Saudi Electricity Company لكهرباء الشركة السعودية لSEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02 DATE: November 2016 SDCS-02 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice

SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

  • Upload
    others

  • View
    145

  • Download
    8

Embed Size (px)

Citation preview

Page 1: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

Saudi Electricity Company الشركة السعودية للكهرباء

SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02

DATE: November 2016

SDCS-02

CONSTRUCTION STANDARD

FOR

UNDERGROUND DISTRIBUTION NETWORK

This specification is property of SEC and

subject to change or modification without any notice

Page 2: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

Saudi Electricity Company الشركة السعودية للكهرباء

SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02

DATE: November 2016G

Page 2 of 10

PART 10

INSTALLATION

OF

13.8 & 33 KV

METERED RING MAIN UNIT

SF6 ROOM SUBSTATIONS

Page 3: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

Saudi Electricity Company الشركة السعودية للكهرباء

SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02

DATE: November 2016G

Page 3 of 10

TABLE OF CONTENTS

Sr. No. DESCRIPTION PAGE

NO.

13.8/33 KV METERED RING MAIN UNIT SF6 ROOM

1 INTRODUCTION 4

2 SERVICE CONDITIONS AND SERVICE PARAMETERS 4

3 REVISION AND ADDITIONS 4

4 DESIGN OF METER ROOM 4

5 CIVIL CONSTRUCTION REQUIREMENTS 5

6 DRAWINGS 6-10

Fig.1 Meter Room 6

Fig.2 Cable trench & Cover 7

Fig.3 Front elevation Fig.4 Lighting arrangement 8

Fig.5 Door Details Fig.6 Window Details 9

Fig.7 Foundation Plan Fig.8 Roof Slab Plan 10

Fig.9 Tie Beam Detail Fig.10 Roof Beams detail 10

Fig.11 Column and foundation detail 10

Page 4: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

Saudi Electricity Company الشركة السعودية للكهرباء

SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02

DATE: November 2016G

Page 4 of 10

1 Introduction

This construction standard specifies the construction design of 13.8 & 33 KV

Metered Ring Main Unit SF6 Room Sub-station. This standard is intended to assist

the field engineers and technicians to achieve unified standard in construction to

ensure a satisfactory and economical level of service without operation restrictions

so that the operational errors are minimized for safety and reliability of the system.

2 Service conditions and system parameters

For construction and installation of Drawings, the service conditions and system

requirements shall be as given in the latest revision of SEC general requirements for

all Equipment/Material specification No. 01-SDMS-01 (latest revision). This SDMS

shall also be read in conjunction with SEC Purchase Order (PO) requirements.

3 Revision and additions.

This construction standard is subject to revision as new material and methods of

construction are developed. The latest revision of existing Drawings shall be

revised if feasible and new drawings needs to be developed involving work

expansion / modification.

4 Design of Meter Room

4.1 The following points are required to be considered at site during the selection of

Metered Ring Main Unit Room Design:

4.1.1 The minimum inner dimensions of the room shall be 5000mm x 4000mm

to install Meter Ring Main Unit into on RMU’s inside the room.

4.1.2 Room should be easily accessible without any obstruction.

4.1.3 Meter Room shall not be located on the top of sewerage system or water

tanks. However, in case if it is not possible to avoid such service the standard

height of the room and trench depth must be maintained (as shown in drawing).

4.2 Door and Cable entry pipes:

4.2.1 Access to the room shall be from the front by means of hinged metal

doors, fitted with a heavy-duty locking device to secure them at closed position

and one stainless steel hasp set for separate SEC standard pad locking.

4.2.2 Door shall be opened to outside the room either to the right or left hand

side. It shall be provided with door stoppers and locking at open position to

protect from swinging in order to protect the energy meter box to be fixed on the

right side of the front wall as well as to avoid accidents.

4.2.3 All door hinges and its fixing bolts & nuts shall be concealed and made of

rigid material.

4.2.4 Locking shall be as follows:

Handle shall be high grade stainless steel.

Page 5: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

Saudi Electricity Company الشركة السعودية للكهرباء

SEC DISTRIBUTION CONSTRUCTION STANDARD SDCS-02

DATE: November 2016G

Page 5 of 10

Shall be operated by Central handle lock by using SEC standard key or pad

lock according to SEC specification SEC-02-02 latest revision.

4.2.5 The door shall be made of steel 2500mm wide and 3498mm high

excluding the door frame.

4.2.6 Ventilation louvers shall be shall be provided as shown in figure 5.

4.2.7 Door shall be bonded to any metal framework by a bolted removable 35

mm2 tinned copper braid.

4.3 For the entry & exit of SEC Cable in to and out of the meter room shall be 4

PVC pipes of 150mm diameter in compliance with latest revision of relevant SEC

Specification shall be provided.

4.4 Reinforced Concrete Cable Trench:

4.4.1 Reinforced Concrete Cable Trench 15cm thick shall be provided in the

room as shown in figure 1 & 2. The Trench shall be 600mm wide and 1300mm

deep as covered by removable Checkered steel plate.

4.4.2 Steel reinforcement 10mm diameter 20cm C/C on both directions to be

provided as reinforcement for concrete trench walls and bottom.

4.4.3 Steel angel LS to be fixed on the Concrete trench edge.

4.4.4 Lean Concrete 10cm thick to be placed under the trench.

4.4.5 The upper edge of the Cable trench shall be 50mm wider than the standard

width of the trench to form a grove of 25x10mm all around the trench for fixing of

the Trench Cover as shown in Fig.2.

4.4.6 Finishing Color

The interior of the meter room shall be adequately protected against

weather changes and painted with pure white Color with a smooth surface finish

as per SEC Specification 01-SDMS-01 latest revision as refer to (Civil Work

Requirements).

4.4.7 The room shall have minimum 2 Lead lamp light as shown in Fig.4.

5 Civil Construction Requirements:

All Civil Work shall be done according to SEC Unified (Civil Work Requirement)

latest revision.

6 Drawings

Fig.1 Meter Room Fig.2 Cable trench & Cover

Fig.3 Front elevation Fig.4 Lighting arrangement

Fig.5 Door Details. Fig.6 Window Details

Fig.7 Foundation Plan Fig.8 Roof Slab Plan

Fig.9 Tie Beam Detail Fig.10 Roof Beams detail

Fig.11 Column and foundation detail.

Page 6: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

6200

200

2400 1300

200

4000

200

4400

200 200

2400x1000mm WINDOW WITH VENTILATION

FIG: 1 - 13.8 / 33KV METERED RING MAIN UNIT (SF-6)ROOM SIZE 5000mm x 4000mm

5000400 400

400 400

5400

6200

200

4000

4400

400

5200

400

400

5200

450

200

1300

2500x3500mm DOOR OPENING

1000

4-6"Ø PVC PIPECOVERED BY END CAPS

1250 2500 1250200 200

600

600

3500

600150 150

CA

BLE

TR

ENC

H D

EPTH

130

0mm

CO

VER

ED B

Y 8

mm

TH

ICK

NES

STR

ENC

H C

OV

ERA

C

A

B

HIGH VOLTAGE ROOM

450

4-6"Ø PVC PIPECOVERED BY END CAPS

CA

BLE

TR

ENC

H D

EPTH

130

0mm

CO

VER

ED B

Y 8

mm

TH

ICK

NES

STR

ENC

H C

OV

ER

R181

R181

R181

600

M.R.M.U

GROUND ROD AT EACH CORNER(COPPERWELD, 16mm DIA.)

GG

COMPRESSIONCONNECTOR

CABLE SCREEN

COMPRESSIONCONNECTOR

70mm sq.Ground Conductor

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARDSDCS-02

DATE: November 2016G

Page 7: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

SEC

TIO

N C

TREN

CH

CO

VER

600

1300

650

10

8

25

650

LIFT

ING

HO

OK

ALL

PIE

CES

CU

TTO

EQ

UA

L LE

NG

TH

TREN

CH

CO

VER

8m

m T

HIC

K(S

TEEL

)

FIG

2: C

AB

LE T

REN

CH

& C

OV

ER

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARDSDCS-02

DATE: November 2016G

Page 8: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

3500400

500 1450

500

400

500 145060

0 1300

FRO

NT

ELEV

ATI

ON

SEC

TIO

N A

-A

FIG

: 4 L

IGH

TIN

G A

RR

AN

GEM

ENT

3600

150

4000

1400

1200

100

400

400

4003600

SEC

TIO

N B

-BSC

ALE

1

:100

SCA

LE

1:1

00SC

ALE

1:

100

SCA

LE

1:1

00

2 ST

EP-U

PC

ompa

cted

Bac

kfill

ASH

PALT

LEV

EL 0

.00

600 1300

500

ASH

PALT

LEV

EL 0

.00

MET

ERB

OX12

5012

50

2500

3500

3500

2000

x 3

500m

mFU

LLY

LO

UV

ERED

DO

OR

2mm

FLY

MES

H IN

ALU

MIN

UM

FR

AM

E

2400

x 1

000m

mST

EEL

WIN

DO

W

Com

pact

ed B

ackf

ill

Com

pact

ed B

ackf

illA

SHPA

LT L

EVEL

0.0

0A

SHPA

LT L

EVEL

0.0

0

FIN

ISH

FLO

OR

LEV

EL +

50

4000

5000

LED

LA

MP

LIG

HT

500x

500m

m E

XH

AU

ST F

AN

WIT

H O

UTS

IDE

LOU

VER

S

3500400

500 1450

400

500 1450

600 1300

2 ST

EP-U

PC

ompa

cted

Bac

kfill

ASH

PALT

LEV

EL 0

.00

600 1300

ASH

PALT

LEV

EL 0

.00

1000

2400

2400

x 1

000m

mW

IND

OW

WIT

H S

TEEL

FLY

MES

H

LED

LA

MP

LIG

HT

1500

500

2500

x350

0mm

DO

OR

OPE

NIN

G

500x

500m

m E

XH

AU

ST F

AN

WIT

H O

UTS

IDE

LOU

VER

S

FIG

: 3 E

LEV

ATI

ON

& S

ECTI

ON

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARDSDCS-02

DATE: November 2016G

Page 9: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

3500

1350

80

200

646

1000

SECTION D-D

SECTION E-E FIG: 6 WINDOWS DETAILSSCALE 1:50

PLAN2mm THK.LOUVERS

FIG: 5 DOOR DETAILSSCALE 1:50

2500

120013

00

2500

3498

2mm

GA

P

80

2mm

GA

P

FRONT VIEW

PLAN

10x10x1 ANGULARBAR DOOR FRAME4-20cm HINGES

200

200

200

200

2mm GAP2mm GAP2336

10x10x1 ANGULARBAR (DOOR FRAME)

2mm FLY MESH IN ALUMINUM FRAME

FRONT VIEW

2mm

FLY

MES

HIN

ALU

MIN

UM

FR

AM

E

1000

2400

IN ALUMINUM FRAME50x5mm STEEL SIRIP

2mm FLY MESH2mm LOUVER ANGULAR BAR

50x50x5mm

2mm LOUVER50x5mm STEEL SIRIP

1000

5050

50 2400 50

802

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARDSDCS-02

DATE: November 2016G

Page 10: SDCS-02 CONSTRUCTION STANDARD FOR6 Drawings Fig.1 Meter Room Fig.2 Cable trench & Cover Fig.3 Front elevation Fig.4 Lighting arrangement Fig.5 Door Details. Fig.6 Window Details Fig.7

1400

5000

1200C1

F1

TB2

1400

1400

1200

1200C1

F1

450

TB1

TB1

3500

1400

1400

1200

1200

450

C1

F1

TB2

1400

1400

1200

1200C1

F1

450

FIG

: 7 F

OU

ND

ATI

ON

PLA

NSC

ALE

:

N

TS

5000

200

400 200

450

4000 200

450

400

200

FIG

: 8 R

OO

F SL

AB

PLA

NSC

ALE

:

N

TS

200

400

400 200 4000 200 400

200

6-10mmØ /m

4-12mmØ /m

1200

RB

1

400

200

5000

6-12mmØ /m

4-12mmØ /m

6-10mmØ /m

1200

1000

RB

1

SEC

TIO

N A

-ASC

ALE

:

NTS

200

40020

150

SEC

TIO

N B

-BSC

ALE

:

NTS

6-10mmØ /m

4-12mmØ /m

400

200

1200

RB

2

6-12mmØ /m

4000

200

RB

212

0010

00

40020

150

120

4-12mmØ /m

6-10mmØ /m

FIG

: 10

RO

OF

BEA

MS

DET

AIL

RO

OF

BEA

M (R

B1)

45020

035

00

C1

400

1000

450

C1

200

2-14mmØ (TYPICAL)

2-14mmØ (TYPICAL)

10mmØ STIRRUPS

@15

0mm

C.C

.

5-14mmØ

3-14mmØ

YY

400

200

3-14mmØ

10mmØ STIRRUPS

4-14mmØ

SEC

TIO

N Y

-Y

400

200

C1

5000

RO

OF

BEA

M (R

B2)

200

C1

400

2-14mmØ (TYPICAL)

2-14mmØ (TYPICAL)

10mmØ STIRRUPS

@15

0mm

C.C

.

5-14mmØ

3-14mmØ

ZZ

SEC

TIO

N Z

-Z20

0

400

3-14mmØ

10mmØ STIRRUPS

4-14mmØ

FIG

: 9 T

IE B

EAM

S D

ETA

IL

SCA

LE:

N

TS

SCA

LE:

N

TS

TIE

BEA

M (T

B1)

C1

450

3500

450 C1

10mmØ STIRRUPS

@15

0mm

C.C

.

3-14mmØ (TYPICAL)

3-14mmØ

3-14mmØ

Y1

Y1

10cm

TH

K. L

EAN

CO

NC

RET

ESE

CTI

ON

Y1-

Y1

200

500

3-14mmØ

10mmØ STIRRUPS

3-14mmØ

10cm

TH

K. L

EAN

CO

NC

RET

E

200

5000

C1

TIE

BEA

M (T

B2)

C1

200

Z1Z1

3-14mmØ

3-14mmØ

10cm

TH

K. L

EAN

CO

NC

RET

E

10mmØ STIRRUPS

@15

0mm

C.C

.

3-14mmØ (TYPICAL)

SEC

TIO

N Z

1-Z1

200

500

3-14mmØ

10mmØ STIRRUPS

3-14mmØ

10cm

TH

K. L

EAN

CO

NC

RET

E

REI

NFO

RC

EMEN

T C

OV

ER W

ITH

IN C

ON

CR

ETE

SHA

LL B

E:SL

AB

S-20

mm

FO

OTI

NG

S-75

mm

CO

LUM

NS

:-40m

m O

THER

S-40

mm

SPEC

IAL

NO

TE:

1400

1400

200

1200

450

120

370

PLA

N (F

1/C

1)

10-14mmØ BOTHWAYS

8-14mmØ

TIES 10mmØ

@ 1

50m

m C

.C.

200

500

3-14mmØ

3-14mmØ

10mmØ STIRRUPS ELEV ± 0.0

8-14mmØ

TIES 10mmØ

@ 1

50m

m C

.C. 10-12mmØ BOTHWAYS

300

10cm

TH

K. L

EAN

CO

NC

RET

E

1400

1200

1050

300

300

6-10mmØ (TOP) BOTHWAYS 100

Depth Variesas per site

SEC

TIO

N X

-X (F

1/C

1)

FIG

: 11

CO

LUM

N A

ND

FO

OTI

NG

DET

AIL

SCA

LE:

NTS

400

400

400

6-10mmØ /m

4-12mmØ

/m

RB

2

/m

B

RB

2

RB1

6-/10mmØ

B

4-12mmØ

6-12mmØ /mAlternate bend up bars /m

1000

(TY

PIC

AL) 6-10mmØ /m

A

4-12mmØ /m

6-12mmØ /m

1200

/m

RB1

6-12mmØ /m

4-12mmØ

A

GR

OU

ND

RO

D A

T EA

CH

CO

RN

ER(C

OPP

ERW

ELD

, 16m

m D

IA.)

Saudi Electricity Company

SEC DISTRIBUTION CONSTRUCTION STANDARDSDCS-02