Turning a Legacy Landfill into an Asset April 13, 2015 Gershman, Brickner& Bratton, Inc. 1 Turning a Legacy Landfill into an Asset SWANA NJ Annual Spring Conference April 13, 2015 John Carlton, PE, BCEE, Gershman Brickner & Bratton, Inc. James Sherman, Esquire, McManimon Scotland Baumann, LLC I –About GBB and MSB I –About GBB and MSB II –Challenges of Legacy Landfills II –Challenges of Legacy Landfills III –A Brighter Way to Close a Landfill III –A Brighter Way to Close a Landfill IV –The Edison Landfill Project IV –The Edison Landfill Project V –Questions V –Questions Presentation Outline

Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Embed Size (px)

Citation preview

Page 1: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 1

Turning a Legacy Landfill into an Asset

SWANA NJ Annual Spring Conference

April 13, 2015

John Carlton, PE, BCEE, Gershman Brickner & Bratton, Inc.

James Sherman, Esquire, McManimon Scotland Baumann, LLC

I – About GBB and MSBI – About GBB and MSB

II – Challenges of Legacy LandfillsII – Challenges of Legacy Landfills

III – A Brighter Way to Close a LandfillIII – A Brighter Way to Close a Landfill

IV – The Edison Landfill ProjectIV – The Edison Landfill Project

V – QuestionsV – Questions

Presentation Outline

Page 2: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 2

Established in 1980

Solid Waste Management and Technology Consultants

Helping Clients Turn Problems into Opportunities

Established in 1971

Law Firm focused on New Jersey

Renewable Energy, Brownfields Redevelopment, and Cutting Edge Financing Techniques

3

THE CHALLENGES OF

LEGACY LANDFILLS

4

Page 3: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 3

5

6

“Legacy Landfill” is a landfill that ceased operations prior to

January 1, 1982, and received household, commercial or

industrial solid waste for disposal

Page 4: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 4

Unlined and uncontrolled

Closure and post-closure often

unfunded

Quantity, location and nature of

wastes undefined

NJAC 7:26-2A.9 does not require Closure and Post-

Closure Plan

Legacy Landfill Law, June 26, 2013

7

Challenges of Legacy Landfills

A BRIGHTER WAY TO

CLOSE A LANDFILL

8

Page 5: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 5

9

Source: PV Navigator

Operational

• 6 Projects

• 17.9 MW

Design

• 5 Projects

• 15.9 MW

Pre-Design

• 7 Projects

• 25.2 MW

Preliminary

• 12 Projects

• 73.1 MW

10

NJ Landfill Solar Projects as of 2012

Page 6: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 6

Pennsauken Renewable Energy Park

11

BP Site in Paulsboro

12

Page 7: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 7

Geomembrane Solar (Atlanta)

13

THE EDISON

LANDFILL PROJECT

14

Page 8: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 8

15

16

Page 9: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 9

35 Acre Edison Landfill (post 1982)

35 Acre legacy landfill (pre 1982)

Current closure fund insufficient

Seeking a Design Build Own Operate (DBOO) contractor to close both sites and install utility-scale solar array

17

Summary of Project

Environmental protection

• Engineered cap

• Environmental controls

• Long-term care

Renewable energy

• Utility-scale electrical generation

Savings to the Township of Edison

• Reduced closure/post-closure costs

• Lease or other revenues

18

Project Goals

Page 10: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 10

Combined landfill closure and utility-

scale PV project

Request for Proposals to be

issued (not a bid)

Expected reduced construction costs

Economics of PV project to support

closure saving Township money

19

What Makes This Project Different?

Closure Plan

(9-12 months)

Request for Proposals

(6-9 months)

Construction

(24-36 months)

20

Project Schedule

Page 11: Turning a Legacy Landfill Liability into an Asset Carlton ...gbbinc.com/gbbwp2013/wp-content/uploads/2015/04/CarltonSWANANJ2015.pdfJohn Carlton, PE, BCEE, Gershman Brickner & Bratton,

Turning a Legacy Landfill into an Asset April 13, 2015

Gershman, Brickner & Bratton, Inc. 11

Thank you!

Questions and comments?

John G. Carlton, P.E., BCEE

Senior Vice President, GBB

908-319-5992

[email protected]

James Sherman, Esq.

Counsel

McManimon Scotland Baumann, LLC

973-622-5672

[email protected]