Financial StatementsFor the Period
September 1, 2012 ‐ November 30, 2012
For the Meeting of the Board of Trustees ‐ December 13, 2012
for
Houston Community College System&
Houston Community College Public Facility Corporation
Memorandum Management Discussion & Analysis
Summary HCCS Unrestricted Revenue & Expenditures 1
Adjusted Budgets by Division 2
Actual YTD by College 2
Cash Flow Analysis 3
Contact Hours Reimbursement 8
Enrollment Data 9Charts Revenue & Expenditure YTD thru November 30, 2012 10
Revenue and Expenditures with Trendlines 11
Revenue Source Comparison By Year 12
Expenditure Source Comparison By Year 13
Fund Balances Balance Sheet By Fund 14
Designated Funds Budget Summary / Cash Position 15
Capital Projects & Unexpended Plant Fund Projects 16
Unexpended 2004 CIP Projects 17
Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 25
Maintenance Tax Notes/Sr. Lien Bonds 2008 26
Maintenance Tax Notes 2010 28
Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 29
Auxiliary Sources and Uses of Auxiliary Funds 30
Restricted Funds Grants, Contracts and Student Aid 32
Position Control 2013 Positions 38
Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 42
Duplicated Headcount Monthly Comparison 51
Unduplicated Headcount Monthly Comparison 52
Statement of Net Assets PFC 1
Statement of Cash Flows (Cash Basis‐ Interim Period) PFC 2
Public Safety Institute PFC 3
Westgate PFC 4
Hayes Road ‐ Alief Project PFC 5
Northline Mall Project PFC 6
Houston Community College ‐ Public Facility Corporation
Table of ContentsFor the Period September 1, 2012 ‐ November 30, 2012
For the Meeting of the Board of Trustees
Houston Community College System
MEMORANDUM
To: Houston Community College System Board of Trustees
Via: Dr. Mary Spangler, Chancellor
From: Dr. Art Tyler, Deputy Chancellor Chief Operating Officer
Date: December 13, 2012
Re: Financial Report for Month Ended November 30, 2012
Enclosed please find the preliminary financial reports for the month ending November 30, 2012 for your review. The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.
Operating Fund net revenue through November 30, 2012 is $88,643,166 which is 2% below last year. Expenditures year‐to‐date total $69,560,880 which is 9.2% less than the same time last year, for a net of $19,082,286.
The reserves for the month of November 2012 are $62,432,001 or 21.3% of revenues (see page IV). Thus, we continue to project a healthy fiscal strength for the college.
Managements Discussion and Analysis
Thru November 30, 2012
Revenues
Expenditures
Utilities costs totaled $1,752,050 year‐to‐date. We will continue to monitor these costs. Total utilities cost at
fiscal year end is projected to $12,889,610.
Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one,
behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:
State Appropriations received year to date totaled $24,385,875, 0.4% below last year. Total appropriations
received are expected to be $70,014,007. This amount was reduced by $218,031 due to a formula reallocation
to align with the Legislative Budget Board data and methodology.
Ad Valorem Tax collections totaled $1,705,447 year‐to‐date. The year‐to‐date total is 20.4% below last year. We
project total tax revenue for the fiscal year will be $102,195,871.
Tuition and Fees net revenue year to date totaled $59,727,623 which is 2.2% lower than the same time last year.
Current enrollment numbers for Fall 2012 are trending downward at 5%. We are projecting tuition and fees
revenue to be $112,296,647.
i
Insurance/Risk Management payments totaled $6,518,690 year‐to‐date, 5.9% above last year. The increase is
due to an increase in insurance premiums. Total expenses for the year are expected to be within budget at
$6,871,709.
Tuition & Fee‐Extended Learning receipts totaled $2,224,042 year to date, 0.9% above last year. Total tuition
and fees‐Extended Learning at fiscal year end are expected to be $6,188,581.
Marketing and Advertising expense totaled $383,941 year‐to‐date, a 19% increase compared to last year.
Marketing expenses are projected to be $1,293,090 at fiscal year end.
Rental and Leases expenses totaled $677,870 year‐to‐date, which is 64.4% below the previous year. The
decrease is due to the completion of IT projects. Total expenses at year end are projected to be $3,809,230.
Total revenue collections, net of exemptions and waivers, totaled $88,643,166 year‐to‐date. This is a 2% decrease below last year.
Total Salaries are $43,431,053 year‐to‐date, 0.2% above the previous year. Total salaries at year end are
expected to be $162,610,402.
Benefits costs totaled $4,413,949 year‐to‐date, 21.5% above last year. This increase is due namely to the
reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total
benefits at fiscal year end are expected to be $18,209,301.
Contract Services expense totaled $3,638,877 year‐to‐date. Fiscal year end expenses are projected to be
$23,442,119.
Managements Discussion and Analysis
Thru November 30, 2012
Budget Priorities funding allocated for the year are detailed below through November 30, 2012.
Contingency/Budget Priorities
Capital Outlay & Equipment
Position Management
Other
Total Contingency/Budget Priorities
Grants
Unexpended Plant Fund
Public Facility Corporation
Budget expenditures for grant‐funded projects so far this year total $3,581,529.
Budgeted
1,445,240 553,014 892,226
11,372,376$ 5,503,708$ 5,868,668$
Expensed Remaining
6,127,136$ 292,725$
The college has received $824,000 in new grant awards since the beginning of the current fiscal year.
5,834,411$
3,800,000 4,657,969 (857,969)
Instructional and Other Materials expenses totaled $1,541,859 year‐to‐date, which is 17% below last year.
Expenses in this area are projected to be $11,138,916.
Transfers/Debt activities totaled $5,083,281 year‐to‐date. Items in this expense category include all student
revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended Plant Fund.
Total expenses are expected to be $33,699,339.
Total operating fund expenditures year‐to‐date total $69,560,880, a 9.2% decrease below last year.
The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate),
Alief and Northline Mall deferred maintenance, new construction and renovation projects. Expenditures year‐to‐
date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details.
ii
Total grant awards (federal, state & private) year‐to‐date total, $43,903,720.
Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was
discontinued in FY 2009. All deferred maintenance expense is captured in the operating account. See page 15
for prior year encumbrances.
Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition
projects for a budget of $46,198,878. Funds for these projects are 100% committed. See page 16 for more
details.
The 2004 CIP budgets are $263,779,995 and are 99.99% committed. The spending categories in the schedule
have now been revised for more ease of reference to the Board approved budget. Please see page 17 for the
summary and pages 19 through 23 for details.
The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant. Commitments year‐to‐
date total $12.5 million, 99.87% of budget. See page 25 for the details.
Managements Discussion and Analysis
Thru November 30, 2012
Balance Sheet – Operating Fund
Cash and Investments
Cash
Investments
Total
Fund Balance
Audited Fund Balance, August 31, 2012
Projected Revenue @ 08/31/2013
Total Projected Revenue
Projected Expenses @ 08/31/2013
FY 2012 Purchase Order Roll
Total Projected Expenses @ 08/31/2013
Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)
Required Reserve for FY 2013 (11% Projected Revenues)
Added Reserves
Additional Expenditures Funded From Reserves:
FY2012‐2013 Salary Increases
Total Expenses Paid From Reserves
Added Reserves
Required Reserve for FY 2013 (11% Projected Revenues)
Current Reserves
% of Total Operating Revenue
November 2012 November 2011
58,007,489$ 41,205,467$
293,647,476
360,312,031$
293,647,476$
2,395,994
11,006,205 ‐
69,013,694$ 41,205,467$
66,664,555$
30,130,779$
32,301,222$
62,432,001$
21.3%
Budget
296,043,470$
64,268,561$
32,301,222$
31,967,339$
Expense to Date Balance
The projected reserves at November 30, 2012 of $62,432,001 is an estimate at this time and represents 21.3% of
expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain
a fund balance of 9% ‐11% of general fund revenues as of August 31.
iii
(1,836,560) ‐ (1,836,560)
(1,836,560)$ ‐$ (1,836,560)
FY2011‐12 FY2012‐13
Tuition
Budget:AdjustedBudgetFY2012‐13 43,067,676$Exemptions&Waivers (3,770,729)AdjustedBudgetFY2012‐13,Net 39,296,947$
RevenuesReceived:Tuition 48,824,432 27,903,703 27,095,290
Waivers&Exemptions:DualCredit (5,170,736) (3,391,911) (2,766,119)Other (1,693,502) (875,997) (1,004,610)
TotalWaivers&Exemptions (6,864,238) (4,267,908) (3,770,729)TotalTuitionRevenue,Net 41,960,194$ 23,635,795$ 23,324,561$
Tuition‐ExtendedLearning
Budget:BudgetFY2012‐13 6,188,581$Exemptions&Waivers (597,708)BudgetFY2012‐13,Net 5,590,873$
RevenuesReceived:
Tuition 8,853,381 2,884,674 2,821,750Waivers&Exemptions:
Corrections (2,612,080) (681,444) (597,708)
TotalELTuitionRevenue,Net 6,241,301$ 2,203,230$ 2,224,042$
Exemptions&WaiversDeptofCorrections 2,612,080$ 681,444$ 597,708$DualCreditWaiver 5,170,736 3,391,911 2,766,119
Other:EmployeeFeeExemptions 84,810 41,387 36,691Firemen 42,521 23,866 14,333Hazelwood 906,036 450,441 599,026Deaf&Blind 309,603 174,103 171,501HighRankingHiSCHGrad 868 372 1,271ChildofDisabledVetETC 431 (1,687) 2,248NonresMilitaryPer&Dep 2,390 1,062 ‐NonresTeach/ResearchAsst 13,905 5,949 6,107NonresCompetitiveScholar ‐ ‐ 1,062SeniorCitizens 18,730 9,321 7,904ScholarshipDistribution 1,450 1,450 ‐ApprenticeshipWaivers (28) ‐ ‐SpecialFeesWaiverHFD 117 117 ‐AVISAWaiver(Non‐AlienWaiver) 1,110 1,110 ‐RefugeeWaiver (1,554) (1,110) (162)FosterChildren‐Resident 294,543 159,031 158,693FireAcademyWaiver 157 157 ‐UndocumentedStudents 2,171 1,814 ‐TXTomorrowWaiver 2,874 2,875 ‐PeaceOfficerExemption 13,368 5,739 5,936
TotalOtherExemptions 1,693,502 875,997 1,004,610GrandTotalExemptions&Waivers 9,476,318$ 4,949,352$ 4,368,437$
Note:AsofDecember31,2008,thefinancialstatementsreflectallexpensesincurredforExemptionsandWaiversasnetoftuitionandfeerevenue.PriortothisdateExemptions&Waiverswereshownasanexpenditureandrevenuewasshownasgrossrevenue.
iv
Exemptions&WaiversThruNovember30,2012
Year‐to‐DateActivitythru11/30/2012
Year‐to‐DateActivitythru11/30/2011
EndofYearActivityAccount
g
YTD Adjusted Budget
YTD Actuals Thru
November 30, 2012
YTD Actuals Thru
November 30, 2011
2012‐2013 Inc/(Dec)
vs. 2011‐2012
Actuals %
Inc/(Dec)YTD vs.
PriorYTD
Projected Actuals
2012‐2013
Projected 2012‐2013
Inc/(Dec) vs. Adj
Budget
Projected 2012‐
2013 Inc/(Dec) vs.
Adj Budget %
REVENUES
State Appropriations 70,232,038$ 24,385,875$ 24,494,718$ (108,843)$ ‐0.44% 70,014,007$ (218,031)$ ‐0.31%Ad Valorem Taxes 102,195,871 1,705,447 2,141,068 (435,622) ‐20.35% 102,195,871 ‐ 0.00%Tuition, Net 43,067,676 23,324,561 23,635,795 (311,235) ‐1.32% 42,206,322 (861,354) ‐2.00%Fees 71,520,739 36,403,062 37,444,157 (1,041,094) ‐2.78% 70,090,324 (1,430,415) ‐2.00%Other Local Income* 2,952,370 475,566 397,580 77,986 19.62% 2,952,370 ‐ 0.00%Tuition & Fee, Net
‐‐ Extended Learning6,188,581 2,224,042 2,203,230 20,813 0.94% 6,188,581 ‐ 0.00%
Grant Revenue ‐ 124,614 114,967 9,646 8.39% ‐ ‐
Total Revenues 296,157,275 88,643,166 90,431,515 (1,788,349) ‐1.98% 293,647,476$ (2,509,799)$ ‐0.85%
EXPENSES
Faculty‐FT 53,213,154 15,169,237 14,891,634 277,603 1.86% 53,213,154 ‐ 0.00%
Faculty‐PT 30,488,118 9,160,846 9,185,397 (24,551) ‐0.27% 30,488,118 ‐ 0.00%
Librarian/Counselor‐FT 4,774,339 1,307,082 1,702,716 (395,634) ‐23.24% 4,774,339 ‐ 0.00%
Librarian/Counselor‐PT 830,449 184,742 148,706 36,036 24.23% 830,449 ‐ 0.00%
Staff‐FT 64,567,959 15,711,768 15,413,392 298,376 1.94% 64,567,959 ‐ 0.00%Staff‐PT 9,927,708 1,897,378 2,000,841 (103,463) ‐5.17% 8,736,383 (1,191,325) ‐12.00%
Sub‐total Salaries 163,801,727 43,431,053 43,342,686 88,366 0.20% 162,610,402 (1,191,325) ‐0.73%
Employee Benefits 18,209,301 4,413,949 3,631,687 782,262 21.54% 18,209,301 ‐ 0.00%
Supplies Gen Exp 5,637,841 1,180,097 1,015,787 164,310 16.18% 5,355,949 (281,892) ‐5.00%
Travel 949,968 157,433 125,501 31,931 25.44% 949,968 ‐ 0.00%
Marketing Costs 1,487,317 383,941 322,477 61,464 19.06% 1,293,090 (194,227) ‐13.06%
Rental & Leases 3,809,230 677,870 1,901,760 (1,223,890) ‐64.36% 3,809,230 ‐ 0.00%
Insurance/Risk Mgmt 6,871,709 6,518,690 6,153,931 364,759 5.93% 6,871,709 ‐ 0.00%
Contract Services 23,442,119 3,638,877 2,716,689 922,188 33.95% 23,442,119 ‐ 0.00%
Utilities 12,889,610 1,752,050 1,555,594 196,456 12.63% 12,889,610 ‐ 0.00%
Other Departmental Expenses 1,806,443 567,458 461,099 106,359 23.07% 1,394,185 (412,258) ‐22.82%
Instructional & Other Materials 11,138,916 1,541,859 1,857,470 (315,610) ‐16.99% 11,138,916 ‐ 0.00%
Maintenance & Repair 1,211,543 99,337 108,466 (9,129) ‐8.42% 1,211,543 ‐ 0.00%
Transfers/Debt 33,699,339 5,083,281 13,193,307 (8,110,026) ‐61.47% 33,699,339 ‐ 0.00%
Contingency 2,600,275 ‐ ‐ ‐ 0.00% 2,600,275 ‐ 0.00%Capital Outlay 8,601,937 114,986 246,856 (131,870) ‐53.42% 8,171,840 (430,097) ‐5.00%
Total Expenses 296,157,275 69,560,880 76,633,310 (7,072,430) ‐9.23% 293,647,476 (2,509,799) ‐0.85%
REVENUES H/(L) Vs EXPENSES 0 19,082,286 13,798,205 5,284,081 (0) (0)
* Includes interest & dividends income, fines & penalties and parking fines
1
HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures HCCS CURRENT UNRESTRICTED
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Adjusted
Budget
EXPENSES
Faculty‐FT 10,224,328 10,092,399 7,284,350 11,995,950 4,907,675 5,979,387 2,378,018 ‐ ‐ ‐ 215,922 135,125 ‐ ‐ 53,213,154 17.97%
Faculty‐PT 4,753,315 6,327,932 4,066,211 5,823,205 3,779,081 1,790,194 3,617,035 ‐ ‐ ‐ 330,386 759 ‐ ‐ 30,488,118 10.29%
Librarian/Counselor‐FT 1,054,830 1,115,400 880,441 730,819 514,757 53,730 2,887 ‐ ‐ ‐ 340,010 ‐ 81,465 ‐ 4,774,339 1.61%
Librarian/Counselor‐PT 87,030 194,185 119,380 183,845 82,452 33,248 ‐ ‐ ‐ ‐ 19,773 ‐ 110,536 ‐ 830,449 0.28%
Staff‐FT 5,457,530 4,399,974 4,775,393 5,687,552 3,834,196 2,401,250 3,655,814 3,635,005 15,361,448 102,108 3,423,693 7,534,496 4,299,500 ‐ 64,567,959 21.80%
Staff‐PT 1,984,961 1,642,718 742,949 1,490,920 1,225,172 441,322 623,862 263,028 573,372 ‐ 272,930 235,344 431,130 ‐ 9,927,708 3.35%
Sub‐total Salaries 23,561,994 23,772,608 17,868,724 25,912,291 14,343,333 10,699,131 10,277,616 3,898,033 15,934,820 102,108 4,602,714 7,905,724 4,922,631 ‐ 163,801,727 55.31%
Employee Benefits ‐ ‐ ‐ 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 18,209,297 18,209,301 6.15%
Supplies Gen Exp 250,392 384,315 199,061 235,406 207,437 336,750 199,396 310,446 1,322,313 ‐ 151,064 254,809 (13,548) 1,800,000 5,637,841 1.90%
Travel 103,210 88,882 34,545 64,006 56,181 87,417 77,555 125,009 120,510 ‐ 56,671 103,281 32,701 ‐ 949,968 0.32%
Marketing Costs 49,979 46,349 109,159 36,266 89,207 38,323 191,180 81,220 843,634 ‐ ‐ 2,000 ‐ ‐ 1,487,317 0.50%
Rental & Leases 34,418 121,260 1,316,150 631,380 41,484 508,719 38,680 24,980 224,371 ‐ ‐ 858,067 9,721 ‐ 3,809,230 1.29%
Insurance/Risk Mgmt 794 ‐ ‐ 154 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 676 ‐ 6,870,085 6,871,709 2.32%
Contract Services 321,129 298,506 69,710 49,485 163,144 345,973 65,574 420,093 13,174,586 ‐ 132,335 2,411,598 31,883 5,958,103 23,442,119 7.92%
Utilities 5,025 ‐ 4,600 ‐ ‐ ‐ ‐ ‐ 1,575,778 ‐ ‐ 1,400,000 ‐ 9,904,207 12,889,610 4.35%
Other Departmental Expenses 80,355 45,343 36,783 43,845 137,872 115,724 53,544 300,603 186,578 ‐ 136,159 253,373 138,291 277,973 1,806,443 0.61%
Instructional & Other Materials 449,461 293,885 141,398 283,330 67,815 364,475 1,346,475 36,261 132,117 ‐ 1,061,676 6,682,931 279,092 ‐ 11,138,916 3.76%
Maintenance & Repair 116,709 28,627 47,999 33,463 15,772 84,713 158,650 1,265 704,068 ‐ 8,472 8,870 416 2,519 1,211,543 0.41%
Transfers/Debt ‐ 845,619 5,636,142 1,155,001 ‐ ‐ ‐ ‐ 3,264 ‐ ‐ ‐ ‐ 26,059,313 33,699,339 11.38%
Contingency 50,000 25,768 47,410 49,044 40,000 50,000 ‐ 83,000 125,000 ‐ 50,000 50,000 38,697 1,991,356 2,600,275 0.88%
Capital Outlay 578,077 323,139 286,843 111,859 282,606 559,924 30,859 61,150 1,480,548 ‐ 1,089 756,834 1,873 4,127,136 8,601,937 2.90%
Total Budget 25,601,543 26,274,301 25,798,524 28,605,534 15,444,851 13,191,149 12,439,529 5,342,060 35,827,587 102,108 6,200,180 20,688,163 5,441,757 75,199,989 296,157,275 100.00%
CENTRAL
NORTH
WEST
NORTH
EAST
SOUTH
WEST SOUTH EAST COLEMAN
EXTENDED
LEARNING
CHAN‐
CELLOR
DEPUTY CHAN‐
CELLOR
INSTITU‐
TIONAL
EFFECTIVE‐
NESS
INSTRUC‐
TION
INFO
TECH
STUDENT
SUCCESS SYSTEM HCCS
% of
Actuals
EXPENSES
Faculty‐FT 2,974,481 2,898,204 2,078,454 3,455,334 1,406,914 1,656,709 659,299 ‐ ‐ ‐ 15,509 24,333 ‐ ‐ 15,169,237 21.81%
Faculty‐PT 1,513,022 1,938,657 1,224,182 1,843,027 1,169,053 462,923 927,400 ‐ ‐ ‐ 82,581 ‐ ‐ ‐ 9,160,846 13.17%
Librarian/Counselor‐FT 274,331 292,886 246,747 195,234 167,136 13,414 2,886 ‐ ‐ ‐ 92,411 ‐ 22,037 ‐ 1,307,082 1.88%
Librarian/Counselor‐PT 17,885 43,240 35,205 49,096 16,042 8,066 ‐ ‐ ‐ ‐ ‐ ‐ 15,207 ‐ 184,742 0.27%
Staff‐FT 1,334,507 1,044,704 1,150,593 1,363,646 901,624 588,690 903,123 914,974 3,807,707 25,527 842,414 1,804,834 1,029,426 ‐ 15,711,768 22.59%
Staff‐PT 338,655 345,322 178,692 323,564 231,767 72,553 157,711 34,813 92,984 ‐ 28,024 32,253 61,038 ‐ 1,897,378 2.73%
Sub‐total Salaries 6,452,882 6,563,013 4,913,872 7,229,901 3,892,537 2,802,356 2,650,419 949,787 3,900,692 25,527 1,060,938 1,861,420 1,127,709 ‐ 43,431,053 62.44%
Employee Benefits ‐ ‐ ‐ 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4,413,946 4,413,949 6.35%
Supplies Gen Exp 36,113 46,488 44,314 55,979 42,820 50,313 58,602 77,070 256,333 ‐ 45,303 20,293 30,529 415,938 1,180,097 1.70%
Travel 4,888 16,597 4,216 8,224 3,224 17,475 25,307 23,576 17,156 ‐ 17,623 9,814 9,333 ‐ 157,433 0.23%
Marketing Costs 1,098 12,432 ‐ 15,627 11,175 1,346 51,740 62,986 227,536 ‐ ‐ ‐ ‐ ‐ 383,941 0.55%
Rental & Leases 30,060 17,856 345,241 72,112 8,370 124,555 3,654 3,948 64,115 ‐ ‐ 5,543 2,415 ‐ 677,870 0.97%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,518,690 6,518,690 9.37%
Contract Services 15,053 19,027 9,378 10,105 19,551 238,613 17,013 40,496 1,680,943 ‐ 7,689 156,499 29,076 1,395,435 3,638,877 5.23%
Utilities 1,168 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 137,873 ‐ ‐ 376,736 ‐ 1,236,273 1,752,050 2.52%
Other Departmental Expenses 7,858 4,059 5,287 9,329 3,058 19,022 19,046 151,252 17,219 ‐ 21,893 18,885 16,178 274,370 567,458 0.82%
Instructional & Other Materials 91,712 23,651 16,752 22,836 7,624 33,775 111,823 ‐ 6,926 ‐ 238,846 950,413 37,502 ‐ 1,541,859 2.22%
Maintenance & Repair 13,044 1,870 3,091 700 1,774 1,256 18,410 238 53,479 ‐ 4,853 622 ‐ ‐ 99,337 0.14%
Transfers/Debt ‐ 221,329 1,651,966 664,709 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,545,277 5,083,281 7.31%
Contingency ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0.00%
Capital Outlay 12,637 15,962 9,215 20,886 5,429 ‐ ‐ ‐ 10,000 ‐ ‐ 40,857 ‐ ‐ 114,986 0.17%
Total Expense 6,666,513 6,942,284 7,003,331 8,110,412 3,995,563 3,288,710 2,956,015 1,309,354 6,372,273 25,527 1,397,146 3,441,082 1,252,742 16,799,929 69,560,880 100.00%% of Adjusted
Budget by Division 26.04% 26.42% 27.15% 28.35% 25.87% 24.93% 23.76% 24.51% 17.79% 25.00% 22.53% 16.63% 23.02% 22.34% 23.49% 100.00%
Remaining Balance 18,935,030 19,332,017 18,795,193 20,495,122 11,449,288 9,902,439 9,483,514 4,032,706 29,455,314 76,581 4,803,034 17,247,081 4,189,015 58,400,060 226,596,395
HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures
YTD Adjusted Budget by Division
YTD Actuals by Division
2
Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug.
Central FY2013 8.77% 17.29% 26.04%
FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%
Northwest FY2013 8.26% 17.69% 26.42%
FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%
Northeast FY2013 6.80% 19.95% 27.15%
FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%
Southwest FY2013 8.59% 19.46% 28.35%
FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%
Southeast FY2013 7.94% 16.74% 25.87%
FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%
Coleman FY2013 8.06% 17.28% 24.93%
FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%
Extended Learning FY2013 7.79% 15.60% 23.76%
3 FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%
Chancellor FY2013 7.14% 13.81% 24.51%
FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%
Deputy Chancellor FY2013 4.52% 10.80% 17.79%
FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%
Institute Effectiveness FY2013 8.33% 16.67% 25.00%
FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%
Instruction FY2013 6.55% 15.59% 22.53%
FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%
Info Tech FY2013 5.56% 12.11% 16.63%
FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%
Student Success FY2013 7.33% 14.68% 23.02%
FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%
System FY2013 12.41% 18.87% 22.34%
FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%
Total HCCS FY2013 8.55% 16.77% 23.49%
FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%
Houston Community College
Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 11,318,430 3,312,980 29.27% 10,224,328 2,974,481 29.09%
Faculty‐PT 3,773,770 1,194,508 31.65% 4,753,315 1,513,022 31.83%
Librarian/Counselor‐FT 1,048,871 287,942 27.45% 1,054,830 274,331 26.01%
Librarian/Counselor‐PT 124,493 14,401 11.57% 87,030 17,885 20.55%
Staff‐FT 5,320,421 1,325,800 24.92% 5,457,530 1,334,507 24.45%
Staff‐PT 1,783,972 390,870 21.91% 1,984,961 338,655 17.06%
Sub‐total Salaries 23,369,957 6,526,500 27.93% 23,561,994 6,452,882 27.39%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 220,648 39,977 18.12% 250,392 36,113 14.42%
Travel 100,311 3,263 3.25% 103,210 4,888 4.74%
Marketing Costs 56,879 18,391 32.33% 49,979 1,098 2.20%
Rental & Leases 84,498 26,000 30.77% 34,418 30,060 87.34%
Insurance/Risk Mgmt 794 ‐ 0.00% 794 ‐ 0.00%
Contract Services 330,483 24,685 7.47% 321,129 15,053 4.69%
Utilities ‐ ‐ ‐ 5,025 1,168 0.00%
Other Departmental Expenses 62,728 5,236 8.35% 80,355 7,858 9.78%
Instructional & Other Materials 456,040 84,265 18.48% 449,461 91,712 20.40%
Maintenance & Repair 86,838 9,673 11.14% 116,709 13,044 11.18%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 47,504 ‐ 0.00% 50,000 ‐ ‐
Capital Outlay 118,876 2,524 2.12% 578,077 12,637 2.19%
Total Expenses 24,935,556 6,740,514 27.03% 25,601,543 6,666,513 26.04%
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 10,095,800 2,917,775 28.90% 10,092,399 2,898,204 28.72%
Faculty‐PT 4,194,862 1,354,863 32.30% 6,327,932 1,938,657 30.64%
Librarian/Counselor‐FT 979,988 240,481 24.54% 1,115,400 292,886 26.26%
Librarian/Counselor‐PT 133,561 31,405 23.51% 194,185 43,240 22.27%
Staff‐FT 3,715,862 871,928 23.47% 4,399,974 1,044,704 23.74%
Staff‐PT 1,168,139 283,125 24.24% 1,642,718 345,322 21.02%
Sub‐total Salaries 20,288,212 5,699,577 28.09% 23,772,608 6,563,013 27.61%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 257,745 17,718 6.87% 384,315 46,488 12.10%
Travel 77,267 14,438 18.69% 88,882 16,597 18.67%
Marketing Costs 41,176 13,235 32.14% 46,349 12,432 26.82%
Rental & Leases 73,501 12,685 17.26% 121,260 17,856 14.73%
Insurance/Risk Mgmt ‐ ‐ 0.00% ‐ ‐ 0.00%
Contract Services 287,300 61,806 21.51% 298,506 19,027 6.37%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 34,882 10,357 29.69% 45,343 4,059 8.95%
Instructional & Other Materials 194,343 23,897 12.30% 293,885 23,651 8.05%
Maintenance & Repair 24,520 765 3.12% 28,627 1,870 6.53%
Transfers/Debt 875,943 242,943 27.74% 845,619 221,329 ‐
Contingency 29,677 ‐ 0.00% 25,768 ‐ ‐
Capital Outlay 92,998 4,306 4.63% 323,139 15,962 4.94%
Total Expenses 22,277,564 6,101,727 27.39% 26,274,301 6,942,284 26.42%
Central College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Northwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
4
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 7,922,908 2,285,769 28.85% 7,284,350 2,078,454 28.53%
Faculty‐PT 2,906,276 1,020,738 35.12% 4,066,211 1,224,182 30.11%
Librarian/Counselor‐FT 1,100,054 282,126 25.65% 880,441 246,747 28.03%
Librarian/Counselor‐PT 115,648 24,507 21.19% 119,380 35,205 29.49%
Staff‐FT 4,552,312 1,136,163 24.96% 4,775,393 1,150,593 24.09%
Staff‐PT 693,595 174,929 25.22% 742,949 178,692 24.05%
Sub‐total Salaries 17,290,793 4,924,231 28.48% 17,868,724 4,913,872 27.50%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 321,937 47,518 14.76% 199,061 44,314 22.26%
Travel 31,665 4,899 15.47% 34,545 4,216 12.20%
Marketing Costs 46,417 1,933 4.16% 109,159 ‐ 0.00%
Rental & Leases 1,260,216 221,547 17.58% 1,316,150 345,241 26.23%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 49,560 2,135 4.31% 69,710 9,378 13.45%
Utilities 4,600 950 20.65% 4,600 ‐ 0.00%
Other Departmental Expenses 46,840 6,969 14.88% 36,783 5,287 14.37%
Instructional & Other Materials 153,006 13,374 8.74% 141,398 16,752 11.85%
Maintenance & Repair 27,847 5,384 19.33% 47,999 3,091 6.44%
Transfers/Debt 5,640,942 1,697,155 30.09% 5,636,142 1,651,966 ‐
Contingency 41,706 ‐ 0.00% 47,410 ‐ ‐
Capital Outlay 48,101 76 0.16% 286,843 9,215 3.21%
Total Expenses 24,963,630 6,926,171 27.75% 25,798,524 7,003,331 27.15%
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 13,857,500 4,000,646 28.87% 11,995,950 3,455,334 28.80%
Faculty‐PT 5,610,993 1,826,414 32.55% 5,823,205 1,843,027 31.65%
Librarian/Counselor‐FT 1,484,458 491,617 33.12% 730,819 195,234 26.71%
Librarian/Counselor‐PT 282,472 49,168 17.41% 183,845 49,096 26.71%
Staff‐FT 5,498,683 1,433,108 26.06% 5,687,552 1,363,646 23.98%
Staff‐PT 1,664,426 434,307 26.09% 1,490,920 323,564 21.70%
Sub‐total Salaries 28,398,531 8,235,260 29.00% 25,912,291 7,229,901 27.90%
Employee Benefits ‐ ‐ ‐ 4 3 ‐
Supplies Gen Exp 253,668 41,130 16.21% 235,406 55,979 23.78%
Travel 65,224 8,959 13.74% 64,006 8,224 12.85%
Marketing Costs 37,367 9,726 26.03% 36,266 15,627 43.09%
Rental & Leases 855,864 109,722 12.82% 631,380 72,112 11.42%
Insurance/Risk Mgmt 113 ‐ ‐ 154 ‐ 0.00%
Contract Services 42,150 15,841 37.58% 49,485 10,105 20.42%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 42,868 13,732 32.03% 43,845 9,329 21.28%
Instructional & Other Materials 238,615 38,424 16.10% 283,330 22,836 8.06%
Maintenance & Repair 21,054 4,202 19.96% 33,463 700 2.09%
Transfers/Debt 2,492,129 687,010 27.57% 1,155,001 664,709 57.55%
Contingency 44,734 ‐ 0.00% 49,044 ‐ 0.00%
Capital Outlay 106,254 731 0.69% 111,859 20,886 18.67%
Total Expenses 32,598,571 9,164,735 28.11% 28,605,534 8,110,412 28.35%
5
Northeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Southwest College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 5,655,140 1,618,482 28.62% 4,907,675 1,406,914 28.67%
Faculty‐PT 2,658,054 887,711 33.40% 3,779,081 1,169,053 30.93%
Librarian/Counselor‐FT 694,643 180,201 25.94% 514,757 167,136 32.47%
Librarian/Counselor‐PT 79,814 12,340 15.46% 82,452 16,042 19.46%
Staff‐FT 3,356,007 826,555 24.63% 3,834,196 901,624 23.52%
Staff‐PT 990,093 240,176 24.26% 1,225,172 231,767 18.92%
Sub‐total Salaries 13,433,752 3,765,464 28.03% 14,343,333 3,892,537 27.14%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 191,529 51,922 27.11% 207,437 42,820 20.64%
Travel 48,763 7,054 14.47% 56,181 3,224 5.74%
Marketing Costs 115,335 11,302 9.80% 89,207 11,175 12.53%
Rental & Leases 177,160 48,585 27.42% 41,484 8,370 20.18%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 134,489 60,264 44.81% 163,144 19,551 11.98%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 175,608 3,579 2.04% 137,872 3,058 2.22%
Instructional & Other Materials 61,008 10,420 17.08% 67,815 7,624 11.24%
Maintenance & Repair 15,172 810 5.34% 15,772 1,774 11.25%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 32,436 ‐ 0.00% 40,000 ‐ 0.00%
Capital Outlay 82,501 28,289 34.29% 282,606 5,429 1.92%
Total Expenses 14,467,753 3,987,690 27.56% 15,444,851 3,995,563 25.87%
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 6,678,924 1,790,567 26.81% 5,979,387 1,656,709 27.71%
Faculty‐PT 1,222,995 312,450 25.55% 1,790,194 462,923 25.86%
Librarian/Counselor‐FT 186,866 46,782 25.04% 53,730 13,414 24.96%
Librarian/Counselor‐PT 29,835 8,036 26.94% 33,248 8,066 24.26%
Staff‐FT 2,356,886 585,218 24.83% 2,401,250 588,690 24.52%
Staff‐PT 361,263 79,691 22.06% 441,322 72,553 16.44%
Sub‐total Salaries 10,836,769 2,822,745 26.05% 10,699,131 2,802,356 26.19%
Employee Benefits ‐ ‐ ‐ ‐ ‐ ‐
Supplies Gen Exp 326,341 35,860 10.99% 336,750 50,313 14.94%
Travel 78,252 12,149 15.53% 87,417 17,475 19.99%
Marketing Costs 43,823 ‐ 0.00% 38,323 1,346 3.51%
Rental & Leases 490,461 109,387 22.30% 508,719 124,555 24.48%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ ‐
Contract Services 324,209 156,675 48.33% 345,973 238,613 68.97%
Utilities ‐ ‐ ‐ ‐ ‐ 0.00%
Other Departmental Expenses 63,843 10,575 16.56% 115,724 19,022 16.44%
Instructional & Other Materials 352,296 34,908 9.91% 364,475 33,775 9.27%
Maintenance & Repair 61,334 3,341 5.45% 84,713 1,256 1.48%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency 50,001 ‐ 0.00% 50,000 ‐ 0.00%
Capital Outlay 25,000 ‐ 0.00% 559,924 ‐ 0.00%
Total Expenses 12,652,329 3,185,641 25.18% 13,191,149 3,288,710 24.93%
Southeast College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
Coleman College
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
6
Adjusted Budget
FY2012
YTD Actuals Thru
November 30, 2011 % of Budget Used
Adjusted Budget
FY2013
YTD Actuals Thru
November 30, 2012 % of Budget Used
EXPENSES
Faculty‐FT 2,379,308 652,585 27.43% 2,378,018 659,299 27.72%
Faculty‐PT 3,216,621 813,399 25.29% 3,617,035 927,400 25.64%
Librarian/Counselor‐FT 67,910 16,977 25.00% 2,887 2,886 99.97%
Librarian/Counselor‐PT ‐ ‐ 0.00% ‐ ‐ 0.00%
Staff‐FT 3,688,413 915,439 24.82% 3,655,814 903,123 24.70%
Staff‐PT 672,108 124,324 18.50% 623,862 157,711 25.28%
Sub‐total Salaries 10,024,360 2,522,726 25.17% 10,277,616 2,650,419 25.79%
Employee Benefits ‐ ‐ ‐ ‐ ‐ 0.00%
Supplies Gen Exp 198,614 25,448 12.81% 199,396 58,602 29.39%
Travel 68,930 11,956 17.35% 77,555 25,307 32.63%
Marketing Costs 206,496 89,081 43.14% 191,180 51,740 27.06%
Rental & Leases 49,990 5,062 10.13% 38,680 3,654 9.45%
Insurance/Risk Mgmt ‐ ‐ ‐ ‐ ‐ 0.00%
Contract Services 93,052 12,268 13.18% 65,574 17,013 25.94%
Utilities ‐ ‐ ‐ ‐ ‐ ‐
Other Departmental Expenses 54,193 14,682 27.09% 53,544 19,046 35.57%
Instructional & Other Materials 1,166,812 115,703 9.92% 1,346,475 111,823 8.30%
Maintenance & Repair 102,500 20,521 20.02% 158,650 18,410 11.60%
Transfers/Debt ‐ ‐ ‐ ‐ ‐ ‐
Contingency ‐ ‐ ‐ ‐ ‐ ‐
Capital Outlay 9,869 3,150 0.00% 30,859 ‐ 0.00%
Total Expenses 11,974,816 2,820,597 23.55% 12,439,529 2,956,015 23.76%
Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used
7
Division of Extended Learning
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256
Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072
Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940
Total Fundable Contact Hou 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268
Source: Certified CBM004 & CBM00C.
8
HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours
FY 2006-07 thru FY 2011-12
0
5000000
10000000
15000000
20000000
25000000
30000000
2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12
Continuing Education Technical Academic
+5.9%+15.1%
+10.7%+2.5%
‐2.6%
HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)
Fall Semester (Unduplicated Enrollment ‐ All Students)*
Spring Semester (Unduplicated Enrollment ‐ All Students)
Summer Semester (Unduplicated Enrollment ‐ All Students)
* As of November 07, 2012.
9
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70 80 90
Spr 12
Spr 11
Spr 10
Census Day
First Class Day
Spr 12 Enrollment:‐5.9% (Spr12 to 11)‐1.4% (Spr12 to 10)
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
-62
-52
-42
-32
-22
-12 -2 8 18 28 38 48 58 68
Sum 12
Sum 11
Sum 10
First Class Day
Census Day
Sum 12 Enrollment:‐0.0% (Sum12 to 11)‐4.1% (Sum12 to 10)
0
10000
20000
30000
40000
50000
60000
70000
80000-1
10
-100 -9
0
-80
-70
-60
-50
-40
-30
-20
-10 0 10 20 30 40 50 60 70
Fall 12
Fall 11
Fall 10Fall 12 Enrollment:
‐6.8% (Fall12 to 11)‐3.3% (Fall12 to 10)
First Class Day
Census Day
HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru November 30, 2012
2009 Positions
Revenues Expenditures Rev H/(L) Exp
YTD Actuals Thru November 30, 2012 88,643,166 69,560,880 19,082,286
YTD Actuals Thru November 30, 2011 90,431,515 76,633,310 13,798,205
(1,788,349) (7,072,430)
10
‐
10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
90,000,000
100,000,000
Revenues Expenditures
` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month
Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 58,227,650 9,431,856 25,352,097
2011‐2012 61,685,752 9,480,515 24,214,599 37,832,575 66,013,487 35,495,964 10,116,378 16,794,724 15,263,177 9,332,949 7,924,181 9,726,145
2009 Positions
Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 28,324,834 24,699,442 20,905,041
2011‐2012 37,698,782 23,302,047 20,581,833 17,164,427 19,407,583 18,185,253 18,965,252 39,130,360 18,696,899 18,586,628 21,489,075 18,505,226
11
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐ 5,000,000
10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru November 30, 2012 by Source
2009 Positions
State
Appropriations Ad Valorem Taxes Tuition, Net Fees
Other Local
Income* Extended Learning Grant Revenue Total Revenues
YTD Actuals Thru November 30, 2012 24,385,875 1,705,447 23,324,561 36,403,062 475,566 2,224,042 124,614 88,643,166
YTD Actuals Thru November 30, 2011 24,494,718 2,141,068 23,635,795 37,444,157 397,580 2,203,230 114,967 90,431,515
(108,843) (435,622) (311,235) (1,041,094) 77,986 20,813 9,646 (1,788,349)
12
‐
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
40,000,000
StateAppropriations
Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*
Extended Learning Grant Revenue
HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru November 30, 2012 by Source
2009 Positions
YTD Actuals Thru Faculty‐FT Faculty‐PT
Librarian/
Counselor‐FT
Librarian/
Counselor‐PT Staff‐FT Staff‐PT
Employee
Benefits
Supplies Gen
Exp Travel
Marketing
Costs
Rental &
Leases
Insurance/
Risk Mgmt
Contract
Services Utilities
Other
Departmental
Expenses
Instructional &
Other
Materials
Maintenance &
Repair
Transfers/
Debt Capital Outlay Total Expenses
November 30,
2012 15,169,237 9,160,846 1,307,082 184,742 15,711,768 1,897,378 4,413,949 1,180,097 157,433 383,941 677,870 6,518,690 3,638,877 1,752,050 567,458 1,541,859 99,337 5,083,281 114,986 69,560,880
November 30,
2011 14,891,634 9,185,397 1,702,716 148,706 15,413,392 2,000,841 3,631,687 1,015,787 125,501 322,477 1,901,760 6,153,931 2,716,689 1,555,594 461,099 1,857,470 108,466 13,193,307 246,856 76,633,310
277,603 (24,551) (395,634) 36,036 298,376 (103,463) 782,262 164,310 31,931 61,464 (1,223,890) 364,759 922,188 196,456 106,359 (315,610) (9,129) (8,110,026) (131,870) (7,072,430)
13
‐
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
8,000,000
9,000,000
10,000,000
11,000,000
12,000,000
13,000,000
14,000,000
15,000,000
16,000,000
17,000,000
18,000,000
19,000,000
20,000,000
21,000,000
22,000,000
23,000,000
24,000,000
25,000,000
26,000,000
27,000,000
28,000,000
29,000,000
30,000,000
Unrestricted Auxiliary Restricted Total
Unexpended
Plant Renewal
Retirement of
Debt
Investment in
Plant Total
Consolidation &
Elimination Total All Funds
ASSETSCurrent Assets:
Cash & cash equivalents 58,007,489$ 8,885,747$ ‐$ 66,893,236$ 2,997,045$ 11,063,608 ‐$ 14,060,653$ ‐$ 80,953,889$
Restricted cash & cash equivalents ‐ ‐ 13,371,683 13,371,683 130,884,839 681,235 ‐ 131,566,074 ‐ 144,937,757
Short term Investments ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Accounts/Other receivable (net) 25,057,757 2,689,739 4,511,695 32,259,191 70,798 794,378 ‐ 865,176 ‐ 33,124,367
Deferred charges ‐ 669,701 ‐ 669,701 ‐ ‐ ‐ ‐ ‐ 669,701
Prepaids 25,178 76,674 ‐ 101,852 1,762,224 ‐ ‐ 1,762,224 ‐ 1,864,076
Total Current Assets 83,090,424 12,321,861 17,883,378 113,295,663 135,714,906 12,539,221 ‐ 148,254,127 ‐ 261,549,790
Non‐current Assets:
Deferred charges, net ‐ ‐ ‐ ‐ 3,548,100 ‐ 2,601,880 6,149,980 ‐ 6,149,980
Restricted long‐term investments ‐ ‐ ‐ ‐ 2,883,896 2,686,693 ‐ 5,570,589 ‐ 5,570,589
Long‐term investments 11,006,205 ‐ ‐ 11,006,205 ‐ ‐ ‐ ‐ ‐ 11,006,205
Capital Assets, net ‐ ‐ ‐ ‐ 74,382,256 ‐ 653,043,159 727,425,415 ‐ 727,425,415
Total Non‐current Assets 11,006,205 ‐ ‐ 11,006,205 80,814,252 2,686,693 655,645,039 739,145,984 ‐ 750,152,189
Total Assets 94,096,629$ 12,321,861$ 17,883,378$ 124,301,868$ 216,529,158$ 15,225,914$ 655,645,039$ 887,400,111$ ‐$ 1,011,701,979$
LIABILITIESCurrent Liabilities:
Accounts payable 6,716,531 286,915 1,837,637 8,841,083 45,392 ‐ ‐ 45,392 ‐ 8,886,475
Accrued liabilities 396,487 6,503 31,449 434,439 142,635 558,933 ‐ 701,568 ‐ 1,136,007
Compensated absences 2,351,464 ‐ ‐ 2,351,464 ‐ ‐ ‐ ‐ ‐ 2,351,464
Funds held for others 6,826 107,889 516,871 631,586 189,209 ‐ ‐ 189,209 ‐ 820,795
Deferred revenue ‐ 297,461 1,754,900 2,052,361 1,474,662 ‐ (1,600,060) (125,398) ‐ 1,926,963
Notes payable‐current portion ‐ ‐ ‐ ‐ 4,655,000 ‐ 2,595,000 7,250,000 ‐ 7,250,000
Bonds payable‐current portion ‐ ‐ ‐ ‐ ‐ ‐ 14,175,000 14,175,000 ‐ 14,175,000
Capital lease obligations‐current ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Current Liabilities 9,471,308 698,768$ 4,140,857 14,310,933 6,506,898 558,933 15,169,940 22,235,771 ‐ 36,546,704
Non‐current Liabilities:
Deposits ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Notes payable ‐ ‐ ‐ ‐ 146,206,719 ‐ 31,405,318 177,612,037 ‐ 177,612,037
Bonds payable ‐ ‐ ‐ ‐ 62,554,009 1,279,420 269,438,431 333,271,860 ‐ 333,271,860
Capital lease obligations ‐ ‐ ‐ ‐ ‐ ‐ 108,309,832 108,309,832 ‐ 108,309,832
Total Non‐current Liabilities ‐ ‐ ‐ ‐ 208,760,728 1,279,420 409,153,581 619,193,729 ‐ 619,193,729
Total Liabilities 9,471,308$ 698,768$ 4,140,857$ 14,310,933$ 215,267,626$ 1,838,353$ 424,323,521$ 641,429,500$ ‐$ 655,740,430$
Fund Balance‐
August 31, 2012 Audited 66,664,555 11,747,296 9,080,325 87,492,176 3,738,684 10,061,216 235,429,798 249,229,698 ‐ 336,721,874
Revenues Over Expenditures
Unrestricted 17,960,766 (124,203) 17,836,563 17,836,563
Restricted 4,662,196 4,662,196 4,662,196
Net Investment in Plant (2,477,150) 3,326,345 (4,108,279) (3,259,084) (3,259,084)
Total Fund Balances 84,625,321$ 11,623,093$ 13,742,521$ 109,990,935$ 1,261,534$ 13,387,561$ 231,321,519$ 245,970,614$ ‐$ 355,961,549$
Total Liabilities & Fund Balances 94,096,629$ 12,321,861$ 17,883,378$ 124,301,868$ 216,529,158$ 15,225,914$ 655,645,040$ 887,400,114$ ‐$ 1,011,701,979$
14
PLANT & BOND FUNDS
Houston Community CollegeBalance Sheet By Fund
For Month Ended November 30, 2012
CURRENT & LOAN FUNDS
TOTAL
Unexpended Plant Funds
Total Unexpended Plant Fund Balances per Books (919,147)$
Spending/Encumbrances/Reserve for Future Use
‐ Encumbrances/PO Issued General Unexpended FY13 919,147
Total Plant Fund PO 919,147$
Anticipated Unexpended Plant Shortfall ‐$
HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP
Cash Position to November 30, 2012
15
Description of Use
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances To
Date Unexpended
DEFERRED MAINTENANCE FY05
System Administration 604,863$ 604,863$ ‐$ ‐$
Subtotal 604,863$ 604,863$ ‐$ ‐$
DEFERRED MAINTENANCE FY06
System Administration 649,625$ 649,624$ ‐$ ‐$
Northwest College 412,743 412,743 ‐ ‐
Coleman College 190,738 190,736 ‐ ‐
Subtotal 1,253,106$ 1,253,103$ ‐$ ‐$
DEFERRED MAINTENANCE FY07
System Administration 775,610$ 775,610$ ‐$ ‐$
Central College 373,917 373,917 ‐ ‐
Northwest College 599,383 599,383 ‐ ‐
Northeast College 1,059,733 1,059,733 ‐ ‐
Southwest College 74,607 74,607 ‐ ‐
Southeast College 38,742 38,742 ‐ ‐
Coleman College 9,900 9,900 ‐ ‐
Subtotal 2,931,893$ 2,931,892$ ‐$ ‐$
DEFERRED MAINTENANCE FY08
System Administration 10,195$ 10,195$ ‐$ ‐$
Central College 478,637 478,637 ‐ ‐
Northwest College 1,217,755 1,217,755 ‐ ‐
Northeast College 494,886 494,886 ‐ ‐
Southwest College 42,063 42,063 ‐ ‐
Coleman College 73,813 73,813 ‐ ‐
Subtotal 2,317,348$ 2,317,349$ ‐$ ‐$
OTHER GENERAL PROJECTS
Minor Construction 657,807$ 657,807$ ‐$ ‐$
System 11,555,483 10,992,789 562,694 ‐
Central College 3,112,723 2,906,526 206,197 ‐
Northwest College 4,060,039 4,044,540 15,499 ‐
Northeast College 626,331 619,524 6,807 ‐
Southwest College 1,118,747 1,000,997 117,750 ‐
Southeast College 1,995,204 1,987,854 7,350 ‐
Coleman College 1,341,159 1,341,159 ‐
Subtotal 24,467,493$ 23,551,196$ 916,297$ ‐$
SURPLUS PROPERTY
Palmetto Property ‐ Purchase 495,154$ 495,154$ ‐$ ‐$
Dixie Property‐ Refund 20,000 20,000 ‐
288 Property‐ Purchase 1,142,402 1,139,552 2,850 ‐
Warehouse Property 12,966,619 12,966,619 ‐ ‐
Subtotal 14,624,175$ 14,621,325$ 2,850$ ‐$
Total Anticipated Uses 46,198,878$ 45,279,728$ 919,147$ ‐$
UNEXPENDED PLANT FUND PROJECTSas of November 30, 2012
16
HOUSTON COMMUNITY COLLEGE
Total Budget
to Date
Total
Expenditures
To Date
Encumbrances
To Date
% of
Expen‐
ditures Unexpended
% of
Total
BudgetSources:
Central College 2001A Bond 25,318,535$
2003 Limited Tax Bond and Premium 150,748,497
Actural Interest Earned 2003 Limited Tax Bonds 20,868,074
2005 Limited Tax and Building Bond 1,875,000
2003/2005 LTD Bond Issuance Cost (2,068,522)
2006 Jr Lien Bond Std Revenue Bond 30,000,000
Bond Issuance Cost (913,149)
Actual Interest Earned 2006 Jr Lien Bonds 2,608,533
Transferred to Fund 7305/Hayes Road (3,169,049)
2008 Maintenance Tax Notes 56,912,320
2008 MTN Bond Issuance Cost (1,056,912)
Actual Interest Earned 2008 MTN 1,654,029
2008 Sr. Lien Bond 1,714,953
Transferred to Residual CIP Funds (20,712,314)
Total Available with Reclassification 263,779,995$
Uses:
Construction 119,626,029$ 119,499,752$ 126,277$ 100% ‐$ 0%
CPMS PGAL 11,121,809 11,121,809 ‐ 100% ‐ 0%
Facility Planning 1,677,989 1,677,989 ‐ 100% ‐ 0%
Architect Fees and Engineering 7,604,912 7,505,762 99,149 100% ‐ 0%
Other Costs including Bldg/Land Purchase 2,273,077 2,258,218 14,859 100% ‐ 0%
Inspectors 890,000 890,000 ‐ 100% ‐ 0%
Design Standard 103,370 103,370 ‐ 100% ‐ 0%
Site Improvement and Infrastructure Development 52,572,901 51,594,875 978,026 100% ‐ 0%
IT Infrastructure Master Plan 29,728,464 29,074,477 653,987 100% ‐ 0%
Furniture and Fixtures 14,352,845 13,909,258 443,071 100% 516 0%
Small Business 567,383 567,383 ‐ 100% ‐ 0%
Administrative Services 3,391,210 3,218,484 172,726 100% ‐ 0%
Material Testing 574,120 537,606 36,513 100% ‐ 0%
Contingency for Construction 23,270 0% 23,270 100%
Surveying 471,813 460,552 11,260 100% ‐ 0%
Design and Geotech 110,911 110,111 800 100% ‐ 0%
Signage 70,000 70,000 100% ‐ 0%
Blue Light Security 126,000 115,200 10,800 100% ‐ 0%
PGAL Website Development 181,208 181,208 ‐ 100% ‐ 0%
System Architect Furniture Consultant 11,367 11,367 100% ‐ 0%
Northline Demolition‐Pizza Hut 226,246 226,246 100% ‐ 0%
Police Cars 342,223 341,613 610 100% ‐ 0%
Bering St. Property 50,687 50,687 100% ‐ 0%
General Repairs & Maintenance 2,079,239 2,079,239 100% ‐ 0%
Land Purchase 1,919,729 1,919,729 100% ‐ 0%
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 100% 3,300 0%
Total Construction Cost 252,331,872$ 249,738,586$ 2,566,199$ 100% 27,086$ 0%
Note: Expenditures Not In Construction Schedule
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ 100% ‐$ 0%
IT Development 6,448,123 6,448,122 ‐ 100% ‐ 0%
263,779,995$ 261,186,708$ 2,566,200$ 100% 27,086$ 0%
Anticipated Budget Shortfall/Surplus (0)
*Footnote on next page
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
17
2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732
1,855,504 213,018 2,068,522
2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974
913,149
2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463
1,056,912
18
HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes
as of November 30, 2012
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
Central ‐ San Jacinto:*
Construction Cost 1,241,868$ 1,241,868$ ‐$
CPMS PGAL 111,440 111,440 ‐ ‐
Facilities Space Programming 393,715 393,715 ‐ ‐
Material Testing ‐ ‐ ‐ ‐
IT Infrastructure Capital Projects 10,000 5,687 4,314 ‐
Design Standards 3,904 3,904 ‐
Total Central ‐ San Jacinto 1,785,007$ 1,780,694$ 4,314$ ‐$
Central ‐ Learning Hub/Science Bldg:*
Construction Cost 21,484,282$ 21,455,534$ 28,748$ -$ CPMS PGAL 1,967,801 1,967,801 ‐
Facilities Space Programming 148,096 148,096 ‐ ‐
Architect and Engineering 1,242,506 1,242,506 ‐
Furniture, Fixtures & Equipment 2,049,869 2,019,706 30,163 ‐
Inspectors 187,000 187,000 ‐
Project Software 7,614 7,614 ‐
Design Standards 15,086 15,086 ‐
Site Infrastructure Improvements 5,693,396 4,996,800 696,594 ‐
IT Infrastructure Master Plan 2,751,121 2,726,528 24,593 ‐
Design Geotech 10,150 10,150 ‐
Material Testing 32,994 32,356 638 ‐
Surveying 69,453 64,118 5,335 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total Central ‐ Learning Hub/Science
Bldg:*
35,677,368$ 34,889,495$ 787,871$ ‐$
NEC ‐ Learning Hub:*
Construction Cost 14,001,119$ 14,001,119$ ‐
CPMS PGAL 1,187,440 1,187,440 ‐
Facilities Space Programming 145,889 145,889 ‐
Architect and Engineering 723,556 723,556 ‐
Furniture, Fixtures & Equipment 1,660,682 1,651,908 8,774 ‐
Other Costs including Bldg/Land Purchase ‐ ‐
Inspectors 205,000 205,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,015 9,015 ‐
Site Infrastructure Improvements 92,682 92,682 ‐ ‐
IT Infrastructure Master Plan 1,250,254 1,249,836 418 ‐
Design Geotech ‐ ‐
Material Testing 131,870 123,607 8,263 ‐
Surveying 71,081 71,081 ‐
Total NEC ‐ Learning Hub 19,478,588$ 19,461,133$ 17,455$ ‐$
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
19
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
NEC ‐ Science Engineering & Technology:*
Construction Cost 11,627,061$ 11,626,428$ 633$ ‐$
CPMS PGAL 857,203 857,203 ‐ ‐
Facilities Space Programming 52,058 52,058 ‐
Architect and Engineering 635,906 635,906 ‐
Furniture, Fixtures & Equipment 644,019 607,016 37,003 ‐
Other Costs including Bldg/Land Purchase 84,400 73,800 10,600 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 6,818 6,818 ‐
Site Infrastructure Improvements 15,423,888 15,353,802 70,086 ‐
IT Infrastructure Master Plan 1,173,585 1,160,824 12,761 ‐
Design Geotech 28,500 28,500 ‐
Material Testing 95,465 95,465 ‐ ‐
Surveying 15,960 10,035 5,925 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total NEC ‐ Science Eng & Technology 30,662,863$ 30,524,055$ 138,808$ ‐$
NEC ‐ Pinemont:
CPMS PGAL 6,269$ 6,269$ ‐$ ‐$
Facilities Space Programming 71,292 71,292 ‐ ‐
Other Costs including Bldg/Land Purchase
102,156 102,156
‐ ‐
Surveying 22,483 22,483 ‐ ‐
Total NEC ‐ Pinemont 202,200$ 202,200$ ‐$ ‐$
SEC - Felix Fraga (Drennan):*Construction Cost 12,419,860$ 12,333,251$ 86,609$ ‐$
CPMS PGAL 1,216,969 1,216,969 ‐
Facilities Space Programming 227,023 227,023 ‐
Architect and Engineering 850,383 835,511 14,872 ‐
Furniture, Fixtures & Equipment 1,007,615 977,469 30,146 ‐
Other Costs including Bldg/Land Purchase 62,466 62,466 ‐
Inspectors - ‐
Project Software - ‐
Design Standards 6,873 6,873 ‐
Site Infrastructure Improvements 5,992,274 5,959,525 32,749 ‐
IT Infrastructure Master Plan 1,279,923 1,268,405 11,518 ‐
Design Geotech 19,000 18,200 800 ‐
Material Testing 150,272 137,662 12,610 ‐
Surveying 27,674 27,674 ‐
HUB/Small Business Program ‐ ‐ ‐ ‐
HUB/Small Business Program ‐ ‐
Bering St Property 50,687 50,687 ‐
Signage ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐ Total SEC - Felix Fraga (Drennan):* 23,329,019$ 23,137,915$ 191,104$ ‐$
20
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
SEC ‐ Felix Morales:*
Construction Cost 3,653,331$ 3,653,330$ ‐$
CPMS PGAL 667,905 667,905 ‐
Facilities Space Programming 62,181 62,181 ‐
Architect and Engineering 367,853 351,968 15,885 ‐
Furniture, Fixtures & Equipment 929,072 898,276 30,796 ‐
Inspectors ‐ ‐ ‐ ‐
Project Software ‐ ‐ ‐ ‐
Design Standards 3,117 3,117 ‐ ‐
Site Infrastructure Improvements 98,015 96,070 1,945 ‐
IT Infrastructure Master Plan 1,165,326 1,008,321 157,005 ‐
Design Geotech ‐ ‐ ‐ ‐
Material Testing 10,009 5,808 4,201 ‐
Surveying 1,225 1,225 ‐ ‐
Total SEC ‐ Felix Morales 6,958,033$ 6,748,200$ 209,832$ ‐$
SEC ‐ Learning Hub:*
Construction Cost 16,555,351$ 16,550,039$ 5,312$ ‐$
CPMS PGAL 1,744,048 1,744,048 ‐
Facilities Space Programming 126,588 126,588 ‐
Architect and Engineering 875,415 875,415 ‐
Furniture, Fixtures & Equipment 2,006,664 1,839,187 167,476 ‐
Other Costs including Bldg/Land Purchase 32,480 28,221 4,259 ‐
Inspectors 258,000 258,000 ‐ ‐
Project Software ‐ ‐
Design Standards 9,367 9,367 ‐
Site Infrastructure Improvements 12,134,156 12,006,927 127,229 ‐
IT Infrastructure Master Plan 2,177,705 2,157,010 20,695 ‐
Administrative Services ‐ ‐
Design Geotech 9,525 9,525 ‐ ‐
Material Testing 122,370 115,883 6,487 ‐
Surveying 144,094 144,094 ‐
Blue Light Security 18,000 18,000 - ‐
Total SEC ‐ Learning Hub 36,213,761$ 35,882,304$ 331,458$ ‐$
21
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
SW ‐ Missouri City:*
Construction Cost 8,891,630$ 8,891,630$ ‐$
CPMS PGAL 601,635 601,635 ‐ ‐
Facilities Space Programming 194,111 194,111 ‐
Architect and Engineering 989,044 958,905 30,139 ‐
Furniture, Fixtures & Equipment 1,053,411 1,011,146 42,265 ‐
Library & Bookstore 1,991,575 1,991,575 ‐
Inspectors ‐ ‐
Project Software ‐ ‐
Design Standards 4,999 4,999 ‐
Site Infrastructure Improvements 5,061,234 5,061,234 ‐ ‐
IT Infrastructure Capital Projects 2,259,481 2,246,083 13,398 ‐
Design Geotech ‐ ‐
Material Testing ‐ ‐
Surveying 48,311 48,311 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Missouri City 21,113,430$ 21,025,828$ 87,602$ ‐$
SW ‐ West Loop Phase I:*
Construction Cost 9,033,809$ 9,031,922$ 1,887$ ‐$
CPMS PGAL 1,033,865 1,033,865 ‐
Facilities Space Programming 76,260 76,260 ‐
Architect and Engineering 718,694 718,694 ‐
Furniture, Fixtures & Equipment 2,166,396 2,154,214 12,182 ‐
Design Standards 8,170 8,170 ‐
IT Infrastructure Capital Projects 2,893,767 2,864,190 29,577 ‐
Design Geotech 22,116 22,116 ‐
Material Testing 21,141 21,140 1 ‐
Surveying 14,995 14,995 ‐ ‐
Exterior Signage 70,000 70,000 ‐ ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ West Loop Phase I 16,077,212$ 16,031,765$ 45,447$ ‐$
22
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures
To Date
Encumbrances
To Date Unexpended
HOUSTON COMMUNITY COLLEGE2004 CIP Projects
as of November 30, 2012
SW ‐ Learning Hub ‐ Stafford:*
Construction Cost 20,717,717$ 20,714,629$ 3,088$ ‐$
CPMS PGAL 1,727,234 1,727,234 ‐
Facilities Space Programming 180,778 180,778 ‐
Architect and Engineering 1,193,942 1,155,688 38,254 ‐
Furniture, Fixtures & Equipment 2,835,121 2,750,339 84,265 517
Inspectors 240,000 240,000 ‐
Project Software ‐ ‐
Design Standards 15,845 15,845 ‐
Site Infrastructure Improvements 8,077,256 8,027,834 49,422 ‐
IT Infrastructure Capital Projects 2,611,069 2,535,820 75,249 ‐
Design Geotech 21,620 21,620 ‐
Material Testing ‐ ‐
Surveying 56,536 56,536 ‐
Blue Light Security 18,000 16,200 1,800 ‐
Total SW ‐ Learning Hub ‐ Stafford 37,695,119$ 37,442,524$ 252,078$ 517$
System ‐ Network:
IT Infrastructure Capital Projects 12,162,330$ 11,853,556$ 308,774$ ‐
Administrative Services 3,391,210 3,218,484 172,726 ‐
PGAL Website Development 181,209 181,208 1 ‐
HUB/Small Business Program 567,383 567,383 ‐ ‐
System Architect Furniture Consultant
11,367 11,367
‐
Ft. Bend Library Inflation Cost Increase
‐
‐
Northline Demolition‐Pizza Hut 226,246 226,246 ‐
Police Cars 342,223 341,613 610 ‐
General Repairs & Maintenance 2,079,239 2,079,239 ‐
Land Purchase 1,919,729 1,919,729 ‐
Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067 2,213,648 18,119 3,300
Total ‐ System ‐ Network 23,116,003$ 22,612,473$ 500,228$ 3,300$
Construction Contingency 23,270$ ‐$ ‐$ 23,270
Subtotal Above 252,331,873$ 249,738,585$ 2,566,197$ 27,086$
100.00% 98.97% 1.02% 0.01%
EXPENDITURES NOT IN CONSTRUCTION SCHEDULE
Deferred Maintenance 5,000,000$ 5,000,000$ ‐$ ‐$
IT Development 6,448,123 6,448,122 ‐ ‐
GRAND TOTAL 263,779,996$ 261,186,707$ 2,566,197$ 27,086$
100.00% 99.02% 0.97% 0.01%
23
*Note 1 Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total
Expenditures to
Date Encumbrances Unexpended
Sources:Transferred CIP Funds 20,712,314
Uses:
Central Learning Hub/Science Bldg:
Site Infrastructure Improvements 6,599,554$ 96,551$ 144,584$ 6,358,420$
NEC ‐ Science Engineering & Technology:
Site Infrastructure Improvements 292,209 11,972 280,238 ‐
SEC ‐ Learning Hub:
Site Infrastructure Improvements 1,998,804 10,127 1,988,677 ‐
Material Testing 23,368 ‐ 23,368 ‐
System ‐ Network:
IT Infrastructure Capital Projects 7,569,405 5,163,235 2,329,496 76,674
Site Infrastructure Improvements 96,600 4,830 91,770 ‐
Construction Contingency 942,305 ‐ 942,305
Contingency 3,190,069 ‐ 3,190,069
Total Construction Cost 20,712,314$ 5,286,714$ 4,858,132$ 10,567,468$
Anticipated Budget Shortfall/Surplus ‐
24
HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds
as of 11/30/12
Total Budget
to Date
Total
Revenues /
Expenditures
To Date
Encumbrances To
Date Unexpended
Sources of funds:
Proceeds from
2006 Tax Maintenance Notes 12,000,000$
Discount (88,756)
Bond Issuance Cost (256,244)
Interest Income 835,346
Funds Available 12,490,346$
Uses of funds:
Site Infrastructure 341,092$ 327,728$ 13,364$ ‐$
Project Management 450,479 450,479 ‐ ‐
Construction 8,805,292 8,805,292 ‐ ‐
Design Phase 1,117,820 1,117,820 ‐ ‐
Architecture 17,822 17,822 ‐
Material Testing & Inspection 6,399 6,399 ‐ ‐
Land/Demolition 420,541 420,541 ‐ ‐
Survey 9,473 9,473 ‐ ‐
Construction‐Maintenance 1,259,003 1,247,114 11,889 ‐
Contingency 62,424 46,700 15,724
Grand Total Uses 12,490,346$ 12,449,368$ 25,253$ 15,724$
Net Available 0$
25
HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)
as of November 30, 2012
Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception.
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Sources:
2008 Maintenance Tax Notes 39,780,489$
2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286
Transferred to CIP Residual Fund (7170) (17,522,242)
Interest Earned To date 1,678,302
Funds Available for Projects 39,014,835$
Uses:
Site Infrastructure Improvements 5,666,582$ 4,937,074$ 729,508$ ‐$
Architectural/Engineering Fees 165,537 151,654 13,883 ‐
IT Infrastructure Master Plan 19,553,388 19,235,543 317,845 ‐
Furniture, Fixtures & Equipment 5,056,049 4,572,572 483,477 ‐
Material Testing 33,351 29,035 4,316 ‐
Construction 5,437,915 5,381,526 56,389 ‐
Construction Management 132,478 132,478 ‐
Campus Security 243,116 242,415 600 101
Truck Driving School 99,200 99,200 ‐
Land 517,306 517,306 ‐
Energy Services 8,860 8,860 ‐
Design GEOTECH 5,189 5,189 ‐ ‐
Surveying 16,310 16,310 ‐ ‐
Contracted Services 2,079,239 2,079,239 ‐
Residual Funds for Completion of CIP Projects 315 315
Total 39,014,835$ 37,408,401$ 1,606,018$ 416$
Bond Issuance Cost:
Bond counsel fees 63,500$
Underwriters' discount 342,526
Insurance premium 498,600
Financial advisory fee 95,105
Rating agencies fees 47,100
Printing costs 9,617
CPA consent letter fee 463
Total 1,056,912$
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
as of November 30, 2012
Fund 7203
Fund 7203 ‐ Maintenance Tax Notes
26
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Source:
2008 Senior Lien Bonds:
Southeast Workforce Project 14,300,000$
Emergency Preparedness 1,000,000
Interest Earned To date 469,918
Funds Available for Projects 15,769,918$
Uses:
Operation and Maintenance 77,034 77,034 ‐
Major Repairs and Renovation 821,560 820,726 834 ‐
South East Work Force Project 3,712,405 3,444,075 268,330 ‐
Land Purchase (Rosalie Property) 2,314,967 2,314,967 ‐
Material Engineering and Testing 8,380 3962 4,418 ‐
Construction of Workforce Building 7,262,398 7,000,777 261,621 ‐
Residual Funds for All Projects 1,573,174 1,573,174
15,769,918$ 13,661,541$ 535,203$ 1,573,174$
Bond Issuance Cost:
Bond counsel fees 123,267$
Underwriters' discount 336,128
Insurance premium 620,827
Financial advisory fee 100,981
Rating agencies fees 51,750
Printing costs 5,880
Paying agent fee 460
Verification fee 5,000
Escrow agent fee 4,600
1,248,893$
27
Fund 7308 ‐ Senior Lien Bonds
HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds
Fund 7308as of November 30, 2012
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances To
Date Unexpended
Central
San Jacinto Memorial 21,391,231$ 8,073,096 2,943,855 10,374,281$
J.B. Whitely Bldg. 4,540,000 913,212 952,126 2,674,662
Theater One 1,699,500 183,660 33,068 1,482,772
Staff Instructional Services 1,005,286 153,621 40,009 811,656
Curriculum Innovation Center 190,000 ‐ 50,934 139,066
Fine Arts Parking Structure 190,000 157,587 18,596 13,818
Crawford Annex 68,200 18,138 ‐ 50,062
Learning Hub/Science Bldg. 122,214 15,953 106,261 ‐
Planned Parenthood Renovation 1,608,769 1,605,024 3,746 ‐
Total Central 30,815,200$ 11,120,289$ 4,148,594$ 15,546,317$
Northeast
Automotive Tech. Training Ctr. 4,000,000$ 630,213$ 65,599$ 3,304,188$
Pinemont 66,558 39,237 ‐ 27,321
Codwell Hall 438,000 204,117 217,788 16,095
Codwell Hall Shower (Temp) 150,000 ‐ 150,000
Roland Smith Truck Driving Ctr. 140,000 54,406 ‐ 85,594
Northline 120,000 11,636 2,789 105,575
Public Safety Institute 115,000 11,668 ‐ 103,332
NE Science and Tech. Bldg 49,500 ‐ 49,500
NE Learning Hub 47,500 6,309 ‐ 41,191
Total Northeast 5,126,558$ 957,585$ 286,175$ 3,882,796$
Southeast
Angela Morales 599,000$ 413,199$ 126,228$ 59,573$
Office City 38,500 ‐ ‐ 38,500
Total Southeast 637,500$ 413,199$ 126,228$ 98,073$
Southwest
Stafford Campus (7 Bldgs) 4,242,406$ 3,927,204$ 315,201$ ‐$
Scarcella Center 927,356 347,710 91,289 488,357
Alief 138,680 132,664 ‐ 6,016
Academic Ctr Sienna Plantation 93,500 85,660 7,736 104
Stafford Learning Hub 54,000 ‐ 54,000
Applied Technology Center 50,000 1,715 ‐ 48,285
Greenbriar Annex 30,000 22,033 414 7,553
Total Southwest 5,535,942$ 4,516,986$ 414,641$ 604,315$
System
System Building 2,368,630$ 1,668,461$ 700,169$ ‐$
Teaching Enhancement Renovations 2,737,135 1,074,963 186,325 1,475,847
Surface Parking & Civil Infrastructure 2,400,000 1,493,817 123,196 782,987
Parking Structure 2,394,235 2,286,034 108,201$ ‐
Total System 9,900,000$ 6,523,274$ 1,117,890$ 2,258,834$
Grand Total 52,015,200$ 23,531,333$ 6,093,528$ 22,390,335$
HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes
as of November 30, 2012
28
Description Date Issued
Original Bond
Amount
Principal
Payments
Principal
Balance
Principal &
Interest FY12
Final Due
Date Call Dates
Foot‐
note
2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)
2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A) (B)
2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)
2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000) 26,375,000 2,124,275 04/15/31 04/15/20 (A)
2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000) 31,590,000 4,150,431 04/15/25 04/15/21 (A)
2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800 04/15/21 11/15/13 (A)
2003 Limited Tax Bonds 12/01/03 144,155,000 (142,960,000) 1,195,000 782,175 02/15/14 (C)
2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)
2006 Maintenance Tax Notes 02/01/06 12,000,000 (2,660,000) 9,340,000 890,550 02/15/26 02/15/16 (C)
2008 Maintenance Tax Notes 03/01/08 54,975,000 (7,735,000) 47,240,000 4,171,426 02/15/28 02/15/18 (C)
2009 Maintenance Tax Notes 09/01/09 13,830,000 (1,445,000) 12,385,000 1,242,569 02/15/25 02/15/19 (C)
2010 Maintenance Tax Notes 07/29/10 47,645,000 (1,840,000) 45,805,000 3,998,400 02/15/29 02/15/20 (C)
2011 Maintenance Tax Notes 03/10/11 41,560,000 (1,295,000) 40,265,000 3,293,775 02/15/31 02/15/21 (C)
2011A Maintenance Tax Notes 10/12/11 19,590,000 19,590,000 1,583,875 02/15/31 02/15/21 (C)
PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)
PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)
PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A) (D)
PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (213,235,000) 612,435,000 53,917,660
Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 11/30/12;
previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)
Footnotes:
(A) Funded from current operations, Fund 1110
(B) Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from
current operations
(C) Funded from real estate taxes, Fund 8300
(D) $1,329,772 of interest expense to be funded from real estate taxes
Schedule of Bonds and Maintenance Tax Notes
For the Month Ended November 30, 2012
Houston Community College
29
3101‐3100 Main
Leasing
3102‐Conference
Training Center 3103‐HCC‐TV
Auxiliary
3105‐HCCS ‐ PFC
Leasing 3110‐Auxiliary
3111‐ Auxiliary
Student Services
3201‐Cafe Club
NEO 3100 Main
3202‐Fitness
Center‐Central
3204‐Heinen
Theater
3207‐
International
Initiatives
3208‐Saudi
Consulting
Services 3209‐Qatar Subtotal
Fund Balance 8/31/12 16,575,935$ (744,125)$ 36,165$ 898,968$ (6,225,160)$ (724,173)$ (1,362,924)$ (76,298)$ 33,917 (82,495) 203,712 807,349 9,340,870
FY2013 Revenue 1,354,823 61,871 6,909 1,000,598 329 115,644 4,413 6,255 23,333 1,874,568 4,448,742
Salaries 72,010 52 121,114 49,152 65,354 597 480 3,833 1,469,227 1,781,820
Benefits 19,420 4 28,875 9,753 15,165 3 233,513 306,733
Supplies Gen Exp 8,197 2,699 422,338 2,438 1,867 420 1,822 1,519 441,301
Travel 19,056 1,535 544 21,134
Marketing Costs ‐
Rental & Leases 1,337 9,715 640 11,692
Contract Services 168,243 356,843 1,085 53,910 580,081
Utilities 81,219 81,219
Departmental Expenses 750 1,831,122 270 ‐ 1,832,142
Instructional & Other Materials 600 4,033 2,454 1,291 2,817 11,196
Maintenance & Repair 39,310 660 39,970
Indirect Cost Expenditures ‐
Exemptions and Waivers 150 150
Capital Outlay 285,406 285,406
Transfer ‐ ‐
Net Income /(Loss) FY13 718,978 57,779 ‐ 6,909 (1,792,497) (58,577) (9,718) 1,946 2,048 13,176 ‐ 115,855 (944,101)
17,294,913 (686,346) 36,165 905,877 (8,017,657) (782,750) (1,372,642) (74,352) 35,965 (69,320) 203,712 923,204 8,396,770
*Discretionary Funds
30
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of November 30, 2012
Auxiliary Funds*
Net Fund Balance
HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund
as of November 30, 2012
3110‐ Student
Vending
Commission
3111‐Auxiliary
Student
Activities
3112‐Auxiliary
Student Athletic
Fee Subtotal Grand Total
Fund Balance 8/31/12 227,335 594,123 1,584,968 2,406,426 11,747,296
FY2013 Revenue 30,095 640,279 473,618 1,143,991 5,592,734
Salaries 700 48,493 49,193 49,193
Benefits 9,851 9,851 9,851
Supplies Gen Exp 4,597 124,820 70,953 200,370 200,370
Travel 290 1,793 21,373 23,455 23,455
Marketing Costs ‐ ‐
Rental & Leases ‐ ‐
Contract Services 5,312 24,860 30,172 30,172
Utilities ‐ ‐
Departmental
Expenses
2,750 1,500 4,250 4,250
Instructional &
Other Materials
‐ ‐
Maintenance &
Repair
‐ ‐
Indirect Cost
Expenditures
‐ ‐
Exemptions and
Waivers
1,553 5,250 6,803 6,803
Capital Outlay ‐ ‐
Transfer ‐ ‐
Net Income /(Loss) FY13 20,206 501,604 298,088 819,898 (124,203)
247,541 1,095,727 1,883,056 3,226,324 11,623,093
*Funds can only be used for services related to students
31
Net Fund Balance
Student Auxiliary Funds ‐ Restricted*
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Education
Direct Programs:
Higher Education ‐ Institutional Aid 5 yrs. 84.031A 26,513 450,183 1,542,133 9/30/2014 10/1/2009
TRIO ‐ Student Support Services 5 yrs. 84.042 91,097 436,682 2,078,155 8/31/2015 9/1/2010
TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399 16,669 1,172,562 ^ 8/31/2012 9/1/2007
TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 58,326 291,335 1,465,615 8/31/2017 9/1/2012
TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 92,757 410,056 2,845,845 5/31/2017 6/1/2012
Astra Stem Grant 3 yrs. 84.120A 40,214 293,375 881,873 9/30/2014 10/1/2011
Vast Academy TPSID 5 yrs. 84.407A 111,989 862,617 2,498,250 9/30/2015 10/1/2010
Pass‐Through From:
Texas Educational Agency
Adult Education ‐ State Grant Program 1 yr. 84.002 1,389,810 5,084,289 5,542,104 6/30/2013 7/1/2012
Adult Education ‐ State Grant Program 1 yr. 84.002 22,971 96,974 102,000 6/30/2013 7/1/2012
University of St. Thomas
Higher Education ‐ Institutional Aid 5 yrs. 84.031C 157,849 870,174 3,243,025 9/30/2016 10/1/2011
Texas Higher Education Coordinating Board
Vocational Education ‐ Basic Grants to States 1 yr. 84.048 82,373 1,051,987 1,051,987 8/31/2013 9/1/2012
College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000 26,707 208,548 8/13/2012 4/6/2011
College Access Challenge Grant Program 1 yr. 84.378A 19,994 169,803 171,798 8/13/2013 8/14/2012
Total Department of Education 2,110,291$ 10,060,852$ 22,803,895$
U.S. Department of Agriculture
Direct Programs:
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 3,217 36,414 298,538 ^ 8/31/2013 8/1/2009
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 3,324 26,428 244,000 ^ 8/14/2013 8/15/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 9,231 135,610 445,000 ^ 8/31/2013 9/1/2010
Hispanic Serving Institutions Education Grants 2 yrs. 10.223 29,695 202,726 245,000 8/31/2013 9/1/2011
Pass‐Through From:
Texas A & M University‐Corpus Christi 2 yrs 10.223 4,803 30,435 48,700 ^ 8/31/2013 9/1/2010
Total Department of Agriculture 50,270$ 431,613$ 1,281,238$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
32
HOUSTON COMMUNITY COLLEGE
as of November 30, 2012
Date Grant
Schedule of Federal Awards *
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U.S. Department of Housing and Urban Development
Direct Programs:
Pass‐Through From:
Child Care Council of Greater Hous. Inc
Community Development Block Grant‐Entitlement Grant 1 yr 14.218 8,203 17,309 32,000 ^12/31/12 8/1/2011
Total Department of Housing And Urban Development 8,203$ 17,309$ 32,000$
Department of Labor
DOL‐Logistics Technician Training 3yrs. 41,081$ 159,097 327,404 6/30/2013 7/1/2010
Pass‐Through From:
Texas Workforce Commission
Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 10,841 61,804 243,163 9/30/2012 7/1/2011
Total Department of Labor 51,923$ 220,901$ 570,567$
Department of State
Pass‐Through From:
Northern Virginia Community College 1 yr 19 16,820 73,538 109,830 5/31/2013 3/8/2012
Total Department of State 16,820$ 73,538$ 109,830$
National Science Foundation
Direct Programs:
Education and Human Resources 4 yrs. 47.076 8,854 64,204 423,300 1/31/2013 2/15/2009
Pass‐Through From:
University of Houston System
Education and Human Resources 5 yrs. 47.076 6,000 47,212 190,000 8/31/2013 9/1/2011
Total National Science Foundation 14,854$ 111,415$ 613,300$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
33
as of November 30, 2012
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
Date Grant
FY12 ‐ 13
Federal Grantor Perform‐ Federal
Pass‐through Grantor ance CFDA Total Budget Total Award
Program Title Period Number Expenditures Amount Amount** Ends Starts
U. S. Department of Energy
Energy Sector Grant (SECO) 8 mos 81.041 37,180 63,836 460,480 ^ 9/30/2012 5/10/2010
Solar Energy Technical Program 13 mos 81.087 55,603 591,069 750,000 12/30/14 11/1/2012
Total U. S. Department of Energy 92,783$ 654,905$ 1,210,480$
U. S. Department of Health and Human Services
Direct Programs:
Head Start 5 yrs. 93.600 15,204 34,617 936,660 9/29/2013 9/30/2008
Head Start 5 yrs. 93.600 23,058 187,332 936,660 9/29/2013 9/30/2008
Pass‐Through From:
Texas Education Agency
Temporary Assistance for Needy Families 1 yr. 93.558 10,178 10,200 208,614 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 93.558 44,391 244,749 244,749 8/31/2013 9/1/2012
YMCA of Greater Houston
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869 82,578 374,938 9/30/2012 10/1/2011
Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 39,101 85,527 374,938 9/30/2013 10/1/2012
Pitt Community College
Health Information Tech Professionals 2 yrs. 93.721 109,966 461,664 1,287,568 4/1/2013 4/2/2010
University of Texas at Austin
Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐ 9,015 22,000 9/29/2012 9/30/2011
Total Department of Health and Human Services 261,767$ 1,115,681$ 4,386,127$
U. S. Department of Homeland Security
Direct Programs:
Homeland Security 2 yrs. 97.062 7,468 58,856 250,000 ^12/31/12 9/1/2010
Total Department of Homeland Security 7,468$ 58,856$ 250,000$
Total Federal Financial Assistance 2,614,377$ 12,745,070$ 31,257,437$
* Scholarship grants are not included in this schedule.
**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
^ No Cost Extension
HOUSTON COMMUNITY COLLEGE
Schedule of Federal Awards *
as of November 30, 2012
FY12 ‐ 13
34
Date Grant
Perform‐
ance Total Budget Total Award
Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts
Texas Education Agency
Adult Education 1 yr. 24,642$ 24,615$ 1,165,635$ 8/31/2012 9/1/2011
Adult Education 1 yr. 347,473 1,165,635 1,165,635 8/31/2013 9/1/2012
Drop‐Out Recovery Program 18mos 960 43,998 194,000 2/28/2013 8/1/2011
Drop‐Out Recovery Performance Pay 1 yr. 14,613 181,750 181,750 until expended 6/1/2011
Temporary Assistance for Needy Families 1 yr. 16,311 16,869 111,445 8/31/2012 9/1/2011
Temporary Assistance for Needy Families 1 yr. 25,575 131,283 131,283 8/31/2013 9/1/2012
Total Texas Education Agency 429,575$ 1,564,151$ 2,949,748$
Texas Higher Education Coordinating Board
Adult Basic Education Innovation Grant 1 yr. 71,070$ 158,314 500,000 8/31/2013 9/1/2012
Collegiate G‐Force Mentorship 1 yr. ‐ 27,148 50,000 8/31/2013 9/1/2009
First Year Experience 13 mos. 5,577 8,709 50,000 until expended 7/18/2011
Nursing Shortage Reduction Program 4 yrs. ‐ 112,280 157,314 8/31/2014 9/1/2010
Nursing Shortage Under 70 Program 1 yr. 4,643 383,891 383,891 8/31/2013 9/1/2012
Rider 58 ATCP School Grant 8 1/2 mos. ‐ 13,960 46,360 until expended 12/18/2009
Pass‐Through From:
University of Tex Health Science Center
Navigator Grant 1 yr. 25,262 51,452 129,195 ^11/30/2012 6/1/2011
Total Texas Higher Education Coordinating Board 106,552$ 755,754$ 1,316,760$
Texas Workforce Commission
Skills Development ‐ Skills for Small Business Initiatives 1 yr. ‐ 18,791 20,000 5/31/2013 6/1/2012
The Methodist 14 mos. 46,618 902,965 902,965 10/31/2013 8/20/2012
Pass‐Through From:
Total Texas Workforce Commission 46,618$ 921,756$ 922,965$
Total State Financial Assistance 582,745$ 3,241,660$ 5,189,473$
* Scholarship grants are not included in this schedule.**Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
Date Grant
as of November 30, 2012
Schedule of State Awards *
FY12 ‐ 13
35
HOUSTON COMMUNITY COLLEGE
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
21st Century FY 12 10 mos. ‐ 1 984 10/31/2012 1/3/2012
Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐ 9,433 20,000 until expended 12/1/2009
Achieving the Dream ‐ Gates Foundation 3 yrs. 42,579 262,135 743,000 ^12/31/2012 7/1/2009
Adult Education/We Can Work 1 yr. ‐ ‐ 11,500 until expended 1/1/2010
American Chemical Society 8 mos 138 248 500 until expended 9/1/2011
AT&T High School Success Grant 1 yr. 7 mos. ‐ 25,216 35,000 until expended 1/31/2010
Bank of America 2 yrs. ‐ 316 50,000 until expended 5/1/2008
Baylor Summer Interns 1 yr. ‐ 1,638 60,000 until expended 5/1/2010
Brown Foundation 1 yr.‐cont. ‐ ‐ 100,000 until expended 2/1/2008
Bulletproof Vest Partnership Program 1 yr.‐cont. ‐ ‐ 5,345 until expended 9/1/2004
Capital Idea project 1 yr. 1,965 73,794 341,000 until expended 8/1/2010
Carnegie FDTN 1 yr 4,563 30,901 67,500 12/31/2012 1/1/2012
Citibank ‐ College Connection Program 1 yr. ‐ 20,475 41,718 until expended 8/15/2007
Civic Ventures 1 yr. 1 mo. ‐ 1,246 25,000 until expended 7/1/2010
Dow Male Minority Initiative Summer Prog. 1 yr. ‐ 12,588 23,986 1/2/2013 1/2/2012
Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐ 6,779 400,000 until expended 6/10/2005
Financial Empowerment Strat. Student Success 2 yrs. 1,181 60,808 63,050 12/31/2013 1/1/2012
Goldman Sachs Grant ‐ Phase I 5 yrs. 219,237 765,458 1,786,121 5/31/2016 1/3/2011
Gulf Coast Pass 3 yrs. 29,097 227,625 318,750 12/31/2014 1/1/2012
Hammill FDTN ‐ Veterans Grants 2 yrs. ‐ 11 18,191 until expended 9/1/2010
Houston Endowment Grant 3 yrs. ‐ 814 267,000 until expended 11/16/2005
Houston Pathways Initiative 2 yrs. 21,760 345,471 1,580,000 8/31/2013 3/26/2009
Interlocal Metro (PSI) 10 yrs. ‐ 45,000 200,000 8/23/2017 8/23/2008
Interlocal Stafford ‐ City of Stafford 1 yr. 12,800 161,986 161,986 until expended 10/1/2010
KBR Veterans Orientation 1 yr.‐cont. ‐ 5,540 19,685 until expended 9/1/2008
Kresge Fdtn‐Coordinator/Evaluation 1 yr. 15,399 17,221 82,450 until expended 9/1/2011
Kresge Fdtn‐Parent Academy 1 yr. 5,667 40,254 89,320 until expended 9/1/2011
Kresge Fdtn‐Veterans Grant 1 yr. 26,146 187,996 187,996 until expended 9/1/2011
MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐ 26,495 60,233 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐ 738 75,000 until expended 11/1/2007
MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐ 385 33,000 until expended 11/1/2007
Metlife Caregiving for Older Americans 1 yr.‐cont. ‐ 18,012 23,855 until expended 7/1/2007
Microsoft Elevate America 1 yr. 1,481 31,985 34,969 3/20/2013 3/20/2012
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
FY12 ‐ 13
36
HOUSTON COMMUNITY COLLEGE
Schedule of Local Government and Private Awards *
as of November 30, 2012
Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts
Mobile Go Center ‐ Valero 1 yr.‐cont. ‐ 494 7,293 until expended 9/1/2007
National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐ 29,273 29,273 until expended 4/1/2005
North Forest GED Preparation 3 mos 244 6,799 25,000 until expended 10/1/2011
St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐ 4,178 142,650 until expended 9/10/2008
Susan B Komen Breast Cancer Initiative 1 yr. ‐ 6,610 123,230 until expended 4/1/2010
Texas Pioneer Foundation Grant 1 yr. 238 2,851 23,117 12/31/2012 1/26/2012
Vast Job Developer 1 yr. 1,910 20,299 94,898 until expended 11/1/2009
Verizon Foundation Grant 1 yr. ‐ 510 12,510 until expended 1/1/2010
Walmart ‐ Minority Male Initiative 1 yr. ‐ 25,215 40,000 until expended 9/1/2009
Washington Mutual 1 yr.‐cont. ‐ 16,717 31,700 until expended 9/1/2006Total Private Financial Assistance 384,407$ 2,493,514$ 7,456,810$
* Scholarship grants are not included in this schedule.
** Award amount for the total grant period. For example, if grant is for three years, the award amount will cover the three years.
37
HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *
Schedule of Local Government and Private Awards * continued
as of November 30, 2012
FY12 ‐ 13
CHANCELLOR
8
DEPUTY CHANCELLOR
15
VICE CHANCELLOR INSTRUCTION
5
New Postions
38
Israel Salazar
Replacement‐External ‐
3
Manuel Ramos
Scott Godley
Nov
TLR
Replacement‐Internal Interim ‐ ‐ NewPosition‐Internal NewPosition‐External1
Kimberly Davis Oct
4
Instructional Designer
NewPosition‐External
New Position‐Hired External
Nov
Replacement‐External
Instructional
Workforce Initiatives Program Manager
New Position‐Budget 12‐13‐Hired External
Oct
Instructional Designer
6 4
New Position‐Budget 12‐13‐Hired External
2 Replacement‐Internal
Jesse Shelton
NewPosition‐Internal
Police DepartmentKeith Harris Police Trianee
VC Instr
Interim ‐ Deputy Chancell
Police Trianee
Antonio Hill
Oct
Nov
Distance Education Advisor New Position‐Budget 12‐13‐Hired External
DOEL English Language Skills Instructor
Repl Deshaunta Stewart‐Hired Internal
Aracelia Saucedo
New Position‐Budget 12‐13‐Hired External
Supvervisor New Position‐Budget 12‐13‐Hired External
Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal
Nov
OctPolice Department
Repl John Chen‐Hired External‐TempManager
New Position‐Budger 12‐13‐Hired External Nov
Nov
HR‐Compensation
James Lindsey
Oct
Houston College Community
2012‐2013 Positions
Employee Name Department Month
SepBarlett Sheinberg Resource & Economic Dev
Procurement
CommentsJob Title
Nov
Nov
Wanda Pleasant New Position‐Budget 12‐13‐Hired External
Supvervisor
Procurement
New Position‐Budget 12‐13‐Hired External
Procurement
Interim 1 1 NewPosition‐External‐ 1
Nov
Nov
Buyer
Procurement
Freddy Conde
Mimi Lemmons Procurement Sr. Buyer
Procurement
Nov
Procurement
Sr. Buyer
Buyer New Position‐Budget 12‐13‐Hired External
Thomas Richardson
Kerry Doucette
Reginald Harmon
Alfred Kessellie, II
NovNew Position‐Budget 12‐13‐Hired External
Sr. Buyer Repl Shiela Perla‐Hired External
Edwin Johnson Police Department
My'Keshia Robinson
Ules Harris
Bapakaye Tamuno
Executive Secretary
Police Department
Oct
Jeremy Hardeway
Security Officer Repl Kenneth Bridges‐Hired External
Oct
Police Trianee
NewPosition‐Internal 5 Replacement‐InternalChancellor Replacement‐External
Patricia Thompson
Sep
Police Department Corporal Repl Timothy Ramirez‐Hired Internal
Repl Willie Rostan‐Hired External Oct
Repl Anthony Maxie‐Hired Internal
Repl Alice Binkley‐Hired Internal
Security Officer
Maria Alarcon
Sep
Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep
Police Department
Shirley Voisin
Repl Victor Fisher‐Hired External
Police Department
Police Department
Police Department
Tobin Anderson
Navidad Martinez
Sep
Corporal
Oct
Corporal New Position‐Budger 11‐12‐Hired Internal
Security Officer Repl Grayland Jones‐Hired External
Repl Majid Iqbal‐Hired ExternalPolice Department Security Officer
New Position‐Budger 12‐13‐Hired External
Accounts Payable Accounting Specialist
Nov
Business Affairs
New Position‐Budger 12‐13‐Hired External
Police Department
Security OfficerKatherine McCabe
Repl Norma Jackson‐Hired Internal
Oct
VICE CHANCELLOR STUDENT SUCCESS
8
VICE CHANCELLOR INFORMATION TECHNOLOGY
1
CENTRAL
5
NORTHWEST
New Postions
39
Houston College Community
2012‐2013 Positions
Employee Name Department Job Title Comments Month
Construction
Oct
Repl Mallikarjun Shintri‐Hired External‐Temp Oct
Transcript Evaluator
COO
‐
New Position‐Hired External
NewPosition‐External 4
3
Repl Samuel sannl‐Hired External
Repl Bonnie Gallup‐Hired External‐Temp
Sep
Oct
Brigid Wilson
Technician Services
Student Services
NewPosition‐Internal
Larke Clishe
Eva Foster English
Recording Imaging Nov
Leslie Dye
Randi Sprouse
Sep
Thomas Tankersley
Bharat Sutaria
‐
Oct
Repl Joaquin Torres‐Hired External‐Temp
Nellie Bradley
New Position‐Hired External
Repl Carlana Brooks‐Hired External‐Temp
Fine Arts
Application Dev
Admissions
1
Dir., Outreach & Student Development
Interim
Instructor
Steven Cohan
Repl Kimberly Crocker Montgomery‐Hire External‐Temp
Oct
Senior Advisor Oct
Student Life Coordinator
Student Services
Instructor
1
Repl Rima Adil‐Hired External‐Temp
Sep
Rima Adil
Repl Manhal Chbat‐Hired External‐Temp
Testing AssociateInstruction‐Testing
Public Relations
Oct
Instructor
New Position‐Budget 12‐13‐Hired External
Laleh Golestani
InstructorEngineering
Hardware/Software Technician
Mona Terrell Registrar
Outreach & Student Dev
Transcript Evaluator
Nov
New Position‐Hired External
VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal
Kevin Lacey
Registrar
Transcript Evaluator
Henry Thomas
Oct
Transcript Evaluator
Repl Shantay Grays‐Hired External
Ashley Martin
New Position‐Hired External
Paul Donaldson Sep
New Position‐Hired External
New Position‐Budget 12‐13‐Hired Internal‐Temp
Oct
Registrar
Wanda Taft
Interim
Repl David Lin‐Hired Internal
Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep
Oct
Oct
Registrar
Insternational Student
NewPosition‐InternalReplacement‐ExternalVCSS
Sep
Enrollment Service Assistant
Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp
Sep
NewPosition‐External 1
Christine Moore
Instructor
Director of Public Relations
System Analyst
2
Student Services Interim Dean of Student Dev
Instructor
Oct
Nov
Oct
Repl Johnny Watson‐Hired External‐Temp
Repl Frank Colmenero‐Hired External
‐ ‐ Replacement‐Internal
Cashier II
Paul Brady
Anthony Hilliard
Central NewPosition‐Internal
‐
Sep
Anika Chowdhury
Repl Nellie Bradley‐Hired Internal‐Temp
Accounting
New Position‐Budget 12‐13‐Hired Internal
Sep
Replacement‐Internal ‐
Community Outreach CoordinatorCOO
Lusinda Eshelman
Sep
Replacement‐External
Biology
‐ VCIT ‐ Replacement‐External
Repl Cheryl Johnson‐Hired Internal
Oct
Replacement‐Internal
Dora Whiteside
Repl Denny Smith‐Hired External
VAST
Sonya Sneed
Student Services
Interim
ADA Counselor
Jason Wilson
James Connery
Repl Stella Villarreal‐Hired External‐Temp
Instructor
Student Services
‐ NewPosition‐External
NORTHWEST continued
21
NORTHEAST
10
SOUTHWEST
12
New Postions
40
Houston College Community
2012‐2013 Positions
Employee Name Department Job Title Comments Month
Public Relations
NewPosition‐External 3
Dean Instruction
William Nicholson
Nov
Repl Laura Wilborn‐Hired External
Nov
Secretary II
Student Services New Position‐Budget 12‐13‐Hired InternalGoddrick Austin
Jose Cruz
Kelli Caraway
NORTHEAST
COO
Southwest
1
New Position‐Budget 12‐13‐Hired Internal
Oct
Nov
Sep
Northwest
New Position‐Budget 12‐13‐Hired Internal
Sep
Sep
David Jones
Instructor
SepIfeanyi Oramulu
Hosein Tahvillian Electronic Engineering
Ronald Dewlen
Instructor Repl Homer Stewart‐Hired External‐Temp
Retention Specialist Repl Joseph Willis‐Hired Internal
Lesley Savoy‐Green Enrollment Services Associate
Sherin Isaac Student Services
Financial Aid Repl Diane Wilborn‐Hired External
Senior Advisor
Student Services Repl Alonia Whitmore‐Hired Internal
New Position‐Budget 12‐13‐Hired Internal
COO
Instructor
Repl Bridgette Bauman‐Hired External
Betty Keller
Repl John Jagdish‐Hired External‐Temp
Office Manager
Cybele Ayaquica Nov
Lorraine Donovan
Student Dev/Advising
Oct
David Stacy
Sabiha Mir
Todd Duplantis
Wendy Allen
Oct
Instructor
Senior Advisor
Oct
Nov
Christine Moore
Brandi Gaza
Dashiel Geyen
Aketa Guillory
Wendy Robbins
Counseling
Repl Belinda Defalco‐Hired Internal
‐ Replacement‐ExternalReplacement‐Internal
Student Development
1 3 NewPosition‐External6 NewPosition‐Internal
Repl Margo Reece‐Hired External‐Temp
2
Instructor
Interim
New Position‐Budget 12‐13‐Hired External
New Position‐Budget 12‐13‐Hired External
Repl Martha Barrera‐Hired External
Advisor
Nov
Nov
Nov
Nov
Student Dev/Advising Advisor
Digital Communication
1
New Position‐Budget 12‐13‐Hired Internal
Interim‐ NewPosition‐External
New Position‐Budget 12‐13‐Hired External
Student Dev/Advising
Academic Instructor
Senior Advisor
Repl Adballah Cherif‐Hired External‐Temp
Counselor New Position‐Budget 12‐13‐Hired Internal
Campus Service Technician
Public Relations
English
Senior Advisor
Technology
‐
Oct
Repl Paul Roberts‐Hired External‐Temp
6 NewPosition‐Internal
Student Dev/Advising
Digital Communication Instructor
Director, Public Relations
‐
Sep
Nov
Replacement‐Internal Replacement‐External3
New Position‐Budget 12‐13‐Hired Internal
Repl Margie Ricks‐Hired External‐Temp
Nov
Student Services Oct
Nicki Norman
Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep
Repl Pratap Talusani‐Hired External
Student Services
Student Services
Advising Manager
Technology
Sep
Instructional
Sep
Replacement‐Internal InterimReplacement‐External
Nov
Nov
Repl Lois Avery‐Hired External
Student Services
Khansaa Almansor
Secretary II
14 NewPosition‐Internal
Repl Barbara Smith‐Hired Internal
Corey Aeck Advisor
Nov
3
Financial Aid Associate
Student Recruiter
Olivia Blake COO
Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov
Sherhonda Le
Nov
Repl Adriana Jimenez‐Hired External
Advisor
Courtney Martinez
Advisor
Jaime Flores Student Services New Position‐Budget 12‐13‐Hired Internal
SOUTHEAST
4
COLEMAN
7
EXTENDED LEARNING, DIVISION OF‐
Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 37
College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 59
Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 96
Over all Total
New Postions
41
Houston College Community
2012‐2013 Positions
Employee Name Department Job Title Comments Month
Rita Callahan
Micalyn Flagg
Ashley Nichols
Daniel Guzman
Southeast
LaTrista Funchez Student Services
Secretary II
Repl Vivian Flores‐Hired External
Nov
Financial Aid
Nancy Garcia
Christy Muniz
Repl Tara Webb‐Hired External
Oct
11 47 10 24 2
8 1
NewPosition‐Internal 1 NewPosition‐External
‐ NewPosition‐Internal ‐ NewPosition‐External ‐ Interim ‐
5 7
3 16 1 6
Interim ‐ 5
Ex. Learning
‐
Replacement‐Internal
Replacement‐External
‐
1
Replacement‐External
96
38
Replacement‐InternalColeman
9
Veronica Mckissic
Jason Smith
Instructor
Interim ‐
Repl Maria Reyes‐Hired External
Repl Independencia Delacruz‐Hired External
Learning Success Coordinator
SepChlinical Simulation Lab Technician
Caroline Couto‐Ortiz
Charmaine Lewinson‐Evans
Repl Verlicia Pope‐Hired External
Student Services
‐ Replacement‐Internal
Nov
Repl Sharon McCowan‐Hired External
Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant
Simulation Center
Sep
Sep
4
Oct
Advisor
Repl Roxine Simms‐Hired External‐Temp
‐
Nov
NovVocaitonal Nursing
Replacement‐External
Student Services
Natural Sciences
NewPosition‐Internal
Vocaitonal Nursing
‐
Instructor
New Position‐Budget 12‐13‐Hired Internal
NewPosition‐External
Repl Pearlie Watts‐Hired External
Vocaitonal Nursing Instructor
Instructor
Vocaitonal Nursing
Financial Aid Associate
New Position‐Hired External
Student Life Coordinator
Oct
HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,361 1,514 1,534
2011‐2012 1,451 1,582 1,598 1,564 823 1,530 1,573 1,598 1,576 1,003 1,098 955
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 1,401 1,426 1,449
2011‐2012 1,429 1,415 1,425 1,327 1,407 1,429 1,396 1,404 1,410 1,397 1,391 1,429
F
T
E
F
T
E
42
‐
200
400
600
800
1,000
1,200
1,400
1,600
1,800
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
1,600
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 238 270 272
2011‐2012 254 293 296 293 159 279 298 300 291 184 204 178
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 155 159 164
2011‐2012 161 158 165 145 155 163 157 157 158 156 154 161
43
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 108 107 113
2011‐2012 115 112 113 109 82 109 107 110 110 99 98 84
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 56 55 55
2011‐2012 58 58 59 55 56 58 55 55 57 54 54 55
F
T
E
F
T
E
44
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 281 310 310
2011‐2012 267 292 293 307 155 323 330 334 335 198 224 190
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 131 135 143
2011‐2012 104 106 108 108 129 138 122 129 130 132 131 138
F
T
E
F
T
E
45
‐
50
100
150
200
250
300
350
400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 187 208 212
2011‐2012 200 211 216 207 112 204 212 212 211 129 137 124
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 126 125 128
2011‐2012 127 126 128 118 121 128 124 127 126 126 126 128
F
T
E
F
T
E
46
‐
50
100
150
200
250
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 318 385 375
2011‐2012 380 433 435 422 183 377 382 386 382 229 252 217
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 152 154 161
2011‐2012 185 184 182 145 146 155 144 150 152 151 147 153
47
F
T
E
F
T
E
‐
50
100
150
200
250
300
350
400
450
500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 130 160 164
2011‐2012 143 168 173 169 77 161 178 183 179 101 120 95
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 96 103 104
2011‐2012 99 96 97 86 94 98 91 95 96 99 96 101
F
T
E
F
T
E
48
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
140
160
180
200
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
20
40
60
80
100
120
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 90 67 79
2011‐2012 85 69 68 56 55 72 63 67 64 59 57 64
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 79 81 81
2011‐2012 78 79 79 75 79 80 77 79 79 79 78 81
F
T
E
F
T
E
49
‐
10
20
30
40
50
60
70
80
90
100
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
10
20
30
40
50
60
70
80
90
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
DISTRICTFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent)
FACULTY FTE
Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 8 7 8
2011‐2012 7 4 4 1 ‐ 5 4 5 3 4 4 3
STAFF FTE
Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
2012‐2013 606 612 614
2011‐2012 616 609 608 595 627 609 625 612 614 601 605 612
F
T
E
F
T
E
50
‐
1
2
3
4
5
6
7
8
9
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
100
200
300
400
500
600
700
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru November 30, 2012 by Type
FACULTY HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 787 795 795
12‐13 PT 1,992 2,361 2,491
12‐13 Total Fac 2,779 3,156 3,286 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 792 797 793 788 793 785 784 782 783 768 757 794
11‐12 PT 1,911 2,334 2,390 2,331 275 2,387 2,391 2,351 2,367 1,075 1,372 679
11‐12 Total Fac 2,703 3,131 3,183 3,119 1,068 3,172 3,175 3,133 3,150 1,843 2,129 1,473
STAFF HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 FT 1,238 1,250 1,264
12‐13 PT 840 833 851
12‐13 Total Staff 2,078 2,083 2,115 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
11‐12 FT 1,256 1,256 1,238 1,235 1,253 1,242 1,249 1,235 1,240 1,201 1,240 1,250
11‐12 PT 877 879 883 839 629 822 834 828 846 767 790 790
11‐12 Total Staff 2,133 2,135 2,121 2,074 1,882 2,064 2,083 2,063 2,086 1,968 2,030 2,040
51
S
t
a
f
f
Headcount
F
a
c
u
l
t
y
Headcount
‐
500
1,000
1,500
2,000
2,500
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
‐
200
400
600
800
1,000
1,200
1,400
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru November 30, 2012 by Type
UNDUPLICATED HEADCOUNT
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
12‐13 Total 4,475 4,446 4,551
11‐12 Total 4,543 4,902 4,917 4,833 2,891 4,728 4,814 4,805 4,806 3,373 3,575 3,303
* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs
52
Unduplicated* Headcount
‐
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Non‐current assets:
Restricted cash 6,805$
Restricted investment in trust accounts 2,248,349
Lease receivable from HCCS 172,194,009
Deferred charges ‐ bond issuance costs 2,046,534
Capital Assets:
Land ‐
Other Structures ‐
Furniture & equipment ‐
Leasehold improvements ‐
Construction in process 827,965
827,965
TOTAL ASSETS 177,323,661$
Current liabilities:
Accounts payable ‐ HCC 60,979$
Accounts payable 5,210
Accrued liabilities ‐ interest ‐
Current bond payable 3,880,000
Total current liabilities 3,946,189$
Non‐current liabilities:
Deposits 440
Arbitrage payable ‐
Unearned interest income (23 years) ‐ HCC 70,298,500
Premium on bonds 2,209,548
Bonds payable 105,655,000
Total non‐current liabilities 178,163,488$
TOTAL LIABILITIES 182,109,678
TOTAL NET ASSETS ‐ restricted (4,786,017)$
PFC 1
Houston Community College ‐ Public Facility CorporationStatement of Net Assets
Cash Basis ‐ Interim Period
as of November 30, 2012
ASSETS
LIABILITIES
Cash Flows from Capital Financing Activities
Receipt from HCCS for lease payment 2,538,004$
Purchases of capital assets (865,847)
Payment on capital debt ‐ principal and interest (2,538,696)
Net cash provided (used by) in financing activities (866,539)
Cash Flows from Investing Activities
Interest income 980
Increase (decrease) in restricted cash and
restricted investment in trust accounts (865,559)
Restricted cash and restricted investment in
trust accounts ‐ beginning of year 3,120,712
Restricted cash and restricted investment in
trust accounts ‐ end of period 2,255,153$
Houston Community College System Public Facility CorporationStatement of Cash Flows
Cash Basis ‐ Interim Period
Three Month Ended as of November 30, 2012
PFC 2
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Proceeds from
2005C Lease Revenue Bond 19,155,000$
Discount (170,064) Land Purchase (4,212,644) Bond Issuance Cost (606,201) Interest Expense (524,785)
13,641,306$ Interest Income 1,003,581 Vendor Contract Refund 102,706 Transfer to Payment Account (1,354,990)
Funds Available 13,392,603$
Uses of funds:4,092$ 4,092$ ‐$ ‐$
11,550,643 11,550,643 ‐ ‐ Maintenance 393,940 171,324 222,616 ‐
6,443 6,443 ‐ 563,928 563,928 ‐
7,200 7,200 ‐ ‐ 27,403 26,326 1,077 ‐ 24,940 24,940 ‐ 44,695 44,695 ‐ ‐
596,787 596,787 ‐ ‐
172,532 8,100 164,432
Grand Total Uses 13,392,603$ 13,004,478$ 223,693$ 164,432$
Net Available ‐$
PFC requires GMP before inception.
Total Proceeds from Bond
Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of November 30, 2012
PFC 3
Bank Service ChargesConstruction
Waste Water Management *Geo Technical Services*
Survey*Architect
Engineering ServicesFFE
Contingency
* Included in GMP
Site Infrasturcture
Total Budget to
Date
Total Revenues
/ Expenditures
to Date
Encumbrances
to Date Unexpended
Sources of funds:
Proceeds from
2005 A Bonds 11,605,000$
Premium Received 492,931
Accrued Interest Received 53,425
Interest Income 998
Bond Issuance Costs (391,474)
Repayment of Loans (11,392,147)
Funds Available 368,733$
Uses of funds:
Debt Service 53,425$ 53,425$ ‐$ ‐$
Renovation & Construction 169,759 169,759 ‐ ‐
Demolish & Renovate Office 56,244 56,244 ‐ ‐
Furniture & Fixtures 46,857 46,857 ‐ ‐
Legal Fees 42,448 42,448 ‐
Grand Total Uses 368,733$ 368,733$ ‐$ ‐$
Net Available ‐$
Note 1: PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationWestgate (Katy)
as of November 30, 2012
PFC 4
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount on Bonds 36,950,000$
Discount on Bonds (546,238)
Underwriter's Discount (209,273)
Accrued Interest on Bonds 98,080
Amount Available 36,292,569$
Issuance Costs (490,131)
Accrued and Capitalized Interest (1,449,023)
Repair and Replacement (1,000,000)
Title Fees Capitalized (81,379)
Amount Available for Project 33,272,036$
Repayment to HCC (188,006)
Project Account Balance 33,084,030$
Administrative & Legal Fees (29,486)
Interest Income 836,407
Transfer Cost Issuance 85,509
Interest Expense on Notes (135,299)
Funds Available 33,841,161$
Uses of funds:
Land & Building 17,807,972$ 17,807,972$ ‐$ ‐$
Maintenance Rehabilitation &
Deferred Maintenance
12,856,469 12,856,469 ‐
CPMS PGAL 211,959 211,959 ‐
Facilities Space Programming 214,620 214,620 ‐
Furniture, Fixtures & Equipment 1,040,112 1,006,277 14,273 19,562
Site Infrastructure 971,369 854,984 4,859 111,526
Architect and Engineering 517,509 428,355 4,632 84,522
Repair & Maintenance Contingency ‐
per bond requirement
221,151 83,089 2,000 136,062
Grand Total Uses 33,841,161$ 33,463,726$ 25,764$ 351,672$
Net Available ‐$
PFC requires GMP before inception.
Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project
as of November 30, 2012
PFC 5
Total Budget to
Date
Total Revenues
/ Expenditures
To Date
Encumbrances
To Date Unexpended
Sources of funds:
Principal Amount of 2007 Series Bonds 58,885,000$
Premium on Bonds 3,094,498
Underwriter's Discount (346,244)
Accrued Interest Income‐ Bonds 173,733
Total Amount Available 61,806,987$
Issuance Cost (839,837)
Accrued and Capitalized Interest (4,632,122)
Repair and Maintenance Account ‐
Amount Available for Project 56,335,028$
Interest Income on Trust Account 2,496,540
Interest Expense on Notes (414,601)
Transfer to Trustee Payment Account (4,712,985)
Vendor Contract Refunds 230,035
Sale of Land 569,890
Funds Available 54,503,907$
Uses of funds:
Land & Building 10,671,234$ 10,671,234$ ‐$ ‐$
Construction Cost‐ Building 18,200,000 18,200,000 ‐ ‐
Construction‐Demolition 494,972 ‐ ‐ 494,972
Constuction‐ Site 640,988 636,957 4,030 ‐
Site Improvement 14,221,039 13,804,804 416,235 ‐
Site Demolition & Abatement 791,298 791,298 ‐
CPMS PGAL 1,391,958 1,391,958 ‐ ‐
Site and Infrastructure Design 2,334,840 2,334,840 ‐ ‐
Facilities Space Programming 29,274 29,274 ‐ ‐
Architect and Engineering 1,256,727 1,256,727 ‐
Furniture, Fixtures & Equipment 1,828,332 1,818,281 10,051 ‐
Library 66,564 66,182 382 ‐
Inspections 214,981 214,981 ‐ ‐
Design Geotech 17,500 17,500 ‐ ‐
Material Testing 24,503 24,503 ‐ ‐
Communications IT‐ PGAL 253,614 253,614 ‐
IT Telephone & Communications 790,467 790,467 ‐
Surveying 62,398 59,124 3,274 ‐
Administrative Expenses 34,505 34,505 ‐
Preconstruction Costs 886,377 886,377 ‐
Contingency 292,338 186 ‐ 292,154
Grand Total Uses 54,503,907$ 53,282,810$ 433,972$ 787,126$
PFC requires GMP before inception.
as of November 30, 2012
PFC 6
Houston Community College ‐ Public Facility CorporationNorthline Mall Project