13
Kalabagh Dam Group Members : Hafiz Abdul Taha Malik Muzammil (Group Leader) Moazzan Kamran Mehtab Zafar Abdul Mueed Abubaker Saleh Umar Naseer Abdullah shahab Aqib Rehman HITEC University Taxila ,Pakistan

Kalabagh dam

Embed Size (px)

Citation preview

Kalabagh Dam

Group Members :Hafiz Abdul Taha Malik Muzammil (Group Leader) Moazzan Kamran Mehtab Zafar Abdul Mueed Abubaker

SalehUmar Naseer Abdullah shahab Aqib

Rehman

HITEC University Taxila ,Pakistan

Why Kalabagh

?Introductio

nInfrastructu

re

Advantages Of

Kalabagh Dam

Need For a large Dam

Kalabagh Vs

Bhasha

SolutionWhy

Incomplete?

Importance of

kalabagh dam

Why Kalabagh?

Banana Gardens Malik Ameer Muhammad (Governor) Geology

Introduction

• Proposed Hydroelectric dam• Proposed in 1984• Gross storage Capacity : 7.9MAF• Gross storage Capacity : 7.9MAF• Live storage capacity : 6.1 MAF• Dead Storage : 1.8 MAF

Height 260ft

Catchment Area

110,500miles2

Total Volume of dam 34

million yads

Main spillway Capacity

1.02 million causec

Retention Level=915

ft amsl

Length 11,000ft

Area at retention level 164

miles2

Infrastructure

Kalabagh Dam Vs Bhasha Dam

Dimensions

Electricity Production

Kalabagh Dam

> Bhasha

Dam

Need for Large Dams In Pakistan

World War on Water

Wastage Of 44% Water

Pakistan In Top 10 Countries

Flood Prevention

Modification Of old Irrigation

system

Advantages Of kalabagh Dam

Generation of Power

Growth Of

Economy

Decrease in Load Sheddin

g

Revival of

Industry

Importance For Pakistan

The FutureBeacon Of lightAnswer To our Problems

Why incomple

te

Apprehensions of

Sindh & KPK

British survey Team

Political Conflicts

India's conflict

Migration of

Nowshehra

Create Awareness Among People

Decrease in Height of Dam

No Political

Influence