1
THE VISIONA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
4
5
Contents from the md’s desk 7
United arab emirates 8-29
qatar 30-41
oman 42-45
bahrain 46-49
kUwait 50-51
saUdi arabia 52-53 india 54-57
6
7
to our Valued Customers,Greetings!
Knauf is a family name and a corporate group of global dimensions at the same time synonymous with a type of corporate culture which has become rare. Knauf is a typical Family firm in spite of its size and this is precisely the reason for its amazing success. It is short and direct decision-making paths, the courage to tackle new ideas, innovations, investments and the wealth of ideas contributed by all Knauf employees that characterize the company.
From its beginnings in gypsum processing, Knauf has expanded and diversified to become a corporation with worldwide activities, Knauf UAE has been active in the Middle East for more than a decade.
Knauf shows its commitment not only in the GCC, headquarters in Dubai UAE, but also in the subcontinent.We have offices based in Saudi, Qatar and India to support the market and dealers.Knauf provides value-added products and services in the following fields:• Building materials and systems based on gypsum and gypsum-related products• ASTM certified products & systems• Multi- Purpose Joint compounds• Knauf Aquapanel interior and exterior wall systems• Knauf Insulations sustainable, high-performance, cost-effective insulation solutions• Knauf Heradesign’s acoustic designs for Interior and Exterior in ceiling & partition systems• Knauf Integral’s Knauf GIFA Floor, sheet-panelled access floors• Thermal and sound insulation materials• Value engineering and technical consultancy for architects and consultants to meet specified design requirements• On site hands-on training and supervision for contractors when installing drywall systems• Knauf systems are approved by Dubai, Abu Dhabi, Ras Al Khaimah and Qatar Civil Defense
Sustainability is central to our vision of doing the right thing for our clients, our people and the communities in which we work. We maintain and provide certificates for individual products and designs to improve quality and performance. Knauf systems combine innovative products to realize speed of installation and warranted high performance-based systems as per ASTM, EN-BS and DIN Standards.
Knauf is not only committed towards it Products and System but also towards it employees. Within the framework of its four key K-Values; Partnership, Commitment, Entrepreneurship and Menschlichkeit meaning human touch Knauf looks after its people and drives a sense of passion in all its staff. This is what makes Knauf Unique and special!
Safety is something that Knauf does not compromise on again whether for its products or people and therefore all our products are tested and approved by Intertek to make sure that nothing leaves the plant which is not up to the mark.
amer Bin ahmedManaging DirectorKnauf GCC & India
From the md’s desk
8
9
UNITEd ArAb EmIrATES
10
UNITEd ArAb EmIrATES
BurJ khalIFaregion: Dubaiknauf systems used: D112 main Contractor: ArabtecYear of Completion: 2009
11
haBtoor PalaCe – duBaIregion: Dubaiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2016
12
UNITEd ArAb EmIrATES
FaIrmont hotel - aBu dhaBIregion: Abu Dhabiknauf systems used: ASTM Partition & Ceilings[Offered tailored made solution to meet the highest rated performance systems].main Contractor: Arabtec
sharJah mIlItarY hosPItalregion: Sharjah
knauf systems used: EN-BS Ceilingssub Contractor: VancouverYear of Completion: 2015
13
al amal PsYChIatrIC hosPItalregion: Dubaiknauf systems used: D112main Contractor: China State ConstructionYear of Completion: 2016
the address BouleVard - duBaI
region: Dubaiknauf systems used: EN-BS Partition & Ceilings with special
board PRO-HD main Contractor: Brookfield Multiplex
Year of Completion: 2016
14
UNITEd ArAb EmIrATES
duBaI audI shoWroomregion: Dubai
knauf systems used: Cleaneo Acoustic Ceilingmain Contractor: Al Sahel Contracting
Year of Completion: 2014
15
landmark toWerregion: Abu Dhabiknauf systems used: Knauf D112 Suspension Ceiling Systems, Knauf EN-BS Partition Systems + Knauf Aquapanel for wet areasmain Contractor: Arabtec / Al HabtoorYear of Completion: 2012
16
UNITEd ArAb EmIrATES
BaB al Qasr hotel & serVICed aPartments – aBu dhaBIregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: NurolYear of Completion: 2015
17
IranIan hosPItal eXPansIon ProJeCt - duBaI: region: Dubaiknauf systems used: EN-BS Partition & Ceilings main Contractor: Al Sahel ContractingYear of Completion: 2013
18
UNITEd ArAb EmIrATES
GhaYathI hosPItalregion: Abu Dhabi
knauf systems used: ASTM Ceilingsmain Contractor: Al Amana Contracting
Year of Completion: 2015
19
sIla hosPItalregion: Abu Dhabiknauf systems used: ASTMmain Contractor: Al Fara’a ContractingYear of Completion: 2015
20
UNITEd ArAb EmIrATES
al hIlal Bankregion: Abu Dhabiknauf systems used: ENBS Ceiling/Partitionsmain Contractor: Al Fara’a ContractingYear of Completion: 2013
21
al muneera region: Abu Dhabi
knauf systems used: EN-BS Partition D112 Ceilings (One of the biggest Aquapanel project)
main Contractor: Al Futtaim CarillionYear of Completion: 2011
22
Conrad hIlton region: Dubaiknauf systems used: EN-BS Parti-tion & Ceilings main Contractor: ArabtecYear of Completion: 2011
al Bustan ComPleXregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2012
UNITEd ArAb EmIrATES
23
arZanah medICal Centerregion: Abu Dhabiknauf systems used: EN-BS Partition & Ceilings main Contractor: Habtoor Leighton GroupYear of Completion: 2012
JW marrIott marQuIsregion: Dubaiknauf systems used: EN-BS main Contractor: Brookfield MultiplexYear of Completion: 2012
natIon toWers region: Abu Dhabi
knauf systems used: EN-BS Partition & Ceilings + Knauf Cinema Systems
main Contractor: Arabtec & NPCYear of Completion: 2012
24
Yas mall region: Abu Dhabiknauf systems used: EN-BS Ceilingsmain Contractor: Six ConstructYear of Completion: 2014
UNITEd ArAb EmIrATES
IndeX toWerregion: DIFC Dubai
system used: Knauf GIFAFloor Year : June 2011
25
Four seasons hotelregion: Abu Dhabi
knauf systems used: EN-BS Partition & Ceilings main Contractor: Al Futtaim Carillion
Year of Completion: 2015
26
draGon mart eXPansIon & CInema’sregion: Dubaiknauf systems used: EN-BS Ceilings &Cinema Systemmain Contractor: UNECYear of Completion: 2015
UNITEd ArAb EmIrATES
ImG theme ParkBIGGest Indoor
theme Park In the World
region: Dubaiknauf systems used: EN-BS
Partition & Ceilings + Cinema System. (High walls)
main Contractor: Simplex Infra-structure
Year of Completion: 2016
27
CItY Walk resIdentIal BuIldInGsregion: Dubaiknauf systems used: Knauf Wall Lining 611 + Knauf Aquapanel Exterior Solution main Contractor: Al Shafar Contg.Year of Completion: 2016
JumeIrah Park VIllaknauf system used: Knauf D112 Ceiling Systemsmain Contractor: S.S.LootahCompletion: 2015
al shaam hosPItal – ras al khaImahknauf system used: EN-BS Partition & Ceiling Systems
main Contractor: Ali Moosa & SonsCompletion: 2015
28
PaddoCk CluB “Formula raCe VIP CluB“ region : Abu Dhabi-UAEsystems/Products used : Aquapanel Exterior wall main Contractor : ISGYear of Completion : 2014
UNITEd ArAb EmIrATES
masdar CItY region : Abu Dhabi-UAE
systems/Products used : Aquapanel Exterior wall main Contractor : Brookfield Multiplex
Year of Completion : 2013-2014
29
InFInItY toWer region : Dubai-UAEsystems/Products used : Aquapanel Exterior cladding in semi exposed areasmain Contractor : Arabtec
duBaI InternatIonal aIrPort termInal 3
region – City and Country : Dubai-UAEsystems/Products used : Aquapanel Exterior ceiling
main Contractor : AlecYear of Completion : 2010
30
31
qATArA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
32
BarZan CamPregion: Dohaknauf system used: EN-BS Ceilings D112 & Access Panels main Contractor: REDCO AlManaYear of Completion: 2015
qATAr
FalCon toWerregion: Dohaknauf system used: BN-BS Ceilings & Aquapanelmain Contractor: Tuscana Year of Completion: 2015
33
World trade Center region: Doha
knauf system used: ASTM Systemmain Contractor: BluuGulf Year of Completion: 2015
42 GoVernment sChools For ashGhalregion: Dohaknauf system used: Heradesign main Contractor: JTC/AMANA/ITC/Hassanesco/Alsyraia/Tadmur/ITCC/AlDarwishYear of Completion: 2014 & 2015
34
asPIre Zone eXtensIon
region: Dohaknauf system used: EN-BS Ceilings
main Contractor: SEG Year of Completion: 2015
Qatar mall region: Dohaknauf system used: ASTM & EN-BS Ceilingsmain Contractor: KCT / UCCYear of Completion: 2016
qATAr
35
male & Female Classrooms - Qatar unIVersItY region: Dohaknauf system used: EN-BS Systems & Cleaneo D126main Contractor: Commodore Co. Year of Completion: 2016
IsF CamP region: Doha
knauf system used: EN-BS Sys-tems, Hatfurring & Aquapanelmain Contractor: QD-SBG Year of Completion: 2016
oXYGen Park Qatar FoundatIon
region: Dohaknauf system used: EN-BS Systems & Aquapanel
main Contractor: Man Enterprises Year of Completion: 2014
36
Banana Island (anantra)region: Dohaknauf system used: EN-BS Ceiling & Aquapanelmain Contractor: UCCYear of Completed: 2014
al WaJBa PalaCe region: Doha
knauf system used: EN-BS System & Aquapanelmain Contractor: UCC
Year of Completed: 2014
sheraton hotel renoVatIon region: Dohaknauf system used: EN-BS System main Contractor: KCT Year of Completed: 2015
qATAr
37
hIlton douBle treeregion: Dohaknauf system used: EN-BS System main Contractor: Derwin Year of Completed: 2015
alsadd multIPurPose hall region: Dohaknauf system used: EN-BS System & Aquapanelmain Contractor: AKTOR Year of Completed: 2014
Qatalumregion: Dohaknauf system used: D112 system main Contractor: Dicotech Year of Completed: 2014
38
mInIstrY oF InterIor - head Quaters region: Dohaknauf system used: D112 system & Cleaneomain Contractor: WCT Year of Completed: 2015
CommunICatIon & medIa ColleGe -
Qatar FoundatIon region: Doha
knauf system used: Ceiling/Parition & Aquapnelmain Contractor: HBK JV REC
Year of Completed: 2015
qATAr
39
deVeloPment & researCh Center Qatar FoundatIon region: Dohaknauf system used: ASTM Ceiling/Parition & Aquapnelmain Contractor: REDCO Al Manaa Year of Completed: 2014
sIdra medICal & researCh Centerregion: Dohaknauf system used: EN-BS Ceiling/Parition Aquapanel & Alurevo access panel main Contractor: MidmacYear of Completed: 2015
Qatar natIonal museum region: Dohaknauf system used: EN-BS Curve Drywall & Heradesign main Contractor: Hyundai Year of Completed: 2013 completion 2016 end
40
BarWa FInanCe dIstrICt region: Dohaknauf system used: EN-BS Ceiling/Paritionmain Contractor: Promer QatarYear of Completed: 2013
PuBlIC Works authorItY ashGhal toWer 3region: Dohaknauf system used: EN-BS Ceilings main Contractor: Promer QatarYear of Completed: 2013
qATAr
41
natIonal lIBrarY - Qatar FoundatIon
region: Dohaknauf system used: EN-BS Ceilings
main Contractor: Brookfield Multiplex Year of Completed: 2015
Qatar aIrWaYs CreW housInG
region: Dohaknauf system used: EN-BS Ceilings
main Contractor: REDCO Year of Completed: 2014
42
43
OmANA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
44
GuteCh unIVersItY, musCat2014/ BS Partitions and DIN ceilings/ 40K sqr mtrsmain Contractor: L&T
ras al hamra deVeloPment, musCat2016/ DIN ceilings/ 95K sqrmtrsmain Contractor: Al Turki Enterprise
OmAN
45
kemPInskI hotel, musCatOn going/ BS ceilings/ 30K sqr mtrsmain Contractor: Carillion-Alawi
saraY Bander JIssa, musCatOngoing/ BS ceilings, partitions and Wall linings/ 35K sqr mtrsmain Contractor: Habtoor Leighton Group
BuraImI unIVersItY, BuraImI2015/ BS partitons and ceilings/ 25K sqr mtrs
main Contractor: L&T
46
47
bAHrAINA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
48
bAHrAIN
Baraka Bank hQtype: Commerial
system used: EN-BS Product used: Gypsum drywall & ceilings
Year completed: 2014main Contractor: ALYUSUF Decor
location: Bahrain
49
draGon CItY almuhraQtype: Commerial system used: EN-BS Product used: Hat Furring EN-BS Year completed: 2015 location: Bahrain
Four seasons hotelregion – City and Country : Bahrain
systems/Products used : Aquapanel interior wallsmain Contractor : Sixo
Year of Completion : 2014
50
kUwAITA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
51
mInIstrY oF eduCatIon type: Government system used: EN-BS /ASTM Product used: D112 & ASTM 12.7mmYear completed: 2015main Contractor: AlKharafi location: Kuwait
kUwAIT
52
SAUdI ArAbIAA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
53
CloCk toWer meCCaOne of the largest building projects in the Arab countries, the new Clock Tower at Mecca has been under construction for 18 months.It is the central building of the unique complex that forms the holiest of all Muslim sites. When finished, the 76-floor tower will be one of the largest in the world, built at a cost of USD 1.6 billion.The first shipment of Knauf building materials for this project 80,000 square meters of gyp-sum fiber boards were sent to the site in 2009. With a strong presence in countries across the Arab world, Knauf is ideally situated to add value to this prestigious project, offering innovative building solutions through the technical competence, logistics and consulting services and high-quality system technology of individual Knauf partners.
SAUdI ArAbIA
54
55
INdIAA PORTFOLIO OF OUR PAST & PRESENT PROJECTS
56
rItZ Carlton mumBaI, IndIaregion: Indiasystems used: Knauf ENBS & ASTM Partition, Ceilings & Shaft wall systems with 3 layers of PRO – HD + Knauf Aquapanel Interior Solutionsmain Contractor: SamsungYear of Completion : On-going , Expected completion 2018
oBeroI esQuIreregion: India
systems used: Knauf EN- BS Partition & Ceiling Systems
main Contractor: Oberoi RealtyYear Completion: on-going
INdIA
57
BosCh headQuarters – BanGalore IndIaregion: Indiamain Contractor: Boschsystem used: Knauf EN- BS Partition & Ceiling SystemsCompletion: On going , expected completion 2016
shIVandra ashram - uttarkashI
knauf systems used: Knauf EN-BS Partition systems + Knauf Aquapanel Exterior Solutions
Year: 2013
58
59
Website : www.knauf.ae | E-Mail : [email protected]
Knauf LLC,PO BOX 112871
Dubai, UAETel: +971 4 337 7170Fax: +971 4 334 9659
Knauf RAK PlantPO BOX 50006
Ras Al Khaimah, UAETel: +971 7 221 5300Fax: +971 7 221 5301
Knauf Qatar,PO BOX 27111
Doha, State of QatarTel: +974 4452 8191Fax: +974 4452 8181