMILIKAN DOKUMEN ..................................................................................................... 168 55.  KERJASAMA ANTARA PENYEDIA DAN SUB PENYEDIA .................................................. 168 56.  USAHA MIKRO, USAHA KECIL DAN KOPERASI KECIL  .................................................. 169 57.  PENYEDIA L AIN ...................................................................................................................... 170 

    58.  ALIH PENGALAMAN/ KEAHLIAN ......................................................................................... 170 59.  KESELAMATAN DAN KESEHATAN KERJA ......................................................................... 170 60.  PEMBAYARAN DENDA ........................................................................................................... 171 

    61.   JAMINAN .................................................................................................................................. 171 D. PERSONIL INTI DAN/ATAU PERALATAN PENYEDIA ......... ........................... ... 173 

    62.  PERSONIL INTI DAN/ATAU PERALATAN ............................................................................ 173 E. KEWAJIBAN PPK ............................. ............................ ............................ ........................ 174 

    63.  FASILITAS ................................................................................................................................ 174 64.  PERISTIWA KOMPENSASI ..................................................................................................... 174 

    F. PEMBAYARAN KEPADA PENYEDIA ....................................... ........................... ....... 175 

    65.  HARGA KONTRAK .................................................................................................................. 175 66.  PEMBAYARAN ......................................................................................................................... 175 

    67.  HARI KERJA............................................................................................................................ 180 68.  PERHITUNGAN AKHIR ........................................................................................................... 181 

    69.  PENANGGUHAN ...................................................................................................................... 181 G. PENGAWASAN MUTU .......................... ........................... ............................ .................... 182 

    70.  PENGAWASAN DAN PEMERIKSAAN .................................................................................... 182 71.  PENILAIAN PEKERJAAN SEMENTARA OLEH PPK............................................................ 182 72.  CACAT MUTU ......................................................................................................................... 182 

    73.  PENGUJIAN ............................................................................................................................. 182 74.  PERBAIKAN CACAT MUTU ................................................................................................... 182 75.  KEGAGALAN KONSTRUKSI DAN KEGAGALAN BANGUNAN ............................................ 183 

    H. PENYELESAIAN PERSELISIHAN .................................... ............................ ............... 184 

    76.  PENYELESAIAN PERSELISIHAN ........................................................................................... 184 77.  I TIKAD BAIK ............................................................................................................................ 185 

    SYARAT-SYARAT KHUSUS KONTRAK (SSKK) .................. ............................ ........... 186 

    A.  DEFINISI .................................................................................................................................. 186 B.  KORESPONDENSI ................................................................................................................... 187 

    C.  WAKIL SAH PARA PIHAK ...................................................................................................... 187 D.   JENIS KONTRAK..................................................................................................................... 187 E.   T ANGGAL BERLAKU KONTRAK ........................................................................................... 187 F.  MASA PELAKSANAAN ............................................................................................................ 188 

    G.  MASA PEMELIHARAAN .......................................................................................................... 188 H.  PEMENUHAN KINERJA JALAN ............................................................................................ 188 I.  PERBAIKAN CACAT MUTU DAN KINERJA JALAN ............................................................ 190 

     J.  UMUR KONSTRUKSI .............................................................................................................. 190 

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    11/243

     

    K.  PENYELESAIAN PEKERJAAN ................................................................................................ 191 

    L.  PEDOMAN PENGOPERASIAN DAN PERAWATAN/PEMELIHARAAN................................ 191 M.  PERUBAHAN KUANTITAS PEKERJAAN ............................................................................... 191 N.  KONTRAK KRITIS ................................................................................................................... 191 O.  KETERLAMBATAN PEKERJAAN ........................................................................................... 191 

    P.  PEMBAYARAN T AGIHAN ........................................................................................................ 192 

    Q.  PENCAIRAN JAMINAN............................................................................................................ 192 R.   T INDAKAN PENYEDIA YANG MENSYARATKAN PERSETUJUAN PPK  ATAU PENGAWAS

    PEKERJAAN ............................................................................................................................. 192 

    S.  KEPEMILIKAN DOKUMEN ..................................................................................................... 193  T.  FASILITAS ................................................................................................................................ 193 U.  PERISTIWA KOMPENSASI ..................................................................................................... 193 

    V.  SUMBER PEMBIAYAAN ......................................................................................................... 193 W.  PEMBAYARAN UANG MUKA ................................................................................................. 193 X.  KESELAMATAN DAN KESEHATAN KERJA ......................................................................... 194 Y.  PEMBAYARAN PRESTASI PEKERJAAN ............................................................................... 194 

    Z.  PEMBAYARAN BAHAN (MATERIAL ON SITE) .................................................................... 194 AA.  SERAH T ERIMA SEBAGIAN PEKERJAAN ............................................................................ 194 BB.  PENYESUAIAN HARGA .......................................................................................................... 194 

    CC.  DENDA ..................................................................................................................................... 194 DD.  USAHA MIKRO, USAHA KECIL DAN KOPERASI KECIL  .................................................. 195 EE.  PENYELESAIAN PERSELISIHAN /SENGKETA ................................................................... 195 L AMPIRAN A  –  SYARAT -SYARAT KHUSUS KONTRAK ............................................................... 196 LAMPIRAN B  –  SYARAT-SYARAT K HUSUS K ONTRAK .............................................................................. 197 

    KETENTUAN INDIKATOR KINERJA JALAN -1 IK-1) DAN .......................... ............................ .. 197 

    LAMPIRAN C SYARAT-SYARAT KHUSUS KONTRAK ............................. ............................ ...... 199 

    KETENTUAN INDIKATOR KINERJA JALAN 2 IK-2) DAN ......................... ........................... .. 199 

    BAB XI ...................................................................................................................................... 204 

    SPESIFIKASI TEKNIS DAN GAMBAR .................................... ............................ ........... 204 

    K ETERANGAN ........................................................................................................................................ 204 B.  GAMBAR PERENCANAAN/DESAIN ........................................................................ 204 K ETERANGAN ........................................................................................................................................ 204 

    BAB XII DAFTAR KUANTITAS DAN HARGA ... ............................ ............................ .................... 205 

    K ETERANGAN ........................................................................................................................................ 205 BAB XIII ................................................................................................................................... 217 

    BENTUK DOKUMEN LAIN ................................................. ........................... ..................... 217 

    A.  BENTUK SURAT  PENUNJUKAN PENYEDIA BARANG/JASA (SPPBJ) ....... 217 

    B.  BENTUK SURAT  PERINTAH MULAI KERJA(SPMK)............................................ 219 C.  BENTUK SURAT   JAMINAN............................................................................................ 152 

    Jaminan Pelaksanaan dari Bank  ..................................................... 152  

    Jaminan Pelaksanaan dari Asuransi/Perusahaan Penjaminan 153  ( Hanya Untuk Badan Usaha Kecil ) ................................................ 153  Jaminan Uang Muka dari Asuransi/Perusahaan Penjaminan 156  

    Jaminan Pemeliharaan dari Asuransi/Perusahaan Penjaminan   159  

    D.  BENTUK SURAT  KETERANGAN DUKUNGAN KEUANGAN DARI BANK..........I ii  

    E.  PENGUMUMAN  [PELELANGAN   UMUM/PEMILIHAN   LANGSUNG]   DENGAN PASCAKUALIFIKASI .............................................................................................................III 

    http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366709http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366709http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366709http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366709http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366711http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366711http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366711http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366711http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366711http://f/DATA%20KERJA/SATKER%20I/LELANG/2016/SBD%202016/PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU/Add%202%20PRESERVASI%20JALAN%20BTS%20KOTA%20WOROTICAN-POIGAR-KAIYA-MAELANG,%20KAIYA-KOTAMOBAGU.docx%23_Toc437366709

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    12/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    1

    BAB I

    UMUM

    BAB I UMUM

    A.  Dalam hal pemilihan metode evaluasi apabila ada pertentangan ketentuan yangtertulis pada Lembar Data Pemilihan (LDP) dengan Instruksi Kepada Peserta (IKP)maka yang digunakan adalah ketentuan pada Lembar Data Pemilihan (LDP).

    B.  Dokumen Pengadaan ini disusun untuk membantu peserta dalam menyiapkandokumen penawaran

    C.  Dalam dokumen pengadaan digunakan pengertian, istilah, dan singkatan sebagaiberikut:

      Pekerjaan

    Konstruksi

    :  adalah seluruh pekerjaan yang berhubungan denganpelaksanaan konstruksi bangunan atau pembuatanwujud fisik lainnya;

      Kontrak

    Harga Satuan

    :  adalah kontrak pengadaan barang/jasa ataspenyelesaian seluruh pekerjaan dalam batas waktutertentu, berdasarkan harga satuan yang pasti dantetap untuk setiap satuan/unsur pekerjaan denganspesifikasi teknis tertentu, yang volume pekerjaannyamasih bersifat perkiraan sementara, sedangkanpembayarannya didasarkan pada hasil pengukuran

    bersama atas volume pekerjaan yang benar-benartelah dilaksanakan oleh penyedia barang/jasa; 

      HEA :  adalah Harga Evaluasi Akhir yang merupakanpenyesuaian atau normalisasi harga terhadap hargapenawaran dalam proses pengadaan dimana unsurpreferensi harga telah diperhitungkan berdasarkancapaian TKDN dan status perusahaan;

      LDP :  adalah Lembar Data Pemilihan yang memuatketentuan dan informasi yang spesifik sesuai dengan

     jenis pekerjaan antara lain meliputi penyiapan,

    penyampaian, pembukaan, kriteria dan tata carapenilaian dokumen penawaran, pengumumanpemenang, dan sanggahan;

      LDK :  adalah Lembar Data Kualifikasi yang memuatketentuan dan informasi yang spesifik sesuai dengankualifikasi yang diperlukan penyedia pekerjaankonstruksi antara lain dalam menyiapkan, mengisiformulir isian kualifikasi, dan melengkapi paktaintegritas;

      APIP :  adalah Aparat Pengawasan Intern Pemerintah (APIP) yang selanjutnya disebut Inspektorat JenderalKementerian Pekerjaan Umum dan Perumahan Rakyat

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    13/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    2

    bertugas melakukan pengawasan melalui audit, reviu,evaluasi, pemantauan dan kegiatan pengawasan lain

    terhadap penyelenggaraan tugas dan fungsiorganisasi;

      Penyedia

    Barang/Jasa

      Sub penyedia

    :

    :

    Adalah badan usaha atau orang perseorangan yangmenyediakan Barang/Pekerjaan Konstruksi/JasaKonsultansi/Jasa Lainnya.

    adalah penyedia yang mengadakan perjanjian kerjadengan penyedia penanggung jawab kontrak, untukmelaksanakan sebagian pekerjaan (subkontrak);

     

    Kemitraan/

    Kerja Sama

    Operasi KSO )

    :

      adalah kerja sama usaha antar penyedia nasionalmaupun penyedia asing, yang masing-masing pihakmempunyai hak, kewajiban dan tanggung jawab yang

     jelas berdasarkan perjanjian tertulis;

      Surat Jaminan :  adalah jaminan tertulis yang selanjutnya disebut Jaminan, bersifat mudah dicairkan dan tidak bersyarat(unconditional ), yang dikeluarkan oleh Bank Umum/Perusahaan Penjaminan/PerusahaanAsuransi/konsorsium perusahaan asuransiumum/lembaga penjaminan/perusahaan penjaminan

     yang mempunyai program asuransi kerugian(suretyship), dimana konsorsium tersebut telahditetapkan/mendapat rekomendasi dari Otoritas JasaKeuangan (OJK) yang diserahkan oleh PenyediaBarang/Jasa kepada PPK/Kelompok Kerja ULP untukmenjamin terpenuhinya kewajiban penyedia;

      Hari :  adalah hari kalender untuk proses pemilihan secaraelektronik, pelaksanaan kontrak. dan jaminan-

     jaminan;

      Daftar kuantitas

    dan harga

    :

      adalah daftar kuantitas yang telah diisi harga satuan

    dan jumlah biaya keseluruhannya yang merupakanbagian dari penawaran;

      Harga

    Perkiraan

    Sendiri HPS)

    :

      adalah perhitungan perkiraan biaya seluruh volumepekerjaan dikalikan dengan Harga Satuan yangdisusun dan ditetapkan oleh PPK, dikalkulasikansecara keahlian berdasarkan data yang dapatdipertanggungjawabkan sudah termasuk biaya umum,keuntungan pekerjaan, dan beban pajak, sertadigunakan oleh Pokja ULP untuk menilai kewajaranpenawaran termasuk rinciannya;

     

    Analisa Harga

    Satuan Pekerjaan

    : adalah uraian perhitungan harga yang meliputitenaga kerja, bahan dan peralatan untuk mendapatkanharga satu satuan jenis pekerjaan tertentu untuk

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    14/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    3

     

    Analisa Teknik

    Satuan Pekerjaan

      Pekerjaan

    Utama

    :

    :

    menghitung kewajaran harga dalam evaluasi.

    adalah uraian perhitungan tehnik yang meliputitenaga kerja, bahan dan peralatan untuk mendapatkanharga satu satuan jenis pekerjaan tertentu untukmenghitung kewajaran harga dalam evaluasi.

    adalah jenis pekerjaan yang secara langsungmenunjang terwujudnya dan berfungsinya suatukonstruksi sesuai peruntukannya yang ditetapkansebagaimana tercantum dalam Dokumen Pengadaan;

      Mata

    Pembayaran

    Utama

    :  adalah mata pembayaran yang pokok dan penting yang nilai bobot kumulatifnya minimal 80% (delapan

    puluh per seratus) dari seluruh nilai pekerjaan,dihitung mulai dari mata pembayaran yang nilaibobotnya terbesar berdasarkan penawaran;

      Harga Satuan

    Pekerjaan HSP)

    :

      adalah harga satu jenis pekerjaan tertentu per satusatuan tertentu;

      Harga Satuan

    Dasar HSD)

      Metode

    pelaksanaan

    pekerjaan

    :

    adalah harga satuan komponen dari harga satuanpekerjaan (HSP) per satu satuan tertentu, misalnya:a.  Upah tenaga kerja (per jam, per hari)b.  Bahan (per m, per m2, per m3, per kg, per

    ton)c.

     

    Peralatan (per jam, per hari)

    adalah metode yang menggambarkan penguasaanpenyelesaian pekerjaan yang sistematis dari awalsampai akhir meliputi tahapan/urutan pekerjaan(utama) dan uraian/cara kerja dari masing-masing

     jenis kegiatan pekerjaan utama dan penunjangpekerjaan utama yang dapat dipertanggung jawabkansecara teknis;

      Personil inti :  adalah tenaga ahli atau tenaga teknis yang akan

    ditempatkan secara penuh, yang di dalam organisasipelaksanaan posisinya sebagai manajemenpelaksanaan pekerjaan;

      Bagian

    pekerjaan yang

    disubkontrakan

    :  adalah bagian pekerjaan bukan pekerjaan utama, ataupekerjaan spesialis yang ditetapkan sebagaimanatercantum dalam Dokumen Pemilihan, yangpelaksanaannya diserahkan kepada penyediabarang/jasa dan disetujui terlebih dahulu oleh PPK;

      Masa

    Pelaksanaan

    jangka waktu

    pelaksanaan)

    :  adalah jangka waktu untuk melaksanakan pekerjaandihitung berdasarkan SPMK sampai dengan serah

    terima pertama pekerjaan;

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    15/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    4

      K/L/D/I : adalah Kementerian/Lembaga/Satuan Kerja PerangkatDaerah/Institusi yang menggunakan Anggaran

    Pendapatan dan Belanja Negara (APBN) dan/atauAnggaran Pendapatan dan Belanja Daerah (APBD).

      PA :  adalah Pengguna Anggaran yang merupakan pejabatpemegang kewenangan penggunaan anggaranKementerian/Lembaga/Satuan Kerja PerangkatDaerah atau Pejabat yang disamakan pada InstitusiPengguna APBN/APBD;

      KPA :  adalah Kuasa Pengguna Anggaran yang merupakanpejabat yang ditetapkan oleh PA untuk menggunakanAPBN atau ditetapkan oleh Kepala Daerah untuk

    menggunakan APBD;

      ULP :  adalah Unit Layanan Pengadaan yang selanjutunyadisebut ULP adalah unit organisasi Kementerian/Lembaga/Pemerintah Daerah/ Institusi yang berfungsimelaksanakan pengadaan barang/jasa yang bersifatpermanen dapat berdiri sendiri atau melekat pada unit

     yang sudah ada;

      Pokja ULP :  adalah Kelompok Kerja ULP perangkat dari ULP yangdisusun dan ditetapkan oleh Kepala ULP berfungsiuntuk melaksanakan Pemilihan Penyedia Barang/Jasa.

    Anggota Pokja ULP terlebih dahulu ditetapkan olehPA/KPA/Kepala Daerah;

      PPK : adalah Pejabat Pembuat Komitmen yang bertanggung jawab atas pelaksanaan pekerjaan;

      SPPBJ : adalah Surat Penunjukan Penyedia Barang/Jasa yangditerbitkan oleh PPK kepada penyedia barang/jasauntuk melaksanakan pekerjaan;

      TKDN : adalah Tingkat Komponen Dalam Negeri besarnyakomponen dalam negeri pada barang, jasa, dan

     gabungan barang dan jasa;

      klarifikasi

      konfirmasi

      RK3K

    :

    :

    :

    Adalah kegiatan penjelasan tertulis terhadap substansipenawaran yang tidak/kurang jelas dalam rangkaevaluasi penawaran.

    adalah kegiatan penegasan tertulis kepadapenyedia/instansi terkait terhadap hal-hal yangdiperlukan dalam rangka evaluasi penawaran

    adalah Rencana Keselamatan dan Kesehatan Kerja (K3)Kontrak, merupakan dokumen lengkap rencana

    penyelenggaraan SMK3 Konstruksi Bidang PU danmerupakan satu kesatuan dengan dokumen kontrak

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    16/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    5

    suatu pekerjaan konstruksi, yang dibuat oleh Penyedia Jasa dan disetujui oleh Pengguna Jasa, untuk

    selanjutnya dijadikan sebagai sarana interaksi antaraPenyedia Jasa dengan Pengguna Jasa dalampenyelenggaraan SMK3 Konstruksi Bidang PU;

    D.  Pelelangan Umum  dengan pascakualifikasi ini dibiayai dari sumber pendanaansebagaimana tercantum dalam LDP.

    E.  Pelelangan Umum ini terbuka dan dapat diikuti oleh semua peserta yang berbentukbadan usaha tunggal atau kemitraan/KSO.

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    17/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    6

    BAB IIINSTRUKSI KEPADA PESERTA (IKP)

    A.  Umum

    1.  LingkupPekerjaan

    1.1  Nama paket dan lingkup pekerjaansebagaimana tercantum dalam LDP.

    1.2  Penyedia yang ditunjuk berkewajibanuntuk menyelesaikan pekerjaan dalam jangka waktu sebagaimana tercantumdalam LDP, berdasarkan syarat umum

    dan syarat khusus kontrak dengan mutusesuai spesifikasi teknis dan hargayangtercantum dalam kontrak.

    2.  SumberDana

    Pengadaan ini dibiayai dari sumber pendanaansebagaimana tercantum dalam LDP.

    3.  Peserta  3.1  Pokja ULP mengumumkan kepada parapeserta untuk menyampaikanpenawaran atas paket pekerjaankonstruksi sebagaimana tercantum

    dalam LDP. 3.2  [dipilih:Pelelangan Umum/Pemilihan

    Langsung] pekerjaan konstruksi initerbuka dan dapat diikuti oleh semuapeserta penyedia pelaksana konstruksitunggal atau kemitraan/KSO yangmemenuhi kualifikasi.

    3.3  Peserta pada paket pekerjaan konstruksidengan nilai diatas Rp.2.500.000.000,00(dua miliar lima ratus juta rupiah)

    sampai dengan Rp.50.000.000.000,00(lima puluh miliar rupiah) dipersyaratkanhanya untuk pelaksana konstruksidengan kualifikasi Usaha Menengah yang kemampuan dasarnya (KD)memenuhi syarat. 

    3.4  Pelelangan paket pekerjaan konstruksisebagaimana dimaksud pada 3.3 dapatdikerjakan oleh penyedia jasa dengankualifikasi besar apabila:

    a. 

    pelelangan gagal karena tidak ada

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    18/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    7

    penyedia jasa dengan kualifikasimenengah yang mendaftar; dan/atau 

    b. 

    peralatan utama dan tingkat kesulitanpekerjaan yang akan dilelangkantidak dapat dipenuhi/dilaksanakanoleh penyedia jasa dengan kualifikasimenengah.

    3.5  Badan Usaha Jasa Konstruksi Asing(BUJKA) dapat mengikuti paketpekerjaan di atas Rp100.000.000.000,00(seratus miliar rupiah) dan harusmelakukan kerja sama usaha dengan

    perusahaan nasional dalam bentukkemitraan, dalam hal terdapatperusahaan nasional yang memilikikemampuan dibidang yangbersangkutan.

    3.6  Kemitraan/KSO dilakukan sebelummemasukkan dokumen penawaran,antar badan usaha pelaksana konstruksiswasta dan/atau milik pemerintah,dan/atau salah satu pesertanya BUJKA.

    3.7  Dalam hal peserta melakukankemitraan/KSO, baik denganperusahaan nasional maupun asingmaka peserta harus memiliki PerjanjianKemitraan/Kerja Sama Operasi yangmemuat persentase kemitraan/KSO danperusahaan yang mewakilikemitraan/KSO tersebut.

    3.8  Kemitraan/KSOharus terdiri dari

    perusahaan nasional untuk nilaipekerjaan di bawahRp100.000.000.000,00 (seratus miliarrupiah)

    3.9  Peserta kemitraan/KSO dilarangmengubah Perjanjian Kemitraan/KerjaSama Operasi selama proses pelelangan.

    3.10  Penyedia jasa yang bermitra/KSO untukmemenuhi jenis pekerjaan yangdilelangkan dapat terdiri dari penyedia

     jasa konstruksi umum (general ),

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    19/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    8

    spesialis, mekanikal/elektrikal, dan/atauketerampilan tertentu.

    3.11 

    Bagi BUJKA yang mengikuti pelelanganharus memiliki bukti Ijin Perwakilan Jasa Konstruksi Asing dan melakukankerja sama usaha dengan perusahaannasional dalam bentuk kemitraan,subkontrak dan lain-lain, dalam halterdapat perusahaan nasional yangmemiliki kemampuan di bidang yangbersangkutan.

    4.  Larangan

    Korupsi,Kolusi, danNepotisme(KKN),Penyalah-gunaanWewenangsertaPenipuan

    4.1  Peserta dan pihak yang terkait denganpengadaan ini berkewajiban untukmematuhi etika pengadaan dengan tidakmelakukan tindakan sebagai berikut:

    a.  berusaha mempengaruhi anggotaPokja ULP dalam bentuk dan caraapapun, untuk memenuhi keinginanpeserta yang bertentangan denganDokumen Pengadaan, dan/atauperaturan perundang-undangan.;

    b. 

    melakukan persekongkolan denganpeserta lain untuk mengatur hasil[ dipilihPelelangan Umum/PemilihanLangsung  ] , sehinggamengurangi/menghambat/memperkecil/meniadakan persaingan yangsehat dan/atau merugikan pihak lainsebagaimana diatur dalam peraturanperundang-undangan.

    Indikasi persekongkolan antar pesertamemenuhi sekurang-kurangnya 2(dua) indikasi di bawah ini:

    1)  terdapat kesamaan dalamDokumen Penawaran, antara lainpada: metode kerja, bahan, alat,analisa pendekatan teknis,koefisien, harga satuan dasarupah, bahan dan alat, hargasatuan pekerjaan, dan/ atauspesifkasi teknis/ barang yangditawarkan (merk/ tipe/ jenis)

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    20/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    9

    dan/ atau dukungan teknis;

    2)  seluruh penawaran dari pesertamendekati HPS;

    3)  adanya keikutsertaan beberapaPenyedia Barang/Jasa yangberada dalam 1 (satu) kendali;

    4)  adanya kesamaan/kesalahan isidokumen penawaran, antara lainkesamaan/ kesalahan pengetikan,susunan, dan format penulisan;atau

    5) 

     jaminan penawaran dikeluarkandari penjamin yang sama dengannomor seri yang berurutan.

    a.  membuat dan/atau menyampaikandokumen dan/atau keterangan lain yang tidak benar untuk memenuhipersyaratan dalam DokumenPengadaan ini.

    4.2  Peserta yang menurut penilaian PokjaULP terbukti melakukan tindakan

    sebagaimana dimaksud dalam pasal 4.1dikenakan sanksi sebagai berikut:

    b.  sanksi administratif, sepertidigugurkan dari proses[ dipilih:Pelelangan Umum/PemilihanLangsung  ]   atau pembatalan penetapanpemenang;

    c.  sanksi pencantuman dalam DaftarHitam;

    d. 

    gugatan secara perdata; dan/ataue.  pelaporan secara pidana kepada pihak

    berwenang.

    5.  LaranganPertentang-anKepentingan

    5.1  Para pihak dalam melaksanakan tugas,fungsi dan perannya,dilarangmemiliki/melakukan peran ganda atauterafiliasi.

    5.2  Peran ganda sebagaimana dimaksudpasal 5.1 antara lain meliputi:

    a. 

    Seorang anggota Direksi atau Dewan

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    21/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    10

    Komisaris suatu Badan Usahamerangkap sebagai anggota Direksi

    atau Dewan Komisaris pada BadanUsaha lainnya yang menjadi pesertapada Pelelangan pekerjaan yangsama;

    b.  Penyedia yang telah ditunjuk sebagaikonsultan manajemen konstruksiberperan sebagai konsultanperencana dan/atau konsultanpengawas;

    c.  Penyedia yang telah ditunjuk sebagaikonsultan perencana/ pengawasbertindak sebagai pelaksanaPekerjaan Konstruksi yangdirencanakannya/diawasinya;

    d.  pengurus koperasi pegawai dalamsuatuKementerian/Lembaga/PemerintahDaerah/Institusi atau anakperusahaan pada BUMN/BUMD yangmengikuti Pengadaan dan bersaing

    dengan perusahaan lainnya,merangkap sebagai anggota Pokja ULPatau pejabat yang berwenangmenetapkanpemenang Pelelangan.

    e.  PPK dan/atau anggota Pokja ULP,baik langsung maupun tidak langsungmengendalikan atau menjalankanperusahaan peserta;

    f.  Hubungan antara 2 (dua) perusahaan

     yang dikendalikan, baik langsungmaupun tidak langsung oleh pihak yang sama yaitu lebih dari 50% (limapuluh per seratus) pemegang saham.

    6.  AlihPengalamandanPendaya-gunaanProduksi

    Dalam

    6.1  Dalam hal pelaksanaan paket pekerjaankonstruksi dengan nilai kontrak di atasRp100.000.000.000,00 (seratus miliarrupiah) penyedia jasa pelaksanakonstruksi diwajibkan memberikan alihpengalaman/keahlian kepada peserta

    didik bidang konstruksi melalui sistem

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    22/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    11

    Negeri kerja praktek/magang sesuai dengan jumlah peserta didik yang diusulkan

    dalam dokumen penawaran.

    6.2  Peserta berkewajiban untukmenyampaikan penawaran yangmengutamakan pekerjaan konstruksi yang dilaksanakan di Indonesia olehtenaga Indonesia (produksi dalamnegeri).

    6.3  Dalam pelaksanaan pekerjaankonstruksi dimungkinkan menggunakanbahan baku, tenaga ahli, dan perangkatlunak yang tidak berasal dari dalamnegeri (impor) dengan ketentuan:

    a.  pemilahan atau pembagian komponenharus benar-benar mencerminkanbagian atau komponen yang telahdapat diproduksi di dalam negeri danbagian atau komponen yang masihharus diimpor;

    b.  komponen berupa bahan baku belum

    diproduksi di dalam negeri dan/atauspesifikasi teknis bahan baku yangdiproduksi di dalam negeri belummemenuhi persyaratan;

    c.  pekerjaan pemasangan, pabrikasi,pengujian dan lainnya sedapatmungkin dilakukan di dalam negeri;

    d.  semaksimal mungkin menggunakan jasa pelayanan yang ada di dalamnegeri, seperti jasa asuransi,angkutan, ekspedisi, perbankan, danpemeliharaan;

    e.  penggunaan tenaga ahli asingdilakukan semata-mata untukmencukupi kebutuhan jenis keahlian yang belum dapat diperoleh diIndonesia, disusun berdasarkankeperluan yang nyata, dandiusahakan secara terencana untuksemaksimal mungkin terjadinya alihpengalaman/keahlian dari tenaga ahli

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    23/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    12

    asing tersebut ke tenaga Indonesia;dan

    f.  peserta diwajibkan membuat daftarBarang yang diimpor yang dilengkapidengan spesifikasi teknis, jumlah danharga yang dilampirkan padaDokumen Penawaran.

    6.4  Pemberian preferensi harga terhadappenawaran peserta atas penggunaanproduksi dalam negeri ditetapkan dalamLDP.

    7.  SatuPenawaranTiap Peserta

    7.1 

    Setiap peserta, baik atas nama sendirimaupun sebagai anggota kemitraan/KSOhanya boleh memasukkan satupenawaran untuk satu paket pekerjaan.

    7.2  Setiap peserta yang termasuk dalamkemitraan/KSO DILARANG menjadipeserta baik secara sendiri maupunsebagai anggota kemitraan/KSO yanglain pada paket pekerjaan yang sama.

    B.  Dokumen Pengadaan

    8.  Pengambil-an DokumenPengadaan

    8.1  Semua peserta wajib melakukanpendaftaran sebelum mengambilDokumen Pengadaan.

    8.2  Peserta dapat mengambil DokumenPengadaan sesuai hari, tanggal, waktudan tempat pengambilan yangditentukan dalam pengumuman.

    8.3 

    Seseorang dilarang mewakili lebih dari 1(satu) perusahaan dalam pendaftarandan pengambilan dokumen.

    9.  Isi DokumenPengadaanPekerjaanKonstruksi

    9.1  Dokumen Pengadaan PekerjaanKonstruksi terdiri dari DokumenPemilihan dan Dokumen Kualifikasi.

    9.2  Dokumen Pemilihan terdiri atas:

    a. Umum

    b. Instruksi Kepada Peserta;

    c. 

    Lembar Data Pemilihan;

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    24/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    13

    d. Contoh Bentuk Dokumen Penawaranmeliputi:

    1) 

    Surat Penawaran;

    2)  Surat Kuasa;

    3)  Surat Perjanjian Kemitraan/KerjaSama Operasi (KSO);

    4)  DokumenPenawaranTeknis;

    5)  Formulir Rekapitulasi Perhitungan TKDN;

    6)  Jaminan Penawaran

    (dipersyaratkan untuk paketpekerjaan dengan nilai di atasRp2.500.000.000,00 (dua miliarlima ratus juta rupiah));

    7)  Analisa Harga Satuan dan Analisa Teknik Satuan Pekerjaan pada saatklarifikasi kewajaran hargaterhadap penawaran di bawah 80%HPS akan diminta, untukkepentingan evaluasi dan tidakmenjadi bagian dari ketentuankontrak.

    e. Contoh Bentuk Rancangan Kontrakmeliputi:

    1)  Surat Perjanjian/Pokok Perjanjian;

    2)  Syarat-Syarat Umum Kontrak;

    3)  Syarat-Syarat Khusus Kontrak;

    f.  Daftar Kuantitas dan Harga;

    g. Formulir RK3K; dan

    h. 

    Contoh Bentuk Dokumen Lainmeliputi:

    1)  Pengumuman Pelelangan;

    2)  SPPBJ;

    3)  SPMK;

    4)  Jaminan Pelaksanaan;

    5)  Jaminan Uang Muka;

    6)  Jaminan Pemeliharaan;

    7) 

    Daftar Barang yang diimpor.

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    25/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    14

    9.3  Isi Dokumen Kualifikasi meliputi:

    a. Lembar Data Kualifikasi;

    b. Pakta Integritas;

    c. Formulir Isian Kualifikasi;

    d. Petunjuk Pengisian Formulir IsianKualifikasi;

    e.  Tata Cara Evaluasi Kualifikasi.

    9.4  Peserta berkewajiban memeriksakeseluruhan isi Dokumen Pengadaan.Kelalaian menyampaikan Dokumen

    Penawaran yang tidak memenuhipersyaratan yang ditetapkan dalamDokumen Pengadaansepenuhnyamerupakan risiko peserta.

    9.5  Peserta dapat meminta penjelasan secaratertulis mengenai isi DokumenPengadaan kepada Pokja ULP sebelumbatas akhir pemasukan penawaran.

    9.6  Pokja ULP wajib menanggapi setiappermintaan penjelasan yang diajukan

    peserta secara tertulis.

    10. BahasaDokumenPengadaan

    Dokumen Pengadaan beserta seluruhkorespondensi tertulis dalam prosesPengadaan menggunakan Bahasa Indonesia.

    11. PemberianPenjelasan

    11.1  Pemberian penjelasan dilakukan padawaktu dan tempat sebagaimanatercantum dalam LDP serta dapatdihadiri oleh peserta yang terdaftar.

    11.2  Ketidakhadiran peserta pada saat

    pemberian penjelasan tidak dapatdijadikan dasar untukmenolak/menggugurkan penawaran.

    11.3  Perwakilan peserta yang hadir pada saatpemberian penjelasan menunjukkantanda pengenal dan surat tugas kepadaPokja ULP.

    11.4  Dalam pemberian penjelasan, Pokja ULPmenjelaskan kepada peserta mengenai:

    a.  lingkup pekerjaan;

    b. 

    metode pemilihan;

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    26/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    15

    c.  metode pemasukan DokumenPenawaran;

    d. 

    kelengkapan yang harus dilampirkanbersama Dokumen Penawaran;

    e.  jadwal batas akhir pemasukanDokumen Penawaran dan pembukaanDokumen Penawaran;

    f.  tatacara pembukaan DokumenPenawaran;

    g.  metode evaluasi;

    h.  hal-hal yang menggugurkan

    penawaran;i.   jenis kontrak yang akan digunakan;

     j.  ketentuan dan cara evaluasiberkenaan dengan preferensi hargaatas penggunaan produksi dalamnegeri;

    k.  ketentuan tentang penyesuaian harga;

    l.  risiko K3 yang mungkin timbul akibatpekerjaan termasuk kondisi danbahaya;

    m. 

    ketentuan dan cara sub kontraksebagian pekerjaan kepada UsahaMikro dan Usaha Kecil serta koperasikecil;

    n.  besaran, masa berlaku dan penjamin yang dapat menerbitkan jaminan; dan

    o.  ketentuan tentang asuransi.

    11.5  Apabila diperlukan, Pokja ULP dapatmemberikan penjelasan lanjutan dengancara melakukan peninjauan lapangan.

    Biaya peninjauan lapangan dankeperluan peserta ditanggung masing-masing peserta.

    11.6  Pemberian penjelasan mengenai isiDokumen Pengadaan, pertanyaan daripeserta, jawaban dari Pokja ULP,perubahan substansi dokumen, hasilpeninjauan lapangan, serta keteranganlainnya harus dituangkan dalam BeritaAcara Pemberian Penjelasan (BAPP) yang

    ditandatangani oleh anggota Pokja ULP

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    27/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    16

    dan minimal 1 (satu) wakil dari peserta yang hadir.

    11.7 

    Apabila tidak ada satupun peserta yanghadir atau yang bersediamenandatangani BAPP, maka BAPPcukup ditandatangani oleh anggota PokjaULP yang hadir.

    11.8  Apabila dalam BAPP sebagaimanadimaksud pada 11.6terdapat hal-hal/ketentuan baru atau perubahanpenting yang perlu ditampung, makaPokja ULP menuangkan ke dalam

    Adendum Dokumen Pengadaanyangmenjadi bagian tidak terpisahkan dariDokumen Pengadaan.

    11.9  Perubahan rancangan kontrak,spesifikasi teknis, gambar, dan/ataunilai total HPS, harus mendapatkanpersetujuan PPK sebelum dituangkandalam Adendum Dokumen Pengadaan.

    11.10 Apabila ketentuan baru atau perubahanpenting tersebut tidak dituangkan dalam

    Adendum Dokumen Pengadaan, makaketentuan baru atau perubahan tersebutdianggap tidak ada dan ketentuan yangberlaku adalah ketentuan dalamDokumen Pengadaan awal.

    11.11 Peserta diberitahu oleh Pokja ULP untukmengambil salinan BAPP dan/atauAdendum Dokumen Pengadaan(apabilaada).

    11.12 Peserta dapat mengambil salinan BAPP

    dan/atau Adendum DokumenPengadaanyang disediakan oleh PokjaULP atau mengunduhmelalui aplikasisistem pengadaan secara elektronik(SPSE)sebagaimana tercantum dalamLDP. 

    11.13 Sangat dianjurkan kepada peserta untukmenghadiri pemberian penjelasanpekerjaan di kantor dan peninjauanlapangan agar dapat menyiapkanpenawarannya dengan baik.

    http://www.pu.go.id/http://www.pu.go.id/http://www.pu.go.id/http://www.pu.go.id/

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    28/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    17

    11.14 Dalam hal pemberian penjelasan secaraelektronik dilakukan sesuai dengan

    petunjuk penggunaan aplikasi SPSEpada website LPSE.

    12. PerubahanDokumenPengadaan

    12.1  Setelah Pemberian Penjelasan dansebelum batas akhir pemasukanpenawaran, Pokja ULP dapatmenetapkan Adendum DokumenPengadaan, berdasarkan informasi baru yang mempengaruhi ketentuanpemilihan maupun substansi DokumenPengadaan.

    12.2 

    Setiap Adendum yang ditetapkanmerupakan bagian yang tidakterpisahkan dari Dokumen Pengadaan.

    12.3  Peserta diberitahu oleh Pokja ULP untukmengambil salinan Adendum DokumenPengadaan.

    12.4  Peserta dapat mengambil salinanAdendum Dokumen Pengadaan yangdisediakan oleh Pokja ULP ataumengunduhnya melalui aplikasi sistem

    pengadaan secara elektronik(SPSE)sebagaimana tercantum dalamLDP.

    13. TambahanWaktuPemasukanDokumenPenawaran

    Dalam Adendum Dokumen Pengadaan, PokjaULP dapat memberikan tambahan waktuuntuk memasukkan Dokumen Penawaran.

    C.  Penyiapan Dokumen Penawaran

    14. BiayadalamPenyiapanPenawaran

    14.1  Peserta menanggung semua biaya dalampenyiapan dan penyampaian penawaran.

    14.2  Pokja ULP tidak bertanggung jawab ataskerugian apapun yang ditanggung olehpeserta.

    15. BahasaPenawaran

    15.1  Semua Dokumen Penawaran harusmenggunakan Bahasa Indonesia.

    15.2 

    Dokumen pendukung yang terkait dengan

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    29/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    18

    Dokumen Penawaran dapatmenggunakan Bahasa Indonesia atau

    bahasa asing.15.3  Dokumen pendukung yang berbahasa

    asing perlu disertai penjelasan dalamBahasa Indonesia. Dalam hal terdapatperbedaan penafsiran, maka yang berlakuadalah penjelasan dalam BahasaIndonesia.

    16. DokumenPenawaran

    16.1  Dokumen Penawaran pokok/utamapaling kurang terdiri atas:

    a.  Penawaran Administrasi;

    b. 

    Penawaran Teknis;

    c.  Penawaran Harga; dan

    d.  Data Kualifikasi.

    16.2  Dokumen Penawaran, meliputi:

    a.  surat penawaran;b.  Jaminan Penawaran asli (untuk paket

    pekerjaan di atasRp.2.500.000.000,00 (dua miliar limaratus juta rupiah));

    c. 

    daftar kuantitas dan harga;d.  surat kuasa dari direkturutama/pimpinan perusahaan kepadapenerima kuasa yang namanyatercantum dalam akta pendirian atauperubahannya (apabila dikuasakan);

    e.  surat perjanjian kemitraan/kerjasama operasi (apabila bermitra);

    f.  dokumen penawaran teknis.g.  RK3K;h.  rekapitulasi perhitungan TKDN;

    i. 

    data kualifikasi; dan j.  Daftar Barang yang diimpor (apabila

    impor).

    17. HargaPenawaran

    17.1  Harga penawaran ditulis dengan jelasdalam angka dan huruf.

    17.2  Peserta mencantumkan hargakegiatan/keluarandan harga total untuksetiap kegiatan pekerjaandalamkebutuhan biaya (daftar kegiatandan harga) dapat dalam setiap mata

    pembayaran yang pokok (milestone)   atau

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    30/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    19

    dalam rincian. Jika hargakegiatan/keluaran ditulis “nol” atau tidak

    dicantumkan, maka pekerjaan tersebuttetap harus dilaksanakan. Hargapenawaran yang mengikat adalah hargatotal penawaran terkoreksi.

    17.3  Biaya overhead termasuk untukpenyelenggaraan Keselamatan danKesehatan Kerja (K3), keuntungan, semuapajak, bea, retribusi, tenaga kerjapraktek/magang, biaya asuransi, danbiaya lain yang harus dibayar oleh

    penyedia untuk pelaksanaan paketpekerjaan konstruksi ini telahdiperhitungkan dalam total hargapenawaran.

    18. Mata UangPenawarandan CaraPembayar-an

    18.1  Semua harga dalam penawaran harusdalam bentuk mata uang sebagaimanatercantum dalam LDP.

    18.2  Pembayaran atas pelaksanaanpekerjaandilakukan sesuai dengan carasebagaimana tercantum dalam LDP dan

    diuraikan dalam Syarat-SyaratUmum/Khusus Kontrak.

    19. MasaBerlakuPenawaran

    19.1  Masa berlaku penawaran sebagaimanatercantum dalam LDP.

    19.2  Apabila evaluasi belum selesaidilaksanakan, sebelum akhir masaberlakunya penawaran, Pokja ULP dapatmeminta kepada seluruh peserta secaratertulis untuk memperpanjang masaberlakunya penawaran tersebut dalam jangka waktu tertentudan diperhitungkanpaling kurang sampai perkiraan tanggalpenandatanganan kontrak.

    19.3  Berkaitan dengan 19.2, maka pesertadapat:

    a.  menyetujui permintaan tersebut tanpamengubah penawaran; atau

    b.  Tidak bersedia memperpanjang sesuaipermintaan tersebut dan dianggapmengundurkan diri, serta tidakdikenakan sanksi.

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    31/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    20

    20. BentukDokumen

    Penawaran

    Dokumen Penawaran disampaikansecaraelektronik, dan penyerahan dokumen

    penawaran asli hanya dilakukan terhadappenawaran yang akan diusulkan sebagai calonpemenang dan calon pemenang cadangan(apabila ada).

    21. PaktaIntegritas

    21.1  Pakta Integritas berisi ikrar untukmencegah dan tidak melakukan dan akanmelaporkan terjadinya kolusi, korupsi,dan nepotisme (KKN) termasukpenyalahgunaan wewenang dalampengadaan pekerjaan konstruksi serta

    akan mengikuti proses pengadaan secarabersih, transparan, dan profesional.

    21.2  Dengan mendaftar sebagai peserta lelangpada suatu paket pekerjaan melaluiaplikasi SPSE, maka peserta telahmenandatangani Pakta Integritas, kecualiuntuk penyedia barang/jasa yangmelakukan Kemitraan/Kerja SamaOperasi (KSO), badan usaha yangditunjuk mewakili Kemitraan/ KerjaSama Operasi (KSO) wajib menyampaikanpakta integritas melalui fasilitasunggahan lainnya pada form isianelektronik data kualifikasi di aplikasiSPSE.

    22. PengisianDataKualifikasi

    22.1  Pengisian Data Kualifikasi

    a.  Data kualifikasi disampaikan melaluiform isian elektronik kualifikasi yangtersedia pada aplikasi SPSE;

    b.  Jika form isian elektronik kualifikasi yang tersedia pada aplikasi SPSEbelum mengakomodir data kualifikasi yang disyaratkan Pokja ULP, makadata kualifikasi tersebut diunggah(upload ) pada fasilitas pengunggahanlain yang tersedia pada aplikasi SPSE;

    c.  Dengan mengirimkan data kualifikasisecara elektronik, peserta menyetujuipernyataan sebagai berikut:

    1)   yang bersangkutan danmanajemennya tidak dalam

    pengawasan pengadilan, tidak

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    32/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    21

    pailit, dan kegiatan usahanya tidaksedang dihentikan;

    2) 

     yang bersangkutan berikutpengurus badan usaha tidakmasuk dalam daftar hitam;

    3)   yang bertindak untuk dan atasnama badan usaha tidak sedangdalam menjalani sanksi pidana;

    4)  data kualifikasi yang diisikanbenar, dan jika dikemudian hariditemukan bahwa data/dokumen yang disampaikan tidak benar dan

    ada pemalsuan, maka direkturutama/pimpinan perusahaan, ataukepala cabang, atau pejabat yangmenurut perjanjian kerja samaberhak mewakili badan usaha yangbekerja sama dan badan usaha yang diwakili bersedia dikenakansanksi administratif, sanksipencantuman dalam daftar hitam,gugatan secara perdata, dan/atau

    pelaporan secara pidana kepadapihak berwenang sesuai denganketentuan peraturan perundangundangan;

    5)  pimpinan dan pengurus badanusaha bukan sebagai pegawaiK/L/D/I atau pimpinan danpengurus badan usaha sebagaipegawai K/L/D/I yang sedangmengambil cuti diluar tanggunganK/L/D/I; dan

    6) 

    pernyataan lain yang menjadisyarat kualifikasi yang tercantumdalam dokumen pengadaan.

    d.  Untuk peserta yang berbentukkonsorsium/ kemitraan/bentukkerjasama lain, pemasukan kualifikasidilakukan oleh badan usaha yangditunjuk mewakili konsorsium/kemitraan/ bentuk kerjasama lain.

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    33/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    22

    22.2  Peserta berkewajiban untuk menyetujuiPakta Integritas dan mengisi form isian

    elektronik data kualifikasi dalam aplikasiSPSE.

    22.3  Pakta Integritas dan Data Kualifikasidianggap telah disetujui danditandatangani oleh peserta pengadaan,kecuali untuk peserta yang melakukanKemitraan/Kerja Sama Operasi (KSO)Pakta Integritas dan dan Data Kualifikasiditandatangani oleh pejabat yangmenurut perjanjian Kemitraan/Kerja

    Sama Operasi berhak mewakiliKemitraan/KSO.

    22.4  Peserta mengirimkan Data Kualifikasimelalui aplikasi SPSE kepada Pokja ULPsesuai jadwal yang ditetapkan.

    22.5  Peserta dapat mengirimkan kekurangandata kualifikasi melalui fasilitaspengiriman data kualifikasi yang tersediapada aplikasi SPSE sebelum batas akhirpemasukan data kualifikasi.

    22.6 

    Data Kualifikasi harus disampaikanmelalui aplikasi SPSE kepada Pokja ULPpaling lambat pada waktu yangditentukan oleh Pokja ULP.

    22.7  Aplikasi SPSE menolak setiap filepenawaran yang dikirimkan setelah batasakhir waktu pemasukan penawaran.

    22.8  Data Kualifikasi dapat dibuka pada saatData Kualifikasi diterima Pokja ULP padaaplikasi SPSE.

    23. JaminanPenawaran

    23.1 

    Penggunaan jaminan penawaran:a.  Paket pekerjaan sampai dengan

    Rp2.500.000.000,00 (dua miliar limaratus juta rupiah) tidak diperlukansurat jaminan penawaran;

    b.  surat jaminan penawaran untuk paketpekerjaan di atasRp2.500.000.000,00 (dua miliar limaratus juta rupiah) sampai denganRp50.000.000.000,00 (lima puluh

    miliar rupiah) dapat diterbitkan oleh

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    34/243

     

    Pokja Satker PJN Wilayah I Provinsi Sulawesi Utara

    23

    Bank Umum, Perusahaan Asuransi,Perusahaan Penjaminan, konsorsium

    perusahaan asuransi umum/lembagapenjaminan/perusahaan penjaminan yang mempunyai program asuransikerugian (suretyship ), bersifat mudahdicairkan dan tidak bersyarat(unconditional ) dimana konsorsiumtersebut telah ditetapkan/mendapatrekomendasi dari Otoritas JasaKeuangan (OJK), dan diserahkan olehPenyedia Jasa kepada Kelompok KerjaULP; atau

    c.  surat jaminan penawaran untuk paketpekerjaan di atasRp50.000.000.000,00 (lima puluhmiliar rupiah) diterbitkan oleh BankUmum, konsorsium perusahaanasuransi umum/lembagapenjaminan/perusahaan penjaminan yang mempunyai program asuransikerugian (suretyship ), bersifat mudahdicairkan dan tidak bersyarat

    (unconditional ) dimana konsorsiumtersebut telah ditetapkan/mendapatrekomendasi dari Otoritas JasaKeuangan (OJK), dan diserahkan olehPenyedia Jasa kepada Kelompok KerjaULP.

    23.2   Jaminan penawaran asli bagi penyedia jasa yang mengikuti pengadaan secaraelektronik wajib diterima Pokja ULPsebelum batas akhir pemasukan

    penawaran.23.3  Peserta menyerahkan Jaminan

    Penawaran dalam mata uang penawaransebagaimana tercantum dalam LDP.

    23.4   Jaminan Penawaran memenuhiketentuan sebagai berikut:

    a.  diterbitkan sesuai dengan nilaiperuntukannya pada pasal 23.1.

    b.  Jaminan Penawaran dimulai sejaktanggal terakhir pemasukan

    penawaran dan masa berlakunya tidak

  • 8/18/2019 Sbd Winangun Maumbi Myc 2016

    35/243

     