65
Financial Statements For the Period September 1, 2012 November 30, 2012 For the Meeting of the Board of Trustees December 13, 2012 for Houston Community College System & Houston Community College Public Facility Corporation

Fs2012 november

Embed Size (px)

Citation preview

Page 1: Fs2012 november

Financial StatementsFor the Period

September 1, 2012 ‐ November 30, 2012

For the Meeting of the Board of Trustees ‐ December 13, 2012

for

Houston Community College System&

Houston Community College Public Facility Corporation

Page 2: Fs2012 november

Memorandum Management Discussion & Analysis

Summary HCCS Unrestricted Revenue & Expenditures 1

Adjusted Budgets by Division 2

Actual YTD by College  2

Cash Flow Analysis 3

Contact Hours Reimbursement 8

Enrollment Data 9Charts Revenue & Expenditure YTD thru November 30, 2012 10

Revenue and Expenditures with Trendlines 11

Revenue Source Comparison By Year 12

Expenditure Source Comparison By Year 13

Fund Balances Balance Sheet By Fund   14

Designated Funds Budget Summary / Cash Position 15

Capital Projects & Unexpended Plant Fund Projects 16

    Unexpended 2004 CIP Projects 17

    Plant Fund Maintenance Tax Notes 2006 (Central Utility Plant Project) 25

Maintenance Tax Notes/Sr. Lien Bonds 2008 26

Maintenance Tax Notes 2010 28

Bonds/Notes Schedule of Bonds & Maintenance Tax Notes 29

Auxiliary Sources and Uses of Auxiliary Funds 30

Restricted Funds Grants, Contracts and Student Aid 32

Position Control 2013 Positions 38

Pos. Control Charts FTE (Full‐Time Equivalent) Monthly Comparison 42

Duplicated Headcount Monthly Comparison 51

Unduplicated Headcount Monthly Comparison 52

Statement of Net Assets PFC 1

Statement of Cash Flows  (Cash Basis‐ Interim Period) PFC 2

Public Safety Institute PFC 3

Westgate PFC 4

Hayes Road ‐ Alief Project PFC 5

Northline Mall Project PFC 6

Houston Community College ‐ Public Facility Corporation

Table of ContentsFor the Period September 1, 2012 ‐ November 30, 2012

For the Meeting of the Board of Trustees

Houston Community College System

Page 3: Fs2012 november

MEMORANDUM  

To:    Houston Community College System          Board of Trustees 

 

    Via:    Dr. Mary Spangler, Chancellor  

From:    Dr. Art Tyler, Deputy Chancellor     Chief Operating Officer  

Date:    December 13, 2012  

Re:  Financial Report for Month Ended November 30, 2012     

 

Enclosed please find the preliminary financial reports for the month ending November 30, 2012 for your review.  The financial report is an internal management report submitted to the Board of Trustees to compare actual financial activities to the approved budgets, strategic priorities, and financial policies for the reported fiscal year.   

 

Operating Fund net revenue through November 30, 2012 is $88,643,166 which is 2% below last year.  Expenditures year‐to‐date total $69,560,880 which is 9.2% less than the same time last year, for a net of $19,082,286. 

 

The reserves for the month of November 2012 are $62,432,001 or 21.3% of revenues (see page IV).  Thus, we continue to project a healthy fiscal strength for the college. 

Page 4: Fs2012 november

Managements Discussion and Analysis

Thru November 30, 2012

Revenues

Expenditures 

Utilities costs totaled $1,752,050 year‐to‐date.   We will continue to monitor these costs.  Total utilities cost at 

fiscal year end is projected to $12,889,610.

Total revenues and expenditures by expense type for the Operating Fund for 2012‐2013 are reported on page one, 

behind the tab Detailed Financial Statements. Highlights of financial activities year‐to‐date are as follows:

State Appropriations received year to date totaled $24,385,875, 0.4% below last year. Total appropriations 

received are expected to be $70,014,007.  This amount was reduced by $218,031 due to a formula reallocation 

to align with the Legislative Budget Board data and methodology.

Ad Valorem Tax collections totaled $1,705,447 year‐to‐date.  The year‐to‐date total is 20.4% below last year.  We 

project total tax revenue for the fiscal year will be $102,195,871.

Tuition and Fees net revenue year to date totaled $59,727,623 which is 2.2% lower than the same time last year.  

Current enrollment numbers for Fall 2012 are trending downward at 5%.  We are projecting tuition and fees 

revenue to be $112,296,647.  

i

Insurance/Risk Management payments totaled $6,518,690 year‐to‐date, 5.9% above last year.  The increase is 

due to an increase in insurance premiums.  Total expenses for the year are expected to be within budget at 

$6,871,709.

Tuition & Fee‐Extended Learning receipts totaled $2,224,042 year to date, 0.9% above last year.  Total tuition 

and fees‐Extended Learning at fiscal year end are expected to be $6,188,581.

Marketing and Advertising expense totaled $383,941 year‐to‐date, a 19% increase compared to last year.  

Marketing expenses are projected to be $1,293,090 at fiscal year end.

Rental and Leases expenses totaled $677,870 year‐to‐date, which is 64.4% below the previous year.  The 

decrease is due to the completion of IT projects. Total expenses at  year end are projected to be $3,809,230.

Total revenue collections, net of exemptions and waivers, totaled $88,643,166 year‐to‐date.  This is a 2% decrease below last year. 

Total Salaries are $43,431,053 year‐to‐date, 0.2% above the previous year.  Total salaries at year end are 

expected to be $162,610,402.

Benefits costs totaled $4,413,949 year‐to‐date, 21.5% above last year.  This increase is due namely to  the 

reduction in the state's contribution to TRS and ORP and an increase in health insurance premiums. Total 

benefits at fiscal year end are expected to be $18,209,301.

Contract Services expense totaled $3,638,877 year‐to‐date.  Fiscal year end expenses are projected to be 

$23,442,119.

Page 5: Fs2012 november

Managements Discussion and Analysis

Thru November 30, 2012

Budget Priorities funding allocated for the year are detailed below through November 30, 2012. 

Contingency/Budget Priorities

Capital Outlay & Equipment

Position Management

Other

Total Contingency/Budget Priorities

Grants

Unexpended Plant Fund  

Public Facility Corporation

Budget expenditures for grant‐funded projects so far this year total $3,581,529.

Budgeted

1,445,240           553,014              892,226             

11,372,376$      5,503,708$        5,868,668$       

Expensed Remaining

6,127,136$        292,725$           

The college has received $824,000 in new grant awards since the beginning of the current fiscal year. 

5,834,411$       

3,800,000           4,657,969           (857,969)            

Instructional and Other Materials expenses totaled $1,541,859 year‐to‐date, which is 17% below last year.  

Expenses in this area are projected to be $11,138,916.

Transfers/Debt activities totaled $5,083,281 year‐to‐date.  Items in this expense category include all student 

revenue bond payments, transfers for scholarship matching funds, and transfers to the Unexpended Plant Fund.  

Total expenses are expected to be $33,699,339.

Total operating fund expenditures year‐to‐date total $69,560,880, a 9.2% decrease below last year.  

The Public Facility Corporation tracks the progress of the PFC ‐ Public Safety Institute, Katy Campus (Westgate), 

Alief and Northline Mall deferred maintenance, new construction and renovation projects.  Expenditures year‐to‐

date total $100.8 million, 98.7% of budget. See pages PFC 1‐6 for details. 

ii

Total grant awards (federal, state & private) year‐to‐date total, $43,903,720.

Cash Position ‐ The use of the Unexpended Plant Fund Excluding 2004 CIP for deferred maintenance projects was 

discontinued in FY 2009.  All deferred maintenance expense is captured in the operating account.  See page 15 

for prior year encumbrances. 

Unexpended Plant Fund Projects include current construction, deferred maintenance, and property acquisition 

projects for a budget of $46,198,878.  Funds for these projects are 100% committed.  See page 16 for more 

details.

The 2004 CIP budgets are $263,779,995 and are 99.99% committed. The spending categories in the schedule 

have now been revised for more ease of reference to the Board approved budget.  Please see page 17 for the 

summary and pages 19 through 23 for details.

The Maintenance Tax Note 2006 tracks the financial progress of the Central Utility Plant.  Commitments year‐to‐

date total $12.5 million, 99.87% of budget.  See page 25 for the details. 

Page 6: Fs2012 november

Managements Discussion and Analysis

Thru November 30, 2012

Balance Sheet – Operating Fund   

Cash and Investments

Cash

Investments

    Total

Fund Balance

Audited Fund Balance, August 31, 2012

Projected Revenue @ 08/31/2013

Total Projected Revenue

Projected Expenses @ 08/31/2013

FY 2012 Purchase Order Roll 

Total Projected Expenses @ 08/31/2013

Ending Fund Balance (Beg. Fund Balance + Revenue ‐ Expenses)

Required Reserve for FY 2013 (11% Projected Revenues)

Added Reserves

Additional Expenditures Funded From Reserves:

FY2012‐2013 Salary Increases

Total Expenses Paid From Reserves

Added Reserves

Required Reserve for FY 2013 (11% Projected Revenues)

Current Reserves

% of Total Operating Revenue

November 2012 November 2011

58,007,489$           41,205,467$          

293,647,476              

360,312,031$            

293,647,476$            

2,395,994                   

11,006,205              ‐                                

69,013,694$           41,205,467$          

66,664,555$              

30,130,779$              

32,301,222$              

62,432,001$              

21.3%

Budget

296,043,470$            

64,268,561$              

32,301,222$              

31,967,339$              

Expense to Date  Balance 

The projected reserves at November 30, 2012 of $62,432,001 is an estimate at this time and represents 21.3% of 

expected general fund revenue for this fiscal year, which is within our financial stability policy requiring us to maintain 

a fund balance of 9% ‐11% of general fund revenues as of August 31.  

iii

(1,836,560)         ‐                           (1,836,560)                 

(1,836,560)$       ‐$                         (1,836,560)                 

Page 7: Fs2012 november

FY2011‐12 FY2012‐13

Tuition

Budget:AdjustedBudgetFY2012‐13 43,067,676$Exemptions&Waivers (3,770,729)AdjustedBudgetFY2012‐13,Net 39,296,947$

RevenuesReceived:Tuition 48,824,432 27,903,703 27,095,290

Waivers&Exemptions:DualCredit (5,170,736) (3,391,911) (2,766,119)Other (1,693,502) (875,997) (1,004,610)

TotalWaivers&Exemptions (6,864,238) (4,267,908) (3,770,729)TotalTuitionRevenue,Net 41,960,194$ 23,635,795$ 23,324,561$

Tuition‐ExtendedLearning

Budget:BudgetFY2012‐13 6,188,581$Exemptions&Waivers (597,708)BudgetFY2012‐13,Net 5,590,873$

RevenuesReceived:

Tuition 8,853,381 2,884,674 2,821,750Waivers&Exemptions:

Corrections (2,612,080) (681,444) (597,708)

TotalELTuitionRevenue,Net 6,241,301$ 2,203,230$ 2,224,042$

Exemptions&WaiversDeptofCorrections 2,612,080$ 681,444$ 597,708$DualCreditWaiver 5,170,736 3,391,911 2,766,119

Other:EmployeeFeeExemptions 84,810 41,387 36,691Firemen 42,521 23,866 14,333Hazelwood 906,036 450,441 599,026Deaf&Blind 309,603 174,103 171,501HighRankingHiSCHGrad 868 372 1,271ChildofDisabledVetETC 431 (1,687) 2,248NonresMilitaryPer&Dep 2,390 1,062 ‐NonresTeach/ResearchAsst 13,905 5,949 6,107NonresCompetitiveScholar ‐ ‐ 1,062SeniorCitizens 18,730 9,321 7,904ScholarshipDistribution 1,450 1,450 ‐ApprenticeshipWaivers (28) ‐ ‐SpecialFeesWaiverHFD 117 117 ‐AVISAWaiver(Non‐AlienWaiver) 1,110 1,110                    ‐RefugeeWaiver (1,554) (1,110) (162)FosterChildren‐Resident 294,543 159,031 158,693FireAcademyWaiver 157 157 ‐UndocumentedStudents 2,171 1,814 ‐TXTomorrowWaiver 2,874 2,875 ‐PeaceOfficerExemption 13,368 5,739 5,936

TotalOtherExemptions 1,693,502 875,997 1,004,610GrandTotalExemptions&Waivers 9,476,318$ 4,949,352$ 4,368,437$

Note:AsofDecember31,2008,thefinancialstatementsreflectallexpensesincurredforExemptionsandWaiversasnetoftuitionandfeerevenue.PriortothisdateExemptions&Waiverswereshownasanexpenditureandrevenuewasshownasgrossrevenue.

iv

Exemptions&WaiversThruNovember30,2012

Year‐to‐DateActivitythru11/30/2012

Year‐to‐DateActivitythru11/30/2011

EndofYearActivityAccount

Page 8: Fs2012 november

g

YTD Adjusted Budget

YTD Actuals Thru 

November 30, 2012

YTD Actuals Thru 

November 30, 2011

2012‐2013 Inc/(Dec) 

vs. 2011‐2012

Actuals % 

Inc/(Dec)YTD vs. 

PriorYTD

Projected Actuals 

2012‐2013

Projected 2012‐2013 

Inc/(Dec) vs. Adj 

Budget

Projected 2012‐

2013 Inc/(Dec) vs. 

Adj Budget %

REVENUES

State Appropriations 70,232,038$           24,385,875$      24,494,718$      (108,843)$          ‐0.44% 70,014,007$      (218,031)$           ‐0.31%Ad Valorem Taxes 102,195,871           1,705,447          2,141,068         (435,622)           ‐20.35% 102,195,871     ‐                       0.00%Tuition, Net 43,067,676             23,324,561        23,635,795       (311,235)           ‐1.32% 42,206,322       (861,354)             ‐2.00%Fees 71,520,739             36,403,062        37,444,157       (1,041,094)        ‐2.78% 70,090,324       (1,430,415)         ‐2.00%Other Local Income* 2,952,370                475,566             397,580             77,986               19.62% 2,952,370         ‐                       0.00%Tuition & Fee, Net

 ‐‐ Extended Learning6,188,581                2,224,042            2,203,230           20,813                 0.94% 6,188,581           ‐                         0.00%

Grant Revenue ‐                                124,614               114,967               9,646                   8.39% ‐                        ‐                        

Total Revenues 296,157,275           88,643,166          90,431,515         (1,788,349)          ‐1.98% 293,647,476$     (2,509,799)$         ‐0.85%

EXPENSES

Faculty‐FT  53,213,154             15,169,237        14,891,634       277,603            1.86% 53,213,154       ‐                       0.00%

Faculty‐PT 30,488,118             9,160,846          9,185,397         (24,551)             ‐0.27% 30,488,118       ‐                       0.00%

Librarian/Counselor‐FT  4,774,339                1,307,082          1,702,716         (395,634)           ‐23.24% 4,774,339         ‐                       0.00%

Librarian/Counselor‐PT 830,449                  184,742             148,706             36,036               24.23% 830,449             ‐                       0.00%

Staff‐FT 64,567,959             15,711,768        15,413,392       298,376            1.94% 64,567,959       ‐                       0.00%Staff‐PT 9,927,708                1,897,378          2,000,841         (103,463)           ‐5.17% 8,736,383         (1,191,325)           ‐12.00%

     Sub‐total Salaries 163,801,727           43,431,053          43,342,686         88,366                 0.20% 162,610,402       (1,191,325)           ‐0.73%

Employee Benefits 18,209,301             4,413,949          3,631,687         782,262            21.54% 18,209,301       ‐                       0.00%

Supplies Gen Exp 5,637,841                1,180,097          1,015,787         164,310            16.18% 5,355,949         (281,892)             ‐5.00%

Travel 949,968                  157,433             125,501             31,931               25.44% 949,968             ‐                       0.00%

Marketing Costs 1,487,317                383,941             322,477             61,464               19.06% 1,293,090         (194,227)             ‐13.06%

Rental & Leases 3,809,230                677,870             1,901,760         (1,223,890)        ‐64.36% 3,809,230         ‐                       0.00%

Insurance/Risk Mgmt 6,871,709                6,518,690          6,153,931         364,759            5.93% 6,871,709         ‐                       0.00%

Contract Services 23,442,119             3,638,877          2,716,689         922,188            33.95% 23,442,119       ‐                       0.00%

Utilities 12,889,610             1,752,050          1,555,594         196,456            12.63% 12,889,610       ‐                       0.00%

Other Departmental Expenses 1,806,443                567,458             461,099             106,359            23.07% 1,394,185         (412,258)             ‐22.82%

Instructional & Other Materials 11,138,916             1,541,859          1,857,470         (315,610)           ‐16.99% 11,138,916       ‐                       0.00%

Maintenance & Repair 1,211,543                99,337               108,466             (9,129)                ‐8.42% 1,211,543         ‐                       0.00%

Transfers/Debt 33,699,339             5,083,281          13,193,307       (8,110,026)        ‐61.47% 33,699,339       ‐                       0.00%

Contingency 2,600,275                ‐                          ‐                          ‐                           0.00% 2,600,275         ‐                       0.00%Capital Outlay 8,601,937                114,986             246,856             (131,870)           ‐53.42% 8,171,840         (430,097)               ‐5.00%

     Total Expenses  296,157,275           69,560,880        76,633,310       (7,072,430)        ‐9.23% 293,647,476     (2,509,799)         ‐0.85%

REVENUES H/(L) Vs EXPENSES 0                              19,082,286        13,798,205       5,284,081         (0)                        (0)                        

* Includes interest & dividends income, fines & penalties and parking fines

1

HOUSTON COMMUNITY COLLEGE2012‐2013 Revenues & Expenditures  HCCS CURRENT UNRESTRICTED

Page 9: Fs2012 november

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Adjusted 

Budget 

EXPENSES

Faculty‐FT  10,224,328      10,092,399      7,284,350         11,995,950     4,907,675       5,979,387       2,378,018       ‐                  ‐                    ‐                   215,922          135,125          ‐                  ‐                  53,213,154      17.97%

Faculty‐PT 4,753,315         6,327,932         4,066,211         5,823,205        3,779,081       1,790,194       3,617,035       ‐                  ‐                    ‐                   330,386          759                 ‐                  ‐                  30,488,118      10.29%

Librarian/Counselor‐FT  1,054,830         1,115,400         880,441            730,819           514,757          53,730            2,887              ‐                  ‐                    ‐                   340,010          ‐                  81,465            ‐                  4,774,339        1.61%

Librarian/Counselor‐PT 87,030              194,185            119,380            183,845           82,452            33,248            ‐                  ‐                  ‐                    ‐                   19,773            ‐                  110,536          ‐                  830,449           0.28%

Staff‐FT 5,457,530         4,399,974         4,775,393         5,687,552        3,834,196       2,401,250       3,655,814       3,635,005       15,361,448    102,108           3,423,693       7,534,496       4,299,500       ‐                  64,567,959      21.80%

Staff‐PT 1,984,961         1,642,718         742,949            1,490,920        1,225,172       441,322          623,862          263,028          573,372           ‐                   272,930          235,344          431,130          ‐                  9,927,708        3.35%

     Sub‐total Salaries 23,561,994      23,772,608      17,868,724      25,912,291     14,343,333    10,699,131    10,277,616    3,898,033       15,934,820    102,108           4,602,714       7,905,724       4,922,631       ‐                  163,801,727    55.31%

Employee Benefits ‐                     ‐                     ‐                     4                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  18,209,297    18,209,301      6.15%

Supplies Gen Exp 250,392            384,315            199,061            235,406           207,437          336,750          199,396          310,446          1,322,313        ‐                   151,064          254,809          (13,548)           1,800,000       5,637,841        1.90%

Travel 103,210            88,882              34,545              64,006             56,181            87,417            77,555            125,009          120,510           ‐                   56,671            103,281          32,701            ‐                  949,968           0.32%

Marketing Costs 49,979              46,349              109,159            36,266             89,207            38,323            191,180          81,220            843,634           ‐                   ‐                  2,000              ‐                  ‐                  1,487,317        0.50%

Rental & Leases 34,418              121,260            1,316,150         631,380           41,484            508,719          38,680            24,980            224,371           ‐                   ‐                  858,067          9,721              ‐                  3,809,230        1.29%

Insurance/Risk Mgmt 794                    ‐                     ‐                     154                  ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  676                 ‐                  6,870,085       6,871,709        2.32%

Contract Services 321,129            298,506            69,710              49,485             163,144          345,973          65,574            420,093          13,174,586    ‐                   132,335          2,411,598       31,883            5,958,103       23,442,119      7.92%

Utilities 5,025                ‐                     4,600                ‐                   ‐                  ‐                  ‐                  ‐                  1,575,778        ‐                   ‐                  1,400,000       ‐                  9,904,207       12,889,610      4.35%

Other Departmental Expenses 80,355              45,343              36,783              43,845             137,872          115,724          53,544            300,603          186,578           ‐                   136,159          253,373          138,291          277,973          1,806,443        0.61%

Instructional & Other Materials 449,461            293,885            141,398            283,330           67,815            364,475          1,346,475       36,261            132,117           ‐                   1,061,676       6,682,931       279,092          ‐                  11,138,916      3.76%

Maintenance & Repair 116,709            28,627              47,999              33,463             15,772            84,713            158,650          1,265              704,068           ‐                   8,472              8,870              416                 2,519              1,211,543        0.41%

Transfers/Debt ‐                     845,619            5,636,142         1,155,001        ‐                  ‐                  ‐                  ‐                  3,264               ‐                   ‐                  ‐                  ‐                  26,059,313    33,699,339      11.38%

Contingency 50,000              25,768              47,410              49,044             40,000            50,000            ‐                  83,000            125,000           ‐                   50,000            50,000            38,697            1,991,356       2,600,275        0.88%

Capital Outlay 578,077            323,139            286,843            111,859           282,606          559,924          30,859            61,150            1,480,548        ‐                   1,089              756,834          1,873              4,127,136       8,601,937        2.90%

Total Budget 25,601,543      26,274,301      25,798,524      28,605,534     15,444,851    13,191,149    12,439,529    5,342,060       35,827,587    102,108           6,200,180       20,688,163    5,441,757       75,199,989    296,157,275    100.00%

 CENTRAL 

 NORTH

WEST 

 NORTH

EAST 

 SOUTH

WEST   SOUTH EAST   COLEMAN 

 EXTENDED 

LEARNING 

 CHAN‐

CELLOR 

DEPUTY CHAN‐

CELLOR 

INSTITU‐

TIONAL 

EFFECTIVE‐

NESS 

 INSTRUC‐

TION 

 INFO

TECH 

 STUDENT 

SUCCESS   SYSTEM   HCCS 

 % of 

Actuals 

EXPENSES

Faculty‐FT  2,974,481         2,898,204         2,078,454         3,455,334        1,406,914       1,656,709       659,299          ‐                  ‐                    ‐                   15,509            24,333            ‐                  ‐                  15,169,237      21.81%

Faculty‐PT 1,513,022         1,938,657         1,224,182         1,843,027        1,169,053       462,923          927,400          ‐                  ‐                    ‐                   82,581            ‐                  ‐                  ‐                  9,160,846        13.17%

Librarian/Counselor‐FT  274,331            292,886            246,747            195,234           167,136          13,414            2,886              ‐                  ‐                    ‐                   92,411            ‐                  22,037            ‐                  1,307,082        1.88%

Librarian/Counselor‐PT 17,885              43,240              35,205              49,096             16,042            8,066              ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  15,207            ‐                  184,742           0.27%

Staff‐FT 1,334,507         1,044,704         1,150,593         1,363,646        901,624          588,690          903,123          914,974          3,807,707        25,527             842,414          1,804,834       1,029,426       ‐                  15,711,768      22.59%

Staff‐PT 338,655            345,322            178,692            323,564           231,767          72,553            157,711          34,813            92,984             ‐                   28,024            32,253            61,038            ‐                  1,897,378        2.73%

     Sub‐total Salaries 6,452,882         6,563,013         4,913,872         7,229,901        3,892,537       2,802,356       2,650,419       949,787          3,900,692        25,527             1,060,938       1,861,420       1,127,709       ‐                  43,431,053      62.44%

Employee Benefits ‐                     ‐                     ‐                     3                       ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  4,413,946       4,413,949        6.35%

Supplies Gen Exp 36,113              46,488              44,314              55,979             42,820            50,313            58,602            77,070            256,333           ‐                   45,303            20,293            30,529            415,938          1,180,097        1.70%

Travel 4,888                16,597              4,216                8,224               3,224              17,475            25,307            23,576            17,156             ‐                   17,623            9,814              9,333              ‐                  157,433           0.23%

Marketing Costs 1,098                12,432              ‐                     15,627             11,175            1,346              51,740            62,986            227,536           ‐                   ‐                  ‐                  ‐                  ‐                  383,941           0.55%

Rental & Leases 30,060              17,856              345,241            72,112             8,370              124,555          3,654              3,948              64,115             ‐                   ‐                  5,543              2,415              ‐                  677,870           0.97%

Insurance/Risk Mgmt ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  6,518,690       6,518,690        9.37%

Contract Services 15,053              19,027              9,378                10,105             19,551            238,613          17,013            40,496            1,680,943        ‐                   7,689              156,499          29,076            1,395,435       3,638,877        5.23%

Utilities 1,168                ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  137,873           ‐                   ‐                  376,736          ‐                  1,236,273       1,752,050        2.52%

Other Departmental Expenses 7,858                4,059                5,287                9,329               3,058              19,022            19,046            151,252          17,219             ‐                   21,893            18,885            16,178            274,370          567,458           0.82%

Instructional & Other Materials 91,712              23,651              16,752              22,836             7,624              33,775            111,823          ‐                  6,926               ‐                   238,846          950,413          37,502            ‐                  1,541,859        2.22%

Maintenance & Repair 13,044              1,870                3,091                700                  1,774              1,256              18,410            238                 53,479             ‐                   4,853              622                 ‐                  ‐                  99,337             0.14%

Transfers/Debt ‐                     221,329            1,651,966         664,709           ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  2,545,277       5,083,281        7.31%

Contingency ‐                     ‐                     ‐                     ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    ‐                   ‐                  ‐                  ‐                  ‐                  ‐                    0.00%

Capital Outlay 12,637              15,962              9,215                20,886             5,429              ‐                  ‐                  ‐                  10,000             ‐                   ‐                  40,857            ‐                  ‐                  114,986           0.17%

Total Expense 6,666,513         6,942,284         7,003,331         8,110,412        3,995,563       3,288,710       2,956,015       1,309,354       6,372,273        25,527             1,397,146       3,441,082       1,252,742       16,799,929    69,560,880      100.00%% of Adjusted 

Budget by Division 26.04% 26.42% 27.15% 28.35% 25.87% 24.93% 23.76% 24.51% 17.79% 25.00% 22.53% 16.63% 23.02% 22.34% 23.49% 100.00%

Remaining Balance 18,935,030      19,332,017      18,795,193      20,495,122     11,449,288    9,902,439       9,483,514       4,032,706       29,455,314    76,581             4,803,034       17,247,081    4,189,015       58,400,060    226,596,395   

HOUSTON COMMUNITY COLLEGE2012‐2013 Expenditures

YTD Adjusted Budget by Division

YTD Actuals by Division

2

Page 10: Fs2012 november

Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July  Aug.

Central                                 FY2013 8.77% 17.29% 26.04%

                                              FY2012 8.89% 17.89% 27.03% 35.01% 41.49% 49.28% 58.01% 66.97% 74.34% 81.43% 88.98% 94.59%

Northwest                          FY2013 8.26% 17.69% 26.42%

                                              FY2012 8.55% 18.72% 27.39% 33.69% 38.31% 46.70% 55.31% 66.77% 74.43% 81.57% 89.43% 95.09%

Northeast                           FY2013 6.80% 19.95% 27.15%

                                              FY2012 6.70% 20.76% 27.75% 33.82% 40.16% 46.70% 53.35% 76.04% 82.19% 88.46% 94.27% 98.45%

Southwest                          FY2013 8.59% 19.46% 28.35%

                                              FY2012 8.58% 19.19% 28.11% 36.68% 43.63% 50.96% 58.38% 71.97% 79.03% 85.23% 92.21% 96.87%

Southeast                            FY2013 7.94% 16.74% 25.87%

                                              FY2012 8.68% 17.97% 27.56% 35.39% 41.33% 49.39% 57.90% 67.21% 74.92% 81.69% 89.81% 95.46%

Coleman                              FY2013 8.06% 17.28% 24.93%

                                              FY2012 8.26% 17.29% 25.18% 32.46% 39.63% 47.52% 55.02% 63.80% 71.21% 79.83% 87.22% 93.29%

Extended Learning            FY2013 7.79% 15.60% 23.76%

3                                               FY2012 7.97% 15.68% 23.55% 30.39% 37.09% 45.43% 53.07% 60.96% 69.35% 76.72% 84.68% 91.63%

Chancellor                           FY2013 7.14% 13.81% 24.51%

                                              FY2012 8.66% 16.11% 23.27% 30.27% 39.34% 45.84% 53.37% 61.08% 68.18% 74.82% 81.30% 89.24%

Deputy Chancellor             FY2013 4.52% 10.80% 17.79%

                                              FY2012 4.52% 10.28% 16.85% 22.58% 31.70% 38.52% 45.34% 51.71% 59.06% 69.23% 76.82% 80.46%

Institute Effectiveness      FY2013 8.33% 16.67% 25.00%

                                              FY2012 5.76% 15.21% 22.37% 29.85% 38.13% 45.15% 52.82% 59.23% 67.73% 76.94% 85.77% 94.82%

Instruction                          FY2013 6.55% 15.59% 22.53%

                                              FY2012 6.73% 16.23% 22.67% 28.96% 35.81% 42.78% 52.10% 59.22% 65.59% 72.63% 82.25% 89.27%

Info Tech                              FY2013 5.56% 12.11% 16.63%

                                              FY2012 20.14% 33.96% 40.28% 45.47% 52.99% 59.23% 64.92% 71.03% 76.35% 82.70% 88.44% 99.49%

Student Success                 FY2013 7.33% 14.68% 23.02%

                                              FY2012 8.33% 15.89% 23.44% 30.58% 40.76% 48.76% 56.63% 65.19% 72.58% 80.37% 90.28% 98.41%

System                                 FY2013 12.41% 18.87% 22.34%

                                              FY2012 22.23% 25.94% 29.46% 32.09% 36.45% 39.69% 43.39% 63.98% 68.16% 71.84% 79.45% 88.27%

Total HCCS                           FY2013 8.55% 16.77% 23.49%

                                              FY2012 12.05% 20.09% 26.81% 32.55% 38.82% 45.08% 51.63% 65.11% 71.48% 77.90% 85.35% 91.73%

Houston Community College

Cash Flow Analysis ‐ Monthly Percentage of Budget UsedFY2013 vs. FY2012

Page 11: Fs2012 november

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  11,318,430          3,312,980        29.27% 10,224,328        2,974,481          29.09%

Faculty‐PT 3,773,770             1,194,508        31.65% 4,753,315           1,513,022          31.83%

Librarian/Counselor‐FT  1,048,871             287,942           27.45% 1,054,830           274,331             26.01%

Librarian/Counselor‐PT 124,493                14,401              11.57% 87,030                17,885                20.55%

Staff‐FT 5,320,421             1,325,800        24.92% 5,457,530           1,334,507          24.45%

Staff‐PT 1,783,972             390,870           21.91% 1,984,961           338,655             17.06%

     Sub‐total Salaries 23,369,957          6,526,500        27.93% 23,561,994        6,452,882          27.39%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 220,648                39,977              18.12% 250,392              36,113                14.42%

Travel 100,311                3,263                3.25% 103,210              4,888                 4.74%

Marketing Costs 56,879                  18,391              32.33% 49,979                1,098                 2.20%

Rental & Leases 84,498                  26,000              30.77% 34,418                30,060                87.34%

Insurance/Risk Mgmt 794                        ‐                    0.00% 794                       ‐                     0.00%

Contract Services 330,483                24,685              7.47% 321,129              15,053                4.69%

Utilities ‐                         ‐                    ‐                 5,025                  1,168                 0.00%

Other Departmental Expenses 62,728                  5,236                8.35% 80,355                7,858                 9.78%

Instructional & Other Materials 456,040                84,265              18.48% 449,461              91,712                20.40%

Maintenance & Repair 86,838                  9,673                11.14% 116,709              13,044                11.18%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 47,504                  ‐                    0.00% 50,000                ‐                     ‐                      

Capital Outlay 118,876                2,524                2.12% 578,077              12,637                2.19%

     Total Expenses  24,935,556          6,740,514        27.03% 25,601,543        6,666,513          26.04%

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  10,095,800          2,917,775        28.90% 10,092,399        2,898,204          28.72%

Faculty‐PT 4,194,862             1,354,863        32.30% 6,327,932           1,938,657          30.64%

Librarian/Counselor‐FT  979,988                240,481           24.54% 1,115,400           292,886             26.26%

Librarian/Counselor‐PT 133,561                31,405              23.51% 194,185              43,240                22.27%

Staff‐FT 3,715,862             871,928           23.47% 4,399,974           1,044,704          23.74%

Staff‐PT 1,168,139             283,125           24.24% 1,642,718           345,322             21.02%

     Sub‐total Salaries 20,288,212          5,699,577        28.09% 23,772,608        6,563,013          27.61%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 257,745                17,718              6.87% 384,315              46,488                12.10%

Travel 77,267                  14,438              18.69% 88,882                16,597                18.67%

Marketing Costs 41,176                  13,235              32.14% 46,349                12,432                26.82%

Rental & Leases 73,501                  12,685              17.26% 121,260              17,856                14.73%

Insurance/Risk Mgmt ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Contract Services 287,300                61,806              21.51% 298,506              19,027                6.37%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 34,882                  10,357              29.69% 45,343                4,059                 8.95%

Instructional & Other Materials 194,343                23,897              12.30% 293,885              23,651                8.05%

Maintenance & Repair 24,520                  765                   3.12% 28,627                1,870                 6.53%

Transfers/Debt 875,943                242,943           27.74% 845,619              221,329             ‐                      

Contingency 29,677                  ‐                    0.00% 25,768                ‐                     ‐                      

Capital Outlay 92,998                  4,306                4.63% 323,139              15,962                4.94%

     Total Expenses  22,277,564          6,101,727        27.39% 26,274,301        6,942,284          26.42%

Central College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Northwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

4

Page 12: Fs2012 november

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  7,922,908             2,285,769        28.85% 7,284,350           2,078,454          28.53%

Faculty‐PT 2,906,276             1,020,738        35.12% 4,066,211           1,224,182          30.11%

Librarian/Counselor‐FT  1,100,054             282,126           25.65% 880,441              246,747             28.03%

Librarian/Counselor‐PT 115,648                24,507              21.19% 119,380              35,205                29.49%

Staff‐FT 4,552,312             1,136,163        24.96% 4,775,393           1,150,593          24.09%

Staff‐PT 693,595                174,929           25.22% 742,949              178,692             24.05%

     Sub‐total Salaries 17,290,793          4,924,231        28.48% 17,868,724        4,913,872          27.50%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 321,937                47,518              14.76% 199,061              44,314                22.26%

Travel 31,665                  4,899                15.47% 34,545                4,216                 12.20%

Marketing Costs 46,417                  1,933                4.16% 109,159              ‐                     0.00%

Rental & Leases 1,260,216             221,547           17.58% 1,316,150           345,241             26.23%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 49,560                  2,135                4.31% 69,710                9,378                 13.45%

Utilities 4,600                    950                   20.65% 4,600                  ‐                     0.00%

Other Departmental Expenses 46,840                  6,969                14.88% 36,783                5,287                 14.37%

Instructional & Other Materials 153,006                13,374              8.74% 141,398              16,752                11.85%

Maintenance & Repair 27,847                  5,384                19.33% 47,999                3,091                 6.44%

Transfers/Debt 5,640,942             1,697,155        30.09% 5,636,142           1,651,966          ‐                      

Contingency 41,706                  ‐                    0.00% 47,410                ‐                     ‐                      

Capital Outlay 48,101                  76                     0.16% 286,843              9,215                 3.21%

     Total Expenses  24,963,630          6,926,171        27.75% 25,798,524        7,003,331          27.15%

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  13,857,500          4,000,646        28.87% 11,995,950        3,455,334          28.80%

Faculty‐PT 5,610,993             1,826,414        32.55% 5,823,205           1,843,027          31.65%

Librarian/Counselor‐FT  1,484,458             491,617           33.12% 730,819              195,234             26.71%

Librarian/Counselor‐PT 282,472                49,168              17.41% 183,845              49,096                26.71%

Staff‐FT 5,498,683             1,433,108        26.06% 5,687,552           1,363,646          23.98%

Staff‐PT 1,664,426             434,307           26.09% 1,490,920           323,564             21.70%

     Sub‐total Salaries 28,398,531          8,235,260        29.00% 25,912,291        7,229,901          27.90%

Employee Benefits ‐                         ‐                    ‐                 4                           3                         ‐                 

Supplies Gen Exp 253,668                41,130              16.21% 235,406              55,979                23.78%

Travel 65,224                  8,959                13.74% 64,006                8,224                 12.85%

Marketing Costs 37,367                  9,726                26.03% 36,266                15,627                43.09%

Rental & Leases 855,864                109,722           12.82% 631,380              72,112                11.42%

Insurance/Risk Mgmt 113                        ‐                    ‐                 154                       ‐                     0.00%

Contract Services 42,150                  15,841              37.58% 49,485                10,105                20.42%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 42,868                  13,732              32.03% 43,845                9,329                 21.28%

Instructional & Other Materials 238,615                38,424              16.10% 283,330              22,836                8.06%

Maintenance & Repair 21,054                  4,202                19.96% 33,463                700                    2.09%

Transfers/Debt 2,492,129             687,010           27.57% 1,155,001           664,709             57.55%

Contingency 44,734                  ‐                    0.00% 49,044                ‐                     0.00%

Capital Outlay 106,254                731                   0.69% 111,859              20,886                18.67%

     Total Expenses  32,598,571          9,164,735        28.11% 28,605,534        8,110,412          28.35%

5

Northeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Southwest College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Page 13: Fs2012 november

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  5,655,140             1,618,482        28.62% 4,907,675           1,406,914          28.67%

Faculty‐PT 2,658,054             887,711           33.40% 3,779,081           1,169,053          30.93%

Librarian/Counselor‐FT  694,643                180,201           25.94% 514,757              167,136             32.47%

Librarian/Counselor‐PT 79,814                  12,340              15.46% 82,452                16,042                19.46%

Staff‐FT 3,356,007             826,555           24.63% 3,834,196           901,624             23.52%

Staff‐PT 990,093                240,176           24.26% 1,225,172           231,767             18.92%

     Sub‐total Salaries 13,433,752          3,765,464        28.03% 14,343,333        3,892,537          27.14%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 191,529                51,922              27.11% 207,437              42,820                20.64%

Travel 48,763                  7,054                14.47% 56,181                3,224                 5.74%

Marketing Costs 115,335                11,302              9.80% 89,207                11,175                12.53%

Rental & Leases 177,160                48,585              27.42% 41,484                8,370                 20.18%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 134,489                60,264              44.81% 163,144              19,551                11.98%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 175,608                3,579                2.04% 137,872              3,058                 2.22%

Instructional & Other Materials 61,008                  10,420              17.08% 67,815                7,624                 11.24%

Maintenance & Repair 15,172                  810                   5.34% 15,772                1,774                 11.25%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 32,436                  ‐                    0.00% 40,000                ‐                     0.00%

Capital Outlay 82,501                  28,289              34.29% 282,606              5,429                 1.92%

     Total Expenses  14,467,753          3,987,690        27.56% 15,444,851        3,995,563          25.87%

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  6,678,924             1,790,567        26.81% 5,979,387           1,656,709          27.71%

Faculty‐PT 1,222,995             312,450           25.55% 1,790,194           462,923             25.86%

Librarian/Counselor‐FT  186,866                46,782              25.04% 53,730                13,414                24.96%

Librarian/Counselor‐PT 29,835                  8,036                26.94% 33,248                8,066                 24.26%

Staff‐FT 2,356,886             585,218           24.83% 2,401,250           588,690             24.52%

Staff‐PT 361,263                79,691              22.06% 441,322              72,553                16.44%

     Sub‐total Salaries 10,836,769          2,822,745        26.05% 10,699,131        2,802,356          26.19%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Supplies Gen Exp 326,341                35,860              10.99% 336,750              50,313                14.94%

Travel 78,252                  12,149              15.53% 87,417                17,475                19.99%

Marketing Costs 43,823                  ‐                    0.00% 38,323                1,346                 3.51%

Rental & Leases 490,461                109,387           22.30% 508,719              124,555             24.48%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Contract Services 324,209                156,675           48.33% 345,973              238,613             68.97%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Other Departmental Expenses 63,843                  10,575              16.56% 115,724              19,022                16.44%

Instructional & Other Materials 352,296                34,908              9.91% 364,475              33,775                9.27%

Maintenance & Repair 61,334                  3,341                5.45% 84,713                1,256                 1.48%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency 50,001                  ‐                    0.00% 50,000                ‐                     0.00%

Capital Outlay 25,000                  ‐                    0.00% 559,924              ‐                     0.00%

     Total Expenses  12,652,329          3,185,641        25.18% 13,191,149        3,288,710          24.93%

Southeast College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

Coleman College

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

6

Page 14: Fs2012 november

Adjusted Budget 

FY2012

YTD Actuals Thru 

November 30, 2011 % of Budget Used

Adjusted Budget 

FY2013

YTD Actuals Thru 

November 30, 2012 % of Budget Used

EXPENSES

Faculty‐FT  2,379,308             652,585           27.43% 2,378,018           659,299             27.72%

Faculty‐PT 3,216,621             813,399           25.29% 3,617,035           927,400             25.64%

Librarian/Counselor‐FT  67,910                  16,977              25.00% 2,887                  2,886                 99.97%

Librarian/Counselor‐PT ‐                         ‐                    0.00% ‐                        ‐                     0.00%

Staff‐FT 3,688,413             915,439           24.82% 3,655,814           903,123             24.70%

Staff‐PT 672,108                124,324           18.50% 623,862              157,711             25.28%

     Sub‐total Salaries 10,024,360          2,522,726        25.17% 10,277,616        2,650,419          25.79%

Employee Benefits ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Supplies Gen Exp 198,614                25,448              12.81% 199,396              58,602                29.39%

Travel 68,930                  11,956              17.35% 77,555                25,307                32.63%

Marketing Costs 206,496                89,081              43.14% 191,180              51,740                27.06%

Rental & Leases 49,990                  5,062                10.13% 38,680                3,654                 9.45%

Insurance/Risk Mgmt ‐                         ‐                    ‐                 ‐                        ‐                     0.00%

Contract Services 93,052                  12,268              13.18% 65,574                17,013                25.94%

Utilities ‐                         ‐                    ‐                 ‐                        ‐                     ‐                 

Other Departmental Expenses 54,193                  14,682              27.09% 53,544                19,046                35.57%

Instructional & Other Materials 1,166,812             115,703           9.92% 1,346,475           111,823             8.30%

Maintenance & Repair 102,500                20,521              20.02% 158,650              18,410                11.60%

Transfers/Debt ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Contingency ‐                         ‐                    ‐                 ‐                        ‐                     ‐                      

Capital Outlay 9,869                    3,150                0.00% 30,859                ‐                     0.00%

     Total Expenses  11,974,816          2,820,597        23.55% 12,439,529        2,956,015          23.76%

Detail Cash Flow Analysis ‐ Monthly Percentage of Budget Used

7

Division of Extended Learning

Page 15: Fs2012 november

2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Academic 12,077,904 12,739,232 14,345,992 16,652,752 17,802,080 17,354,256

Technical 4,378,250 4,422,336 4,883,890 5,680,164 5,924,078 5,822,072

Continuing Education 2,091,365 1,847,195 1,810,761 1,880,857 1,914,445 1,798,940

Total Fundable Contact Hou 18,547,519 19,008,763 21,040,643 24,213,773 25,640,603 24,975,268

Source: Certified CBM004 & CBM00C.

8

HOUSTON COMMUNITY COLLEGEAnnual Fundable Contact Hours 

FY 2006-07 thru FY 2011-12

0

5000000

10000000

15000000

20000000

25000000

30000000

2006‐07 2007‐08 2008‐09 2009‐10 2010‐11 2011‐12

Continuing Education Technical Academic

+5.9%+15.1%

+10.7%+2.5%

‐2.6%

Page 16: Fs2012 november

HOUSTON COMMUNITY COLLEGEUnduplicated Headcount Comparison Semester‐To‐Semester (FY 2009‐10 thru FY 2012‐13)

Fall Semester (Unduplicated Enrollment ‐ All Students)*

Spring Semester (Unduplicated Enrollment ‐ All Students)

Summer Semester (Unduplicated Enrollment ‐ All Students)

* As of November 07, 2012.

9

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

-70

-60

-50

-40

-30

-20

-10 0 10 20 30 40 50 60 70 80 90

Spr 12

Spr 11

Spr 10

Census Day

First Class Day

Spr 12 Enrollment:‐5.9% (Spr12 to 11)‐1.4% (Spr12 to 10)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

-62

-52

-42

-32

-22

-12 -2 8 18 28 38 48 58 68

Sum 12

Sum 11

Sum 10

First Class Day

Census Day

Sum 12 Enrollment:‐0.0%  (Sum12 to 11)‐4.1% (Sum12 to 10)

0

10000

20000

30000

40000

50000

60000

70000

80000-1

10

-100 -9

0

-80

-70

-60

-50

-40

-30

-20

-10 0 10 20 30 40 50 60 70

Fall 12

Fall 11

Fall 10Fall 12 Enrollment:

‐6.8%  (Fall12 to 11)‐3.3% (Fall12 to 10)

First Class Day

Census Day

Page 17: Fs2012 november

HOUSTON COMMUNITY COLLEGERevenues & Expenditures Comparison Year to Date Thru November 30, 2012

2009 Positions

Revenues Expenditures Rev H/(L) Exp

YTD Actuals Thru November 30, 2012 88,643,166           69,560,880          19,082,286       

YTD Actuals Thru November 30, 2011 90,431,515           76,633,310          13,798,205       

(1,788,349)            (7,072,430)          

10

 ‐

 10,000,000

 20,000,000

 30,000,000

 40,000,000

 50,000,000

 60,000,000

 70,000,000

 80,000,000

 90,000,000

 100,000,000

Revenues Expenditures

Page 18: Fs2012 november

` HOUSTON COMMUNITY COLLEGEMonthly Revenues & Expenditures Comparison Year to Date By Month

Revenues SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 58,227,650  9,431,856  25,352,097 

2011‐2012 61,685,752  9,480,515  24,214,599  37,832,575 66,013,487 35,495,964 10,116,378 16,794,724  15,263,177 9,332,949 7,924,181 9,726,145

2009 Positions

Expenditures SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 28,324,834  24,699,442  20,905,041 

2011‐2012 37,698,782  23,302,047  20,581,833  17,164,427 19,407,583 18,185,253 18,965,252 39,130,360  18,696,899 18,586,628 21,489,075 18,505,226

11

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐ 5,000,000

 10,000,000 15,000,000 20,000,000 25,000,000 30,000,000 35,000,000 40,000,000 45,000,000 50,000,000 55,000,000 60,000,000 65,000,000 70,000,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 19: Fs2012 november

HOUSTON COMMUNITY COLLEGERevenues Comparison Year to Date Thru November 30, 2012 by Source

2009 Positions

State 

Appropriations Ad Valorem Taxes Tuition, Net Fees

Other Local 

Income* Extended Learning Grant Revenue Total Revenues

YTD Actuals Thru November 30, 2012 24,385,875  1,705,447 23,324,561 36,403,062 475,566 2,224,042 124,614 88,643,166

YTD Actuals Thru November 30, 2011 24,494,718  2,141,068 23,635,795 37,444,157 397,580 2,203,230 114,967 90,431,515

(108,843)  (435,622) (311,235) (1,041,094) 77,986 20,813 9,646 (1,788,349)

12

 ‐

 5,000,000

 10,000,000

 15,000,000

 20,000,000

 25,000,000

 30,000,000

 35,000,000

 40,000,000

StateAppropriations

Ad Valorem Taxes Tuition, Net Fees Other LocalIncome*

Extended Learning Grant Revenue

Page 20: Fs2012 november

HOUSTON COMMUNITY COLLEGEExpense Comparison Year to Date Thru November 30, 2012 by Source

2009 Positions

YTD Actuals Thru Faculty‐FT  Faculty‐PT

Librarian/

Counselor‐FT 

Librarian/

Counselor‐PT Staff‐FT Staff‐PT

Employee 

Benefits

Supplies Gen 

Exp Travel

Marketing 

Costs

Rental & 

Leases

Insurance/

Risk Mgmt

Contract 

Services Utilities

Other 

Departmental 

Expenses

Instructional & 

Other 

Materials

Maintenance & 

Repair

Transfers/

Debt Capital Outlay      Total Expenses 

 November 30, 

2012  15,169,237  9,160,846  1,307,082  184,742  15,711,768  1,897,378  4,413,949  1,180,097  157,433  383,941  677,870  6,518,690  3,638,877  1,752,050  567,458  1,541,859  99,337  5,083,281  114,986  69,560,880 

 November 30, 

2011  14,891,634  9,185,397  1,702,716  148,706  15,413,392  2,000,841  3,631,687  1,015,787  125,501  322,477  1,901,760  6,153,931  2,716,689  1,555,594  461,099  1,857,470  108,466  13,193,307  246,856  76,633,310 

277,603  (24,551)  (395,634)  36,036  298,376  (103,463)  782,262  164,310  31,931  61,464  (1,223,890)  364,759  922,188  196,456  106,359  (315,610)  (9,129)  (8,110,026)  (131,870)  (7,072,430) 

13

 ‐

 1,000,000

 2,000,000

 3,000,000

 4,000,000

 5,000,000

 6,000,000

 7,000,000

 8,000,000

 9,000,000

 10,000,000

 11,000,000

 12,000,000

 13,000,000

 14,000,000

 15,000,000

 16,000,000

 17,000,000

 18,000,000

 19,000,000

 20,000,000

 21,000,000

 22,000,000

 23,000,000

 24,000,000

 25,000,000

 26,000,000

 27,000,000

 28,000,000

 29,000,000

 30,000,000

Page 21: Fs2012 november

     Unrestricted  Auxiliary  Restricted  Total 

Unexpended 

Plant Renewal 

 Retirement of 

Debt 

Investment in 

Plant  Total 

Consolidation & 

Elimination  Total All Funds 

ASSETSCurrent Assets:

Cash &  cash equivalents 58,007,489$        8,885,747$        ‐$                         66,893,236$       2,997,045$         11,063,608         ‐$                          14,060,653$            ‐$                              80,953,889$           

Restricted cash & cash equivalents ‐                             ‐                           13,371,683       13,371,683        130,884,839      681,235               ‐                           131,566,074           ‐                                144,937,757          

Short term Investments ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Accounts/Other receivable (net) 25,057,757          2,689,739           4,511,695          32,259,191        70,798                794,378               ‐                           865,176                   ‐                                33,124,367            

Deferred charges ‐                             669,701              ‐                          669,701              ‐                           ‐                           ‐                           ‐                                ‐                                669,701                  

Prepaids 25,178                  76,674                ‐                          101,852              1,762,224           ‐                           ‐                           1,762,224                ‐                                1,864,076               

Total Current Assets 83,090,424          12,321,861        17,883,378       113,295,663      135,714,906      12,539,221         ‐                           148,254,127           ‐                                261,549,790          

Non‐current Assets:

Deferred charges, net ‐                             ‐                           ‐                          ‐                           3,548,100           ‐                           2,601,880           6,149,980                ‐                                6,149,980               

Restricted long‐term investments ‐                             ‐                           ‐                          ‐                           2,883,896           2,686,693            ‐                           5,570,589                ‐                                5,570,589               

Long‐term investments 11,006,205          ‐                           ‐                          11,006,205        ‐                           ‐                           ‐                           ‐                                ‐                                11,006,205            

Capital Assets, net ‐                             ‐                           ‐                          ‐                           74,382,256        ‐                           653,043,159      727,425,415           ‐                                727,425,415          

Total Non‐current Assets 11,006,205          ‐                           ‐                          11,006,205        80,814,252        2,686,693            655,645,039      739,145,984           ‐                                750,152,189          

Total Assets 94,096,629$        12,321,861$      17,883,378$      124,301,868$     216,529,158$     15,225,914$       655,645,039$     887,400,111$          ‐$                              1,011,701,979$      

LIABILITIESCurrent Liabilities:

Accounts payable 6,716,531             286,915              1,837,637          8,841,083           45,392                ‐                           ‐                           45,392                     ‐                                8,886,475               

Accrued liabilities 396,487                6,503                   31,449                 434,439                142,635                558,933               ‐                             701,568                     ‐                                  1,136,007                 

Compensated absences 2,351,464             ‐                           ‐                          2,351,464           ‐                           ‐                           ‐                           ‐                                ‐                                2,351,464               

Funds held for others 6,826                    107,889              516,871             631,586              189,209              ‐                           ‐                           189,209                   ‐                                820,795                  

Deferred revenue ‐                             297,461              1,754,900          2,052,361           1,474,662           ‐                           (1,600,060)         (125,398)                  ‐                                1,926,963               

Notes payable‐current portion ‐                             ‐                           ‐                          ‐                           4,655,000           ‐                           2,595,000           7,250,000                ‐                                7,250,000               

Bonds payable‐current portion ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           14,175,000        14,175,000             ‐                                14,175,000            

Capital lease obligations‐current ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Total Current Liabilities 9,471,308             698,768$            4,140,857          14,310,933        6,506,898           558,933               15,169,940        22,235,771             ‐                                36,546,704            

Non‐current Liabilities:

Deposits ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           ‐                           ‐                                ‐                                ‐                                

Notes payable ‐                             ‐                           ‐                          ‐                           146,206,719      ‐                           31,405,318        177,612,037           ‐                                177,612,037          

Bonds payable ‐                             ‐                           ‐                          ‐                           62,554,009        1,279,420            269,438,431      333,271,860           ‐                                333,271,860          

Capital lease obligations ‐                             ‐                           ‐                          ‐                           ‐                           ‐                           108,309,832      108,309,832           ‐                                108,309,832          

Total Non‐current Liabilities ‐                             ‐                           ‐                          ‐                           208,760,728      1,279,420            409,153,581      619,193,729           ‐                                619,193,729          

Total Liabilities 9,471,308$          698,768$            4,140,857$        14,310,933$       215,267,626$     1,838,353$         424,323,521$     641,429,500$          ‐$                              655,740,430$         

 Fund Balance‐ 

August 31, 2012 Audited  66,664,555          11,747,296         9,080,325            87,492,176          3,738,684             10,061,216         235,429,798        249,229,698             ‐                                  336,721,874            

Revenues Over Expenditures

     Unrestricted 17,960,766          (124,203)             17,836,563        17,836,563            

     Restricted 4,662,196          4,662,196           4,662,196               

     Net Investment in Plant     (2,477,150)         3,326,345            (4,108,279)         (3,259,084)              (3,259,084)             

Total Fund Balances 84,625,321$        11,623,093$      13,742,521$      109,990,935$     1,261,534$         13,387,561$       231,321,519$     245,970,614$          ‐$                              355,961,549$         

 Total Liabilities &  Fund Balances  94,096,629$        12,321,861$      17,883,378$      124,301,868$     216,529,158$     15,225,914$       655,645,040$     887,400,114$          ‐$                              1,011,701,979$      

    14 

PLANT & BOND FUNDS

Houston Community CollegeBalance Sheet By Fund

For Month Ended November 30, 2012

CURRENT & LOAN FUNDS

Page 22: Fs2012 november

TOTAL 

Unexpended Plant Funds

Total Unexpended Plant Fund Balances per Books (919,147)$           

  Spending/Encumbrances/Reserve for Future Use

‐ Encumbrances/PO Issued General Unexpended FY13 919,147               

Total  Plant Fund PO 919,147$             

     Anticipated Unexpended Plant Shortfall ‐$                         

HOUSTON COMMUNITY COLLEGEUnexpended Plant Fund Excluding 2004 CIP

Cash Position to November 30, 2012

15

Page 23: Fs2012 november

Description of Use

Total Budget to 

Date

Total 

Expenditures      

To Date

Encumbrances To 

Date Unexpended

DEFERRED MAINTENANCE FY05

System Administration 604,863$                604,863$                ‐$                              ‐$                             

Subtotal 604,863$               604,863$               ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY06

System Administration 649,625$                649,624$                ‐$                              ‐$                             

Northwest College 412,743                412,743                ‐                               ‐                            

Coleman College 190,738                190,736                ‐                               ‐                            

Subtotal 1,253,106$            1,253,103$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY07

System Administration 775,610$                775,610$                ‐$                              ‐$                             

Central College 373,917                373,917                ‐                               ‐                            

Northwest College 599,383                599,383                ‐                               ‐                            

Northeast College 1,059,733             1,059,733             ‐                               ‐                            

Southwest College 74,607                  74,607                  ‐                               ‐                            

Southeast College 38,742                  38,742                  ‐                               ‐                            

Coleman College 9,900                    9,900                    ‐                               ‐                            

Subtotal 2,931,893$            2,931,892$            ‐$                              ‐$                           

DEFERRED MAINTENANCE  FY08

System Administration 10,195$                  10,195$                  ‐$                              ‐$                             

Central College 478,637                478,637                ‐                               ‐                            

Northwest College 1,217,755             1,217,755             ‐                               ‐                            

Northeast College 494,886                494,886                ‐                               ‐                            

Southwest College 42,063                  42,063                  ‐                               ‐                            

Coleman College 73,813                  73,813                  ‐                               ‐                            

Subtotal 2,317,348$            2,317,349$            ‐$                              ‐$                           

OTHER GENERAL PROJECTS

Minor Construction 657,807$               657,807$               ‐$                              ‐$                           

System 11,555,483           10,992,789           562,694                 ‐                            

Central College 3,112,723             2,906,526             206,197                 ‐                            

Northwest College 4,060,039             4,044,540             15,499                   ‐                            

Northeast College 626,331                619,524                6,807                     ‐                            

Southwest College 1,118,747             1,000,997             117,750                 ‐                            

Southeast College 1,995,204             1,987,854             7,350 ‐                            

Coleman College 1,341,159             1,341,159             ‐                            

Subtotal 24,467,493$         23,551,196$         916,297$                ‐$                           

SURPLUS PROPERTY

Palmetto Property ‐ Purchase 495,154$               495,154$               ‐$                              ‐$                           

Dixie Property‐ Refund 20,000                  20,000                  ‐                            

 288 Property‐ Purchase 1,142,402             1,139,552             2,850                     ‐                            

Warehouse Property 12,966,619           12,966,619           ‐                               ‐                            

Subtotal 14,624,175$         14,621,325$         2,850$                    ‐$                           

Total Anticipated Uses 46,198,878$          45,279,728$          919,147$                ‐$                             

UNEXPENDED PLANT FUND PROJECTSas of November 30, 2012

16

HOUSTON COMMUNITY COLLEGE

Page 24: Fs2012 november

 

Total Budget 

to Date

Total 

Expenditures   

To Date

Encumbrances 

To Date

% of 

Expen‐ 

ditures Unexpended

% of 

Total 

BudgetSources:

Central College 2001A Bond 25,318,535$      

2003 Limited Tax Bond and Premium 150,748,497      

Actural Interest Earned 2003 Limited Tax Bonds 20,868,074         

2005 Limited Tax and Building Bond 1,875,000           

2003/2005 LTD Bond Issuance Cost (2,068,522)          

2006 Jr Lien Bond Std Revenue Bond 30,000,000         

Bond Issuance Cost (913,149)             

Actual Interest Earned 2006 Jr Lien Bonds 2,608,533           

Transferred to Fund 7305/Hayes Road (3,169,049)          

2008 Maintenance Tax Notes 56,912,320         

2008 MTN Bond Issuance Cost (1,056,912)          

Actual Interest Earned 2008 MTN 1,654,029           

2008 Sr. Lien Bond             1,714,953 

Transferred to Residual CIP Funds         (20,712,314)

Total Available with Reclassification 263,779,995$    

Uses:

Construction 119,626,029$     119,499,752$     126,277$              100% ‐$                          0%

CPMS PGAL  11,121,809          11,121,809          ‐                             100% ‐                             0%

Facility Planning 1,677,989            1,677,989            ‐                             100% ‐                             0%

Architect Fees and Engineering 7,604,912            7,505,762            99,149                  100% ‐                             0%

Other Costs including Bldg/Land Purchase 2,273,077            2,258,218            14,859                  100% ‐                             0%

Inspectors 890,000               890,000               ‐                             100% ‐                             0%

Design Standard 103,370               103,370               ‐                             100% ‐                             0%

Site Improvement and Infrastructure Development 52,572,901          51,594,875          978,026                100% ‐                             0%

IT Infrastructure Master Plan 29,728,464          29,074,477          653,987                100% ‐                             0%

Furniture and Fixtures 14,352,845          13,909,258          443,071                100% 516                       0%

Small Business 567,383               567,383               ‐                             100% ‐                             0%

Administrative Services 3,391,210            3,218,484            172,726                100% ‐                             0%

Material Testing 574,120               537,606               36,513                  100% ‐                             0%

Contingency for Construction 23,270                  0% 23,270                  100%

Surveying 471,813               460,552               11,260                  100% ‐                             0%

Design and Geotech 110,911               110,111               800                        100% ‐                             0%

Signage 70,000                  70,000                  100% ‐                             0%

Blue Light Security 126,000               115,200               10,800                  100% ‐                             0%

PGAL Website Development 181,208               181,208               ‐                             100% ‐                             0%

System Architect Furniture Consultant 11,367                  11,367                  100% ‐                             0%

Northline Demolition‐Pizza Hut 226,246               226,246               100% ‐                             0%

Police Cars 342,223               341,613               610                        100% ‐                             0%

Bering St. Property 50,687                  50,687                  100% ‐                             0%

General Repairs & Maintenance 2,079,239            2,079,239            100% ‐                             0%

Land Purchase 1,919,729            1,919,729            100% ‐                             0%

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067            2,213,648            18,119                  100% 3,300                    0%

Total Construction Cost 252,331,872$     249,738,586$     2,566,199$          100% 27,086$               0%

Note: Expenditures Not In Construction Schedule

Deferred Maintenance 5,000,000$          5,000,000$          ‐$                           100% ‐$                          0%

IT Development 6,448,123            6,448,122            ‐                             100% ‐                             0%

263,779,995$     261,186,708$     2,566,200$          100% 27,086$               0%

Anticipated Budget Shortfall/Surplus (0)                          

*Footnote on next page

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

17

Page 25: Fs2012 november

2003/2005 Limited Tax Bonds 2003 2005 TotalBond counsel fees 150,000 57,000 207,000Underwriters' discount 814,813 57,000 871,813Insurance premium 558,764 558,764Financial advisory fee 205,391 68,081 273,472Rating agencies fees 114,350 16,000 130,350Printing costs 10,386 4,506 14,892CPA consent letter fee 1,500 1,500 3,000Verification fees 3,500 3,500Paying agent fee 300 5,432 5,732

1,855,504 213,018 2,068,522

2006 Jr Lien Revenue BondsBond counsel fees 79,500Underwriters' discount 509,509Insurance premium 117,904Financial advisory fee 137,910Rating agencies fees 54,850Printing costs 3,502CPA consent letter fee 1,500Verification fees 3,500Paying agent fee 4,974

913,149

2008 Maintenance Tax NotesBond counsel fees 63,500Underwriters' discount 342,526Insurance premium 498,600Financial advisory fee 95,105Rating agencies fees 47,100Printing costs 9,617Paying agent fee 463

1,056,912

18

HOUSTON COMMUNITY COLLEGE2004 CIP Projects Footnotes

as of November 30, 2012

Page 26: Fs2012 november

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

Central ‐ San Jacinto:*

Construction Cost 1,241,868$         1,241,868$         ‐$                         

CPMS PGAL 111,440              111,440              ‐                         ‐                          

Facilities Space Programming 393,715              393,715              ‐                         ‐                          

Material Testing  ‐                           ‐                           ‐                         ‐                          

IT Infrastructure Capital Projects 10,000                5,687                  4,314                 ‐                          

Design Standards 3,904                  3,904                  ‐                          

  Total Central ‐ San Jacinto 1,785,007$          1,780,694$          4,314$               ‐$                          

Central ‐ Learning Hub/Science Bldg:*

Construction Cost 21,484,282$       21,455,534$       28,748$             -$ CPMS PGAL 1,967,801           1,967,801           ‐                          

Facilities Space Programming 148,096              148,096              ‐                         ‐                          

Architect and Engineering 1,242,506           1,242,506           ‐                          

Furniture, Fixtures & Equipment 2,049,869           2,019,706           30,163              ‐                          

Inspectors 187,000              187,000              ‐                          

Project Software 7,614                  7,614                  ‐                          

Design Standards 15,086                15,086                ‐                          

Site Infrastructure Improvements 5,693,396           4,996,800           696,594            ‐                          

IT Infrastructure Master Plan 2,751,121           2,726,528           24,593              ‐                          

Design Geotech 10,150                10,150                ‐                          

Material Testing  32,994                32,356                638                    ‐                          

Surveying  69,453                64,118                5,335                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total Central ‐ Learning Hub/Science 

Bldg:*

35,677,368$        34,889,495$        787,871$           ‐$                          

NEC ‐ Learning Hub:*

Construction Cost 14,001,119$       14,001,119$       ‐                          

CPMS PGAL 1,187,440           1,187,440           ‐                          

Facilities Space Programming 145,889              145,889              ‐                          

Architect and Engineering 723,556              723,556              ‐                          

Furniture, Fixtures & Equipment 1,660,682           1,651,908           8,774                 ‐                          

Other Costs including Bldg/Land Purchase ‐                           ‐                          

Inspectors 205,000              205,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,015                  9,015                  ‐                          

Site Infrastructure Improvements 92,682                92,682                ‐                         ‐                          

IT Infrastructure Master Plan 1,250,254           1,249,836           418                    ‐                          

Design Geotech ‐                           ‐                          

Material Testing  131,870              123,607              8,263                 ‐                          

Surveying  71,081                71,081                ‐                          

  Total NEC ‐ Learning Hub 19,478,588$        19,461,133$        17,455$             ‐$                          

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

19

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 27: Fs2012 november

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

NEC ‐ Science Engineering & Technology:*

Construction Cost 11,627,061$       11,626,428$       633$                   ‐$                         

CPMS PGAL 857,203              857,203              ‐                         ‐                          

Facilities Space Programming 52,058                52,058                ‐                          

Architect and Engineering 635,906              635,906              ‐                          

Furniture, Fixtures & Equipment 644,019              607,016              37,003              ‐                          

Other Costs including Bldg/Land Purchase 84,400                73,800                10,600              ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 6,818                  6,818                  ‐                          

Site Infrastructure Improvements 15,423,888        15,353,802        70,086              ‐                          

IT Infrastructure Master Plan 1,173,585           1,160,824           12,761              ‐                          

Design Geotech 28,500                28,500                ‐                          

Material Testing  95,465                95,465                ‐                         ‐                          

Surveying  15,960                10,035                5,925                 ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total NEC ‐ Science Eng & Technology 30,662,863$        30,524,055$        138,808$           ‐$                          

NEC ‐ Pinemont:

CPMS PGAL 6,269$                 6,269$                 ‐$                        ‐$                         

Facilities Space Programming 71,292                71,292                ‐                         ‐                          

Other Costs including Bldg/Land Purchase

102,156              102,156             

‐                          ‐                            

Surveying  22,483                22,483                ‐                         ‐                          

  Total NEC ‐ Pinemont 202,200$              202,200$              ‐$                        ‐$                          

SEC - Felix Fraga (Drennan):*Construction Cost 12,419,860$       12,333,251$       86,609$             ‐$                         

CPMS PGAL 1,216,969           1,216,969           ‐                          

Facilities Space Programming 227,023              227,023              ‐                          

Architect and Engineering 850,383              835,511              14,872              ‐                          

Furniture, Fixtures & Equipment 1,007,615           977,469              30,146              ‐                          

Other Costs including Bldg/Land Purchase 62,466 62,466                ‐                          

Inspectors - ‐                          

Project Software - ‐                          

Design Standards 6,873                  6,873                  ‐                          

Site Infrastructure Improvements 5,992,274           5,959,525           32,749              ‐                          

IT Infrastructure Master Plan 1,279,923           1,268,405           11,518              ‐                          

Design Geotech 19,000                18,200                800                    ‐                          

Material Testing  150,272              137,662              12,610              ‐                          

Surveying  27,674                27,674                ‐                          

HUB/Small Business Program ‐                           ‐                           ‐                         ‐                          

HUB/Small Business Program ‐                           ‐                          

Bering St Property 50,687                50,687                ‐                          

Signage ‐                           ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                           Total SEC - Felix Fraga (Drennan):* 23,329,019$        23,137,915$        191,104$           ‐$                          

20

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 28: Fs2012 november

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

SEC ‐ Felix Morales:*

Construction Cost 3,653,331$         3,653,330$         ‐$                         

CPMS PGAL 667,905              667,905              ‐                          

Facilities Space Programming 62,181                62,181                ‐                          

Architect and Engineering 367,853              351,968              15,885              ‐                          

Furniture, Fixtures & Equipment 929,072              898,276              30,796              ‐                          

Inspectors ‐                           ‐                           ‐                         ‐                          

Project Software ‐                           ‐                           ‐                         ‐                          

Design Standards 3,117                  3,117                  ‐                         ‐                          

Site Infrastructure Improvements 98,015                96,070                1,945                 ‐                          

IT Infrastructure Master Plan 1,165,326           1,008,321           157,005            ‐                          

Design Geotech ‐                           ‐                           ‐                         ‐                          

Material Testing  10,009                5,808                  4,201                 ‐                          

Surveying  1,225                  1,225                  ‐                         ‐                          

  Total SEC ‐ Felix Morales 6,958,033$          6,748,200$          209,832$           ‐$                          

SEC ‐ Learning Hub:*

Construction Cost 16,555,351$       16,550,039$       5,312$               ‐$                         

CPMS PGAL 1,744,048           1,744,048           ‐                          

Facilities Space Programming 126,588              126,588              ‐                          

Architect and Engineering 875,415              875,415              ‐                          

Furniture, Fixtures & Equipment 2,006,664           1,839,187           167,476            ‐                          

 Other Costs including Bldg/Land Purchase  32,480                  28,221                  4,259                  ‐                            

Inspectors 258,000              258,000              ‐                         ‐                          

Project Software ‐                           ‐                          

Design Standards 9,367                  9,367                  ‐                          

Site Infrastructure Improvements 12,134,156        12,006,927        127,229            ‐                          

IT Infrastructure Master Plan 2,177,705           2,157,010           20,695              ‐                          

Administrative Services ‐                           ‐                          

Design Geotech 9,525                  9,525                  ‐                         ‐                          

Material Testing  122,370              115,883              6,487                 ‐                          

Surveying  144,094              144,094              ‐                          

Blue Light Security 18,000                18,000                - ‐                          

  Total SEC ‐ Learning Hub 36,213,761$        35,882,304$        331,458$           ‐$                          

21

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 29: Fs2012 november

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

SW ‐ Missouri City:*

Construction Cost 8,891,630$         8,891,630$         ‐$                         

CPMS PGAL 601,635              601,635              ‐                         ‐                          

Facilities Space Programming 194,111              194,111              ‐                          

Architect and Engineering 989,044              958,905              30,139              ‐                          

Furniture, Fixtures & Equipment 1,053,411           1,011,146           42,265              ‐                          

 Library & Bookstore  1,991,575           1,991,575           ‐                          

Inspectors ‐                           ‐                          

Project Software ‐                           ‐                          

Design Standards 4,999                  4,999                  ‐                          

Site Infrastructure Improvements 5,061,234           5,061,234           ‐                         ‐                          

IT Infrastructure Capital Projects 2,259,481           2,246,083           13,398              ‐                          

Design Geotech ‐                           ‐                          

Material Testing  ‐                           ‐                          

Surveying  48,311                48,311                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Missouri City 21,113,430$        21,025,828$        87,602$             ‐$                          

SW ‐ West Loop Phase I:*

Construction Cost 9,033,809$         9,031,922$         1,887$               ‐$                         

CPMS PGAL 1,033,865           1,033,865           ‐                          

Facilities Space Programming 76,260                76,260                ‐                          

Architect and Engineering 718,694              718,694              ‐                          

Furniture, Fixtures & Equipment 2,166,396           2,154,214           12,182              ‐                          

Design Standards 8,170                  8,170                  ‐                          

IT Infrastructure Capital Projects 2,893,767           2,864,190           29,577              ‐                          

Design Geotech 22,116                22,116                ‐                          

Material Testing  21,141                21,140                1                        ‐                          

Surveying  14,995                14,995                ‐                         ‐                          

Exterior Signage 70,000                70,000                ‐                         ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ West Loop Phase I 16,077,212$        16,031,765$        45,447$             ‐$                          

22

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 30: Fs2012 november

Total Budget to 

Date

Total 

Expenditures   

To Date

Encumbrances 

To Date Unexpended

HOUSTON COMMUNITY COLLEGE2004 CIP Projects

as of November 30, 2012

SW ‐ Learning Hub ‐ Stafford:*

Construction Cost 20,717,717$       20,714,629$       3,088$               ‐$                         

CPMS PGAL 1,727,234           1,727,234           ‐                          

Facilities Space Programming 180,778              180,778              ‐                          

Architect and Engineering 1,193,942           1,155,688           38,254              ‐                          

Furniture, Fixtures & Equipment 2,835,121           2,750,339           84,265              517                     

Inspectors 240,000              240,000              ‐                          

Project Software ‐                           ‐                          

Design Standards 15,845                15,845                ‐                          

Site Infrastructure Improvements 8,077,256           8,027,834           49,422              ‐                          

IT Infrastructure Capital Projects 2,611,069           2,535,820           75,249              ‐                          

Design Geotech 21,620                21,620                ‐                          

Material Testing  ‐                           ‐                          

Surveying  56,536                56,536                ‐                          

Blue Light Security 18,000                16,200                1,800                 ‐                          

  Total SW ‐ Learning Hub ‐ Stafford 37,695,119$        37,442,524$        252,078$           517$                    

System ‐ Network:

IT Infrastructure Capital Projects 12,162,330$       11,853,556$       308,774$           ‐                          

Administrative Services 3,391,210           3,218,484           172,726            ‐                          

PGAL Website Development 181,209              181,208              1                        ‐                          

HUB/Small Business Program 567,383              567,383              ‐                         ‐                          

 System Architect Furniture Consultant 

11,367                11,367               

‐                            

 Ft. Bend Library Inflation Cost Increase 

‐                          

‐                            

Northline Demolition‐Pizza Hut 226,246              226,246              ‐                          

Police Cars 342,223              341,613              610                    ‐                          

General Repairs & Maintenance 2,079,239           2,079,239           ‐                          

Land Purchase 1,919,729           1,919,729           ‐                          

Amatuer Sports Complex ‐ Willie Gay Hall 2,235,067           2,213,648           18,119              3,300                 

  Total ‐ System ‐ Network 23,116,003$        22,612,473$        500,228$           3,300$                 

Construction Contingency 23,270$               ‐$                           ‐$                        23,270                 

Subtotal Above 252,331,873$      249,738,585$      2,566,197$        27,086$               

100.00% 98.97% 1.02% 0.01%

EXPENDITURES NOT IN CONSTRUCTION SCHEDULE

Deferred Maintenance 5,000,000$         5,000,000$         ‐$                        ‐$                         

IT Development 6,448,123           6,448,122           ‐                         ‐                          

GRAND TOTAL 263,779,996$      261,186,707$      2,566,197$        27,086$               

100.00% 99.02% 0.97% 0.01%

23

 *Note 1  Budgets are adjusted as cost estimate changes; otherwise, budget is preliminary from inception. 

Page 31: Fs2012 november

 

Total Budget to 

Date

Total 

Expenditures to 

Date  Encumbrances  Unexpended

Sources:Transferred CIP Funds 20,712,314

Uses:

Central Learning Hub/Science Bldg:

Site Infrastructure Improvements 6,599,554$         96,551$                 144,584$              6,358,420$        

NEC ‐ Science Engineering & Technology:

Site Infrastructure Improvements 292,209 11,972 280,238                ‐                         

SEC ‐ Learning Hub:

Site Infrastructure Improvements 1,998,804 10,127                  1,988,677             ‐                         

Material Testing 23,368 ‐                             23,368                  ‐                         

System ‐ Network:

IT Infrastructure Capital Projects 7,569,405 5,163,235            2,329,496             76,674              

Site Infrastructure Improvements 96,600 4,830                    91,770                  ‐                         

 

 Construction Contingency 942,305 ‐                             942,305            

Contingency 3,190,069           ‐                             3,190,069         

Total Construction Cost 20,712,314$       5,286,714$           4,858,132$           10,567,468$     

Anticipated Budget Shortfall/Surplus ‐                          

24

HOUSTON COMMUNITY COLLEGE SYSTEMResidual CIP Funds

as of  11/30/12

Page 32: Fs2012 november

Total Budget 

to Date

Total 

Revenues /  

Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources of funds:

Proceeds from 

2006 Tax Maintenance Notes 12,000,000$   

Discount (88,756)            

Bond Issuance Cost (256,244)          

Interest Income 835,346           

Funds Available 12,490,346$  

Uses of funds:

Site Infrastructure 341,092$          327,728$          13,364$                 ‐$                     

Project Management 450,479            450,479            ‐                              ‐                       

Construction 8,805,292         8,805,292         ‐                              ‐                       

Design Phase 1,117,820         1,117,820         ‐                              ‐                       

Architecture 17,822              17,822              ‐                       

Material Testing & Inspection 6,399                6,399                ‐                              ‐                       

Land/Demolition 420,541            420,541            ‐                              ‐                       

Survey 9,473                9,473                ‐                              ‐                       

Construction‐Maintenance 1,259,003         1,247,114         11,889                   ‐                       

Contingency 62,424              46,700              15,724            

Grand Total Uses 12,490,346$    12,449,368$    25,253$                 15,724$          

Net Available 0$                    

25

HOUSTON COMMUNITY COLLEGEMaintenance Tax Notes 2006 (Central Utility Plant Project)

as of November 30, 2012

 Note: Budgets are adjusted as contracts are awarded; otherwise, budget is preliminary from inception. 

Page 33: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Sources:

2008 Maintenance Tax Notes 39,780,489$     

2008 Maintenance Tax Notes‐Phase 1 Infrastructure 15,078,286      

Transferred to CIP Residual Fund (7170) (17,522,242)     

Interest Earned To date 1,678,302        

Funds Available for Projects 39,014,835$     

Uses:

Site Infrastructure Improvements 5,666,582$        4,937,074$       729,508$              ‐$                       

Architectural/Engineering Fees 165,537            151,654           13,883                  ‐                         

IT Infrastructure Master Plan 19,553,388       19,235,543      317,845                ‐                         

Furniture, Fixtures & Equipment 5,056,049         4,572,572        483,477                ‐                         

Material Testing 33,351               29,035              4,316                    ‐                         

Construction 5,437,915         5,381,526        56,389                  ‐                         

Construction Management  132,478            132,478           ‐                         

Campus Security 243,116            242,415           600                       101                   

Truck Driving School 99,200               99,200              ‐                         

Land 517,306            517,306           ‐                         

Energy  Services 8,860                 8,860                ‐                         

Design GEOTECH 5,189                 5,189                ‐                             ‐                         

Surveying 16,310               16,310              ‐                             ‐                         

Contracted Services 2,079,239         2,079,239        ‐                         

Residual Funds for Completion of CIP Projects 315                    315                   

Total  39,014,835$      37,408,401$    1,606,018$           416$                  

Bond Issuance Cost:

Bond counsel fees 63,500$            

Underwriters' discount 342,526           

Insurance premium 498,600           

Financial advisory fee 95,105              

Rating agencies fees 47,100              

Printing costs 9,617                

CPA consent letter fee 463                   

Total 1,056,912$       

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

as of November 30, 2012

Fund 7203 

Fund 7203 ‐ Maintenance Tax Notes

26

Page 34: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Source:

2008 Senior Lien Bonds:

Southeast Workforce Project 14,300,000$     

  Emergency Preparedness 1,000,000        

Interest Earned To date 469,918           

Funds Available for Projects 15,769,918$     

Uses:

Operation and Maintenance 77,034               77,034              ‐                    

Major Repairs and Renovation 821,560            820,726           834                       ‐                    

South East Work Force Project 3,712,405         3,444,075        268,330                ‐                    

Land  Purchase (Rosalie Property) 2,314,967         2,314,967        ‐                    

Material Engineering and Testing 8,380                 3962 4,418                    ‐                    

Construction of Workforce Building 7,262,398         7,000,777        261,621                ‐                    

Residual Funds for All Projects 1,573,174         1,573,174        

15,769,918$      13,661,541$    535,203$              1,573,174$       

Bond Issuance Cost:

Bond counsel fees 123,267$          

Underwriters' discount 336,128           

Insurance premium 620,827           

Financial advisory fee 100,981           

Rating agencies fees 51,750              

Printing costs 5,880                

Paying agent fee 460                   

Verification fee 5,000                

Escrow agent fee 4,600                

1,248,893$       

27

Fund 7308 ‐ Senior Lien Bonds

HOUSTON COMMUNITY COLLEGE SYSTEM 2008 Maintenance Tax Notes & Senior Lien Bonds

Fund 7308as of November 30, 2012

Page 35: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances To 

Date Unexpended

Central 

San Jacinto Memorial 21,391,231$      8,073,096        2,943,855            10,374,281$     

J.B. Whitely Bldg.  4,540,000         913,212           952,126                2,674,662        

Theater One 1,699,500         183,660           33,068                  1,482,772        

Staff Instructional Services 1,005,286         153,621           40,009                  811,656           

Curriculum Innovation Center 190,000            ‐                        50,934                  139,066           

Fine Arts Parking Structure 190,000            157,587           18,596                  13,818              

Crawford Annex 68,200               18,138              ‐                             50,062              

Learning Hub/Science Bldg. 122,214            15,953              106,261                ‐                         

Planned Parenthood Renovation 1,608,769         1,605,024        3,746                    ‐                         

  Total Central  30,815,200$      11,120,289$     4,148,594$           15,546,317$     

Northeast 

Automotive Tech. Training Ctr. 4,000,000$        630,213$          65,599$                 3,304,188$       

Pinemont  66,558               39,237              ‐                             27,321              

Codwell Hall  438,000            204,117           217,788                16,095              

Codwell Hall Shower (Temp) 150,000            ‐                        150,000           

Roland Smith Truck Driving Ctr.  140,000            54,406              ‐                             85,594              

Northline 120,000            11,636              2,789                    105,575           

Public Safety Institute 115,000            11,668              ‐                             103,332           

NE Science and Tech. Bldg 49,500               ‐                        49,500              

NE Learning Hub 47,500               6,309                ‐                             41,191              

  Total Northeast 5,126,558$        957,585$          286,175$              3,882,796$       

Southeast 

Angela Morales 599,000$           413,199$          126,228$              59,573$            

Office City 38,500               ‐                        ‐                             38,500              

  Total Southeast 637,500$           413,199$          126,228$              98,073$            

Southwest

Stafford Campus (7 Bldgs) 4,242,406$        3,927,204$       315,201$              ‐$                       

Scarcella Center 927,356            347,710           91,289                  488,357           

Alief 138,680            132,664           ‐                             6,016                

Academic Ctr Sienna Plantation 93,500               85,660              7,736                    104                   

Stafford Learning Hub 54,000               ‐                        54,000              

Applied Technology Center 50,000               1,715                ‐                             48,285              

Greenbriar Annex 30,000               22,033              414                       7,553                

  Total Southwest 5,535,942$        4,516,986$       414,641$              604,315$          

System

System Building  2,368,630$        1,668,461$       700,169$              ‐$                       

Teaching Enhancement Renovations 2,737,135         1,074,963        186,325                1,475,847        

Surface Parking & Civil Infrastructure 2,400,000         1,493,817        123,196                782,987           

Parking Structure 2,394,235         2,286,034        108,201$              ‐                         

  Total System 9,900,000$        6,523,274$       1,117,890$           2,258,834$       

Grand Total 52,015,200$      23,531,333$    6,093,528$           22,390,335$     

HOUSTON COMMUNITY COLLEGE SYSTEM2010 Maintenance Tax Notes

as of November 30, 2012

28

Page 36: Fs2012 november

Description Date Issued

 Original Bond 

Amount

Principal 

Payments

Principal 

Balance

Principal & 

Interest FY12

Final Due 

Date Call Dates

Foot‐

note

2005 Senior Lien Revenue/Refunding Bonds 04/15/05 51,285,000 (13,540,000) 37,745,000 6,676,363 04/15/20 04/15/15 (A)

2006 Junior Lien Revenue/Refunding Bonds 11/01/06 72,815,000 (15,360,000) 57,455,000 6,274,230 04/15/30 04/15/16 (A)  (B)

2008 Senior Lien Revenue Bonds 05/14/08 54,540,000 (6,115,000) 48,425,000 4,075,100 04/15/30 04/15/18 (A)

2010 Senior Lien Revenue Bonds 07/29/10 27,250,000 (875,000)           26,375,000 2,124,275 04/15/31 04/15/20 (A) 

2011 Junior Lien Revenue Refunding Bonds 03/10/11 33,940,000 (2,350,000)       31,590,000 4,150,431 04/15/25 04/15/21 (A)

2011T Senior Lien Revenue Bond 11/15/11 16,000,000 16,000,000 388,800           04/15/21 11/15/13 (A)

2003 Limited Tax Bonds 12/01/03 144,155,000 (142,960,000) 1,195,000 782,175 02/15/14 (C)

2011 Limited Tax Refunding Bonds 10/20/11 109,490,000 109,490,000 5,308,300 02/15/28 02/15/21 (C)

2006 Maintenance Tax Notes 02/01/06 12,000,000 (2,660,000) 9,340,000 890,550 02/15/26 02/15/16 (C)

2008 Maintenance Tax Notes 03/01/08 54,975,000 (7,735,000) 47,240,000 4,171,426 02/15/28 02/15/18 (C)

2009 Maintenance Tax Notes 09/01/09 13,830,000 (1,445,000) 12,385,000 1,242,569 02/15/25 02/15/19 (C)

2010 Maintenance Tax Notes 07/29/10 47,645,000 (1,840,000)       45,805,000 3,998,400        02/15/29 02/15/20 (C)

2011 Maintenance Tax Notes 03/10/11 41,560,000 (1,295,000)       40,265,000 3,293,775 02/15/31 02/15/21 (C) 

2011A Maintenance Tax Notes 10/12/11 19,590,000 19,590,000 1,583,875 02/15/31 02/15/21 (C) 

PFC Series 2005A Lease Revenue Bonds 06/01/05 11,605,000 (2,485,000) 9,120,000 837,663 04/15/28 04/15/15 (A)

PFC Series 2005C Lease Revenue Bonds 12/01/05 19,155,000 (3,155,000) 16,000,000 1,313,456 04/15/30 04/15/15 (A)

PFC Series 2006 Lease Revenue Bonds 10/01/06 36,950,000 (5,135,000) 31,815,000 2,484,773 04/15/31 04/15/16 (A)  (D)

PFC Series 2007 Lease Revenue Bonds 02/01/07 58,885,000 (6,285,000) 52,600,000 4,321,500 04/15/31 04/15/17 (A) 825,670,000 (213,235,000) 612,435,000 53,917,660

Note: This schedule represents all bonds and maintenance tax notes with outstanding principal balances as of 11/30/12; 

             previously retired debt issues are not shown (i.e. 1997, 1998, 1999, 2001, 2001A, 2003 LTD, 2005 LTD)

Footnotes:

(A)  Funded from current operations, Fund 1110

(B)  Approximately $3.4 MM annually through 8/31/17 to be funded from student technology fees, Fund 8110; remainder from 

       current operations

(C)  Funded from real estate taxes, Fund 8300

(D) $1,329,772 of interest expense to be funded from real estate taxes

Schedule of Bonds and Maintenance Tax Notes

For the Month Ended November 30, 2012

Houston Community College

29

Page 37: Fs2012 november

3101‐3100 Main 

Leasing

3102‐Conference 

Training Center 3103‐HCC‐TV 

Auxiliary

3105‐HCCS ‐ PFC 

Leasing 3110‐Auxiliary

3111‐ Auxiliary 

Student Services

3201‐Cafe Club 

NEO 3100 Main

3202‐Fitness 

Center‐Central

3204‐Heinen 

Theater

3207‐

International 

Initiatives

3208‐Saudi 

Consulting 

Services 3209‐Qatar Subtotal

Fund Balance 8/31/12 16,575,935$       (744,125)$         36,165$          898,968$           (6,225,160)$       (724,173)$           (1,362,924)$       (76,298)$           33,917               (82,495)               203,712             807,349        9,340,870        

FY2013 Revenue  1,354,823               61,871                   6,909                     1,000,598               329                          115,644                   4,413                     6,255                     23,333                     1,874,568        4,448,742            

 Salaries  72,010                     52                           121,114                   49,152                     65,354                     597                         480                         3,833                       1,469,227        1,781,820            

 Benefits  19,420                     4                             28,875                     9,753                       15,165                     3                             233,513           306,733               

 Supplies Gen Exp  8,197                       2,699                     422,338                   2,438                       1,867                     420                         1,822                       1,519                441,301               

 Travel  19,056                     1,535                       544                   21,134                 

 Marketing Costs  ‐                            

 Rental & Leases  1,337                     9,715                       640                          11,692                 

 Contract Services  168,243                   356,843                   1,085                     53,910             580,081               

 Utilities  81,219                     81,219                 

 Departmental Expenses  750                          1,831,122               270                         ‐                        1,832,142            

 Instructional & Other Materials  600                          4,033                       2,454                       1,291                     2,817                       11,196                 

 Maintenance & Repair  39,310                     660                         39,970                 

 Indirect Cost Expenditures  ‐                            

 Exemptions and Waivers  150                          150                       

 Capital Outlay  285,406                   285,406               

 Transfer  ‐                                ‐                            

Net Income /(Loss) FY13 718,978              57,779              ‐                       6,909                 (1,792,497)          (58,577)               (9,718)                 1,946                 2,048                 13,176                ‐                         115,855        (944,101)          

17,294,913         (686,346)           36,165            905,877             (8,017,657)          (782,750)             (1,372,642)          (74,352)             35,965               (69,320)               203,712             923,204        8,396,770        

*Discretionary Funds

30

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of November 30, 2012

Auxiliary Funds*

Net Fund Balance 

Page 38: Fs2012 november

HOUSTON COMMUNITY COLLEGE SYSTEMAuxiliary Budget By Fund

as of November 30, 2012

3110‐ Student 

Vending 

Commission

3111‐Auxiliary 

Student 

Activities

3112‐Auxiliary 

Student Athletic 

Fee Subtotal Grand Total

Fund Balance 8/31/12 227,335            594,123          1,584,968         2,406,426           11,747,296        

FY2013 Revenue  30,095                   640,279              473,618                 1,143,991               5,592,734          

 Salaries  700                        48,493                   49,193                     49,193               

 Benefits  9,851                     9,851                       9,851                  

 Supplies Gen Exp  4,597                     124,820              70,953                   200,370                   200,370             

 Travel  290                        1,793                  21,373                   23,455                     23,455               

 Marketing Costs  ‐                                ‐                          

 Rental & Leases  ‐                                ‐                          

 Contract Services  5,312                  24,860                   30,172                     30,172               

 Utilities  ‐                                ‐                          

 Departmental 

Expenses 

2,750                     1,500                  4,250                       4,250                  

 Instructional & 

Other Materials 

‐                                ‐                          

 Maintenance & 

Repair 

‐                                ‐                          

 Indirect Cost 

Expenditures 

‐                                ‐                          

 Exemptions and 

Waivers 

1,553                     5,250                  6,803                       6,803                  

 Capital Outlay  ‐                                ‐                          

 Transfer  ‐                                ‐                          

Net Income /(Loss) FY13 20,206              501,604          298,088             819,898              (124,203)            

247,541            1,095,727       1,883,056         3,226,324           11,623,093        

*Funds can only be used for services related to students

31

Net Fund Balance 

Student Auxiliary Funds ‐ Restricted*

Page 39: Fs2012 november

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total AwardProgram Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Education

Direct Programs:

Higher Education ‐ Institutional Aid 5 yrs. 84.031A 26,513               450,183            1,542,133         9/30/2014 10/1/2009

TRIO ‐ Student Support Services 5 yrs. 84.042 91,097               436,682            2,078,155         8/31/2015 9/1/2010

TRIO ‐ Upward Bound ‐ Southeast 4 yrs. 84.047 1,399                 16,669               1,172,562         ^   8/31/2012 9/1/2007

TRIO ‐ Upward Bound ‐ Southeast 5 yrs. 84.047 58,326               291,335            1,465,615          8/31/2017 9/1/2012

TRIO ‐ Upward Bound ‐ Central 5 yrs. 84.047A 92,757               410,056            2,845,845         5/31/2017 6/1/2012

Astra Stem Grant 3 yrs. 84.120A 40,214               293,375            881,873            9/30/2014 10/1/2011

Vast Academy TPSID 5 yrs. 84.407A 111,989            862,617            2,498,250         9/30/2015 10/1/2010

Pass‐Through From:

Texas Educational Agency

Adult Education ‐ State Grant Program 1 yr. 84.002 1,389,810         5,084,289         5,542,104         6/30/2013 7/1/2012

Adult Education ‐ State Grant Program 1 yr. 84.002 22,971               96,974               102,000            6/30/2013 7/1/2012

University of St. Thomas

Higher Education ‐ Institutional Aid 5 yrs. 84.031C 157,849            870,174            3,243,025         9/30/2016 10/1/2011

 Texas Higher Education Coordinating Board 

Vocational Education ‐ Basic Grants to States 1 yr. 84.048 82,373               1,051,987         1,051,987         8/31/2013 9/1/2012

College Access Challenge Grant Program 1 yr. 4 mos. 84.378A 15,000               26,707               208,548            8/13/2012 4/6/2011

College Access Challenge Grant Program 1 yr.  84.378A 19,994               169,803            171,798            8/13/2013 8/14/2012

Total Department of Education 2,110,291$        10,060,852$      22,803,895$     

U.S. Department of Agriculture

Direct Programs:

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 3,217                 36,414               298,538            ^   8/31/2013 8/1/2009

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 3,324                 26,428               244,000            ^   8/14/2013 8/15/2010

    Hispanic Serving Institutions Education Grants 2 yrs. 10.223 9,231                 135,610            445,000            ^   8/31/2013 9/1/2010

Hispanic Serving Institutions Education Grants 2 yrs. 10.223 29,695               202,726            245,000            8/31/2013 9/1/2011

Pass‐Through From:

Texas A & M University‐Corpus Christi 2 yrs 10.223 4,803                 30,435               48,700               ^   8/31/2013 9/1/2010

Total Department of Agriculture 50,270$             431,613$           1,281,238$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

32

HOUSTON COMMUNITY COLLEGE

as of November 30, 2012

Date Grant

Schedule of Federal Awards *

FY12 ‐ 13

Page 40: Fs2012 november

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U.S. Department of Housing and Urban Development

Direct Programs:

Pass‐Through From:

Child Care Council of Greater Hous. Inc

Community Development Block Grant‐Entitlement Grant 1 yr 14.218 8,203                 17,309               32,000               ^12/31/12 8/1/2011

Total Department of Housing And Urban Development 8,203$               17,309$             32,000$            

Department of Labor

DOL‐Logistics Technician Training 3yrs. 41,081$             159,097            327,404            6/30/2013 7/1/2010

Pass‐Through From:

Texas Workforce Commission

Recovery ‐ WIA Dislocated Worker Formula Grant 1 yr. 17 10,841 61,804 243,163 9/30/2012 7/1/2011

Total Department of Labor 51,923$             220,901$           570,567$          

Department of State

Pass‐Through From:

Northern Virginia Community College 1 yr 19 16,820               73,538               109,830            5/31/2013 3/8/2012

Total Department of State 16,820$             73,538$             109,830$          

National Science Foundation

Direct Programs:

 Education and Human Resources 4 yrs. 47.076 8,854                 64,204               423,300            1/31/2013 2/15/2009

Pass‐Through From:

University of Houston System

Education and Human Resources 5 yrs. 47.076 6,000                 47,212               190,000            8/31/2013 9/1/2011

Total National Science Foundation 14,854$             111,415$           613,300$          

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

33

as of November 30, 2012

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

Date Grant

FY12 ‐ 13

Page 41: Fs2012 november

Federal Grantor Perform‐ Federal

Pass‐through Grantor ance CFDA Total Budget Total Award

Program Title Period Number Expenditures Amount Amount** Ends Starts

U. S. Department of Energy

Energy Sector Grant (SECO) 8 mos 81.041 37,180               63,836 460,480 ^  9/30/2012 5/10/2010

Solar Energy Technical Program 13 mos 81.087 55,603 591,069            750,000            12/30/14 11/1/2012

Total U. S. Department of Energy 92,783$             654,905$           1,210,480$       

U. S. Department of Health and Human Services

Direct Programs:

Head Start 5 yrs. 93.600 15,204 34,617               936,660            9/29/2013 9/30/2008

Head Start 5 yrs. 93.600 23,058 187,332            936,660            9/29/2013 9/30/2008

Pass‐Through From:

Texas Education Agency

Temporary Assistance for Needy Families 1 yr. 93.558 10,178               10,200               208,614            8/31/2012 9/1/2011

Temporary Assistance for Needy Families 1 yr. 93.558 44,391               244,749            244,749            8/31/2013 9/1/2012

YMCA of Greater Houston

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 19,869               82,578               374,938            9/30/2012 10/1/2011

Refugee and Entrant Assistance ‐ Targeted Assistance Grants 1 yr. 93.584 39,101               85,527               374,938            9/30/2013 10/1/2012

Pitt Community College

Health Information Tech Professionals 2 yrs. 93.721 109,966            461,664            1,287,568         4/1/2013 4/2/2010

University of Texas at Austin

Block Grants for Prevention and Treatment of Substance Abus 1 yr. 93.959 ‐                           9,015                 22,000               9/29/2012 9/30/2011

Total Department of Health and Human Services 261,767$           1,115,681$        4,386,127$       

U. S. Department of Homeland Security

Direct Programs:

 Homeland Security 2 yrs. 97.062 7,468                 58,856               250,000            ^12/31/12 9/1/2010

Total Department of Homeland Security 7,468$               58,856$             250,000$          

Total  Federal Financial Assistance 2,614,377$        12,745,070$      31,257,437$     

* Scholarship grants are not included in this schedule.

**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

^ No Cost Extension

HOUSTON COMMUNITY COLLEGE

Schedule of Federal Awards *

as of November 30, 2012

FY12 ‐ 13

34

Date Grant

Page 42: Fs2012 november

Perform‐

ance Total Budget Total Award

Program Title ‐ State Grantor Period Expenditures Amount Amount** Ends Starts

Texas Education Agency

Adult Education 1 yr. 24,642$             24,615$             1,165,635$        8/31/2012 9/1/2011

Adult Education 1 yr. 347,473            1,165,635         1,165,635         8/31/2013 9/1/2012

Drop‐Out Recovery Program 18mos 960                     43,998               194,000            2/28/2013 8/1/2011

Drop‐Out Recovery Performance Pay 1 yr. 14,613               181,750            181,750            until expended 6/1/2011

Temporary Assistance for Needy Families 1 yr. 16,311               16,869               111,445            8/31/2012 9/1/2011

    Temporary Assistance for Needy Families 1 yr. 25,575               131,283            131,283            8/31/2013 9/1/2012

       Total Texas Education Agency 429,575$           1,564,151$        2,949,748$       

Texas Higher Education Coordinating Board

Adult Basic Education Innovation Grant 1 yr. 71,070$             158,314            500,000            8/31/2013 9/1/2012

Collegiate G‐Force Mentorship 1 yr. ‐                           27,148               50,000               8/31/2013 9/1/2009

First Year Experience 13 mos. 5,577                 8,709                 50,000               until expended 7/18/2011

Nursing Shortage Reduction Program 4 yrs. ‐                           112,280            157,314            8/31/2014 9/1/2010

Nursing Shortage Under 70 Program 1 yr. 4,643                 383,891            383,891            8/31/2013 9/1/2012

Rider 58 ATCP School Grant 8 1/2 mos. ‐                           13,960               46,360               until expended 12/18/2009

Pass‐Through From:

University of Tex Health Science Center

Navigator Grant 1 yr. 25,262               51,452               129,195            ^11/30/2012 6/1/2011

       Total Texas Higher Education Coordinating Board 106,552$           755,754$           1,316,760$       

Texas Workforce Commission

Skills Development ‐ Skills for Small Business Initiatives 1 yr. ‐                           18,791               20,000               5/31/2013 6/1/2012

The Methodist 14 mos. 46,618               902,965            902,965            10/31/2013 8/20/2012

Pass‐Through From:

       Total Texas Workforce Commission 46,618$             921,756$           922,965$          

Total State Financial Assistance 582,745$           3,241,660$        5,189,473$       

* Scholarship grants are not included in this schedule.**Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

Date Grant

as of November 30, 2012

Schedule of State Awards *

FY12 ‐ 13

35

HOUSTON COMMUNITY COLLEGE

Page 43: Fs2012 november

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

21st Century FY 12 10 mos. ‐                           1                         984                    10/31/2012 1/3/2012

Achieving the Dream ‐ Intiative 1 yr.‐cont. ‐                           9,433                 20,000               until expended 12/1/2009

Achieving the Dream ‐ Gates Foundation 3 yrs. 42,579               262,135            743,000            ^12/31/2012 7/1/2009

Adult Education/We Can Work 1 yr. ‐                           ‐                         11,500               until expended 1/1/2010

American Chemical Society 8 mos 138                     248                    500                    until expended 9/1/2011

AT&T High School Success Grant 1 yr. 7 mos. ‐                           25,216               35,000               until expended 1/31/2010

Bank of America  2 yrs. ‐                           316                    50,000               until expended 5/1/2008

Baylor Summer Interns 1 yr. ‐                      1,638                 60,000               until expended 5/1/2010

Brown Foundation 1 yr.‐cont. ‐                      ‐                         100,000            until expended 2/1/2008

Bulletproof Vest Partnership Program 1 yr.‐cont. ‐                      ‐                         5,345                 until expended 9/1/2004

Capital Idea project 1 yr. 1,965                 73,794               341,000            until expended 8/1/2010

Carnegie FDTN 1 yr 4,563                 30,901               67,500               12/31/2012 1/1/2012

Citibank ‐ College Connection Program 1 yr. ‐                      20,475               41,718               until expended 8/15/2007

Civic Ventures 1 yr. 1 mo. ‐                      1,246                 25,000               until expended 7/1/2010

Dow Male Minority Initiative Summer Prog. 1 yr. ‐                      12,588               23,986               1/2/2013 1/2/2012

Early College High School (Southeast) ‐ Gates/Dell 5 yrs. ‐                           6,779                 400,000            until expended 6/10/2005

Financial Empowerment Strat. Student Success 2 yrs. 1,181                 60,808               63,050               12/31/2013 1/1/2012

Goldman Sachs Grant ‐ Phase I 5 yrs. 219,237            765,458            1,786,121         5/31/2016 1/3/2011

Gulf Coast Pass 3 yrs. 29,097               227,625            318,750            12/31/2014 1/1/2012

Hammill FDTN ‐ Veterans Grants 2 yrs. ‐                           11                      18,191               until expended 9/1/2010

Houston Endowment Grant 3 yrs. ‐                           814                    267,000            until expended 11/16/2005

Houston Pathways Initiative 2 yrs. 21,760               345,471            1,580,000         8/31/2013 3/26/2009

Interlocal Metro (PSI) 10 yrs. ‐                           45,000               200,000            8/23/2017 8/23/2008

Interlocal Stafford ‐ City of Stafford 1 yr. 12,800               161,986            161,986            until expended 10/1/2010

KBR Veterans Orientation 1 yr.‐cont. ‐                           5,540                 19,685               until expended 9/1/2008

Kresge Fdtn‐Coordinator/Evaluation 1 yr. 15,399               17,221               82,450               until expended 9/1/2011

Kresge Fdtn‐Parent Academy 1 yr. 5,667                 40,254               89,320               until expended 9/1/2011

Kresge Fdtn‐Veterans Grant 1 yr. 26,146               187,996            187,996            until expended 9/1/2011

MDRC ‐ Learning Community Demonstration Grant ‐ Northeast 4 yrs. ‐                           26,495               60,233               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Southeast 4 yrs. ‐                           738                    75,000               until expended 11/1/2007

MDRC ‐ Learning Community Demonstration Grant ‐ Central 4 yrs. ‐                           385                    33,000               until expended 11/1/2007

Metlife Caregiving for Older Americans 1 yr.‐cont. ‐                           18,012               23,855               until expended 7/1/2007

Microsoft Elevate America 1 yr. 1,481                 31,985               34,969               3/20/2013 3/20/2012

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

FY12 ‐ 13

36

HOUSTON COMMUNITY COLLEGE

Schedule of Local Government and Private Awards *

as of November 30, 2012

Page 44: Fs2012 november

Program Title ‐ Private Grantor Period Expenditures Budget Award Amount** Ends Starts

Mobile Go Center ‐ Valero 1 yr.‐cont. ‐                           494                    7,293                 until expended 9/1/2007

National Articulation & Transfer Network Council(NATN) 1 yr.‐cont. ‐                           29,273               29,273               until expended 4/1/2005

North Forest GED Preparation 3 mos 244                     6,799                 25,000               until expended 10/1/2011

St. Luke's Episcopal Health Charities Immunization Fellowship 2 yrs. ‐                           4,178                 142,650            until expended 9/10/2008

Susan B Komen Breast Cancer Initiative 1 yr. ‐                           6,610                 123,230            until expended 4/1/2010

Texas Pioneer Foundation Grant 1 yr. 238                     2,851                 23,117               12/31/2012 1/26/2012

Vast Job Developer 1 yr. 1,910                 20,299               94,898               until expended 11/1/2009

Verizon Foundation Grant 1 yr. ‐                           510                    12,510               until expended 1/1/2010

Walmart ‐ Minority Male Initiative 1 yr. ‐                           25,215               40,000               until expended 9/1/2009

Washington Mutual 1 yr.‐cont. ‐                           16,717               31,700               until expended 9/1/2006Total Private Financial Assistance 384,407$           2,493,514$        7,456,810$       

* Scholarship grants are not included in this schedule.

** Award amount for the total grant period.  For example, if grant is for three years, the award amount will cover the three years.

37

         HOUSTON COMMUNITY COLLEGE ‐ Schedule of Local Government and Private Awards *

Schedule of Local Government and Private Awards * continued

as of November 30, 2012

FY12 ‐ 13

Page 45: Fs2012 november

CHANCELLOR

8         

DEPUTY CHANCELLOR

15       

VICE CHANCELLOR INSTRUCTION

5         

New Postions

38

Israel Salazar

Replacement‐External ‐        

3       

Manuel Ramos

Scott Godley

Nov

TLR

Replacement‐Internal Interim ‐           ‐        NewPosition‐Internal NewPosition‐External1       

Kimberly Davis Oct

4       

Instructional Designer

NewPosition‐External

New Position‐Hired External

Nov

Replacement‐External

Instructional

Workforce Initiatives Program Manager

New Position‐Budget 12‐13‐Hired External

Oct

Instructional Designer

6       4       

New Position‐Budget 12‐13‐Hired External

2       Replacement‐Internal

Jesse Shelton

NewPosition‐Internal

Police DepartmentKeith Harris Police Trianee

VC Instr

Interim ‐           Deputy Chancell

Police Trianee

Antonio Hill

Oct

Nov

Distance Education Advisor New Position‐Budget 12‐13‐Hired External

DOEL English Language Skills Instructor

Repl Deshaunta Stewart‐Hired Internal

Aracelia Saucedo

New Position‐Budget 12‐13‐Hired External

Supvervisor New Position‐Budget 12‐13‐Hired External

Interim Dir., Resource & Economic Dev New Position‐Budget 12‐13‐Hired Internal

Nov

OctPolice Department

Repl John Chen‐Hired External‐TempManager

New Position‐Budger 12‐13‐Hired External Nov

Nov

HR‐Compensation

James Lindsey

Oct

Houston College Community

2012‐2013 Positions

Employee Name Department Month

SepBarlett Sheinberg Resource & Economic Dev

Procurement

CommentsJob Title

Nov

Nov

Wanda Pleasant New Position‐Budget 12‐13‐Hired External

Supvervisor

Procurement

New Position‐Budget 12‐13‐Hired External

Procurement

Interim 1          1        NewPosition‐External‐         1       

Nov

Nov

Buyer

Procurement

Freddy Conde

Mimi Lemmons Procurement Sr. Buyer

Procurement

Nov

Procurement

Sr. Buyer

Buyer New Position‐Budget 12‐13‐Hired External

Thomas Richardson

Kerry Doucette

Reginald Harmon

Alfred Kessellie, II

NovNew Position‐Budget 12‐13‐Hired External

Sr. Buyer Repl Shiela Perla‐Hired External

Edwin Johnson Police Department

My'Keshia Robinson

Ules Harris

Bapakaye Tamuno

Executive Secretary

Police Department

Oct

Jeremy Hardeway

Security Officer Repl Kenneth Bridges‐Hired External

Oct

Police Trianee

NewPosition‐Internal 5       Replacement‐InternalChancellor Replacement‐External

Patricia Thompson

Sep

Police Department Corporal Repl Timothy Ramirez‐Hired Internal

Repl Willie Rostan‐Hired External Oct

Repl Anthony Maxie‐Hired Internal

Repl Alice Binkley‐Hired Internal

Security Officer

Maria Alarcon

Sep

Police Department Corporal New Position‐Budger 11‐12‐Hired Internal Sep

Police Department

Shirley Voisin

Repl Victor Fisher‐Hired External

Police Department

Police Department

Police Department

Tobin Anderson

Navidad Martinez

Sep

Corporal

Oct

Corporal New Position‐Budger 11‐12‐Hired Internal

Security Officer Repl Grayland Jones‐Hired External

Repl Majid Iqbal‐Hired ExternalPolice Department Security Officer

New Position‐Budger 12‐13‐Hired External

Accounts Payable Accounting Specialist

Nov

Business Affairs

New Position‐Budger 12‐13‐Hired External

Police Department

Security OfficerKatherine McCabe

Repl Norma Jackson‐Hired Internal

Oct

Page 46: Fs2012 november

VICE CHANCELLOR STUDENT SUCCESS

8         

VICE CHANCELLOR INFORMATION TECHNOLOGY

1         

CENTRAL

5         

NORTHWEST

New Postions

39

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Construction

Oct

Repl Mallikarjun Shintri‐Hired External‐Temp Oct

Transcript Evaluator

COO

‐        

New Position‐Hired External

NewPosition‐External 4       

3       

Repl Samuel sannl‐Hired External

Repl Bonnie Gallup‐Hired External‐Temp

Sep 

Oct

Brigid Wilson

Technician Services

Student Services

NewPosition‐Internal

Larke Clishe

Eva Foster English

Recording Imaging Nov

Leslie Dye

Randi Sprouse

Sep

Thomas Tankersley

Bharat Sutaria

‐        

Oct

Repl Joaquin Torres‐Hired External‐Temp

Nellie Bradley

New Position‐Hired External

Repl Carlana Brooks‐Hired External‐Temp

Fine Arts

Application Dev

Admissions

1          

Dir., Outreach & Student Development

Interim

Instructor

Steven Cohan

Repl Kimberly Crocker Montgomery‐Hire External‐Temp

Oct

Senior Advisor Oct

Student Life Coordinator

Student Services

Instructor

1       

Repl Rima Adil‐Hired External‐Temp

Sep 

Rima Adil

Repl Manhal Chbat‐Hired External‐Temp

Testing AssociateInstruction‐Testing

Public Relations

Oct

Instructor

New Position‐Budget 12‐13‐Hired External

Laleh Golestani

InstructorEngineering

Hardware/Software Technician

Mona Terrell Registrar

Outreach & Student Dev

Transcript Evaluator

Nov

New Position‐Hired External

VA/Student Support Svcs Advisor New Position‐Budget 12‐13‐Hired Internal

Kevin Lacey

Registrar

Transcript Evaluator

Henry Thomas

Oct

Transcript Evaluator

Repl Shantay Grays‐Hired External

Ashley Martin

New Position‐Hired External

Paul Donaldson Sep     

New Position‐Hired External

New Position‐Budget 12‐13‐Hired Internal‐Temp

Oct

Registrar

Wanda Taft

Interim

Repl David Lin‐Hired Internal

Student Information Svcs Advisor Repl Laura Collins‐Hired External Sep     

Oct

Oct

Registrar

Insternational Student

NewPosition‐InternalReplacement‐ExternalVCSS

Sep

Enrollment Service Assistant

Sandra Brooks Enrollment Service Assistant Repl Makeba Brown‐Hired External‐Temp

Sep 

NewPosition‐External 1       

Christine Moore

Instructor

Director of Public Relations

System Analyst

2       

Student Services Interim Dean of Student Dev

Instructor

Oct

Nov

Oct

Repl Johnny Watson‐Hired External‐Temp

Repl Frank Colmenero‐Hired External

‐         ‐           Replacement‐Internal

Cashier II

Paul Brady

Anthony Hilliard

Central NewPosition‐Internal

‐           

Sep 

Anika Chowdhury

Repl Nellie Bradley‐Hired Internal‐Temp

Accounting

New Position‐Budget 12‐13‐Hired Internal

Sep 

Replacement‐Internal ‐        

Community Outreach CoordinatorCOO

Lusinda Eshelman

Sep 

Replacement‐External

Biology

‐        VCIT ‐        Replacement‐External

Repl Cheryl Johnson‐Hired Internal

Oct

Replacement‐Internal

Dora Whiteside

Repl Denny Smith‐Hired External

VAST

Sonya Sneed

Student Services

Interim

ADA Counselor

Jason Wilson

James Connery

Repl Stella Villarreal‐Hired External‐Temp

Instructor

Student Services

‐        NewPosition‐External

Page 47: Fs2012 november

NORTHWEST continued

21       

NORTHEAST

10       

SOUTHWEST

12       

New Postions

40

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Public Relations

NewPosition‐External 3       

Dean Instruction

William Nicholson

Nov

Repl Laura Wilborn‐Hired External

Nov

Secretary II

Student Services New Position‐Budget 12‐13‐Hired InternalGoddrick Austin

Jose Cruz

Kelli Caraway

NORTHEAST

COO

Southwest

1       

New Position‐Budget 12‐13‐Hired Internal

Oct

Nov

Sep

Northwest

New Position‐Budget 12‐13‐Hired Internal

Sep

Sep

David Jones

Instructor

SepIfeanyi Oramulu

Hosein Tahvillian Electronic Engineering

Ronald Dewlen

Instructor Repl Homer Stewart‐Hired External‐Temp

Retention Specialist Repl Joseph Willis‐Hired Internal

Lesley Savoy‐Green Enrollment Services Associate

Sherin Isaac Student Services

Financial Aid Repl Diane Wilborn‐Hired External

Senior Advisor

Student Services Repl Alonia Whitmore‐Hired Internal

New Position‐Budget 12‐13‐Hired Internal

COO

Instructor

Repl Bridgette Bauman‐Hired External

Betty Keller

Repl John Jagdish‐Hired External‐Temp

Office Manager

Cybele Ayaquica Nov

Lorraine Donovan

Student Dev/Advising

Oct

David Stacy

Sabiha Mir

Todd Duplantis

Wendy Allen

Oct

Instructor

Senior Advisor

Oct

Nov

Christine Moore

Brandi Gaza

Dashiel Geyen

Aketa Guillory

Wendy Robbins

Counseling

Repl Belinda Defalco‐Hired Internal

‐           Replacement‐ExternalReplacement‐Internal

Student Development

1        3       NewPosition‐External6        NewPosition‐Internal

Repl Margo Reece‐Hired External‐Temp

2       

Instructor

Interim

New Position‐Budget 12‐13‐Hired External

New Position‐Budget 12‐13‐Hired External

Repl Martha Barrera‐Hired External

Advisor

Nov

Nov

Nov

Nov

Student Dev/Advising Advisor

Digital Communication

1       

New Position‐Budget 12‐13‐Hired Internal

Interim‐        NewPosition‐External

New Position‐Budget 12‐13‐Hired External

Student Dev/Advising

Academic Instructor

Senior Advisor

Repl Adballah Cherif‐Hired External‐Temp

Counselor New Position‐Budget 12‐13‐Hired Internal

Campus Service Technician

Public Relations

English

Senior Advisor

Technology

‐           

Oct

Repl Paul Roberts‐Hired External‐Temp

6        NewPosition‐Internal

Student Dev/Advising

Digital Communication Instructor

Director, Public Relations

‐           

Sep

Nov

Replacement‐Internal Replacement‐External3       

New Position‐Budget 12‐13‐Hired Internal

Repl Margie Ricks‐Hired External‐Temp

Nov

Student Services Oct

Nicki Norman

Electronic Engineering Instructor Repl Nicky Haddock‐Hired External Sep

Repl Pratap Talusani‐Hired External

Student Services

Student Services

Advising Manager

Technology

Sep

Instructional

Sep

Replacement‐Internal InterimReplacement‐External

Nov

Nov

Repl Lois Avery‐Hired External

Student Services

Khansaa Almansor

Secretary II

14     NewPosition‐Internal

Repl Barbara Smith‐Hired Internal

Corey Aeck Advisor

Nov

3       

Financial Aid Associate

Student Recruiter

Olivia Blake COO 

Contrice Kendall Student Services Advisor New Position‐Budget 12‐13‐Hired Internal Nov

Sherhonda Le

Nov

Repl Adriana Jimenez‐Hired External

Advisor

Courtney Martinez

Advisor

Jaime Flores Student Services New Position‐Budget 12‐13‐Hired Internal

Page 48: Fs2012 november

SOUTHEAST

4         

COLEMAN

7          

EXTENDED LEARNING, DIVISION OF‐          

Adm. Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 37       

College Totals Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 59       

Grand Total Replacement‐Internal Replacement‐External NewPosition‐Internal NewPosition‐External Interim 96       

Over all Total

New Postions

41

Houston College Community

2012‐2013 Positions

Employee Name Department Job Title Comments Month

Rita Callahan

Micalyn Flagg

Ashley Nichols

Daniel Guzman

Southeast

LaTrista Funchez Student Services

Secretary II

Repl Vivian Flores‐Hired External

Nov

Financial Aid

Nancy Garcia

Christy Muniz

Repl Tara Webb‐Hired External

Oct

11     47     10     24     2          

8        1          

NewPosition‐Internal 1        NewPosition‐External

‐         NewPosition‐Internal ‐         NewPosition‐External ‐         Interim ‐           

5        7       

3        16     1          6       

Interim ‐           5       

Ex. Learning

‐        

Replacement‐Internal

Replacement‐External

‐        

1       

Replacement‐External

96    

38    

Replacement‐InternalColeman

9       

Veronica Mckissic

Jason Smith

Instructor

Interim ‐           

Repl Maria Reyes‐Hired External

Repl Independencia Delacruz‐Hired External

Learning Success Coordinator

SepChlinical Simulation Lab Technician

Caroline Couto‐Ortiz

Charmaine Lewinson‐Evans

Repl Verlicia Pope‐Hired External

Student Services

‐        Replacement‐Internal

Nov

Repl Sharon McCowan‐Hired External

Health Science SepNew Position‐Budget 12‐13‐Hired ExternalDental Hygiene Operations Assistant

Simulation Center

Sep

Sep

4       

Oct

Advisor

Repl Roxine Simms‐Hired External‐Temp

‐        

Nov

NovVocaitonal Nursing

Replacement‐External

Student Services

Natural Sciences

NewPosition‐Internal

Vocaitonal Nursing

‐        

Instructor

New Position‐Budget 12‐13‐Hired Internal

NewPosition‐External

Repl Pearlie Watts‐Hired External

Vocaitonal Nursing Instructor

Instructor

Vocaitonal Nursing

Financial Aid Associate

New Position‐Hired External

Student Life Coordinator

Oct

Page 49: Fs2012 november

HOUSTON COMMUNITY COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,361    1,514    1,534   

2011‐2012 1,451    1,582    1,598    1,564    823       1,530    1,573    1,598    1,576    1,003    1,098    955      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 1,401    1,426    1,449   

2011‐2012 1,429    1,415    1,425    1,327    1,407    1,429    1,396    1,404    1,410    1,397    1,391    1,429   

F

T

E

F

T

E

42

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

 1,800

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

 1,600

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 50: Fs2012 november

CENTRAL COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 238       270       272      

2011‐2012 254       293       296       293       159       279       298       300       291       184       204       178      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 155       159       164      

2011‐2012 161       158       165       145       155       163       157       157       158       156       154       161      

43

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 51: Fs2012 november

COLEMAN COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 108       107       113      

2011‐2012 115       112       113       109       82          109       107       110       110       99          98          84         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 56          55          55         

2011‐2012 58          58          59          55          56          58          55          55          57          54          54          55         

F

T

E

F

T

E

44

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 52: Fs2012 november

NORTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 281       310       310      

2011‐2012 267       292       293       307       155       323       330       334       335       198       224       190      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 131       135       143      

2011‐2012 104       106       108       108       129       138       122       129       130       132       131       138      

F

T

E

F

T

E

45

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 53: Fs2012 november

NORTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 187       208       212      

2011‐2012 200       211       216       207       112       204       212       212       211       129       137       124      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 126       125       128      

2011‐2012 127       126       128       118       121       128       124       127       126       126       126       128      

F

T

E

F

T

E

46

 ‐

 50

 100

 150

 200

 250

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 54: Fs2012 november

SOUTHWEST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 318       385       375      

2011‐2012 380       433       435       422       183       377       382       386       382       229       252       217      

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 152       154       161      

2011‐2012 185       184       182       145       146       155       144       150       152       151       147       153      

47

F

T

E

F

T

E

 ‐

 50

 100

 150

 200

 250

 300

 350

 400

 450

 500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 55: Fs2012 november

SOUTHEAST COLLEGEFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 130       160       164      

2011‐2012 143       168       173       169       77          161       178       183       179       101       120       95         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 96          103       104      

2011‐2012 99          96          97          86          94          98          91          95          96          99          96          101      

F

T

E

F

T

E

48

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

 140

 160

 180

 200

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 20

 40

 60

 80

 100

 120

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 56: Fs2012 november

Division of Extended Learning (DOEL)FTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 90          67          79         

2011‐2012 85          69          68          56          55          72          63          67          64          59          57          64         

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 79          81          81         

2011‐2012 78          79          79          75          79          80          77          79          79          79          78          81         

F

T

E

F

T

E

49

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

 100

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 10

 20

 30

 40

 50

 60

 70

 80

 90

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 57: Fs2012 november

DISTRICTFTE Comparison Year‐To‐Date Thru November 30, 2012 by Type(Full‐Time Employee Equivalent) 

FACULTY FTE

Faculty SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 8            7            8           

2011‐2012 7            4            4            1            ‐             5            4            5            3            4            4            3           

STAFF FTE

Staff/Lib/Cou SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

2012‐2013 606       612       614      

2011‐2012 616       609       608       595       627       609       625       612       614       601       605       612      

F

T

E

F

T

E

50

 ‐

 1

 2

 3

 4

 5

 6

 7

 8

 9

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 100

 200

 300

 400

 500

 600

 700

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 58: Fs2012 november

HOUSTON COMMUNITY COLLEGEDuplicated Headcount Comparison Year‐To‐Date Thru November 30, 2012 by Type

FACULTY HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 787       795       795      

12‐13 PT 1,992    2,361    2,491   

12‐13 Total Fac 2,779    3,156    3,286    ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 792       797       793       788       793       785       784       782       783       768       757       794      

11‐12 PT 1,911    2,334    2,390    2,331    275       2,387    2,391    2,351    2,367    1,075    1,372    679      

11‐12 Total Fac 2,703    3,131    3,183    3,119    1,068    3,172    3,175    3,133    3,150    1,843    2,129    1,473   

STAFF HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 FT 1,238    1,250    1,264   

12‐13 PT 840       833       851      

12‐13 Total Staff 2,078    2,083    2,115    ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            

11‐12 FT 1,256    1,256    1,238    1,235    1,253    1,242    1,249    1,235    1,240    1,201    1,240    1,250   

11‐12 PT 877       879       883       839       629       822       834       828       846       767       790       790      

11‐12 Total Staff 2,133    2,135    2,121    2,074    1,882    2,064    2,083    2,063    2,086    1,968    2,030    2,040   

51

 

S

t

a

f

f

 

Headcount

 

F

a

c

u

l

t

y

Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

 ‐

 200

 400

 600

 800

 1,000

 1,200

 1,400

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 59: Fs2012 november

HOUSTON COMMUNITY COLLEGEUnduplicated* Headcount Comparison Year‐To‐Date Thru November 30, 2012 by Type

UNDUPLICATED HEADCOUNT

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

12‐13 Total  4,475    4,446    4,551   

11‐12 Total  4,543    4,902    4,917    4,833    2,891    4,728    4,814    4,805    4,806    3,373    3,575    3,303   

* Includes Full‐time and Part‐time Faculties, Librarians, Counselors, and Staffs 

52

Unduplicated* Headcount

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

 5,000

SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG

Page 60: Fs2012 november

Non‐current assets:

Restricted cash 6,805$                  

Restricted investment in trust accounts 2,248,349

Lease receivable from HCCS 172,194,009        

Deferred charges ‐ bond issuance costs 2,046,534            

Capital Assets:

Land ‐                         

Other Structures ‐                         

Furniture & equipment ‐                         

Leasehold improvements ‐                         

Construction in process 827,965            

827,965                

TOTAL ASSETS 177,323,661$      

Current liabilities:

Accounts payable ‐ HCC 60,979$                

Accounts payable 5,210                    

Accrued liabilities ‐ interest ‐                             

Current bond payable 3,880,000            

Total current liabilities 3,946,189$          

Non‐current liabilities:

Deposits 440                       

Arbitrage payable ‐                             

Unearned interest income (23 years) ‐ HCC 70,298,500          

Premium on bonds 2,209,548            

Bonds payable 105,655,000        

Total non‐current liabilities 178,163,488$      

TOTAL LIABILITIES 182,109,678        

TOTAL NET ASSETS ‐ restricted (4,786,017)$         

PFC 1

Houston Community College ‐ Public Facility CorporationStatement of Net Assets

Cash Basis ‐ Interim Period

as of November 30, 2012

ASSETS

LIABILITIES

Page 61: Fs2012 november

Cash Flows from Capital Financing Activities

Receipt from HCCS for lease payment 2,538,004$     

Purchases of capital assets (865,847)          

Payment on capital debt ‐ principal and interest (2,538,696)      

Net cash provided (used by) in financing activities (866,539)          

Cash Flows from Investing Activities

  Interest income 980

Increase (decrease) in restricted cash and 

restricted investment in trust accounts (865,559)          

Restricted cash and restricted investment in 

trust accounts ‐ beginning of year 3,120,712        

Restricted cash and restricted investment in 

trust accounts ‐ end of period 2,255,153$     

Houston Community College System Public Facility CorporationStatement of Cash Flows

Cash Basis ‐ Interim Period

Three Month Ended as of November 30, 2012

PFC 2

Page 62: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Proceeds from 

2005C Lease Revenue Bond 19,155,000$   

Discount (170,064)        Land Purchase (4,212,644)    Bond Issuance Cost (606,201)        Interest Expense (524,785)        

13,641,306$  Interest Income 1,003,581      Vendor Contract Refund 102,706         Transfer to Payment Account (1,354,990)    

Funds Available 13,392,603$  

Uses of funds:4,092$             4,092$             ‐$ ‐$                   

11,550,643    11,550,643    ‐                      ‐                    Maintenance 393,940          171,324          222,616         ‐                    

6,443              6,443              ‐                    563,928          563,928          ‐                    

7,200              7,200              ‐                      ‐                    27,403            26,326            1,077              ‐                    24,940            24,940            ‐                    44,695            44,695            ‐                      ‐                    

596,787          596,787          ‐                      ‐                    

172,532            8,100                164,432         

Grand Total Uses 13,392,603$   13,004,478$   223,693$        164,432$     

Net Available ‐$                     

  PFC requires GMP before inception.

Total Proceeds from Bond

Houston Community College ‐ Public Facility CorporationPublic Safety Instituteas of November 30, 2012

PFC 3

Bank Service ChargesConstruction

Waste Water Management *Geo Technical Services*

Survey*Architect

Engineering ServicesFFE

Contingency

 * Included in GMP 

Site Infrasturcture

Page 63: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

to Date

Encumbrances    

to Date Unexpended

Sources of funds:

Proceeds from 

 2005 A Bonds  11,605,000$   

 Premium Received             492,931 

 Accrued Interest Received               53,425 

 Interest Income                    998 

 Bond Issuance Costs           (391,474)

 Repayment of Loans     (11,392,147)

Funds Available 368,733$        

Uses of funds:

Debt Service 53,425$            53,425$          ‐$                        ‐$                       

Renovation & Construction  169,759            169,759          ‐                          ‐                         

Demolish & Renovate Office 56,244              56,244            ‐                          ‐                         

Furniture & Fixtures 46,857              46,857            ‐                          ‐                         

Legal Fees 42,448              42,448            ‐                         

Grand Total Uses 368,733$         368,733$       ‐$                        ‐$                      

Net Available ‐$                     

Note 1: PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationWestgate (Katy)

as of November 30, 2012

PFC 4

Page 64: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount on Bonds 36,950,000$   

Discount on Bonds (546,238)          

Underwriter's Discount (209,273)

Accrued Interest on Bonds 98,080             

Amount Available 36,292,569$   

Issuance Costs (490,131)          

 Accrued and Capitalized Interest (1,449,023)      

Repair and Replacement (1,000,000)      

Title Fees Capitalized (81,379)            

Amount Available for Project 33,272,036$   

Repayment to HCC (188,006)          

Project Account Balance 33,084,030$   

Administrative & Legal Fees (29,486)            

Interest Income 836,407           

Transfer Cost Issuance 85,509             

Interest Expense on Notes (135,299)          

Funds Available 33,841,161$  

Uses of funds:

Land & Building 17,807,972$    17,807,972$    ‐$                     ‐$                

Maintenance Rehabilitation & 

Deferred Maintenance

12,856,469      12,856,469      ‐                  

CPMS PGAL 211,959            211,959            ‐                  

Facilities Space Programming 214,620            214,620            ‐                  

Furniture, Fixtures & Equipment 1,040,112         1,006,277         14,273            19,562       

Site Infrastructure 971,369            854,984            4,859               111,526     

Architect and Engineering 517,509            428,355            4,632               84,522       

Repair & Maintenance Contingency   ‐ 

per bond requirement

221,151            83,089              2,000               136,062     

Grand Total Uses 33,841,161$   33,463,726$   25,764$          351,672$  

Net Available ‐$                     

  PFC requires GMP before inception.

Houston Community College ‐ Public Facility CorporationHayes Road ‐ Alief Project

as of November 30, 2012

PFC 5

Page 65: Fs2012 november

Total Budget to 

Date

Total Revenues 

/  Expenditures 

To Date

Encumbrances 

To Date Unexpended

Sources of funds:

Principal Amount of 2007 Series Bonds 58,885,000$   

Premium on Bonds 3,094,498        

Underwriter's Discount (346,244)          

Accrued Interest Income‐ Bonds 173,733           

Total Amount Available 61,806,987$   

Issuance Cost (839,837)          

Accrued  and Capitalized Interest (4,632,122)      

Repair and Maintenance Account ‐                        

Amount Available for Project 56,335,028$   

Interest Income on Trust Account 2,496,540        

Interest Expense on Notes (414,601)          

Transfer to Trustee Payment Account (4,712,985)      

Vendor Contract Refunds 230,035           

Sale of Land 569,890           

Funds Available 54,503,907$  

Uses of funds:

Land & Building 10,671,234$    10,671,234$    ‐$                     ‐$                    

Construction Cost‐ Building 18,200,000      18,200,000      ‐                       ‐                      

Construction‐Demolition 494,972            ‐                         ‐                       494,972         

Constuction‐ Site 640,988            636,957            4,030              ‐                      

Site Improvement 14,221,039      13,804,804      416,235          ‐                      

Site Demolition & Abatement 791,298            791,298            ‐                      

CPMS PGAL 1,391,958         1,391,958         ‐                       ‐                      

Site and Infrastructure Design 2,334,840         2,334,840         ‐                       ‐                      

Facilities Space Programming 29,274              29,274              ‐                       ‐                      

Architect and Engineering 1,256,727         1,256,727         ‐                      

Furniture, Fixtures & Equipment 1,828,332         1,818,281         10,051            ‐                      

Library 66,564              66,182              382                 ‐                      

Inspections 214,981            214,981            ‐                       ‐                      

Design Geotech 17,500              17,500              ‐                       ‐                      

Material Testing  24,503              24,503              ‐                       ‐                      

Communications IT‐ PGAL 253,614            253,614            ‐                      

IT Telephone & Communications 790,467            790,467            ‐                      

Surveying  62,398              59,124              3,274              ‐                      

Administrative Expenses 34,505              34,505              ‐                      

Preconstruction Costs 886,377            886,377            ‐                      

Contingency 292,338            186                    ‐                       292,154         

Grand Total Uses 54,503,907$   53,282,810$   433,972$       787,126$     

  PFC requires GMP before inception.

as of November 30, 2012

PFC 6

Houston Community College ‐ Public Facility CorporationNorthline Mall Project