SSR 2011-12

Embed Size (px)

Citation preview

  • 8/3/2019 SSR 2011-12.

    1/28

    SSR 2011-12.

    1 2 3 4 5 6 7 81 Gravel(Incl.seignoirage) 80.00 9.27 4.63 93.90 2.782 Sand for Mortar(Incl.seignoirage) 325.00 9.27 4.63 338.90 2.783 Sand for filling 250.00 9.27 4.63 263.90 2.784 12mm HG SS5 metal 980.00 18.53 9.27 1007.80 5.565 20mm HG SS5 Metal 1025.00 18.53 9.27 1052.80 5.567 40mm HG SS5 Metal 745.00 18.53 9.27 772.80 5.569 5 to 7mm IRC HG Metal 750.00 18.53 9.27 777.80 5.56

    10 12 to 14mm IRC HG Metal 895.00 18.53 9.27 922.80 5.5611 19 to 22mm IRC HG metal 905.00 18.53 9.27 932.80 5.5612 40 to 45mm IRC HG Metal 745.00 18.53 9.27 772.80 5.5613 65mm HG IRC Metal 595.00 18.53 9.27 622.80 5.5614 75mm HG IRC metal 560.00 18.53 9.27 587.80 5.5619 RR Stone HG 225.00 18.53 9.27 252.80 5.5621 Rough stone 225mm thick HG 140.00 18.53 9.27 167.80 5.56

    23 Rough stone 300mm thick HG 18.53 9.27 27.80 5.5625 CR Stone HG 18.53 9.27 27.80 5.5626 Bricks 2nd class 1000No's. 3100.00 27.95 27.95 3155.90 11.1827 Quarry Rubbish 46.00 9.27 4.63 59.90 2.7828 Carting earth 9.27 4.63 13.90 2.7829 Shabad stone 40mm 10M2 968.00 18.53 9.27 995.80 5.56

    29 Polished shabad/Tandur slabs of 15 to 18mm thick 1291.00 18.53 18.53 1328.06 7.4130 Polished black Kadapa slabs of 15mm 10Sqm 1076.00 18.53 9.27 1103.80 5.5631 Polished stone 25mm 10Sqm(White) 1455.30 18.53 9.27 1483.10 5.5632 " " " " (Blue) 1841.40 18.53 9.27 1869.20 5.5633 Bethamcherla stone 25mm 10Sqm(White) 3012.00 18.53 9.27 3039.80 5.56

    34 " " " " (Blue) 2152.00 18.53 9.27 2179.80 5.5635 Cement 5500.00 33.54 33.54 13.4236 Steel 41000 40.21 40.21 16.08

    Skilled/1st Class mason 285.00 Day193.00/Rm

    Semi Skilled /2nd Class Mason 260.00 Day915.00/1No

    Un Skilled/Mazdoor 215.00 Day288.00/1No

    Loading

    Labour RatesBMW-A-02-S/L/J and Testing of 101.6mm SWG SP-1

    BMW-D-04-S/F Orissa pan WG WC

    BMW-D-06-Labour charges for fixing of WC

    RATES OF MATERIALS AS PER SSR 2011-12.

    S.No. Name of the MaterialInitialRate

    Unloading Stack ingTotal

    (3+4+5)

    20%Extra(Column.4,5,6)

    Sanitory Items

  • 8/3/2019 SSR 2011-12.

    2/28

    SSR 2011-12.

    1 Coarse Aggregate(4.75mm-10mm) IncludingSeignoirage+Blasting+25%M/C Charges 750.00 /Cum

    2 Coarse Aggregate(5.6mm-13.2mm) IncludingSeignoirage+Blasting+25%M/C Charges 805.00 /Cum

    3 Coarse Aggregate(10mm-13.2mm) IncludingSeignoirage+Blasting+25%M/C Charges 895.00 /Cum

    4 Coarse Aggregate(10mm-20mm) Including

    Seignoirage+Blasting+25% M/C charges 1025.00 /cum5 Coarse Aggregate(10 to 25mm)IncludingSeignoirage+Blasting+25% M/C Charges 985.00 /cum

    6 Coarse Aggregate(20mm-40mm) IncludingSeignoirage+Blasting+25% M/C charges 975.00 /cum

    7 Coarse Aggregate(45mm-63mm) IncludingSeignoirage+Blasting+25% M/C charges 595.00 /cum

    8 Coarse Aggregate(40mm-80mm) IncludingSeignoirage+Blasting+25% M/C charges 560.00 /cum

    9 Aggregate 6mm Nominal size 655.00 /cum10 Aggregate 10mm Nominal size 820.00 /Cum11 Aggregate 20mm Nominal size 1175.00 /Cum

    12 Aggregate 40mm Nominal size 745.00 /cum13 CRS 30x30x45CM(Including Seignoirage) 13.00 /Each14 CRS 30x30x60CM(Including Seignoirage) 15.00 /Each15 RR Stones(M 148) 225.00 cum16 Murram(Incl.Seignoirage,loading charges) 80.00 /Cum

    17 RRStones 20x20x45CM(Including Seignoirage) 11.00 /Each18 Shabad Stone slab(Incl.seignoirage,loading 179.00 /Sqm19 Synthetic Enamel Paint 1st Quality 170.00 /1lit20 Synthetic Enamel Paint 2nd Quality 130.00 1lit21 Bond Stone 25x25x45to60CM 27.00 /Each22 Bond Stone 30x30x65to75CM 38.00 /Each

    23 Bond Stone 20x20x30to45CM 16.00 /Each24 Flyash 46.00 /Cum25 Coarse Sand(Filling Incl.Seignoirage) 250.00 /Cum26 Coarse Sand(Mortar Incl.Seignoirage) 325.00 /Cum27 Gravel (Incl.Seignoirage,loading charges) 80.00 /Cum

    28Earth cost or Compensation of earth from private land 27.00 /Cum

    29 Square rubble coarsed stone 1680.00 /Cum30 Water 77.00 /1KL

    31Rough stone for rivetment 225mmthick(Incl.Seignoirage 140.00 /Cum

    32 Impervious water proofing compound 55.00 1kg33 cement primer water base Gr.1 100.00 1kg34 wood primer 100.00 1kg35 Snowcem paint 35.00 1kg36 Synthetic Enamel Paint 1st Quality 170.00 1lit37 Selected Earth 72.00 cum38 Binding wire 55.00 /1Kg39 Barbed Wire 66.00 /1Kg

    Coarse Aggregate & Material Rates(2011-12.)

  • 8/3/2019 SSR 2011-12.

    3/28

    SSR 2011-12.

    S.No. Code ,Kind and Size Rate Per165 BMT-G-08-Aluminium Tower Bolt 150mm Long 69.00 1No166 BMT-G-09-Do 200mm Long 86.00 1No167 BMT-G-10-Do-250mm Long 103.00 1No168 BMT-G-11-Do-300mm Long 120.00 1No172 BMT-G-15-MS Powder coated Tower Bolt 150mm 27.00 1No173 BMT-G-16-Do-200mm Long 38.00 1No

    174 BMT-G-17-Do-250mm Long 51.00 1No175 BMT-G18-Do-300mm Long 63.00 1No177 BMT-G20-Brass-Butt Hinges-100mm Long 104.00 1No178 BMT-G21-Brass-Butt Hinges-125mm Long 126.00 1No179 BMT-G22-Do-150mm Long 166.00 1No181 BMT-G24-Al.Butt Hinges 100mm Long 81.00 1No182 BMT-G-25-Al.Butt Hinges 125mm 96.00 1No183 BMT-G-26-Do-150mm 100.00 1No185 BMT-G-28-MS Powder Coated BH 100mm 16.00 1No186 BMT-G-29-MS Powder Coated BH 125mm 23.00 1No187 BMT-G-30-Do-150mm 31.00 1No191 BMT-G-34-Al.Door Handle 150mm 85.00 1No193 BMT-G-36-MSPC Door Handle 150mm 34.00 1No194 BMT-G37-Brass Aldrop 300mm 675.00 1No197 BMT-G-40-Al.Aldrop 200mm 200.00 1No198 BMT-G-41-Al.Aldrop 250mm 238.00 1No199 BMT-G-42-Al.Aldrop 300mm 258.00 1No200 BMT-G43-MSPC Aldrop 200mm 80.00 1No201 BMT-G-44-MSPC Aldrop 250mm 104.00 1No202 BMT-G-45-Do-300mm 124.00 1No205 BMT-G48-Al.Flat laches 200mm 96.00 1No206 BMT-G49-" " 250mm 109.00 1No207 BMT-G50-" " 300mm 115.00 1No

    208 BMT-G-51-MSPC Flat Laches 250mm 39.00 1No209 BMT-G-52-Do-300mm 50.00 1No

    PAINTS & POLISHES

    S.No. Code ,Kind and Size Rate Per237 BMT-H-01-Impervious Water proofing Compound 24.00 1Kg353 BMT-J-01-Cement Primer Gr-1 100.00 1Lit354 BMT-J-02-Do Gr-2 60.00 1Lit355 BMT-J-03-Red Oxide Iron primer Gr-1 90.00 1Lit357 BMT-J-05- Wood primer 100.00 1Lit376 BMT-J-24-Water proof Cement Paint Of Snowcem 35.00 1Kg378 BMT-J-26-water proof paint of Indocem 820.00 25Kg382 BMT-J-30-Synthetic enamel Paint Gr-1 170.00 1Lit383 BMT-J-31-Synthetic enamel Paint Gr-2 130.00 1Lit

    Miscellaneous Items852 BMM-V01-Bailing out of water 146.00 1cum865 BMM-V-14-Labour charges for fabricating Steel 16.00 1Kg866 BMM-V-15-Labour charges for fixing iron gate etc. 3.00 1Kg895 BMS-W-20 Mastic Pad 2'0"x4'0" of 1" thick 805.00 1Sqm896 BMS-W-21 Mastic Pad 2'0"x4'0" of 1/2" thick 461.00 1Sqm943 BMS-W-68 White cement 25.00 1Kg

    FIXTURES OF DOORS & WINDOWS

  • 8/3/2019 SSR 2011-12.

    4/28

    SSR 2011-12.

    S.No. MACHINERY HIRE FUEL CREW TOTAL

    1 Dozer(D 80) 1881.00 1Hour 1256.70 476.10 148.20 1881.002 Motor grater 2600.00 1Hour 0.003 hydrolic excavator 1808.50 1Hour 1097.50 582.30 128.70 1808.504 Front end loader 2009.50 1Hour 1180.70 680.60 148.20 2009.505 Tipper 5.5Cum 696.40 1Hour 351.30 233.90 111.20 696.406 Smooth wheeled roller 8T 844.40 1Hour 151.50 556.90 136.00 844.407 Water Tanker 6Kl 626.00 1Hour 285.80 233.90 106.30 626.008 Tractor 626.00 1Hour 285.80 233.90 106.30 626.009 air compressor 7mm diesel 871.40 1Hour 178.50 556.90 136.00 871.40

    10 Concrete Mixer 0.28Cum 248.40 1Hour 44.80 61.90 141.70 248.4011 Concrete Mixer 1.00Cum 342.50 1Hour 77.00 123.80 141.70 342.5012 Needle vibrator(petrol)40mm 120.40 1Hour 6.00 12.40 102.00 120.4013 Needle vibrator(petrol)60mm 126.80 1Hour 6.20 18.60 102.00 126.80

    14 Plate Compacter(Shearing machine upto 12mm) 201.70 1Hour 32.20 80.60 88.90 201.7015 Concrete Mixer300/200(diesel) 248.40 1Hour 44.80 61.90 141.70 248.40

    S. No. Name of the Structural Member

    A Footings Rs 59.00 Rs 330.00 Rs 389.001cum

    B Pedestals Rs 70.00 Rs 524.00 Rs 594.001cum

    C Plinth Beams Rs 993.00 Rs 795.00 Rs 1788.001cum

    D Lintels Rs 843.00 Rs 675.00 Rs 1518.001cum

    E Chajjas& Sun shades Rs 167.00 Rs 104.00 Rs 271.001Sqm

    F Columns Rs 127.00 Rs 948.00 Rs 1075.001cum

    G Beams Rs 1276.00 Rs 795.00 Rs 2071.001cum

    H Slabs upto 150mm thick Rs 143.00 Rs 89.00 Rs 232.001Sqm

    D Lintels Rs 590.00 Rs 532.00 Rs 1122.001cum

    E Chajjas -Sunshades Rs 117.00 Rs 82.00 Rs 199.001Sqm

    F Columns Rs 89.00 Rs 747.00 Rs 836.001cum

    G Beams Rs 893.00 Rs 626.00 Rs 1519.001cum

    H Slabs Upto 150mm thick Rs 100.00 Rs 70.00 Rs 170.00

    Hire charges for Centering & Scafolding-Unsupported Height upto 3.66Mt.Casurina Ballies,Bamboos,Wooden Reapers,Runners,WoodPosts,Wall plates,etc.

    Hire charges for Centering & Scafolding-Unsupported Height upto 3.66Mt.Steel scafolding pipes,jack props, wallers,foot plates,brackets,steelcentering plates,etc.

    HIRE CHARGES

    CENTERING CHARGES (BUILDINGS)Material hire

    chargesLabour charges

    Centering Charges for2011-12.

  • 8/3/2019 SSR 2011-12.

    5/28

    SSR 2011-12. 1Sqm

    S. No. Name of the Structural Member

    A Footings Rs 59.00 Rs 330.00 Rs 389.001cum

    B Pedestals Rs 70.00 Rs 524.00 Rs 594.001cum

    C Plinth Beams Rs 993.00 Rs 795.00 Rs 1788.001cum

    D Lintels Rs 843.00 Rs 675.00 Rs 1518.001cum

    E Chajjas& Sun shades Rs 167.00 Rs 104.00 Rs 271.00

    1SqmF Columns Rs 127.00 Rs 948.00 Rs 1075.00

    1cumG Beams Rs 1276.00 Rs 795.00 Rs 2071.00

    1cumH Slabs upto 150mm thick Rs 143.00 Rs 89.00 Rs 232.00

    1Sqm

    D Lintels Rs 590.00 Rs 532.00 Rs 1122.001cum

    E Chajjas -Sunshades Rs 117.00 Rs 82.00 Rs 199.001Sqm

    F Columns Rs 89.00 Rs 747.00 Rs 836.001cum

    G Beams Rs 893.00 Rs 626.00 Rs 1519.001cum

    H Slabs Upto 150mm thick Rs 100.00 Rs 70.00 Rs 170.001Sqm

    Hire charges for Centering & Scafolding-Unsupported Height upto 3.66Mt.Casurina Ballies,Bamboos,Wooden Reapers,Runners,WoodPosts,Wall plates,etc.

    CENTERING CHARGES (BUILDINGS)

    Material hirecharges

    Labour chargesCentering Charges for

    2011-12.

    Hire charges for Centering & Scafolding-Unsupported Height upto 3.66Mt.Steel scafolding pipes,jack props, wallers,foot plates,brackets,steelcentering plates,etc.

  • 8/3/2019 SSR 2011-12.

    6/28

    N e t C o n v e y a n c e TotalLoading &

    Unloadingby

    manualmeans ofRs.67.10+24.03=9

    1.13) N e t C o n v e y a n c e Total

    Loading &Unloadingby manualmeans of

    Rs.77.19+38.60=115.7

    9) N e t C o n v e y a n c e Total

    Loading &Unloadingby manualmeans ofRs.96.4+96.4=192.8

    ) N e t C o n v e y a n c e Total

    Loading &Unloadingby manualmeans ofRs.103.15+103.15=2

    06.30) N e t C o n v e y a n c e Total

    Loading &Unloadingby manualmeans of

    Rs.139.49+139.49=278

    .98) N e t C o n v e y a n c e Total

    Loading &Unloadingby manualmeans of

    Rs.77.19+38.60=115

    .79) N e t C o n v e y a n c e

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    1 20.88 112.01 18.77 134.56 11.75 204.55 11.75 218.05 27.85 306.83 27.63 143.42

    2 29.21 120.34 26.32 142.11 16.40 209.20 16.40 222.70 39.00 317.98 38.68 154.47

    3 39.03 130.16 39.03 154.82 24.39 217.19 24.39 230.69 52.00 330.98 57.36 173.15

    4 47.37 138.50 47.37 163.16 29.56 222.36 29.56 235.86 63.14 342.12 69.64 185.43

    5 55.70 146.83 55.70 171.49 34.82 227.62 34.82 241.12 74.28 353.26 81.92 197.71

    6 64.03 155.16 64.03 179.82 40.08 232.88 40.08 246.38 85.42 364.40 94.20 209.99

    7 72.36 163.49 72.36 188.15 45.34 238.14 45.34 251.64 96.56 375.54 106.48 222.27

    8 80.69 171.82 80.69 196.48 50.60 243.40 50.60 256.90 107.70 386.68 118.76 234.55

    9 89.02 180.15 89.02 204.81 55.86 248.66 55.86 262.16 118.84 397.82 131.04 246.83

    10 97.35 188.48 97.35 213.14 61.12 253.92 61.12 267.42 129.98 408.96 143.32 259.11

    11 105.68 196.81 105.68 221.47 66.38 259.18 66.38 272.68 141.12 420.10 155.60 271.39

    12 114.01 205.14 114.01 229.80 71.64 264.44 71.64 277.94 152.26 431.24 167.88 283.67

    13 122.34 213.47 122.34 238.13 76.90 269.70 76.90 283.20 163.40 442.38 180.16 295.95

    14 130.67 221.80 130.67 246.46 82.16 274.96 82.16 288.46 174.54 453.52 192.44 308.2315 139.00 230.13 139.00 254.79 87.42 280.22 87.42 293.72 185.68 464.66 204.72 320.51

    16 147.33 238.46 147.33 263.12 92.68 285.48 92.68 298.98 196.82 475.80 217.00 332.79

    17 155.66 246.79 155.66 271.45 97.94 290.74 97.94 304.24 207.96 486.94 229.28 345.07

    18 163.99 255.12 163.99 279.78 103.20 296.00 103.20 309.50 219.10 498.08 241.56 357.35

    19 172.32 263.45 172.32 288.11 108.46 301.26 108.46 314.76 230.24 509.22 253.84 369.63

    20 180.65 271.78 180.65 296.44 113.72 306.52 113.72 320.02 241.38 520.36 266.12 381.91

    21 188.98 280.11 188.98 304.77 118.98 311.78 118.98 325.28 252.52 531.50 278.40 394.19

    22 197.31 288.44 197.31 313.10 124.24 317.04 124.24 330.54 263.66 542.64 290.68 406.47

    23 205.64 296.77 205.64 321.43 129.50 322.30 129.50 335.80 274.80 553.78 302.96 418.75

    24 213.97 305.10 213.97 329.76 134.76 327.56 134.76 341.06 285.94 564.92 315.24 431.03

    25 222.30 313.43 222.30 338.09 140.02 332.82 140.02 346.32 297.08 576.06 327.52 443.31

    26 230.63 321.76 230.63 346.42 145.28 338.08 145.28 351.58 308.22 587.20 339.80 455.59

    27 238.96 330.09 238.96 354.75 150.54 343.34 150.54 356.84 319.36 598.34 352.08 467.87

    28 247.29 338.42 247.29 363.08 155.80 348.60 155.80 362.10 330.50 609.48 364.36 480.15

    29 255.62 346.75 255.62 371.41 161.06 353.86 161.06 367.36 341.64 620.62 376.64 492.43

    30 263.95 355.08 263.95 379.74 166.32 359.12 166.32 372.62 352.78 631.76 388.92 504.71

    31 270.88 362.01 270.88 386.67 170.70 363.50 170.70 377.00 362.06 641.04 399.18 514.97

    32 277.81 368.94 277.81 393.60 175.08 367.88 175.08 381.38 371.34 650.32 409.44 525.23

    33 284.74 375.87 284.74 400.53 179.46 372.26 179.46 385.76 380.62 659.60 419.70 535.49

    34 291.67 382.80 291.67 407.46 183.84 376.64 183.84 390.14 389.90 668.88 429.96 545.75

    35 298.60 389.73 298.60 414.39 188.22 381.02 188.22 394.52 399.18 678.16 440.22 556.01

    36 305.53 396.66 305.53 421.32 192.60 385.40 192.60 398.90 408.46 687.44 450.48 566.27

    37 312.46 403.59 312.46 428.25 196.98 389.78 196.98 403.28 417.74 696.72 460.74 576.53

    Watpe

    1000Ls

    Conveyance Charges(Loading and Un-Loading by Manual means Including Idle hire charges of Trucks.)

    (EXCLUDING OVER HEAD,CONTRACTOR PROFIT AND VAT CHARGES)

    D i s t a n c e i n K m

    Earth/Sand/Gravel/Morrum/Su

    rki per Cum

    Stones andC.A.Per Cum

    Cement per MTSteel/AC&GI

    Sheets per MTBricks 1000No's Shabad Stone

  • 8/3/2019 SSR 2011-12.

    7/28

    N e t C o n v e y a n c e

    TotalLoading &Unloading

    bymanual

    means ofRs.67.10+24.03=9

    1.13) N e t C o n v e y a n c e Total

    Loading &Unloadingby manual

    means ofRs.77.19+38.60=115.7

    9) N e t C o n v e y a n c e Total

    Loading &Unloadingby manual

    means ofRs.96.4+96.4=192.8

    ) N e t C o n v e y a n c e Total

    Loading &Unloadingby manual

    means ofRs.103.15+103.15=2

    06.30) N e t C o n v e y a n c e Total

    Loading &Unloadingby manual

    means ofRs.139.49+139.49=278

    .98) N e t C o n v e y a n c e Total

    Loading &Unloadingby manual

    means ofRs.77.19+38.60=115

    .79) N e t C o n v e y a n c e

    1 2 3 4 5 6 7 8 9 10 11 12 13 14

    38 319.39 410.52 319.39 435.18 201.36 394.16 201.36 407.66 427.02 706.00 471.00 586.79

    39 326.32 417.45 326.32 442.11 205.74 398.54 205.74 412.04 436.30 715.28 481.26 597.05

    40 333.25 424.38 333.25 449.04 210.12 402.92 210.12 416.42 445.58 724.56 491.52 607.31

    41 340.18 431.31 340.18 455.97 214.50 407.30 214.50 420.80 454.86 733.84 501.78 617.57

    42 347.11 438.24 347.11 462.90 218.88 411.68 218.88 425.18 464.14 743.12 512.04 627.83

    43 354.04 445.17 354.04 469.83 223.26 416.06 223.26 429.56 473.42 752.40 522.30 638.09

    44 360.97 452.10 360.97 476.76 227.64 420.44 227.64 433.94 482.70 761.68 532.56 648.35

    45 367.90 459.03 367.90 483.69 232.02 424.82 232.02 438.32 491.98 770.96 542.82 658.61

    46 374.83 465.96 374.83 490.62 236.40 429.20 236.40 442.70 501.26 780.24 553.08 668.87

    47 381.76 472.89 381.76 497.55 240.78 433.58 240.78 447.08 510.54 789.52 563.34 679.13

    48 388.69 479.82 388.69 504.48 245.16 437.96 245.16 451.46 519.82 798.80 573.60 689.39

    49 395.62 486.75 395.62 511.41 249.54 442.34 249.54 455.84 529.10 808.08 583.86 699.65

    50 402.55 493.68 402.55 518.34 253.92 446.72 253.92 460.22 538.38 817.36 594.12 709.91

    51 409.48 500.61 409.48 525.27 258.30 451.10 258.30 464.60 547.66 826.64 604.38 720.17

    52 416.41 507.54 416.41 532.20 262.68 455.48 262.68 468.98 556.94 835.92 614.64 730.43

    53 423.34 514.47 423.34 539.13 267.06 459.86 267.06 473.36 566.22 845.20 624.90 740.69

    54 430.27 521.40 430.27 546.06 271.44 464.24 271.44 477.74 575.50 854.48 635.16 750.9555 437.20 528.33 437.20 552.99 275.82 468.62 275.82 482.12 584.78 863.76 645.42 761.21

    56 444.13 535.26 444.13 559.92 280.20 473.00 280.20 486.50 594.06 873.04 655.68 771.47

    57 451.06 542.19 451.06 566.85 284.58 477.38 284.58 490.88 603.34 882.32 665.94 781.73

    58 457.99 549.12 457.99 573.78 288.96 481.76 288.96 495.26 612.62 891.60 676.20 791.99

    59 464.92 556.05 464.92 580.71 293.34 486.14 293.34 499.64 621.90 900.88 686.46 802.25

    60 471.85 562.98 471.85 587.64 297.72 490.52 297.72 504.02 631.18 910.16 696.72 812.51

    61 478.78 569.91 478.78 594.57 302.10 494.90 302.10 508.40 640.46 919.44 706.98 822.77

    62 485.71 576.84 485.71 601.50 306.48 499.28 306.48 512.78 649.74 928.72 717.24 833.03

    63 492.64 583.77 492.64 608.43 310.86 503.66 310.86 517.16 659.02 938.00 727.50 843.29

    64 499.57 590.70 499.57 615.36 315.24 508.04 315.24 521.54 668.30 947.28 737.76 853.55

    65 506.50 597.63 506.50 622.29 319.62 512.42 319.62 525.92 677.58 956.56 748.02 863.81

    66 513.43 604.56 513.43 629.22 324.00 516.80 324.00 530.30 686.86 965.84 758.28 874.07

    67 520.36 611.49 520.36 636.15 328.38 521.18 328.38 534.68 696.14 975.12 768.54 884.33

    68 527.29 618.42 527.29 643.08 332.76 525.56 332.76 539.06 705.42 984.40 778.80 894.59

    69 534.22 625.35 534.22 650.01 337.14 529.94 337.14 543.44 714.70 993.68 789.06 904.85

    70 541.15 632.28 541.15 656.94 341.52 534.32 341.52 547.82 723.98 1002.96 799.32 915.11

    71 548.08 639.21 548.08 663.87 345.90 538.70 345.90 552.20 733.26 1012.24 809.58 925.37

    72 555.01 646.14 555.01 670.80 350.28 543.08 350.28 556.58 742.54 1021.52 819.84 935.63

    73 561.94 653.07 561.94 677.73 354.66 547.46 354.66 560.96 751.82 1030.80 830.10 945.89

    74 568.87 660.00 568.87 684.66 359.04 551.84 359.04 565.34 761.10 1040.08 840.36 956.15

    75 575.80 666.93 575.80 691.59 363.42 556.22 363.42 569.72 770.38 1049.36 850.62 966.4176 582.73 673.86 582.73 698.52 367.80 560.60 367.80 574.10 779.66 1058.64 860.88 976.67

    77 589.66 680 79 589.66 705 45 372.18 564 98 372.18 578 48 788.94 1067 92 871.14 986 93

    D i s t a n c e i n K m

    Earth/Sand/Gravel/Morrum/Su

    rki per Cum

    Stones andC.A.Per Cum

    Cement per MTSteel/AC&GI

    Sheets per MTBricks 1000No's Shabad Stone

    W

    100

  • 8/3/2019 SSR 2011-12.

    8/28

    78 596.59 687.72 596.59 712.38 376.56 569.36 376.56 582.86 798.22 1077.20 881.40 997.19

    N e t C o n v e y a n c e

    TotalLoading &Unloading

    bymanual

    means ofRs.67.10+24.03=9

    1.13) N e t C o n v e y a n c e

    TotalLoading &Unloadingby manual

    means ofRs.77.19+38.60=115.7

    9) N e t C o n v e y a n c e

    TotalLoading &Unloadingby manual

    means ofRs.96.4+96.4=192.8

    ) N e t C o n v e y a n c e

    TotalLoading &Unloadingby manual

    means ofRs.103.15+103.15=2

    06.30) N e t C o n v e y a n c e

    TotalLoading &Unloadingby manual

    means ofRs.139.49+139.49=278

    .98) N e t C o n v e y a n c e

    TotalLoading &Unloadingby manual

    means ofRs.77.19+38.60=115

    .79) N e t C o n v e y a n c e

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 1

    79 603.52 694.65 603.52 719.31 380.94 573.74 380.94 587.24 807.50 1086.48 891.66 1007.45

    80 610.45 701.58 610.45 726.24 385.32 578.12 385.32 591.62 816.78 1095.76 901.92 1017.71

    81 617.38 708.51 617.38 733.17 389.70 582.50 389.70 596.00 826.06 1105.04 912.18 1027.97

    82 624.31 715.44 624.31 740.10 394.08 586.88 394.08 600.38 835.34 1114.32 922.44 1038.23

    83 631.24 722.37 631.24 747.03 398.46 591.26 398.46 604.76 844.62 1123.60 932.70 1048.49

    84 638.17 729.30 638.17 753.96 402.84 595.64 402.84 609.14 853.90 1132.88 942.96 1058.75

    85 645.10 736.23 645.10 760.89 407.22 600.02 407.22 613.52 863.18 1142.16 953.22 1069.01

    86 652.03 743.16 652.03 767.82 411.60 604.40 411.60 617.90 872.46 1151.44 963.48 1079.27

    87 658.96 750.09 658.96 774.75 415.98 608.78 415.98 622.28 881.74 1160.72 973.74 1089.53

    88 665.89 757.02 665.89 781.68 420.36 613.16 420.36 626.66 891.02 1170.00 984.00 1099.79

    89 672.82 763.95 672.82 788.61 424.74 617.54 424.74 631.04 900.30 1179.28 994.26 1110.05

    90 679.75 770.88 679.75 795.54 429.12 621.92 429.12 635.42 909.58 1188.56 1004.52 1120.31

    91 686.68 777.81 686.68 802.47 433.50 626.30 433.50 639.80 918.86 1197.84 1014.78 1130.57

    92 693.61 784.74 693.61 809.40 437.88 630.68 437.88 644.18 928.14 1207.12 1025.04 1140.83

    93 700.54 791.67 700.54 816.33 442.26 635.06 442.26 648.56 937.42 1216.40 1035.30 1151.09

    94 707.47 798.60 707.47 823.26 446.64 639.44 446.64 652.94 946.70 1225.68 1045.56 1161.35

    95 714.40 805.53 714.40 830.19 451.02 643.82 451.02 657.32 955.98 1234.96 1055.82 1171.6196 721.33 812.46 721.33 837.12 455.40 648.20 455.40 661.70 965.26 1244.24 1066.08 1181.87

    97 728.26 819.39 728.26 844.05 459.78 652.58 459.78 666.08 974.54 1253.52 1076.34 1192.13

    98 735.19 826.32 735.19 850.98 464.16 656.96 464.16 670.46 983.82 1262.80 1086.60 1202.39

    99 742.12 833.25 742.12 857.91 468.54 661.34 468.54 674.84 993.10 1272.08 1096.86 1212.65

    100 749.05 840.18 749.05 864.84 472.92 665.72 472.92 679.22 1002.38 1281.36 1107.12 1222.91

    Shabad Stone

    ap

    1000

    D i s t a n c e i n K m

    Earth/Sand/Gravel/Morrum/Su

    rki per Cum

    Stones andC.A.Per Cum

    Cement per MTSteel/AC&GI

    Sheets per MTBricks 1000No's

  • 8/3/2019 SSR 2011-12.

    9/28

    300mmDia.

    450mmDia.

    600mmDia.

    700mmDia.

    800mmDia.

    900mmDia.

    S.NO. KM Pipes cost 765.00 1221.00 1983.00 2453.00 3235.00 4049.001 1 29.30 40.90 67.00 74.50 89.30 117.302 2 29.30 40.90 67.00 74.50 89.30 117.303 3 29.30 40.90 67.00 74.50 89.30 117.30

    4 4 29.30 40.90 67.00 74.50 89.30 117.305 5 29.30 40.90 67.00 74.50 89.30 117.306 6 30.10 42.30 70.10 78.10 92.90 124.107 7 30.90 43.70 73.20 81.70 96.50 130.908 8 31.70 45.10 76.30 85.30 100.10 137.709 9 32.50 46.50 79.40 88.90 103.70 144.50

    10 10 33.30 47.90 82.50 92.50 107.30 151.3011 11 34.10 49.30 85.60 96.10 110.90 158.1012 12 34.90 50.70 88.70 99.70 114.50 164.9013 13 35.70 52.10 91.80 103.30 118.10 171.7014 14 36.50 53.50 94.90 106.90 121.70 178.5015 15 37.30 54.90 98.00 110.50 125.30 185.3016 16 38.10 56.30 101.10 114.10 128.90 192.1017 17 38.90 57.70 104.20 117.70 132.50 198.9018 18 39.70 59.10 107.30 121.30 136.10 205.7019 19 40.50 60.50 110.40 124.90 139.70 212.5020 20 41.30 61.90 113.50 128.50 143.30 219.3021 21 42.10 63.30 116.60 132.10 146.90 226.1022 22 42.90 64.70 119.70 135.70 150.50 232.9023 23 43.70 66.10 122.80 139.30 154.10 239.7024 24 44.50 67.50 125.90 142.90 157.70 246.5025 25 45.30 68.90 129.00 146.50 161.30 253.3026 26 46.10 70.30 132.10 150.10 164.90 260.10

    27 27 46.90 71.70 135.20 153.70 168.50 266.9028 28 47.70 73.10 138.30 157.30 172.10 273.7029 29 48.50 74.50 141.40 160.90 175.70 280.5030 30 49.30 75.90 144.50 164.50 179.30 287.3031 31 50.10 77.30 147.60 168.10 182.90 294.1032 32 50.90 78.70 150.70 171.70 186.50 300.9033 33 51.70 80.10 153.80 175.30 190.10 307.7034 34 52.50 81.50 156.90 178.90 193.70 314.5035 35 53.30 82.90 160.00 182.50 197.30 321.3036 36 54.10 84.30 163.10 186.10 200.90 328.1037 37 54.90 85.70 166.20 189.70 204.50 334.9038 38 55.70 87.10 169.30 193.30 208.10 341.7039 39 56.50 88.50 172.40 196.90 211.70 348.5040 40 57.30 89.90 175.50 200.50 215.30 355.3041 41 58.10 91.30 178.60 204.10 218.90 362.1042 42 58.90 92.70 181.70 207.70 222.50 368.9043 43 59.70 94.10 184.80 211.30 226.10 375.7044 44 60.50 95.50 187.90 214.90 229.70 382.5045 45 61.30 96.90 191.00 218.50 233.30 389.3046 46 62.10 98.30 194.10 222.10 236.90 396.1047 47 62.90 99.70 197.20 225.70 240.50 402.9048 48 63.70 101.10 200.30 229.30 244.10 409.70

    CONVEYANCE CHARGES OF RCC PIPES

    E. Loading and Unloading charges by Mechanical Means

    ( RCC NP3 PLAIN ENDED PIPES )

  • 8/3/2019 SSR 2011-12.

    10/28

    300mm Dia. 450mm Dia. 600mm Dia. 700mm Dia. 800mm Dia. 900mm Dia.

    49 49 64.50 102.50 203.40 232.90 247.70 416.5050 50 65.30 103.90 206.50 236.50 251.30 423.3051 51 66.10 105.30 209.60 240.10 254.90 430.1052 52 66.90 106.70 212.70 243.70 258.50 436.9053 53 67.70 108.10 215.80 247.30 262.10 443.7054 54 68.50 109.50 218.90 250.90 265.70 450.5055 55 69.30 110.90 222.00 254.50 269.30 457.3056 56 70.10 112.30 225.10 258.10 272.90 464.1057 57 70.90 113.70 228.20 261.70 276.50 470.9058 58 71.70 115.10 231.30 265.30 280.10 477.7059 59 72.50 116.50 234.40 268.90 283.70 484.5060 60 73.30 117.90 237.50 272.50 287.30 491.3061 61 74.10 119.30 240.60 276.10 290.90 498.1062 62 74.90 120.70 243.70 279.70 294.50 504.9063 63 75.70 122.10 246.80 283.30 298.10 511.7064 64 76.50 123.50 249.90 286.90 301.70 518.5065 65 77.30 124.90 253.00 290.50 305.30 525.3066 66 78.10 126.30 256.10 294.10 308.90 532.1067 67 78.90 127.70 259.20 297.70 312.50 538.90

    68 68 79.70 129.10 262.30 301.30 316.10 545.7069 69 80.50 130.50 265.40 304.90 319.70 552.5070 70 81.30 131.90 268.50 308.50 323.30 559.3071 71 82.10 133.30 271.60 312.10 326.90 566.1072 72 82.90 134.70 274.70 315.70 330.50 572.9073 73 83.70 136.10 277.80 319.30 334.10 579.7074 74 84.50 137.50 280.90 322.90 337.70 586.5075 75 85.30 138.90 284.00 326.50 341.30 593.3076 76 86.10 140.30 287.10 330.10 344.90 600.1077 77 86.90 141.70 290.20 333.70 348.50 606.9078 78 87.70 143.10 293.30 337.30 352.10 613.7079 79 88.50 144.50 296.40 340.90 355.70 620.5080 80 89.30 145.90 299.50 344.50 359.30 627.3081 81 90.10 147.30 302.60 348.10 362.90 634.1082 82 90.90 148.70 305.70 351.70 366.50 640.9083 83 91.70 150.10 308.80 355.30 370.10 647.7084 84 92.50 151.50 311.90 358.90 373.70 654.5085 85 93.30 152.90 315.00 362.50 377.30 661.3086 86 94.10 154.30 318.10 366.10 380.90 668.1087 87 94.90 155.70 321.20 369.70 384.50 674.9088 88 95.70 157.10 324.30 373.30 388.10 681.7089 89 96.50 158.50 327.40 376.90 391.70 688.5090 90 97.30 159.90 330.50 380.50 395.30 695.30

    91 91 98.10 161.30 333.60 384.10 398.90 702.1092 92 98.90 162.70 336.70 387.70 402.50 708.9093 93 99.70 164.10 339.80 391.30 406.10 715.7094 94 100.50 165.50 342.90 394.90 409.70 722.5095 95 101.30 166.90 346.00 398.50 413.30 729.3096 96 102.10 168.30 349.10 402.10 416.90 736.1097 97 102.90 169.70 352.20 405.70 420.50 742.9098 98 103.70 171.10 355.30 409.30 424.10 749.7099 99 104.50 172.50 358.40 412.90 427.70 756.50

    100 100 105.30 173.90 361.50 416.50 431.30 763.30

  • 8/3/2019 SSR 2011-12.

    11/28

    300mmDia.

    450mmDia.

    600mmDia.

    700mmDia.

    800mmDia.

    900mmDia.

    S.NO. KM Pipes cost 973.00 1549.00 2473.00 3141.00 4149.00 5200.001 1 35.00 51.20 76.30 102.40 121.00 139.602 2 35.00 51.20 76.30 102.40 121.00 139.60

    3 3 35.00 51.20 76.30 102.40 121.00 139.604 4 35.00 51.20 76.30 102.40 121.00 139.605 5 35.00 51.20 76.30 102.40 121.00 139.606 6 36.10 53.60 79.90 109.60 128.20 146.807 7 37.20 56.00 83.50 116.80 135.40 154.008 8 38.30 58.40 87.10 124.00 142.60 161.209 9 39.40 60.80 90.70 131.20 149.80 168.40

    10 10 40.50 63.20 94.30 138.40 157.00 175.6011 11 41.60 65.60 97.90 145.60 164.20 182.8012 12 42.70 68.00 101.50 152.80 171.40 190.0013 13 43.80 70.40 105.10 160.00 178.60 197.2014 14 44.90 72.80 108.70 167.20 185.80 204.40

    15 15 46.00 75.20 112.30 174.40 193.00 211.6016 16 47.10 77.60 115.90 181.60 200.20 218.8017 17 48.20 80.00 119.50 188.80 207.40 226.0018 18 49.30 82.40 123.10 196.00 214.60 233.2019 19 50.40 84.80 126.70 203.20 221.80 240.4020 20 51.50 87.20 130.30 210.40 229.00 247.6021 21 52.60 89.60 133.90 217.60 236.20 254.8022 22 53.70 92.00 137.50 224.80 243.40 262.0023 23 54.80 94.40 141.10 232.00 250.60 269.2024 24 55.90 96.80 144.70 239.20 257.80 276.4025 25 57.00 99.20 148.30 246.40 265.00 283.60

    26 26 58.10 101.60 151.90 253.60 272.20 290.8027 27 59.20 104.00 155.50 260.80 279.40 298.0028 28 60.30 106.40 159.10 268.00 286.60 305.2029 29 61.40 108.80 162.70 275.20 293.80 312.4030 30 62.50 111.20 166.30 282.40 301.00 319.6031 31 63.60 113.60 169.90 289.60 308.20 326.8032 32 64.70 116.00 173.50 296.80 315.40 334.0033 33 65.80 118.40 177.10 304.00 322.60 341.2034 34 66.90 120.80 180.70 311.20 329.80 348.4035 35 68.00 123.20 184.30 318.40 337.00 355.6036 36 69.10 125.60 187.90 325.60 344.20 362.8037 37 70.20 128.00 191.50 332.80 351.40 370.0038 38 71.30 130.40 195.10 340.00 358.60 377.2039 39 72.40 132.80 198.70 347.20 365.80 384.4040 40 73.50 135.20 202.30 354.40 373.00 391.6041 41 74.60 137.60 205.90 361.60 380.20 398.8042 42 75.70 140.00 209.50 368.80 387.40 406.0043 43 76.80 142.40 213.10 376.00 394.60 413.2044 44 77.90 144.80 216.70 383.20 401.80 420.4045 45 79.00 147.20 220.30 390.40 409.00 427.6046 46 80.10 149.60 223.90 397.60 416.20 434.8047 47 81.20 152.00 227.50 404.80 423.40 442.00

    CONVEYANCE CHARGES OF RCC PIPES

    ( RCC NP3 S/S PIPES )

    E. Loading and Unloading charges by Mechanical Means

  • 8/3/2019 SSR 2011-12.

    12/28

    48 48 82.30 154.40 231.10 412.00 430.60 449.20

    300mm Dia. 450mm Dia. 600mm Dia. 700mm Dia. 800mm Dia. 900mm Dia.

    49 49 83.40 156.80 234.70 419.20 437.80 456.4050 50 84.50 159.20 238.30 426.40 445.00 463.6051 51 85.60 161.60 241.90 433.60 452.20 470.8052 52 86.70 164.00 245.50 440.80 459.40 478.0053 53 87.80 166.40 249.10 448.00 466.60 485.2054 54 88.90 168.80 252.70 455.20 473.80 492.4055 55 90.00 171.20 256.30 462.40 481.00 499.6056 56 91.10 173.60 259.90 469.60 488.20 506.8057 57 92.20 176.00 263.50 476.80 495.40 514.0058 58 93.30 178.40 267.10 484.00 502.60 521.2059 59 94.40 180.80 270.70 491.20 509.80 528.4060 60 95.50 183.20 274.30 498.40 517.00 535.6061 61 96.60 185.60 277.90 505.60 524.20 542.8062 62 97.70 188.00 281.50 512.80 531.40 550.0063 63 98.80 190.40 285.10 520.00 538.60 557.2064 64 99.90 192.80 288.70 527.20 545.80 564.4065 65 101.00 195.20 292.30 534.40 553.00 571.6066 66 102.10 197.60 295.90 541.60 560.20 578.80

    67 67 103.20 200.00 299.50 548.80 567.40 586.0068 68 104.30 202.40 303.10 556.00 574.60 593.2069 69 105.40 204.80 306.70 563.20 581.80 600.4070 70 106.50 207.20 310.30 570.40 589.00 607.6071 71 107.60 209.60 313.90 577.60 596.20 614.8072 72 108.70 212.00 317.50 584.80 603.40 622.0073 73 109.80 214.40 321.10 592.00 610.60 629.2074 74 110.90 216.80 324.70 599.20 617.80 636.4075 75 112.00 219.20 328.30 606.40 625.00 643.6076 76 113.10 221.60 331.90 613.60 632.20 650.8077 77 114.20 224.00 335.50 620.80 639.40 658.0078 78 115.30 226.40 339.10 628.00 646.60 665.2079 79 116.40 228.80 342.70 635.20 653.80 672.4080 80 117.50 231.20 346.30 642.40 661.00 679.6081 81 118.60 233.60 349.90 649.60 668.20 686.8082 82 119.70 236.00 353.50 656.80 675.40 694.0083 83 120.80 238.40 357.10 664.00 682.60 701.2084 84 121.90 240.80 360.70 671.20 689.80 708.4085 85 123.00 243.20 364.30 678.40 697.00 715.6086 86 124.10 245.60 367.90 685.60 704.20 722.8087 87 125.20 248.00 371.50 692.80 711.40 730.0088 88 126.30 250.40 375.10 700.00 718.60 737.2089 89 127.40 252.80 378.70 707.20 725.80 744.40

    90 90 128.50 255.20 382.30 714.40 733.00 751.6091 91 129.60 257.60 385.90 721.60 740.20 758.8092 92 130.70 260.00 389.50 728.80 747.40 766.0093 93 131.80 262.40 393.10 736.00 754.60 773.2094 94 132.90 264.80 396.70 743.20 761.80 780.4095 95 134.00 267.20 400.30 750.40 769.00 787.6096 96 135.10 269.60 403.90 757.60 776.20 794.8097 97 136.20 272.00 407.50 764.80 783.40 802.0098 98 137.30 274.40 411.10 772.00 790.60 809.2099 99 138.40 276.80 414.70 779.20 797.80 816.40

  • 8/3/2019 SSR 2011-12.

    13/28

    100 100 139.50 279.20 418.30 786.40 805.00 823.60

    300mmDia.

    450mmDia.

    600mmDia.

    700mmDia.

    800mmDia.

    900mmDia.

    S.NO. KM Pipes cost 341.00 599.00 975.00 1248.00 1528.00 1912.001 1 11.10 21.30 33.60 42.80 50.40 57.80

    2 2 11.10 21.30 33.60 42.80 50.40 57.803 3 11.10 21.30 33.60 42.80 50.40 57.804 4 11.10 21.30 33.60 42.80 50.40 57.805 5 11.10 21.30 33.60 42.80 50.40 57.806 6 11.50 22.50 35.80 45.90 53.50 60.907 7 11.90 23.70 38.00 49.00 56.60 64.008 8 12.30 24.90 40.20 52.10 59.70 67.109 9 12.70 26.10 42.40 55.20 62.80 70.20

    10 10 13.10 27.30 44.60 58.30 65.90 73.3011 11 13.50 28.50 46.80 61.40 69.00 76.4012 12 13.90 29.70 49.00 64.50 72.10 79.5013 13 14.30 30.90 51.20 67.60 75.20 82.60

    14 14 14.70 32.10 53.40 70.70 78.30 85.7015 15 15.10 33.30 55.60 73.80 81.40 88.8016 16 15.50 34.50 57.80 76.90 84.50 91.9017 17 15.90 35.70 60.00 80.00 87.60 95.0018 18 16.30 36.90 62.20 83.10 90.70 98.1019 19 16.70 38.10 64.40 86.20 93.80 101.2020 20 17.10 39.30 66.60 89.30 96.90 104.3021 21 17.50 40.50 68.80 92.40 100.00 107.4022 22 17.90 41.70 71.00 95.50 103.10 110.5023 23 18.30 42.90 73.20 98.60 106.20 113.6024 24 18.70 44.10 75.40 101.70 109.30 116.70

    25 25 19.10 45.30 77.60 104.80 112.40 119.8026 26 19.50 46.50 79.80 107.90 115.50 122.9027 27 19.90 47.70 82.00 111.00 118.60 126.0028 28 20.30 48.90 84.20 114.10 121.70 129.1029 29 20.70 50.10 86.40 117.20 124.80 132.2030 30 21.10 51.30 88.60 120.30 127.90 135.3031 31 21.50 52.50 90.80 123.40 131.00 138.4032 32 21.90 53.70 93.00 126.50 134.10 141.5033 33 22.30 54.90 95.20 129.60 137.20 144.6034 34 22.70 56.10 97.40 132.70 140.30 147.7035 35 23.10 57.30 99.60 135.80 143.40 150.8036 36 23.50 58.50 101.80 138.90 146.50 153.9037 37 23.90 59.70 104.00 142.00 149.60 157.0038 38 24.30 60.90 106.20 145.10 152.70 160.1039 39 24.70 62.10 108.40 148.20 155.80 163.2040 40 25.10 63.30 110.60 151.30 158.90 166.3041 41 25.50 64.50 112.80 154.40 162.00 169.4042 42 25.90 65.70 115.00 157.50 165.10 172.5043 43 26.30 66.90 117.20 160.60 168.20 175.6044 44 26.70 68.10 119.40 163.70 171.30 178.7045 45 27.10 69.30 121.60 166.80 174.40 181.8046 46 27.50 70.50 123.80 169.90 177.50 184.90

    ( RCC NP2 PLAIN ENDED PIPES )

    E. Loading and Unloading charges by Mechanical Means

    CONVEYANCE CHARGES OF RCC PIPES

  • 8/3/2019 SSR 2011-12.

    14/28

    47 47 27.90 71.70 126.00 173.00 180.60 188.0048 48 28.30 72.90 128.20 176.10 183.70 191.10

    300mm Dia. 450mm Dia. 600mm Dia. 700mm Dia. 800mm Dia. 900mm Dia.

    49 49 28.70 74.10 130.40 179.20 186.80 194.2050 50 29.10 75.30 132.60 182.30 189.90 197.3051 51 29.50 76.50 134.80 185.40 193.00 200.4052 52 29.90 77.70 137.00 188.50 196.10 203.5053 53 30.30 78.90 139.20 191.60 199.20 206.6054 54 30.70 80.10 141.40 194.70 202.30 209.7055 55 31.10 81.30 143.60 197.80 205.40 212.8056 56 31.50 82.50 145.80 200.90 208.50 215.9057 57 31.90 83.70 148.00 204.00 211.60 219.0058 58 32.30 84.90 150.20 207.10 214.70 222.1059 59 32.70 86.10 152.40 210.20 217.80 225.2060 60 33.10 87.30 154.60 213.30 220.90 228.3061 61 33.50 88.50 156.80 216.40 224.00 231.4062 62 33.90 89.70 159.00 219.50 227.10 234.5063 63 34.30 90.90 161.20 222.60 230.20 237.6064 64 34.70 92.10 163.40 225.70 233.30 240.7065 65 35.10 93.30 165.60 228.80 236.40 243.80

    66 66 35.50 94.50 167.80 231.90 239.50 246.9067 67 35.90 95.70 170.00 235.00 242.60 250.0068 68 36.30 96.90 172.20 238.10 245.70 253.1069 69 36.70 98.10 174.40 241.20 248.80 256.2070 70 37.10 99.30 176.60 244.30 251.90 259.3071 71 37.50 100.50 178.80 247.40 255.00 262.4072 72 37.90 101.70 181.00 250.50 258.10 265.5073 73 38.30 102.90 183.20 253.60 261.20 268.6074 74 38.70 104.10 185.40 256.70 264.30 271.7075 75 39.10 105.30 187.60 259.80 267.40 274.8076 76 39.50 106.50 189.80 262.90 270.50 277.9077 77 39.90 107.70 192.00 266.00 273.60 281.0078 78 40.30 108.90 194.20 269.10 276.70 284.1079 79 40.70 110.10 196.40 272.20 279.80 287.2080 80 41.10 111.30 198.60 275.30 282.90 290.3081 81 41.50 112.50 200.80 278.40 286.00 293.4082 82 41.90 113.70 203.00 281.50 289.10 296.5083 83 42.30 114.90 205.20 284.60 292.20 299.6084 84 42.70 116.10 207.40 287.70 295.30 302.7085 85 43.10 117.30 209.60 290.80 298.40 305.8086 86 43.50 118.50 211.80 293.90 301.50 308.9087 87 43.90 119.70 214.00 297.00 304.60 312.0088 88 44.30 120.90 216.20 300.10 307.70 315.10

    89 89 44.70 122.10 218.40 303.20 310.80 318.2090 90 45.10 123.30 220.60 306.30 313.90 321.3091 91 45.50 124.50 222.80 309.40 317.00 324.4092 92 45.90 125.70 225.00 312.50 320.10 327.5093 93 46.30 126.90 227.20 315.60 323.20 330.6094 94 46.70 128.10 229.40 318.70 326.30 333.7095 95 47.10 129.30 231.60 321.80 329.40 336.8096 96 47.50 130.50 233.80 324.90 332.50 339.9097 97 47.90 131.70 236.00 328.00 335.60 343.0098 98 48.30 132.90 238.20 331.10 338.70 346.10

  • 8/3/2019 SSR 2011-12.

    15/28

    99 99 48.70 134.10 240.40 334.20 341.80 349.20100 100 49.10 135.30 242.60 337.30 344.90 352.30

    300mmDia.

    450mmDia.

    600mmDia.

    700mmDia.

    800mmDia.

    900mmDia.

    S.NO. KM Pipes cost 411.00 724.00 1176.00 1524.00 1944.00 2443.00

    1 1 12.80 22.00 32.60 39.60 54.90 82.002 2 12.80 22.00 32.60 39.60 54.90 82.003 3 12.80 22.00 32.60 39.60 54.90 82.004 4 12.80 22.00 32.60 39.60 54.90 82.005 5 12.80 22.00 32.60 39.60 54.90 82.006 6 13.70 23.30 35.00 42.10 58.80 89.007 7 14.60 24.60 37.40 44.60 62.70 96.008 8 15.50 25.90 39.80 47.10 66.60 103.009 9 16.40 27.20 42.20 49.60 70.50 110.00

    10 10 17.30 28.50 44.60 52.10 74.40 117.0011 11 18.20 29.80 47.00 54.60 78.30 124.0012 12 19.10 31.10 49.40 57.10 82.20 131.00

    13 13 20.00 32.40 51.80 59.60 86.10 138.0014 14 20.90 33.70 54.20 62.10 90.00 145.0015 15 21.80 35.00 56.60 64.60 93.90 152.0016 16 22.70 36.30 59.00 67.10 97.80 159.0017 17 23.60 37.60 61.40 69.60 101.70 166.0018 18 24.50 38.90 63.80 72.10 105.60 173.0019 19 25.40 40.20 66.20 74.60 109.50 180.0020 20 26.30 41.50 68.60 77.10 113.40 187.0021 21 27.20 42.80 71.00 79.60 117.30 194.0022 22 28.10 44.10 73.40 82.10 121.20 201.0023 23 29.00 45.40 75.80 84.60 125.10 208.00

    24 24 29.90 46.70 78.20 87.10 129.00 215.0025 25 30.80 48.00 80.60 89.60 132.90 222.0026 26 31.70 49.30 83.00 92.10 136.80 229.0027 27 32.60 50.60 85.40 94.60 140.70 236.0028 28 33.50 51.90 87.80 97.10 144.60 243.0029 29 34.40 53.20 90.20 99.60 148.50 250.0030 30 35.30 54.50 92.60 102.10 152.40 257.0031 31 36.20 55.80 95.00 104.60 156.30 264.0032 32 37.10 57.10 97.40 107.10 160.20 271.0033 33 38.00 58.40 99.80 109.60 164.10 278.0034 34 38.90 59.70 102.20 112.10 168.00 285.0035 35 39.80 61.00 104.60 114.60 171.90 292.0036 36 40.70 62.30 107.00 117.10 175.80 299.0037 37 41.60 63.60 109.40 119.60 179.70 306.0038 38 42.50 64.90 111.80 122.10 183.60 313.0039 39 43.40 66.20 114.20 124.60 187.50 320.0040 40 44.30 67.50 116.60 127.10 191.40 327.0041 41 45.20 68.80 119.00 129.60 195.30 334.0042 42 46.10 70.10 121.40 132.10 199.20 341.0043 43 47.00 71.40 123.80 134.60 203.10 348.0044 44 47.90 72.70 126.20 137.10 207.00 355.0045 45 48.80 74.00 128.60 139.60 210.90 362.00

    CONVEYANCE CHARGES OF RCC PIPES

    ( RCC NP2 S/S PIPES )

    E. Loading and Unloading charges by Mechanical Means

  • 8/3/2019 SSR 2011-12.

    16/28

    46 46 49.70 75.30 131.00 142.10 214.80 369.0047 47 50.60 76.60 133.40 144.60 218.70 376.0048 48 51.50 77.90 135.80 147.10 222.60 383.00

    300mmDia.

    450mmDia.

    600mmDia.

    700mmDia.

    800mmDia.

    900mmDia.

    49 49 52.40 79.20 138.20 149.60 226.50 390.0050 50 53.30 80.50 140.60 152.10 230.40 397.0051 51 54.20 81.80 143.00 154.60 234.30 404.0052 52 55.10 83.10 145.40 157.10 238.20 411.0053 53 56.00 84.40 147.80 159.60 242.10 418.0054 54 56.90 85.70 150.20 162.10 246.00 425.0055 55 57.80 87.00 152.60 164.60 249.90 432.0056 56 58.70 88.30 155.00 167.10 253.80 439.0057 57 59.60 89.60 157.40 169.60 257.70 446.0058 58 60.50 90.90 159.80 172.10 261.60 453.0059 59 61.40 92.20 162.20 174.60 265.50 460.0060 60 62.30 93.50 164.60 177.10 269.40 467.0061 61 63.20 94.80 167.00 179.60 273.30 474.0062 62 64.10 96.10 169.40 182.10 277.20 481.0063 63 65.00 97.40 171.80 184.60 281.10 488.0064 64 65.90 98.70 174.20 187.10 285.00 495.00

    65 65 66.80 100.00 176.60 189.60 288.90 502.0066 66 67.70 101.30 179.00 192.10 292.80 509.0067 67 68.60 102.60 181.40 194.60 296.70 516.0068 68 69.50 103.90 183.80 197.10 300.60 523.0069 69 70.40 105.20 186.20 199.60 304.50 530.0070 70 71.30 106.50 188.60 202.10 308.40 537.0071 71 72.20 107.80 191.00 204.60 312.30 544.0072 72 73.10 109.10 193.40 207.10 316.20 551.0073 73 74.00 110.40 195.80 209.60 320.10 558.0074 74 74.90 111.70 198.20 212.10 324.00 565.0075 75 75.80 113.00 200.60 214.60 327.90 572.00

    76 76 76.70 114.30 203.00 217.10 331.80 579.0077 77 77.60 115.60 205.40 219.60 335.70 586.0078 78 78.50 116.90 207.80 222.10 339.60 593.0079 79 79.40 118.20 210.20 224.60 343.50 600.0080 80 80.30 119.50 212.60 227.10 347.40 607.0081 81 81.20 120.80 215.00 229.60 351.30 614.0082 82 82.10 122.10 217.40 232.10 355.20 621.0083 83 83.00 123.40 219.80 234.60 359.10 628.0084 84 83.90 124.70 222.20 237.10 363.00 635.0085 85 84.80 126.00 224.60 239.60 366.90 642.0086 86 85.70 127.30 227.00 242.10 370.80 649.0087 87 86.60 128.60 229.40 244.60 374.70 656.00

    88 88 87.50 129.90 231.80 247.10 378.60 663.0089 89 88.40 131.20 234.20 249.60 382.50 670.0090 90 89.30 132.50 236.60 252.10 386.40 677.0091 91 90.20 133.80 239.00 254.60 390.30 684.0092 92 91.10 135.10 241.40 257.10 394.20 691.0093 93 92.00 136.40 243.80 259.60 398.10 698.0094 94 92.90 137.70 246.20 262.10 402.00 705.0095 95 93.80 139.00 248.60 264.60 405.90 712.0096 96 94.70 140.30 251.00 267.10 409.80 719.0097 97 95.60 141.60 253.40 269.60 413.70 726.00

  • 8/3/2019 SSR 2011-12.

    17/28

    98 98 96.50 142.90 255.80 272.10 417.60 733.0099 99 97.40 144.20 258.20 274.60 421.50 740.00

    100 100 98.30 145.50 260.60 277.10 425.40 747.00

  • 8/3/2019 SSR 2011-12.

    18/28

    1000mmDia.

    5041.00141.60141.60141.60

    141.60141.60148.40155.20162.00168.80175.60182.40189.20196.00202.80209.60216.40223.20230.00236.80243.60250.40257.20264.00270.80277.60284.40

    291.20298.00304.80311.60318.40325.20332.00338.80345.60352.40359.20366.00372.80379.60386.40393.20400.00406.80413.60420.40427.20434.00

  • 8/3/2019 SSR 2011-12.

    19/28

    1000mmDia.440.80447.60454.40461.20468.00474.80481.60488.40495.20502.00508.80515.60522.40529.20536.00542.80549.60556.40563.20

    570.00576.80583.60590.40597.20604.00610.80617.60624.40631.20638.00644.80651.60658.40665.20672.00678.80685.60692.40699.20706.00712.80719.60

    726.40733.20740.00746.80753.60760.40767.20774.00780.80787.60

  • 8/3/2019 SSR 2011-12.

    20/28

    1000mmDia.

    5906.00147.20147.20

    147.20147.20147.20154.40161.60168.80176.00183.20190.40197.60204.80212.00

    219.20226.40233.60240.80248.00255.20262.40269.60276.80284.00291.20

    298.40305.60312.80320.00327.20334.40341.60348.80356.00363.20370.40377.60384.80392.00399.20406.40413.60420.80428.00435.20442.40449.60

  • 8/3/2019 SSR 2011-12.

    21/28

    456.801000mm

    Dia.464.00471.20478.40485.60492.80500.00507.20514.40521.60528.80536.00543.20550.40557.60564.80572.00579.20586.40

    593.60600.80608.00615.20622.40629.60636.80644.00651.20658.40665.60672.80680.00687.20694.40701.60708.80716.00723.20730.40737.60744.80752.00

    759.20766.40773.60780.80788.00795.20802.40809.60816.80824.00

  • 8/3/2019 SSR 2011-12.

    22/28

    831.20

    1000mmDia.

    2318.0085.70

    85.7085.7085.7085.7092.1098.50

    104.90111.30117.70124.10130.50136.90

    143.30149.70156.10162.50168.90175.30181.70188.10194.50200.90207.30

    213.70220.10226.50232.90239.30245.70252.10258.50264.90271.30277.70284.10290.50296.90303.30309.70316.10322.50328.90335.30341.70348.10

  • 8/3/2019 SSR 2011-12.

    23/28

    354.50360.90

    1000mmDia.367.30373.70380.10386.50392.90399.30405.70412.10418.50424.90431.30437.70444.10450.50456.90463.30469.70

    476.10482.50488.90495.30501.70508.10514.50520.90527.30533.70540.10546.50552.90559.30565.70572.10578.50584.90591.30597.70604.10610.50616.90

    623.30629.70636.10642.50648.90655.30661.70668.10674.50680.90

  • 8/3/2019 SSR 2011-12.

    24/28

    687.30693.70

    1000mmDia.

    2958.00

    93.2093.2093.2093.2093.20

    100.20107.20114.20121.20128.20135.20142.20

    149.20156.20163.20170.20177.20184.20191.20198.20205.20212.20219.20

    226.20233.20240.20247.20254.20261.20268.20275.20282.20289.20296.20303.20310.20317.20324.20331.20338.20345.20352.20359.20366.20373.20

  • 8/3/2019 SSR 2011-12.

    25/28

    380.20387.20394.20

    1000mmDia.401.20408.20415.20422.20429.20436.20443.20450.20457.20464.20471.20478.20485.20492.20499.20506.20

    513.20520.20527.20534.20541.20548.20555.20562.20569.20576.20583.20

    590.20597.20604.20611.20618.20625.20632.20639.20646.20653.20660.20667.20

    674.20681.20688.20695.20702.20709.20716.20723.20730.20737.20

  • 8/3/2019 SSR 2011-12.

    26/28

    744.20751.20758.20

  • 8/3/2019 SSR 2011-12.

    27/28

    S.NO. SIZE UNIT NP2(in Rs.)1 300MM METRE 3412 400MM METRE 4883 450MM METRE 5994 600MM METRE 9755 700MM METRE 12486 800MM METRE 1528

    7 900MM METRE 19128 1000MM METRE 2318

    S.NO. SIZE UNIT NP21 300MM METRE 4112 400MM METRE 5823 450MM METRE 7244 600MM METRE 11765 700MM METRE 15246 800MM METRE 1944

    7 900MM METRE 24438 1000MM METRE 2958

    S.NO. SIZERATE UPTO 5KMS LEADINCL.LOADING,UNLOADI

    NG AND STACKING

    RATE FOR EVERY ADDITIONAL 1KM LEAD OR PART THEREOF

    RATE UPTO 5KMSLEAD

    INCL.LOADING,UNLOADING AND

    STACKING

    RATE FOR EVERYADDITIONAL 1 KM

    LEAD OR PARTTHEREOF

    1 300MM 11.10 0.40 29.30 0.802 400MM 16.80 1.00 37.30 1.203 450MM 21.30 1.20 40.90 1.404 600MM 33.60 2.20 67.00 3.105 700MM 42.80 3.10 74.50 3.606 800MM 50.40 3.10 89.30 3.607 900MM 57.80 3.10 117.30 6.808 1000MM 85.70 6.40 141.60 6.80

    S.NO. SIZERATE UPTO 5KMS LEADINCL.LOADING,UNLOADI

    NG AND STACKING

    RATE FOR EVERY ADDITIONAL 1KM LEAD OR PART THEREOF

    RATE UPTO 5KMSLEAD

    INCL.LOADING,UNLOADING AND

    STACKING

    RATE FOR EVERYADDITIONAL 1 KM

    LEAD OR PARTTHEREOF

    1 300MM 12.80 0.90 35.00 1.102 400MM 16.00 1.20 46.40 2.403 450MM 22.00 1.30 51.20 2.404 600MM 32.60 2.40 76.30 3.605 700MM 39.60 2.50 102.40 7.206 800MM 54.90 3.90 121.00 7.207 900MM 82.00 7.00 139.60 7.208 1000MM 93.20 7.00 147.20 7.20

    247331414149

    52005906

    CONVEYANCE OF R.C.C. S/S PIPES PER 1 METRE (NON PRESSURE)

    97314031549

    NP2 NP3

    1221198324533235

    40495041

    SS RATES FOR R.C.C.PLAIN ENDED PIPES(NON PRESSURE)

    SS RATES FOR R.C.C. S/S PIPES(NON PRESSURE)

    CONVEYANCE OF R.C.C. PLAIN ENDED PIPES PER 1 METRE (NON PRESSURE)

    NP3 (in Rs.)

    NP3

    NP2 NP3

    SSR 2011-12.

    7651069

  • 8/3/2019 SSR 2011-12.

    28/28

    Frames Qty in CftShuttersQty in Cft

    1.65 2.10 1.87 3.791.50 2.10 1.81 3.501.35 2.10 1.75 2.981.20 2.10 1.67 2.67 4.341.05 2.10 1.61 2.391.65 2.30 1.96 4.191.50 2.10 1.90 3.871.35 2.10 1.84 3.271.20 2.30 1.76 2.951.05 2.30 1.70 2.651.65 2.00 1.79 3.491.50 2.00 1.73 3.221.35 2.00 1.67 2.641.20 2.00 1.59 2.38

    1.05 2.00 1.53 2.11 3.640.90 2.00 1.47 1.85

    0.90 1.20 0.94 1.021.05 1.20 0.99 1.180.90 1.35 1.03 1.101.80 1.35 2.14 2.291.05 1.35 1.06 1.130.90 1.50 1.06 1.341.50 1.20 1.52 1.55

    1.50 1.35 1.61 2.10

    Size in Mts

    FOR DOORS

    FOR WINDOWS

    WOOD REQUIREMENT FOR DOORS AND WINDOWS