True/False Question Performance benchmarking does not involves comparison of financial ratios at the aggregate
level. Correct Answer False
Your Answer False
Multiple Choice Single Answer Question Setup time includes :-
Correct Answer Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single Answer Question Participants of the groups for quality circles should be decided by :-
Correct Answer Employees coming together by their own enthusiasm
Your Answer Employees coming together by their own enthusiasm
Multiple Choice Single Answer Question Check sheet are also used as :-
Correct Answer Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single Answer Question SMED means :-
Correct Answer Single minute exchange of dies
Your Answer Single minute exchange of dies
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement
Turnover employee Cost of quality
Financial performance measurement
Sales of the months Sales of the months
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Select The Blank Question ________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer Poor production planning & control
Sem – 3rd Techniques for Operations Efficiency 3
Select The Blank Question If some defective parts are discovered by the subsequent process they should be returned to
the ________ to prevent reoccurrence. Correct Answer Preceding process
Your Answer Return to stores
Multiple Choice Multiple Answer Question The results oriented efforts of the quality circle should also include :-
Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently , Publication or advertisement of your contribution , Attacking the real root causes & all possibilities
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on
Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their frequency of occurrence
Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order Magnitude of defects
Multiple Choice Multiple Answer Question Few steps in construction in Radar chart are :-
Correct Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which require to be evaluated & draw the circle & divide it into 'slices' equal to number of characteristics , The first slice begins at 12 noon. Then draw vertical line & calibrate it equal to the number of levels required , Draw concentric circles from each gradiation using 'o' point as centre
Select The Blank Question 5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer Monthly
True/False Question Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer False
Sem – 3rd Techniques for Operations Efficiency 4
Multiple Choice Single Answer Question One Green Belt may head a team of :-
Correct Answer 20 employees
Your Answer 20 employees
Multiple Choice Multiple Answer Question Role of champions are :-
Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve six sigma projects , Remove road block in the path of six sigma implementation
Multiple Choice Multiple Answer Question To draw control charts, sample must be representative of homogeneous segment of
production for which :- Correct Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batch Your Answer The items of the sample should be from the same machine setting , The items should be of
the same batch , Items should be made from the same raw material batch
Multiple Choice Single Answer Question Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Your Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Multiple Choice Single Answer Question One Master Black Belt may head a team of :-
Correct Answer 15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or processes
& comparing with those of :- Correct Answer Main competitor
Your Answer Main competitor
Multiple Choice Single Answer Question Implication of Quality problem is:-
Sem – 3rd Techniques for Operations Efficiency 5
Correct Answer Gap in performance
Your Answer Gap in performance
Select The Blank Question Number of defects in an individual component, like gear, shaft, wheel etc can be monitored
through ________ type of control chart. Correct Answer c-chart
Your Answer c-chart
True/False Question Non-availability of files /document in time is a problem to be addressed by office TPM.
Correct Answer True
Your Answer True
Multiple Choice Single Answer Question Check sheet is easy to use because it is :-
Correct Answer Simplest tool
Your Answer Simplest tool
Multiple Choice Single Answer Question Benchmarking helps to identify the gap between the current performance of the organization
and the :- Correct Answer Performance of the best organization
Your Answer Performance of the best organization
True/False Question Flow chart is pictorial representation of the steps in production control.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer Question Breakdown problem may be stratified by :-
Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g mech. Or electrical)
Select The Blank Question A control chart to exhibit counted data on number of defect is called ________.
Correct Answer c-chart
Your Answer c-chart
Sem – 3rd Techniques for Operations Efficiency 6
Select The Blank Question Procedure for implementation of TPM consists of ________ numbers of steps.
Correct Answer 12
Your Answer 8
Select The Blank Question Capability index Cp = ________
Correct Answer Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :-
Correct Answer Vital few = trivial many
Your Answer Vital few = trivial many
True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at
parts is carried out at different locations. Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :-
Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Select The Blank Question Benchmarking allows exchange of ________ between the benchmarking partners.
Correct Answer Information
Your Answer Information
Multiple Choice Multiple Answer Question TQM can never flourish if the staff are:-
Correct Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being reprimanded if there are mistakes , Scared of their bosses
True/False
Sem – 3rd Techniques for Operations Efficiency 7
Question In bar graph each bar is of same height.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer Question During SMED implementation, primary study consists of :-
Correct Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis , Preparation items (storage place , method) analysis
True/False Question Daily work management can also be extended to non manufacturing areas like procurement,
QA, HRD etc. Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Types of Poka-Yoke are :-
Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single Answer Question Quality problem solving tool is used to :-
Correct Answer Improve quality
Your Answer Save time
True/False Question Along with problem solving tools experience and judgment is also used.
Correct Answer True
Your Answer False
Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to
________. Correct Answer Over Production
Your Answer Over Production
True/False Question Without measuring initial performance, target can't be set.
Correct Answer True
Sem – 3rd Techniques for Operations Efficiency 8
Your Answer False
Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :-
Correct Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
True/False Question Sample size for the construction of p-chart are larger than X bar-R chart.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation
Multiple Choice Single Answer Question Productivity improves by :-
Correct Answer Voluntary participants of everyone
Your Answer Voluntary participants of everyone
2nd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Training related to Quality includes:- Correct Answer Quality measures , Quality failure Your Answer Negotiation skill , Goal of business , Quality measures , Quality failure Multiple Choice Single Answer Question If defects found at own process, the cost to the company is :- Correct Answer Very little Your Answer Very high Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :- Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits , A bird's eye view of the variation
Sem – 3rd Techniques for Operations Efficiency 9
True/False Question In bar graph each bar is of same height. Correct Answer False Your Answer False Select The Blank Question Basic objective of control chart is to ________ the variation due to chance & assignable cause. Correct Answer Separate out Your Answer Separate out Multiple Choice Multiple Answer Question Benefits of stratification are :- Correct Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors , Finding out different reasons Multiple Choice Single Answer Question For 'Timely clearance of GRR's', checking point will be :- Correct Answer Number of GRRs pending beyond 1 day Your Answer Number of GRRs pending beyond 1 day Multiple Choice Single Answer Question Organizing the place is not enough , what is required is : Correct Answer Planning storage based on Frequency of use Your Answer Planning storage based on Frequency of use Select The Blank Question JIT helps to ________ the waste in the purchasing process. Correct Answer Eliminates Your Answer Eliminates Multiple Choice Single Answer Question In cellular manufacturing system, the cells are designed so that the material flow within the cell and between the cells are :- Correct Answer Minimized Your Answer Minimized True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Causes of Muda of transport are :- Correct Answer Faulty layout , Over production Your Answer Faulty layout , Over production , Proper material handling equipment , Low rejection / rework Multiple Choice Multiple Answer Question Types of meetings held in DWM are :- Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting Your Answer Monthly PDCA meeting , Daily PDCA meeting , Weekly PDCA meeting Multiple Choice Multiple Answer Question Customers complaints may be segregated by :- Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity , Payment problem Sem – 3rd Techniques for Operations Efficiency 10
Multiple Choice Multiple Answer Question Cleaning your own area/equipments gives benefits of :- Correct Answer You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust Your Answer You know your self how to avoid dust , When you touch while cleaning you may find a fault , Saving of further failure due to dust , Utilization of spare time Multiple Choice Multiple Answer Question Role of champions are :- Correct Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects Your Answer Approve six sigma projects , Remove road block in the path of six sigma implementation , Monitor progress of six sigma projects , Deliver presentation to teams on six sigma projects Select The Blank Question Benchmarking shows how an organization is ________ in comparison to its competitors. Correct Answer Performing Your Answer Performing True/False Question Inspection is poor method of assuring 100% quality. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Benefits of TQM are :- Correct Answer Greater customer satisfaction , Lower manufacturing cost Your Answer Greater customer satisfaction , Lower manufacturing cost Select The Blank Question ________ ensures that communication is simple & effective. Correct Answer Visual Management Your Answer Visual Management True/False Question Daily work management develops problem finding & solving attitude. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Key principles of TQM :- Correct Answer Continuous improvement , People involvement , Cost of quality Your Answer Continuous improvement , People involvement , Cost of quality , Competitor focus Select The Blank Question A histogram is a graphical display of distribution of measurements & reveals the amounts of ________ within the process. Correct Answer Variation Your Answer Variation Select The Blank Question To assess effectiveness of training ________ is essential. Correct Answer Evaluation Your Answer Evaluation Select The Blank Question ________ are implemented for defect detection & prevention. Correct Answer Poka-Yokes Your Answer TPM True/False Sem – 3rd Techniques for Operations Efficiency 11
Question To achieve quality, it has to be designed into the product. Correct Answer True Your Answer True Multiple Choice Single Answer Question Setting & maintaining optimal process condition to get quality product is the aim of :- Correct Answer Quality maintenance Your Answer Quality maintenance Match The Following Question Correct Answer Your Answer Productivity performance measurement Turnover employee Cost of quality Financial performance measurement Sales of the months Sales of the months Customer satisfaction measurement Customer complaints per period Customer complaints per period Staff attitude measurement Employee satisfaction index Employee satisfaction index Multiple Choice Single Answer Question Recording of the entire setup operators focusing on hand, eye and body movements of the person doing the setting is done through :- Correct Answer Video recording Your Answer Video recording Match The Following Question Correct Answer Your Answer In scatter diagram, the strength of relationship can be determined By "correlation coefficient" By "correlation coefficient" The scatter diagram provides the technique to establish The possible relationship between a pair of variables The possible dependency between a pair of variables The scatter diagram displays The pair of data as a cloud of points The possible relationship between a pair of variables The scatter is also known as Correlation diagram Correlation diagram Multiple Choice Single Answer Question What is to be done before selecting benchmarking partner? Correct Answer level of benchmarking is to be decided Your Answer level of benchmarking is to be decided True/False Question Flow chart helps to stop an old process. Correct Answer False Your Answer False Select The Blank Question Create as many ________ system as possible for better Seiketsu. Correct Answer Visual control Your Answer Labeling Multiple Choice Single Answer Question Allowing worker's to stop machine / assembly line if they believe that product quality is below standard' is an example of :- Correct Answer Empowerment Sem – 3rd Techniques for Operations Efficiency 12
Your Answer Empowerment Multiple Choice Single Answer Question Kanban Signals are required when :- Correct Answer Set up time on the feeding operation is higher then the receiving operation. Your Answer Set up time on the feeding operation is higher then the receiving operation. Multiple Choice Single Answer Question Kanban system is Correct Answer 1. Pull System Your Answer 1. Pull System Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Improve quality Multiple Choice Single Answer Question To avoid short receipt of items to customers, provide the dispatch clerk with : Correct Answer The check list for verification Your Answer The check list for verification True/False Question Control chart is also called as 'Mean -Range or X-chart'. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Flow chart is required :- Correct Answer When trying to improve the process , At the time of review of the process , To understand steps in a process by pictorial presentation Your Answer When trying to improve the process , At the time of review of the process , To understand steps in a process by pictorial presentation , For defects finding of the products Select The Blank Question ________ is the critical element of TQM. Correct Answer Focus on customer Your Answer Focus on customer Multiple Choice Multiple Answer Question Management skill includes :- Correct Answer Leadership , Motivation , Performance appraisals Your Answer Leadership , Motivation , Performance appraisals , Quality measurement Multiple Choice Single Answer Question 5-S technique is useful to: Correct Answer To all places including homes Your Answer To all places including homes True/False Question Safety, hygiene and environment control is one of the pillar of TPM. Correct Answer True Your Answer True Select The Blank Question Inspection activity for semi finished & finished component should be ________ to reduce muda of transport . Correct Answer Decentralized Your Answer Decentralized True/False Sem – 3rd Techniques for Operations Efficiency 13
Question Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer True Select The Blank Question Good ________ is the asset to acquire the success of quality circle. Correct Answer Teamwork Your Answer Teamwork
3rd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer Question Advantages of JIT :-
Correct Answer
Reduce incoming inspection , Reduce inventory , Lower per unit cost
Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost
Multiple Choice Multiple Answer Question Benefits from the standardized containers are
Correct Answer
Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock
Multiple Choice Multiple Answer Question Benefits from SMED are :-
Correct Answer
Reduce work in process , Better average daily production , Increase capacity
Your Answer Reduce work in process , Increase capacity
Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or
processes & comparing with those of :- Correct Answer
Main competitor
Your Answer Main competitor
Multiple Choice Multiple Answer Question Benefits of stratification are :-
Correct Answer
It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors
Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , Finding out different reasons
Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :-
Correct Answer
Men , Machine , Material
Sem – 3rd Techniques for Operations Efficiency 14
Your Answer Men , Machine , Management
Multiple Choice Single Answer Question The success indicators in quality, cost, delivery & product development are :-
Correct Answer
Managing points
Your Answer Accountability
Multiple Choice Multiple Answer Question Steps in setup time reduction are :-
Correct Answer
Team formation , Training , Recoding of activities on multiple activity charts
Your Answer Team formation , Recoding of activities on multiple activity charts , Convert external setups in to internal setups
Multiple Choice Multiple Answer Question POM essentially consists of :-
Correct Answer
Time management , Team participation and performance , Moral boosting
Your Answer Time management , Team participation and performance , Cost Management
Multiple Choice Single Answer Question Activity under quality management is :-
Correct Answer
Use team approach to track down root causes of the problem
Your Answer Maintenance of equipment condition by eliminating lubricant leakage.
True/False Question Every department should make their own rules of standardization.
Correct Answer
False
Your Answer True
Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :-
Correct Answer
It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits
Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement
Turnover employee Sales of the months
Sem – 3rd Techniques for Operations Efficiency 15
Financial performance measurement
Sales of the months Cash saving per department
Customer satisfaction measurement
Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single Answer Question TPM helps to reduce down time due to:-
Correct Answer
Breakdown of machine
Your Answer Breakdown of machine
Multiple Choice Single Answer Question Kaizen emphasizes :-
Correct Answer
Implementation of ideas
Your Answer Collection of ideas
Select The Blank Question Create as many ________ system as possible for better Seiketsu.
Correct Answer
Visual control
Your Answer Visual control
True/False Question Inadequate maintenance of machine leads to muda of defects
Correct Answer
True
Your Answer False
Select The Blank Question The shape of histogram can provide a clue about the ________ of the lot.
Correct Answer
Quality
Your Answer Distribution
Multiple Choice Single Answer Question Customer's return is an indicators of the MUDA of :-
Correct Answer
Defect
Your Answer Defect
Multiple Choice Single Answer Question In bar graph the interval (gap) between the bars is :-
Correct EqualSem – 3rd Techniques for Operations Efficiency 16
Answer Your Answer Symmetrical
True/False Question Inspection is poor method of assuring 100% quality.
Correct Answer
True
Your Answer False
True/False Question A radar chart is combination of a circle & line graph
Correct Answer
True
Your Answer True
Multiple Choice Single Answer Question A workshop is to be treated as :-
Correct Answer
Place where one's creativity can be applied
Your Answer Place where one's creativity can be applied
True/False Question Customer wise outstanding is discussed in daily work management meeting by
operations head. Correct Answer
False
Your Answer True
True/False Question Number of operation can change according to production requirement in U-Line
arrangement. Correct Answer
False
Your Answer True
True/False Question Automation can correct the basic faults of a improper setup process.
Correct Answer
False
Your Answer True
Select The Blank Question Cp for six sigma process is ________
Correct Answer
2
Your Answer 1.66
Sem – 3rd Techniques for Operations Efficiency 17
Select The Blank Question Range ( R ) is obtained as the difference between the highest and ________
measurement of a sample. Correct Answer
Lowest
Your Answer Second highest
Select The Blank Question ________is an important step toward successful JIT purchasing.
Correct Answer
JIT Contract
Your Answer JIT Contract
True/False Question U-Line layout is better than straight lime layout.
Correct Answer
True
Your Answer True
Multiple Choice Single Answer Question TQM applicable to :-
Correct Answer
Marketing, design & manufacturing
Your Answer Quality Control department
Select The Blank Question Bar graph is display of data that facilitates ________ of quality.
Correct Answer
Comparison
Your Answer Performance
Multiple Choice Single Answer Question Production kanban is presented by :-
Correct Answer
P-kanban
Your Answer R-kanban
Multiple Choice Single Answer Question Check sheet are also used as :-
Correct Answer
Data gathering & interpretation tool
Your Answer Cause finding & effect finding tool
Select The Blank
Sem – 3rd Techniques for Operations Efficiency 18
Question Japanese believe that when they are ________ they are cleaning there minds too.
Correct Answer
Cleaning
Your Answer Repairing machines
Select The Blank Question Poka-Yoke devices under category use ________ to distinguish between similar parts
which may be assembled in wrong position. Correct Answer
Color coding
Your Answer Counting device
Select The Blank Question Shitsuke means ________ all the previous 4-S throughout the month/year.
Correct Answer
Sustaining
Your Answer Implementing
Multiple Choice Multiple Answer Question Types of meetings held in DWM are :-
Correct Answer
Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting
Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting
True/False Question By TPM, consumption of electrical energy can be reduced.
Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer Question According to Seiketsu Standardization means :-
Correct Answer
To develop easy to follow standards , Evolve standard operating procedure , Better visual management
Your Answer To develop easy to follow standards , Evolve standard operating procedure , Reduction of wastage
True/False Question Flow chart helps to stop an old process.
Correct Answer
False
Your Answer True
Multiple Choice Multiple Answer Question Training related to Quality includes:-
Correct Quality measures , Quality failure Sem – 3rd Techniques for Operations Efficiency 19
Answer Your Answer Quality measures , Quality failure , Goal of business
Multiple Choice Single Answer Question Total area under the normal curve is
Correct Answer
Unity
Your Answer Six
Multiple Choice Multiple Answer Question Cpk =
Correct Answer
(x - USL)/3 sigma , (x - LSL)/3 sigma
Your Answer (x - USL)/6 sigma
Select The Blank Question A histogram is a graphical display of distribution of measurements & reveals the
amounts of ________ within the process. Correct Answer
Variation
Your Answer Percentage defects
Match The FollowingQuestion Correct Answer Your Answer
Value analysis / value engineering To eliminate MUDA of processing To eliminate MUDA of over production
SMED To eliminate MUDA of over production
To eliminate MUDA of defect
VMI ( Vendor Management Inventory) system
To eliminate MUDA of stock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing
Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer
Relative
Your Answer Comparative
4th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False Question Performance benchmarking does not involves comparison of financial ratios at the
aggregate level. Correct Answer
False
Your Answer False
Sem – 3rd Techniques for Operations Efficiency 20
Multiple Choice Multiple Answer Question Few steps to construct a flow chart are :-
Correct Answer
Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'
Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record'
Select The Blank Question In PDCA cycle for benchmarking 'Identification of performance gap' is done in
________. Correct Answer
Checking
Your Answer Checking
Select The Blank Question 5 S audit result is discussed in ________ meeting.
Correct Answer
Monthly
Your Answer Shift beginning
Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases
as the value of 'x' increases. Correct Answer
Strong negative
Your Answer Strong negative
Select The Blank Question Kaizen projects are managed by ________
Correct Answer
Cross functional team
Your Answer Management
Multiple Choice Single Answer Question Poka-yoke for employee not performing work as per established method is :-
Correct Answer
Implement work standard
Your Answer Implement work standard
Multiple Choice Multiple Answer Question Typical examples of process benchmark are :-
Correct Answer
Procurement procedures , Budgeting , Recruitment
Your Answer Procurement procedures , Budgeting , Recruitment
Sem – 3rd Techniques for Operations Efficiency 21
Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner?
Correct Answer
Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners
Your Answer Decide level of benchmarking , Collect information of short listed partners
Multiple Choice Single Answer Question Errors by armatures is :-
Correct Answer
Lack of experience
Your Answer Absent mindedness
True/False Question Control chart is also called as run-chart.
Correct Answer
True
Your Answer True
Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declamping time
Use U-shaped washer Use U-shaped washer
Reduce time of external setup Improve work aids positioning method
Improve work aids positioning method
Convert internal setup into external setup
Preparation of tools / dies as off line activity
Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Multiple Choice Single Answer Question Muda of defect is very serious in case of:-
Correct Answer
High speed automatic machines
Your Answer High speed automatic machines
Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :-
Correct Answer
Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device
Multiple Choice Single Answer Question Requirement of more machines, is an example of :-
Correct Answer
Muda of overproduction
Sem – 3rd Techniques for Operations Efficiency 22
Your Answer Muda of waiting
Multiple Choice Single Answer Question In India quality circle was first launched by :-
Correct Answer
Hyderabad unit of BHEL
Your Answer Hyderabad unit of BHEL
Multiple Choice Multiple Answer Question 3M' is world class benchmarking ' candidates in the field of :-
Correct Answer
Product development , Technology transfer , Environmental Management
Your Answer Product development , Technology transfer , Environmental Management
Multiple Choice Single Answer Question Responsibility for Quality should rest on:-
Correct Answer
Who produce the product
Your Answer Quality control department
True/False Question Increase in defect rate is an example of 'Deviation from an established norms'
Correct Answer
True
Your Answer True
Select The Blank Question ________ are implemented for defect detection & prevention.
Correct Answer
Poka-Yokes
Your Answer Poka-Yokes
Multiple Choice Single Answer Question Quality problem solving tool is used to :-
Correct Answer
Improve quality
Your Answer Improve quality
Multiple Choice Single Answer Question Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer Lower efficiency
Sem – 3rd Techniques for Operations Efficiency 23
True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding.
Correct Answer
True
Your Answer True
Select The Blank Question ________ waste is probably the biggest waste in most of the organizations.
Correct Answer
Time
Your Answer Labor
True/False Question Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven. Correct Answer
True
Your Answer True
True/False Question TQM improves the quality by improving processes.
Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :-
Correct Answer
Poorly trained operators , Defect in materials , Frequent adjustment of machines
Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators
Multiple Choice Single Answer Question Defects per million for the process at six sigma level are :-
Correct Answer
3.4
Your Answer 6210
Multiple Choice Single Answer Question To provide flexibility to supervisors in allocation of task, JIT emphasizes :-
Correct Answer
Multiskilled operators
Your Answer Multiskilled operators
Multiple Choice Single Answer Question To maintain smoothness in production :-
Sem – 3rd Techniques for Operations Efficiency 24
Correct Answer
Elimination of buffer stock is recommended
Your Answer Maintenance of buffer stock is recommended.
Select The Blank Question ________ should be used to exercise control on the process.
Correct Answer
Control chart
Your Answer Latest checking instruments
Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bell shape
Tapering away on the both sides from average value
Tapering away on the both sides from average value
Histogram is a graphical display of distribution of measurements and
Reveals the amount of variation within the process
Reveals the amount of variation within the process
Histogram is a diagrammatic presentation of
The frequency distribution of a characteristics
The frequency distribution of a characteristics
The shape of histogram can Provide a clue about the quality of the lot
Provide a clue about the quality of the lot
True/False Question In single card kanban system production greater than quantity withdrawn is permitted.
Correct Answer
False
Your Answer False
True/False Question Flow chart are drawn to document a process charting the tasks performed & the
sequence in which tasks are performed. Correct Answer
True
Your Answer True
Select The Blank Question Cpk for six sigma process is ________
Correct Answer
1.5
Your Answer 1.5
True/False Question Seiso prevents the potential problems by discovering abnormalities while cleaning your
own area. Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer
Sem – 3rd Techniques for Operations Efficiency 25
Question Some steps for stratification are :-
Correct Answer
Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
Your Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required?
True/False Question Processing cost of a product is mainly decided by conversion process.
Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer Question Work standards enable management to minimize variation in :-
Correct Answer
Output , Quality , Cost
Your Answer Output , Quality , Cost
Multiple Choice Multiple Answer Question Process can be made capable by :-
Correct Answer
Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification
Your Answer Reducing process variability , Bringing target & average to fall at the same point , Use of less precision machine
Multiple Choice Multiple Answer Question Few steps in construction of Pie chart are :-
Correct Answer
Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart
Your Answer Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart
Multiple Choice Multiple Answer Question As benchmark in Japan seiso activities means :-
Correct Answer
Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence
Select The Blank Question Poka Yoke designed to help operators to know immediately ________ of the defeat
called detection type Poka-Yoke. Correct Answer
On occurrence
Sem – 3rd Techniques for Operations Efficiency 26
Your Answer Before Occurrence
Select The Blank Question Flow chart helps to dissect a process for better understanding & ________ of process.
Correct Answer
Analysis
Your Answer Analysis
Multiple Choice Single Answer Question Small groups forming a circle should consist of :-
Correct Answer
Employees of different department related to the problem
Your Answer Employees of same department
Select The Blank Question Graphs convey a situation more ________ than summary of data or figures.
Correct Answer
Effectively & clearly
Your Answer Effectively & clearly
Multiple Choice Single Answer Question Number of Kaizen projects suggested and implemented is checking point for :-
Correct Answer
Continual Improvement
Your Answer Continual Improvement
5th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :-
Correct Answer
Material , Men , Machine
Your Answer Material , Men , Machine
Multiple Choice Multiple Answer Question Histograms are useful to :-
Correct Answer
Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control
Multiple Choice Single Answer Question In problem solving the best alternative is that :-
Sem – 3rd Techniques for Operations Efficiency 27
Correct Answer
Which best meets the criteria
Your Answer Which best meets the criteria
Multiple Choice Single Answer Question "Cause & effect" diagram was developed by :-
Correct Answer
DR.Kaoru Ishikawa
Your Answer DR.Kaoru Ishikawa
Multiple Choice Single Answer Question Identifying key preventive operational functions and comparing these operational
functions within the firm's own division & branches comes under :- Correct Answer
Internal benchmarking
Your Answer Internal benchmarking
Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to
________. Correct Answer
Over Production
Your Answer Over Production
Select The Blank Question In scatter diagram "________" relationship is said to exist when there is positive
relationship upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter.
Correct Answer
Curvilinear
Your Answer Curvilinear
True/False Question Kanban signals are required when assembly work, subassembly work and
manufacturing at parts is carried out at different locations. Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer Question Customers complaints may be segregated by :-
Correct Answer
Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity
True/False Question In case of more than one quality characteristics, separate chart is made for each
quality characteristics. Correct True
Sem – 3rd Techniques for Operations Efficiency 28
Answer Your Answer True
True/False Question Safety, hygiene and environment control is one of the pillar of TPM.
Correct Answer
True
Your Answer True
Multiple Choice Single Answer Question 5-S technique is useful to:
Correct Answer
To all places including homes
Your Answer To all places including homes
Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioning method
Improve work aids positioning method
Convert internal setup into external setup
Preparation of tools / dies as off line activity
Preparation of tools / dies as off line activity
Eliminate adjustment Pre setting of tool Pre setting of tool
Reduce clamping & declamping time
Use U-shaped washer Use U-shaped washer
Multiple Choice Single Answer Question The facilitator should be normally :-
Correct Answer
Senior officer /Shop incharge
Your Answer Senior officer /Shop incharge
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on
Philosophy of "vital few:trivial many"
Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their frequency of occurrence
Arranging data according to the f
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order
Magnitude of defects
Multiple Choice Single Answer Question Quality problem solving tool is used to :-
Correct Answer
Improve quality
Sem – 3rd Techniques for Operations Efficiency 29
Your Answer Make work easy
True/False Question Pie chart is also called as angular diagram.
Correct Answer
True
Your Answer True
Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' somewhat
decreases as the value of 'x' increases. Correct Answer
Weak negative
Your Answer Weak negative
Multiple Choice Single Answer Question From scatter diagram the strength of relationship between two variables or associated
set of data can be inferred from the examination of the shape of :- Correct Answer
Cloud
Your Answer Cloud
Multiple Choice Multiple Answer Question Product benchmarking requires, comparison of product :-
Correct Answer
Performance , Features , Cost
Your Answer Performance , Features , Cost
Multiple Choice Multiple Answer Question Steps in construction of scatter diagram :-
Correct Answer
Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship
Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship
Multiple Choice Single Answer Question Implication of Quality problem is:-
Correct Answer
Gap in performance
Your Answer Gap in performance
Select The Blank Question Each quality characteristic has permitted variation & is equal to ________.
Correct USL - LSLSem – 3rd Techniques for Operations Efficiency 30
Answer Your Answer USL - LSL
Select The Blank Question Kaizen is ________ supported process.
Correct Answer
Management
Your Answer Management
True/False Question The flow charts are prepared to enhance the employees understanding of the process
by indicating interrelationship within the process. Correct Answer
True
Your Answer False
True/False Question Gap analysis for production & dispatches is discussed in monthly meeting.
Correct Answer
False
Your Answer False
Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases
as the value of 'x' increases. Correct Answer
Strong negative
Your Answer Strong negative
Select The Blank Question ________ is most difficult 'S' to implement & achieve.
Correct Answer
Shitsuke
Your Answer Shitsuke
True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding.
Correct Answer
True
Your Answer True
Select The Blank Question Graphs convey a situation more ________ than summary of data or figures.
Correct Answer
Effectively & clearly
Your Answer Effectively & clearly
Sem – 3rd Techniques for Operations Efficiency 31
Multiple Choice Single Answer Question Errors by armatures is :-
Correct Answer
Lack of experience
Your Answer Lack of experience
Multiple Choice Multiple Answer Question While preparing scatter diagram following precautions are to be taken :-
Correct Answer
Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
Your Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance
True/False Question Globalization of trade and industrial operations have forced Indian companies to
become more & more competitive and customer driven. Correct Answer
True
Your Answer True
Multiple Choice Multiple Answer Question If 'Annual saving in procurement expenses is managing point', then checking points will
be :- Correct Answer
Price revision , Credit period , Transport expenses
Your Answer Price revision , Credit period , Transport expenses
Multiple Choice Single Answer Question Number of kaizen in Group kaizen categories are :-
Correct Answer
Two to three per year
Your Answer Two to three per year
True/False Question Flow chart is pictorial representation of the steps in production control.
Correct Answer
False
Your Answer False
Multiple Choice Single Answer Question It is essential to convey customer's expectations to :-
Correct Answer
Top Management
Your Answer Supervisors & workmen
Sem – 3rd Techniques for Operations Efficiency 32
Multiple Choice Single Answer Question Check sheet is easy to use because it is :-
Correct Answer
Simplest tool
Your Answer Simplest tool
Select The Blank Question Identification of non-value added operations & their elimination is the first step to
eliminate muda of ________. Correct Answer
Processing
Your Answer Processing
Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity.
Correct Answer
Relative
Your Answer Relative
Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :-
Correct Answer
Vital few = trivial many
Your Answer Vital few = trivial many
True/False Question In single card kanban system production greater than quantity withdrawn is permitted.
Correct Answer
False
Your Answer False
Multiple Choice Multiple Answer Question Benefits of planned maintenance are :-
Correct Answer
Improved reliability mean time between failures , Improved maintainability mean time to repair , Improvement in breakdown
Your Answer Improved reliability mean time between failures , Improved maintainability mean time to repair
Multiple Choice Multiple Answer Question Gap analysis & problem identification is done during converting internal setups into
external setups in the areas like :- Correct Answer
Equipment , Method , Human
Your Answer Equipment , Method , Human
Multiple Choice Single Answer Question Some quantity in stock of item, is desirable if :-
Sem – 3rd Techniques for Operations Efficiency 33
Correct Answer
Manufacturing lead time is more
Your Answer Manufacturing lead time is more
Multiple Choice Single Answer Question Sorting of usable items should be
Correct Answer
Planned storage based on frequency of use
Your Answer Within visual reach method
Multiple Choice Multiple Answer Question Benefits of Quality maintenance are :-
Correct Answer
Reduction in customer quality complaints , Reduction in inspection time
Your Answer Reduction in customer quality complaints , Reduction in inspection time
5th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Advantages of JIT :- Correct Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost Your Answer Reduce incoming inspection , Reduce inventory , Lower per unit cost Multiple Choice Multiple Answer Question Benefits from the standardized containers are Correct Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock Your Answer Minimization of transit damages , Ease in verification of quantity of parts , Automatic signal to supplier to replenish stock Multiple Choice Multiple Answer Question Benefits from SMED are :- Correct Answer Reduce work in process , Better average daily production , Increase capacity Your Answer Reduce work in process , Increase capacity Multiple Choice Single Answer Question Competitive benchmarking involves identifying key competitive product, services or processes & comparing with those of :- Correct Answer Main competitor Your Answer Main competitor Multiple Choice Multiple Answer Question Benefits of stratification are :- Correct Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , It helps to identify the influencing factors Your Answer It helps to separate data into groups so that you can draw connect & meaningful inference , It helps to diagnose & localize problem , Finding out different reasons Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :- Correct Answer Men , Machine , Material Your Answer Men , Machine , Management Sem – 3rd Techniques for Operations Efficiency 34
Multiple Choice Single Answer Question The success indicators in quality, cost, delivery & product development are :- Correct Answer Managing points Your Answer Accountability Multiple Choice Multiple Answer Question Steps in setup time reduction are :- Correct Answer Team formation , Training , Recoding of activities on multiple activity charts Your Answer Team formation , Recoding of activities on multiple activity charts , Convert external setups in to internal setups Multiple Choice Multiple Answer Question POM essentially consists of :- Correct Answer Time management , Team participation and performance , Moral boosting Your Answer Time management , Team participation and performance , Cost Management Multiple Choice Single Answer Question Activity under quality management is :- Correct Answer Use team approach to track down root causes of the problem Your Answer Maintenance of equipment condition by eliminating lubricant leakage. True/False Question Every department should make their own rules of standardization. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Histogram is an important diagnostic tool. Analysis of the histogram gives :- Correct Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Your Answer It shows cause which affects the process , An idea of what is happening to the process , Whether the process is capable of meeting process or not i.e. around correct average & within specific limits Match The FollowingQuestion Correct Answer Your Answer
Productivity performance measurement Turnover employee Sales of the months
Financial performance measurement Sales of the months Cash saving per department
Customer satisfaction measurement Customer complaints per period Customer complaints per period
Staff attitude measurement Employee satisfaction index Employee satisfaction index
Multiple Choice Single Answer Question TPM helps to reduce down time due to:- Correct Answer Breakdown of machine Your Answer Breakdown of machine Multiple Choice Single Answer Question Kaizen emphasizes :- Correct Answer Implementation of ideas Your Answer Collection of ideas Select The Blank Question Create as many ________ system as possible for better Seiketsu. Correct Answer Visual control Your Answer Visual control Sem – 3rd Techniques for Operations Efficiency 35
True/False Question Inadequate maintenance of machine leads to muda of defects Correct Answer True Your Answer False Select The Blank Question The shape of histogram can provide a clue about the ________ of the lot. Correct Answer Quality Your Answer Distribution Multiple Choice Single Answer Question Customer's return is an indicators of the MUDA of :- Correct Answer Defect Your Answer Defect Multiple Choice Single Answer Question In bar graph the interval (gap) between the bars is :- Correct Answer Equal Your Answer Symmetrical True/False Question Inspection is poor method of assuring 100% quality. Correct Answer True Your Answer False True/False Question A radar chart is combination of a circle & line graph Correct Answer True Your Answer True Multiple Choice Single Answer Question A workshop is to be treated as :- Correct Answer Place where one's creativity can be applied Your Answer Place where one's creativity can be applied True/False Question Customer wise outstanding is discussed in daily work management meeting by operations head. Correct Answer False Your Answer True True/False Question Number of operation can change according to production requirement in U-Line arrangement. Correct Answer False Your Answer True True/False Question Automation can correct the basic faults of a improper setup process. Correct Answer False Your Answer True Select The Blank Question Cp for six sigma process is ________ Correct Answer 2 Your Answer 1.66 Select The Blank Question Range ( R ) is obtained as the difference between the highest and ________ measurement of a sample. Correct Answer Lowest Your Answer Second highestSem – 3rd Techniques for Operations Efficiency 36
Select The Blank Question ________is an important step toward successful JIT purchasing. Correct Answer JIT Contract Your Answer JIT Contract True/False Question U-Line layout is better than straight lime layout. Correct Answer True Your Answer True Multiple Choice Single Answer Question TQM applicable to :- Correct Answer Marketing, design & manufacturing Your Answer Quality Control department Select The Blank Question Bar graph is display of data that facilitates ________ of quality. Correct Answer Comparison Your Answer Performance Multiple Choice Single Answer Question Production kanban is presented by :- Correct Answer P-kanban Your Answer R-kanban Multiple Choice Single Answer Question Check sheet are also used as :- Correct Answer Data gathering & interpretation tool Your Answer Cause finding & effect finding tool Select The Blank Question Japanese believe that when they are ________ they are cleaning there minds too. Correct Answer Cleaning Your Answer Repairing machines Select The Blank Question Poka-Yoke devices under category use ________ to distinguish between similar parts which may be assembled in wrong position. Correct Answer Color coding Your Answer Counting device Select The Blank Question Shitsuke means ________ all the previous 4-S throughout the month/year. Correct Answer Sustaining Your Answer Implementing Multiple Choice Multiple Answer Question Types of meetings held in DWM are :- Correct Answer Daily PDCA meeting , Weekly PDCA meeting , Monthly PDCA meeting Your Answer Weekly PDCA meeting , Monthly PDCA meeting , Yearly PDCA meeting True/False Question By TPM, consumption of electrical energy can be reduced. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question According to Seiketsu Standardization means :- Correct Answer To develop easy to follow standards , Evolve standard operating procedure , Better visual management Sem – 3rd Techniques for Operations Efficiency 37
Your Answer To develop easy to follow standards , Evolve standard operating procedure , Reduction of wastage True/False Question Flow chart helps to stop an old process. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Training related to Quality includes:- Correct Answer Quality measures , Quality failure Your Answer Quality measures , Quality failure , Goal of business Multiple Choice Single Answer Question Total area under the normal curve is Correct Answer Unity Your Answer Six Multiple Choice Multiple Answer Question Cpk = Correct Answer (x - USL)/3 sigma , (x - LSL)/3 sigma Your Answer (x - USL)/6 sigma Select The Blank Question A histogram is a graphical display of distribution of measurements & reveals the amounts of ________ within the process. Correct Answer Variation Your Answer Percentage defects Match The FollowingQuestion Correct Answer Your Answer
Value analysis / value engineering To eliminate MUDA of processing To eliminate MUDA of over production
SMED To eliminate MUDA of over production To eliminate MUDA of defect
VMI ( Vendor Management Inventory) system To eliminate MUDA of stock To eliminate MUDA of stock
Flow / string diagram To eliminate MUDA of transport To eliminate MUDA of processing
Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity. Correct Answer Relative Your Answer Comparative
------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Performance benchmarking does not involves comparison of financial ratios at the aggregate level. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Few steps to construct a flow chart are :-Sem – 3rd Techniques for Operations Efficiency 38
Correct Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record' Your Answer Decide on the objective of flowchart & define boundaries of the process , Identify steps in the process & construct a draft of the flowchart , Review the draft & connect the changes as per review & name it & put the data & use it as 'Record' Select The Blank Question In PDCA cycle for benchmarking 'Identification of performance gap' is done in ________. Correct Answer Checking Your Answer Checking Select The Blank Question 5 S audit result is discussed in ________ meeting. Correct Answer Monthly Your Answer Shift beginning Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases. Correct Answer Strong negative Your Answer Strong negative Select The Blank Question Kaizen projects are managed by ________ Correct Answer Cross functional team Your Answer Management Multiple Choice Single Answer Question Poka-yoke for employee not performing work as per established method is :- Correct Answer Implement work standard Your Answer Implement work standard Multiple Choice Multiple Answer Question Typical examples of process benchmark are :- Correct Answer Procurement procedures , Budgeting , Recruitment Your Answer Procurement procedures , Budgeting , Recruitment Multiple Choice Multiple Answer Question What are the steps in deciding the benchmarking partner? Correct Answer Decide level of benchmarking , List down a few prospective candidates of partnership , Collect information of short listed partners Your Answer Decide level of benchmarking , Collect information of short listed partners Multiple Choice Single Answer Question Errors by armatures is :- Correct Answer Lack of experience Your Answer Absent mindedness True/False Question Control chart is also called as run-chart. Correct Answer True Your Answer True Match The FollowingQuestion Correct Answer Your Answer
Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer
Reduce time of external setup Improve work aids positioning method Improve work aids positioning methodSem – 3rd Techniques for Operations Efficiency 39
Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation of tools / dies as off line activity
Eliminate adjustmentPre setting of tool Pre setting of tool
Multiple Choice Single Answer Question Muda of defect is very serious in case of:- Correct Answer High speed automatic machines Your Answer High speed automatic machines Multiple Choice Multiple Answer Question To reduce clamping & declamping time, following actions are desirable :- Correct Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Your Answer Standardize clamping bolts / screws , Cut off unnecessary threads , Use quick clamping device Multiple Choice Single Answer Question Requirement of more machines, is an example of :- Correct Answer Muda of overproduction Your Answer Muda of waiting Multiple Choice Single Answer Question In India quality circle was first launched by :- Correct Answer Hyderabad unit of BHEL Your Answer Hyderabad unit of BHEL Multiple Choice Multiple Answer Question 3M' is world class benchmarking ' candidates in the field of :- Correct Answer Product development , Technology transfer , Environmental Management Your Answer Product development , Technology transfer , Environmental Management Multiple Choice Single Answer Question Responsibility for Quality should rest on:- Correct Answer Who produce the product Your Answer Quality control department True/False Question Increase in defect rate is an example of 'Deviation from an established norms' Correct Answer True Your Answer True Select The Blank Question ________ are implemented for defect detection & prevention. Correct Answer Poka-Yokes Your Answer Poka-Yokes Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Improve quality Multiple Choice Single Answer Question Implication of Quality problem is:- Correct Answer Gap in performance Your Answer Lower efficiency True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding.Sem – 3rd Techniques for Operations Efficiency 40
Correct Answer True Your Answer True Select The Blank Question ________ waste is probably the biggest waste in most of the organizations. Correct Answer Time Your Answer Labor True/False Question Globalization of trade and industrial operations have forced Indian companies to become more & more competitive and customer driven. Correct Answer True Your Answer True True/False Question TQM improves the quality by improving processes. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question An erratic patterns falling above & below the control limits indicates :- Correct Answer Poorly trained operators , Defect in materials , Frequent adjustment of machines Your Answer Defect in materials , Frequent adjustment of machines , Poorly trained operators Multiple Choice Single Answer Question Defects per million for the process at six sigma level are :- Correct Answer 3.4 Your Answer 6210 Multiple Choice Single Answer Question To provide flexibility to supervisors in allocation of task, JIT emphasizes :- Correct Answer Multiskilled operators Your Answer Multiskilled operators Multiple Choice Single Answer Question To maintain smoothness in production :- Correct Answer Elimination of buffer stock is recommended Your Answer Maintenance of buffer stock is recommended. Select The Blank Question ________ should be used to exercise control on the process. Correct Answer Control chart Your Answer Latest checking instruments Match The FollowingQuestion Correct Answer Your Answer
Ideally the histogram will have a bell shape Tapering away on the both sides from average valueTapering away on the both sides from average value
Histogram is a graphical display of distribution of measurements and Reveals the amount of variation within the process Reveals the amount of variation within the process
Histogram is a diagrammatic presentation of The frequency distribution of a characteristics The frequency distribution of a characteristics
The shape of histogram can Provide a clue about the quality of the lot Provide a clue about the quality of the lot
True/FalseSem – 3rd Techniques for Operations Efficiency 41
Question In single card kanban system production greater than quantity withdrawn is permitted. Correct Answer False Your Answer False True/False Question Flow chart are drawn to document a process charting the tasks performed & the sequence in which tasks are performed. Correct Answer True Your Answer True Select The Blank Question Cpk for six sigma process is ________ Correct Answer 1.5 Your Answer 1.5 True/False Question Seiso prevents the potential problems by discovering abnormalities while cleaning your own area. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Some steps for stratification are :- Correct Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required? Your Answer Define the problem & identify the stratification variables , Sort out data into categories & summarise information in each category , Present the information in graphical form & study, decide if further stratification is required? True/False Question Processing cost of a product is mainly decided by conversion process. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Work standards enable management to minimize variation in :- Correct Answer Output , Quality , Cost Your Answer Output , Quality , Cost Multiple Choice Multiple Answer Question Process can be made capable by :- Correct Answer Reducing process variability , Bringing target & average to fall at the same point , Examine possibility of relaxing specification Your Answer Reducing process variability , Bringing target & average to fall at the same point , Use of less precision machine Multiple Choice Multiple Answer Question Few steps in construction of Pie chart are :- Correct Answer Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart Your Answer Express value of each category as percentage of total of all categories & calculate the degree of angle form by each category by equation degree = Value of groups/Total value * 360 , Draw the circle & segment the circle into angles calculated in step one , Colour different segments & enter the percentage of each category into pie chart Multiple Choice Multiple Answer Question As benchmark in Japan seiso activities means :-
Sem – 3rd Techniques for Operations Efficiency 42
Correct Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence Your Answer Everyone, clerk to officer does cleaning his area , No sweeper or cleaner employees , Every family does cleaning of pavement of their residence Select The Blank Question Poka Yoke designed to help operators to know immediately ________ of the defeat called detection type Poka-Yoke. Correct Answer On occurrence Your Answer Before Occurrence Select The Blank Question Flow chart helps to dissect a process for better understanding & ________ of process. Correct Answer Analysis Your Answer Analysis Multiple Choice Single Answer Question Small groups forming a circle should consist of :- Correct Answer Employees of different department related to the problem Your Answer Employees of same department Select The Blank Question Graphs convey a situation more ________ than summary of data or figures. Correct Answer Effectively & clearly Your Answer Effectively & clearly Multiple Choice Single Answer Question Number of Kaizen projects suggested and implemented is checking point for :- Correct Answer Continual Improvement Your Answer Continual Improvement
--------------------------------------------------------------------
LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Quality maintenance & pillar focuses on following production inputs :- Correct Answer Material , Men , Machine Your Answer Material , Men , Machine Multiple Choice Multiple Answer Question Histograms are useful to :- Correct Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control Your Answer Measure the current pattern & extent of variation , Assess current conformance to specification & scope of improvement , Determine whether or not the process is in the state of control Multiple Choice Single Answer Question In problem solving the best alternative is that :- Correct Answer Which best meets the criteria Your Answer Which best meets the criteria Multiple Choice Single Answer Question "Cause & effect" diagram was developed by :- Correct Answer DR.Kaoru Ishikawa Your Answer DR.Kaoru Ishikawa Multiple Choice Single Answer Question Identifying key preventive operational functions and comparing these operational functions within the firm's own division & branches comes under :-Sem – 3rd Techniques for Operations Efficiency 43
Correct Answer Internal benchmarking Your Answer Internal benchmarking Select The Blank Question JIT advocates the philosophy at elimination of waste from system which occurs due to ________. Correct Answer Over Production Your Answer Over Production Select The Blank Question In scatter diagram "________" relationship is said to exist when there is positive relationship upto certain level & negative thereafter or negative relationship upto certain level & positive thereafter. Correct Answer Curvilinear Your Answer Curvilinear True/False Question Kanban signals are required when assembly work, subassembly work and manufacturing at parts is carried out at different locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Customers complaints may be segregated by :- Correct Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity Your Answer Nature of compliant i.e. defective product , Delayed delivery , Short/excess quantity True/False Question In case of more than one quality characteristics, separate chart is made for each quality characteristics. Correct Answer True Your Answer True True/False Question Safety, hygiene and environment control is one of the pillar of TPM. Correct Answer True Your Answer True Multiple Choice Single Answer Question 5-S technique is useful to: Correct Answer To all places including homes Your Answer To all places including homes Match The FollowingQuestion Correct Answer Your Answer
Reduce time of external setup Improve work aids positioning method Improve work aids positioning method
Convert internal setup into external setup Preparation of tools / dies as off line activity Preparation of tools / dies as off line activity
Eliminate adjustmentPre setting of tool Pre setting of tool
Reduce clamping & declamping time Use U-shaped washer Use U-shaped washer
Multiple Choice Single Answer Question The facilitator should be normally :- Correct Answer Senior officer /Shop incharge Your Answer Senior officer /Shop incharge Sem – 3rd Techniques for Operations Efficiency 44
Match The FollowingQuestion Correct Answer Your Answer
Parato diagram always indicates Magnitude of defects Philosophy of 20% of the activity causes 80% of the effect
Parato analysis underlines & operates on Philosophy of "vital few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes byArranging data according to the descending order of their frequency of occurrence Arranging data according to the descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by Arranging data in descending orderMagnitude of defects
Multiple Choice Single Answer Question Quality problem solving tool is used to :- Correct Answer Improve quality Your Answer Make work easy True/False Question Pie chart is also called as angular diagram. Correct Answer True Your Answer True Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' somewhat decreases as the value of 'x' increases. Correct Answer Weak negative Your Answer Weak negative Multiple Choice Single Answer Question From scatter diagram the strength of relationship between two variables or associated set of data can be inferred from the examination of the shape of :- Correct Answer Cloud Your Answer Cloud Multiple Choice Multiple Answer Question Product benchmarking requires, comparison of product :- Correct Answer Performance , Features , Cost Your Answer Performance , Features , Cost Multiple Choice Multiple Answer Question Steps in construction of scatter diagram :- Correct Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship Your Answer Collect paired data (X,Y) from two variables who's relationship is to be studied , Find out max & min values for both X & Y and these values to scale X & Y axis & plot the paired data , Examine the shape of the cloud of points & discover type & strength of relationship Multiple Choice Single Answer Question Implication of Quality problem is:- Correct Answer Gap in performance Your Answer Gap in performance Select The Blank Question Each quality characteristic has permitted variation & is equal to ________. Correct Answer USL - LSLSem – 3rd Techniques for Operations Efficiency 45
Your Answer USL - LSL Select The Blank Question Kaizen is ________ supported process. Correct Answer Management Your Answer Management True/False Question The flow charts are prepared to enhance the employees understanding of the process by indicating interrelationship within the process. Correct Answer True Your Answer False True/False Question Gap analysis for production & dispatches is discussed in monthly meeting. Correct Answer False Your Answer False Select The Blank Question In scatter diagram "________" relationship is said to exist when value of 'y' decreases as the value of 'x' increases. Correct Answer Strong negative Your Answer Strong negative Select The Blank Question ________ is most difficult 'S' to implement & achieve. Correct Answer Shitsuke Your Answer Shitsuke True/False Question Presentation of graphs in pictorial form of data collection are for easy understanding. Correct Answer True Your Answer True Select The Blank Question Graphs convey a situation more ________ than summary of data or figures. Correct Answer Effectively & clearly Your Answer Effectively & clearly Multiple Choice Single Answer Question Errors by armatures is :- Correct Answer Lack of experience Your Answer Lack of experience Multiple Choice Multiple Answer Question While preparing scatter diagram following precautions are to be taken :- Correct Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance Your Answer Data should be properly stratified & should be collected for full range , Scale selected should be right to avoid wrong conclusions , Data should be free from bias or undue importance True/False Question Globalization of trade and industrial operations have forced Indian companies to become more & more competitive and customer driven. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question If 'Annual saving in procurement expenses is managing point', then checking points will be :- Correct Answer Price revision , Credit period , Transport expenses Your Answer Price revision , Credit period , Transport expenses Sem – 3rd Techniques for Operations Efficiency 46
Multiple Choice Single Answer Question Number of kaizen in Group kaizen categories are :- Correct Answer Two to three per year Your Answer Two to three per year True/False Question Flow chart is pictorial representation of the steps in production control. Correct Answer False Your Answer False Multiple Choice Single Answer Question It is essential to convey customer's expectations to :- Correct Answer Top Management Your Answer Supervisors & workmen Multiple Choice Single Answer Question Check sheet is easy to use because it is :- Correct Answer Simplest tool Your Answer Simplest tool Select The Blank Question Identification of non-value added operations & their elimination is the first step to eliminate muda of ________. Correct Answer Processing Your Answer Processing Select The Blank Question A 'Radar chart' is used to portray ________ strength or weakness of the activity. Correct Answer Relative Your Answer Relative Multiple Choice Single Answer Question Pareto's analysis underlines & operates philosophy of :- Correct Answer Vital few = trivial many Your Answer Vital few = trivial many True/False Question In single card kanban system production greater than quantity withdrawn is permitted. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Benefits of planned maintenance are :- Correct Answer Improved reliability mean time between failures , Improved maintainability mean time to repair , Improvement in breakdown Your Answer Improved reliability mean time between failures , Improved maintainability mean time to repair Multiple Choice Multiple Answer Question Gap analysis & problem identification is done during converting internal setups into external setups in the areas like :- Correct Answer Equipment , Method , Human Your Answer Equipment , Method , Human Multiple Choice Single Answer Question Some quantity in stock of item, is desirable if :- Correct Answer Manufacturing lead time is more Your Answer Manufacturing lead time is more Multiple Choice Single AnswerSem – 3rd Techniques for Operations Efficiency 47
Question Sorting of usable items should be Correct Answer Planned storage based on frequency of use Your Answer Within visual reach method Multiple Choice Multiple Answer Question Benefits of Quality maintenance are :- Correct Answer Reduction in customer quality complaints , Reduction in inspection time Your Answer Reduction in customer quality complaints , Reduction in inspection time