8
PROJECT: BUILDINGS AROUND THE SCHOOL IRIA ,BIEL,JESICA AND ROGER.

Presentació biel iria_jesica_roger_def

Embed Size (px)

Citation preview

Page 1: Presentació biel iria_jesica_roger_def

PROJECT: BUILDINGS

AROUND THE SCHOOL

IRIA ,BIEL,JESICA AND ROGER.

Page 2: Presentació biel iria_jesica_roger_def

INDEX1-GROUP MEMBERS AND RESPONSIBILITIES.2-SCHOOL LOCATION.3-PROJECT DEVELOPMENT:LOOKING FOR 2D SHAPES AND BUILDINGS AROUND THE SCHOOL.4- PROJECT DEVELOPMENT: BUILDINGS CONSTRUCTION WITH 3D SHAPES.5-PROJECT CONSOLIDATION:MAP DESCRIPTION.6- ENDING OF THE PROJECT.

Page 3: Presentació biel iria_jesica_roger_def

1-GROUP MEMBERS AND RESPONSIBILITIES.

ARCHITECT : Proposes ideas about the designs and construction.

SPOKES PERSON: Asks questions to the teacher and represents the group.

TECHNOWIZARD: Controlling the computer. Takes the mouse and uses the laptop to search information.

PARTICIPETION MANAGER: Makes all members participate and avoids problems.

Page 4: Presentació biel iria_jesica_roger_def

2-SCHOOL LOCATION.

Adress:

Can Fabra Primary School

34-56 Segre street

08030-Barcelona

Page 5: Presentació biel iria_jesica_roger_def

3-PROJECT DEVELOPMENT:LOOKING FOR 2D SHAPES AND BUILDINGS

AROUND THE SCHOOL. BUILDINGS: Can Fabra school Can Fabra library Fountains

Page 6: Presentació biel iria_jesica_roger_def

4- PROJECT DEVELOPMENT: BUILDINGS CONSTRUCTION WITH

3D SHAPES.Can Fabra school: rectangular prism

Can Fabra Library: rectangular prism and tringular prism

Fountains: Small rectangular prism.

Page 7: Presentació biel iria_jesica_roger_def

5-PROJECT CONSOLIDATION:MAP DESCRIPTION.

Buildings: Can Fabra school is next to the Library,

the fountains are in front of the Library.

Jobs: At Can Fabra school, there are: teachers,

pupils, monitors, teacher trainees, a school keeper, cooks and cleaning staff.

There is a librarian at the library.

Page 8: Presentació biel iria_jesica_roger_def

6- ENDING OF THE PROJECT. We can describe the buildings position

and the jobs around the school.