Dialog Swap On-filed SituationRoof-Top(99%) & Green Field Tower Site(1%)
1.Spacing for installation BTS units and feeder windows are avaliable
2. Spacing for RRU & Antenna are avaliabel
3,Power plate can provide avaliabel input port
Typical Configuration:Element including: 1,"19'' Rack"2,"BBU Unit" 3,"DCDU Unit"4,"BTS installation materials package-Input power cables"5,"RRU unit"6,"RRU installation materials package-RRU power calbe&CPRI cable" 7,"Jumper cables"8,"E1 cables"9,"Antenna unit"
Precondition:
EHS:Sub-con should get mounting license,Wear safty belt,Wear Anti-slipper shoes, Wear glove;
EHS
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第2页,共38页
Standard Tool For Dialog Swap Project Site Engineering
羊角锤、橡胶锤 一字、十字螺丝刀 活动扳手 工具刀、水平尺 套筒扳手 液压钳 梅花扳手
压线钳 断线钳 剥线钳 记号笔 斜口钳 十字批力矩螺丝刀 开口扳手
力矩扳手 热风枪 万用表、长卷尺 防静电手套、腕带 吊装滑轮 吊装绳 绝缘胶带
驻波比测试仪 梯子 指南针 馈线刀 倾角仪 色环胶带 防水胶带
Personal Protection ware
防尘口罩 防滑鞋 防滑手套 耳塞 工作服 防异物伤害护目镜 安全帽
安全带
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 3 页,共 38 页
SOP For Scenario 1
1.1 1.2 1.3 1.13 1.9
20 20 20 5 60
Team No AB Team No AB Team No AB Team No B Team No AB
1.0 1.0 1.0
EHS Prepation Materials Carrying
30 30 30
Team No ABCD Team No ABCD Team No ABCD
1.5 1.7 1.5 1.5 1.5
Mount RRU assembly Fix Assembly
10 5 10 10 5
Team No C Team No C Team No CD Team No CD Team No CD
1.6 1.10
15 30 1.12 Comission Comission Cutover Cutover Cutover Cutover
Team No AB Team No AB Site integrate Power off ALU&HW
10 N/A N/A 5 10 20 10
1.8 1.9 Team No ABCD Team No Remote Dialog Team No Team No CD Team No CD CD CD
20 15
Team No CD Team No CD
19'' Rack InstallationBBU&DCDU Installation Install BTS Internal
cable(E1/Alarm/PW/PGND)Route&Punch E1/Alarm/PW/PGND
Route CPRI Fiber&RRU Powewr(Indoor)
Materials & environment check
RRU assembly on-field installation RRU on-field connect
connection anti-water Mount RRU&Fix RRU
Connect the BTS input Power
Labeling
Power on&Verfication Transmission MappingSwap Jumper to orignal antenna
Anti-water Antenna&Jumper
Power On HW BTS
Remote Dialog
Connect RRU Power and CPRI cable
Connect RRU Power and CPRI cable
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 1.75 hour)
Start
Standard down time 1.75 hour
I
SOP For Scenario 2
1.1 1.2 1.3 1.13
20 20 20 5
Team No AB Team No AB Team No AB Team No AB
1.0 1.0 1.0
EHS Prepation Materials Carrying
30 30 30
Team No ABCD Team No ABCD Team No ABCD
1.5 1.7 1.5 1.5
Mount RRU assembly Fix Assembly
10 5 10 10
Team No CD Team No CD Team No CD Team No CD
1.6 1.10
15 30 1.12 Commission Commission Cutover Cutover Cutover Cutover Cutover
Team No AB Team No AB Integrate Uninstall ALU ANT
10 N/A N/A 5 15 10 10 10
1.8 1.9 Team No ABCD Dialog
20 15
Team No CD Team No CD
19'' Rack InstallationBBU&DCDU Installation Install BTS Internal
cable(E1/Alarm/PW/PGND)Route&Punch E1/Alarm/PW/PGND
Materials & environment check
RRU assembly on-ground installation RRU on-ground connection
anti-water
Connect the BTS input Power Labeling
Power on&Verfication Transmission Mapping Poweroff ANT's Assembly
install on-field
Mount ANT and Assembly
SwapJumper to antenna
Dialog CD CD CD CD CD
Connect RRU Power and CPRI cable
Route CPRI Fiber& RRU Power Cable(outdoor)
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.3 hour)
Start
Standard down time 4.3 hour
SOP For Scenario 2
1.9
60
Team No AB
1.5
5
Team No CD
Cutover Cutover
20 10
Route CPRI Fiber& RRU Power Cable(Indoor)
Mount RRU &Fix RRU
Anti-water Antenna&Jumper
Power HW BTS
CD CD
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.3 hour)
Standard down time 4.3 hour
I
SOP For Scenario 3
1.1 1.2 1.3 1.9
20 20 20 5 60
Team No AB Team No AB Team No AB Team No AB Team No
1.0 1.0 1.0
EHS Prepation Materials Carrying
30 30 30
Team No ABCD Team No ABCD Team No ABCD
1.5 1.7 1.6 1.5 1.6
Mount RRU assembly Fix Assembly Mount RRU&FIX RRU
10 5 10 10 5
Team No CD Team No CD Team No CD Team No CD Team No
1.10
30 Cutover 1.13 Cutover Cutover Cutover 1.12 Comission Comission
Power on&Verfication
5 5 15 10 20 10 N/A N/A
1.6 1.9 ACD ACD ACD
20 15
CD CD
19'' Rack InstallationBBU&DCDU Installation Install BTS Internal
cable(E1/Alarm/PW/PGND)Route E1/Alarm/PW/PGND
Route CPRI Fiber&RRU Power Cable(Indoor)
Materials & environment check
RRU assembly on-ground installation
RRU on-ground connection anti-water
Labeling
AB Power OFF ALU BTS
Punch E1 In ALU Port
Connect input power in ALU Port
Swap Jumper to orignal ANT Anti-water
Antenna&Jumper
Transmission Mapping
Site integrate Dismantle
AB AB AB Remote Dialog
Remote Dialog
connect RRU pw&Cpri
Route CPRI Fiber&RRU Power
Cable(Indoor)
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 2 hour)
Start
Standard down time 2 hour- Precondition Transmission mapping ok
SOP For Scenario 3
1.9
60
Team No AB
1.6
Mount RRU&FIX RRU
5
Team No CD
Route CPRI Fiber&RRU Power Cable(Indoor)
Dismantle
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 2 hour)
Standard down time 2 hour- Precondition Transmission mapping ok
I
SOP For Scenario 4
1.1 1.2 1.3 1.9
30 30 30 30 30
Team No AB Team No AB Team No AB Team No AB Team No
1.0 1.0 1.0
EHS Prepation Materials Carrying
30 30 30
Team No ABCD Team No ABCD Team No ABCD
1.5 1.7 1.6 1.5 1.6
Mount RRU assembly Fix Assembly Mount RRU&FIX RRU
30 30 30 30 30
Team No CD Team No CD Team No CD Team No CD Team No
1.10
Labeling
30 Cutover 1.13 Cutover Cutover Cutover Cutover Cutover 1.12 Comission
AB Uninstall ALU ANT
1 5 15 10 15 10 10 2 10 N/A
1.5 1.9 AB AB AB ABCD CD CD CD CD CD Remote Dialog
20 15
CD CD
19'' Rack Installation BBU&DCDU Installation Install BTS Internal cable(E1/Alarm/PW/PGND)
Route E1/Alarm/PW/PGND
Route CPRI Fiber&RRU Power Cable( Indoor)
Materials & environment check
RRU assembly on-ground installation
RRU on-ground connection anti-water
Cutover
Power OFF ALU BTS
Punch E1 In ALU Port
Connect input PW in ALU Port
ANT's Assembly install on-field
Mount ANT and Assembly
Swap Jumper to
New ANT
Anti-water Antenna&
Jumper
Power on HW BTS&Verfication
Transmission Mapping
Connect RRU PW&CPRI
Route CPRI Fiber&RRU Power Cable( outdoor)
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.5 hour)
Start
Standard down time 4.5 hour-Precondition Transmission Mapping OK
SOP For Scenario 4
1.9
30
Team No AB
1.6
Mount RRU&FIX RRU
30
Team No CD
Comission Comission
Site integrate
N/A N/A
Remote Dialog Remote Dialog
Route CPRI Fiber&RRU Power Cable( Indoor)
Transmission Mapping
Dismantle
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 4.5 hour)
Standard down time 4.5 hour-Precondition Transmission Mapping OK
I
SOP For Scenario 5
1.0 1.0 1.0
EHS Prepation Materials Carrying
30 30 30
Team No ABCD Team No ABCD Team No ABCD
1.10 1.10 1.10
30 30 30 30
Cutover
1.5 1.9 15
20 15
CD CD
Materials & environment check
Fix 19'' Rack in position
Route&Punch E1/Alarm/PW/PGND
Route CPRI Fiber&RRU Power Cable( Indoor)
Labeling
AB AB AB AB
Uninstall ALU ANT
Connect RRU PW&CPRI
Route CPRI Fiber&RRU Power Cable( outdoor) CD
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)
Start
Standard down time 7 hour-Precondition Transmission Mapping OK
SOP For Scenario 5
1.1 1.2 1.3
30 30 30
Team No AB Team No AB Team No
1.0
Materials Carrying
30
ABCD
1.5 1.7 1.6
Mount RRU assembly
30 30 30
Team No CD Team No CD Team No
Cutover Cutover Cutover Cutover Cutover
15 10 10 10 20
CD CD CD
19'' Rack Installation (move aside not fix to ground) BBU&DCDU Installation BTS Install Internal
cable(E1/Alarm/PW/PGND)
RRU assembly on-ground installation RRU on-ground connection anti-water
Uninstall ALU ANT
ANT's Assembly install on-field
Mount ANT and Assembly
Swap Jumper to New ANT
Anti-water Antenna&Jumper
CD CD
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)
Standard down time 7 hour-Precondition Transmission Mapping OK
SOP For Scenario 5
1.3 1.9
30 30 30
AB Team No AB Team No AB
1.6 1.5 1.6
Mount RRU assembly Fix Assembly Mount RRU&FIX RRU
30 30 30
CD Team No CD Team No CD
1.12 Comission Comission
Site integrate
10 N/A N/A
Remote Dialog Remote Dialog
BTS Install Internal cable(E1/Alarm/PW/PGND)
Power off&Uninstall ALU BTS (move aside from position)
Uninstall the indoor feeder&Jumper in ladder
Power on HW BTS&Verfication
Transmission Mapping Dismantle
CD
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 DBS3900 Site【Standard labour hour 】 4 person 8.5 hour( Including integrate) , down time( 7 hour)
Standard down time 7 hour-Precondition Transmission Mapping OK
I
Standard down time 7 hour-Precondition Transmission Mapping OK
Dismantle
0
AB
Anteena package Site auxliary
Package Antenna
Remove all RF module and cables from Cabinet
Pack the RF module&Cables with
bubble sheet
Remove the Base band moudle from cabinet
Pack the Base band module with bubble sheet
AB AB AB
Uninstall Anteen&Anteena
Assembly
Mount down antenna&antenna
assembly to ground
Remove the feeder fix
Uninstall the feeder &jumpers (outdoor)
CD CD CD CD
Main equipment package
Put Cabinets package, RF
module&RF cables package and Base
band package together
Put feeders&jumper( Indoor\outdoor) with E1\Power\PGND\Alarm
cables together
Dismantle
I
CD CD CD
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 ALU Marco BTS【Standard labour hour 】 3 Hours
Dismantle
Remove Jumper cables&Feeder(Indoor)
Roll and tied the Jumpers&Feeder(Inddor)
Remove E1\Power\PGND\Alarm calbes
Roll and tied E1\Power\PGND\Alarm
cables
AB AB AB
Roll and tied the jumpers&
Feeder(outdoor)
CD
I
【Sub-con Team 】 4 Hardware installation members-A(Leader);B(Team member) ;CD(Mounting experience and license);【On-field Senarios 】 Roof -top site & Green-field Tower Site【Typical configuration 】 ALU Marco BTS【Standard labour hour 】 3 Hours
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第17页,共38页
EHS Training & Materials checking & Materials carrying& Eviroment second checking
Assembeling the Rack
Fix the Rack on the ground
EHS Training & Materials checking & Materials carrying& Eviroment second checking
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 20 页,共 38 页
DCDU & BBU Installation in 19'' Rack
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 21 页,共 38 页
BTS Internal Power & Signal cables
BBU Power
RRU Power Cable CPRI Cable
Alarm Cables
LOAD6 LOAD7
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 22 页,共 38 页
Power Off BTSSequency No
1.1 Power Off BTS A 10 Min
1 Block Cell
2
3
4
5
1
2
3
4
1 2
3 4
5 6
1 2
3 4
5 6
Procedure Name
Operator cost time
Procedure Step
Power off RRU\BBU; Power off DCDU itself.
Key technis
Installation Tool
Installation Materials
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 23 页,共 38 页
RRU Assembly Installation & Fix
Input Power For BTS
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 26 页,共 38 页
Antenna&RRU & Assembly Mount
Antenna Mount
RRU Mount
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 27 页,共 38 页
RRU Jumper & Anti-water
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 28 页,共 38 页
RRU Power & CPRI fiber
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 29 页,共 38 页
Out door Route RRU Power cable & CPRI Fiber
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 30 页,共 38 页
Labeling Standard
Label type Antenna System Cable
Input Power Cable Intallation Sample
Alarm_Signal Cable Fiber Cable
E1 Signal Cable
GSM
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第 31 页,共 38 页
TDS-LTE MBTS V100R001 室外塔站有机房 站点标准安装工艺 内部公开
04/08/2023 华为机密,未经许可不得扩散 第32页,共38页
Clear Site
Power On & Verification
E1 Punch