  LIST OF ATTEMPTED QUESTIONS AND ANSWERS  

Sem – 3rd Techniques for Operations Efficiency 2

Page 3: Techniques for Operations Efficiency 4

    True/False  Question   Performance benchmarking does not involves comparison of financial ratios at the aggregate

level.  Correct Answer  False

  Your Answer   False

  Multiple Choice Single Answer  Question   Setup time includes :-

  Correct Answer  Internal setup time & External setup time

  Your Answer   Internal setup time & External setup time

  Multiple Choice Single Answer  Question   Participants of the groups for quality circles should be decided by :-

  Correct Answer  Employees coming together by their own enthusiasm

  Your Answer   Employees coming together by their own enthusiasm

  Multiple Choice Single Answer  Question   Check sheet are also used as :-

  Correct Answer  Data gathering & interpretation tool

  Your Answer   Data gathering & interpretation tool

  Multiple Choice Single Answer  Question   SMED means :-

  Correct Answer  Single minute exchange of dies

  Your Answer   Single minute exchange of dies

  Match The FollowingQuestion Correct Answer Your Answer

Productivity performance measurement

Turnover employee Cost of quality

Financial performance measurement

Sales of the months Sales of the months

Customer satisfaction measurement Customer complaints per period Customer complaints per period

Staff attitude measurement Employee satisfaction index Employee satisfaction index

  Select The Blank  Question   ________ is an effect due to the muda of defect.

  Correct Answer  Wear & tear of parts while disassembling

  Your Answer   Poor production planning & control

 

Sem – 3rd Techniques for Operations Efficiency 3

Page 4: Techniques for Operations Efficiency 4

  Select The Blank  Question   If some defective parts are discovered by the subsequent process they should be returned to

the ________ to prevent reoccurrence.  Correct Answer  Preceding process

  Your Answer   Return to stores

  Multiple Choice Multiple Answer  Question   The results oriented efforts of the quality circle should also include :-

  Correct Answer  Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities

  Your Answer   Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities  

 Match The FollowingQuestion Correct Answer Your Answer

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines & operates on

Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes by

Arranging data according to the descending order of their frequency of occurrence

Arranging data according to the descending order of their frequency of occurrence

Parato diagram is a Bar graph with height or value drawn by

Arranging data in descending order Magnitude of defects

  Multiple Choice Multiple Answer  Question   Few steps in construction in Radar chart are :-

  Correct Answer  Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre

  Your Answer   Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre  

 Select The Blank  Question   5 S audit result is discussed in ________ meeting.

  Correct Answer  Monthly

  Your Answer   Monthly

  True/False  Question   Fishbone analysis is used both in analysis & planning.

  Correct Answer  True

  Your Answer   False

 

Sem – 3rd Techniques for Operations Efficiency 4

Page 5: Techniques for Operations Efficiency 4

 Multiple Choice Single Answer  Question   One Green Belt may head a team of :-

  Correct Answer  20 employees

  Your Answer   20 employees

  Multiple Choice Multiple Answer  Question   Role of champions are :-

  Correct Answer  Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects

  Your Answer   Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation  

 Multiple Choice Multiple Answer  Question   To draw control charts, sample must be representative of homogeneous segment of

production for which :-  Correct Answer  The items of the sample should be from the same machine setting , The items should be of

the same batch , Items should be made from the same raw material batch   Your Answer   The items of the sample should be from the same machine setting , The items should be of

the same batch , Items should be made from the same raw material batch  

 Multiple Choice Single Answer  Question   Failure mode and effect analysis (FMEA) establish

  Correct Answer  Process failure and minimize frequency

  Your Answer   Process failure and minimize frequency

  Multiple Choice Multiple Answer  Question   What are the steps in deciding the benchmarking partner?

  Correct Answer  Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners

  Your Answer   Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners  

 Multiple Choice Single Answer  Question   One Master Black Belt may head a team of :-

  Correct Answer  15-20 Black Belts

  Your Answer   15-20 Black Belts

  Multiple Choice Single Answer  Question   Competitive benchmarking involves identifying key competitive product, services or processes

& comparing with those of :-  Correct Answer  Main competitor

  Your Answer   Main competitor

  Multiple Choice Single Answer  Question   Implication of Quality problem is:-

Sem – 3rd Techniques for Operations Efficiency 5

Page 6: Techniques for Operations Efficiency 4

  Correct Answer  Gap in performance

  Your Answer   Gap in performance

  Select The Blank  Question   Number of defects in an individual component, like gear, shaft, wheel etc can be monitored

through ________ type of control chart.  Correct Answer  c-chart

  Your Answer   c-chart

  True/False  Question   Non-availability of files /document in time is a problem to be addressed by office TPM.

  Correct Answer  True

  Your Answer   True

  Multiple Choice Single Answer  Question   Check sheet is easy to use because it is :-

  Correct Answer  Simplest tool

  Your Answer   Simplest tool

  Multiple Choice Single Answer  Question   Benchmarking helps to identify the gap between the current performance of the organization

and the :-  Correct Answer  Performance of the best organization

  Your Answer   Performance of the best organization

  True/False  Question   Flow chart is pictorial representation of the steps in production control.

  Correct Answer  False

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Breakdown problem may be stratified by :-

  Correct Answer  Sections , Machines , Type of breakdown (e.g mech. Or electrical)

  Your Answer   Sections , Machines , Type of breakdown (e.g mech. Or electrical)

  Select The Blank  Question   A control chart to exhibit counted data on number of defect is called ________.

  Correct Answer  c-chart

  Your Answer   c-chart

Sem – 3rd Techniques for Operations Efficiency 6

Page 7: Techniques for Operations Efficiency 4

  Select The Blank  Question   Procedure for implementation of TPM consists of ________ numbers of steps.

  Correct Answer  12

  Your Answer   8

  Select The Blank  Question   Capability index Cp = ________

  Correct Answer  Specification width/process width

  Your Answer   Specification width/process width

  Multiple Choice Single Answer  Question   Pareto's analysis underlines & operates philosophy of :-

  Correct Answer  Vital few = trivial many

  Your Answer   Vital few = trivial many

  True/False  Question   Kanban signals are required when assembly work, subassembly work and manufacturing at

parts is carried out at different locations.  Correct Answer  True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   To reduce clamping & declamping time, following actions are desirable :-

  Correct Answer  Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device

  Your Answer   Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device  

 Select The Blank  Question   Benchmarking allows exchange of ________ between the benchmarking partners.

  Correct Answer  Information

  Your Answer   Information

  Multiple Choice Multiple Answer  Question   TQM can never flourish if the staff are:-

  Correct Answer  Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses

  Your Answer   Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses  

 True/False

Sem – 3rd Techniques for Operations Efficiency 7

Page 8: Techniques for Operations Efficiency 4

  Question   In bar graph each bar is of same height.

  Correct Answer  False

  Your Answer   False

  Multiple Choice Multiple Answer  Question   During SMED implementation, primary study consists of :-

  Correct Answer  Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis

  Your Answer   Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis  

 True/False  Question   Daily work management can also be extended to non manufacturing areas like procurement,

QA, HRD etc.  Correct Answer  True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Types of Poka-Yoke are :-

  Correct Answer  Prevention type Poka-Yoke , Detection type Poka-Yoke

  Your Answer   Prevention type Poka-Yoke , Detection type Poka-Yoke

  Multiple Choice Single Answer  Question   Quality problem solving tool is used to :-

  Correct Answer  Improve quality

  Your Answer   Save time

  True/False  Question   Along with problem solving tools experience and judgment is also used.

  Correct Answer  True

  Your Answer   False

  Select The Blank  Question   JIT advocates the philosophy at elimination of waste from system which occurs due to

________.  Correct Answer  Over Production

  Your Answer   Over Production

  True/False  Question   Without measuring initial performance, target can't be set.

  Correct Answer  True

Sem – 3rd Techniques for Operations Efficiency 8

Page 9: Techniques for Operations Efficiency 4

  Your Answer   False

  Multiple Choice Multiple Answer  Question   An erratic patterns falling above & below the control limits indicates :-

  Correct Answer  Defect in materials , Frequent adjustment of machines , Poorly trained operators

  Your Answer   Defect in materials , Frequent adjustment of machines , Poorly trained operators

  True/False  Question   Sample size for the construction of p-chart are larger than X bar-R chart.

  Correct Answer  True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Histogram is an important diagnostic tool. Analysis of the histogram gives :-

  Correct Answer  It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits

  Your Answer   An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation  

 Multiple Choice Single Answer  Question   Productivity improves by :-

  Correct Answer  Voluntary participants of everyone

  Your Answer   Voluntary participants of everyone

2nd Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Training related to Quality includes:- Correct Answer Quality measures , Quality failure Your Answer Negotiation skill , Goal of business , Quality measures , Quality failure Multiple Choice Single Answer Question If defects found at own process, the cost to the company is :- Correct Answer Very little Your Answer Very high Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :- Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation

Sem – 3rd Techniques for Operations Efficiency 9

Page 10: Techniques for Operations Efficiency 4

True/False Question In bar graph each bar is of same height. Correct Answer False Your Answer False Select The Blank Question Basic objective of control chart is to ________ the variation due to chance & assignable cause. Correct Answer Separate out Your Answer Separate out Multiple Choice Multiple Answer Question Benefits of stratification are :- Correct Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors , Finding out different reasons Multiple Choice Single Answer Question For 'Timely clearance of GRR's', checking point will be :- Correct Answer Number of GRRs pending beyond 1 day Your Answer Number of GRRs pending beyond 1 day Multiple Choice Single Answer Question Organizing the place is not enough , what is required is : Correct Answer Planning storage based on Frequency of use Your Answer Planning storage based on Frequency of use Select The Blank Question JIT helps to ________ the waste in the purchasing process. Correct Answer Eliminates Your Answer Eliminates Multiple Choice Single Answer Question In cellular manufacturing system, the cells are designed so that the material flow within the cell and between the cells are :- Correct Answer Minimized Your Answer Minimized True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Causes of Muda of transport are :- Correct Answer Faulty layout , Over production Your Answer Faulty layout , Over production , Proper material handling equipment , Low rejection / rework Multiple Choice Multiple Answer Question Types of meetings held in DWM are :- Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting Your Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA meeting Multiple Choice Multiple Answer Question Customers complaints may be segregated by :- Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity , Payment problem Sem – 3rd Techniques for Operations Efficiency 10

Page 11: Techniques for Operations Efficiency 4

Multiple Choice Multiple Answer Question Cleaning your own area/equipments gives benefits of :- Correct Answer You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust Your Answer You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust , Utilization of spare time Multiple Choice Multiple Answer Question Role of champions are :- Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects , Deliver presentation to teams on six sigma projects Select The Blank Question Benchmarking shows how an organization is ________ in comparison to its competitors. Correct Answer Performing Your Answer Performing True/False Question Inspection is poor method of assuring 100% quality. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Benefits of TQM are :- Correct Answer Greater customer satisfaction , Lower manufacturing cost Your Answer Greater customer satisfaction , Lower manufacturing cost Select The Blank Question ________ ensures that communication is simple & effective. Correct Answer Visual Management Your Answer Visual Management True/False Question Daily work management develops problem finding & solving attitude. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Key principles of TQM :- Correct Answer Continuous improvement , People involvement , Cost of quality Your Answer Continuous improvement , People involvement , Cost of quality , Competitor focus Select The Blank Question A histogram is a graphical display of distribution of measurements & reveals the amounts of ________ within the process. Correct Answer Variation Your Answer Variation Select The Blank Question To assess effectiveness of training ________ is essential. Correct Answer Evaluation Your Answer Evaluation Select The Blank Question ________ are implemented for defect detection & prevention. Correct Answer Poka-Yokes Your Answer TPM True/False Sem – 3rd Techniques for Operations Efficiency 11

Page 12: Techniques for Operations Efficiency 4

Question To achieve quality, it has to be designed into the product. Correct Answer True Your Answer True Multiple Choice Single Answer Question Setting & maintaining optimal process condition to get quality product is the aim of :- Correct Answer Quality maintenance Your Answer Quality maintenance Match The Following Question Correct Answer Your Answer Productivity performance measurement Turnover employee Cost of quality Financial performance measurement Sales of the months Sales of the months Customer satisfaction measurement Customer complaints per period Customer complaints per period Staff attitude measurement Employee satisfaction index Employee satisfaction index Multiple Choice Single Answer Question Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :- Correct Answer Video recording Your Answer Video recording Match The Following Question Correct Answer Your Answer In scatter diagram, the strength of relationship can be determined By "correlation coefficient" By "correlation coefficient" The scatter diagram provides the technique to establish The possible relationship between a pair of variables The possible dependency between a pair of variables The scatter diagram displays The pair of data as a cloud of points The possible relationship between a pair of variables The scatter is also known as Correlation diagram Correlation diagram Multiple Choice Single Answer Question What is to be done before selecting benchmarking partner? Correct Answer level of benchmarking is to be decided Your Answer level of benchmarking is to be decided True/False Question Flow chart helps to stop an old process. Correct Answer False Your Answer False Select The Blank Question Create as many ________ system as possible for better Seiketsu. Correct Answer Visual control Your Answer Labeling Multiple Choice Single Answer Question Allowing worker's to stop machine / assembly line if they believe that product quality is below standard' is an example of :- Correct Answer Empowerment Sem – 3rd Techniques for Operations Efficiency 12

Page 13: Techniques for Operations Efficiency 4

Your Answer Empowerment Multiple Choice Single Answer Question Kanban Signals are required when :- Correct Answer Set up time on the feeding operation is higher then the receiving operation. Your Answer Set up time on the feeding operation is higher then the receiving operation. Multiple Choice Single Answer Question Kanban system is Correct Answer 1. Pull System Your Answer 1. Pull System Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Improve quality Multiple Choice Single Answer Question To avoid short receipt of items to customers, provide the dispatch clerk with : Correct Answer The check list for verification Your Answer The check list for verification True/False Question Control chart is also called as 'Mean -Range or X-chart'. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Flow chart is required :- Correct Answer When trying to improve the process , At the time of review of the process , To understand steps in a process by pictorial presentation Your Answer When trying to improve the process , At the time of review of the process , To understand steps in a process by pictorial presentation , For defects finding of the products Select The Blank Question ________ is the critical element of TQM. Correct Answer Focus on customer Your Answer Focus on customer Multiple Choice Multiple Answer Question Management skill includes :- Correct Answer Leadership , Motivation , Performance appraisals Your Answer Leadership , Motivation , Performance appraisals , Quality measurement Multiple Choice Single Answer Question 5-S technique is useful to: Correct Answer To all places including homes Your Answer To all places including homes True/False Question Safety, hygiene and environment control is one of the pillar of TPM. Correct Answer True Your Answer True Select The Blank Question Inspection activity for semi finished & finished component should be ________ to reduce muda of transport . Correct Answer Decentralized Your Answer Decentralized True/False Sem – 3rd Techniques for Operations Efficiency 13

Page 14: Techniques for Operations Efficiency 4

Question Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer True Select The Blank Question Good ________ is the asset to acquire the success of quality circle. Correct Answer Teamwork Your Answer Teamwork

3rd Copy

  LIST OF ATTEMPTED QUESTIONS AND ANSWERS     

 Multiple Choice Multiple Answer  Question   Advantages of JIT :-

  Correct Answer  

Reduce incoming inspection , Reduce inventory , Lower per unit cost

  Your Answer   Reduce incoming inspection , Reduce inventory , Lower per unit cost

  Multiple Choice Multiple Answer  Question   Benefits from the standardized containers are

  Correct Answer  

Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock

  Your Answer   Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock  

 Multiple Choice Multiple Answer  Question   Benefits from SMED are :-

  Correct Answer  

Reduce work in process , Better average daily production , Increase capacity

  Your Answer   Reduce work in process , Increase capacity

  Multiple Choice Single Answer  Question   Competitive benchmarking involves identifying key competitive product, services or

processes & comparing with those of :-  Correct Answer  

Main competitor

  Your Answer   Main competitor

  Multiple Choice Multiple Answer  Question   Benefits of stratification are :-

  Correct Answer  

It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors

  Your Answer   It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , Finding out different reasons  

 Multiple Choice Multiple Answer  Question   Quality maintenance & pillar focuses on following production inputs :-

  Correct Answer  

Men , Machine , Material

 

Sem – 3rd Techniques for Operations Efficiency 14

Page 15: Techniques for Operations Efficiency 4

  Your Answer   Men , Machine , Management

  Multiple Choice Single Answer  Question   The success indicators in quality, cost, delivery & product development are :-

  Correct Answer  

Managing points

  Your Answer   Accountability

  Multiple Choice Multiple Answer  Question   Steps in setup time reduction are :-

  Correct Answer  

Team formation , Training , Recoding of activities on multiple activity charts

  Your Answer   Team formation , Recoding of activities on multiple activity charts , Convert external setups in to internal setups  

 Multiple Choice Multiple Answer  Question   POM essentially consists of :-

  Correct Answer  

Time management , Team participation and performance , Moral boosting

  Your Answer   Time management , Team participation and performance , Cost Management

  Multiple Choice Single Answer  Question   Activity under quality management is :-

  Correct Answer  

Use team approach to track down root causes of the problem

  Your Answer   Maintenance of equipment condition by eliminating lubricant leakage.

  True/False  Question   Every department should make their own rules of standardization.

  Correct Answer  

False

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Histogram is an important diagnostic tool. Analysis of the histogram gives :-

  Correct Answer  

It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits

  Your Answer   It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits  

 Match The FollowingQuestion Correct Answer Your Answer

Productivity performance measurement

Turnover employee Sales of the months

Sem – 3rd Techniques for Operations Efficiency 15

Page 16: Techniques for Operations Efficiency 4

Financial performance measurement

Sales of the months Cash saving per department

Customer satisfaction measurement

Customer complaints per period Customer complaints per period

Staff attitude measurement Employee satisfaction index Employee satisfaction index

  Multiple Choice Single Answer  Question   TPM helps to reduce down time due to:-

  Correct Answer  

Breakdown of machine

  Your Answer   Breakdown of machine

  Multiple Choice Single Answer  Question   Kaizen emphasizes :-

  Correct Answer  

Implementation of ideas

  Your Answer   Collection of ideas

  Select The Blank  Question   Create as many ________ system as possible for better Seiketsu.

  Correct Answer  

Visual control

  Your Answer   Visual control

  True/False  Question   Inadequate maintenance of machine leads to muda of defects

  Correct Answer  

True

  Your Answer   False

  Select The Blank  Question   The shape of histogram can provide a clue about the ________ of the lot.

  Correct Answer  

Quality

  Your Answer   Distribution

  Multiple Choice Single Answer  Question   Customer's return is an indicators of the MUDA of :-

  Correct Answer  

Defect

  Your Answer   Defect

  Multiple Choice Single Answer  Question   In bar graph the interval (gap) between the bars is :-

  Correct EqualSem – 3rd Techniques for Operations Efficiency 16

Page 17: Techniques for Operations Efficiency 4

Answer    Your Answer   Symmetrical

  True/False  Question   Inspection is poor method of assuring 100% quality.

  Correct Answer  

True

  Your Answer   False

  True/False  Question   A radar chart is combination of a circle & line graph

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Single Answer  Question   A workshop is to be treated as :-

  Correct Answer  

Place where one's creativity can be applied

  Your Answer   Place where one's creativity can be applied

  True/False  Question   Customer wise outstanding is discussed in daily work management meeting by

operations head.  Correct Answer  

False

  Your Answer   True

  True/False  Question   Number of operation can change according to production requirement in U-Line

arrangement.  Correct Answer  

False

  Your Answer   True

  True/False  Question   Automation can correct the basic faults of a improper setup process.

  Correct Answer  

False

  Your Answer   True

  Select The Blank  Question   Cp for six sigma process is ________

  Correct Answer  

2

  Your Answer   1.66

Sem – 3rd Techniques for Operations Efficiency 17

Page 18: Techniques for Operations Efficiency 4

  Select The Blank  Question   Range ( R ) is obtained as the difference between the highest and ________

measurement of a sample.  Correct Answer  

Lowest

  Your Answer   Second highest

  Select The Blank  Question   ________is an important step toward successful JIT purchasing.

  Correct Answer  

JIT Contract

  Your Answer   JIT Contract

  True/False  Question   U-Line layout is better than straight lime layout.

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Single Answer  Question   TQM applicable to :-

  Correct Answer  

Marketing, design & manufacturing

  Your Answer   Quality Control department

  Select The Blank  Question   Bar graph is display of data that facilitates ________ of quality.

  Correct Answer  

Comparison

  Your Answer   Performance

  Multiple Choice Single Answer  Question   Production kanban is presented by :-

  Correct Answer  

P-kanban

  Your Answer   R-kanban

  Multiple Choice Single Answer  Question   Check sheet are also used as :-

  Correct Answer  

Data gathering & interpretation tool

  Your Answer   Cause finding & effect finding tool

  Select The Blank

Sem – 3rd Techniques for Operations Efficiency 18

Page 19: Techniques for Operations Efficiency 4

  Question   Japanese believe that when they are ________ they are cleaning there minds too.

  Correct Answer  

Cleaning

  Your Answer   Repairing machines

  Select The Blank  Question   Poka-Yoke devices under category use ________ to distinguish between similar parts

which may be assembled in wrong position.  Correct Answer  

Color coding

  Your Answer   Counting device

  Select The Blank  Question   Shitsuke means ________ all the previous 4-S throughout the month/year.

  Correct Answer  

Sustaining

  Your Answer   Implementing

  Multiple Choice Multiple Answer  Question   Types of meetings held in DWM are :-

  Correct Answer  

Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting

  Your Answer   Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting

  True/False  Question   By TPM, consumption of electrical energy can be reduced.

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   According to Seiketsu Standardization means :-

  Correct Answer  

To develop easy to follow standards , Evolve standard operating procedure , Better visual management

  Your Answer   To develop easy to follow standards , Evolve standard operating procedure , Reduction of wastage  

 True/False  Question   Flow chart helps to stop an old process.

  Correct Answer  

False

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Training related to Quality includes:-

  Correct Quality measures , Quality failure Sem – 3rd Techniques for Operations Efficiency 19

Page 20: Techniques for Operations Efficiency 4

Answer    Your Answer   Quality measures , Quality failure , Goal of business

  Multiple Choice Single Answer  Question   Total area under the normal curve is

  Correct Answer  

Unity

  Your Answer   Six

  Multiple Choice Multiple Answer  Question   Cpk =

  Correct Answer  

(x - USL)/3 sigma , (x - LSL)/3 sigma

  Your Answer   (x - USL)/6 sigma

  Select The Blank  Question   A histogram is a graphical display of distribution of measurements & reveals the

amounts of ________ within the process.  Correct Answer  

Variation

  Your Answer   Percentage defects

  Match The FollowingQuestion Correct Answer Your Answer

Value analysis / value engineering To eliminate MUDA of processing To eliminate MUDA of over production

SMED To eliminate MUDA of over production

To eliminate MUDA of defect

VMI ( Vendor Management Inventory) system

To eliminate MUDA of stock To eliminate MUDA of stock

Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing

  Select The Blank  Question   A 'Radar chart' is used to portray ________ strength or weakness of the activity.

  Correct Answer  

Relative

  Your Answer   Comparative

4th Copy

  LIST OF ATTEMPTED QUESTIONS AND ANSWERS     

 True/False  Question   Performance benchmarking does not involves comparison of financial ratios at the

aggregate level.  Correct Answer  

False

  Your Answer   False

 

Sem – 3rd Techniques for Operations Efficiency 20

Page 21: Techniques for Operations Efficiency 4

  Multiple Choice Multiple Answer  Question   Few steps to construct a flow chart are :-

  Correct Answer  

Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'

  Your Answer   Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'  

 Select The Blank  Question   In PDCA cycle for benchmarking 'Identification of performance gap' is done in

________.  Correct Answer  

Checking

  Your Answer   Checking

  Select The Blank  Question   5 S audit result is discussed in ________ meeting.

  Correct Answer  

Monthly

  Your Answer   Shift beginning

  Select The Blank  Question   In scatter diagram "________" relationship is said to exist when value of 'y' decreases

as the value of 'x' increases.  Correct Answer  

Strong negative

  Your Answer   Strong negative

  Select The Blank  Question   Kaizen projects are managed by ________

  Correct Answer  

Cross functional team

  Your Answer   Management

  Multiple Choice Single Answer  Question   Poka-yoke for employee not performing work as per established method is :-

  Correct Answer  

Implement work standard

  Your Answer   Implement work standard

  Multiple Choice Multiple Answer  Question   Typical examples of process benchmark are :-

  Correct Answer  

Procurement procedures , Budgeting , Recruitment

  Your Answer   Procurement procedures , Budgeting , Recruitment

Sem – 3rd Techniques for Operations Efficiency 21

Page 22: Techniques for Operations Efficiency 4

  Multiple Choice Multiple Answer  Question   What are the steps in deciding the benchmarking partner?

  Correct Answer  

Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners

  Your Answer   Decide level of benchmarking , Collect information of short listed partners

  Multiple Choice Single Answer  Question   Errors by armatures is :-

  Correct Answer  

Lack of experience

  Your Answer   Absent mindedness

  True/False  Question   Control chart is also called as run-chart.

  Correct Answer  

True

  Your Answer   True

  Match The FollowingQuestion Correct Answer Your Answer

Reduce clamping & declamping time

Use U-shaped washer Use U-shaped washer

Reduce time of external setup Improve work aids positioning method

Improve work aids positioning method

Convert internal setup into external setup

Preparation of tools / dies as off line activity

Preparation of tools / dies as off line activity

Eliminate adjustment Pre setting of tool Pre setting of tool

  Multiple Choice Single Answer  Question   Muda of defect is very serious in case of:-

  Correct Answer  

High speed automatic machines

  Your Answer   High speed automatic machines

  Multiple Choice Multiple Answer  Question   To reduce clamping & declamping time, following actions are desirable :-

  Correct Answer  

Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device

  Your Answer   Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device  

 Multiple Choice Single Answer  Question   Requirement of more machines, is an example of :-

  Correct Answer  

Muda of overproduction

Sem – 3rd Techniques for Operations Efficiency 22

Page 23: Techniques for Operations Efficiency 4

  Your Answer   Muda of waiting

  Multiple Choice Single Answer  Question   In India quality circle was first launched by :-

  Correct Answer  

Hyderabad unit of BHEL

  Your Answer   Hyderabad unit of BHEL

  Multiple Choice Multiple Answer  Question   3M' is world class benchmarking ' candidates in the field of :-

  Correct Answer  

Product development , Technology transfer , Environmental Management

  Your Answer   Product development , Technology transfer , Environmental Management

  Multiple Choice Single Answer  Question   Responsibility for Quality should rest on:-

  Correct Answer  

Who produce the product

  Your Answer   Quality control department

  True/False  Question   Increase in defect rate is an example of 'Deviation from an established norms'

  Correct Answer  

True

  Your Answer   True

  Select The Blank  Question   ________ are implemented for defect detection & prevention.

  Correct Answer  

Poka-Yokes

  Your Answer   Poka-Yokes

  Multiple Choice Single Answer  Question   Quality problem solving tool is used to :-

  Correct Answer  

Improve quality

  Your Answer   Improve quality

  Multiple Choice Single Answer  Question   Implication of Quality problem is:-

  Correct Answer  

Gap in performance

  Your Answer   Lower efficiency

 

Sem – 3rd Techniques for Operations Efficiency 23

Page 24: Techniques for Operations Efficiency 4

 True/False  Question   Presentation of graphs in pictorial form of data collection are for easy understanding.

  Correct Answer  

True

  Your Answer   True

  Select The Blank  Question   ________ waste is probably the biggest waste in most of the organizations.

  Correct Answer  

Time

  Your Answer   Labor

  True/False  Question   Globalization of trade and industrial operations have forced Indian companies to

become more & more competitive and customer driven.  Correct Answer  

True

  Your Answer   True

  True/False  Question   TQM improves the quality by improving processes.

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   An erratic patterns falling above & below the control limits indicates :-

  Correct Answer  

Poorly trained operators , Defect in materials , Frequent adjustment of machines

  Your Answer   Defect in materials , Frequent adjustment of machines , Poorly trained operators

  Multiple Choice Single Answer  Question   Defects per million for the process at six sigma level are :-

  Correct Answer  

3.4

  Your Answer   6210

  Multiple Choice Single Answer  Question   To provide flexibility to supervisors in allocation of task, JIT emphasizes :-

  Correct Answer  

Multiskilled operators

  Your Answer   Multiskilled operators

  Multiple Choice Single Answer  Question   To maintain smoothness in production :-

Sem – 3rd Techniques for Operations Efficiency 24

Page 25: Techniques for Operations Efficiency 4

  Correct Answer  

Elimination of buffer stock is recommended

  Your Answer   Maintenance of buffer stock is recommended.

  Select The Blank  Question   ________ should be used to exercise control on the process.

  Correct Answer  

Control chart

  Your Answer   Latest checking instruments

  Match The FollowingQuestion Correct Answer Your Answer

Ideally the histogram will have a bell shape

Tapering away on the both sides from average value

Tapering away on the both sides from average value

Histogram is a graphical display of distribution of measurements and

Reveals the amount of variation within the process

Reveals the amount of variation within the process

Histogram is a diagrammatic presentation of

The frequency distribution of a characteristics

The frequency distribution of a characteristics

The shape of histogram can Provide a clue about the quality of the lot

Provide a clue about the quality of the lot

  True/False  Question   In single card kanban system production greater than quantity withdrawn is permitted.

  Correct Answer  

False

  Your Answer   False

  True/False  Question   Flow chart are drawn to document a process charting the tasks performed & the

sequence in which tasks are performed.  Correct Answer  

True

  Your Answer   True

  Select The Blank  Question   Cpk for six sigma process is ________

  Correct Answer  

1.5

  Your Answer   1.5

  True/False  Question   Seiso prevents the potential problems by discovering abnormalities while cleaning your

own area.  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer

Sem – 3rd Techniques for Operations Efficiency 25

Page 26: Techniques for Operations Efficiency 4

  Question   Some steps for stratification are :-

  Correct Answer  

Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?

  Your Answer   Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?  

 True/False  Question   Processing cost of a product is mainly decided by conversion process.

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Work standards enable management to minimize variation in :-

  Correct Answer  

Output , Quality , Cost

  Your Answer   Output , Quality , Cost

  Multiple Choice Multiple Answer  Question   Process can be made capable by :-

  Correct Answer  

Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification

  Your Answer   Reducing process variability , Bringing target & average to fall at the same point , Use of less precision machine  

 Multiple Choice Multiple Answer  Question   Few steps in construction of Pie chart are :-

  Correct Answer  

Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart

  Your Answer   Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart  

 Multiple Choice Multiple Answer  Question   As benchmark in Japan seiso activities means :-

  Correct Answer  

Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence

  Your Answer   Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence  

 Select The Blank  Question   Poka Yoke designed to help operators to know immediately ________ of the defeat

called detection type Poka-Yoke.  Correct Answer  

On occurrence

Sem – 3rd Techniques for Operations Efficiency 26

Page 27: Techniques for Operations Efficiency 4

  Your Answer   Before Occurrence

  Select The Blank  Question   Flow chart helps to dissect a process for better understanding & ________ of process.

  Correct Answer  

Analysis

  Your Answer   Analysis

  Multiple Choice Single Answer  Question   Small groups forming a circle should consist of :-

  Correct Answer  

Employees of different department related to the problem

  Your Answer   Employees of same department

  Select The Blank  Question   Graphs convey a situation more ________ than summary of data or figures.

  Correct Answer  

Effectively & clearly

  Your Answer   Effectively & clearly

  Multiple Choice Single Answer  Question   Number of Kaizen projects suggested and implemented is checking point for :-

  Correct Answer  

Continual Improvement

  Your Answer   Continual Improvement

5th Copy

  LIST OF ATTEMPTED QUESTIONS AND ANSWERS     

 Multiple Choice Multiple Answer  Question   Quality maintenance & pillar focuses on following production inputs :-

  Correct Answer  

Material , Men , Machine

  Your Answer   Material , Men , Machine

  Multiple Choice Multiple Answer  Question   Histograms are useful to :-

  Correct Answer  

Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control

  Your Answer   Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control  

 Multiple Choice Single Answer  Question   In problem solving the best alternative is that :-

 

Sem – 3rd Techniques for Operations Efficiency 27

Page 28: Techniques for Operations Efficiency 4

  Correct Answer  

Which best meets the criteria

  Your Answer   Which best meets the criteria

  Multiple Choice Single Answer  Question   "Cause & effect" diagram was developed by :-

  Correct Answer  

DR.Kaoru Ishikawa

  Your Answer   DR.Kaoru Ishikawa

  Multiple Choice Single Answer  Question   Identifying key preventive operational functions and comparing these operational

functions within the firm's own division & branches comes under :-  Correct Answer  

Internal benchmarking

  Your Answer   Internal benchmarking

  Select The Blank  Question   JIT advocates the philosophy at elimination of waste from system which occurs due to

________.  Correct Answer  

Over Production

  Your Answer   Over Production

  Select The Blank  Question   In scatter diagram "________" relationship is said to exist when there is positive

relationship upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter.

  Correct Answer  

Curvilinear

  Your Answer   Curvilinear

  True/False  Question   Kanban signals are required when assembly work, subassembly work and

manufacturing at parts is carried out at different locations.  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   Customers complaints may be segregated by :-

  Correct Answer  

Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity

  Your Answer   Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity

  True/False  Question   In case of more than one quality characteristics, separate chart is made for each

quality characteristics.  Correct True

Sem – 3rd Techniques for Operations Efficiency 28

Page 29: Techniques for Operations Efficiency 4

Answer    Your Answer   True

  True/False  Question   Safety, hygiene and environment control is one of the pillar of TPM.

  Correct Answer  

True

  Your Answer   True

  Multiple Choice Single Answer  Question   5-S technique is useful to:

  Correct Answer  

To all places including homes

  Your Answer   To all places including homes

  Match The FollowingQuestion Correct Answer Your Answer

Reduce time of external setup Improve work aids positioning method

Improve work aids positioning method

Convert internal setup into external setup

Preparation of tools / dies as off line activity

Preparation of tools / dies as off line activity

Eliminate adjustment Pre setting of tool Pre setting of tool

Reduce clamping & declamping time

Use U-shaped washer Use U-shaped washer

  Multiple Choice Single Answer  Question   The facilitator should be normally :-

  Correct Answer  

Senior officer /Shop incharge

  Your Answer   Senior officer /Shop incharge

  Match The FollowingQuestion Correct Answer Your Answer

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines & operates on

Philosophy of "vital few:trivial many"

Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes by

Arranging data according to the descending order of their frequency of occurrence

Arranging data according to the f

Parato diagram is a Bar graph with height or value drawn by

Arranging data in descending order

Magnitude of defects

  Multiple Choice Single Answer  Question   Quality problem solving tool is used to :-

  Correct Answer  

Improve quality

Sem – 3rd Techniques for Operations Efficiency 29

Page 30: Techniques for Operations Efficiency 4

  Your Answer   Make work easy

  True/False  Question   Pie chart is also called as angular diagram.

  Correct Answer  

True

  Your Answer   True

  Select The Blank  Question   In scatter diagram "________" relationship is said to exist when value of 'y' somewhat

decreases as the value of 'x' increases.  Correct Answer  

Weak negative

  Your Answer   Weak negative

  Multiple Choice Single Answer  Question   From scatter diagram the strength of relationship between two variables or associated

set of data can be inferred from the examination of the shape of :-  Correct Answer  

Cloud

  Your Answer   Cloud

  Multiple Choice Multiple Answer  Question   Product benchmarking requires, comparison of product :-

  Correct Answer  

Performance , Features , Cost

  Your Answer   Performance , Features , Cost

  Multiple Choice Multiple Answer  Question   Steps in construction of scatter diagram :-

  Correct Answer  

Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship

  Your Answer   Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship  

 Multiple Choice Single Answer  Question   Implication of Quality problem is:-

  Correct Answer  

Gap in performance

  Your Answer   Gap in performance

  Select The Blank  Question   Each quality characteristic has permitted variation & is equal to ________.

  Correct USL - LSLSem – 3rd Techniques for Operations Efficiency 30

Page 31: Techniques for Operations Efficiency 4

Answer    Your Answer   USL - LSL

  Select The Blank  Question   Kaizen is ________ supported process.

  Correct Answer  

Management

  Your Answer   Management

  True/False  Question   The flow charts are prepared to enhance the employees understanding of the process

by indicating interrelationship within the process.  Correct Answer  

True

  Your Answer   False

  True/False  Question   Gap analysis for production & dispatches is discussed in monthly meeting.

  Correct Answer  

False

  Your Answer   False

  Select The Blank  Question   In scatter diagram "________" relationship is said to exist when value of 'y' decreases

as the value of 'x' increases.  Correct Answer  

Strong negative

  Your Answer   Strong negative

  Select The Blank  Question   ________ is most difficult 'S' to implement & achieve.

  Correct Answer  

Shitsuke

  Your Answer   Shitsuke

  True/False  Question   Presentation of graphs in pictorial form of data collection are for easy understanding.

  Correct Answer  

True

  Your Answer   True

  Select The Blank  Question   Graphs convey a situation more ________ than summary of data or figures.

  Correct Answer  

Effectively & clearly

  Your Answer   Effectively & clearly

Sem – 3rd Techniques for Operations Efficiency 31

Page 32: Techniques for Operations Efficiency 4

  Multiple Choice Single Answer  Question   Errors by armatures is :-

  Correct Answer  

Lack of experience

  Your Answer   Lack of experience

  Multiple Choice Multiple Answer  Question   While preparing scatter diagram following precautions are to be taken :-

  Correct Answer  

Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance

  Your Answer   Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance  

 True/False  Question   Globalization of trade and industrial operations have forced Indian companies to

become more & more competitive and customer driven.  Correct Answer  

True

  Your Answer   True

  Multiple Choice Multiple Answer  Question   If 'Annual saving in procurement expenses is managing point', then checking points will

be :-  Correct Answer  

Price revision , Credit period , Transport expenses

  Your Answer   Price revision , Credit period , Transport expenses

  Multiple Choice Single Answer  Question   Number of kaizen in Group kaizen categories are :-

  Correct Answer  

Two to three per year

  Your Answer   Two to three per year

  True/False  Question   Flow chart is pictorial representation of the steps in production control.

  Correct Answer  

False

  Your Answer   False

  Multiple Choice Single Answer  Question   It is essential to convey customer's expectations to :-

  Correct Answer  

Top Management

  Your Answer   Supervisors & workmen

 

Sem – 3rd Techniques for Operations Efficiency 32

Page 33: Techniques for Operations Efficiency 4

 Multiple Choice Single Answer  Question   Check sheet is easy to use because it is :-

  Correct Answer  

Simplest tool

  Your Answer   Simplest tool

  Select The Blank  Question   Identification of non-value added operations & their elimination is the first step to

eliminate muda of ________.  Correct Answer  

Processing

  Your Answer   Processing

  Select The Blank  Question   A 'Radar chart' is used to portray ________ strength or weakness of the activity.

  Correct Answer  

Relative

  Your Answer   Relative

  Multiple Choice Single Answer  Question   Pareto's analysis underlines & operates philosophy of :-

  Correct Answer  

Vital few = trivial many

  Your Answer   Vital few = trivial many

  True/False  Question   In single card kanban system production greater than quantity withdrawn is permitted.

  Correct Answer  

False

  Your Answer   False

  Multiple Choice Multiple Answer  Question   Benefits of planned maintenance are :-

  Correct Answer  

Improved reliability mean time between failures , Improved maintainability mean time to repair , Improvement in breakdown

  Your Answer   Improved reliability mean time between failures , Improved maintainability mean time to repair  

 Multiple Choice Multiple Answer  Question   Gap analysis & problem identification is done during converting internal setups into

external setups in the areas like :-  Correct Answer  

Equipment , Method , Human

  Your Answer   Equipment , Method , Human

  Multiple Choice Single Answer  Question   Some quantity in stock of item, is desirable if :-

Sem – 3rd Techniques for Operations Efficiency 33

Page 34: Techniques for Operations Efficiency 4

  Correct Answer  

Manufacturing lead time is more

  Your Answer   Manufacturing lead time is more

  Multiple Choice Single Answer  Question   Sorting of usable items should be

  Correct Answer  

Planned storage based on frequency of use

  Your Answer   Within visual reach method

  Multiple Choice Multiple Answer  Question   Benefits of Quality maintenance are :-

  Correct Answer  

Reduction in customer quality complaints , Reduction in inspection time

  Your Answer   Reduction in customer quality complaints , Reduction in inspection time

5th Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Advantages of JIT :- Correct Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost Multiple Choice Multiple Answer Question Benefits from the standardized containers are Correct Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock Multiple Choice Multiple Answer Question Benefits from SMED are :- Correct Answer Reduce work in process , Better average daily production , Increase capacity Your Answer Reduce work in process , Increase capacity Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :- Correct Answer Main competitor Your Answer Main competitor Multiple Choice Multiple Answer Question Benefits of stratification are :- Correct Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , Finding out different reasons Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :- Correct Answer Men , Machine , Material Your Answer Men , Machine , Management Sem – 3rd Techniques for Operations Efficiency 34

Page 35: Techniques for Operations Efficiency 4

Multiple Choice Single Answer Question The success indicators in quality, cost, delivery & product development are :- Correct Answer Managing points Your Answer Accountability Multiple Choice Multiple Answer Question Steps in setup time reduction are :- Correct Answer Team formation , Training , Recoding of activities on multiple activity charts Your Answer Team formation , Recoding of activities on multiple activity charts , Convert external setups in to internal setups Multiple Choice Multiple Answer Question POM essentially consists of :- Correct Answer Time management , Team participation and performance , Moral boosting Your Answer Time management , Team participation and performance , Cost Management Multiple Choice Single Answer Question Activity under quality management is :- Correct Answer Use team approach to track down root causes of the problem Your Answer Maintenance of equipment condition by eliminating lubricant leakage. True/False Question Every department should make their own rules of standardization. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :- Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Match The FollowingQuestion Correct Answer Your Answer

Productivity performance measurement Turnover employee Sales of the months

Financial performance measurement Sales of the months Cash saving per department

Customer satisfaction measurement Customer complaints per period Customer complaints per period

Staff attitude measurement Employee satisfaction index Employee satisfaction index

Multiple Choice Single Answer Question TPM helps to reduce down time due to:- Correct Answer Breakdown of machine Your Answer Breakdown of machine Multiple Choice Single Answer Question Kaizen emphasizes :- Correct Answer Implementation of ideas Your Answer Collection of ideas Select The Blank Question Create as many ________ system as possible for better Seiketsu. Correct Answer Visual control Your Answer Visual control Sem – 3rd Techniques for Operations Efficiency 35

Page 36: Techniques for Operations Efficiency 4

True/False Question Inadequate maintenance of machine leads to muda of defects Correct Answer True Your Answer False Select The Blank Question The shape of histogram can provide a clue about the ________ of the lot. Correct Answer Quality Your Answer Distribution Multiple Choice Single Answer Question Customer's return is an indicators of the MUDA of :- Correct Answer Defect Your Answer Defect Multiple Choice Single Answer Question In bar graph the interval (gap) between the bars is :- Correct Answer Equal Your Answer Symmetrical True/False Question Inspection is poor method of assuring 100% quality. Correct Answer True Your Answer False True/False Question A radar chart is combination of a circle & line graph Correct Answer True Your Answer True Multiple Choice Single Answer Question A workshop is to be treated as :- Correct Answer Place where one's creativity can be applied Your Answer Place where one's creativity can be applied True/False Question Customer wise outstanding is discussed in daily work management meeting by operations head. Correct Answer False Your Answer True True/False Question Number of operation can change according to production requirement in U-Line arrangement. Correct Answer False Your Answer True True/False Question Automation can correct the basic faults of a improper setup process. Correct Answer False Your Answer True Select The Blank Question Cp for six sigma process is ________ Correct Answer 2 Your Answer 1.66 Select The Blank Question Range ( R ) is obtained as the difference between the highest and ________ measurement of a sample. Correct Answer Lowest Your Answer Second highestSem – 3rd Techniques for Operations Efficiency 36

Page 37: Techniques for Operations Efficiency 4

Select The Blank Question ________is an important step toward successful JIT purchasing. Correct Answer JIT Contract Your Answer JIT Contract True/False Question U-Line layout is better than straight lime layout. Correct Answer True Your Answer True Multiple Choice Single Answer Question TQM applicable to :- Correct Answer Marketing, design & manufacturing Your Answer Quality Control department Select The Blank Question Bar graph is display of data that facilitates ________ of quality. Correct Answer Comparison Your Answer Performance Multiple Choice Single Answer Question Production kanban is presented by :- Correct Answer P-kanban Your Answer R-kanban Multiple Choice Single Answer Question Check sheet are also used as :- Correct Answer Data gathering & interpretation tool Your Answer Cause finding & effect finding tool Select The Blank Question Japanese believe that when they are ________ they are cleaning there minds too. Correct Answer Cleaning Your Answer Repairing machines Select The Blank Question Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position. Correct Answer Color coding Your Answer Counting device Select The Blank Question Shitsuke means ________ all the previous 4-S throughout the month/year. Correct Answer Sustaining Your Answer Implementing Multiple Choice Multiple Answer Question Types of meetings held in DWM are :- Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting True/False Question By TPM, consumption of electrical energy can be reduced. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question According to Seiketsu Standardization means :- Correct Answer To develop easy to follow standards , Evolve standard operating procedure , Better visual management Sem – 3rd Techniques for Operations Efficiency 37

Page 38: Techniques for Operations Efficiency 4

Your Answer To develop easy to follow standards , Evolve standard operating procedure , Reduction of wastage True/False Question Flow chart helps to stop an old process. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Training related to Quality includes:- Correct Answer Quality measures , Quality failure Your Answer Quality measures , Quality failure , Goal of business Multiple Choice Single Answer Question Total area under the normal curve is Correct Answer Unity Your Answer Six Multiple Choice Multiple Answer Question Cpk = Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigma Your Answer (x - USL)/6 sigma Select The Blank Question A histogram is a graphical display of distribution of measurements & reveals the amounts of ________ within the process. Correct Answer Variation Your Answer Percentage defects Match The FollowingQuestion Correct Answer Your Answer

Value analysis / value engineering To eliminate MUDA of processing To eliminate MUDA of over production

SMED To eliminate MUDA of over production To eliminate MUDA of defect

VMI ( Vendor Management Inventory) system To eliminate MUDA of stock To eliminate MUDA of stock

Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing

Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity. Correct Answer Relative Your Answer Comparative

------------------------------------------------------------

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Few steps to construct a flow chart are :-Sem – 3rd Techniques for Operations Efficiency 38

Page 39: Techniques for Operations Efficiency 4

Correct Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record' Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record' Select The Blank Question In PDCA cycle for benchmarking 'Identification of performance gap' is done in ________. Correct Answer Checking Your Answer Checking Select The Blank Question 5 S audit result is discussed in ________ meeting. Correct Answer Monthly Your Answer Shift beginning Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases. Correct Answer Strong negative Your Answer Strong negative Select The Blank Question Kaizen projects are managed by ________ Correct Answer Cross functional team Your Answer Management Multiple Choice Single Answer Question Poka-yoke for employee not performing work as per established method is :- Correct Answer Implement work standard Your Answer Implement work standard Multiple Choice Multiple Answer Question Typical examples of process benchmark are :- Correct Answer Procurement procedures , Budgeting , Recruitment Your Answer Procurement procedures , Budgeting , Recruitment Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner? Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , Collect information of short listed partners Multiple Choice Single Answer Question Errors by armatures is :- Correct Answer Lack of experience Your Answer Absent mindedness True/False Question Control chart is also called as run-chart. Correct Answer True Your Answer True Match The FollowingQuestion Correct Answer Your Answer

Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer

Reduce time of external setup Improve work aids positioning method Improve work aids positioning methodSem – 3rd Techniques for Operations Efficiency 39

Page 40: Techniques for Operations Efficiency 4

Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation of tools / dies as off line activity

Eliminate adjustmentPre setting of tool Pre setting of tool

Multiple Choice Single Answer Question Muda of defect is very serious in case of:- Correct Answer High speed automatic machines Your Answer High speed automatic machines Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :- Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Multiple Choice Single Answer Question Requirement of more machines, is an example of :- Correct Answer Muda of overproduction Your Answer Muda of waiting Multiple Choice Single Answer Question In India quality circle was first launched by :- Correct Answer Hyderabad unit of BHEL Your Answer Hyderabad unit of BHEL Multiple Choice Multiple Answer Question 3M' is world class benchmarking ' candidates in the field of :- Correct Answer Product development , Technology transfer , Environmental Management Your Answer Product development , Technology transfer , Environmental Management Multiple Choice Single Answer Question Responsibility for Quality should rest on:- Correct Answer Who produce the product Your Answer Quality control department True/False Question Increase in defect rate is an example of 'Deviation from an established norms' Correct Answer True Your Answer True Select The Blank Question ________ are implemented for defect detection & prevention. Correct Answer Poka-Yokes Your Answer Poka-Yokes Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Improve quality Multiple Choice Single Answer Question Implication of Quality problem is:- Correct Answer Gap in performance Your Answer Lower efficiency True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding.Sem – 3rd Techniques for Operations Efficiency 40

Page 41: Techniques for Operations Efficiency 4

Correct Answer True Your Answer True Select The Blank Question ________ waste is probably the biggest waste in most of the organizations. Correct Answer Time Your Answer Labor True/False Question Globalization of trade and industrial operations have forced Indian companies to become more & more competitive and customer driven. Correct Answer True Your Answer True True/False Question TQM improves the quality by improving processes. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :- Correct Answer Poorly trained operators , Defect in materials , Frequent adjustment of machines Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators Multiple Choice Single Answer Question Defects per million for the process at six sigma level are :- Correct Answer 3.4 Your Answer 6210 Multiple Choice Single Answer Question To provide flexibility to supervisors in allocation of task, JIT emphasizes :- Correct Answer Multiskilled operators Your Answer Multiskilled operators Multiple Choice Single Answer Question To maintain smoothness in production :- Correct Answer Elimination of buffer stock is recommended Your Answer Maintenance of buffer stock is recommended. Select The Blank Question ________ should be used to exercise control on the process. Correct Answer Control chart Your Answer Latest checking instruments Match The FollowingQuestion Correct Answer Your Answer

Ideally the histogram will have a bell shape Tapering away on the both sides from average valueTapering away on the both sides from average value

Histogram is a graphical display of distribution of measurements and Reveals the amount of variation within the process Reveals the amount of variation within the process

Histogram is a diagrammatic presentation of The frequency distribution of a characteristics The frequency distribution of a characteristics

The shape of histogram can Provide a clue about the quality of the lot Provide a clue about the quality of the lot

True/FalseSem – 3rd Techniques for Operations Efficiency 41

Page 42: Techniques for Operations Efficiency 4

Question In single card kanban system production greater than quantity withdrawn is permitted. Correct Answer False Your Answer False True/False Question Flow chart are drawn to document a process charting the tasks performed & the sequence in which tasks are performed. Correct Answer True Your Answer True Select The Blank Question Cpk for six sigma process is ________ Correct Answer 1.5 Your Answer 1.5 True/False Question Seiso prevents the potential problems by discovering abnormalities while cleaning your own area. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Some steps for stratification are :- Correct Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required? Your Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required? True/False Question Processing cost of a product is mainly decided by conversion process. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Work standards enable management to minimize variation in :- Correct Answer Output , Quality , Cost Your Answer Output , Quality , Cost Multiple Choice Multiple Answer Question Process can be made capable by :- Correct Answer Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification Your Answer Reducing process variability , Bringing target & average to fall at the same point , Use of less precision machine Multiple Choice Multiple Answer Question Few steps in construction of Pie chart are :- Correct Answer Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart Your Answer Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart Multiple Choice Multiple Answer Question As benchmark in Japan seiso activities means :-

Sem – 3rd Techniques for Operations Efficiency 42

Page 43: Techniques for Operations Efficiency 4

Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence Select The Blank Question Poka Yoke designed to help operators to know immediately ________ of the defeat called detection type Poka-Yoke. Correct Answer On occurrence Your Answer Before Occurrence Select The Blank Question Flow chart helps to dissect a process for better understanding & ________ of process. Correct Answer Analysis Your Answer Analysis Multiple Choice Single Answer Question Small groups forming a circle should consist of :- Correct Answer Employees of different department related to the problem Your Answer Employees of same department Select The Blank Question Graphs convey a situation more ________ than summary of data or figures. Correct Answer Effectively & clearly Your Answer Effectively & clearly Multiple Choice Single Answer Question Number of Kaizen projects suggested and implemented is checking point for :- Correct Answer Continual Improvement Your Answer Continual Improvement

--------------------------------------------------------------------

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :- Correct Answer Material , Men , Machine Your Answer Material , Men , Machine Multiple Choice Multiple Answer Question Histograms are useful to :- Correct Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control Multiple Choice Single Answer Question In problem solving the best alternative is that :- Correct Answer Which best meets the criteria Your Answer Which best meets the criteria Multiple Choice Single Answer Question "Cause & effect" diagram was developed by :- Correct Answer DR.Kaoru Ishikawa Your Answer DR.Kaoru Ishikawa Multiple Choice Single Answer Question Identifying key preventive operational functions and comparing these operational functions within the firm's own division & branches comes under :-Sem – 3rd Techniques for Operations Efficiency 43

Page 44: Techniques for Operations Efficiency 4

Correct Answer Internal benchmarking Your Answer Internal benchmarking Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer Over Production Your Answer Over Production Select The Blank Question In scatter diagram "________" relationship is said to exist when there is positive relationship upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter. Correct Answer Curvilinear Your Answer Curvilinear True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Customers complaints may be segregated by :- Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity True/False Question In case of more than one quality characteristics, separate chart is made for each quality characteristics. Correct Answer True Your Answer True True/False Question Safety, hygiene and environment control is one of the pillar of TPM. Correct Answer True Your Answer True Multiple Choice Single Answer Question 5-S technique is useful to: Correct Answer To all places including homes Your Answer To all places including homes Match The FollowingQuestion Correct Answer Your Answer

Reduce time of external setup Improve work aids positioning method Improve work aids positioning method

Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation of tools / dies as off line activity

Eliminate adjustmentPre setting of tool Pre setting of tool

Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer

Multiple Choice Single Answer Question The facilitator should be normally :- Correct Answer Senior officer /Shop incharge Your Answer Senior officer /Shop incharge Sem – 3rd Techniques for Operations Efficiency 44

Page 45: Techniques for Operations Efficiency 4

Match The FollowingQuestion Correct Answer Your Answer

Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes byArranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence

Parato diagram is a Bar graph with height or value drawn by Arranging data in descending orderMagnitude of defects

Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Make work easy True/False Question Pie chart is also called as angular diagram. Correct Answer True Your Answer True Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' somewhat decreases as the value of 'x' increases. Correct Answer Weak negative Your Answer Weak negative Multiple Choice Single Answer Question From scatter diagram the strength of relationship between two variables or associated set of data can be inferred from the examination of the shape of :- Correct Answer Cloud Your Answer Cloud Multiple Choice Multiple Answer Question Product benchmarking requires, comparison of product :- Correct Answer Performance , Features , Cost Your Answer Performance , Features , Cost Multiple Choice Multiple Answer Question Steps in construction of scatter diagram :- Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship Multiple Choice Single Answer Question Implication of Quality problem is:- Correct Answer Gap in performance Your Answer Gap in performance Select The Blank Question Each quality characteristic has permitted variation & is equal to ________. Correct Answer USL - LSLSem – 3rd Techniques for Operations Efficiency 45

Page 46: Techniques for Operations Efficiency 4

Your Answer USL - LSL Select The Blank Question Kaizen is ________ supported process. Correct Answer Management Your Answer Management True/False Question The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process. Correct Answer True Your Answer False True/False Question Gap analysis for production & dispatches is discussed in monthly meeting. Correct Answer False Your Answer False Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases. Correct Answer Strong negative Your Answer Strong negative Select The Blank Question ________ is most difficult 'S' to implement & achieve. Correct Answer Shitsuke Your Answer Shitsuke True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding. Correct Answer True Your Answer True Select The Blank Question Graphs convey a situation more ________ than summary of data or figures. Correct Answer Effectively & clearly Your Answer Effectively & clearly Multiple Choice Single Answer Question Errors by armatures is :- Correct Answer Lack of experience Your Answer Lack of experience Multiple Choice Multiple Answer Question While preparing scatter diagram following precautions are to be taken :- Correct Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance Your Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance True/False Question Globalization of trade and industrial operations have forced Indian companies to become more & more competitive and customer driven. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question If 'Annual saving in procurement expenses is managing point', then checking points will be :- Correct Answer Price revision , Credit period , Transport expenses Your Answer Price revision , Credit period , Transport expenses Sem – 3rd Techniques for Operations Efficiency 46

Page 47: Techniques for Operations Efficiency 4

Multiple Choice Single Answer Question Number of kaizen in Group kaizen categories are :- Correct Answer Two to three per year Your Answer Two to three per year True/False Question Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer False Multiple Choice Single Answer Question It is essential to convey customer's expectations to :- Correct Answer Top Management Your Answer Supervisors & workmen Multiple Choice Single Answer Question Check sheet is easy to use because it is :- Correct Answer Simplest tool Your Answer Simplest tool Select The Blank Question Identification of non-value added operations & their elimination is the first step to eliminate muda of ________. Correct Answer Processing Your Answer Processing Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity. Correct Answer Relative Your Answer Relative Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :- Correct Answer Vital few = trivial many Your Answer Vital few = trivial many True/False Question In single card kanban system production greater than quantity withdrawn is permitted. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Benefits of planned maintenance are :- Correct Answer Improved reliability mean time between failures , Improved maintainability mean time to repair , Improvement in breakdown Your Answer Improved reliability mean time between failures , Improved maintainability mean time to repair Multiple Choice Multiple Answer Question Gap analysis & problem identification is done during converting internal setups into external setups in the areas like :- Correct Answer Equipment , Method , Human Your Answer Equipment , Method , Human Multiple Choice Single Answer Question Some quantity in stock of item, is desirable if :- Correct Answer Manufacturing lead time is more Your Answer Manufacturing lead time is more Multiple Choice Single AnswerSem – 3rd Techniques for Operations Efficiency 47

Page 48: Techniques for Operations Efficiency 4

Question Sorting of usable items should be Correct Answer Planned storage based on frequency of use Your Answer Within visual reach method Multiple Choice Multiple Answer Question Benefits of Quality maintenance are :- Correct Answer Reduction in customer quality complaints , Reduction in inspection time Your Answer Reduction in customer quality complaints , Reduction in inspection time