1
km.qa 30303991 / kahramaa 991 kahramaa.live %40 %60 800 350 %10 10 Qatar General Electricity & Water Corporation “KAHRAMAA” signed a Power Purchase Agreement with Siraj1 for the Large-Scale Solar PV Power Plant for 25 years. The Large-Scale Solar PV Power Plant The Plant One of the largest Solar PV power projects in the region and the first of its kind in Qatar. MW / Peak total capacity of the project meets of Peak demand for electricity MW will be connected to the grid by 1Q 2021 The commercial commissioning of the total capacity will start in 1Q 2022 Project Structure The project is structured as Build Own Operate Transfer BOOT years 25 for The ownership will be transferred to KAHRAMAA The total cost of the project construction is Q.R. 1.7 billion Plant Location and Size km2 at Al-Kharsaah area west of Doha Electricity Unit Price - Marubeni Total Consortium offered: 6.36 Dhs/kWh (1.745 US cents/kWh) - Financial Close of the project: May 2020 - Based on current financial market indices the equivalent LEC is 5.71 Dhs/kWh (1.567 US cents/kWh) which is one of the world’s lowest for projects of this type Request for Bids KAHRAMAA announced Request for Bids (RFB) for Qatar first large scale solar Photovoltaic (PV) power plant Prequalification for 16 international Solar Power Developers 5 competitive offers received from international companies and consortiums Project Company Siraj1 owned by: Siraj Energy the Strategic National Investor The consortium of Marubeni Corporation (Japan) and Total Solar International (France) The plant will contribute to reduce 26.000.000 TCO2 Project Advantages Competitive power generation prices Reducing Gas Dependency Saving natural gas used in traditional power generation Reducing carbon emissions and preserve the environment. Project Technology Single-axis tracking Photovoltaic Panels New solutions and innovations in solar energy technology including: The use of dual panels The latest automated systems to track the sun The use of robots in the process of cleaning solar panels Reduction of Emissions

The Large-Scale Solar PV Power Plantwith Siraj1 for the Large-Scale Solar PV Power Plant for 25 years. The Large-Scale Solar PV Power Plant The Plant One of the largest Solar PV power

  • Upload
    others

  • View
    10

  • Download
    1

Embed Size (px)

Citation preview

Page 1: The Large-Scale Solar PV Power Plantwith Siraj1 for the Large-Scale Solar PV Power Plant for 25 years. The Large-Scale Solar PV Power Plant The Plant One of the largest Solar PV power

km.qa 30303991/ kahramaa991 kahramaa.live

%40 %60

800 350

تنفيذ المشروع بنظام

%10

10

Qatar General Electricity & Water Corporation “KAHRAMAA” signed a Power Purchase Agreement with Siraj1 for the Large-Scale Solar PV Power Plant for 25 years.

The Large-Scale Solar PV Power Plant

The PlantOne of the largest Solar PV power projects in the region and the first of its kind in Qatar.

MW / Peak

total capacity of the project

meets of Peak demand for electricity

MW

will be connected to the grid by 1Q 2021

The commercial commissioning of the total capacity

will start in 1Q 2022

Project Structure The project is structured as Build

Own Operate Transfer BOOTyears 25 for

The ownership will be transferredto KAHRAMAA

The total cost of the project

construction is Q.R. 1.7 billion

Plant Location and Sizekm2 at Al-Kharsaah area west of Doha

Electricity Unit Price- Marubeni Total Consortium offered: 6.36 Dhs/kWh (1.745 US cents/kWh) - Financial Close of the project: May 2020 - Based on current financial market indices the equivalent LEC is 5.71 Dhs/kWh (1.567 US cents/kWh) which is one of the world’s lowest for projects of this type

Request for BidsKAHRAMAA announced Request for Bids (RFB) for Qatar first large scale solar Photovoltaic (PV) power plant

Prequalification for 16 international Solar Power Developers

5 competitive offers received from international companies

and consortiums

Project Company

Siraj1 owned by:Siraj Energy the Strategic National Investor

The consortium of Marubeni Corporation (Japan) and Total Solar International (France)

The plant will contribute to reduce 26.000.000 TCO2

Project Advantages

Competitive power generation prices

Reducing Gas Dependency

Saving natural gas used in traditional powergeneration

Reducing carbon emissions and preserve the environment.

Project Technology Single-axis tracking Photovoltaic PanelsNew solutions and innovations in solar energy technology including:

The use of dual panelsThe latest automated systems to track the sun The use of robots in the process of cleaning solar panels

Reduction of Emissions