TDS-LTE MBTS V100R001 室室室室室室室 室室室室室室室室 室室室室 06/06/2022 室室室室 室室室室室室室室 室1室 38室 Dialog Swap On-filed Situation Roof-Top(99%) & Green Field Tower Site(1%) 1.Spacing for installation BTS units and feeder windows are avaliable 2. Spacing for RRU & Antenna are avaliabel 3,Power plate can provide avaliabel input port Typical ConfigurationElement including: 1,"19'' Rack"2,"BBU Unit" 3,"DCDU Unit"4,"BTS installation materials package-Input power cables"5,"RRU unit"6,"RRU installation materials package-RRU power calbe&CPRI cable" 7,"Jumper cables"8,"E1 cables"9,"Antenna unit" PreconditionEHSSub-con should get mounting license,Wear safty belt,Wear Anti-slipper shoes, Wear glove EHS

Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Embed Size (px)

Citation preview

Page 1: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第1页,共38页

Dialog Swap On-filed SituationRoof-Top(99%) & Green Field Tower Site(1%)

1.Spacing for installation BTS units and feeder windows are avaliable

2. Spacing for RRU & Antenna are avaliabel

3,Power plate can provide avaliabel input port

Typical Configuration:Element including: 1,"19'' Rack"2,"BBU Unit" 3,"DCDU Unit"4,"BTS installation materials package-Input power cables"5,"RRU unit"6,"RRU installation materials package-RRU power calbe&CPRI cable" 7,"Jumper cables"8,"E1 cables"9,"Antenna unit"

Precondition:

EHS:Sub-con should get mounting license,Wear safty belt,Wear Anti-slipper shoes, Wear glove;

EHS

Page 2: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第2页,共38页

Standard Tool For Dialog Swap Project Site Engineering

羊角锤、橡胶锤 一字、十字螺丝刀 活动扳手 工具刀、水平尺 套筒扳手 液压钳 梅花扳手

压线钳 断线钳 剥线钳 记号笔 斜口钳 十字批力矩螺丝刀 开口扳手

力矩扳手 热风枪 万用表、长卷尺 防静电手套、腕带 吊装滑轮 吊装绳 绝缘胶带

驻波比测试仪 梯子 指南针 馈线刀 倾角仪 色环胶带 防水胶带

Personal Protection ware

防尘口罩 防滑鞋 防滑手套 耳塞 工作服 防异物伤害护目镜 安全帽

安全带

Page 3: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 3 页,共 38 页

SOP For Scenario 1

1.1 1.2 1.3 1.13 1.9

20 20 20 5 60

Team No AB Team No AB Team No AB Team No B Team No AB

1.0 1.0 1.0

EHS Prepation Materials Carrying

30 30 30

Team No ABCD Team No ABCD Team No ABCD

1.5 1.7 1.5 1.5 1.5

Mount RRU assembly Fix Assembly

10 5 10 10 5

Team No C Team No C Team No CD Team No CD Team No CD

1.6 1.10

15 30 1.12 Comission Comission Cutover Cutover Cutover Cutover

Team No AB Team No AB Site integrate Power off ALU&HW

10 N/A N/A 5 10 20 10

1.8 1.9 Team No ABCD Team No Remote Dialog Team No Team No CD Team No CD CD CD

20 15

Team No CD Team No CD

19'' Rack InstallationBBU&DCDU Installation Install BTS Internal

cable(E1/Alarm/PW/PGND)Route&Punch E1/Alarm/PW/PGND

Route CPRI Fiber&RRU Powewr(Indoor)

Materials & environment check

RRU assembly on-field installation RRU on-field connect

connection anti-water Mount RRU&Fix RRU

Connect the BTS input Power

Labeling

Power on&Verfication Transmission MappingSwap Jumper to orignal antenna

Anti-water Antenna&Jumper

Power On HW BTS

Remote Dialog

Connect RRU Power and CPRI cable

Connect RRU Power and CPRI cable

I

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 1.75 hour)

Start

Standard down time 1.75 hour

I

Page 4: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 2

1.1 1.2 1.3 1.13

20 20 20 5

Team No AB Team No AB Team No AB Team No AB

1.0 1.0 1.0

EHS Prepation Materials Carrying

30 30 30

Team No ABCD Team No ABCD Team No ABCD

1.5 1.7 1.5 1.5

Mount RRU assembly Fix Assembly

10 5 10 10

Team No CD Team No CD Team No CD Team No CD

1.6 1.10

15 30 1.12 Commission Commission Cutover Cutover Cutover Cutover Cutover

Team No AB Team No AB Integrate Uninstall ALU ANT

10 N/A N/A 5 15 10 10 10

1.8 1.9 Team No ABCD Dialog

20 15

Team No CD Team No CD

19'' Rack InstallationBBU&DCDU Installation Install BTS Internal

cable(E1/Alarm/PW/PGND)Route&Punch E1/Alarm/PW/PGND

Materials & environment check

RRU assembly on-ground installation RRU on-ground connection

anti-water

Connect the BTS input Power Labeling

Power on&Verfication Transmission Mapping Poweroff ANT's Assembly

install on-field

Mount ANT and Assembly

SwapJumper to antenna

Dialog CD CD CD CD CD

Connect RRU Power and CPRI cable

Route CPRI Fiber& RRU Power Cable(outdoor)

I

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.3 hour)

Start

Standard down time 4.3 hour

Page 5: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 2

1.9

60

Team No AB

1.5

5

Team No CD

Cutover Cutover

20 10

Route CPRI Fiber& RRU Power Cable(Indoor)

Mount RRU &Fix RRU

Anti-water Antenna&Jumper

Power HW BTS

CD CD

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.3 hour)

Standard down time 4.3 hour

I

Page 6: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 3

1.1 1.2 1.3 1.9

20 20 20 5 60

Team No AB Team No AB Team No AB Team No AB Team No

1.0 1.0 1.0

EHS Prepation Materials Carrying

30 30 30

Team No ABCD Team No ABCD Team No ABCD

1.5 1.7 1.6 1.5 1.6

Mount RRU assembly Fix Assembly Mount RRU&FIX RRU

10 5 10 10 5

Team No CD Team No CD Team No CD Team No CD Team No

1.10

30 Cutover 1.13 Cutover Cutover Cutover 1.12 Comission Comission

Power on&Verfication

5 5 15 10 20 10 N/A N/A

1.6 1.9 ACD ACD ACD

20 15

CD CD

19'' Rack InstallationBBU&DCDU Installation Install BTS Internal

cable(E1/Alarm/PW/PGND)Route E1/Alarm/PW/PGND

Route CPRI Fiber&RRU Power Cable(Indoor)

Materials & environment check

RRU assembly on-ground installation

RRU on-ground connection anti-water

Labeling

AB Power OFF ALU BTS

Punch E1 In ALU Port

Connect input power in ALU Port

Swap Jumper to orignal ANT Anti-water

Antenna&Jumper

Transmission Mapping

Site integrate Dismantle

AB AB AB Remote Dialog

Remote Dialog

connect RRU pw&Cpri

Route CPRI Fiber&RRU Power

Cable(Indoor)

I

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 2 hour)

Start

Standard down time 2 hour- Precondition Transmission mapping ok

Page 7: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 3

1.9

60

Team No AB

1.6

Mount RRU&FIX RRU

5

Team No CD

Route CPRI Fiber&RRU Power Cable(Indoor)

Dismantle

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 2 hour)

Standard down time 2 hour- Precondition Transmission mapping ok

I

Page 8: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 4

1.1 1.2 1.3 1.9

30 30 30 30 30

Team No AB Team No AB Team No AB Team No AB Team No

1.0 1.0 1.0

EHS Prepation Materials Carrying

30 30 30

Team No ABCD Team No ABCD Team No ABCD

1.5 1.7 1.6 1.5 1.6

Mount RRU assembly Fix Assembly Mount RRU&FIX RRU

30 30 30 30 30

Team No CD Team No CD Team No CD Team No CD Team No

1.10

Labeling

30 Cutover 1.13 Cutover Cutover Cutover Cutover Cutover 1.12 Comission

AB Uninstall ALU ANT

1 5 15 10 15 10 10 2 10 N/A

1.5 1.9 AB AB AB ABCD CD CD CD CD CD Remote Dialog

20 15

CD CD

19'' Rack Installation BBU&DCDU Installation Install BTS Internal cable(E1/Alarm/PW/PGND)

Route E1/Alarm/PW/PGND

Route CPRI Fiber&RRU Power Cable( Indoor)

Materials & environment check

RRU assembly on-ground installation

RRU on-ground connection anti-water

Cutover

Power OFF ALU BTS

Punch E1 In ALU Port

Connect input PW in ALU Port

ANT's Assembly install on-field

Mount ANT and Assembly

Swap Jumper to

New ANT

Anti-water Antenna&

Jumper

Power on HW BTS&Verfication

Transmission Mapping

Connect RRU PW&CPRI

Route CPRI Fiber&RRU Power Cable( outdoor)

I

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.5 hour)

Start

Standard down time 4.5 hour-Precondition Transmission Mapping OK

Page 9: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 4

1.9

30

Team No AB

1.6

Mount RRU&FIX RRU

30

Team No CD

Comission Comission

Site integrate

N/A N/A

Remote Dialog Remote Dialog

Route CPRI Fiber&RRU Power Cable( Indoor)

Transmission Mapping

Dismantle

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.5 hour)

Standard down time 4.5 hour-Precondition Transmission Mapping OK

I

Page 10: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 5

1.0 1.0 1.0

EHS Prepation Materials Carrying

30 30 30

Team No ABCD Team No ABCD Team No ABCD

1.10 1.10 1.10

30 30 30 30

Cutover

1.5 1.9 15

20 15

CD CD

Materials & environment check

Fix 19'' Rack in position

Route&Punch E1/Alarm/PW/PGND

Route CPRI Fiber&RRU Power Cable( Indoor)

Labeling

AB AB AB AB

Uninstall ALU ANT

Connect RRU PW&CPRI

Route CPRI Fiber&RRU Power Cable( outdoor) CD

I

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)

Start

Standard down time 7 hour-Precondition Transmission Mapping OK

Page 11: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 5

1.1 1.2 1.3

30 30 30

Team No AB Team No AB Team No

1.0

Materials Carrying

30

ABCD

1.5 1.7 1.6

Mount RRU assembly

30 30 30

Team No CD Team No CD Team No

Cutover Cutover Cutover Cutover Cutover

15 10 10 10 20

CD CD CD

19'' Rack Installation (move aside not fix to ground) BBU&DCDU Installation BTS Install Internal

cable(E1/Alarm/PW/PGND)

RRU assembly on-ground installation RRU on-ground connection anti-water

Uninstall ALU ANT

ANT's Assembly install on-field

Mount ANT and Assembly

Swap Jumper to New ANT

Anti-water Antenna&Jumper

CD CD

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)

Standard down time 7 hour-Precondition Transmission Mapping OK

Page 12: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

SOP For Scenario 5

1.3 1.9

30 30 30

AB Team No AB Team No AB

1.6 1.5 1.6

Mount RRU assembly Fix Assembly Mount RRU&FIX RRU

30 30 30

CD Team No CD Team No CD

1.12 Comission Comission

Site integrate

10 N/A N/A

Remote Dialog Remote Dialog

BTS Install Internal cable(E1/Alarm/PW/PGND)

Power off&Uninstall ALU BTS (move aside from position)

Uninstall the indoor feeder&Jumper in ladder

Power on HW BTS&Verfication

Transmission Mapping Dismantle

CD

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)

Standard down time 7 hour-Precondition Transmission Mapping OK

I

Standard down time 7 hour-Precondition Transmission Mapping OK

Page 13: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Dismantle

0

AB

Anteena package Site auxliary

Package Antenna

Remove all RF module and cables from Cabinet

Pack the RF module&Cables with

bubble sheet

Remove the Base band moudle from cabinet

Pack the Base band module with bubble sheet

AB AB AB

Uninstall Anteen&Anteena

Assembly

Mount down antenna&antenna

assembly to ground

Remove the feeder fix

Uninstall the feeder &jumpers (outdoor)

CD CD CD CD

Main equipment package

Put Cabinets package, RF

module&RF cables package and Base

band package together

Put feeders&jumper( Indoor\outdoor) with E1\Power\PGND\Alarm

cables together

Dismantle

I

Page 14: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

CD CD CD

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 ALU Marco BTS【Standard labour hour 】 3 Hours

Page 15: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Dismantle

Remove Jumper cables&Feeder(Indoor)

Roll and tied the Jumpers&Feeder(Inddor)

Remove E1\Power\PGND\Alarm calbes

Roll and tied E1\Power\PGND\Alarm

cables

AB AB AB

Roll and tied the jumpers&

Feeder(outdoor)

CD

I

Page 16: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 ALU Marco BTS【Standard labour hour 】 3 Hours

Page 17: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第17页,共38页

EHS Training & Materials checking & Materials carrying& Eviroment second checking

Page 18: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Assembeling the Rack

Fix the Rack on the ground

EHS Training & Materials checking & Materials carrying& Eviroment second checking

Page 19: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP
Page 20: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 20 页,共 38 页

DCDU & BBU Installation in 19'' Rack

Page 21: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 21 页,共 38 页

BTS Internal Power & Signal cables

BBU Power

RRU Power Cable CPRI Cable

Alarm Cables

LOAD6 LOAD7

Page 22: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 22 页,共 38 页

Power Off BTSSequency No

1.1 Power Off BTS A 10 Min

1 Block Cell

2

3

4

5

1

2

3

4

1 2

3 4

5 6

1 2

3 4

5 6

Procedure Name

Operator cost time

Procedure Step

Power off RRU\BBU; Power off DCDU itself.

Key technis

Installation Tool

Installation Materials

Page 23: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 23 页,共 38 页

RRU Assembly Installation & Fix

Page 24: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Input Power For BTS

Page 25: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP
Page 26: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 26 页,共 38 页

Antenna&RRU & Assembly Mount

Antenna Mount

RRU Mount

Page 27: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 27 页,共 38 页

RRU Jumper & Anti-water

Page 28: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 28 页,共 38 页

RRU Power & CPRI fiber

Page 29: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 29 页,共 38 页

Out door Route RRU Power cable & CPRI Fiber

Page 30: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 30 页,共 38 页

Labeling Standard

Label type Antenna System Cable

Input Power Cable Intallation Sample

Alarm_Signal Cable Fiber Cable

E1 Signal Cable

GSM

Page 31: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第 31 页,共 38 页

Page 32: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开

04/08/2023 华为机密,未经许可不得扩散 第32页,共38页

Clear Site

Page 33: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

Power On & Verification

Page 34: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP
Page 35: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP

E1 Punch

Page 36: Srilanka_Dialog Project Swap 5 Scenarios Site Engineering SOP