TREND BizCase Presentation

Embed Size (px)

Citation preview

  • 7/31/2019 TREND BizCase Presentation

    1/19

    Click to edit Master subtitle style

    8/16/12

    TREND ProjectPresentation

    The TREND Team:Joe PasquarelloJC Howard

  • 7/31/2019 TREND BizCase Presentation

    2/19

    8/16/12

    Presentation Structure

    Project Introduction and Background

    Recommendations

    Justification Stakeholders and Communications

    Key Variables and Controls

    Risk Assessment and Management Quality Assurance methods

  • 7/31/2019 TREND BizCase Presentation

    3/19

    8/16/12

    Project Introduction &Background

    Project proposal and study requested by VP ofTechnology

    Red team proposed TREND: TechnologyRevitalization and Efficiency at NewwDeal.

    TREND = Energy costs, Efficiency

    Achieves savings through

    Virtualization

    Green IT

    Achieves efficiency through

    ITIL

    Lean process improvement

  • 7/31/2019 TREND BizCase Presentation

    4/19

    8/16/12

    Project Introduction &Background

    Power Consumption Considerations:

    Power consumed is approximately double eachservers load

    UPS inefficiencies, whether at the PC or rack Internal power supply inefficiencies

    Network equipment (firewalls, routers, switches)

    Cooling

    Source: US EPA report to Congress August2, 2007

    Average server CPUusage only 5-15%

    Will consume 60-90% of

    its power at low usagelevels

    Power consumedconverted directly toheat

    Lifetime power & cooling cost more than themachine!

  • 7/31/2019 TREND BizCase Presentation

    5/19

    8/16/12

    Our investigation showed:

    Mixed brands, ages of computers

    Inconsistent capabilities

    Difficult to plan upgrades

    Administrators supporting

    Different operating systems Different software products, versions

    Older systems

    Slower

    Recommendations

  • 7/31/2019 TREND BizCase Presentation

    6/19

    8/16/12

    Recommendations

    Increase NewwDeal efficiencywith:

    Reducehardware size &

    complexity Lower power costsand carbonfootprint Integrate IT

    servicesmanagement

    Virtualization + Green IT= Synergy!

  • 7/31/2019 TREND BizCase Presentation

    7/19

    8/16/12

    Virtualization and Green IT = Major savings

    Lower power consumption Less heat for a/c to remove

    Less real estate for systems

    Green initiatives = good Public Relations

    Project pays for itself almost right away!

    Justification

  • 7/31/2019 TREND BizCase Presentation

    8/19

  • 7/31/2019 TREND BizCase Presentation

    9/19

    8/16/12

    Stakeholders &Communications

    Stakeholder communications requirements. Information to be communicated, including format,

    content, and level of detail. Who will receive, produce the information. Suggested methods or technologies for conveying

    the information.

    Frequency of communication. Escalation procedures for resolving issues. Revision procedures for updating the

    communications management plan.

    TREND Stakeholder CommunicationPlan

  • 7/31/2019 TREND BizCase Presentation

    10/19

    8/16/12

    Stakeholders &CommunicationsTREND Stakeholder Communication

    Plan

  • 7/31/2019 TREND BizCase Presentation

    11/19

    8/16/12

    Key variables: Cost, Scope, and Schedule

    Key variable: COST

    Cost and Scope controlled through Earned Value

    Management EVM contributes to:

    Improving communication and visibility withstakeholders

    Preventing scope creep

    Reducing risk

    Profitability analysis

    Project forecasting

    Key Variables & Controls

  • 7/31/2019 TREND BizCase Presentation

    12/19

    8/16/12

    Key Variables & Controls

    Schedule Variable

    Managed with Microsoft Project

    Easy to tie back to Earned Value Management

    Easy to assess actual vs expected progress

  • 7/31/2019 TREND BizCase Presentation

    13/19

    8/16/12

    Risk Assessment &Management

    Refer to TREND Risk Management Plan andRisk Register

  • 7/31/2019 TREND BizCase Presentation

    14/19

    8/16/12

    Risk Assessment &Management

    TREND risk management process includes Monitoring Communication Consultation

  • 7/31/2019 TREND BizCase Presentation

    15/19

    8/16/12

    Quality AssuranceMethods

    We have to get these right EVERY time

  • 7/31/2019 TREND BizCase Presentation

    16/19

    8/16/12

    Quality AssuranceMethods

    Lean methodology value mapping:

    Identify wait times, wasted steps Pre-build, pre-test Focus on value to customer (Lean

    + ITIL)

  • 7/31/2019 TREND BizCase Presentation

    17/19

    8/16/12

    In Summary

    Recommended Technology and EfficiencyMeasures

    Virtualization & thin clients

    Green IT ITIL

    Justified TREND via

    Cost Savings

    ROI Materialized in 1.3 years

    How We Will Engage Stakeholders

    Controlling Key Variables

    Mana in Pro ect and Information RisksTREND Is Going To Produce Results forNewwDeal

  • 7/31/2019 TREND BizCase Presentation

    18/19

    8/16/12

    Next Steps

    Board Approval for TREND project

    Firm Up Project Plan

    Assemble TREND Key Leads Project Kickoff

    Execute to Plan

    Keep Risk under Control

  • 7/31/2019 TREND BizCase Presentation

    19/19

    8/16/12

    Credits

    Slide 4, chart: Report to Congress on Server and Data Center EnergyEfficiency by US EPA, August 2, 2007.

    Slide 5, Sherlock Holmes image:http://worldoffancydress.com/index.php?main_page=product_info&products_id=5

    Slide 7, Green leaf @ sign: http://www.templates.com/

    Slide 8, Worried woman:http://www.itsasmartdecision.com/2010/06/changeyourbottomline/

    Slide 9, Handshake image http://www.brighthub.com/office/project-management/articles/15148.aspx?image=7444

    Slide 16, Value map: http://www.matthewlai.co.uk/tips_excelvsm.html Slide 17, Bullhorn guy: www.fotolia.com

    Slide 18, Leaning guy: www.fotolia.com

    http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://worldoffancydress.com/index.php?main_page=product_info&products_id=540http://www.templates.com/http://www.itsasmartdecision.com/2010/06/changeyourbottomline/http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.matthewlai.co.uk/tips_excelvsm.htmlhttp://www.fotolia.com/http://www.fotolia.com/http://www.matthewlai.co.uk/tips_excelvsm.htmlhttp://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.brighthub.com/office/project-management/articles/15148.aspx?image=74440http://www.itsasmartdecision.com/2010/06/changeyourbottomline/http://www.templates.com/http://worldoffancydress.com/index.php?main_page=product_info&products_id=540