PETROVIETNAMEnergy for National Sustainable Development
Presented by: Ngo Anh Hien
Deputy General ManagerGas Division of PetroVienam
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
2/18
Content
OVERVIEW OF PIPELINE SYSTEM CURRENT GAS PIPELINE SYSTEMS
DIRECTION TO DEVELOPMENT
ON-GOING GAS PIPELINE PROJECTS
UP-COMING GAS PIPELINE PROJECTS
PETROVIETNAMEnergy for National Sustainable Development
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
3/18
Overview of Gas Pipeline System
In 1981, the first developed gas field from Tien HaiSong
Hong basin with flowrate of 20
23 MMCM/year supplied
to local industry.
In 1995, the first associated gas from Bach Ho field Cuu
Long basin with flowrate 1 MMCM/day supplied to Ba
Ria Power Plant. In 2003, a first natural gas from Lan Tay field Nam Con
Son basin with flowrate of 2 MMCM/day supplied to Phu
My Power Complex. By October 2008, the flowrate was
increased to 20 MMCM/day.
In 2007, a first associated gas from PM3-CAA overlapping
area supplied to Ca Mau Power Complex.
PETROVIETNAMEnergy for National Sustainable Development
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
4/18
Current Gas Pipeline Systems
Northern areaThai Binh Pipeline
Rang DongBach HoPhu My Pipeline
Nam Con Son Pipeline
PM3Ca Mau Pipeline
Low Pressure Pipeline
PETROVIETNAMEnergy for National Sustainable Development
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
5/18
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
Northern area Thai Binh
Fields: Tien Hai C (07/1981)
D14_STL (5/2004)
Dong Quan D (2005)
Specification: Length: ~20 km
Diameter: Small (~6)
Description: Limited gas resources
Supply gas to Tien Hai
industrial zone, Thai
Binh.
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
6/18
CAMBODIA
Ca MauComplex
PM3-CAA
O Mon
HiepPhuoc
Dinh Co
GPP
Phu MyComplex
Cuu LongBasin
Nam Con SonBasin
Ma Lay
Tho ChuBasin
Bach Ho Phu My PL:Capacity: 2 bcmpaLength: 117 kmDiameter: 16
Nam Con Son 1 PL:Capacity: 7 bcmpaLength: 400 kmDiameter: 26
PM3-Ca Mau PL:Capacity: 2 bcmpaLength: 330 kmDiameter: 18
Block B,48 &52
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
7/18
Current Gas Pipeline SystemsSoutheast Region
PETROVIETNAMEnergy for National Sustainable Development
LO 06.1LANTAY-
LANO
LO 11.2
MO
NHA MAYX LY KH
NAM CON SN
NHA MAYX LY KH
DINH CO
TRUNG TAM
PHU MY
GDC
BLOCK 06.1LAN TAY& LAN DO
BLOCK 11.2
BACH HO
DINH COTERMINAL
NAM CON SON
DINH COGPP
BACH HO
BA RIA POWER PLANT
BACH HO
GASDISTRIBUTION
CENTERPHU MY GDS
PHU MY 2.1
PHU MY 2.1 EXT.
PHU MY 1
PHU MY 3NAM CON SON
GAS DISTRIBUTIONCENTER
PHU MY GDCPHU MY 2.2
PHU MY FERTILIZER
LOW PRESSUREPMMX - GD
PHU MY INDUSTRIAL ZONE
PHU MY - HCM
OFFSHORE
DINH CO AREA
BA RIA AREA
Max. capacity: 2.0 BCM/y
Max. capacity: 7 BCM/yPHU MY 4
PHUONG DONGRANG DONG
PHU MY 3
NHON TRACH 1
HIEP PHUOC
CA NGU VANG
NHON TRACH 2
STD/STV
RongDoi Moi
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
8/18
Current Gas Pipeline Systems
PETROVIETNAMEnergy for National Sustainable Development
Rang Dong Bach Ho Phu My Pipeline
Ba RiaGDS
Ba Ria
Power Plant
1.5 Bcm/y, 125 bar
LBV-804
SDV-805
LBV
547 MMCM/y22.5 - 24 bar
Bach Ho
Thi Vai Terminal
Phu MyGDS
Dinh CoGPP
Rang Dong
PM1
PM 2.2
PM 2.1
PM 3
UREA
PM 4
Phu MyGDC
STD/STV
Ca Ngu Vang
Rong Doi Moi
http://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Field-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Thi%20Vai-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Thi%20Vai-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Field-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Condensate%20Overview.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Pipeline%20Picture1.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Onshore%20ROW.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Pipeline%20Picture2.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Offshore%20Pipelines.ppt8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
9/18
Current Gas Pipeline Systems
Nam Con Son Pipeline
LBV
Dinh CoGPP
LBV
Lan Tay
Thi Vai Terminal
Dinh Co
Terminal
Hai Thach
Rong Doi
PM 2.2
PM 4
PM 3Phu My
GDS
Phu MyGDC
PETROVIETNAMEnergy for National Sustainable Development
PM 2.1
PM 1
http://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Field-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Thi%20Vai-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GDC%20at%20Phu%20My.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Thi%20Vai-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Field-Pictures.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Condensate%20Overview.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/BH%20Pipeline%20Picture1.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Onshore%20ROW.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/Offshore%20Pipelines.ppthttp://localhost/var/www/PetroVietnam%20Gas%20Company/GPP-Pictures.ppt8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
10/18
Current Gas Pipeline SystemsLow Pressure Gas Pipeline
PETROVIETNAMEnergy for National Sustainable Development
Design
Capacity:
1 BCMY
Specification: Length: 15 km
Description: Supply gas to theindustrial zones
along the trunk-
pipeline to Ba Ria,
Phu My area.
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
11/18
Direction to Development
PETROVIETNAMEnergy for National Sustainable Development
Maximize the utilization of existing pipeline system.
Expand gas pipeline system in Southeast and Southwest
region.
Utilize gas reserves in the Central and Northern of
Vietnam.
Interconnect regional/national gas pipeline systems.
Expand gas usage in other sectors such as resident,
transportation, industry etc through low pressure and city
gas pipeline system.
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
12/18
PETROVIETNAMEnergy for National Sustainable Development
Master Plan For Pipeline System
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
13/18
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Rong-Doi Moi Bach Ho Pipeline
Design Capacity: 6.4 BCMY
Location: Southeast region
Description: To gather gas and then
compress associated gas
in Rong Doi Moi gas
fields through Bach HoDinh Co pipeline.
Specification: RC1-RP2: 9,5km, 10
RP3-RP2: 8.5km, 12
RP3-RC4: 16km, 10
RC4-RC5: 5.5km, 8
RC4-RCDM: 3.5km, 8
First gas: 12/2010
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
14/18
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
15/18
On-going Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Block B O Mon Pipeline
06-2
PETR
O
CARIGA
LI
CARI
G
O ON
PHU My Design Capacity: 6.4 BCMY
Location: Southwest region
Specification: Length: 406 km
Onshore: 160 km, 30
Offshore: 246 km, 28
First gas: 2014
Customers: - O Mon Power Complex
(O Mon Power Plant
2,3,4,5)
- Gas-Power-Fertilizer
Industry Zone in Ca Mau
Province.
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
16/18
Up-coming Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Nam Con Son II Gas PipelineDesign Capacity: 7 BCMY
Location: Southeast region
Description: The 400 km line will be built in parallel
with the 1st pipeline to transport gas
from Block 05-2, 05-3 and 04-3 with
consideration of re-serving for other
potential gas fields in Nam Con Son
basin and importing gas later.
First gas: 2014
8/10/2019 tongquanduongongkhivn-130124204405-phpapp01
17/18
Up-coming Gas Pipeline Projects
PETROVIETNAMEnergy for National Sustainable Development
Block 102/106 & 103/107 Thai Binh Pipeline
Distances
Hong Long - Landfall: ~55km
Hac Long - Hong Long: 10,3km
Bach Long - Hong Long: 17,4km
Dia Long - Hong Long: ~20km
Hong Long - Thai Binh: ~40km
Thai Binh Landfall: 19,54km